JP2016130421A - Bearing member for scaffold board, and bearing method for scaffold board using the same applied when casting foundation concrete - Google Patents

Bearing member for scaffold board, and bearing method for scaffold board using the same applied when casting foundation concrete Download PDF

Info

Publication number
JP2016130421A
JP2016130421A JP2015004805A JP2015004805A JP2016130421A JP 2016130421 A JP2016130421 A JP 2016130421A JP 2015004805 A JP2015004805 A JP 2015004805A JP 2015004805 A JP2015004805 A JP 2015004805A JP 2016130421 A JP2016130421 A JP 2016130421A
Authority
JP
Japan
Prior art keywords
support
plate
bolt
insertion hole
scaffold board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015004805A
Other languages
Japanese (ja)
Other versions
JP6511270B2 (en
Inventor
あけみ 植田
Akemi Ueda
あけみ 植田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2015004805A priority Critical patent/JP6511270B2/en
Publication of JP2016130421A publication Critical patent/JP2016130421A/en
Application granted granted Critical
Publication of JP6511270B2 publication Critical patent/JP6511270B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a bearing member for a scaffold board that enables a worker to walk and work on the scaffold board after casting foundation concrete and before the foundation concrete is cured, by assembling the bearing member to a foundation reinforcing bar before casting the foundation concrete.SOLUTION: Iron rods 2, 2 are intersected with foundation reinforcing bars T, T and fastened. The iron rods 2, 2 are sandwiched from above and below with a pair of metallic holding plates 4, 5, and a top edge of a support bolt inserted into a bolt insertion hole of the lower metallic holding plate 5 from an undersurface side is made to protrude from a bolt insertion hole of the upper metallic holding plate 4. Two nuts 7, 8 are screwed into the protruded part of the support bolt. The nut 8 narrows a gap between the pair of upper and lower metallic holding plates 4, 5 that face each other, thus sandwiching the iron rods 2, 2. A lower edge part of a connection support part 9 is screwed into a top edge part of the support bolt for connection, the connection support part having a tapered lower side 9A. Another support member 1 for a scaffold board is assembled with the foundation reinforcing bar, in the same processes leaving a prescribed distance in between. Finally, the scaffold board is mounted over scaffold board support parts 9B, 9B of both support members 1, 1 for the scaffold board.SELECTED DRAWING: Figure 3

Description

本発明は、足場板の支持部材及びこれを用いた基礎コンクリート打設時における足場板の支持方法に関するものである。   The present invention relates to a support member for a scaffold plate and a method for supporting the scaffold plate at the time of foundation concrete placement using the same.

一般的に、建物等の建造物を構築する際には、先ず基礎コンクリートを打設し、その後該基礎コンクリートの硬化を待って立ち上がり部のコンクリートの打設が行われる。   In general, when constructing a building such as a building, foundation concrete is first placed, and then the rising concrete is placed after the foundation concrete is hardened.

そして、この基礎コンクリートの硬化には通常1日程度を要し、また、ある程度硬化しなければ作業員がその上を歩くこともできないから、中1日空けてからでなければ立ち上がり部のコンクリートの打設を行うことができない。   This foundation concrete usually takes about 1 day to harden, and if it does not harden to some extent, workers cannot walk on it. Cannot be placed.

そして、このように基礎コンクリートが硬化した後で立ち上がり部のコンクリートの打設が行われるため、基礎コンクリートと立ち上がり部のコンクリートとは硬化の度合いが異なる。このため、両者が組織的に完全に一体化することはない。そしてまたこのため両者の境界部分に隙間が出来ることになる。尚、それは、基礎コンクリートの表面(上面)は完全な平滑面ではなく、僅かな凹凸面となっていることによるものである。そして、両者の間に隙間が出来ると、この隙間から侵入した水が中の鉄筋を錆びさせてしまい、鉄筋の寿命を短くするという問題がある。   Then, since the concrete at the rising portion is placed after the foundation concrete is cured in this manner, the degree of curing differs between the concrete at the rising portion and the concrete at the rising portion. For this reason, both are not systematically integrated completely. This also creates a gap at the boundary between the two. This is because the surface (upper surface) of the foundation concrete is not a completely smooth surface but a slightly uneven surface. And if there is a gap between the two, the water that has entered from this gap rusts the reinforcing bars inside, and there is a problem that the life of the reinforcing bars is shortened.

また、基礎コンクリートと立ち上がり部のコンクリートとの組織的な完全一体化ができないから、両者の境界部分において強度的に脆いという問題点もある。   In addition, since the systematic complete integration of the foundation concrete and the concrete at the rising portion cannot be performed, there is a problem that the boundary portion between the two is brittle in strength.

また、基礎コンクリートの打設完了から立ち上がり部のコンクリートの打設までに作業を中断しなければならないから、多くの無駄な時間を要し、またこの間において重機(生コンの圧送ポンプ等)のリース料や人件費等も必要であり、その分コストが高くつくことになる。   In addition, since the work must be interrupted from the completion of foundation concrete placement to the concrete placement of the rising section, it takes a lot of wasted time, and during this time, lease fees for heavy machinery (such as pumps for raw concrete) And labor costs are also necessary, and the cost will increase accordingly.

また、基礎コンクリートを打設した後、未硬化のうちにその表面(上面)をならしたりするために作業員がその上を歩きたい場合があるが、従来はこれを行うこともできなかった。 Also, after placing the concrete foundation, workers may want to walk on it to smooth the surface (upper surface) while it is uncured, but this has not been possible in the past. .

本発明は上記の点に鑑みなされたものであって、基礎コンクリートを打設する前に基礎鉄筋に組み付けておくことにより、基礎コンクリートを打設した後、それが未硬化の状態のうちに、足場板を用いてその上方を作業員が歩いて作業できるようになし、もって、基礎コンクリートが未硬化のうちに立ち上がり部のコンクリートの打設を行うことにより、両者の組織的に完全な一体化を図り、従来における両者の境界部分の隙間の発生をなくし、且つ境界部分の強度を増大させることができ、更にはコンクリートの打設作業に要する時間を大幅に短縮することができると共にコストを大幅に軽減することができ、加えて基礎コンクリートが未硬化のうちにその表面(上面)をならすこともできるようになした足場板の支持部材及びこれを用いた基礎コンクリート打設時における足場板の支持方法を提供しようとするものである。   The present invention has been made in view of the above points, and by placing the foundation concrete before assembling the foundation concrete, after placing the foundation concrete, in an uncured state, By using a scaffolding board, workers can walk and work above it, and the foundation concrete is uncured, and the concrete at the rising part is placed, so that both are systematically integrated. Can eliminate the occurrence of gaps at the boundary between the two and increase the strength of the boundary, and can significantly reduce the time required for placing concrete and greatly increase the cost. In addition, a support member for a scaffolding plate, which can also reduce the surface of the foundation concrete and smooth the surface (upper surface) while the base concrete is uncured, and using the same It is intended to provide a method for supporting scaffolding plate in foundation concrete after casting.

而して、本発明は、基礎鉄筋間に交差させて架け渡し、両端部を該基礎鉄筋に針金等で固定する鉄棒と、前記鉄棒を上下から挟むようにして位置せしめる、中心部にボルト挿通孔を穿設した一対の金属製挟持板と、前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から挿通し、上端部を上側の金属製挟持板のボルト挿通孔から突出させる支持ボルトと、前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に螺合する2個のナットと、下部側を、下端に行くに従って縮径するテーパー状になし且つ下端部に、前記支持ボルトにおける前記2個のナットの上部に螺合するネジ孔を刻設し、上部側の頂部に、直交して左右に張り出す足場板支承部を形成した連結支持部とからなることを特徴とする足場板の支持部材を要旨とするものである。   Thus, the present invention crosses and bridges the basic reinforcing bars, and fixes the both ends to the basic reinforcing bars with a wire or the like, and positions the iron bars so as to sandwich them from above and below, and the bolt insertion hole at the center. A pair of drilled metal clamping plates and a bolt insertion hole of the lower metal clamping plate of the pair of metal clamping plates from the lower surface side, and an upper end bolt insertion hole of the upper metal clamping plate A support bolt that protrudes from the base, two nuts that are screwed into a portion that protrudes from the bolt insertion hole of the metal clamping plate on the upper side of the support bolt, and a taper that is reduced in diameter toward the lower end on the lower side In addition, a connecting support portion in which a screw hole that is screwed into the upper portion of the two nuts in the support bolt is formed in the lower end portion, and a scaffold plate support portion that projects to the right and left is formed on the top portion on the upper side. Feet characterized by consisting of It is an gist support plate.

また、本発明は上記足場板の支持部材を用い、先ず前記鉄棒を基礎鉄筋に交差させて固定し、次に前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から前記支持ボルトを挿通し、更に該支持ボルトの上部側を上側の金属製挟持板のボルト挿通孔に挿通させ、これら上下一対の金属製挟持板で前記鉄棒を上下から挟むようになし、次に前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に前記2個のナットを螺合し、次に該2個のナットにおける下側のナットを締め付け方向に捻じ回し、前記上下一対の金属製挟持板の対向間隙を狭めて前記鉄棒を挟み付け、次に前記支持ボルトの上端部に、前記連結支持部の下端部に刻設したネジ孔を螺合して連結すると共に、足場板支承部が、それが支承する足場板の軸線と直交する位置となるよう、前記上側のナットを捻じ回して調節し、その後上記と同手順にて所定の距離をおいて基礎鉄筋に足場板の支持部材を組み付け、最後に両足場板の支持部材における足場板支承部に足場板を跨がるように載せ、また打設した基礎コンクリートが作業員が歩ける程度に硬化したとき、足場板を取り外すと共に前記連結支持部を支持ボルトから取り外すようになしたことを特徴とする足場板の支持部材を用いた基礎コンクリート打設時における足場板の支持方法をもその要旨とするものである。   Further, the present invention uses the support member for the scaffold plate, and firstly fixes the iron bar so as to cross the basic rebar, and then lowers the bottom surface of the pair of metal sandwich plates in the bolt insertion hole of the lower metal sandwich plate. The support bolt is inserted from the side, the upper side of the support bolt is further inserted into the bolt insertion hole of the upper metal holding plate, and the iron bar is sandwiched from above and below by a pair of upper and lower metal holding plates, Next, the two nuts are screwed into a portion protruding from the bolt insertion hole of the metal clamping plate on the upper side of the support bolt, and then the lower nut of the two nuts is twisted in the tightening direction, The opposing gap between the pair of upper and lower metal sandwiching plates is narrowed to sandwich the iron rod, and then the upper end portion of the support bolt is screwed into the screw hole formed in the lower end portion of the connection support portion and connected. Along with the scaffolding plate support, it supports Twist and adjust the upper nut so that it is in a position perpendicular to the axis of the scaffolding plate, and then attach the scaffolding plate support member to the foundation rebar at a predetermined distance in the same procedure as above. When the foundation concrete placed on the scaffolding plate support part of the supporting member of the scaffolding board is straddled and hardened to the extent that the worker can walk, the scaffolding board is removed and the connection supporting part is supported by the support bolt. The gist of the present invention is also a method for supporting a scaffolding plate at the time of foundation concrete placement using a scaffolding plate supporting member that is removed from the foundation.

本発明に係る足場板の支持部材及びこれを用いた基礎コンクリート打設時における足場板の保持方法は、上記の如き構成であるから、基礎コンクリートを打設する前に基礎鉄筋に組み付けておくことにより、基礎コンクリートを打設した後、それが未硬化の状態のうちに、足場板を用いてその上方を作業員が歩いて作業できるようになるものである。したがって、基礎コンクリートが未硬化のうちに立ち上がり部のコンクリートの打設を行うことが可能となり、基礎コンクリートと立ち上がり部のコンクリートとの組織的に完全な一体化を図ることができるものである。そして、これにより従来における両者の境界部分の隙間の発生をなくし、且つ境界部分の強度を増大させることができるものである。また、コンクリートの打設作業に要する時間を大幅に短縮することができると共にコストを大幅に軽減することができ、加えて基礎コンクリートが未硬化のうちにその表面(上面)をならすこともできるようになものである。   Since the scaffolding plate supporting member according to the present invention and the method of holding the scaffolding plate at the time of placing the concrete using the same are as described above, the scaffolding plate must be assembled to the foundation rebar before placing the foundation concrete. Thus, after placing the concrete foundation, the worker can walk and work on the upper side of the foundation concrete using the scaffolding plate in an uncured state. Accordingly, it is possible to place the concrete at the rising portion while the basic concrete is uncured, and the basic concrete and the concrete at the rising portion can be systematically completely integrated. As a result, it is possible to eliminate the occurrence of a gap at the boundary portion between the two and increase the strength of the boundary portion. In addition, the time required for placing concrete can be greatly reduced and the cost can be greatly reduced. In addition, the surface (upper surface) of the foundation concrete can be leveled while it is uncured. It is something.

本発明の実施形態に係る足場板の支持部材を構成する各部材の斜視図である。It is a perspective view of each member which comprises the support member of the scaffold board which concerns on embodiment of this invention. 同連結支持部の下端部分の拡大斜視図である。It is an expansion perspective view of the lower end part of the connection support part. 同基礎鉄筋に組み付けた状態の斜視図である。It is a perspective view of the state assembled | attached to the basic reinforcement. 同組み付け方の手順を示すものであり、基礎鉄筋に鉄棒を固定し、上下一対の金属製挟持板に支持ボルトを挿通した状態を示すものである。The procedure of the assembling method is shown, in which a steel bar is fixed to a basic rebar, and a support bolt is inserted through a pair of upper and lower metal clamping plates. 同組み付け方の手順を示すものであり、支持ボルトの上端部に2個のナットを螺合した状態を示すものである。The procedure of the assembly method is shown, and shows a state in which two nuts are screwed onto the upper end portion of the support bolt. 同組み付け方の手順を示すものであり、支持ボルトの上端部に連結支持部の下端部を螺合する状態を示すものである。The procedure of the assembling method is shown, and a state in which the lower end portion of the connection support portion is screwed to the upper end portion of the support bolt is shown. 同組み付け方の手順を示すものであり、上側のナットを捻じ回す状態を示すものである。The procedure of the assembly method is shown, and the upper nut is twisted. 同組み付け方の手順を示すものであり、支持ボルトの上端部に連結支持部を連結した状態の断面図である。The procedure of the assembly method is shown, and is a cross-sectional view of a state in which a connection support portion is connected to an upper end portion of a support bolt. 同基礎鉄筋に組み付けて足場板を載せた状態の斜視図である。It is a perspective view of the state which assembled | attached to the foundation reinforcement and mounted the scaffold board. 同基礎コンクリートの打設後所要の硬化状態となったときに連結支持部を支持ボルトから取り外した状態の断面図である。It is sectional drawing of the state which removed the connection support part from the support bolt, when it became a required hardening state after placement of the foundation concrete.

以下、本発明を実施するための形態について、図面を参照して説明する。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings.

先ず、足場板の支持部材について説明する。
図中、1は基礎鉄筋に所定の距離をおいて組み付ける足場板の支持部材である。また、該足場板の支持部材1は、以下の鉄棒、一対の金属製挟持板、支持ボルト等の部材からなるものである。
First, the support member for the scaffold plate will be described.
In the figure, reference numeral 1 denotes a support member for a scaffold plate that is assembled to a foundation rebar at a predetermined distance. Moreover, the supporting member 1 of the scaffold plate is composed of members such as the following iron bars, a pair of metal holding plates, and supporting bolts.

2、2は鉄棒であり、廃材としての鉄筋の切れ端を用いればよく、これによりコストを削減することが可能となる。また、該鉄棒2、2は基礎鉄筋T、T間に交差させて架け渡し、両端部を該基礎鉄筋T、Tに針金3、3等で固定するものである。   2 and 2 are iron bars, and it is only necessary to use a piece of reinforcing steel as a waste material, which makes it possible to reduce costs. Further, the iron bars 2 and 2 are crossed and bridged between the basic rebars T and T, and both ends are fixed to the basic rebars T and T with wires 3, 3 and the like.

4、5は前記鉄棒2、2を上下から挟むようにして位置せしめる一対の金属製挟持板であり、夫々中心部にボルト挿通孔4a、5aを穿設している。   Reference numerals 4 and 5 denote a pair of metal clamping plates which are positioned so as to sandwich the iron bars 2 and 2 from above and below, and have bolt insertion holes 4a and 5a formed in the center.

6は支持ボルトであり、前記一対の金属製挟持板4、5における下側の金属製挟持板5のボルト挿通孔5aに下面側から挿通し、上端部を上側の金属製挟持板4のボルト挿通孔4aから突出させるものである。   Reference numeral 6 denotes a support bolt, which is inserted through the bolt insertion hole 5a of the lower metal sandwich plate 5 in the pair of metal sandwich plates 4 and 5 from the lower surface side, and the upper end of the bolt of the upper metal sandwich plate 4 It protrudes from the insertion hole 4a.

7、8は前記支持ボルト6の上側の金属製挟持板4のボルト挿通孔4aから突出する部分に螺合する2個のナットである。また、該2個のナット7、8のうちの下側のナット8は、締め付け方向に捻じ回すことにより前記一対の金属製挟持板4、5の対向間隙を狭め、前記鉄棒2、2を挟み付けるためのものであり、また上側のナット7は、前記支持ボルト6の上端部に後記連結支持部を連結する際において、捻じ回して前記ナット8と逆方向に移動させることにより、連結支持部における足場板支承部が、それが支承する足場板の軸線と直交する位置にて固定するためのものである。   Reference numerals 7 and 8 denote two nuts which are screwed into portions protruding from the bolt insertion holes 4a of the metal holding plate 4 on the upper side of the support bolt 6. The lower nut 8 of the two nuts 7 and 8 is twisted in the tightening direction to narrow the gap between the pair of metal clamping plates 4 and 5 so as to sandwich the iron bars 2 and 2. The upper nut 7 is connected to the upper end portion of the support bolt 6 by twisting and moving in the opposite direction to the nut 8 when connecting the connection support portion described later. The scaffolding plate support part in the is for fixing at a position orthogonal to the axis of the scaffolding plate on which it is supported.

9は前記支持ボルト6の上端部に連結し、足場板を載せる連結支持部である。また、該連結支持部9は下部側9Aを、下端に行くに従って縮径するテーパー状になし且つ下端部に、前記支持ボルト6における前記2個のナット7、8の上部に螺合するネジ孔9aを刻設し、上部側の頂部に、直交して左右に張り出す足場板支承部9Bを形成してなるものである。   9 is a connection support part which connects with the upper end part of the said support bolt 6, and mounts a scaffold board. In addition, the connecting support portion 9 has a lower side 9A that has a tapered shape with a diameter decreasing toward the lower end, and a screw hole that engages the lower end portion with the upper portions of the two nuts 7 and 8 of the support bolt 6. 9a is engraved, and a scaffolding plate supporting portion 9B is formed on the top portion on the upper side so as to extend perpendicularly to the left and right.

10は前記連結支持部9における足場板支承部9Bに乗せる足場板である。尚、その他、図中11は立ち上がり部のコンクリート打設用の型枠、12は立ち上がり鉄筋、13は打設した基礎コンクリートを示す。 Reference numeral 10 denotes a scaffold plate placed on the scaffold plate support 9B in the connection support portion 9. In addition, in the figure, 11 is a formwork for placing concrete at a rising portion, 12 is a rising rebar, and 13 is foundation concrete that has been placed.

次に、上記足場板の支持部材1を用いた基礎コンクリート打設時における足場板の支持方法について説明する。 Next, a description will be given of a method for supporting the scaffold plate during foundation concrete placement using the support member 1 for the scaffold plate.

先ず、図4に示す如く、鉄棒2、2を針金3を用いて基礎鉄筋T、Tに交差させて固定する。次に、一対の金属製挟持板4、5における下側の金属製挟持板5のボルト挿通孔5aに下面側から支持ボルト6を挿通し、更に支持ボルト6の上部側を上側の金属製挟持板4のボルト挿通孔4aに挿通させ、これら上下一対の金属製挟持板4、5で鉄棒2、2を上下から挟むようにする。 First, as shown in FIG. 4, the iron bars 2 and 2 are fixed by using the wire 3 so as to cross the basic reinforcing bars T and T. Next, the support bolt 6 is inserted into the bolt insertion hole 5a of the lower metal sandwich plate 5 of the pair of metal sandwich plates 4 and 5 from the lower surface side, and the upper side of the support bolt 6 is sandwiched with the upper metal sandwich plate. The steel rods 2 and 2 are sandwiched from above and below by a pair of upper and lower metal clamping plates 4 and 5 inserted through the bolt insertion holes 4a of the plate 4.

先ず、図5に示す如く、支持ボルト6の上側の金属製挟持板4のボルト挿通孔4aから突出する部分に2個のナット7、8を螺合する。次に、下側のナット8を締め付け方向に捻じ回し、上下一対の金属製挟持板4、5の対向間隙を狭めて鉄棒2、2を挟み付ける。これにより支持ボルト6は基礎鉄筋T、Tに垂直に固定される。 First, as shown in FIG. 5, two nuts 7 and 8 are screwed into a portion protruding from the bolt insertion hole 4 a of the metal holding plate 4 on the upper side of the support bolt 6. Next, the lower nut 8 is twisted in the tightening direction to narrow the facing gap between the pair of upper and lower metal clamping plates 4 and 5 to sandwich the iron bars 2 and 2. Thereby, the support bolt 6 is fixed perpendicularly to the foundation reinforcing bars T and T.

先ず、図6に示す如く、支持ボルト6の上端部に、連結支持部9の下端部に刻設したネジ孔9aを螺合して連結すると共に、図7に示す如く、足場板支承部9Bが、それが支承する足場板10の軸線と直交する位置となるように、上側のナット7を捻じ回して調節する。尚、このナット7の捻じ回しにはスパナ等の工具を用いて行い、該ナット7をナット8の締め付け方向と逆方向に捻じ回し、連結支持部9を所定の角度の位置に確実に固定する。 First, as shown in FIG. 6, a screw hole 9a carved in the lower end portion of the connection support portion 9 is screwed and connected to the upper end portion of the support bolt 6, and as shown in FIG. 7, the scaffolding plate support portion 9B. However, the upper nut 7 is twisted and adjusted so that it is in a position orthogonal to the axis of the scaffolding plate 10 on which it is supported. The nut 7 is twisted using a tool such as a spanner, and the nut 7 is twisted in the direction opposite to the tightening direction of the nut 8 to securely fix the connection support portion 9 at a predetermined angle. .

以上により1組目の足場板の支持部材1の組み付けが完了する。次に、同手順にて所定の距離をおいて基礎鉄筋T、Tにもう一組の足場板の支持部材1を組み付ける。この状態は図3に示す通りである。そして、その後両足場板の支持部材1,1における足場板支承部9B、9Bに足場板10を跨がるように載せるものである。図9はこの状態を示すものである。そして、その後この状態において基礎コンクリート13を打設するものである。 Thus, the assembly of the support member 1 of the first set of scaffolding plates is completed. Next, another set of scaffolding plate support members 1 is assembled to the basic reinforcing bars T and T at a predetermined distance in the same procedure. This state is as shown in FIG. And after that, it mounts so that the scaffold board 10 may be straddled on the scaffold board support parts 9B and 9B in the supporting members 1 and 1 of both scaffold boards. FIG. 9 shows this state. And after that, the foundation concrete 13 is cast in this state.

斯かる方法によれば、基礎コンクリート13を打設した後、それが未硬化の状態のうちに、足場板10を用いてその上方を作業員が歩いて作業できるようになるものである。したがって、基礎コンクリート13が未硬化のうちに立ち上がり部のコンクリート(図示せず。)の打設を行うことが可能となり、基礎コンクリート13と立ち上がり部のコンクリートとの組織的に完全な一体化を図ることができるものである。そして、これにより従来における両者の境界部分の隙間の発生をなくし、且つ境界部分の強度を増大させることができるものである。また、コンクリートの打設作業に要する時間を大幅に短縮することができると共にコストを大幅に軽減することができ、加えて基礎コンクリート13が未硬化のうちにその表面(上面)をならすこともできるようになるものである。 According to such a method, after the foundation concrete 13 is placed, the worker can walk and work on the upper side of the foundation concrete 10 using the scaffold board 10 while the foundation concrete 13 is in an uncured state. Therefore, it is possible to place the rising concrete (not shown) while the foundation concrete 13 is uncured, and systematically and completely integrate the foundation concrete 13 and the rising concrete. It is something that can be done. As a result, it is possible to eliminate the occurrence of a gap at the boundary portion between the two and increase the strength of the boundary portion. Further, the time required for the concrete placing work can be greatly reduced and the cost can be greatly reduced. In addition, the surface (upper surface) of the basic concrete 13 can be smoothed while it is uncured. It will be like that.

また、打設した基礎コンクリート13が作業員が歩ける程度に硬化したとき、足場板10を取り外すと共に連結支持部9を支持ボルト6から取り外すものである。またこのとき、連結支持部9の下部側はテーパー状となっているから、捻じ回した後上方に容易に抜くことができるものである。そして、取り外した連結支持部9は、他の場所において再使用するものである。 Further, when the cast concrete foundation 13 is hardened to such an extent that an operator can walk, the scaffold board 10 is removed and the connection support portion 9 is removed from the support bolt 6. At this time, since the lower side of the connection support portion 9 is tapered, it can be easily pulled upward after being twisted. And the removed connection support part 9 is reused in another place.

1 足場板の支持部材
2、2 鉄棒
4、5 一対の金属製挟持板
4a ボルト挿通孔,
5a ボルト挿通孔
6 支持ボルト
7、8 ナット
9 連結支持部
9A 連結支持部の下部側
9a ネジ孔
10 足場板
1 Support member for scaffolding plate 2, 2 Iron bar
4, 5 A pair of metal clamping plates 4a Bolt insertion holes,
5a Bolt insertion hole 6 Support bolt 7, 8 Nut 9 Connection support portion 9A Lower side 9a of connection support portion Screw hole 10 Scaffold plate

Claims (2)

基礎鉄筋間に交差させて架け渡し、両端部を該基礎鉄筋に針金等で固定する鉄棒と、前記鉄棒を上下から挟むようにして位置せしめる、中心部にボルト挿通孔を穿設した一対の金属製挟持板と、前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から挿通し、上端部を上側の金属製挟持板のボルト挿通孔から突出させる支持ボルトと、前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に螺合する2個のナットと、下部側を、下端に行くに従って縮径するテーパー状になし且つ下端部に、前記支持ボルトにおける前記2個のナットの上部に螺合するネジ孔を刻設し、上部側の頂部に、直交して左右に張り出す足場板支承部を形成した連結支持部とからなることを特徴とする足場板の支持部材。   A pair of metal clamps with a bolt insertion hole drilled in the center and a steel bar that crosses and bridges between the basic rebars and positions both ends of the steel bar to the foundation rebar with a wire etc. A support bolt that is inserted from the lower surface side into the bolt insertion hole of the lower metal clamping plate of the plate and the pair of metal clamping plates, and the upper end protrudes from the bolt insertion hole of the upper metal clamping plate; Two nuts to be screwed into a portion protruding from the bolt insertion hole of the metal clamping plate on the upper side of the support bolt, and the lower side is formed into a taper shape with a diameter decreasing toward the lower end, and the support bolt at the lower end portion. A screw hole that is screwed into the upper part of the two nuts in the upper part, and a connecting support part that forms a scaffolding plate support part that projects perpendicularly to the left and right at the top part of the upper part. Scaffolding plate support member. 請求項1記載の足場板の支持部材を用い、先ず前記鉄棒を基礎鉄筋に交差させて固定し、次に前記一対の金属製挟持板における下側の金属製挟持板のボルト挿通孔に下面側から前記支持ボルトを挿通し、更に該支持ボルトの上部側を上側の金属製挟持板のボルト挿通孔に挿通させ、これら上下一対の金属製挟持板で前記鉄棒を上下から挟むようになし、次に前記支持ボルトの上側の金属製挟持板のボルト挿通孔から突出する部分に前記2個のナットを螺合し、次に該2個のナットにおける下側のナットを締め付け方向に捻じ回し、前記上下一対の金属製挟持板の対向間隙を狭めて前記鉄棒を挟み付け、次に前記支持ボルトの上端部に、前記連結支持部の下端部に刻設したネジ孔を螺合して連結すると共に、足場板支承部が、それが支承する足場板の軸線と直交する位置となるよう、前記上側のナットを捻じ回して調節し、その後上記と同手順にて所定の距離をおいて基礎鉄筋に足場板の支持部材を組み付け、最後に両足場板の支持部材における足場板支承部に足場板を跨がるように載せ、また打設した基礎コンクリートが作業員が歩ける程度に硬化したとき、足場板を取り外すと共に前記連結支持部を支持ボルトから取り外すようになしたことを特徴とする足場板の支持部材を用いた基礎コンクリート打設時における足場板の支持方法。
The supporting member for the scaffolding plate according to claim 1 is used. First, the iron bar is crossed and fixed to the basic reinforcing bar, and then the lower surface side of the bolt insertion hole of the lower metal holding plate in the pair of metal holding plates. The support bolt is inserted through, and the upper side of the support bolt is further inserted into the bolt insertion hole of the upper metal holding plate, and the iron bar is sandwiched from above and below by the pair of upper and lower metal holding plates. The two nuts are screwed into a portion protruding from the bolt insertion hole of the metal clamping plate on the upper side of the support bolt, and the lower nut of the two nuts is then twisted in the tightening direction, Narrow the gap between the pair of upper and lower metal clamping plates to sandwich the iron bar, and then screw and connect the upper end of the support bolt with a screw hole formed in the lower end of the connection support portion , The scaffolding plate support, the foot it supports Twist and adjust the upper nut so that it is in a position perpendicular to the axis of the plate, and then attach the support member of the scaffold plate to the foundation rebar at a predetermined distance in the same procedure as above, and finally both scaffolds When the foundation concrete is placed so as to straddle the scaffold plate in the support member of the plate and the cast concrete has hardened to such an extent that workers can walk, the scaffold plate is removed and the connection support portion is removed from the support bolt. A method for supporting a scaffold plate during foundation concrete placement using a support member for the scaffold plate, wherein the scaffold plate support member is removed.
JP2015004805A 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same Expired - Fee Related JP6511270B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015004805A JP6511270B2 (en) 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015004805A JP6511270B2 (en) 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same

Publications (2)

Publication Number Publication Date
JP2016130421A true JP2016130421A (en) 2016-07-21
JP6511270B2 JP6511270B2 (en) 2019-05-15

Family

ID=56415695

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015004805A Expired - Fee Related JP6511270B2 (en) 2015-01-14 2015-01-14 Supporting member of scaffolding plate and supporting method of scaffolding plate at the time of foundation concrete placing using the same

Country Status (1)

Country Link
JP (1) JP6511270B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180508A (en) * 2019-04-26 2020-11-05 ジャパン スチールス グループ株式会社 Handrail support column support tool
CN115324357A (en) * 2022-08-29 2022-11-11 中信国安建工集团有限公司 Reinforcing bar node ligature auxiliary device
CN115506571A (en) * 2022-08-25 2022-12-23 中国一冶集团有限公司 Scaffold foundation fixing system for loess slope and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5629140U (en) * 1979-08-15 1981-03-19
JPS57117108U (en) * 1981-01-12 1982-07-20
JPH03158568A (en) * 1989-11-15 1991-07-08 Ota Kosan:Kk Positioning method and device for mold form supporter
JP2002161587A (en) * 2000-11-24 2002-06-04 Kaoru Taneichi Fixing tool for base and spacer for base
JP2002339568A (en) * 2001-05-14 2002-11-27 Tomoya Ueda Top-end inspecting measuring spacer
US20040088945A1 (en) * 2001-01-06 2004-05-13 George Owen Support

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5629140U (en) * 1979-08-15 1981-03-19
JPS57117108U (en) * 1981-01-12 1982-07-20
JPH03158568A (en) * 1989-11-15 1991-07-08 Ota Kosan:Kk Positioning method and device for mold form supporter
JP2002161587A (en) * 2000-11-24 2002-06-04 Kaoru Taneichi Fixing tool for base and spacer for base
US20040088945A1 (en) * 2001-01-06 2004-05-13 George Owen Support
JP2002339568A (en) * 2001-05-14 2002-11-27 Tomoya Ueda Top-end inspecting measuring spacer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180508A (en) * 2019-04-26 2020-11-05 ジャパン スチールス グループ株式会社 Handrail support column support tool
CN115506571A (en) * 2022-08-25 2022-12-23 中国一冶集团有限公司 Scaffold foundation fixing system for loess slope and construction method
CN115506571B (en) * 2022-08-25 2024-05-17 中国一冶集团有限公司 Scaffold foundation fixing system for loess slope and construction method
CN115324357A (en) * 2022-08-29 2022-11-11 中信国安建工集团有限公司 Reinforcing bar node ligature auxiliary device
CN115324357B (en) * 2022-08-29 2023-09-05 中信国安建工集团有限公司 Reinforcing bar node ligature auxiliary device

Also Published As

Publication number Publication date
JP6511270B2 (en) 2019-05-15

Similar Documents

Publication Publication Date Title
CN109707173B (en) Construction method of assembly type laminated beam plate installation auxiliary device
KR100819833B1 (en) Apparatus and method for building slab of a concrete build
JP2021119296A (en) Construction method for connection structure of precast structural member and overtime hardening material
KR100622935B1 (en) Horizontal extension joint structuer and joint method using thereof
JP2016130421A (en) Bearing member for scaffold board, and bearing method for scaffold board using the same applied when casting foundation concrete
KR100865133B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
JP6308502B2 (en) Construction method of pre-tension slab in overhang construction
KR101854653B1 (en) Construction method of concrete structure based on exposed concrete method
KR20180117498A (en) Truss deck which is available for slab maintenance repair and manufacture method
KR20120078217A (en) Block out construction method for apparatus base
JP6914028B2 (en) Formwork fixing device, formwork, formwork fixing method and joint construction method
JP6914822B2 (en) Formwork method and formwork unit for lifting
JPH06316939A (en) Positioning jig for construction work, and construction of building therewith
KR20190139369A (en) The three-dimensional wire mesh for concrete
KR102298690B1 (en) Prefabricated steel frame for composite member of steel and concrete with ferrocement form and construction method of composite member using the same
JP7371315B2 (en) Precast floor slab construction method
JP7455931B1 (en) Precast board manufacturing method and precast board
JP7143208B2 (en) Formwork for precast concrete and method for manufacturing foundation block
JP2005146582A (en) Connection structure between reinforced column and steel frame beam, and method of manufacturing anchoring fitting
JP2022118552A (en) Ditch passage constructing unit and method of constructing ditch passage
JP2022181299A (en) Construction method of structure, and fastened jig
JP2008150820A (en) Wall concrete, and manufacturing method and construction method therefor
JP2021006701A (en) Method of constructing connection structure of precast structural member and time-hardening material
KR20180047500A (en) Truss deck which is available for slab maintenance repair and manufacture method
KR200373487Y1 (en) The mold conjunction structure having a join means which formed a notch portion

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190227

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190408

R150 Certificate of patent or registration of utility model

Ref document number: 6511270

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees