Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007153929A
Other languages
Japanese (ja)
Other versions
JP2008303677A (en
Inventor
秀雄 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Homes Corp
Original Assignee
Asahi Kasei Homes Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Homes Corp filed Critical Asahi Kasei Homes Corp
Priority to JP2007153929A priority Critical patent/JP5000387B2/en
Publication of JP2008303677A publication Critical patent/JP2008303677A/en
Application granted granted Critical
Publication of JP5000387B2 publication Critical patent/JP5000387B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

建物の改築に際し、新たな上部構造(土台、柱や壁、筋交いなど)を既存のコンクリート基礎に止めつけるため、アンカーボルトを既存のコンクリート基礎に設置する後施工アンカー設置方法と、後施工アンカーを設置した基礎構造と、に関するものである。   When renovating the building, in order to fix the new superstructure (base, pillars and walls, bracing, etc.) to the existing concrete foundation, post-installation anchor installation method with anchor bolts installed on the existing concrete foundation and post-construction anchor It relates to the installed basic structure.

建物の改築に際し、新たな上部構造(土台、柱や壁、筋交いなど)を既存のコンクリート基礎に止めつけるための、従来のアンカーボルトと同等の引き抜き耐力を確保しえる後施工アンカーボルトがある。   There are post-installed anchor bolts that can secure the same pull-out strength as conventional anchor bolts to fix new superstructures (bases, columns, walls, braces, etc.) to existing concrete foundations when renovating buildings.

アンカーボルトを後施工する方法として、例えば、既存基礎に沿い新たに打設したコンクリートにアンカーボルトを埋め込む方法(特許文献2)が提案されている。また、既存のコンクリート基礎に天端面から下端面まで形成された竪穴に、アンカーボルトを挿通する、もしくは天端面から途中位置まで形成された縦穴に挿入する方法(特許文献2)が提案されている。   As a method for post-installing anchor bolts, for example, a method of embedding anchor bolts in concrete that has been newly placed along an existing foundation (Patent Document 2) has been proposed. Moreover, the method (patent document 2) which inserts an anchor bolt in the coffin hole formed in the existing concrete foundation from the top end surface to the lower end surface, or inserts it in the vertical hole formed from the top end surface to the middle position is proposed. .

特開2002−357005号公報JP 2002-357005 A 特開2005−299129号公報JP 2005-299129 A

しかしながら、上記特許文献1の方法では、当然新たなコンクリート基礎を打設しなければならず、コンクリート基礎中には配筋をもする必要が有り、大掛かりな工事が必要となりコストがかかる。また当然、基礎を打設する場所の土を掘削しておく必要もある。また、既存の基礎に沿って新たな基礎を作るため、新たなアンカーボルトは既存の基礎上からずれて配置される。そのため、上部構造(柱、土台や壁、筋交い等)の設置のために余分な部品が必要で、施工工数的にもコスト的にも負担が大きい。   However, in the method of Patent Document 1, it is necessary to place a new concrete foundation, and it is necessary to arrange bars in the concrete foundation, which requires large-scale construction and costs. Of course, it is also necessary to excavate the soil where the foundation will be placed. Moreover, in order to make a new foundation along the existing foundation, a new anchor bolt is displaced from the existing foundation. For this reason, extra parts are required to install the superstructure (columns, foundations, walls, braces, etc.), and the burden is large in terms of construction man-hours and costs.

また、上記特許文献2の方法では、竪穴が長いため精度良く形成するのに大変高度な技術が必要である。   In addition, the method of Patent Document 2 requires a very advanced technique to form with high accuracy because of the long hole.

そこで本発明は、既存コンクリート基礎および周辺部材、地盤等に対する各種工事をできるだけせずに、既存コンクリート基礎の上面にアンカーボルトを簡単な施工で正確に設置することができる後施工アンカー設置方法を提供することを目的とする。   Therefore, the present invention provides a post-installation anchor installation method capable of accurately installing anchor bolts on the upper surface of an existing concrete foundation without performing various constructions on the existing concrete foundation, peripheral members, and ground as much as possible. The purpose is to do.

上記課題を解決するために本発明に係る後施工アンカー設置方法の第一の構成は、アンカーボルトを既存のコンクリート基礎に設置する後施工アンカー設置方法であって、前記コンクリート基礎の上面から竪穴を穿孔する段階と、前記コンクリート基礎の主筋より下になる位置で、前記コンクリート基礎の側面を貫通して前記竪穴と連通する横穴を穿孔する段階と、前記竪穴にアンカーボルトを挿入する段階と、前記アンカーボルトの上部をワッシャーとナットにより前記竪穴の周りの前記コンクリート基礎の上面に係止し、前記アンカーボルトを垂下させる段階と、前記横穴に前記板状部材を挿入し、前記アンカーボルトの下部板状部材固定する段階と、前記竪穴の隙間と前記横穴の隙間とに充填剤を充填する段階と、を有することを特徴とする。 In order to solve the above problems, the first configuration of the post-construction anchor installation method according to the present invention is a post-construction anchor installation method in which anchor bolts are installed on an existing concrete foundation, and a pothole is formed from the top surface of the concrete foundation. comprising the steps of drilling at a position to be below the main reinforcement of the concrete foundation, the method comprising drilling a lateral hole communicating with the wells through the side surface of the concrete foundation, and inserting the anchor bolts into the pit, the The upper part of the anchor bolt is locked to the upper surface of the concrete foundation around the hole by a washer and a nut, the anchor bolt is suspended , the plate-like member is inserted into the lateral hole, and the lower part of the anchor bolt is inserted. affixing a plate-shaped member, a step of filling the filler into the gap between the the gap of the pit lateral hole, that it has a And butterflies.

後施工アンカー設置方法の第二の構成は、第一の構成において、前記板状部材を前記コンクリート基礎に接触しないように前記アンカーボルトの下部に固定することを特徴とし、 後施工アンカー設置方法の第三の構成は、第一または第二の構成において、前記アンカーボルト2本につき1枚の前記板状部材を用いることを特徴とする。 A second configuration of the rear installed anchor installation method, in a first configuration, the plate-like member, characterized in that fixed to the lower portion of said anchor bolt so as not to contact the concrete foundation, post-installed anchor installation method The third configuration is characterized in that, in the first or second configuration, one plate-like member is used for every two anchor bolts.

本発明によれば、既存コンクリート基礎および周辺部材、地盤等に対する各種工事をできるだけせずに、既存コンクリート基礎の上面にアンカーボルトを簡単な施工で正確に設置することができる。また、既存アンカーボルトと同程度の強度を長くない竪穴を穿孔することで確保できる。また、既存コンクリート基礎の最小限の表面アンカー部解体のみで、新たに基礎を作る必要がなく、短時間で施工できる。   ADVANTAGE OF THE INVENTION According to this invention, an anchor bolt can be correctly installed by simple construction on the upper surface of an existing concrete foundation, without performing various constructions with respect to the existing concrete foundation, peripheral members, and ground as much as possible. Moreover, it can be ensured by drilling a pothole that is not as long as existing anchor bolts. In addition, it is possible to perform construction in a short time without the need to make a new foundation by disassembling only the minimum surface anchor part of the existing concrete foundation.

本発明に係る後施工アンカー設置方法の実施形態について、図を用いて説明する。図1(a)は基礎構造の側断面図である。図1(b)は基礎構造の正面図である。図2は基礎構造の断面図である。   Embodiment of the post-installation anchor installation method which concerns on this invention is described using figures. FIG. 1A is a side sectional view of the foundation structure. FIG. 1B is a front view of the foundation structure. FIG. 2 is a sectional view of the foundation structure.

(基礎構造)
まず、アンカーボルトを既存のコンクリート基礎に設置した基礎構造について説明する。図1、図2に示すように、基礎構造は、コンクリート基礎1、アンカーボルト3、板状部材4、充填剤5、充填剤溢出防止蓋6から構成されている。
(Basic structure)
First, a foundation structure in which anchor bolts are installed on an existing concrete foundation will be described. As shown in FIGS. 1 and 2, the foundation structure includes a concrete foundation 1, an anchor bolt 3, a plate-like member 4, a filler 5, and a filler overflow prevention lid 6.

コンクリート基礎1は、基礎下部11から基礎上部12が突出した断面凸形状(逆T字形状)であり、基礎上部12の一部は、地面から突出している。コンクリート基礎1は、地面から突出した部分において、上面1aかつ主筋(横筋)の両側位置に4つの竪穴1cを穿孔され、側面1bかつ主筋より下になる位置に、竪穴1cの下部を連結する横穴1dを穿孔されている。   The concrete foundation 1 has a convex cross-sectional shape (inverted T shape) in which the foundation upper part 12 projects from the foundation lower part 11, and a part of the foundation upper part 12 projects from the ground. The concrete foundation 1 has four side holes 1c drilled in the upper surface 1a and both sides of the main bar (lateral bar) in a portion protruding from the ground, and the side hole connecting the lower part of the side hole 1c to the side 1b and lower than the main bar. 1d is perforated.

なお、竪穴1cの数は4つに限定されるものではなく、コンクリート基礎に埋め込まれた主筋の両側位置に複数設けてあればよい。竪穴1cの直径は、30mm程度であり、竪穴1cの長さは簡単かつ正確に施工できるように300mm程度になっている。横穴1dは主筋より下になる位置であればよい。横穴1dの直径は、80mm程度として、後述する板状部材4を挿入してアンカーボルト3を固定する作業を行えるようにしてある。横穴1dを丸穴としたことにより、充填剤5が横穴全体に充填できる。   In addition, the number of the hole 1c is not limited to four, What is necessary is just to provide two or more in the both-sides position of the main reinforcement embedded in the concrete foundation. The diameter of the pothole 1c is about 30 mm, and the length of the pothole 1c is about 300 mm so that it can be constructed easily and accurately. The horizontal hole 1d may be located at a position below the main muscle. The diameter of the horizontal hole 1d is set to about 80 mm so that the work of fixing the anchor bolt 3 by inserting a plate-like member 4 to be described later can be performed. By making the horizontal hole 1d a round hole, the filler 5 can be filled in the entire horizontal hole.

アンカーボルト3は、コンクリート基礎1の4つの竪穴1cに挿入されている。アンカーボルトの上部は、ワッシャー8、ナット9により、竪穴1cの周りの上面1aに係止されている。   The anchor bolts 3 are inserted into the four potholes 1 c of the concrete foundation 1. The upper part of the anchor bolt is locked to the upper surface 1a around the hole 1c by a washer 8 and a nut 9.

板状部材4は、2穴の鋼板であり、コンクリート基礎1の横穴1dから挿入され、2本のアンカーボルト3の下部3aを連結固定する。板状部材4は、アンカーボルト3の引き抜き力に対して抵抗力が働くように、主筋の下方に水平に配置され、1枚の板状部材4に2本のアンカーボルト3をナット7で固定している。板状部材4の面積は、固定するアンカーボルト3の数にもよるが、固定するアンカーボルト3が2本の場合には、引き抜き力に対する抵抗力を考慮して50cm2程度以上が好ましい。なお、板状部材4を2枚用い、4本のアンカーボルト3を固定したが、1枚の板状部材4で、主筋を挟んだ複数のアンカーボルト3を固定すればよく、4本のアンカーボルト3を1枚の板状部材4で固定してもよい。   The plate-like member 4 is a two-hole steel plate that is inserted from the lateral hole 1d of the concrete foundation 1 and connects and fixes the lower portions 3a of the two anchor bolts 3. The plate-like member 4 is disposed horizontally below the main bar so that a resistance force acts against the pulling force of the anchor bolt 3, and the two anchor bolts 3 are fixed to the single plate-like member 4 with nuts 7. is doing. Although the area of the plate-like member 4 depends on the number of anchor bolts 3 to be fixed, when there are two anchor bolts 3 to be fixed, it is preferably about 50 cm 2 or more in consideration of the resistance force against the pulling force. Although two plate-like members 4 are used and four anchor bolts 3 are fixed, a plurality of anchor bolts 3 sandwiching the main bar may be fixed by one plate-like member 4 and four anchor bolts 3 are fixed. The bolt 3 may be fixed by a single plate-like member 4.

充填剤5は、竪穴1cの隙間と横穴1dとの隙間とに充填されている。   The filler 5 is filled in the gap between the pothole 1c and the gap between the horizontal holes 1d.

充填剤溢出防止蓋6は、コンクリート基礎1の両側面の横穴1dを塞ぎ、充填剤5の溢出を防止している。   The filler overflow prevention lid 6 closes the lateral holes 1d on both side surfaces of the concrete foundation 1 to prevent the filler 5 from overflowing.

(後施工アンカー設置方法)
次に、アンカーボルトを既存のコンクリート基礎に設置する後施工アンカー設置方法について説明する。図3、図4は後施工アンカー設置方法の説明図である。
(Post-installation anchor installation method)
Next, a post-construction anchor installation method for installing anchor bolts on an existing concrete foundation will be described. 3 and 4 are explanatory diagrams of the post-installation anchor installation method.

図3(a)に示すように、増改築時に新たに柱等の固定用に充分な強度のあるアンカーボルトを施工する場合、1階床の一部を解体し、既存のコンクリート基礎1を露出させる。   As shown in Fig. 3 (a), when newly installing anchor bolts with sufficient strength for fixing pillars, etc. during extension and renovation, a part of the first floor is dismantled to expose the existing concrete foundation 1 Let

図3(b)に示すように、コンクリート基礎1の上面1aに、アンカーボルト3を主筋の両側位置に挿入させるための複数(4つ)の竪穴1cを穿孔する。   As shown in FIG. 3 (b), a plurality of (four) stud holes 1c for inserting the anchor bolts 3 on both sides of the main bar are drilled in the upper surface 1a of the concrete foundation 1.

図3(c)に示すように、コンクリート基礎1の主筋より下になる位置で、コンクリート基礎1の側面1bに、横穴1dを穿孔する。   As shown in FIG. 3 (c), a horizontal hole 1 d is drilled in the side surface 1 b of the concrete foundation 1 at a position below the main reinforcement of the concrete foundation 1.

図4(a)に示すように、複数の竪穴1cに複数のアンカーボルト3を挿入する。アンカーボルト3の上部をワッシャー8、ナット9により竪穴1cの周りの上面1aに係止する。横穴1dに板状部材4を挿入し、挿入した板状部材4のボルト穴に、竪穴1cに挿入した複数(4本)のアンカーボルト3の下部を通し、ナット7で連結固定する。   As shown in FIG. 4 (a), a plurality of anchor bolts 3 are inserted into the plurality of blind holes 1c. The upper part of the anchor bolt 3 is locked to the upper surface 1a around the hole 1c by a washer 8 and a nut 9. The plate-like member 4 is inserted into the horizontal hole 1 d, and the lower portions of the plurality of (four) anchor bolts 3 inserted into the stud holes 1 c are passed through the bolt holes of the inserted plate-like member 4, and connected and fixed with nuts 7.

図4(b)に示すように、充填剤溢出防止蓋6で充填剤5が溢出しないように横穴1dを塞ぐ。竪穴1cの隙間へ充填剤5を注入することで、竪穴1cの隙間と横穴1dの隙間とに充填剤5を充填する。なお、充填剤5の流動性が小さい場合には、横穴1dからも注入し、全体に充填剤5が充填されるようにする。   As shown in FIG. 4B, the lateral hole 1d is closed by the filler overflow prevention lid 6 so that the filler 5 does not overflow. By injecting the filler 5 into the gap of the pothole 1c, the filler 5 is filled into the gap of the pothole 1c and the gap of the lateral hole 1d. In addition, when the fluidity | liquidity of the filler 5 is small, it inject | pours also from the horizontal hole 1d so that the filler 5 may be filled with the whole.

充填剤5が硬化することで、図4(c)、図1に示すような後施工アンカーボルト3をコンクリート基礎1に設置した基礎構造が完成する。   When the filler 5 is cured, a foundation structure in which the post-construction anchor bolts 3 as shown in FIG. 4C and FIG. 1 are installed on the concrete foundation 1 is completed.

(効果)
上記基礎構造及び後施工アンカー設置方法によれば、既存コンクリート基礎1および周辺部材、地盤等に対する各種工事をできるだけせずに、既存コンクリート基礎1の上面1aにアンカーボルト3を簡単な施工で正確に設置することができる。また、既存アンカーボルトと同程度の強度を長くない竪穴1cを穿孔することで確保できる。また、最小限の表面アンカー部解体のみで、新たに基礎を作る必要がなく、短時間で施工できる。
(effect)
According to the above-mentioned foundation structure and post-installation anchor installation method, the anchor bolt 3 can be accurately applied to the upper surface 1a of the existing concrete foundation 1 with simple construction, without performing various works on the existing concrete foundation 1 and surrounding members, the ground, etc. Can be installed. Moreover, it can be ensured by drilling a hole 1c that is not as long as the existing anchor bolt. In addition, with minimal surface anchor disassembly, it is not necessary to create a new foundation, and construction can be performed in a short time.

すなわち、新たなコンクリート基礎を打設する必要がなく、コストをおさえることができる。また、既存のコンクリート基礎1の基礎上部12を利用するため、基礎を打設する場所の土を掘削しておく必要もない。また、既存のコンクリート基礎1の上面1aに新たなアンカーボルト3を配置するため、アンカーボルト3が既存の基礎上からずれて配置されることもない。そのため、上部構造(柱、土台や壁、筋交い等)の設置のために余分な部品を必要とせず、施工工数的、コスト的な負担を低減できる。   That is, it is not necessary to place a new concrete foundation, and the cost can be reduced. Moreover, since the foundation upper part 12 of the existing concrete foundation 1 is utilized, it is not necessary to excavate the soil where the foundation is to be placed. Moreover, since the new anchor bolt 3 is arrange | positioned on the upper surface 1a of the existing concrete foundation 1, the anchor bolt 3 is not arrange | positioned and shifted from on the existing foundation. Therefore, no extra parts are required for the installation of the superstructure (columns, foundations, walls, braces, etc.), and the construction man-hours and cost burden can be reduced.

また、アンカーボルト3の下部を水平に板状部材4で固定することにより、引き抜きに対する抵抗力を増大させるこができ、アンカーボルト3を挿入する竪穴1cを短くすることができ、精度良く形成するのに大変高度な技術を必要としない。   Further, by fixing the lower part of the anchor bolt 3 horizontally with the plate-like member 4, the resistance to pulling can be increased, and the hole 1c into which the anchor bolt 3 is inserted can be shortened and formed with high accuracy. It does not require very advanced technology.

また、アンカーボルト3を主筋の両側位置に配置し、板状部材4が主筋の下方に水平に配置された構造により、アンカーボルト3の引き抜き力が板状部材4、充填剤5を介して主筋に伝わるため、短いアンカーボルト3であっても、引き抜き力に対する強度を大きくすることができる。   In addition, the anchor bolt 3 is arranged on both sides of the main bar, and the plate-like member 4 is horizontally arranged below the main bar, so that the pull-out force of the anchor bolt 3 is passed through the plate-like member 4 and the filler 5 to the main bar. Therefore, even with a short anchor bolt 3, the strength against the pulling force can be increased.

本発明は、住宅鉄骨造、木造等の増改築時に適用できる。   The present invention can be applied at the time of extension and renovation of a residential steel structure, a wooden structure or the like.

(a)基礎構造の側断面図である。(b)基礎構造の正面図である。(A) It is a sectional side view of a foundation structure. (B) It is a front view of a foundation structure. 基礎構造の断面図である。It is sectional drawing of a foundation structure. 後施工アンカー設置方法の説明図である。It is explanatory drawing of the post-installation anchor installation method. 後施工アンカー設置方法の説明図である。It is explanatory drawing of the post-installation anchor installation method.

1 …コンクリート基礎
1a …上面
1b …側面
1c …竪穴
1d …横穴
3 …アンカーボルト
3a …下部
4 …板状部材
5 …充填剤
6 …充填剤溢出防止蓋
7 …ナット
8 …ワッシャー
9 …ナット
11 …基礎下部
12 …基礎上部
DESCRIPTION OF SYMBOLS 1 ... Concrete foundation 1a ... Upper surface 1b ... Side surface 1c ... Side hole 1d ... Side hole 3 ... Anchor bolt 3a ... Lower part 4 ... Plate-shaped member 5 ... Filler 6 ... Filler overflow prevention lid 7 ... Nut 8 ... Washer 9 ... Nut 11 ... Lower foundation 12 ... Upper foundation

Claims (3)

アンカーボルトを既存のコンクリート基礎に設置する後施工アンカー設置方法であって、
前記コンクリート基礎の上面から竪穴を穿孔する段階と、
前記コンクリート基礎の主筋より下になる位置で、前記コンクリート基礎の側面を貫通して前記竪穴と連通する横穴を穿孔する段階と、
前記竪穴にアンカーボルトを挿入する段階と、
前記アンカーボルトの上部をワッシャーとナットにより前記竪穴の周りの前記コンクリート基礎の上面に係止し、前記アンカーボルトを垂下させる段階と、
前記横穴に前記板状部材を挿入し、前記アンカーボルトの下部板状部材固定する段階と、
前記竪穴の隙間と前記横穴の隙間とに充填剤を充填する段階と、
を有することを特徴とする後施工アンカー設置方法。
A post-installation anchor installation method in which anchor bolts are installed on an existing concrete foundation,
Drilling a pit from the upper surface of the concrete foundation;
Drilling a lateral hole penetrating the side surface of the concrete foundation and communicating with the pothole at a position below the main reinforcement of the concrete foundation;
Inserting an anchor bolt into the hole,
Locking the upper part of the anchor bolt to the upper surface of the concrete foundation around the hole with a washer and a nut, and dropping the anchor bolt;
Inserting the plate-like member into the lateral hole and fixing the plate-like member to the lower part of the anchor bolt;
Filling the gaps in the wells and the gaps in the side holes with a filler;
The post-installation anchor installation method characterized by having.
前記板状部材を前記コンクリート基礎に接触しないように前記アンカーボルトの下部に固定することを特徴とする請求項1に記載の後施工アンカー設置方法。
The post-installed anchor installation method according to claim 1, wherein the plate-like member is fixed to a lower portion of the anchor bolt so as not to contact the concrete foundation .
前記アンカーボルト2本につき1枚の前記板状部材を用いることを特徴とする請求項1又は2に記載の後施工アンカー設置方法。The post-construction anchor installation method according to claim 1 or 2, wherein one plate member is used for every two anchor bolts.
JP2007153929A 2007-06-11 2007-06-11 Post-installation anchor installation method Active JP5000387B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007153929A JP5000387B2 (en) 2007-06-11 2007-06-11 Post-installation anchor installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007153929A JP5000387B2 (en) 2007-06-11 2007-06-11 Post-installation anchor installation method

Publications (2)

Publication Number Publication Date
JP2008303677A JP2008303677A (en) 2008-12-18
JP5000387B2 true JP5000387B2 (en) 2012-08-15

Family

ID=40232638

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007153929A Active JP5000387B2 (en) 2007-06-11 2007-06-11 Post-installation anchor installation method

Country Status (1)

Country Link
JP (1) JP5000387B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5787669B2 (en) * 2011-08-25 2015-09-30 旭化成建材株式会社 Construction method of rising block
JP5964660B2 (en) * 2012-06-04 2016-08-03 旭化成ホームズ株式会社 Anchor bolt installation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0328999U (en) * 1989-07-31 1991-03-22
JPH0447027A (en) * 1990-06-13 1992-02-17 Natl House Ind Co Ltd Structure of footing
JPH08260501A (en) * 1995-03-22 1996-10-08 Nippon Steel Corp Setting method of shearing type foundation bolt
JP2005299129A (en) * 2004-04-08 2005-10-27 Sekisui House Ltd Hole-in anchor bolt

Also Published As

Publication number Publication date
JP2008303677A (en) 2008-12-18

Similar Documents

Publication Publication Date Title
KR101708760B1 (en) Construction method for precast concrete wall
JP2006104747A (en) Pier stud connection structure and pier stud connecting method
JP2016216975A (en) Installation method of earth anchor
JP5000387B2 (en) Post-installation anchor installation method
KR20110029454A (en) Reinforcing structure
JP5229913B2 (en) Slope reinforcement method
JP3198237U (en) Reinforcing equipment for concrete structures
JP2006016893A (en) Shearing reinforcing method of existing structure
KR101138499B1 (en) Method for Head Setting of Micro-Pile and Apparatus for the Same
KR101903286B1 (en) Seismic retrofit PC wall panel for RC frame, Manufacturing method thereof, and Construction method of Seismic retrofit structure of RC frame using PC wall panel
JP4789549B2 (en) Reconstruction method for existing buildings
JP5270255B2 (en) Foundation reinforcement method for existing wooden houses
JP5458375B2 (en) Base isolation structure
JP5912194B1 (en) Construction method of wooden building and basic member used in the construction method
JP5028323B2 (en) Ground anchor method
KR101424347B1 (en) Shear anchor for joing new and old concrete and method for joining new and old concrete
KR20220030457A (en) Seismic wall to reduce post installed anchor length by retrofit of PC member on RC frame and construction method thereof
JP4889414B2 (en) Foundation structure
JP2017206844A (en) Earthquake resistant wall structure
JP2017061803A (en) Positioning jig for anchor bolt for column, and construction method for steel column base part
KR102312126B1 (en) Temporary retaining wall structure and method construturing the same
JP6114071B2 (en) Seismic isolation method for existing buildings and temporary structure under construction
JP2018096050A (en) Horizontal force restraint structure and seismic isolation method
JP3114141B2 (en) Basement
JPH10292393A (en) Method for reinforcing foundation of existing structure

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20090807

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20090812

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100415

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120515

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120516

R150 Certificate of patent or registration of utility model

Ref document number: 5000387

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150525

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350