JPH08260501A - Setting method of shearing type foundation bolt - Google Patents

Setting method of shearing type foundation bolt

Info

Publication number
JPH08260501A
JPH08260501A JP8773295A JP8773295A JPH08260501A JP H08260501 A JPH08260501 A JP H08260501A JP 8773295 A JP8773295 A JP 8773295A JP 8773295 A JP8773295 A JP 8773295A JP H08260501 A JPH08260501 A JP H08260501A
Authority
JP
Japan
Prior art keywords
concrete
anchor
existing foundation
foundation concrete
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP8773295A
Other languages
Japanese (ja)
Inventor
Koji Kudo
幸二 工藤
Norio Maruyama
宣男 丸山
Tetsuo Ota
哲郎 太田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP8773295A priority Critical patent/JPH08260501A/en
Publication of JPH08260501A publication Critical patent/JPH08260501A/en
Withdrawn legal-status Critical Current

Links

Abstract

PURPOSE: To extensively shorten a construction period, to restrict a construction space small and to set a shearing type foundation bolt at low cost. CONSTITUTION: A side hole 4 for insertion of an anchor plate 6 is drilled from a side surface of an existing foundation concrete 1, and a plurality of vertical holes 5 for insertion of anchor bolts reaching the side hole 4 from an upper part of the existing foundation concrete 1 are drilled. Thereafter, the anchor bolts 8 are inserted into the vertical holes 5 from the upper part of the foundation concrete 1, the anchor bolts 8 and the anchor plate 6 are fixed and concrete is injected into the vertical holes 5 thereafter.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、既設基礎中にせん断型
基礎ボルトを設置する際の工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for installing a shear type foundation bolt in an existing foundation.

【0002】[0002]

【従来の技術】既設の基礎コンクリート中にせん断型基
礎ボルトを設置する場合、従来の工法では、例えば図6
に示されるように、まず重機(図示せず)を用いて既設
基礎コンクリート1に凹部11を形成し、次にその凹部
(空間)11に、あらかじめアンカープレート6とアン
カーボルト8を固定した架構(アンカーフレーム)10
を設置した後、コンクリートを打設して架構10を既設
基礎コンクリート1に一体的に固定する方法が一般的で
ある。なお図中2は地盤である。
2. Description of the Related Art When a shear type foundation bolt is installed in an existing foundation concrete, the conventional construction method is, for example, as shown in FIG.
As shown in FIG. 1, first, a recess 11 is formed in the existing foundation concrete 1 using a heavy machine (not shown), and then the anchor plate 6 and the anchor bolt 8 are previously fixed in the recess (space) 11 ( Anchor frame) 10
After the installation, the concrete is generally cast to fix the frame 10 to the existing foundation concrete 1 integrally. In the figure, 2 is the ground.

【0003】[0003]

【発明が解決しようとする課題】従来の工法では、以下
に示すような問題があった。 (1)せん断型基礎ボルトを設置するためには、前述の
ように、既設基礎コンクリート1を一部撤去した後、再
び復旧する必要があり、そのための工事に時間を要す
る。 (2)既設基礎コンクリート1の撤去には重機を用いる
ため、広い施工スペースが必要となる。 (3)あらかじめアンカープレート6及び、アンカーボ
ルト8を固定する架構10の加工及び、据え付けが必要
であり、材料加工費がかさむ。 (4)アンカープレート6及びアンカーボルト8を固定
する架構10を加工した後は、現場へ搬送する必要があ
るため、輸送費用がかさむ。
The conventional method has the following problems. (1) In order to install the shear type foundation bolt, it is necessary to remove the existing foundation concrete 1 and then restore it again as described above, which requires time for construction. (2) A large construction space is required because heavy equipment is used to remove the existing foundation concrete 1. (3) It is necessary to process and install the frame 10 for fixing the anchor plate 6 and the anchor bolt 8 in advance, which increases the material processing cost. (4) Since the frame 10 for fixing the anchor plate 6 and the anchor bolt 8 has been processed, it needs to be transported to the site, which increases the transportation cost.

【0004】本発明は、前記の課題を解決するもので、
大幅に工期短縮をはかり、施工スペースが小さくてす
み、安価にせん断基礎ボルトを設置できる工法を提供す
ることを目的とする。
The present invention is to solve the above-mentioned problems.
It is an object of the present invention to provide a construction method in which the construction period can be greatly shortened, a construction space can be small, and a shear foundation bolt can be installed inexpensively.

【0005】[0005]

【課題を解決するための手段】前記の課題を解決するた
め、本発明のせん断型基礎ボルト設置工法は、既設基礎
コンクリート1の側面からアンカープレート6の挿入用
横穴4を穿設するとともに、前記既設基礎コンクリート
1の上部から前記横穴4まで達するアンカーボルト挿入
用縦穴5を複数穿設し、次に、前記既設基礎コンクリー
ト1側面の前記横穴4に前記アンカープレート6を挿入
した後、前記既設基礎コンクリート1の上部より前記縦
穴5にアンカーボルト8を挿入し、前記アンカーボルト
8と前記アンカープレート6を固定し、その後、前記縦
穴5にコンクリートを注入することを特徴とする。
In order to solve the above-mentioned problems, in the shear foundation bolt installation method of the present invention, a lateral hole 4 for inserting an anchor plate 6 is formed from a side surface of an existing foundation concrete 1, and A plurality of vertical holes 5 for inserting anchor bolts that reach the horizontal hole 4 from the upper part of the existing foundation concrete 1 are drilled, and then the anchor plate 6 is inserted into the lateral hole 4 on the side surface of the existing foundation concrete 1 and then the existing foundation An anchor bolt 8 is inserted into the vertical hole 5 from above the concrete 1, the anchor bolt 8 and the anchor plate 6 are fixed, and then concrete is poured into the vertical hole 5.

【0006】[0006]

【作用】本発明によると、既設基礎コンクリート1に穿
設する横穴4と縦穴5に挿入するアンカープレート6
と、アンカーボルト8を既設基礎コンクリート1中で結
合したうえ、前記縦穴5にコンクリートを注入するだけ
で、せん断型基礎ボルトを既設基礎コンクリート1に設
置でき、従来の架構10埋設のためのコンクリートの撤
去を最小限に抑え、かつ架構10の運搬が不要となる。
According to the present invention, the anchor plate 6 to be inserted into the horizontal hole 4 and the vertical hole 5 drilled in the existing foundation concrete 1.
By connecting the anchor bolt 8 in the existing foundation concrete 1 and injecting the concrete into the vertical hole 5, the shear type foundation bolt can be installed in the existing foundation concrete 1, and the conventional concrete for burying the frame 10 can be installed. The removal is minimized and the frame 10 need not be transported.

【0007】[0007]

【実施例】以下本発明の実施例を図を参照して説明す
る。図1には、既設基礎コンクリート1の上面と側面が
地盤2で覆われていない既設の基礎が示されている。本
工法では、まず始めに既設基礎コンクリート1の上面と
側面に、コンクリートカッター3を用いてコアをボーリ
ングする。その場合、既設基礎コンクリート1の側面に
は、図2に示されるように、コアを連続的に重ねてボー
リングすることにより、アンカープレート6が挿入でき
る大きさの水平横穴4を設ける。
Embodiments of the present invention will now be described with reference to the drawings. FIG. 1 shows an existing foundation in which the upper surface and the side surface of the existing foundation concrete 1 are not covered with the ground 2. In this construction method, first, a core is bored on the upper surface and the side surface of the existing foundation concrete 1 by using the concrete cutter 3. In that case, on the side surface of the existing foundation concrete 1, as shown in FIG. 2, a horizontal lateral hole 4 having a size into which the anchor plate 6 can be inserted is provided by boring cores continuously.

【0008】一方、既設基礎コンクリート1の上面から
は、地盤2に鉛直方向に沿って、アンカーボルト8が挿
入できる大きさの垂直縦穴5を、横穴4に達するまで設
ける。この縦穴5は、基礎を築くのに必要な数だけ設け
る。次に、図3に示されるように、アンカープレート6
を横穴4に挿入して設置する。このアンカープレート6
には、アンカーボルト8を固定するための係合用穴7が
設けられている。この係合用穴7は、アンカープレート
6を横穴4に挿入したとき、前記縦穴5の直下に位置す
る部位に設けられる。
On the other hand, from the upper surface of the existing foundation concrete 1, a vertical vertical hole 5 having a size into which the anchor bolt 8 can be inserted is provided along the vertical direction in the ground 2 until the horizontal hole 4 is reached. The vertical holes 5 are provided as many as necessary to build the foundation. Next, as shown in FIG. 3, the anchor plate 6
Is inserted into the lateral hole 4 and installed. This anchor plate 6
Is provided with an engagement hole 7 for fixing the anchor bolt 8. The engagement hole 7 is provided at a portion located immediately below the vertical hole 5 when the anchor plate 6 is inserted into the lateral hole 4.

【0009】そして、図4に示されるように、アンカー
プレート6を横穴4に挿入した後、アンカーボルト8を
縦穴5に挿入する。アンカーボルト8の先端部分には係
止用止め具9が設けられており、この係止用止め具9が
アンカープレート6の係合用穴7を貫通するまでアンカ
ーボルト8を挿入し、その後、このアンカーボルト8を
回転させて、アンカープレート6に固定する。なお、こ
のとき図5に示されるように、アンカープレート6は横
穴4の盛上り部12に支持されていて、アンカープレー
ト6の下側には空隙13が形成されるので、この空隙1
3を介して前記係止用止め具9を係合用穴7を通してそ
の下側にスムーズに移動させることができる。次に横穴
4の前面を塞ぐ型枠(図示を省略した)等を配設し、そ
して、最後に、コンクリートを縦穴5に注入し、各穴
4,5の空間部を充填することによってアンカープレー
ト6及び、アンカーボルト8を既設基礎コンクリート1
に固定する。また、前記係止用止め具9と係合用穴7の
構造は図示のものに限らず、ねじ込み式その他適宜の結
合手段を用いて構わない。
Then, as shown in FIG. 4, after inserting the anchor plate 6 into the horizontal hole 4, the anchor bolt 8 is inserted into the vertical hole 5. A locking stopper 9 is provided at a tip portion of the anchor bolt 8, and the anchor bolt 8 is inserted until the locking stopper 9 penetrates the engaging hole 7 of the anchor plate 6, and then the anchor bolt 8 is inserted. The anchor bolt 8 is rotated and fixed to the anchor plate 6. At this time, as shown in FIG. 5, the anchor plate 6 is supported by the raised portion 12 of the lateral hole 4, and the void 13 is formed below the anchor plate 6.
The locking stopper 9 can be smoothly moved to the lower side through the engagement hole 7 via the engaging hole 7. Next, a mold (not shown) for closing the front surface of the horizontal hole 4 is arranged, and finally, concrete is poured into the vertical hole 5 to fill the spaces of the holes 4 and 5 with the anchor plate. 6 and anchor bolt 8 to the existing foundation concrete 1
Fixed to. Further, the structures of the locking stopper 9 and the engaging hole 7 are not limited to those shown in the drawings, and a screwing type or other suitable connecting means may be used.

【0010】[0010]

【発明の効果】以上説明したように本発明のせん断型基
礎ボルトの設置工法によると次の諸効果が得られる。 (1)コアボーリングによって、既設基礎コンクリート
1の撤去及び、復旧範囲を必要最小限に抑えることが可
能であり、それにより大幅に工期を短縮できる。 (2)既設基礎コンクリート1を撤去するのに重機が不
要であるので、小さな施工スペースで済む。 (3)アンカープレート及び、アンカーボルトを固定す
る架構が不要なため、その施工コストを大幅に削減でき
安価にできる。
As described above, according to the installation method of the shear type foundation bolt of the present invention, the following various effects can be obtained. (1) By core boring, it is possible to remove the existing foundation concrete 1 and to minimize the restoration range, thereby significantly shortening the construction period. (2) Since a heavy machine is not required to remove the existing foundation concrete 1, a small construction space is sufficient. (3) Since the frame for fixing the anchor plate and the anchor bolt is unnecessary, the construction cost can be greatly reduced and the cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のせん断型基礎ボルトの設置工法を実施
する第1施工工程を示す図である。
FIG. 1 is a diagram showing a first construction step for carrying out the shearing foundation bolt installation method of the present invention.

【図2】同上、第2施工工程を示す図である。FIG. 2 is a diagram showing a second construction step of the same.

【図3】同上、第3施工工程を示す図である。FIG. 3 is a diagram showing a third construction step of the same.

【図4】同上、第4施工工程を示す図である。FIG. 4 is a diagram showing a fourth construction step of the same.

【図5】図4の断面図である。FIG. 5 is a sectional view of FIG. 4;

【図6】従来工法を示す図である。FIG. 6 is a diagram showing a conventional method.

【符号の説明】[Explanation of symbols]

1 既設基礎コンクリート 2 地盤 3 コンクリートカッター 4 横穴 5 縦穴 6 アンカープレート 7 係合用穴 8 アンカーボルト 9 係止用止め具 10 アンカーフレーム 11 凹部 12 盛上り部 13 空隙 1 Existing Foundation Concrete 2 Ground 3 Concrete Cutter 4 Horizontal Hole 5 Vertical Hole 6 Anchor Plate 7 Engagement Hole 8 Anchor Bolt 9 Locking Stopper 10 Anchor Frame 11 Recess 12 Raised Part 13 Void

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 既設基礎コンクリート1の側面からアン
カープレート6の挿入用横穴4を穿設するとともに、前
記既設基礎コンクリート1の上部から前記横穴4まで達
するアンカーボルト挿入用縦穴5を複数穿設し、次に、
前記既設基礎コンクリート1側面の前記横穴4に前記ア
ンカープレート6を挿入した後、前記既設基礎コンクリ
ート1の上部より前記縦穴5にアンカーボルト8を挿入
し、前記アンカーボルト8と前記アンカープレート6を
固定し、その後、前記縦穴5にコンクリートを注入する
ことを特徴とするせん断型基礎ボルトの設置工法。
1. A horizontal hole 4 for inserting an anchor plate 6 is bored from a side surface of an existing foundation concrete 1, and a plurality of vertical holes 5 for inserting an anchor bolt reaching from the upper portion of the existing foundation concrete 1 to the horizontal hole 4 are bored. ,next,
After inserting the anchor plate 6 into the horizontal hole 4 on the side surface of the existing foundation concrete 1, an anchor bolt 8 is inserted into the vertical hole 5 from the upper portion of the existing foundation concrete 1 to fix the anchor bolt 8 and the anchor plate 6. Then, after that, concrete is poured into the vertical holes 5, and a method for installing a shear type foundation bolt is characterized.
JP8773295A 1995-03-22 1995-03-22 Setting method of shearing type foundation bolt Withdrawn JPH08260501A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8773295A JPH08260501A (en) 1995-03-22 1995-03-22 Setting method of shearing type foundation bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8773295A JPH08260501A (en) 1995-03-22 1995-03-22 Setting method of shearing type foundation bolt

Publications (1)

Publication Number Publication Date
JPH08260501A true JPH08260501A (en) 1996-10-08

Family

ID=13923102

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8773295A Withdrawn JPH08260501A (en) 1995-03-22 1995-03-22 Setting method of shearing type foundation bolt

Country Status (1)

Country Link
JP (1) JPH08260501A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100443672C (en) * 2006-03-08 2008-12-17 中铁隧道集团有限公司 Underpinning method of pile ground underground
JP2008303677A (en) * 2007-06-11 2008-12-18 Asahi Kasei Homes Kk Post-constructed anchor installation method and foundation structure
CN101922160A (en) * 2009-06-11 2010-12-22 贵阳铝镁设计研究院 Reinforced structure for vibrating equipment foundation
JP2013249699A (en) * 2012-06-04 2013-12-12 Asahi Kasei Homes Co Installation method for anchor bolt
CN106759560A (en) * 2016-12-21 2017-05-31 山东中车风电有限公司 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system and method
JP2019070269A (en) * 2017-10-10 2019-05-09 ユニーク株式会社 Anchor construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100443672C (en) * 2006-03-08 2008-12-17 中铁隧道集团有限公司 Underpinning method of pile ground underground
JP2008303677A (en) * 2007-06-11 2008-12-18 Asahi Kasei Homes Kk Post-constructed anchor installation method and foundation structure
CN101922160A (en) * 2009-06-11 2010-12-22 贵阳铝镁设计研究院 Reinforced structure for vibrating equipment foundation
JP2013249699A (en) * 2012-06-04 2013-12-12 Asahi Kasei Homes Co Installation method for anchor bolt
CN106759560A (en) * 2016-12-21 2017-05-31 山东中车风电有限公司 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system and method
CN106759560B (en) * 2016-12-21 2019-02-26 山东中车风电有限公司 A kind of reparation blower foundation cracking pre-buried grouted anchor bar, system and method
JP2019070269A (en) * 2017-10-10 2019-05-09 ユニーク株式会社 Anchor construction method

Similar Documents

Publication Publication Date Title
JPH08260501A (en) Setting method of shearing type foundation bolt
KR100639786B1 (en) Precast pulling up apparatus of manhole and mounting structure for precast pulling up apparatus of manhole and construction method for precast pulling up apparatus of manhole
JPH1181487A (en) T bolt support and its installation method
JP3484558B2 (en) Method of forming slide center and grout injection hole for tunnel lining
JPH07173843A (en) Foundation coupling metal fittings and foundation construction method
JP2001329715A (en) Method of constructing base-isolated structure
JP2002194746A (en) Anchor bolt burying method
JPS59192145A (en) Fixing of iron pillar
WO1988004712A1 (en) Method of fixing a column on a foundation
JPH0657768A (en) Retaining wall structure and working method thereof
JP3783386B2 (en) Joint method and foundation structure of column material and steel pipe pile in one pillar and one pile foundation
JP3790310B2 (en) Construction method of the building by the prior construction of steel frame
JPS5961626A (en) Construction of foundation, pillar and leg
JP3648670B2 (en) Seismic isolation device installation method for existing foundation deep piles
KR200206349Y1 (en) Precast raceway structure
JP2002147027A (en) Fixing construction method for safety fence column
JP3253047B2 (en) How to fix the base plate for construction
JP2005023769A (en) Fixing method for base plate having large bolt hole and anchor bolt
JP2829626B2 (en) Structure of concrete block and method of stacking concrete block on slope
JP2008303677A (en) Post-constructed anchor installation method and foundation structure
JP3205653B2 (en) Precast floor slab for semi-underground parking and its mounting structure
JPS5944464A (en) Anchoring of building to concrete foundation
JPH09165749A (en) Construction method of slope face stability receiving pressure structural body
JPH06346462A (en) Embedding work of anchor bolt and guide plate for the work
JP2002309586A (en) Method of constructing column-to-pile joint

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20020604