JP6511270B2 - Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same - Google Patents

Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same Download PDF

Info

Publication number
JP6511270B2
JP6511270B2 JP2015004805A JP2015004805A JP6511270B2 JP 6511270 B2 JP6511270 B2 JP 6511270B2 JP 2015004805 A JP2015004805 A JP 2015004805A JP 2015004805 A JP2015004805 A JP 2015004805A JP 6511270 B2 JP6511270 B2 JP 6511270B2
Authority
JP
Japan
Prior art keywords
support
bolt
metal holding
plate
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2015004805A
Other languages
Japanese (ja)
Other versions
JP2016130421A (en
Inventor
あけみ 植田
あけみ 植田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2015004805A priority Critical patent/JP6511270B2/en
Publication of JP2016130421A publication Critical patent/JP2016130421A/en
Application granted granted Critical
Publication of JP6511270B2 publication Critical patent/JP6511270B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、足場板の支持部材及びこれを用いた基礎コンクリート打設時における足場板の支持方法に関するものである。   The present invention relates to a support member of a scaffolding board and a supporting method of the scaffolding board at the time of foundation concrete placement using the same.

一般的に、建物等の建造物を構築する際には、先ず基礎コンクリートを打設し、その後該基礎コンクリートの硬化を待って立ち上がり部のコンクリートの打設が行われる。   In general, when building a building or the like, foundation concrete is first placed, and then the foundation concrete is placed in a stand-up portion after hardening of the foundation concrete.

そして、この基礎コンクリートの硬化には通常1日程度を要し、また、ある程度硬化しなければ作業員がその上を歩くこともできないから、中1日空けてからでなければ立ち上がり部のコンクリートの打設を行うことができない。   And, it takes about 1 day to harden the foundation concrete, and because the workers can not walk on it unless it hardens to a certain extent, it is necessary to leave the inside of the concrete in the rising part if it is not open for 1 day. I can not do the placement.

そして、このように基礎コンクリートが硬化した後で立ち上がり部のコンクリートの打設が行われるため、基礎コンクリートと立ち上がり部のコンクリートとは硬化の度合いが異なる。このため、両者が組織的に完全に一体化することはない。そしてまたこのため両者の境界部分に隙間が出来ることになる。尚、それは、基礎コンクリートの表面(上面)は完全な平滑面ではなく、僅かな凹凸面となっていることによるものである。そして、両者の間に隙間が出来ると、この隙間から侵入した水が中の鉄筋を錆びさせてしまい、鉄筋の寿命を短くするという問題がある。   Then, since the foundation concrete is hardened in this way and concrete in the rising portion is casted, the degree of hardening differs between the base concrete and the concrete in the rising portion. For this reason, the two are not completely integrated systematically. And again, a gap will be created at the boundary between the two. In addition, it is because the surface (upper surface) of the base concrete is not a perfect smooth surface but a slight uneven surface. And, when a gap is formed between the two, the water which has entered from the gap causes the reinforcing steel in the inside to rust, which causes a problem of shortening the life of the reinforcing steel.

また、基礎コンクリートと立ち上がり部のコンクリートとの組織的な完全一体化ができないから、両者の境界部分において強度的に脆いという問題点もある。   In addition, since it is not possible to completely integrate the foundation concrete with the concrete at the rising portion, there is a problem that the boundary between the two is fragile in strength.

また、基礎コンクリートの打設完了から立ち上がり部のコンクリートの打設までに作業を中断しなければならないから、多くの無駄な時間を要し、またこの間において重機(生コンの圧送ポンプ等)のリース料や人件費等も必要であり、その分コストが高くつくことになる。   In addition, since it is necessary to interrupt the work from the completion of the foundation concrete placement to the placement of the concrete at the rising part, it takes a lot of wasted time, and during this time, the lease fee of heavy machinery (such as pump delivery pump) In addition, labor costs etc. are also required, and the cost will increase accordingly.

また、基礎コンクリートを打設した後、未硬化のうちにその表面(上面)をならしたりするために作業員がその上を歩きたい場合があるが、従来はこれを行うこともできなかった。 In addition, after placing foundation concrete, there are cases where workers want to walk on the surface (upper surface) while they are unhardened, but it has not been possible in the past. .

本発明は上記の点に鑑みなされたものであって、基礎コンクリートを打設する前に基礎鉄筋に組み付けておくことにより、基礎コンクリートを打設した後、それが未硬化の状態のうちに、足場板を用いてその上方を作業員が歩いて作業できるようになし、もって、基礎コンクリートが未硬化のうちに立ち上がり部のコンクリートの打設を行うことにより、両者の組織的に完全な一体化を図り、従来における両者の境界部分の隙間の発生をなくし、且つ境界部分の強度を増大させることができ、更にはコンクリートの打設作業に要する時間を大幅に短縮することができると共にコストを大幅に軽減することができ、加えて基礎コンクリートが未硬化のうちにその表面(上面)をならすこともできるようになした足場板の支持部材及びこれを用いた基礎コンクリート打設時における足場板の支持方法を提供しようとするものである。   The present invention has been made in view of the above points, and by putting the foundation concrete on the foundation reinforcing bar before placing the foundation concrete, after placing the foundation concrete, it is in an unhardened state, The scaffolding board enables workers to walk on the upper side of the scaffolding board, so that foundation concrete is unhardened and the concrete of the rising part is casted, so that both are completely integrated And the strength of the boundary can be increased, and furthermore, the time required for placing concrete can be greatly reduced and the cost is significantly increased. Support member of the scaffolding board which can be reduced to the surface, and in addition, the surface concrete (upper surface) can be smoothed while the base concrete is uncured It is intended to provide a method for supporting scaffolding plate in foundation concrete after casting.

而して、本発明は、基礎鉄筋間に交差させて架け渡し、両端部を該基礎鉄筋に針金で固定する鉄棒と、前記鉄棒を上下から挟むようにして位置せしめる、中心部にボルト挿通孔を穿設した一対の金属製挟持板と、前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から挿通し、上端部を上側の金属製挟持板のボルト挿通孔から突出させる支持ボルトと、前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に螺合する2個のナットと、下部側を、下端に行くに従って縮径するテーパー状になし且つ下端部に、前記支持ボルトにおける前記2個のナットの上部に螺合するネジ孔を刻設し、上部側の頂部に、直交して左右に張り出す足場板支承部を形成した連結支持部とからなることを特徴とする足場板の支持部材を要旨とするものである。 And Thus, the present invention is bridged by intersecting between foundation rebar, and the horizontal bar opposite ends for fixing a needle gold to the underlying reinforcing bar and allowed positioned so as to sandwich the iron bar from above and below, a bolt insertion hole in the center The bolt insertion holes of the pair of metal holding plates formed and the metal holding plates of the lower side of the pair of metal holding plates are inserted from the lower surface side, and the upper end portions are bolt insertion holes of the upper metal holding plate The support bolt made to project from the above, two nuts screwed into the part of the metal clamping plate on the upper side of the support bolt that protrudes from the bolt insertion hole, and the lower side is tapered without reducing the diameter toward the lower end And the lower end portion is formed with a screw hole screwed to the upper portion of the two nuts in the support bolt, and a connection support portion in which a scaffold plate bearing portion is formed at the top portion on the upper side Scaffolding characterized by The support member is intended to be subject matter.

また、本発明は上記足場板の支持部材を用い、先ず前記鉄棒を基礎鉄筋に交差させて固定し、次に前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から前記支持ボルトを挿通し、更に該支持ボルトの上部側を上側の金属製挟持板のボルト挿通孔に挿通させ、これら上下一対の金属製挟持板で前記鉄棒を上下から挟むようになし、次に前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に前記2個のナットを螺合し、次に該2個のナットにおける下側のナットを締め付け方向に捻じ回し、前記上下一対の金属製挟持板の対向間隙を狭めて前記鉄棒を挟み付け、次に前記支持ボルトの上端部に、前記連結支持部の下端部に刻設したネジ孔を螺合して連結すると共に、足場板支承部が、それが支承する足場板の軸線と直交する位置となるよう、前記上側のナットを捻じ回して調節し、その後上記と同手順にて所定の距離をおいて基礎鉄筋に足場板の支持部材を組み付け、最後に両足場板の支持部材における足場板支承部に足場板を跨がるように載せ、また打設した基礎コンクリートが作業員が歩ける程度に硬化したとき、足場板を取り外すと共に前記連結支持部を支持ボルトから取り外すようになしたことを特徴とする足場板の支持部材を用いた基礎コンクリート打設時における足場板の支持方法をもその要旨とするものである。   Further, according to the present invention, using the supporting member of the scaffolding plate, the iron rod is first crossed and fixed to the base rebar, and then the lower surface of the bolt inserting hole of the lower metal holding plate in the pair of metal holding plates The support bolt is inserted from the side, and the upper side of the support bolt is inserted into the bolt insertion hole of the upper metal holding plate, and the upper and lower metal holding plates sandwich the iron rod from above and below, Next, the two nuts are screwed into a portion of the upper side of the support bolt that protrudes from the bolt insertion hole of the metal holding plate, and then the lower nuts of the two nuts are twisted in the tightening direction. The opposing gap of the pair of upper and lower metal clamping plates is narrowed to hold the iron rod, and then screw holes connected to the lower end of the connection support are screwed into the upper end of the support bolt and connected. Together with the scaffold plate bearing Adjust the upper nut by twisting to adjust the position orthogonal to the axis of the scaffolding board, then attach the scaffolding board supporting member to the foundation rebar at a predetermined distance in the same procedure as above, and finally, both feet When the foundation concrete placed and placed on the scaffold plate support portion of the support member of the field plate straddling the scaffold plate is hardened enough for the worker to walk, the scaffold plate is removed and the connection support portion is supported by the support bolt The gist of the present invention is a method of supporting a scaffolding board at the time of foundation concrete placement using a supporting member of the scaffolding board, which is characterized in that it is removed from the above.

本発明に係る足場板の支持部材及びこれを用いた基礎コンクリート打設時における足場板の保持方法は、上記の如き構成であるから、基礎コンクリートを打設する前に基礎鉄筋に組み付けておくことにより、基礎コンクリートを打設した後、それが未硬化の状態のうちに、足場板を用いてその上方を作業員が歩いて作業できるようになるものである。したがって、基礎コンクリートが未硬化のうちに立ち上がり部のコンクリートの打設を行うことが可能となり、基礎コンクリートと立ち上がり部のコンクリートとの組織的に完全な一体化を図ることができるものである。そして、これにより従来における両者の境界部分の隙間の発生をなくし、且つ境界部分の強度を増大させることができるものである。また、コンクリートの打設作業に要する時間を大幅に短縮することができると共にコストを大幅に軽減することができ、加えて基礎コンクリートが未硬化のうちにその表面(上面)をならすこともできるようになものである。   Since the supporting member of the scaffolding plate according to the present invention and the method of holding the scaffolding plate at the time of foundation concrete placing using the same are as described above, they should be assembled to foundation rebar before placing foundation concrete. Thus, after placing the foundation concrete, it is possible for the worker to work while walking on the upper side using the scaffolding board while it is in a non-hardened state. Therefore, it is possible to cast the concrete of the rising portion while the base concrete is not hardened, and complete integration of the base concrete and the concrete of the rising portion can be achieved. And thereby, generation | occurrence | production of the clearance gap of both the boundary part in the past can be eliminated, and the intensity | strength of a boundary part can be increased. In addition, the time required for placing concrete can be significantly reduced and the cost can be significantly reduced, and in addition, the surface (upper surface) of the foundation concrete can be smoothed before being hardened It is

本発明の実施形態に係る足場板の支持部材を構成する各部材の斜視図である。It is a perspective view of each member which constitutes a support member of a scaffold board concerning an embodiment of the present invention. 同連結支持部の下端部分の拡大斜視図である。It is an expansion perspective view of the lower end part of the connection support part. 同基礎鉄筋に組み付けた状態の斜視図である。It is a perspective view of the state assembled | attached to the foundation rebar. 同組み付け方の手順を示すものであり、基礎鉄筋に鉄棒を固定し、上下一対の金属製挟持板に支持ボルトを挿通した状態を示すものである。It shows a procedure of how to assemble the same, shows a state in which an iron rod is fixed to a foundation rebar, and a support bolt is inserted into a pair of upper and lower metal holding plates. 同組み付け方の手順を示すものであり、支持ボルトの上端部に2個のナットを螺合した状態を示すものである。It shows a procedure of how to assemble the same, and shows a state in which two nuts are screwed to the upper end portion of the support bolt. 同組み付け方の手順を示すものであり、支持ボルトの上端部に連結支持部の下端部を螺合する状態を示すものである。It shows a procedure of how to assemble the same, and shows a state in which the lower end portion of the connection support portion is screwed to the upper end portion of the support bolt. 同組み付け方の手順を示すものであり、上側のナットを捻じ回す状態を示すものである。It shows a procedure of how to assemble the same, and shows a state of twisting the upper nut. 同組み付け方の手順を示すものであり、支持ボルトの上端部に連結支持部を連結した状態の断面図である。It is a sectional view showing a procedure of how to assemble the same, in which a connection support portion is connected to an upper end portion of a support bolt. 同基礎鉄筋に組み付けて足場板を載せた状態の斜視図である。It is a perspective view in the state where it was attached to the foundation rebar and the scaffolding board was mounted. 同基礎コンクリートの打設後所要の硬化状態となったときに連結支持部を支持ボルトから取り外した状態の断面図である。It is sectional drawing of the state which removed the connection support part from the support bolt, when it becomes a required hardening state after casting of the foundation concrete.

以下、本発明を実施するための形態について、図面を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

先ず、足場板の支持部材について説明する。
図中、1は基礎鉄筋に所定の距離をおいて組み付ける足場板の支持部材である。また、該足場板の支持部材1は、以下の鉄棒、一対の金属製挟持板、支持ボルト等の部材からなるものである。
First, the support member of the scaffold plate will be described.
In the figure, 1 is a support member of the scaffold board which assembles | attaches a predetermined | prescribed distance to a foundation rebar. Further, the support member 1 of the scaffold plate is made of the following members such as an iron rod, a pair of metal holding plates, and a support bolt.

2、2は鉄棒であり、廃材としての鉄筋の切れ端を用いればよく、これによりコストを削減することが可能となる。また、該鉄棒2、2は基礎鉄筋T、T間に交差させて架け渡し、両端部を該基礎鉄筋T、Tに針金3、3等で固定するものである。   2 and 2 are iron rods, and scraps of rebars as waste material may be used, which makes it possible to reduce costs. The iron rods 2, 2 are bridged between the foundation reinforcing bars T, T, and fixed at both ends to the foundation reinforcing bars T, T with wires 3, 3 or the like.

4、5は前記鉄棒2、2を上下から挟むようにして位置せしめる一対の金属製挟持板であり、夫々中心部にボルト挿通孔4a、5aを穿設している。   Numerals 4 and 5 are a pair of metal holding plates positioned so as to sandwich the iron rods 2, 2 from above and below, and bolt insertion holes 4a, 5a are bored in the central portions respectively.

6は支持ボルトであり、前記一対の金属製挟持板4、5における下側の金属製挟持板5のボルト挿通孔5aに下面側から挿通し、上端部を上側の金属製挟持板4のボルト挿通孔4aから突出させるものである。   Reference numeral 6 denotes a support bolt, which is inserted from the lower surface side into the bolt insertion hole 5a of the lower metal holding plate 5 in the pair of metal holding plates 4 and 5 and the upper end is a bolt of the upper metal holding plate 4 It is made to project from the penetration hole 4a.

7、8は前記支持ボルト6の上側の金属製挟持板4のボルト挿通孔4aから突出する部分に螺合する2個のナットである。また、該2個のナット7、8のうちの下側のナット8は、締め付け方向に捻じ回すことにより前記一対の金属製挟持板4、5の対向間隙を狭め、前記鉄棒2、2を挟み付けるためのものであり、また上側のナット7は、前記支持ボルト6の上端部に後記連結支持部を連結する際において、捻じ回して前記ナット8と逆方向に移動させることにより、連結支持部における足場板支承部が、それが支承する足場板の軸線と直交する位置にて固定するためのものである。   Numerals 7 and 8 denote two nuts which are screwed to a portion of the metal holding plate 4 on the upper side of the support bolt 6 which protrudes from the bolt insertion hole 4a. Further, the lower one of the two nuts 7 and 8 is twisted in the tightening direction to narrow the opposing gap between the pair of metal holding plates 4 and 5 to hold the iron rods 2. The upper nut 7 is twisted and moved in the direction opposite to that of the nut 8 when connecting the later-described connection support to the upper end of the support bolt 6. The scaffolding plate support in the case is for fixing at a position perpendicular to the axis of the scaffolding plate it supports.

9は前記支持ボルト6の上端部に連結し、足場板を載せる連結支持部である。また、該連結支持部9は下部側9Aを、下端に行くに従って縮径するテーパー状になし且つ下端部に、前記支持ボルト6における前記2個のナット7、8の上部に螺合するネジ孔9aを刻設し、上部側の頂部に、直交して左右に張り出す足場板支承部9Bを形成してなるものである。   Reference numeral 9 denotes a connection support portion which is connected to the upper end portion of the support bolt 6 and on which a scaffolding plate is placed. Further, the connection support portion 9 has a tapered shape in which the diameter decreases on the lower side 9A toward the lower end, and a screw hole is screwed to the upper end of the two nuts 7 and 8 in the support bolt 6 at the lower end. 9a is engraved, and a scaffold plate bearing 9B is formed at the top on the upper side to extend perpendicularly to the left and right.

10は前記連結支持部9における足場板支承部9Bに乗せる足場板である。尚、その他、図中11は立ち上がり部のコンクリート打設用の型枠、12は立ち上がり鉄筋、13は打設した基礎コンクリートを示す。 The reference numeral 10 denotes a scaffolding board to be placed on the scaffolding board supporting part 9B in the connection support part 9. In addition, in the figure, 11 is a formwork for placing concrete in the rising portion, 12 is a rising reinforcing bar, and 13 is a foundation concrete placed.

次に、上記足場板の支持部材1を用いた基礎コンクリート打設時における足場板の支持方法について説明する。 Next, a method of supporting the scaffolding board at the time of foundation concrete placement using the supporting member 1 of the scaffolding board will be described.

先ず、図4に示す如く、鉄棒2、2を針金3を用いて基礎鉄筋T、Tに交差させて固定する。次に、一対の金属製挟持板4、5における下側の金属製挟持板5のボルト挿通孔5aに下面側から支持ボルト6を挿通し、更に支持ボルト6の上部側を上側の金属製挟持板4のボルト挿通孔4aに挿通させ、これら上下一対の金属製挟持板4、5で鉄棒2、2を上下から挟むようにする。 First, as shown in FIG. 4, the iron rods 2, 2 are fixed to the foundation reinforcing bars T, T by using the wire 3. Next, the support bolt 6 is inserted from the lower surface side into the bolt insertion hole 5a of the lower metal holding plate 5 of the pair of metal holding plates 4 and 5 and the upper side of the support bolt 6 is made of the upper metal holding The steel rods 2, 2 are inserted from above and below by the pair of upper and lower metal holding plates 4, 5 by inserting them into the bolt insertion holes 4a of the plate 4.

先ず、図5に示す如く、支持ボルト6の上側の金属製挟持板4のボルト挿通孔4aから突出する部分に2個のナット7、8を螺合する。次に、下側のナット8を締め付け方向に捻じ回し、上下一対の金属製挟持板4、5の対向間隙を狭めて鉄棒2、2を挟み付ける。これにより支持ボルト6は基礎鉄筋T、Tに垂直に固定される。 First, as shown in FIG. 5, two nuts 7 and 8 are screwed into a portion of the metal holding plate 4 on the upper side of the support bolt 6 which protrudes from the bolt insertion hole 4a. Next, the lower nut 8 is twisted in the tightening direction to narrow the opposing gap between the pair of upper and lower metal holding plates 4 and 5 to hold the iron rods 2 and 2 therebetween. As a result, the support bolt 6 is fixed vertically to the foundation reinforcing bars T, T.

先ず、図6に示す如く、支持ボルト6の上端部に、連結支持部9の下端部に刻設したネジ孔9aを螺合して連結すると共に、図7に示す如く、足場板支承部9Bが、それが支承する足場板10の軸線と直交する位置となるように、上側のナット7を捻じ回して調節する。尚、このナット7の捻じ回しにはスパナ等の工具を用いて行い、該ナット7をナット8の締め付け方向と逆方向に捻じ回し、連結支持部9を所定の角度の位置に確実に固定する。 First, as shown in FIG. 6, screw holes 9a engraved on the lower end portion of the connection support portion 9 are screwed into the upper end portion of the support bolt 6 and connected, and as shown in FIG. Adjust the upper nut 7 so that it is at a position perpendicular to the axis of the scaffolding plate 10 it supports. The twisting of the nut 7 is performed using a tool such as a spanner, and the nut 7 is twisted in the direction opposite to the tightening direction of the nut 8 to securely fix the connection support 9 at a predetermined angle. .

以上により1組目の足場板の支持部材1の組み付けが完了する。次に、同手順にて所定の距離をおいて基礎鉄筋T、Tにもう一組の足場板の支持部材1を組み付ける。この状態は図3に示す通りである。そして、その後両足場板の支持部材1,1における足場板支承部9B、9Bに足場板10を跨がるように載せるものである。図9はこの状態を示すものである。そして、その後この状態において基礎コンクリート13を打設するものである。 Thus, the assembly of the first set of scaffolding board supporting members 1 is completed. Next, in the same procedure, at a predetermined distance, another set of supporting members 1 of the scaffold plate is assembled to the foundation reinforcing bars T, T. This state is as shown in FIG. And after that, the scaffold board 10 is mounted so as to straddle the scaffold board supports 9B and 9B in the support members 1 and 1 of both scaffold boards. FIG. 9 shows this state. And after that, the foundation concrete 13 is cast in this state.

斯かる方法によれば、基礎コンクリート13を打設した後、それが未硬化の状態のうちに、足場板10を用いてその上方を作業員が歩いて作業できるようになるものである。したがって、基礎コンクリート13が未硬化のうちに立ち上がり部のコンクリート(図示せず。)の打設を行うことが可能となり、基礎コンクリート13と立ち上がり部のコンクリートとの組織的に完全な一体化を図ることができるものである。そして、これにより従来における両者の境界部分の隙間の発生をなくし、且つ境界部分の強度を増大させることができるものである。また、コンクリートの打設作業に要する時間を大幅に短縮することができると共にコストを大幅に軽減することができ、加えて基礎コンクリート13が未硬化のうちにその表面(上面)をならすこともできるようになるものである。 According to such a method, after the foundation concrete 13 has been set, while it is in an unhardened state, it is possible for a worker to work while walking on the upper side using the scaffolding plate 10. Therefore, it becomes possible to cast the concrete (not shown) of the rising portion while the base concrete 13 is not hardened, and the structural concrete 13 and the concrete of the rising portion are structurally completely integrated. It can be done. And thereby, generation | occurrence | production of the clearance gap of both the boundary part in the past can be eliminated, and the intensity | strength of a boundary part can be increased. In addition, the time required for placing concrete can be significantly reduced and the cost can be significantly reduced. In addition, the surface (upper surface) of the foundation concrete 13 can be smoothed while it is not hardened. It is something like

また、打設した基礎コンクリート13が作業員が歩ける程度に硬化したとき、足場板10を取り外すと共に連結支持部9を支持ボルト6から取り外すものである。またこのとき、連結支持部9の下部側はテーパー状となっているから、捻じ回した後上方に容易に抜くことができるものである。そして、取り外した連結支持部9は、他の場所において再使用するものである。 Further, when the cast foundation concrete 13 is hardened to the extent that the worker can walk, the scaffold plate 10 is removed and the connection support 9 is removed from the support bolt 6. Further, at this time, since the lower side of the connection support 9 is tapered, it can be easily pulled upward after being twisted. And the removed connection support part 9 is reused in another place.

1 足場板の支持部材
2、2 鉄棒
4、5 一対の金属製挟持板
4a ボルト挿通孔,
5a ボルト挿通孔
6 支持ボルト
7、8 ナット
9 連結支持部
9A 連結支持部の下部側
9a ネジ孔
10 足場板
1 Scaffolding board support member 2, 2 Iron rod
4, 5 pairs of metal clamping plates 4a bolt insertion holes,
5a Bolt insertion hole 6 Support bolt 7, 8 Nut 9 Connection support part 9A Lower side 9a of connection support part Screw hole 10 Scaffolding plate

Claims (2)

基礎鉄筋間に交差させて架け渡し、両端部を該基礎鉄筋に針金で固定する鉄棒と、前記鉄棒を上下から挟むようにして位置せしめる、中心部にボルト挿通孔を穿設した一対の金属製挟持板と、前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から挿通し、上端部を上側の金属製挟持板のボルト挿通孔から突出させる支持ボルトと、前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に螺合する2個のナットと、下部側を、下端に行くに従って縮径するテーパー状になし且つ下端部に、前記支持ボルトにおける前記2個のナットの上部に螺合するネジ孔を刻設し、上部側の頂部に、直交して左右に張り出す足場板支承部を形成した連結支持部とからなることを特徴とする足場板の支持部材。 Spanned by intersecting between foundation rebar, and the horizontal bar opposite ends for fixing a needle gold to the underlying reinforcing bar and allowed positioned so as to sandwich the iron bar from above and below, a pair of metallic clamping bored bolt insertion hole in the center A support bolt which is inserted from the lower surface side into the bolt insertion hole of the lower metal holding plate of the pair of metal holding plates and whose upper end portion protrudes from the bolt insertion hole of the upper metal holding plate; The two support nuts screwed to the part of the upper side of the metal holding plate projecting from the bolt insertion hole of the support bolt, and the lower end does not have a tapered shape whose diameter decreases toward the lower end. Screw holes screwed into the upper part of the two nuts in the above, and comprising a connection support part having a scaffold plate support part formed at the top on the upper side, projecting orthogonally to the left and right Scaffolding board support member. 請求項1記載の足場板の支持部材を用い、先ず前記鉄棒を基礎鉄筋に交差させて固定し、次に前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から前記支持ボルトを挿通し、更に該支持ボルトの上部側を上側の金属製挟持板のボルト挿通孔に挿通させ、これら上下一対の金属製挟持板で前記鉄棒を上下から挟むようになし、次に前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に前記2個のナットを螺合し、次に該2個のナットにおける下側のナットを締め付け方向に捻じ回し、前記上下一対の金属製挟持板の対向間隙を狭めて前記鉄棒を挟み付け、次に前記支持ボルトの上端部に、前記連結支持部の下端部に刻設したネジ孔を螺合して連結すると共に、足場板支承部が、それが支承する足場板の軸線と直交する位置となるよう、前記上側のナットを捻じ回して調節し、その後上記と同手順にて所定の距離をおいて基礎鉄筋に足場板の支持部材を組み付け、最後に両足場板の支持部材における足場板支承部に足場板を跨がるように載せ、また打設した基礎コンクリートが作業員が歩ける程度に硬化したとき、足場板を取り外すと共に前記連結支持部を支持ボルトから取り外すようになしたことを特徴とする足場板の支持部材を用いた基礎コンクリート打設時における足場板の支持方法。 Using the support member of the scaffold plate according to claim 1, first, the iron rod is made to cross and fix to the base rebar, and then the bolt insertion hole of the lower metal holding plate in the pair of metal holding plates is the lower surface side The support bolt is inserted from above, and the upper side of the support bolt is further inserted into the bolt insertion hole of the upper metal holding plate, and the upper and lower metal holding plates sandwich the iron rod from above and below. The two nuts are screwed into the part of the upper side of the metal holding plate of the support bolt that protrudes from the bolt insertion hole, and then the lower nuts of the two nuts are screwed in the tightening direction, The opposing gap between the upper and lower pair of metal clamping plates is narrowed to hold the iron rod, and then screw holes are screwed into the upper end portion of the support bolt and connected to the lower end portion of the connection support portion. , Footplate bearing, the foot it supports Adjust the upper nut by twisting to adjust the position perpendicular to the axis of the plate, then attach the scaffold plate support member to the foundation rebar at a predetermined distance in the same procedure as above, and finally, both scaffolds When the foundation concrete placed and placed on the scaffold plate support portion of the plate support member straddling the scaffold plate support is hardened enough for workers to walk, the scaffold plate is removed and the connection support portion is removed from the support bolt A supporting method of a scaffolding board at the time of foundation concrete placing using a supporting member of a scaffolding board characterized by having been removed.
JP2015004805A 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same Expired - Fee Related JP6511270B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015004805A JP6511270B2 (en) 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015004805A JP6511270B2 (en) 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same

Publications (2)

Publication Number Publication Date
JP2016130421A JP2016130421A (en) 2016-07-21
JP6511270B2 true JP6511270B2 (en) 2019-05-15

Family

ID=56415695

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015004805A Expired - Fee Related JP6511270B2 (en) 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same

Country Status (1)

Country Link
JP (1) JP6511270B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180508A (en) * 2019-04-26 2020-11-05 ジャパン スチールス グループ株式会社 Handrail support column support tool
CN115506571B (en) * 2022-08-25 2024-05-17 中国一冶集团有限公司 Scaffold foundation fixing system for loess slope and construction method
CN115324357B (en) * 2022-08-29 2023-09-05 中信国安建工集团有限公司 Reinforcing bar node ligature auxiliary device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5919083Y2 (en) * 1979-08-15 1984-06-01 大成建設株式会社 base jack
JPS57117108U (en) * 1981-01-12 1982-07-20
JP2736363B2 (en) * 1989-11-15 1998-04-02 株式会社太田興産 Method and apparatus for positioning support for formwork
JP2002161587A (en) * 2000-11-24 2002-06-04 Kaoru Taneichi Fixing tool for base and spacer for base
GB0100372D0 (en) * 2001-01-06 2001-02-14 Owen George Support apparatus
JP2002339568A (en) * 2001-05-14 2002-11-27 Tomoya Ueda Top-end inspecting measuring spacer

Also Published As

Publication number Publication date
JP2016130421A (en) 2016-07-21

Similar Documents

Publication Publication Date Title
KR100819833B1 (en) Apparatus and method for building slab of a concrete build
JP6511270B2 (en) Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same
JP2018115489A (en) Anchor frame and method of building steel frame structure using the same
KR100622935B1 (en) Horizontal extension joint structuer and joint method using thereof
WO2016068692A1 (en) A formwork arrangement
JP6567355B2 (en) Joint structure of prestressed concrete structure
JP5183606B2 (en) Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP6308502B2 (en) Construction method of pre-tension slab in overhang construction
JP3763575B2 (en) Underground beam construction frame and underground beam construction method using the same
JP2018066142A (en) Setting method for structure and foundation for setting structure
KR20120078217A (en) Block out construction method for apparatus base
CN112681613A (en) Assembled steel construction concrete building body
JP2017008693A (en) Structure repair method
JP2012012812A (en) Construction method of nut
CN111851755A (en) Embedded part suspension type installation supporting device and construction method thereof
JP2019094671A (en) Concrete form portal shape assembling metal fitting
JP6914822B2 (en) Formwork method and formwork unit for lifting
CN114150861B (en) Template back frame and construction method thereof
JP2005146582A (en) Connection structure between reinforced column and steel frame beam, and method of manufacturing anchoring fitting
CN212317177U (en) Embedded part suspension type mounting and supporting device
JP7143208B2 (en) Formwork for precast concrete and method for manufacturing foundation block
KR200307607Y1 (en) Temporang construction sfuctare for culvating slad
JP7371315B2 (en) Precast floor slab construction method
JP3123302U (en) Reusable formwork rebar spacer

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190227

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190408

R150 Certificate of patent or registration of utility model

Ref document number: 6511270

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees