JP2005299129A - Hole-in anchor bolt - Google Patents

Hole-in anchor bolt Download PDF

Info

Publication number
JP2005299129A
JP2005299129A JP2004113936A JP2004113936A JP2005299129A JP 2005299129 A JP2005299129 A JP 2005299129A JP 2004113936 A JP2004113936 A JP 2004113936A JP 2004113936 A JP2004113936 A JP 2004113936A JP 2005299129 A JP2005299129 A JP 2005299129A
Authority
JP
Japan
Prior art keywords
concrete foundation
anchor rod
hole
anchor
vertical hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004113936A
Other languages
Japanese (ja)
Inventor
Yoshitomo Takahashi
是友 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP2004113936A priority Critical patent/JP2005299129A/en
Publication of JP2005299129A publication Critical patent/JP2005299129A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a hole-in anchor bolt which can secure pull-out strength equivalent to that of an original anchor bolt. <P>SOLUTION: An anchor rod 2, where male screws 2a are formed at both ends, is inserted into a vertical hole 11a which is formed by penetrating a range from an upper surface of a concrete foundation 11 to a lower end surface thereof; on the side of the lower end surface of the concrete foundation 11, a lower end of the anchor rod 2, which is protruded from the lower end surface, is passed through a mounting hole 3a of a connecting plate 3; and after that, the male screw 2a on the side of the lower end of the anchor rod 2 is screwed into a nut 4, so as to be fastened to it. Subsequently, the grout G covers the lower end of the anchor rod 2, the connecting plate 3 and the nut 4, so as to be joined to the concrete foundation 11. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

この発明は、後施工アンカーボルトに関するものである。   The present invention relates to a post-installed anchor bolt.

一般に、図5に示すように、アンカーボルト10は、コンクリート基礎11の鉄筋組立てと同時に組み込まれ、その後、コンクリートを打設することによって、コンクリート基礎11と一体化されている。そして、コンクリート基礎11に埋設されたアンカーボルト10に穴開けした土台Sを差し込んだ後、アンカーボルト10にワッシャを介してナットを締め付けることにより、土台Sを固定するものである。   In general, as shown in FIG. 5, the anchor bolt 10 is incorporated at the same time as the rebar assembly of the concrete foundation 11, and is then integrated with the concrete foundation 11 by placing concrete. And after inserting the base S drilled in the anchor bolt 10 embed | buried under the concrete foundation 11, the base S is fixed by tightening a nut to the anchor bolt 10 via a washer.

なお、コンクリート基礎11を構築するにあたっては、割栗地業12を形成した後、捨てコンクリート13が打設される。また、コンクリート基礎11のフーチングは盛土14によって覆われている。   In constructing the concrete foundation 11, the discarded concrete 13 is placed after forming the split chestnut industry 12. The footing of the concrete foundation 11 is covered with the embankment 14.

ところで、もし、コンクリート基礎の鉄筋や型枠を組み立てる段階でアンカーボルトを入れ忘れたままコンクリートを打設してしまうと、土台や柱を固定することができない。また、アンカーボルトを誤って設定位置以外の場所に植設することもあり、その際にも、土台や柱を固定することが困難となる。さらには、コンクリート基礎を形成した後、増築などの事情により、アンカーボルトを追加して要求されることがある。   By the way, if the concrete is cast with the anchor bolts forgotten in the stage of assembling the reinforcing bars and formwork of the concrete foundation, the foundation and the pillar cannot be fixed. Moreover, an anchor bolt may be mistakenly planted in places other than a setting position, and it becomes difficult to fix a base and a pillar also in that case. Furthermore, after forming a concrete foundation, an anchor bolt may be additionally required depending on circumstances such as extension.

このように、コンクリート基礎を形成した後にアンカーボルトを必要とする事態に対応して、後施工アンカーボルトが広く採用されている。例えば、特許文献1に記載されるように、端部にテーパー部を形成したボルトと、先端拡張部を有するスリーブとから後施工アンカーボルトを構成し、コンクリート基礎に縦穴を形成した後、縦穴にボルトを挿入するとともに、スリーブをボルトに打ち込むことにより、先端拡張部をボルトのテーパー部に沿って穴の内周面に押圧しながら拡径させて定着するメカニカルアンカーボルトが知られている。また、詳細には説明しないが、ケミカルアンカーと呼ばれる後施工アンカーボルトも知られている。
特開平6−65931号公報(第4図)
Thus, post-construction anchor bolts are widely adopted in response to situations where anchor bolts are required after the concrete foundation is formed. For example, as described in Patent Document 1, a post-construction anchor bolt is configured from a bolt having a tapered portion at the end and a sleeve having a tip extension portion, and a vertical hole is formed in a concrete foundation. A mechanical anchor bolt is known in which, while inserting a bolt and driving a sleeve into the bolt, the tip extension portion is pressed against the inner peripheral surface of a hole along the taper portion of the bolt, and the diameter is expanded and fixed. Although not described in detail, a post-installed anchor bolt called a chemical anchor is also known.
JP-A-6-65931 (FIG. 4)

ところで、後施工アンカーボルトは、コンクリート基礎の鉄筋組立てと同時に組み込まれてコンクリート基礎と一体化される本来のアンカーボルトに比較すると、どうしても引き抜き耐力が劣るため、土台や柱の取り付けに際して必要な強度を確保することができないという欠点があった。   By the way, post-installed anchor bolts are inferior to the original anchor bolts that are incorporated at the same time as the reinforcement of the concrete foundation and integrated with the concrete foundation. There was a drawback that it could not be secured.

本発明は、このような問題点に鑑みてなされたもので、本来のアンカーボルトと同等の引き抜き耐力を確保し得る後施工アンカーボルトを提供するものである。   This invention is made | formed in view of such a problem, and provides the post-installed anchor bolt which can ensure the pulling-out strength equivalent to the original anchor bolt.

本発明は、コンクリート基礎の天端面から下端面にかけて貫通して形成された縦穴に挿通され、両端部に雄ねじが形成されたアンカーロッドと、アンカーロッドに挿通可能な取付穴が形成され、コンクリート基礎の下端面から突出されたアンカーロッドの下端部に挿通された連結プレートと、アンカーロッドの下端側の雄ねじに締結されて連結プレートを保持するナットと、アンカーロッドの下端部、連結プレートおよびナットを覆ってコンクリート基礎に接合されたグラウトと、からなり、アンカーロッドが連結プレートを介してコンクリート基礎に定着されたことを特徴とするものである。   The present invention is provided with an anchor rod that is inserted through a vertical hole formed through from the top end surface to the lower end surface of a concrete foundation, male threads are formed at both ends, and a mounting hole that can be inserted into the anchor rod. A connecting plate inserted into the lower end portion of the anchor rod protruding from the lower end surface of the anchor rod, a nut that is fastened to a male screw on the lower end side of the anchor rod and holds the connecting plate, and a lower end portion of the anchor rod, the connecting plate and the nut The anchor rod is fixed to the concrete foundation via a connecting plate. The grout is covered and joined to the concrete foundation.

本発明によれば、コンクリート基礎の天端面から下端面にかけてアンカーロッドの外径に対応する内径の縦穴を貫通して形成した後、縦穴にアンカーロッドを挿通し、その下端部に連結プレートの取付穴を挿通するととともに、下端側の雄ねじにナットをねじ込んで締結し、コンクリート基礎の天端面からアンカーロッドの突出量を調整する。この際、作業に支障のないように、予め縦穴近傍の盛土、捨てコンクリートおよび割栗地業を除去しておく。次いで、連結プレートがコンクリート基礎の下端面に接した状態にアンカーロッドを支持し、グラウトをアンカーロッドの下端部、連結プレートおよびナットを覆ってコンクリート基礎の下端面に接合させる。また、アンカーロッドが縦穴の内周面とアンカーロッドの外周面との隙間で移動しないように、該隙間にもグラウトを充填する。この後、グラウトが硬化したならば、地業を回復させる。   According to the present invention, after forming a vertical hole having an inner diameter corresponding to the outer diameter of the anchor rod from the top end surface to the lower end surface of the concrete foundation, the anchor rod is inserted into the vertical hole, and the connecting plate is attached to the lower end portion thereof. Along with the insertion of the hole, a nut is screwed into the male screw on the lower end side and tightened to adjust the protruding amount of the anchor rod from the top end surface of the concrete foundation. At this time, so as not to hinder the work, the embankment near the vertical hole, the abandoned concrete, and the split chestnut industry are removed beforehand. Next, the anchor rod is supported in a state where the connecting plate is in contact with the lower end surface of the concrete foundation, and the grout is joined to the lower end surface of the concrete foundation covering the lower end portion of the anchor rod, the connecting plate and the nut. Also, grout is filled in the gap so that the anchor rod does not move in the gap between the inner peripheral surface of the vertical hole and the outer peripheral surface of the anchor rod. After this, if the grout has hardened, restore the groundwork.

この結果、アンカーロッドは、連結プレートを介してコンクリート基礎に定着されるため、コンクリート基礎と一体化された本来のアンカーボルトと同等の引き抜き耐力を有することになり、必要な強度を確保することができ、アンカーボルトの入れ忘れや、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することができる。   As a result, the anchor rod is fixed to the concrete foundation via the connecting plate, so that the anchor rod has the same pulling strength as the original anchor bolt integrated with the concrete foundation, and the necessary strength can be secured. It is possible to cope with forgetting to put the anchor bolt, planting the anchor bolt in the wrong position, adding an anchor bolt, or the like.

ここで、縦穴の内径をアンカーロッドの外径よりも若干大きく形成すると、縦穴の範囲内でアンカーロッドの位置を調整することができる。   Here, if the inner diameter of the vertical hole is slightly larger than the outer diameter of the anchor rod, the position of the anchor rod can be adjusted within the range of the vertical hole.

本発明は、コンクリート基礎の天端面から途中位置まで形成された縦穴に挿入され、下端部に貫通穴が形成される一方、上端部に雄ねじが形成されたアンカーロッドと、コンクリート基礎の縦穴に連通されるとともに、その一側面から他側面にかけて貫通して形成された横穴に挿通され、アンカーロッドの貫通穴に挿通された連結部材と、連結部材を覆ってコンクリート基礎に接合されたグラウトと、からなり、アンカーロッドが連結部材を介してコンクリート基礎に定着されたことを特徴とするものである。   The present invention is inserted into a vertical hole formed from the top end surface of the concrete foundation to a midway position, a through hole is formed at the lower end portion, and an anchor rod having a male screw formed at the upper end portion, and communicated with the vertical hole of the concrete foundation. And a connecting member that is inserted through a through hole formed from one side surface to the other side surface and inserted through the through hole of the anchor rod, and a grout that covers the connecting member and is joined to the concrete foundation. Thus, the anchor rod is fixed to the concrete foundation via the connecting member.

本発明によれば、コンクリート基礎の天端面からアンカーロッドの下端部に対応する内径の縦穴を設定深さ形成するとともに、コンクリート基礎に形成された縦穴の深さに合わせて、かつ、縦穴の底部に連通するように、コンクリート基礎の一側面から他側面にかけて横穴を形成する。次いで、コンクリート基礎の縦穴にアンカーロッドを挿入する一方、その横穴にボルトやピンなどの連結部材を挿通し、アンカーロッドの下端部に形成された貫通穴に連結部材を挿通させる。次いで、グラウトをコンクリート基礎の横穴の内周面と連結部材の外周面との隙間に充填し、連結部材を覆ってコンクリート基礎の横穴に接合させる。また、アンカーロッドがコンクリート基礎の縦穴の内周面とアンカーロッドの外周面との隙間で移動しないように、該隙間にもグラウトを充填する。   According to the present invention, a vertical hole having an inner diameter corresponding to the lower end portion of the anchor rod is formed from the top end surface of the concrete foundation to a set depth, and the bottom of the vertical hole is matched to the depth of the vertical hole formed in the concrete foundation. A side hole is formed from one side of the concrete foundation to the other side so as to communicate with the other side. Next, the anchor rod is inserted into the vertical hole of the concrete foundation, while a connecting member such as a bolt or a pin is inserted into the horizontal hole, and the connecting member is inserted into the through hole formed at the lower end of the anchor rod. Next, the grout is filled in the gap between the inner peripheral surface of the lateral hole of the concrete foundation and the outer peripheral surface of the connecting member, and the connecting member is covered and joined to the lateral hole of the concrete foundation. Moreover, grout is filled also into this clearance gap so that an anchor rod may not move by the clearance gap between the internal peripheral surface of the vertical hole of a concrete foundation, and the outer peripheral surface of an anchor rod.

この結果、アンカーロッドは、連結部材を介してコンクリート基礎に定着されるため、コンクリート基礎と一体化された本来のアンカーボルトと同等の引き抜き耐力を有することになり、必要な強度を確保することができ、アンカーボルトの入れ忘れや、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することができる。   As a result, the anchor rod is fixed to the concrete foundation via the connecting member, so that it has the same pulling strength as the original anchor bolt integrated with the concrete foundation, and the necessary strength can be ensured. It is possible to cope with forgetting to put the anchor bolt, planting the anchor bolt in the wrong position, adding an anchor bolt, or the like.

本発明は、コンクリート基礎の天端面から途中位置まで形成された縦穴に挿入され、両端部に雄ねじが形成されたアンカーロッドと、コンクリート基礎の縦穴に連通されるとともに、その一側面から縦穴の底部を越える位置まで形成された横穴に挿入され、アンカーロッドの下端側の雄ねじに締結されたナットと、ナットを覆ってコンクリート基礎に接合されたグラウトと、からなり、アンカーロッドがナットを介してコンクリート基礎に定着されたことを特徴とするものである。   The present invention is inserted into a vertical hole formed from the top end surface of the concrete foundation to an intermediate position, and is connected to the vertical hole of the concrete foundation with an anchor rod formed with male threads at both ends, and from one side to the bottom of the vertical hole The nut is inserted into a horizontal hole formed up to a position exceeding the upper end of the anchor rod and fastened to the male screw on the lower end side of the anchor rod, and a grout that covers the nut and is joined to the concrete foundation. The anchor rod is connected to the concrete through the nut. It is characterized by being established in the foundation.

本発明によれば、コンクリート基礎の天端面からアンカーロッドの外径に対応する内径の縦穴を設定深さ形成するとともに、コンクリート基礎に形成された縦穴の深さ位置に合わせて、かつ、縦穴の底部に連通するように、コンクリート基礎の一側面からその縦穴の底部を一定長さ越えた位置までナットを挿入できる大きさの横穴を形成する。次いで、コンクリート基礎の横穴から縦穴直下位置までナットを挿入する一方、その縦穴にアンカーロッドを挿入し、その下端側の雄ねじをナットにねじ込んで締結する。この後、グラウトをコンクリート基礎の横穴に充填し、ナットを覆ってコンクリート基礎の横穴に接合させる。また、アンカーロッドが縦穴の内周面とアンカーロッドの外周面との隙間で移動しないように、該隙間にもグラウトを充填する。   According to the present invention, the vertical hole having the inner diameter corresponding to the outer diameter of the anchor rod is formed from the top end surface of the concrete foundation to the set depth, and the vertical hole is formed in accordance with the depth position of the vertical hole formed in the concrete foundation. A lateral hole having a size capable of inserting a nut from one side surface of the concrete foundation to a position beyond a certain length beyond the bottom of the vertical hole is formed so as to communicate with the bottom. Next, the nut is inserted from the horizontal hole of the concrete foundation to the position directly below the vertical hole, while the anchor rod is inserted into the vertical hole, and the male screw on the lower end side is screwed into the nut and fastened. After this, grout is filled into the side hole of the concrete foundation, and the nut is covered and joined to the side hole of the concrete foundation. Also, grout is filled in the gap so that the anchor rod does not move in the gap between the inner peripheral surface of the vertical hole and the outer peripheral surface of the anchor rod.

この結果、アンカーロッドは、ナットを介してコンクリート基礎に定着されるため、コンクリート基礎と一体化された本来のアンカーボルトと同等の引き抜き耐力を有することになり、必要な強度を確保することができ、アンカーボルトの入れ忘れや、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することができる。   As a result, the anchor rod is fixed to the concrete foundation via the nut, so that it has the same pulling strength as the original anchor bolt integrated with the concrete foundation, and the necessary strength can be ensured. It is possible to cope with forgetting to put the anchor bolt, planting the anchor bolt in the wrong position, adding the anchor bolt, and the like.

本発明によれば、予めコンクリートと一体化される本来のアンカーボルトと同等の強度を備えた後施工アンカーボルトを得ることができる。   According to the present invention, a post-installed anchor bolt having a strength equivalent to that of an original anchor bolt integrated with concrete in advance can be obtained.

以下、本発明の実施の形態を図面に基づいて説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1および図2には、後施工アンカーボルト1の実施例1が示されている。   FIG. 1 and FIG. 2 show Example 1 of a post-installed anchor bolt 1.

この後施工アンカーボルト1は、両端部に雄ねじ2aが形成され、コンクリート基礎11の高さを十分越える長さのアンカーロッド2と、アンカーロッド2に挿通可能な取付穴3aを形成した連結プレート3と、アンカーロッド2の雄ねじ2aに螺合可能なナット4と、から構成されている。   This post-installed anchor bolt 1 has male screws 2 a formed at both ends, and a connecting plate 3 having an anchor rod 2 having a length sufficiently exceeding the height of the concrete foundation 11 and an attachment hole 3 a that can be inserted into the anchor rod 2. And a nut 4 that can be screwed into the male thread 2a of the anchor rod 2.

この施工アンカー1を施工するに際しては、まず、後施工アンカーボルト1を施工する近辺の盛土14、捨てコンクリート13および割栗地業12を予め除去して、作業に支障のないように準備した後、コンクリート基礎11の天端面から下端面にかけて、アンカーロッド2の外径よりも若干大きな内径の縦穴11aを形成する。次いで、コンクリート基礎11の縦穴11aにアンカーロッド2を挿通し、コンクリート基礎11の下端面側において、アンカーロッド2の下端部に連結プレート3の取付穴3aを挿通した後、その雄ねじ2aにナット4をねじ込んで締結する。この際、アンカーロッド2の、コンクリート基礎11の天端面からの突出量を調整する。この後、コンクリート基礎11の下端面に連結プレート3が接した状態にアンカーロッド2を支持し、アンカーロッド2、連結プレート3およびナット4に錆が発生するのを防止するため、グラウトGをアンカーロッド2の下端部、連結プレート3およびナット4を覆って充填し、コンクリート基礎11の下端面に接合させる。合わせて、コンクリート基礎11の縦穴11aの内周面とアンカーロッド2の外周面との隙間にグラウトGを充填する。グラウトGが硬化したならば、割栗地業12を施工するとともに、捨てコンクリート13を打設した後、盛土14を回復させる。   When constructing the construction anchor 1, first, the embankment 14, the discarded concrete 13, and the split chestnut industry 12 in the vicinity where the post-construction anchor bolt 1 is constructed are removed in advance and prepared so as not to hinder the work. A vertical hole 11 a having an inner diameter slightly larger than the outer diameter of the anchor rod 2 is formed from the top end surface to the lower end surface of the concrete foundation 11. Next, the anchor rod 2 is inserted into the vertical hole 11 a of the concrete foundation 11, the attachment hole 3 a of the connecting plate 3 is inserted into the lower end portion of the anchor rod 2 on the lower end surface side of the concrete foundation 11, and then the nut 4 is inserted into the male screw 2 a. Screw in and tighten. At this time, the amount of protrusion of the anchor rod 2 from the top end surface of the concrete foundation 11 is adjusted. Thereafter, the anchor rod 2 is supported with the connecting plate 3 in contact with the lower end surface of the concrete foundation 11, and the grout G is anchored to prevent the anchor rod 2, the connecting plate 3 and the nut 4 from being rusted. The lower end of the rod 2, the connecting plate 3 and the nut 4 are covered and filled, and joined to the lower end surface of the concrete foundation 11. In addition, the grout G is filled in the gap between the inner peripheral surface of the vertical hole 11 a of the concrete foundation 11 and the outer peripheral surface of the anchor rod 2. When the grout G is hardened, the cut chestnut industry 12 is constructed, and after the discarded concrete 13 is cast, the embankment 14 is restored.

この結果、アンカーロッド2は、連結プレート3を介してコンクリート基礎11に定着されるため、本来のアンカーボルトと同等の引き抜き耐力を有することになり、必要な強度を確保することができる。したがって、アンカーボルトの入れ忘れ、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することができる。   As a result, the anchor rod 2 is fixed to the concrete foundation 11 via the connecting plate 3, so that it has a pulling strength equivalent to that of the original anchor bolt, and the necessary strength can be ensured. Therefore, it is possible to cope with forgetting to insert the anchor bolt, planting the anchor bolt at a wrong position, adding the anchor bolt, and the like.

なお、前述した後施工アンカーボルト1においては、コンクリート基礎11を形成した後、コンクリート基礎11に縦穴11aを形成し、後施工アンカーボルト1を設ける場合を説明したが、予めアンカーボルトを余分に必要とすることが把握されているような場合、例えば、後日増築が予想されているような場合には、土台や柱を連結する位置に合わせて予めコンクリート基礎11に穴を形成しておくことができる。具体的には、コンクリート基礎11の鉄筋に予めシース管を取り付け、コンクリートを打設してコンクリート基礎11を形成することにより、コンクリート基礎11の上下方向にシース管を埋設することができ、シース管を利用して後施工アンカーボルト1を取り付けることができる。この場合は、コンクリート基礎11に縦穴11aを形成する必要がなく、作業を迅速に行うことができる利点がある。   In addition, in the post-construction anchor bolt 1 described above, after the concrete foundation 11 is formed, the vertical hole 11a is formed in the concrete foundation 11 and the post-construction anchor bolt 1 is provided. For example, when an extension is expected at a later date, a hole may be formed in the concrete foundation 11 in advance in accordance with the position where the foundation and the pillar are connected. it can. Specifically, by attaching a sheath tube to the reinforcing bar of the concrete foundation 11 in advance and placing the concrete to form the concrete foundation 11, the sheath tube can be embedded in the vertical direction of the concrete foundation 11, The post-construction anchor bolt 1 can be attached using In this case, there is no need to form the vertical hole 11a in the concrete foundation 11, and there is an advantage that the operation can be performed quickly.

図3に示す後施工アンカーボルト1の実施例2は、一端部に雄ねじ21aが形成されたロッド21の他端部に貫通孔22aが形成されたブロック22を溶接してなるアンカーロッド2Aと、アンカーロッド2Aの貫通孔22aに挿通可能なピンやボルトなどの連結部材5と、から構成されている。   Example 2 of the post-installed anchor bolt 1 shown in FIG. 3 includes an anchor rod 2A formed by welding a block 22 having a through hole 22a formed at the other end of the rod 21 having a male screw 21a formed at one end thereof. It is composed of a connecting member 5 such as a pin or a bolt that can be inserted into the through hole 22a of the anchor rod 2A.

この後施工アンカーボルト1を施工するに際しては、まず、アンカーロッド2Aのブロック22を挿入できる穴径の縦穴11aをコンクリート基礎11の天端面から設定深さにわたって形成する。次いで、コンクリート基礎11に形成された縦穴11aの深さに合わせて、かつ、縦穴11aの底部に連通するように、コンクリート基礎11の一側面から他側面にかけて横穴11bを形成する。次いで、コンクリート基礎11の縦穴11aにアンカーロッド2Aを挿入する一方、その横穴11bに連結部材5を挿通し、アンカーロッド2Aに形成された貫通穴22aに連結部材5を挿通させる。次いで、連結部材5に錆が発生するのを防止するため、グラウトGをコンクリート基礎11の横穴11bの内周面と連結部材5の外周面との隙間に充填し、連結部材5を覆ってコンクリート基礎11の横穴11bに接合させる。また、アンカーロッド2Aがコンクリート基礎11の縦穴11aの内周面とアンカーロッド2Aの外周面との隙間で移動しないように、該隙間にもグラウトGを充填する。   When constructing the post-installed anchor bolt 1, first, a vertical hole 11 a having a hole diameter into which the block 22 of the anchor rod 2 </ b> A can be inserted is formed from the top end surface of the concrete foundation 11 over a set depth. Next, a horizontal hole 11b is formed from one side of the concrete foundation 11 to the other side so as to match the depth of the vertical hole 11a formed in the concrete foundation 11 and communicate with the bottom of the vertical hole 11a. Next, the anchor rod 2A is inserted into the vertical hole 11a of the concrete foundation 11, while the connecting member 5 is inserted into the horizontal hole 11b, and the connecting member 5 is inserted into the through hole 22a formed in the anchor rod 2A. Next, in order to prevent rust from being generated in the connecting member 5, the grout G is filled in a gap between the inner peripheral surface of the horizontal hole 11 b of the concrete foundation 11 and the outer peripheral surface of the connecting member 5, and the connecting member 5 is covered to provide concrete. The base 11 is joined to the lateral hole 11b. Also, grout G is filled in the gap so that anchor rod 2A does not move in the gap between the inner circumferential surface of vertical hole 11a of concrete foundation 11 and the outer circumferential surface of anchor rod 2A.

この結果、アンカーロッド2Aは、連結部材5を介してコンクリート基礎11に定着されるため、本来のアンカーボルトと同等の引き抜き耐力を有することになり、必要な強度を確保することができる。したがって、アンカーボルトの入れ忘れ、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することができる。   As a result, the anchor rod 2 </ b> A is fixed to the concrete foundation 11 via the connecting member 5, so that it has the same pulling strength as the original anchor bolt, and the necessary strength can be ensured. Therefore, it is possible to cope with forgetting to insert the anchor bolt, planting the anchor bolt at a wrong position, adding the anchor bolt, and the like.

図4に示す後施工アンカーボルト1の実施例3は、両端部に雄ねじ2aが形成されたアンカーロッド2と、アンカーロッド2の雄ねじ2aに螺合可能なナット4Aと、から構成されている。   A third embodiment of the post-installed anchor bolt 1 shown in FIG. 4 includes an anchor rod 2 having male threads 2a formed at both ends, and a nut 4A that can be screwed into the male threads 2a of the anchor rod 2.

ここで、ナット4Aの外径は、コンクリート基礎11に形成された縦穴11aの内径よりも充分に大きなものが用いられる。   Here, the outer diameter of the nut 4 </ b> A is sufficiently larger than the inner diameter of the vertical hole 11 a formed in the concrete foundation 11.

この施工アンカー1を施工するに際しては、まず、アンカーロッド2の外径よりも若干大きな内径の縦穴11aをコンクリート基礎11の天端面から設定深さにわたって形成する。次いで、コンクリート基礎11に形成された縦穴11aの深さに合わせて、かつ、縦穴11aの底部に連通するように、コンクリート基礎11の一側面からその縦穴11aの底部を一定長さ越えた位置までナット4Aを挿入できる大きさの横穴11bを形成する。次いで、コンクリート基礎11の横穴11bから縦穴11aの直下位置までナット4Aを挿入する一方、その縦穴11aにアンカーロッド2を挿入し、その下端側の雄ねじ2aをナット4Aにねじ込んで締結する。この後、ナット4Aに錆が発生するのを防止するため、グラウトGをコンクリート基礎11の横穴11bに充填し、ナット4Aを覆ってコンクリート基礎11の横穴11bに接合させる。また、アンカーロッド2がコンクリート基礎11の縦穴11aの内周面とアンカーロッド2の外周面との隙間で移動しないように、該隙間にもグラウトGを充填する。   When constructing the construction anchor 1, first, a vertical hole 11 a having an inner diameter slightly larger than the outer diameter of the anchor rod 2 is formed from the top end surface of the concrete foundation 11 over a set depth. Next, in accordance with the depth of the vertical hole 11a formed in the concrete foundation 11 and so as to communicate with the bottom of the vertical hole 11a, from one side of the concrete foundation 11 to a position exceeding the bottom of the vertical hole 11a by a certain length. A lateral hole 11b having a size capable of inserting the nut 4A is formed. Next, the nut 4A is inserted from the horizontal hole 11b of the concrete foundation 11 to a position directly below the vertical hole 11a, while the anchor rod 2 is inserted into the vertical hole 11a, and the male screw 2a on the lower end side is screwed into the nut 4A and fastened. Thereafter, in order to prevent the rust from being generated in the nut 4A, the grout G is filled in the lateral hole 11b of the concrete foundation 11, and the nut 4A is covered and joined to the lateral hole 11b of the concrete foundation 11. Further, the grout G is also filled in the gap so that the anchor rod 2 does not move in the gap between the inner peripheral surface of the vertical hole 11 a of the concrete foundation 11 and the outer peripheral surface of the anchor rod 2.

この結果、アンカーロッド2は、ナット4Aを介してコンクリート基礎11に定着されるため、本来のアンカーボルトと同等の引き抜き耐力を有することになり、必要な強度を確保することができる。したがって、アンカーボルトの入れ忘れ、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することができる。   As a result, since the anchor rod 2 is fixed to the concrete foundation 11 via the nut 4A, the anchor rod 2 has a pulling strength equivalent to that of the original anchor bolt, and the necessary strength can be ensured. Therefore, it is possible to cope with forgetting to insert the anchor bolt, planting the anchor bolt at a wrong position, adding the anchor bolt, and the like.

以上のように本発明によれば、コンクリート基礎が形成された後であっても、本来のアンカーボルトと同等の引き抜き耐力を備えた後施工アンカーボルトを取り付けることができ、アンカーボルトの入れ忘れ、アンカーボルトの誤った位置への植設、アンカーボルトの追加などに対応することが可能となる。   As described above, according to the present invention, even after the concrete foundation is formed, it is possible to attach the post-construction anchor bolt having the same pulling strength as the original anchor bolt, forgetting to put the anchor bolt, the anchor It is possible to cope with the installation of bolts at wrong positions, the addition of anchor bolts, and the like.

本発明の後施工アンカーボルトの実施例1を示す正面側縦断面図である。It is a front side longitudinal cross-sectional view which shows Example 1 of the post-installed anchor bolt of this invention. 図1のA−A線断面図である。It is the sectional view on the AA line of FIG. 本発明の後施工アンカーボルトの実施例2を示す側面側縦断面図である。It is a side surface side longitudinal cross-sectional view which shows Example 2 of the post-installed anchor bolt of this invention. 本発明の後施工アンカーボルトの実施例3を示す側面側縦断面図である。It is a side surface side longitudinal cross-sectional view which shows Example 3 of the post-installed anchor bolt of this invention. 従来のアンカーボルトをコンクリート基礎とともに示す斜視図である。It is a perspective view which shows the conventional anchor bolt with a concrete foundation.

符号の説明Explanation of symbols

1 後施工アンカーボルト
2,2A アンカーロッド
3 連結プレート
4,4A ナット
5 連結部材
11 コンクリート基礎
11a 縦穴
11b 横穴
1 Post-installed anchor bolt 2, 2A Anchor rod 3 Connecting plate 4, 4A Nut 5 Connecting member 11 Concrete foundation 11a Vertical hole 11b Horizontal hole

Claims (3)

コンクリート基礎の天端面から下端面にかけて貫通して形成された縦穴に挿通され、両端部に雄ねじが形成されたアンカーロッドと、アンカーロッドに挿通可能な取付穴が形成され、コンクリート基礎の下端面から突出されたアンカーロッドの下端部に挿通された連結プレートと、アンカーロッドの下端側の雄ねじに締結されて連結プレートを保持するナットと、アンカーロッドの下端部、連結プレートおよびナットを覆ってコンクリート基礎に接合されたグラウトと、からなり、アンカーロッドが連結プレートを介してコンクリート基礎に定着されたことを特徴とする後施工アンカーボルト。   An anchor rod with a male thread formed on both ends and a mounting hole that can be inserted into the anchor rod are formed through the vertical hole formed through the top and bottom surfaces of the concrete foundation. A connecting plate inserted into the lower end of the protruding anchor rod, a nut fastened to the male screw on the lower end side of the anchor rod, and holding the connecting plate, and a concrete foundation covering the lower end of the anchor rod, the connecting plate and the nut A post-installed anchor bolt, characterized in that the anchor rod is fixed to the concrete foundation via a connecting plate. コンクリート基礎の天端面から途中位置まで形成された縦穴に挿入され、下端部に貫通穴が形成される一方、上端部に雄ねじが形成されたアンカーロッドと、コンクリート基礎の縦穴に連通されるとともに、その一側面から他側面にかけて貫通して形成された横穴に挿通され、アンカーロッドの貫通穴に挿通された連結部材と、連結部材を覆ってコンクリート基礎に接合されたグラウトと、からなり、アンカーロッドが連結部材を介してコンクリート基礎に定着されたことを特徴とする後施工アンカーボルト。   It is inserted into a vertical hole formed from the top end surface of the concrete foundation to a middle position, and a through hole is formed at the lower end, while communicating with an anchor rod with an external thread formed at the upper end, and a vertical hole in the concrete foundation, An anchor rod comprising: a connecting member inserted through a lateral hole formed through one side to the other side, and inserted into a through hole of the anchor rod; and a grout covering the connecting member and joined to a concrete foundation. A post-installed anchor bolt characterized in that is fixed to a concrete foundation via a connecting member. コンクリート基礎の天端面から途中位置まで形成された縦穴に挿入され、両端部に雄ねじが形成されたアンカーロッドと、コンクリート基礎の縦穴に連通されるとともに、その一側面から縦穴の底部を越える位置まで形成された横穴に挿入され、アンカーロッドの下端側の雄ねじに締結されたナットと、ナットを覆ってコンクリート基礎に接合されたグラウトと、からなり、アンカーロッドがナットを介してコンクリート基礎に定着されたことを特徴とする後施工アンカーボルト。   Inserted into a vertical hole formed from the top end surface of the concrete foundation to a midway position, with an anchor rod with male threads formed at both ends, and communicated with the vertical hole in the concrete foundation, from one side to the position beyond the bottom of the vertical hole It consists of a nut inserted into the formed horizontal hole and fastened to the male screw on the lower end side of the anchor rod, and a grout that covers the nut and is joined to the concrete foundation, and the anchor rod is fixed to the concrete foundation via the nut Post-installed anchor bolt characterized by that.
JP2004113936A 2004-04-08 2004-04-08 Hole-in anchor bolt Pending JP2005299129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004113936A JP2005299129A (en) 2004-04-08 2004-04-08 Hole-in anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004113936A JP2005299129A (en) 2004-04-08 2004-04-08 Hole-in anchor bolt

Publications (1)

Publication Number Publication Date
JP2005299129A true JP2005299129A (en) 2005-10-27

Family

ID=35331013

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004113936A Pending JP2005299129A (en) 2004-04-08 2004-04-08 Hole-in anchor bolt

Country Status (1)

Country Link
JP (1) JP2005299129A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303677A (en) * 2007-06-11 2008-12-18 Asahi Kasei Homes Kk Post-constructed anchor installation method and foundation structure
JP2011052398A (en) * 2009-08-31 2011-03-17 Sanko Techno Co Ltd Penetration-type anchor and construction method for fixing the same
JP2013249699A (en) * 2012-06-04 2013-12-12 Asahi Kasei Homes Co Installation method for anchor bolt

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303677A (en) * 2007-06-11 2008-12-18 Asahi Kasei Homes Kk Post-constructed anchor installation method and foundation structure
JP2011052398A (en) * 2009-08-31 2011-03-17 Sanko Techno Co Ltd Penetration-type anchor and construction method for fixing the same
JP2013249699A (en) * 2012-06-04 2013-12-12 Asahi Kasei Homes Co Installation method for anchor bolt

Similar Documents

Publication Publication Date Title
JP2006112224A (en) Insert for supporting reinforcing bar
JP2000054376A (en) Foundation pile and building-building frame structure
JP4675363B2 (en) PC steel bar fixing method in after-bond method, and instrument used for carrying out the method
KR101016047B1 (en) Apparatus for reinforcing anchor and construction method thereof
JP2005299129A (en) Hole-in anchor bolt
JP2006016952A (en) Anchor, method for temporarily fixing it, and temporary fixing structure using the same
JP4653675B2 (en) Anchor method
JP3778535B2 (en) Joint for pile head reinforcement
JP2004124495A (en) Pile head structure of prefabricated pile
JP4451491B1 (en) Anchor device and installation method thereof
JP5028323B2 (en) Ground anchor method
JP3578210B2 (en) Underground wall structure
JP2010203097A (en) Member for fixing bolt on wall surface, and method for mounting the same
JP2008063776A (en) Mounting structure of panel member
JP2005314993A (en) Rock bolt
KR100717252B1 (en) Grouting apparatus and Method of construction work using Earth anchor
JP7195114B2 (en) Anchor bolt fixing member, anchor bolt set using the same, and anchor bolt fixing member fixture
JP2009203716A (en) Method of fixing anchor to concrete slab, and anchor fixture for use in the method
JPH0724493Y2 (en) PC steel edge fixing device
JP4344923B2 (en) Form fixture for concrete buried hardware and concrete buried hardware unit
JP3875979B2 (en) Rock bolt
JP3683205B2 (en) Connecting wire rope member and method of connecting building pillar and foundation using connecting wire rope member
JP6727854B2 (en) Shear reinforcement structure of reinforced concrete structure
JP4760679B2 (en) Muscle hole forming bracket
JP2023058769A (en) Anchor, installation tool for anchor, and earthquake proof reinforcement construction method for concrete support column using these