JP4889414B2 - Foundation structure - Google Patents

Foundation structure Download PDF

Info

Publication number
JP4889414B2
JP4889414B2 JP2006240367A JP2006240367A JP4889414B2 JP 4889414 B2 JP4889414 B2 JP 4889414B2 JP 2006240367 A JP2006240367 A JP 2006240367A JP 2006240367 A JP2006240367 A JP 2006240367A JP 4889414 B2 JP4889414 B2 JP 4889414B2
Authority
JP
Japan
Prior art keywords
anchor bolt
fixing plate
foundation
concrete foundation
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006240367A
Other languages
Japanese (ja)
Other versions
JP2008063751A (en
Inventor
暁 矢崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Homes Corp
Original Assignee
Asahi Kasei Homes Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Homes Corp filed Critical Asahi Kasei Homes Corp
Priority to JP2006240367A priority Critical patent/JP4889414B2/en
Publication of JP2008063751A publication Critical patent/JP2008063751A/en
Application granted granted Critical
Publication of JP4889414B2 publication Critical patent/JP4889414B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Description

建物の改築に際し、新たな上部構造(土台、柱や壁、筋交いなど)を既存のコンクリート基礎に止めつけるためのアンカーボルトが固定されたアンカーボルトユニットと、該アンカーボルトユニットを前記コンクリート基礎に取り付けた基礎構造に関するものである。 When rebuilding a building, an anchor bolt unit to which an anchor bolt for fixing a new superstructure (base, column, wall, bracing, etc.) to an existing concrete foundation is fixed, and the anchor bolt unit is attached to the concrete foundation. it relates to the underlying structure.

建物の改築に際し、新たな上部構造(土台、柱や壁、筋交いなど)を既存のコンクリート基礎に止めつけるための、従来のアンカーボルトと同等の引き抜き耐力を確保しえる後施工アンカーボルトがある。   There are post-installed anchor bolts that can secure the same pull-out strength as conventional anchor bolts to fix new superstructures (bases, columns, walls, braces, etc.) to existing concrete foundations when renovating buildings.

アンカーボルトを後施工する方法として、例えば、既存基礎に沿い新たに打設したコンクリートにアンカーボルトを埋め込む方法(特許文献2)が提案されている。また、既存のコンクリート基礎に天端面から下端面まで形成された竪穴に、アンカーボルトを挿通する、もしくは天端面から途中位置まで形成された縦穴に挿入する方法(特許文献2)が提案されている。   As a method for post-installing anchor bolts, for example, a method of embedding anchor bolts in concrete that has been newly placed along an existing foundation (Patent Document 2) has been proposed. Moreover, the method (patent document 2) which inserts an anchor bolt in the coffin hole formed in the existing concrete foundation from the top end surface to the lower end surface, or inserts it in the vertical hole formed from the top end surface to the middle position is proposed. .

特開2002−357005号公報JP 2002-357005 A 特開2005−299129号公報JP 2005-299129 A

しかしながら、上記特許文献1の方法では、当然新たなコンクリート基礎を打設しなければならず、コンクリート基礎中には配筋をもする必要が有り、大掛かりな工事が必要となりコストがかかる。また当然、基礎を打設する場所の土を掘削しておく必要もある。また、既存の基礎に沿って新たな基礎を作るため、新たなアンカーボルトは既存の基礎上からずれて配置される。そのため、上部構造(柱、土台や壁、筋交い等)の設置のために余分な部品が必要で、施工工数的にもコスト的にも負担が大きい。   However, in the method of Patent Document 1, it is necessary to place a new concrete foundation, and it is necessary to arrange bars in the concrete foundation, which requires large-scale construction and costs. Of course, it is also necessary to excavate the soil where the foundation will be placed. Moreover, in order to make a new foundation along the existing foundation, a new anchor bolt is displaced from the existing foundation. For this reason, extra parts are required to install the superstructure (columns, foundations, walls, braces, etc.), and the burden is large in terms of construction man-hours and costs.

また、上記特許文献2の方法では、竪穴が長いため精度良く形成するのに大変高度な技術が必要である。また、基礎の表面近くに竪穴を形成することはコンクリートのかぶり厚さが小さくなるために、ほとんど不可能である。複数本のアンカーボルトを近い位置で必要な場合は、近い位置で複数の竪穴を限られた場所に形成しなければならず、技術的にも大変難しい。   In addition, the method of Patent Document 2 requires a very advanced technique to form with high accuracy because of the long hole. Also, it is almost impossible to form a pit near the surface of the foundation because the cover thickness of the concrete is small. When a plurality of anchor bolts are required at a close position, a plurality of potholes must be formed at a limited position at a close position, which is technically very difficult.

そこで本発明は、既存コンクリート基礎および周辺部材、地盤等に対する各種工事をできるだけせずに、既存コンクリート基礎の上面にアンカーボルトを簡単な施工で正確に設置することができる基礎構造を提供することを目的とする。 The present invention is to provide existing concrete foundation and peripheral members, without as much as possible so various construction for soil, etc., a basic structure which is capable of accurately installing the anchor bolt on the upper surface of the existing concrete foundation with a simple construction With the goal.

(1)上記課題を解決するために本発明に係る基礎構造の第一の構成は、コンクリート基礎と、前記コンクリート基礎の上面を覆うアンカーボルト定着板と、前記アンカーボルト定着板の上面から起立したアンカーボルトと、前記アンカーボルト定着板の両側端から垂下して前記コンクリート基礎の両側面を覆う基礎定着板と、を備えたアンカーボルトユニットと、からなり、前記アンカーボルトユニットは、前記コンクリート基礎に対して、前記基礎定着板に千鳥状に穿孔された複数のボルト貫通孔、及び前記コンクリート基礎の側面に前記複数のボルト貫通孔に対応して穿孔された複数のボルト孔に挿通された貫通ボルトにて固定されたことを特徴とする。 (1) In order to solve the above problems, the first configuration of the foundation structure according to the present invention is a concrete foundation, an anchor bolt fixing plate that covers the upper surface of the concrete foundation, and an upper surface of the anchor bolt fixing plate. An anchor bolt, and an anchor bolt unit provided with a base fixing plate that hangs down from both ends of the anchor bolt fixing plate and covers both sides of the concrete foundation, and the anchor bolt unit is attached to the concrete foundation. On the other hand, a plurality of bolt through holes drilled in a staggered manner in the foundation fixing plate, and a through bolt inserted into a plurality of bolt holes drilled corresponding to the plurality of bolt through holes on the side surface of the concrete foundation It is fixed by .

(2)本発明に係る基礎構造の第二の構成は、コンクリート基礎と、前記コンクリート基礎の上面を覆うアンカーボルト定着板と、前記アンカーボルト定着板の上面から起立したアンカーボルトと、前記アンカーボルト定着板の両側端から垂下して前記コンクリート基礎の両側面を覆う基礎定着板と、を備えたアンカーボルトユニットと、からなり、 前記アンカーボルトユニットは、前記コンクリート基礎に対して、前記基礎定着板に穿孔された複数のボルト貫通孔、及び前記コンクリート基礎の側面に前記複数のボルト貫通孔に対応して穿孔された複数のボルト孔に挿通された貫通ボルトにて固定されており、 前記ボルト孔と前記貫通ボルトとの間にはグラウト材が充填されたことを特徴とする。 (2) The second structure of the foundation structure according to the present invention includes a concrete foundation, an anchor bolt fixing plate covering an upper surface of the concrete foundation, an anchor bolt standing from the upper surface of the anchor bolt fixing plate, and the anchor bolt. A foundation fixing plate that hangs down from both ends of the fixing plate and covers both side surfaces of the concrete foundation, and the anchor bolt unit is configured to support the foundation fixing plate with respect to the concrete foundation. A plurality of bolt through-holes drilled into the concrete foundation, and fixed to the side surface of the concrete foundation with through-bolts inserted through the plurality of bolt holes drilled corresponding to the plurality of bolt through-holes, A grout material is filled between the through bolt and the through bolt .

(3)本発明に係る基礎構造の第三の構成は、第二の構成の基礎構造において、前記グラウト材は、前記基礎定着板の外側面に当接されるように前記貫通ボルトに通されたワッシャーのグラウト材注入孔から充填されたことを特徴とする。 (3) A third structure of the foundation structure according to the present invention is the foundation structure of the second structure, in which the grout material is passed through the through bolt so as to be in contact with the outer surface of the foundation fixing plate. It was filled from the grout injection hole of the washer .

(4)本発明に係る基礎構造の第四の構成は、コンクリート基礎と、前記コンクリート基礎の上面を覆うアンカーボルト定着板と、前記アンカーボルト定着板の上面から起立したアンカーボルトと、前記アンカーボルト定着板の両側端から垂下して前記コンクリート基礎の両側面を覆う基礎定着板と、を備えたアンカーボルトユニットと、からなり、前記アンカーボルトユニットは、前記コンクリート基礎の上面に形成された凹部に載せられるとともに、前記アンカーボルト定着板の上面が前記コンクリート基礎の上面とフラットとなるように、前記基礎定着板にて固定されたことを特徴とする。 (4) A fourth structure of the foundation structure according to the present invention is a concrete foundation, an anchor bolt fixing plate that covers an upper surface of the concrete foundation, an anchor bolt standing from the upper surface of the anchor bolt fixing plate, and the anchor bolt. A foundation fixing plate that hangs down from both ends of the fixing plate and covers both side surfaces of the concrete foundation, and the anchor bolt unit is formed in a recess formed on the upper surface of the concrete foundation. The anchor fixing plate is fixed by the foundation fixing plate so that the upper surface of the anchor bolt fixing plate is flat with the upper surface of the concrete foundation .

第一乃至第四の構成の基礎構造によれば、新たなコンクリート基礎を作る必要が無く、また高度な技術を必要とするコンクリート基礎に竪穴を形成する工程の必要も無く、安価かつ簡易に施工が可能である。 According to the foundation structures of the first to fourth configurations, it is not necessary to create a new concrete foundation, and there is no need to form a hole in a concrete foundation that requires advanced technology. Is possible.

また、アンカーボルトユニットに設置するアンカーボルトは、あらかじめ所定の本数をアンカーボルト定着板の所定の位置に固定する。アンカーボルトはアンカーボルト定着板に制約無く配置することが出来るので、コンクリート基礎にそって複数列のアンカーボルトをコンクリート基礎のかぶり厚さの大小にかかわらず容易に設置できる。 In addition , a predetermined number of anchor bolts installed in the anchor bolt unit are fixed in advance to a predetermined position of the anchor bolt fixing plate. Since the anchor bolts can be arranged on the anchor bolt fixing plate without restriction, a plurality of rows of anchor bolts can be easily installed along the concrete foundation regardless of the cover thickness of the concrete foundation.

また、アンカーボルト定着板をコンクリート基礎の上面に、基礎定着板をコンクリート基礎の側面に面着できるので、アンカーボルトユニットを安定した状態でコンクリート基礎に載置し、正確に取付施工できる。   In addition, since the anchor bolt fixing plate can be attached to the upper surface of the concrete foundation and the foundation fixing plate can be attached to the side surface of the concrete foundation, the anchor bolt unit can be placed on the concrete foundation in a stable state and can be mounted accurately.

また、アンカーボルトユニットの2枚の基礎定着板をコンクリート基礎の両側面に面着できるので、ボルトにて貫通固定しやすい。 In addition , since the two foundation fixing plates of the anchor bolt unit can be attached to both side surfaces of the concrete foundation, it is easy to fix through with bolts.

第四の構成の基礎構造によれば、更に、コンクリート基礎の上面にアンカーボルト定着板が突出せず、アンカーボルト定着板の上面を既存のコンクリート基礎の上面とレベルを合わせることが出来るので、上部構造部材(柱材など)の寸法を既存の上部構造部材と合わせることが出来て便利である。 According to the foundation structure of the fourth configuration, the anchor bolt fixing plate does not protrude from the upper surface of the concrete foundation, and the upper surface of the anchor bolt fixing plate can be leveled with the upper surface of the existing concrete foundation. It is convenient that the dimensions of the structural members (columns, etc.) can be matched with the existing upper structural members.

[第一実施形態]
本発明に係る基礎構造、アンカーボルトユニット及び施工方法の第一実施形態について、図を用いて説明する。図1は本実施形態に係る基礎構造の斜視図である。図2は基礎構造の正面図、断面図である。図3はアンカーボルトユニットの斜視図である。図4は施工方法の説明図である。
[First embodiment]
A first embodiment of a foundation structure, an anchor bolt unit, and a construction method according to the present invention will be described with reference to the drawings. FIG. 1 is a perspective view of a foundation structure according to this embodiment. FIG. 2 is a front view and a sectional view of the foundation structure. FIG. 3 is a perspective view of the anchor bolt unit. FIG. 4 is an explanatory diagram of the construction method.

(基礎構造A)
図1、図2に示すように、本実施形態の基礎構造Aは、コンクリート基礎1と、コンクリート基礎1のアンカーボルトが必要な部分1aに固定されたアンカーボルトユニット2と、を有している。
(Basic structure A)
As shown in FIGS. 1 and 2, the foundation structure A of the present embodiment includes a concrete foundation 1 and an anchor bolt unit 2 fixed to a portion 1 a of the concrete foundation 1 where an anchor bolt is required. .

図3に示すように、アンカーボルトユニット2は、コンクリート基礎1のアンカーボルトが必要な部分1aの上面を覆うアンカーボルト23が固定されたアンカーボルト定着板21と、コンクリート基礎1のアンカーボルトが必要な部分1aの両側面を覆う基礎定着板22と、を有している。   As shown in FIG. 3, the anchor bolt unit 2 requires the anchor bolt fixing plate 21 to which the anchor bolt 23 covering the upper surface of the portion 1 a of the concrete foundation 1 where the anchor bolt is necessary, and the anchor bolt of the concrete foundation 1. And a basic fixing plate 22 that covers both side surfaces of the first portion 1a.

コンクリート基礎1は、既存のコンクリート基礎を用いる。コンクリート基礎1は、フーチング部11と立上部12とを有する断面凸状に形成されており、立上部12の途中まで地面に埋められている。立上部12の内部には、複数本の主筋12aがコンクリート基礎1の長手方向に水平に入っている。   The concrete foundation 1 uses an existing concrete foundation. The concrete foundation 1 is formed in a convex section having a footing portion 11 and an upright portion 12, and is buried in the ground up to the middle of the upright portion 12. Inside the upright portion 12, a plurality of main bars 12 a are horizontally inserted in the longitudinal direction of the concrete foundation 1.

アンカーボルト定着板21は、アンカーボルト23を上方に起立固定している。アンカーボルト23は、あらかじめ所定の本数をアンカーボルト定着板21の所定の位置に溶接又はボルト固定されている。   The anchor bolt fixing plate 21 has the anchor bolt 23 standing and fixed upward. A predetermined number of anchor bolts 23 are welded or bolted to a predetermined position of the anchor bolt fixing plate 21 in advance.

アンカーボルト23はアンカーボルト定着板21に制約無く配置することが出来るので、基礎にそって複数列のアンカーボルト23を基礎のかぶり厚さの大小にかかわらず容易に設置できる。   Since the anchor bolts 23 can be arranged on the anchor bolt fixing plate 21 without restriction, a plurality of rows of anchor bolts 23 can be easily installed along the foundation regardless of the cover thickness of the foundation.

また、アンカーボルトユニット2のアンカーボルト定着板21はコンクリート基礎1の上面に、基礎定着板22はコンクリート基礎1の側面に面着できるので、アンカーボルトユニット2を安定した状態でコンクリート基礎1に載置し、正確な取付施工をすることができる。   Further, since the anchor bolt fixing plate 21 of the anchor bolt unit 2 can be attached to the upper surface of the concrete foundation 1 and the foundation fixing plate 22 can be attached to the side surface of the concrete foundation 1, the anchor bolt unit 2 can be mounted on the concrete foundation 1 in a stable state. And can be installed accurately.

上部構造(柱脚3、柱4)からの引き抜き力及びせん断力により、アンカーボルト23がアンカーボルト定着板21から離れないように溶接又はボルト固定している。   The anchor bolt 23 is welded or bolted so as not to be separated from the anchor bolt fixing plate 21 by a pulling-out force and a shearing force from the upper structure (column base 3, column 4).

基礎定着板22は、アンカーボルト定着板21の両側端から垂下している。基礎定着板22はコンクリート基礎1に固定されている。   The base fixing plate 22 hangs from both ends of the anchor bolt fixing plate 21. The foundation fixing plate 22 is fixed to the concrete foundation 1.

アンカーボルトユニット2の上部には、柱脚3を介して柱4が立てられる。柱脚3は4本のアンカーボルト23によってアンカーボルト定着板21の上にボルト固定されている。柱4は柱脚3に溶接されている。   A column 4 is erected on the upper portion of the anchor bolt unit 2 via a column base 3. The column base 3 is bolted onto the anchor bolt fixing plate 21 by four anchor bolts 23. The column 4 is welded to the column base 3.

コンクリート基礎1の上面に、アンカーボルト定着板21を載せる凹部1bが形成されている。凹部1bにアンカーボルト定着板21を載せた状態で、コンクリート基礎1の上面とアンカーボルト定着板21の上面がフラットになる。なお、アンカーボルト23をボルト固定した場合には、基礎定着板22の裏面に出たボルトの高さ分凹部1bを深く形成する必要がある。   On the upper surface of the concrete foundation 1, a recess 1 b for placing the anchor bolt fixing plate 21 is formed. With the anchor bolt fixing plate 21 placed on the recess 1b, the upper surface of the concrete foundation 1 and the upper surface of the anchor bolt fixing plate 21 are flat. When the anchor bolt 23 is fixed with a bolt, it is necessary to form the concave portion 1b deeper by the height of the bolt protruding from the back surface of the basic fixing plate 22.

これにより、コンクリート基礎1の上面にアンカーボルト定着板21が突出せず、アンカーボルト定着板21の上面を既存のコンクリート基礎の上面とレベルを合わせることが出来るので、上部構造部材(柱材など)の寸法を既存の上部構造部材と合わせることが出来て便利である。   As a result, the anchor bolt fixing plate 21 does not protrude from the upper surface of the concrete foundation 1 and the level of the upper surface of the anchor bolt fixing plate 21 can be matched with the upper surface of the existing concrete foundation. It is convenient to match the dimensions of the existing superstructure member.

基礎定着板22の下端は、地面より上になっている。これにより、土を掘削する必要がなく、簡単な施工で設置できる。   The lower end of the base fixing plate 22 is above the ground. Thereby, it is not necessary to excavate soil, and can be installed by simple construction.

基礎定着板22は、複数のボルト貫通孔22aを有している。ボルト貫通孔22aは、アンカーボルトユニット2をコンクリート基礎1に取り付けた際にコンクリート基礎1の最上部の主筋12aより下になる位置に穿孔されている。これにより、大地震発生時にコンクリート基礎1が壊れにくく、アンカーボルト23が負担する上部構造からの引き抜き力及びせん断力に対抗できるようにアンカーボルトユニット2をコンクリート基礎1に固定できる。   The base fixing plate 22 has a plurality of bolt through holes 22a. The bolt through hole 22 a is drilled at a position below the uppermost main bar 12 a of the concrete foundation 1 when the anchor bolt unit 2 is attached to the concrete foundation 1. Thereby, the concrete foundation 1 is hard to break at the time of the occurrence of a large earthquake, and the anchor bolt unit 2 can be fixed to the concrete foundation 1 so as to resist the pulling force and the shearing force from the upper structure borne by the anchor bolt 23.

2枚の基礎定着板22がコンクリート基礎1のアンカーボルトが必要な部分1aの両側面を覆った状態で、一方のボルト貫通孔22a、コンクリート基礎1のボルト孔1c、他方のボルト貫通孔22aに貫通ボルト5を通してナット6を締めて、アンカーボルトユニット2をコンクリート基礎1にボルト固定している。このように、アンカーボルトユニット2の2枚の基礎定着板22をコンクリート基礎1の両側面に面着できるので、貫通ボルト5にて貫通固定しやすい。   With the two foundation fixing plates 22 covering both sides of the portion 1a of the concrete foundation 1 where anchor bolts are required, one bolt through hole 22a, the bolt hole 1c of the concrete foundation 1, and the other bolt through hole 22a The nut 6 is tightened through the through bolt 5, and the anchor bolt unit 2 is bolted to the concrete foundation 1. Thus, since the two foundation fixing plates 22 of the anchor bolt unit 2 can be surface-attached to the both side surfaces of the concrete foundation 1, it is easy to penetrate and fix with the through bolts 5.

貫通ボルト5又はナット6の受けに用いるワッシャー7には、グラウト材注入用孔7aが穿孔されている。グラウト材注入用孔7aから固定材であるグラウト材を注入して貫通ボルト5とボルト孔1cの間に充填することで、アンカーボルトユニット2とコンクリート基礎1は強固に固定される。   A washer 7 used for receiving the through bolt 5 or the nut 6 is formed with a grout injection hole 7a. The anchor bolt unit 2 and the concrete foundation 1 are firmly fixed by injecting a grout material as a fixing material from the grout material injection hole 7a and filling it between the through bolt 5 and the bolt hole 1c.

基礎定着板22の形状は、台形が好ましい。下方の貫通ボルト5の数を多くでき、コンクリート基礎1にさらに強固に固定できる。   The shape of the base fixing plate 22 is preferably a trapezoid. The number of lower through bolts 5 can be increased and the concrete foundation 1 can be more firmly fixed.

(施工方法)
次に、アンカーボルトユニット2をコンクリート基礎1に固定する施工方法について説明する。
(Construction method)
Next, a construction method for fixing the anchor bolt unit 2 to the concrete foundation 1 will be described.

図4(a)、図4(b)に示すように、まず、コンクリート基礎1の上面のアンカーボルトが必要な部分1aにアンカーボルト定着板21を載せる凹部1bを形成する。凹部1bはアンカーボルト定着板21の上面が既存のコンクリート基礎1の上面とフラットになる深さに形成する。   As shown in FIGS. 4 (a) and 4 (b), first, a recess 1b on which the anchor bolt fixing plate 21 is placed is formed on a portion 1a on the top surface of the concrete foundation 1 where an anchor bolt is required. The recess 1b is formed to a depth such that the upper surface of the anchor bolt fixing plate 21 is flat with the upper surface of the existing concrete foundation 1.

コンクリート基礎1の側面かつ、コンクリート基礎1の最上部の主筋12aより下になる位置にボルト孔1cを穿孔する。ボルト孔1cは、コンクリート基礎1の主筋12aを避けた位置かつ、基礎定着板22のボルト貫通孔22aに合わせた位置に穿孔する。   Bolt holes 1c are drilled at positions on the side of the concrete foundation 1 and below the uppermost main bar 12a of the concrete foundation 1. The bolt hole 1 c is drilled at a position that avoids the main reinforcement 12 a of the concrete foundation 1 and at a position that matches the bolt through hole 22 a of the foundation fixing plate 22.

図4(c)に示すように、アンカーボルト定着板21が凹部1bに載るようにアンカーボルトユニット2をコンクリート基礎1のアンカーボルトが必要な部分1aに載置する。   As shown in FIG. 4C, the anchor bolt unit 2 is placed on the portion 1a of the concrete foundation 1 where the anchor bolt is required so that the anchor bolt fixing plate 21 is placed in the recess 1b.

図4(d)に示すように、一方の基礎定着板22のボルト貫通孔22a、コンクリート基礎1のボルト孔1c、他方の基礎定着板22のボルト貫通孔22aに、貫通ボルト5を通してナット6を締めてアンカーボルトユニット2をコンクリート基礎1に固定する。ワッシャー7のグラウト材注入用孔7aからボルト貫通孔22aと貫通ボルト5の間にグラウト材を充填し、グラウト材が固まることでアンカーボルトユニット2とコンクリート基礎1は強固に固定される。   As shown in FIG. 4 (d), nuts 6 are passed through the through bolts 5 into the bolt through holes 22 a of one foundation fixing plate 22, the bolt holes 1 c of the concrete foundation 1, and the bolt through holes 22 a of the other foundation fixing plate 22. Tighten and fix the anchor bolt unit 2 to the concrete foundation 1. The grout material is filled between the bolt through hole 22a and the through bolt 5 from the grout material injection hole 7a of the washer 7, and the anchor bolt unit 2 and the concrete foundation 1 are firmly fixed when the grout material is solidified.

(効果)
本実施形態によれば、新たなコンクリート基礎を作る必要が無く、また高度な技術を必要とするコンクリート基礎に竪穴を形成する工程の必要も無く、安価かつ簡易に施工が可能である。
(effect)
According to this embodiment, there is no need to make a new concrete foundation, and there is no need for a step of forming a hole in a concrete foundation that requires advanced technology, and construction can be performed at low cost and easily.

また、廃棄物を減らして、資源を有効利用した改築等を行うことができる。また、上部構造(柱、土台や壁、筋交い等)の移動や新設が容易にでき、建物の間取りを容易に変更でき、建物の機能的耐久性を延長することができる。   In addition, it is possible to reduce the waste and perform reconstruction using resources effectively. In addition, the superstructure (columns, foundations, walls, braces, etc.) can be easily moved or newly installed, the building layout can be easily changed, and the functional durability of the building can be extended.

[他の実施形態]
次に本発明に係る基礎構造、アンカーボルトユニット及び施工方法の他の実施形態について図を用いて説明する。図5は本実施形態に係る基礎構造の側面図である。上記第一実施形態と説明の重複する部分については、同一の符号を付して説明を省略する。
[Other embodiments]
Next, other embodiments of the foundation structure, anchor bolt unit and construction method according to the present invention will be described with reference to the drawings. FIG. 5 is a side view of the foundation structure according to the present embodiment. About the part which overlaps with said 1st embodiment, the same code | symbol is attached | subjected and description is abbreviate | omitted.

基礎定着板22は、図1〜3では下方に向けて広がった台形形状となっているが、本発明はかかる形状に限定されるものではない。例えば、図5(a)に示すような長方形等であってもよい。   The basic fixing plate 22 has a trapezoidal shape spreading downward in FIGS. 1 to 3, but the present invention is not limited to such a shape. For example, a rectangle as shown in FIG.

このように、基礎定着板22の面積を増やすことで、基礎定着板22をコンクリート基礎1へ固定するためのボルト数を増やすことができ、強固に固定できる。   Thus, by increasing the area of the foundation fixing plate 22, the number of bolts for fixing the foundation fixing plate 22 to the concrete foundation 1 can be increased, and the foundation fixing plate 22 can be firmly fixed.

図5(b)に示すように、アンカーボルト定着板21の長さを長くすることで、アンカーボルト定着板21と基礎定着板22の強度を上げることができ、大地震発生時に上部構造(柱脚3、柱4等)からの引き抜き力及びせん断力が加わった際に、アンカーボルト定着板21が基礎定着板22から引きちぎれることを防止できる。   As shown in FIG. 5 (b), by increasing the length of the anchor bolt fixing plate 21, the strength of the anchor bolt fixing plate 21 and the base fixing plate 22 can be increased. It is possible to prevent the anchor bolt fixing plate 21 from being torn off from the basic fixing plate 22 when a pulling force and a shearing force are applied from the legs 3 and the columns 4.

建物の改築の際に、既存の基礎に新たな上部構造(柱、土台や壁、筋交い等)を設置する場合に利用可能である。   It can be used to install new superstructures (posts, foundations and walls, braces, etc.) on existing foundations when rebuilding buildings.

第一実施形態に係る基礎構造の斜視図である。It is a perspective view of the foundation structure concerning a first embodiment. (a)基礎構造の正面図である(b)基礎構造の断面図である。(A) It is a front view of a foundation structure, (b) It is sectional drawing of a foundation structure. アンカーボルトユニットの斜視図である。It is a perspective view of an anchor bolt unit. 施工方法の説明図である。It is explanatory drawing of a construction method. 他の実施形態に係る基礎構造の正面図である。It is a front view of the foundation structure concerning other embodiments.

A …基礎構造
1 …コンクリート基礎
1a …部分
1b …凹部
1c …ボルト孔
2 …アンカーボルトユニット
3 …柱脚
4 …柱
5 …貫通ボルト
6 …ナット
7 …ワッシャー
7a …グラウト材注入用孔
11 …フーチング部
12 …立上部
12a …主筋
21 …アンカーボルト定着板
22 …基礎定着板
22a …ボルト貫通孔
23 …アンカーボルト
A ... Foundation structure 1 ... Concrete foundation 1a ... Part 1b ... Recess 1c ... Bolt hole 2 ... Anchor bolt unit 3 ... Column base 4 ... Column 5 ... Through bolt 6 ... Nut 7 ... Washer 7a ... Grout material injection hole 11 ... Footing Part 12 ... Upright part 12a ... Main bar 21 ... Anchor bolt fixing plate 22 ... Foundation fixing plate 22a ... Bolt through hole 23 ... Anchor bolt

Claims (4)

コンクリート基礎と、  Concrete foundation,
前記コンクリート基礎の上面を覆うアンカーボルト定着板と、前記アンカーボルト定着板の上面から起立したアンカーボルトと、前記アンカーボルト定着板の両側端から垂下して前記コンクリート基礎の両側面を覆う基礎定着板と、を備えたアンカーボルトユニットと、からなり、  Anchor bolt fixing plate covering the upper surface of the concrete foundation, anchor bolt standing from the upper surface of the anchor bolt fixing plate, and foundation fixing plate covering the both sides of the concrete foundation depending from both ends of the anchor bolt fixing plate And an anchor bolt unit with
前記アンカーボルトユニットは、前記コンクリート基礎に対して、前記基礎定着板に千鳥状に穿孔された複数のボルト貫通孔、及び前記コンクリート基礎の側面に前記複数のボルト貫通孔に対応して穿孔された複数のボルト孔に挿通された貫通ボルトにて固定されたことを特徴とする基礎構造。  The anchor bolt unit has a plurality of bolt through holes drilled in a staggered manner in the foundation fixing plate and a side surface of the concrete foundation corresponding to the plurality of bolt through holes. A foundation structure characterized by being fixed by through bolts inserted through a plurality of bolt holes.
コンクリート基礎と、  Concrete foundation,
前記コンクリート基礎の上面を覆うアンカーボルト定着板と、前記アンカーボルト定着板の上面から起立したアンカーボルトと、前記アンカーボルト定着板の両側端から垂下して前記コンクリート基礎の両側面を覆う基礎定着板と、を備えたアンカーボルトユニットと、からなり、  Anchor bolt fixing plate covering the upper surface of the concrete foundation, anchor bolt standing from the upper surface of the anchor bolt fixing plate, and foundation fixing plate covering the both sides of the concrete foundation depending from both ends of the anchor bolt fixing plate And an anchor bolt unit with
前記アンカーボルトユニットは、前記コンクリート基礎に対して、前記基礎定着板に穿孔された複数のボルト貫通孔、及び前記コンクリート基礎の側面に前記複数のボルト貫通孔に対応して穿孔された複数のボルト孔に挿通された貫通ボルトにて固定されており、  The anchor bolt unit includes a plurality of bolt through holes perforated in the foundation fixing plate and a plurality of bolts perforated on the side surface of the concrete foundation corresponding to the plurality of bolt through holes. It is fixed with a through bolt inserted through the hole,
前記ボルト孔と前記貫通ボルトとの間にはグラウト材が充填されたことを特徴とする基礎構造。  A foundation structure in which a grout material is filled between the bolt hole and the through bolt.
前記グラウト材は、前記基礎定着板の外側面に当接されるように前記貫通ボルトに通されたワッシャーのグラウト材注入孔から充填されたことを特徴とする請求項2に記載した基礎構造。The foundation structure according to claim 2, wherein the grout material is filled from a grout material injection hole of a washer passed through the through bolt so as to be in contact with an outer surface of the foundation fixing plate. コンクリート基礎と、  Concrete foundation,
前記コンクリート基礎の上面を覆うアンカーボルト定着板と、前記アンカーボルト定着板の上面から起立したアンカーボルトと、前記アンカーボルト定着板の両側端から垂下して前記コンクリート基礎の両側面を覆う基礎定着板と、を備えたアンカーボルトユニットと、からなり、  Anchor bolt fixing plate covering the upper surface of the concrete foundation, anchor bolt standing from the upper surface of the anchor bolt fixing plate, and foundation fixing plate covering the both sides of the concrete foundation depending from both ends of the anchor bolt fixing plate And an anchor bolt unit with
前記アンカーボルトユニットは、前記コンクリート基礎の上面に形成された凹部に載せられるとともに、前記アンカーボルト定着板の上面が前記コンクリート基礎の上面とフラットとなるように、前記基礎定着板にて固定されたことを特徴とする基礎構造。  The anchor bolt unit is mounted on a recess formed on the upper surface of the concrete foundation, and is fixed by the foundation fixing plate so that the upper surface of the anchor bolt fixing plate is flat with the upper surface of the concrete foundation. Basic structure characterized by that.
JP2006240367A 2006-09-05 2006-09-05 Foundation structure Expired - Fee Related JP4889414B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006240367A JP4889414B2 (en) 2006-09-05 2006-09-05 Foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006240367A JP4889414B2 (en) 2006-09-05 2006-09-05 Foundation structure

Publications (2)

Publication Number Publication Date
JP2008063751A JP2008063751A (en) 2008-03-21
JP4889414B2 true JP4889414B2 (en) 2012-03-07

Family

ID=39286697

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006240367A Expired - Fee Related JP4889414B2 (en) 2006-09-05 2006-09-05 Foundation structure

Country Status (1)

Country Link
JP (1) JP4889414B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6719293B2 (en) * 2016-06-28 2020-07-08 株式会社熊谷組 Seismic reinforcement structure of pile foundation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263307A (en) * 1988-04-13 1989-10-19 Kyokuto Kogen Concrete Shinko Kk Bridge support device
JPH0328999U (en) * 1989-07-31 1991-03-22
JP2001164584A (en) * 1999-12-08 2001-06-19 Yoshihiro Okuyama Seismic isolation equipment for lightweight building or mechanical facility

Also Published As

Publication number Publication date
JP2008063751A (en) 2008-03-21

Similar Documents

Publication Publication Date Title
JP4691690B2 (en) Joint structure and joining method of pedestal
JP4791997B2 (en) Rebuilding method
KR20130006420A (en) Method of constructing underground structure to be newly built
JP4433066B2 (en) Wall structure with permanent anchor construction, wall construction method with permanent anchor construction,
KR101707170B1 (en) Structure for connecting support
KR20150101742A (en) Deckroad using stand alone pile and installing method thereof
KR20040076713A (en) Retaining Wall using Permanent Anchor and Pre-Cast Concrete Panel and its Construction Method
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP4249046B2 (en) Support capacity increase method, sheet pile foundation construction method, sheet pile foundation, bridge
JP2005105531A (en) Foundation structure of building and its construction method
JP2006316495A (en) Foundation structure of bridge pier and its construction method
JP2004100157A (en) Retaining wall structure and its construction method
JP4889414B2 (en) Foundation structure
JP4211491B2 (en) Method for constructing wall structure with permanent anchor, wall structure constructed by this method
JP2015183366A (en) Structure and construction method for banking structure
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP3185440U (en) Solar panel installation structure
KR20060117746A (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
JP5270255B2 (en) Foundation reinforcement method for existing wooden houses
JP2009121051A (en) Method of re-constructing building
JP4612422B2 (en) Construction method of structure and foundation structure used for it
KR101772938B1 (en) Precast foundation structure buried support of road facility and method for constructing this same
JP5000387B2 (en) Post-installation anchor installation method
JP6461690B2 (en) Foundation structure and foundation construction method
KR20060048843A (en) Reinforcement structure for a foundation pile

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20080131

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090903

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110427

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110510

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111213

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111213

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141222

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees