JP6415815B2 - 電気的負荷への電力の順次の付与のためのシステム及び方法 - Google Patents
電気的負荷への電力の順次の付与のためのシステム及び方法 Download PDFInfo
- Publication number
- JP6415815B2 JP6415815B2 JP2013513014A JP2013513014A JP6415815B2 JP 6415815 B2 JP6415815 B2 JP 6415815B2 JP 2013513014 A JP2013513014 A JP 2013513014A JP 2013513014 A JP2013513014 A JP 2013513014A JP 6415815 B2 JP6415815 B2 JP 6415815B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- controller
- unit controller
- unit
- delay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title description 20
- 238000011084 recovery Methods 0.000 claims description 66
- 230000005540 biological transmission Effects 0.000 claims description 16
- 238000004891 communication Methods 0.000 claims description 10
- 230000001934 delay Effects 0.000 claims description 7
- 238000010438 heat treatment Methods 0.000 claims description 5
- 238000004378 air conditioning Methods 0.000 claims description 3
- 230000008859 change Effects 0.000 claims description 3
- 238000009423 ventilation Methods 0.000 claims description 3
- 230000001419 dependent effect Effects 0.000 description 72
- 230000006870 function Effects 0.000 description 21
- 238000007726 management method Methods 0.000 description 13
- 238000004364 calculation method Methods 0.000 description 9
- 238000001514 detection method Methods 0.000 description 7
- 238000012545 processing Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 230000003287 optical effect Effects 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000036962 time dependent Effects 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000004913 activation Effects 0.000 description 2
- 238000003491 array Methods 0.000 description 2
- 238000004590 computer program Methods 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 230000003278 mimic effect Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000004065 semiconductor Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 1
- 239000000872 buffer Substances 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000009849 deactivation Effects 0.000 description 1
- 230000002779 inactivation Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000006903 response to temperature Effects 0.000 description 1
- 230000007474 system interaction Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/58—The condition being electrical
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
Claims (15)
- 複数の電気的負荷に順次の電力付与を供給するためのエネルギー管理システムであって、前記エネルギー管理システムは、複数の電気的負荷と、複数のユニットコントローラとを有し、各ユニットコントローラは、少なくとも一つの電気的負荷に接続され、前記少なくとも一つの電気的負荷への電力付与を制御し、各ユニットコントローラが個々のユニットコントローラと通信可能にするための固有の識別子を具備し、各固有の識別子は、固有の電源オン遅延と関係し、
前記ユニットコントローラは、
電力の供給を検知し、パワーアップイベントを決定するためのパワーアップコントローラであって、前記パワーアップイベントは、当該ユニットコントローラが電源オフの状態から電源オンの状態に変化することである、パワーアップコントローラと、
メモリと、
前記パワーアップイベントの後、前記ユニットコントローラの前記固有の電源オン遅延に従って決定される時間に前記少なくとも一つの電気的負荷への前記電力の伝送を可能にするため前記メモリにより設定されるプロセッサとを有し、
前記ユニットコントローラの前記固有の電源オン遅延は、前記固有の識別子と、ランダム回復時間とに基づき決定され、
ここで、前記ランダム回復時間は、乱数発生器を使用して計算された時間であって、電気的サージから回復するためにかかる最小回復時間と平均して同様の大きさであるか、又は、既知の数のユニットコントローラで連続した遅延間の差が、それぞれのユニットコントローラにより計算される遅延間で許容される前記最小回復時間と少なくとも同じ大きさであることを統計学的に保証するような時間であり、前記固有の電源オン遅延は、前記固有の識別子から得られるアドレス若しくはアドレスに1を引いたものと、前記ランダム回復時間との乗算であるか、又は、前記固有の識別子から得られるアドレス若しくはアドレスに1を引いたものと、前記最小回復時間の半分と前記ランダム回復時間の半分との和との乗算であり、
前記複数のユニットコントローラは、前記パワーアップイベントの後、予め定められた順序で前記複数の電気的負荷へ電力を供給する、エネルギー管理システム。 - 特定のユニットコントローラの前記固有の電源オン遅延が前記特定のユニットコントローラの前記固有の識別子に依存して事前に決められている、請求項1に記載のエネルギー管理システム。
- 特定のユニットコントローラの前記固有の電源オン遅延が前記特定のユニットコントローラの前記固有の識別子に依存して前記特定のユニットコントローラにより計算される、請求項1に記載のエネルギー管理システム。
- 各ユニットコントローラの前記固有の識別子が各ユニットコントローラに位置される関連するディップスイッチにより供給される、請求項1に記載のエネルギー管理システム。
- 前記電気的負荷の全てが同じビル内に位置される、請求項1に記載のエネルギー管理システム。
- 前記電気的負荷の全てが同じビル内に位置されていない、請求項1に記載のエネルギー管理システム。
- 前記電気的負荷が、加熱ユニット、ベンチレーションユニット、及び空気調節ユニットから成るグループから選択される、請求項1に記載のエネルギー管理システム。
- 前記ユニットコントローラが、複数の電気的負荷に接続され、前記複数の電気的負荷への電力付与を制御できる、請求項1に記載のエネルギー管理システム。
- 複数の電気的負荷と、複数のユニットコントローラであって、各ユニットコントローラは、少なくとも一つの電気的負荷に接続され、各ユニットコントローラが個々のユニットコントローラと通信可能にするための固有の識別子を具備する前記複数のユニットコントローラと、前記少なくとも一つの電気的負荷と関連した少なくとも一つのユニットコントローラとの通信を介して、前記複数の電気的負荷内の少なくとも一つの電気的負荷への電力付与を制御するためのビルコントローラとを有する複数の電気的負荷へ順次の電力付与を供給するためのエネルギー管理システムであって、ユニットコントローラの各固有の識別子が固有の電源オン遅延と関連し、
前記ビルコントローラは、
メモリと、
電源オフの状態が発生し、続いて電源オンの状態が発生することを決定するステップであって、これらの状態のシーケンスがパワーアップイベントと呼ばれる当該ステップと、前記パワーアップイベントの後、前記ユニットコントローラの前記固有の電源オン遅延に従って決定される時間に前記少なくとも一つの電気的負荷への電力の伝送を可能にするステップとを実施するため前記メモリにより設定されるプロセッサとを有し、
前記ユニットコントローラの前記固有の電源オン遅延は、前記固有の識別子と、ランダム回復時間とに基づき決定され、
ここで、前記ランダム回復時間は、乱数発生器を使用して計算された時間であって、電気的サージから回復するためにかかる最小回復時間と平均して同様の大きさであるか、又は、既知の数のユニットコントローラで連続した遅延間の差が、それぞれのユニットコントローラにより計算される遅延間で許容される前記最小回復時間と少なくとも同じ大きさであることを統計学的に保証するような時間であり、前記固有の電源オン遅延は、前記固有の識別子から得られるアドレス若しくはアドレスに1を引いたものと、前記ランダム回復時間との乗算であるか、又は、前記固有の識別子から得られるアドレス若しくはアドレスに1を引いたものと、前記最小回復時間の半分と前記ランダム回復時間の半分との和との乗算であり、
前記ビルコントローラは、前記パワーアップイベントの後、予め定められた順序で前記複数の電気的負荷へ電力を供給する、エネルギー管理システム。 - 特定のユニットコントローラの前記固有の電源オン遅延が前記特定のユニットコントローラの前記固有の識別子に依存して事前に決められている、請求項9に記載のエネルギー管理システム。
- 特定のユニットコントローラの前記固有の電源オン遅延が前記特定のユニットコントローラの前記固有の識別子に依存して、前記特定のユニットコントローラにより計算される、請求項9に記載のエネルギー管理システム。
- 特定のユニットコントローラの前記固有の電源オン遅延が前記特定のユニットコントローラの前記固有の識別子に依存して、前記ビルコントローラにより計算される、請求項9に記載のエネルギー管理システム。
- 各ユニットコントローラの前記固有の識別子が各ユニットコントローラに位置される関連するディップスイッチにより供給される、請求項9に記載のエネルギー管理システム。
- 前記電気的負荷の全てが、同じビル内に位置され、加熱ユニット、ベンチレーションユニット及び空気調節ユニットから成るグループから選択される、請求項9に記載のエネルギー管理システム。
- 前記電気的負荷の全てが同じビル内に位置されていない、請求項9に記載のエネルギー管理システム。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US35018910P | 2010-06-01 | 2010-06-01 | |
US61/350,189 | 2010-06-01 | ||
PCT/IB2011/052099 WO2011151750A2 (en) | 2010-06-01 | 2011-05-12 | System and method for sequential application of power to electrical loads |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2013531451A JP2013531451A (ja) | 2013-08-01 |
JP2013531451A5 JP2013531451A5 (ja) | 2014-06-26 |
JP6415815B2 true JP6415815B2 (ja) | 2018-10-31 |
Family
ID=44628033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013513014A Expired - Fee Related JP6415815B2 (ja) | 2010-06-01 | 2011-05-12 | 電気的負荷への電力の順次の付与のためのシステム及び方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US9652010B2 (ja) |
EP (1) | EP2577830A2 (ja) |
JP (1) | JP6415815B2 (ja) |
CN (1) | CN102906957B (ja) |
TW (1) | TW201223064A (ja) |
WO (1) | WO2011151750A2 (ja) |
Families Citing this family (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7934052B2 (en) | 2007-12-27 | 2011-04-26 | Pliant Technology, Inc. | System and method for performing host initiated mass storage commands using a hierarchy of data structures |
US9699263B1 (en) | 2012-08-17 | 2017-07-04 | Sandisk Technologies Llc. | Automatic read and write acceleration of data accessed by virtual machines |
KR20140049336A (ko) * | 2012-10-17 | 2014-04-25 | 현대모비스 주식회사 | 안정적인 터치 전원 제어 가능한 멀티미디어 시스템용 디스플레이 장치 및 그 방법 |
US9501398B2 (en) | 2012-12-26 | 2016-11-22 | Sandisk Technologies Llc | Persistent storage device with NVRAM for staging writes |
US9612948B2 (en) | 2012-12-27 | 2017-04-04 | Sandisk Technologies Llc | Reads and writes between a contiguous data block and noncontiguous sets of logical address blocks in a persistent storage device |
US9454420B1 (en) | 2012-12-31 | 2016-09-27 | Sandisk Technologies Llc | Method and system of reading threshold voltage equalization |
US9870830B1 (en) | 2013-03-14 | 2018-01-16 | Sandisk Technologies Llc | Optimal multilevel sensing for reading data from a storage medium |
US9367246B2 (en) | 2013-03-15 | 2016-06-14 | Sandisk Technologies Inc. | Performance optimization of data transfer for soft information generation |
US9244763B1 (en) | 2013-03-15 | 2016-01-26 | Sandisk Enterprise Ip Llc | System and method for updating a reading threshold voltage based on symbol transition information |
US9236886B1 (en) | 2013-03-15 | 2016-01-12 | Sandisk Enterprise Ip Llc | Universal and reconfigurable QC-LDPC encoder |
US9524235B1 (en) | 2013-07-25 | 2016-12-20 | Sandisk Technologies Llc | Local hash value generation in non-volatile data storage systems |
US9384126B1 (en) | 2013-07-25 | 2016-07-05 | Sandisk Technologies Inc. | Methods and systems to avoid false negative results in bloom filters implemented in non-volatile data storage systems |
US9235509B1 (en) | 2013-08-26 | 2016-01-12 | Sandisk Enterprise Ip Llc | Write amplification reduction by delaying read access to data written during garbage collection |
US9639463B1 (en) | 2013-08-26 | 2017-05-02 | Sandisk Technologies Llc | Heuristic aware garbage collection scheme in storage systems |
US9442662B2 (en) | 2013-10-18 | 2016-09-13 | Sandisk Technologies Llc | Device and method for managing die groups |
US9298608B2 (en) | 2013-10-18 | 2016-03-29 | Sandisk Enterprise Ip Llc | Biasing for wear leveling in storage systems |
US9436831B2 (en) | 2013-10-30 | 2016-09-06 | Sandisk Technologies Llc | Secure erase in a memory device |
US9263156B2 (en) | 2013-11-07 | 2016-02-16 | Sandisk Enterprise Ip Llc | System and method for adjusting trip points within a storage device |
US9244785B2 (en) | 2013-11-13 | 2016-01-26 | Sandisk Enterprise Ip Llc | Simulated power failure and data hardening |
US9703816B2 (en) | 2013-11-19 | 2017-07-11 | Sandisk Technologies Llc | Method and system for forward reference logging in a persistent datastore |
US9520197B2 (en) | 2013-11-22 | 2016-12-13 | Sandisk Technologies Llc | Adaptive erase of a storage device |
US9520162B2 (en) | 2013-11-27 | 2016-12-13 | Sandisk Technologies Llc | DIMM device controller supervisor |
US9582058B2 (en) * | 2013-11-29 | 2017-02-28 | Sandisk Technologies Llc | Power inrush management of storage devices |
US9235245B2 (en) | 2013-12-04 | 2016-01-12 | Sandisk Enterprise Ip Llc | Startup performance and power isolation |
US9703636B2 (en) | 2014-03-01 | 2017-07-11 | Sandisk Technologies Llc | Firmware reversion trigger and control |
US9454448B2 (en) | 2014-03-19 | 2016-09-27 | Sandisk Technologies Llc | Fault testing in storage devices |
US9448876B2 (en) | 2014-03-19 | 2016-09-20 | Sandisk Technologies Llc | Fault detection and prediction in storage devices |
US9390814B2 (en) | 2014-03-19 | 2016-07-12 | Sandisk Technologies Llc | Fault detection and prediction for data storage elements |
US9390021B2 (en) | 2014-03-31 | 2016-07-12 | Sandisk Technologies Llc | Efficient cache utilization in a tiered data structure |
US9626399B2 (en) | 2014-03-31 | 2017-04-18 | Sandisk Technologies Llc | Conditional updates for reducing frequency of data modification operations |
US9626400B2 (en) | 2014-03-31 | 2017-04-18 | Sandisk Technologies Llc | Compaction of information in tiered data structure |
US9697267B2 (en) | 2014-04-03 | 2017-07-04 | Sandisk Technologies Llc | Methods and systems for performing efficient snapshots in tiered data structures |
US11625147B2 (en) | 2014-05-08 | 2023-04-11 | Beet, Inc. | Automation management interface with multiple asset display |
US10048670B2 (en) | 2014-05-08 | 2018-08-14 | Beet, Llc | Automation operating and management system |
US10146448B2 (en) | 2014-05-30 | 2018-12-04 | Sandisk Technologies Llc | Using history of I/O sequences to trigger cached read ahead in a non-volatile storage device |
US10656842B2 (en) | 2014-05-30 | 2020-05-19 | Sandisk Technologies Llc | Using history of I/O sizes and I/O sequences to trigger coalesced writes in a non-volatile storage device |
US10162748B2 (en) | 2014-05-30 | 2018-12-25 | Sandisk Technologies Llc | Prioritizing garbage collection and block allocation based on I/O history for logical address regions |
US10656840B2 (en) | 2014-05-30 | 2020-05-19 | Sandisk Technologies Llc | Real-time I/O pattern recognition to enhance performance and endurance of a storage device |
US10372613B2 (en) | 2014-05-30 | 2019-08-06 | Sandisk Technologies Llc | Using sub-region I/O history to cache repeatedly accessed sub-regions in a non-volatile storage device |
US10114557B2 (en) | 2014-05-30 | 2018-10-30 | Sandisk Technologies Llc | Identification of hot regions to enhance performance and endurance of a non-volatile storage device |
US9703491B2 (en) | 2014-05-30 | 2017-07-11 | Sandisk Technologies Llc | Using history of unaligned writes to cache data and avoid read-modify-writes in a non-volatile storage device |
US9652381B2 (en) | 2014-06-19 | 2017-05-16 | Sandisk Technologies Llc | Sub-block garbage collection |
US9443601B2 (en) | 2014-09-08 | 2016-09-13 | Sandisk Technologies Llc | Holdup capacitor energy harvesting |
JP7050945B2 (ja) * | 2018-03-01 | 2022-04-08 | ライカ バイオシステムズ イメージング インコーポレイテッド | 電源オフディレーシステムおよび方法 |
US11205896B2 (en) * | 2018-11-21 | 2021-12-21 | Black & Decker Inc. | Solar power system |
AU2022262847A1 (en) * | 2021-04-23 | 2023-11-02 | Breville USA, Inc. | An electrical appliance |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6081622A (ja) | 1983-10-12 | 1985-05-09 | Yamatake Honeywell Co Ltd | 瞬間最大電力低減方法 |
US4686630A (en) * | 1984-09-27 | 1987-08-11 | Process Systems, Inc. | Load management control system and method |
JPH01272289A (ja) * | 1988-04-25 | 1989-10-31 | Hitachi Ltd | 電化機器の集中制御装置 |
US5572438A (en) * | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
JP4052391B2 (ja) * | 1996-07-30 | 2008-02-27 | 三菱電機株式会社 | ビル管理装置システム、設備コントローラ |
US20050216131A1 (en) * | 2004-03-24 | 2005-09-29 | Sodemann Wesley C | Residential load power management system |
US7376854B2 (en) * | 2004-03-31 | 2008-05-20 | Intel Corporation | System for enabling and disabling voltage regulator controller of electronic appliance according to a series of delay times assigned to voltage regulator controllers |
US20060052906A1 (en) * | 2004-09-03 | 2006-03-09 | Lawrence Kates | Method and apparatus for load management metering in an electric power system |
JP2006345608A (ja) * | 2005-06-07 | 2006-12-21 | Toshiba Corp | 電子装置、電源制御方法、およびrofシステム、その給電方法、ならびにrof子局 |
JP4654964B2 (ja) * | 2006-04-13 | 2011-03-23 | 株式会社デンソー | グロープラグ通電制御装置 |
US7566987B2 (en) * | 2006-09-14 | 2009-07-28 | Lutron Electronics Co., Inc. | Method of powering up a plurality of loads in sequence |
US7781919B2 (en) * | 2006-09-14 | 2010-08-24 | Lutron Electronics Co., Inc. | Method of controlling a load control module as part of a startup sequence |
JP2008154068A (ja) | 2006-12-19 | 2008-07-03 | Canon Inc | 受電機器、受電機器の制御方法、及びコンピュータプログラム |
JP2008199823A (ja) * | 2007-02-14 | 2008-08-28 | Toshiba Corp | 無線信号分配システムと無線信号分配システムに用いられる分配装置用給電装置、子局装置用給電装置及び子局装置 |
US20080294291A1 (en) * | 2007-05-24 | 2008-11-27 | Johnson Controls Technology Company | Building automation systems and methods for controlling interacting control loops |
US8122235B2 (en) * | 2008-06-10 | 2012-02-21 | Dell Products, Lp | System and method of delaying power-up of an information handling system |
US8212396B2 (en) * | 2008-10-24 | 2012-07-03 | Shih-Chien Chiou | Apparatus power restart method in response to network connection status |
CN103718407A (zh) * | 2011-03-24 | 2014-04-09 | 爱立信(中国)通信有限公司 | 用于减小多模块系统的浪涌电流的方法和布置 |
-
2011
- 2011-05-12 WO PCT/IB2011/052099 patent/WO2011151750A2/en active Application Filing
- 2011-05-12 EP EP11730072.3A patent/EP2577830A2/en not_active Withdrawn
- 2011-05-12 JP JP2013513014A patent/JP6415815B2/ja not_active Expired - Fee Related
- 2011-05-12 US US13/700,564 patent/US9652010B2/en not_active Expired - Fee Related
- 2011-05-12 CN CN201180027384.0A patent/CN102906957B/zh not_active Expired - Fee Related
- 2011-05-12 TW TW100116726A patent/TW201223064A/zh unknown
Also Published As
Publication number | Publication date |
---|---|
US20130079942A1 (en) | 2013-03-28 |
CN102906957A (zh) | 2013-01-30 |
WO2011151750A3 (en) | 2012-07-19 |
WO2011151750A2 (en) | 2011-12-08 |
CN102906957B (zh) | 2016-01-27 |
US9652010B2 (en) | 2017-05-16 |
EP2577830A2 (en) | 2013-04-10 |
TW201223064A (en) | 2012-06-01 |
JP2013531451A (ja) | 2013-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6415815B2 (ja) | 電気的負荷への電力の順次の付与のためのシステム及び方法 | |
CA2910058C (en) | Context adaptive cool-to-dry feature for hvac controller | |
US9910577B2 (en) | Prospective determination of processor wake-up conditions in energy buffered HVAC control unit having a preconditioning feature | |
US9158322B2 (en) | Network latency tolerant control of a demand coordination network | |
JP6129280B2 (ja) | システムコントローラ、遠隔制御方法及びプログラム | |
WO2014136585A1 (ja) | 計測システム、統合コントローラ、センサ機器制御方法、及びプログラム | |
CA2765564A1 (en) | Methods, apparatuses, and computer program products for monitoring functionality of a refrigeration system | |
JP6890876B2 (ja) | 制御装置、制御システムおよびプログラム | |
US20200056800A1 (en) | Method for monitoring and controlling devices | |
EP4086718B1 (en) | Parallel transformer temperature measurement and fault detection system | |
JP6815464B2 (ja) | ローカル管理装置、サーバ管理装置、及び管理方法 | |
JP2007102313A (ja) | 制御装置およびマルチプロセッサ制御方法 | |
JP2019193564A (ja) | エネルギー管理システム、エネルギー管理装置、端末及びエネルギー管理方法 | |
JP2019002591A (ja) | 設備制御装置、設備制御システム、及び設備制御方法 | |
WO2012172690A1 (ja) | 空調管理装置、空調管理方法、及び、プログラム | |
WO2017107481A1 (zh) | 一种终端和终端加热方法 | |
JP6717579B2 (ja) | 電子機器温度制御装置、電子機器温度制御方法、及び、電子機器温度制御プログラム | |
JP2015132433A (ja) | エネルギー管理装置及びエネルギー管理方法 | |
WO2016207894A1 (en) | Thermostat control system | |
JP2015002585A (ja) | 電力管理装置および電力管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140509 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140509 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20140509 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150128 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150216 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20150514 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150814 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160203 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160502 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20160921 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20160927 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170301 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20171218 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180316 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180720 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20181003 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6415815 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |