JP4768747B2 - Pre-support tunnel construction method and equipment adapted to it - Google Patents

Pre-support tunnel construction method and equipment adapted to it Download PDF

Info

Publication number
JP4768747B2
JP4768747B2 JP2007542920A JP2007542920A JP4768747B2 JP 4768747 B2 JP4768747 B2 JP 4768747B2 JP 2007542920 A JP2007542920 A JP 2007542920A JP 2007542920 A JP2007542920 A JP 2007542920A JP 4768747 B2 JP4768747 B2 JP 4768747B2
Authority
JP
Japan
Prior art keywords
tunnel
support material
support
construction method
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007542920A
Other languages
Japanese (ja)
Other versions
JP2008522058A (en
Inventor
セオ,ドン−ヒュン
Original Assignee
セオ,ドンヒュン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by セオ,ドンヒュン filed Critical セオ,ドンヒュン
Publication of JP2008522058A publication Critical patent/JP2008522058A/en
Application granted granted Critical
Publication of JP4768747B2 publication Critical patent/JP4768747B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/04Provisional protective covers for working space for use in drifting galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、トンネル入出口と都心のトンネルで発生する地被りの浅い土砂トンネルの施工及び大断面トンネル内において、導坑を先掘削貫通後に先支保材を多数の位置でまず穿孔設置した後、大断面トンネル、すなわち、メイントンネルの掘削ラインまで掘削しながらライニング形成材であるプレキャストピース版、鉄筋からなるトラス版、スチールリブなどのセグメントを先支保材と結合施工したり、超軟弱地盤で放射状に設置する先支保材の外に、縦方向のパイプルーフ鋼管多段グラウティングをちゅう密にしなければならない場合は、施工上互いに干渉しないように内部ライニング支保材で掘削ラインを補強する先支保トンネル工法及びこれに適合した装置に関する。   In the present invention, the construction of a shallow earth and sand tunnel generated in the tunnel entrance and exit of the tunnel in the city center and in the large cross-section tunnel, after first drilling the leading support material in a number of positions after penetrating through the lead shaft, While digging to the large section tunnel, that is, the main tunnel excavation line, segments such as precast piece slabs that are lining forming materials, truss slabs made of steel bars, steel ribs, etc. are combined with pre-support materials, or radial on ultra soft ground If the pipe roof steel pipe multi-stage grouting in the vertical direction must be tight outside the pre-support material installed in the pre-support tunnel method, the excavation line is reinforced with an internal lining support material so as not to interfere with each other in construction. And a device adapted to the same.

従来、市街地の浅層トンネルの施工時にあらかじめ地盤を補強するためのグラウティングを実施し、地盤を改良する補助工法があったが、このような補助工法は、投入した努力に比べて地盤の支保効果が少ないという短所があった。   Conventionally, there has been an auxiliary method to improve the ground by performing grouting to reinforce the ground in advance when constructing shallow tunnels in urban areas. There was a disadvantage that the effect was small.

また、トンネル内でパイプルーフのみで先支保したり、シールドトンネル概念を導入した大型シールドを油圧で圧入し、内部を掘削するタイプがあったが、パイプルーフは横方向の補強に欠けており、シールドタイプは、局地的に発生するトンネルに過費用が発生するから大断面では適用が不可能だった。   In addition, there was a type in which the pipe roof was supported only with a pipe roof or a large shield that introduced the shield tunnel concept was hydraulically pressed to excavate the inside, but the pipe roof lacks lateral reinforcement, The shield type was not applicable to large sections because of the overhead of locally generated tunnels.

したがって、本発明は、上記の問題点を解決するためのもので、その目的は、トンネル入出口と都心のトンネルで発生する土被りの浅い土砂トンネルの施工と大断面トンネルの施工のための工法で、地盤沈下を減らし、より容易にトンネルライニングを形成しながらトンネル内部を掘削する先支保トンネル工法を提供することにある。
射流29aが内部を洗浄するので、被洗浄部品が異なる場合でも対応できる。
Accordingly, the present invention is for solving the above-mentioned problems, and the purpose thereof is a construction method for construction of a shallow earth and sand tunnel with a shallow earth covering generated in a tunnel entrance and exit of a tunnel in a city center and construction of a large section tunnel. Therefore, it is an object of the present invention to provide a pre-supported tunnel construction method that excavates the inside of a tunnel while reducing ground settlement and forming a tunnel lining more easily.
Since the jet 29a cleans the inside, it is possible to cope with different parts to be cleaned.

上記の目的を達成する本発明による先支保トンネル工法は、地表面から予定されたトンネルの掘削ラインに向かって多数の先支保材を穿孔設置してグラウティングする段階と、
前記トンネルの掘削ラインに沿ってトンネルを掘削する段階と、
前記先支保材ごとにピース版を連続して噛合って設置して、各ピース版の側面に形成された噛合突起と噛合溝が互いに噛み合ってライニングが形成されるように設置する段階と、
前記ピース版を貫通した先支保材に支圧版を当てて定着具を締め付けて先支保材にピース版を圧着固定する段階と、を備えることを特徴とする。
A pre-supported tunnel construction method according to the present invention that achieves the above-mentioned object includes a step of drilling and grouting a number of pre-support materials from the ground surface toward a planned tunnel excavation line;
Drilling a tunnel along the tunnel excavation line ;
Installing each piece of the support plate in such a way that the piece plates are continuously engaged with each other, and the engagement protrusions and engagement grooves formed on the side surfaces of each piece plate are engaged with each other to form a lining; and
A step of applying a pressure plate to the support material penetrating the piece plate, tightening the fixing tool, and fixing the piece plate to the support material by pressure bonding.

本発明の先支保トンネル工法及びこれに適合した装置によれば、トンネルの掘削前に多数の先支保材をトンネルの掘削ラインの地表面で穿孔設置するから、掘削作業と競合することなく施工され、工期が短縮される他、従来トンネルでロックボルトを施工することに比べて地表沈下が低減し、トンネル掘削のための自立時間が増加し、トンネル周辺地盤のアーチ形成効果があり、地盤改良効果及び梁形成効果、内穴の耐圧作用効果、岩壊の縫合作用効果がある。   According to the pre-supported tunnel construction method of the present invention and the apparatus adapted thereto, a large number of pre-support materials are drilled and installed on the ground surface of the tunnel excavation line before excavation of the tunnel. In addition to shortening the construction period, surface subsidence is reduced compared to the construction of rock bolts in conventional tunnels, the self-sustaining time for tunnel excavation is increased, and there is an arch formation effect on the ground around the tunnel, and the ground improvement effect It also has a beam forming effect, a pressure resistance effect of the inner hole, and a stitching effect of rock fracture.

また、ピース版と先支保材を連結し締め付けてトンネル内穴周辺に圧着を加えるので、ライニング効果と短時間で掘削浅端部地盤を支圧でき、土砂トンネルでも施工が可能である。地表面で垂直杭をトンネルの両側壁に設置する時は、トンネル側壁の土流抵抗の役割をし、3アーチ掘削2アーチトンネルでは中央垂直杭がフィラーの役割を果たす。そして、排水材をトンネル掘削面とピース版との間に設置するので、排水が円滑になり、従来トンネルのショートクリートで生じる白化現象がない。しかも、都心地や山岳トンネルの入出口部に発生する土被りの浅い浅層トンネルを原地盤の過度な切取無しにトンネル施工できるため、自然環境のき損なしにトンネルを施工できる。特に5〜6メートルと土被りの極めて浅いトンネルは先支保材の摩擦力が不足することになるが、本発明では地表面に反力ビームの役割を担うコンクリートスラブを打設するか、ピース版を当てて圧着するため、プレストレス型先支保材の引張材である鋼棒にプレストレスが導入される効果があり、沈下の低減効果及びそれによるせん断強度の増加が図られる。   In addition, since the piece plate and the support material are connected and tightened, and crimping is applied to the periphery of the tunnel hole, the lining effect and the ground at the shallow end of the excavation can be supported in a short time, and construction is also possible in the earth and sand tunnel. When vertical piles are installed on both side walls of the tunnel on the ground surface, they play the role of earth flow resistance on the side walls of the tunnel, and in the 3-arch excavation 2-arch tunnel, the central vertical pile plays the role of filler. And since a drainage material is installed between a tunnel excavation surface and a piece plate, drainage becomes smooth and there is no whitening phenomenon which occurs in the short cleat of a conventional tunnel. In addition, shallow tunnels with shallow coverings that occur at the entrances and exits of city centers and mountain tunnels can be tunneled without excessive cutting of the original ground, so tunnels can be constructed without damage to the natural environment. In particular, tunnels with extremely shallow soil covering of 5 to 6 meters will lack the frictional force of the support material. In the present invention, a concrete slab that plays the role of a reaction beam is placed on the ground surface, or a piece plate. Therefore, prestress is introduced into the steel rod, which is the tensile material of the prestress type support material, and the effect of reducing settlement and the increase in shear strength are achieved.

セグメント版の一種である鉄筋トラス版は、ショートクリートと一体化しやすい構造であり、リバウンド量を最小化でき、縦方向と横方向に断面2次モーメントが最大化できる幾何学的な構造に設計された。   Reinforcing bar truss plate, a kind of segment plate, has a structure that is easy to integrate with short cleats, is designed to have a geometric structure that can minimize the amount of rebound and maximize the secondary moment of inertia in the vertical and horizontal directions. It was.

また、本発明の他の実施例による排水装置は、トンネル内の湧き出し水による地盤侵食及び余掘を減少させることができ、ピース版の背面のグラウティング時にグラウティング液が水抜管の通穴を塞ぐのを防止するように水抜管の下端外周面に設置されたラッパ状の漏斗がチェックバルブの役割を果たし、よって、排水管が塞がらず排水が円滑になる。   In addition, the drainage device according to another embodiment of the present invention can reduce ground erosion and surplus digging due to the spring water in the tunnel, and the grouting liquid can pass through the drainage pipe when grouting on the back of the piece plate. A trumpet-shaped funnel installed on the outer peripheral surface of the lower end of the drainage pipe serves as a check valve so as to prevent the drainage pipe from being blocked.

また、導坑を用いて先支保材を設置する時には、原地盤が軟弱な所においても大断面トンネルを設置することができるので、地下油類貯蔵施設にも非常に効果的な工法であり、穿孔穴内の先支保材をパッカー手段によって加圧してグラウティングができるようにし、リッピング(ripping)岩または土砂地盤に脈像形態や浸透形態のグラウティングで地盤補強ができるし、完全に先支保材周辺がグラウティング(grouting)されたことが確認できるように、中空鋼棒型先支保材またはグラウティングホースを通して注入してグラウティング液がオーバーフロするのを確認できる構造とした。   In addition, when installing the support material using the guide shaft, it is possible to install a large section tunnel even in a place where the original ground is weak, so it is a very effective construction method for underground oil storage facilities, The support material in the borehole can be grooved by pressurizing it with the packer means, and the ground reinforcement can be done with ripping rock or earth and sand ground by grouting in the form of pulse image or infiltration. In order to confirm that the surroundings were grouting, the structure was such that the grouting liquid could be confirmed to overflow by being injected through a hollow steel rod type tip support material or a grouting hose.

先支保材を設置するための穿孔穴を用いて掘削時に、ベンチカット発破工法のための装薬が可能であり、発破時に先支保材の露出された頭部の損傷を防止するためにポリエチレンフォーム(P.E.foam)パイプを付着したし、機械化施工を可能にするために導坑穿孔装置の縦軸中心がトンネルクラウン部半径中心に一致するように導坑位置を設定した。   Polyethylene foam to prevent damage to the exposed head of the support material during blasting when drilling using the perforated hole for installing the support material, and for the bench-cut blasting method (PE foam) The pipe was attached and the shaft position was set so that the vertical axis center of the shaft drilling device coincided with the radius center of the tunnel crown in order to enable mechanized construction.

工期長大トンネルの側面では、大断面トンネルにおいて導坑をまず掘削貫通した後、多数の位置で先支保材を施工でき、掘削段階でも多数の位置で切羽を形成して各箇所で作業ができるようにし、工期を画期的に短縮できる。   On the side of the long tunnel, the first step is to drill through the guide tunnel in the large section tunnel, and then support support materials can be constructed at a number of positions. The construction period can be shortened dramatically.

以下、本発明の実施例を、添付の図面に基づいて詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

図1a乃至図1cは、本発明のトンネル工法において、トンネルの掘削前に予定されたトンネルの掘削ラインに向けて先支保材を様々に施工した様子を示す図であり、図1dは、3アーチ掘削2アーチトンネルのピラー部を先支保材で施工した様子を示す断面図であり、図2aは、本発明によるトンネル工法において、先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとにピース版を連結して締め付けた様子を示す断面図であり、図2bは、本発明によるトンネル工法において先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインにおいて各先支保材ごとに鉄筋からなるトラス版を連結して締め付けた様子を示す断面図であり、図2cは、本発明によるトンネル工法において先支保材を施工し、トンネルの横方向に等間隔に多数のパイプルーフ(pipe roof)で補強したのちトンネルを掘削し、トンネルの掘削ラインにトンネルの縦方向に等間隔にアーチ型スチールリブ(steelrib)を施工した後、先支保材と連結して締め付けた様子を示す断面図であり、図2dは、本発明のトンネル工法において、先支保材をトンネルの掘削ラインの周辺のみまで到達するようにして多数のパイプルーフ(pipe roof)と干渉しないように施工した断面図であり、図2eは、本発明のトンネルの横方向に等間隔に多数のパイプルーフを施工した後、トンネルの掘削ラインにトンネルの縦方向に等間隔にアーチ型スチールリブ(steel rib)を施工後に先支保材と連結して締め付けた様子を示す斜視図であり、図2fは、本発明の多数のスチールリブをスチールプレートで連結する様子を示す斜視図であり、図2gは、図2eのA−A線に沿った断面図であり、図3は、本発明のトンネル工法においてトンネルの掘削ラインの下部でラックボルトを施工する様子を示す断面図であり、図4aは、本発明のトンネル工法において切羽内の自立補強のために先支保材をトンネルの掘削ラインよりも深く穿孔設置した様子を示す部分断面図であり、図4bは、図4aのB−B線に沿った断面図であり、図4cは、図4aのC−C線に沿った断面図であり、図5aは本発明のトンネル工法において、鉄筋からなるトラス版とショートクリートを用いてライニングを形成する場合、掘削面とピース版との間に帯状の排水材をトンネル周辺に連続して設置した様子を示す斜視図であり、図5bは、本発明のトンネル工法において、他のトンネルの排水構造を示す断面図であり、図5cは、図5bの排水装置を拡大して示す断面図であり、図6は、本発明のトンネル工法においてプレストレス型先支保材とピース版のようなシェル形成部材を支圧版で連結して締め付けるとき、先支保材にプレストレスを加えることによる効果を示す断面図であり、図7は、図6のD部分の先端支持プレストレス型先支保材を詳細に示す断面図であり、図8は、本発明のトンネル工法において土被りの浅い浅層トンネルに施工された先支保材を示す断面図であり、図9aは、本発明のトンネル工法において鉄筋トラス版を示す斜視図であり、図9bは、図9aのX−X線に沿った断面図であり、図9cは、図9aのY−Y線に沿った断面図であり、図10a乃至図10eは、本発明のトンネル工法において先支保材の施工順序を示す図である。   FIG. 1a to FIG. 1c are diagrams showing various forms of supporting materials for the tunnel excavation line planned before excavation of the tunnel in the tunnel construction method of the present invention, and FIG. FIG. 2a is a cross-sectional view showing a state in which a pillar portion of an excavation 2 arch tunnel is constructed with a pre-support material. FIG. 2a is a cross-sectional view of a tunnel construction method according to the present invention. FIG. 2B is a cross-sectional view showing a state in which piece plates are connected and tightened for each support material, and FIG. 2B is a diagram of excavating a tunnel after applying the support material in the tunneling method according to the present invention. FIG. 2c is a cross-sectional view showing a state in which truss plates made of reinforcing bars are connected and tightened for each material, and FIG. After reinforced with a number of pipe roofs at equal intervals in the horizontal direction, the tunnel is excavated, and after arched steel ribs (steelrib) are installed at equal intervals in the vertical direction of the tunnel on the tunnel excavation line, FIG. 2d is a cross-sectional view showing a state in which the material is connected and tightened, and FIG. 2d shows a plurality of pipe roofs in the tunnel method according to the present invention so that the support material reaches only the periphery of the tunnel excavation line. 2e is a cross-sectional view constructed so as not to interfere with), and FIG. 2e is a diagram illustrating the construction of a plurality of pipe roofs at equal intervals in the lateral direction of the tunnel of the present invention, and then at equal intervals in the vertical direction of the tunnel in the tunnel excavation line. FIG. 2f is a perspective view showing a state in which an arch type steel rib is connected and tightened with a support material after construction, and FIG. It is a perspective view which shows a mode that many steel ribs are connected with a steel plate, FIG. 2g is sectional drawing along the AA line of FIG. 2e, FIG. 3 is excavation of a tunnel in the tunnel construction method of this invention. FIG. 4A is a cross-sectional view showing a state in which rack bolts are constructed at the lower part of the line, and FIG. 4A is a state in which the supporting material is drilled deeper than the tunnel excavation line for self-reinforcing reinforcement in the face in the tunnel method of the present invention. 4b is a cross-sectional view taken along line BB in FIG. 4a, FIG. 4c is a cross-sectional view taken along line CC in FIG. 4a, and FIG. In the tunnel construction method of the invention, when forming a lining using a truss plate made of steel bars and a short cleat, a perspective view showing a state in which a belt-shaped drainage material is continuously installed around the tunnel between the excavation surface and the piece plate In 5b is a cross-sectional view showing a drainage structure of another tunnel in the tunnel construction method of the present invention, FIG. 5c is an enlarged cross-sectional view showing the drainage device of FIG. 5b, and FIG. FIG. 7 is a cross-sectional view showing an effect obtained by applying prestress to a pre-support material when a pre-stress type pre-support material and a shell forming member such as a piece plate are connected and tightened by a support plate in the tunnel method of FIG. FIG. 8 is a cross-sectional view showing in detail the tip-supported prestressed support material at the D portion in FIG. 6, and FIG. 8 shows the support material constructed in a shallow tunnel with a shallow earth covering in the tunnel method of the present invention. 9a is a perspective view showing a reinforcing bar truss plate in the tunnel method of the present invention, FIG. 9b is a sectional view taken along line XX in FIG. 9a, and FIG. It is sectional drawing along the YY line of 9a. FIGS. 10a to 10e are diagrams showing the construction sequence of the pre-support material in the tunnel method of the present invention.

本発明による先支保材及びピース版で支持される先支保トンネル工法のプロセスを説明すると、まず、図1a乃至図1dに示すように、トンネル内で地盤に向かって放射状に設置するロックボルトのような先支保材10を、トンネルの予定された地表面からトンネルの掘削ライン20に向かってトンネル掘削前に穿孔設置し、グラウティングする。図1aは、トンネルの掘削ラインに向かって放射状に先支保材10を施工した様子を示す図であり、図1bは、トンネルの掘削ラインに向かって鉛直方向に先支保材10を施工した様子を示す図であり、図1cは、トンネルの掘削ラインに向かって鉛直及び放射状の方向を混合して先支保材10を施工した様子を示す図であり、図1dは、3アーチ掘削2アーチトンネルのピラー部を先支保材で施工した様子を示す図である。これについてそれぞれ説明すると、図1aは、比較的トンネル上部の表面が広いか、アーチ形態の場合に適用し、図1bは、都心のトンネルにおいてトンネル地表面の横方向空間が限定される時に適用し、図1cは、トンネルの掘削ラインの両側面の安定が追加的に必要な時に適用し、両側面の垂直の先支保材を施工基面下部まで根入させることによって、トンネル側壁の土流抵抗体の役割を果たし、図1dは、3アーチ掘削2アーチトンネルにおいてピラー部位置に設置される垂直先支保材を鋼管とすることによってトンネルのピラー部の役割を果たすようにし、この垂直先支保材に鉄版13とアングル14で熔接連結して一体化させて先支保トンネルを形成する。   The process of the pre-supporting tunnel construction method supported by the pre-supporting material and piece plate according to the present invention will be described. First, as shown in FIGS. 1a to 1d, it is like a rock bolt installed radially toward the ground in the tunnel. The tip support material 10 is pierced and ground from the planned ground surface of the tunnel toward the tunnel excavation line 20 before tunnel excavation. FIG. 1a is a diagram showing a state in which the support material 10 is radially applied toward the tunnel excavation line, and FIG. 1b is a diagram in which the support material 10 is applied in the vertical direction toward the tunnel excavation line. FIG. 1c is a diagram showing a state in which the support material 10 is constructed by mixing the vertical and radial directions toward the tunnel excavation line, and FIG. It is a figure which shows a mode that the pillar part was constructed with the pre-support material. For each of these, FIG. 1a is applied when the surface of the upper part of the tunnel is relatively wide or arched, and FIG. 1b is applied when the lateral space of the tunnel ground surface is limited in the tunnel in the center of the city. Fig. 1c is applied when the stability of both sides of the tunnel excavation line is additionally required, and the earth flow resistance of the tunnel side wall is made by allowing the vertical support members on both sides to penetrate to the bottom of the construction base. FIG. 1d shows the role of the pillar of the tunnel by using a steel pipe as the vertical support material installed at the pillar position in the 3-arch excavation 2 arch tunnel. The iron plate 13 and the angle 14 are welded and integrated to form a pre-support tunnel.

上記のように先支保材10を施工後に、トンネルを掘削する。すなわち、図2a乃至図2gに示すように、先支保材10の施工は、予定されたトンネルの掘削ライン20の上部面、すなわち、地表面から放射状の方向にトンネルの掘削ライン20に向かって多数の先支保材10を穿孔設置した後、トンネルを掘削するようになる。図2aに示すように、トンネルの掘削ライン20には、一側と他側にそれぞれ噛合突起31と噛合溝32が形成されたピース版30が、パズルのように互いに噛み合っている。そして、各先支保材10の位置に合うように穴が穿孔されたピース版30が支圧版11で締め付けられている。また、ピース版30とトンネルの掘削面との間には、排水材40が挿入設置されている。そして、ピース版30とトンネルの掘削面間の隙間を埋めるための背面グラウティングは、従来のトンネル工法と同様に、2重のシェルを設置するに当たりピース版全面に排水フィルターと防水紙を設置する前に、支圧版11を取り付けた穿孔された穴を通して施工される。   After the pre-support material 10 is constructed as described above, the tunnel is excavated. That is, as shown in FIGS. 2 a to 2 g, the support material 10 is applied in a large number toward the tunnel excavation line 20 in a radial direction from the upper surface of the planned tunnel excavation line 20, that is, the ground surface. After the first support material 10 is drilled, the tunnel is excavated. As shown in FIG. 2a, in the tunnel excavation line 20, piece plates 30, each having a meshing protrusion 31 and a meshing groove 32 formed on one side and the other side, mesh with each other like a puzzle. Then, the piece plate 30 in which holes are drilled so as to match the positions of the respective support members 10 is fastened by the support plate 11. A drainage material 40 is inserted between the piece plate 30 and the excavation surface of the tunnel. The back side grouting for filling the gap between the piece plate 30 and the excavation surface of the tunnel is to install a drain filter and waterproof paper on the whole piece plate when installing a double shell as in the conventional tunnel method. Before, it is constructed through a perforated hole with a bearing plate 11 attached.

図2bは、ピース版30の代わりに、鉄筋で編まれたトラス版33を支持版とする例を示すもので、先支保材10ごとにトラス版33をそれぞれ取り付け、その内部をショートクリートする。図2c乃至図2gは、ピース版30の代わりに、トンネルの横方向に等間隔のパイプルーフ(Pipe Roof)34をトンネルの進行方向に設置した後、トンネルを掘削し、その掘削面に排水材40を設置し、このパイプルーフ34の下端にはトンネルの横方向アーチ形状のスチールリブ(Steel Rib)35を縦方向、すなわち、トンネルの進行方向に設置し、これらの多数のスチールリブ35同士間にはスチールプレート36が設置されてそれらのスチールリブ35を互いに結着させている。そして、パイプルーフ34とスチールプレート36との間にはショートクリート37を打設するようになっている。すなわち、図2a乃至図2gに示すように、シェルを形成する部材はプレキャストピース版30、鉄筋トラス版33またはスチールリブ35のいずれかが地盤条件に基づいて選択的に設置される。   FIG. 2 b shows an example in which a truss plate 33 knitted with a reinforcing bar is used as a support plate instead of the piece plate 30, and the truss plate 33 is attached to each support material 10 and its interior is short cleated. 2c to 2g show that instead of the piece plate 30, a pipe roof 34 (Pipe Roof) 34 is installed in the transverse direction of the tunnel in the traveling direction of the tunnel, and then the tunnel is excavated and drainage material is provided on the excavation surface. 40, and a steel rib (Steel Rib) 35 in the transverse direction of the tunnel is installed at the lower end of the pipe roof 34 in the vertical direction, that is, in the traveling direction of the tunnel. Are provided with steel plates 36 to bind the steel ribs 35 to each other. A short cleat 37 is placed between the pipe roof 34 and the steel plate 36. That is, as shown in FIGS. 2a to 2g, any of the members forming the shell is selectively installed based on the ground conditions, either the precast piece plate 30, the rebar truss plate 33, or the steel rib 35.

図2cでは、ロックボルトの施工時に支圧版でトンネルの掘削ラインを支圧して局部的な崩壊を防止することが開示されているが、図2dでは、本発明のトンネル工法で先支保材をトンネルの掘削ラインの周辺のみにまで到達するようにして多数のパイプルーフと干渉しないように施工した例が開示されている。すなわち、トンネルの進行方向にパイプルーフ34と干渉しないようにトンネルの掘削ラインの上側面のみにまで到達するようにしたわけである。   In FIG. 2c, it is disclosed that the excavation line of the tunnel is supported by the bearing plate during the construction of the rock bolt to prevent local collapse, but in FIG. 2d, the pre-support material is applied by the tunnel method of the present invention. An example in which construction is performed so as to reach only the periphery of a tunnel excavation line so as not to interfere with a large number of pipe roofs is disclosed. That is, only the upper side surface of the tunnel excavation line is reached so as not to interfere with the pipe roof 34 in the traveling direction of the tunnel.

図3では、上記のように、トンネル掘削後にピース版30で先支保材10をトンネルの掘削ライン20内で支圧版11を用いて結合した後、掘削ライン20の比較的掘削しやすい側部分は、トンネルの内部でロックボルト50とピース版30を施工している。 In FIG. 3, as described above, after the tunnel support excavation, the support material 10 is joined with the support plate 11 in the tunnel excavation line 20 with the piece plate 30, and then the side portion of the excavation line 20 that is relatively easy to excavate. Has installed the rock bolt 50 and the piece plate 30 inside the tunnel.

図4a乃至図4cに示すように、切羽の自立補強のために先支保材10を掘削ライン20よりも深く穿孔設置した様子を示す図である。図示のように、先支保材10を掘削ライン10よりも深く穿孔設置すると、切羽をせん断補強する結果となる。   As shown in FIGS. 4 a to 4 c, it is a diagram illustrating a state where the support material 10 is drilled deeper than the excavation line 20 for self-supporting reinforcement of the face. As shown in the figure, when the support material 10 is drilled deeper than the excavation line 10, the face is shear-reinforced.

図5aは、本発明のトンネル工法において、鉄筋で編んだトラス版とショートクリートを用いてライニングを形成する場合、トンネルの掘削面とピース版30との間に設置された帯状の排水材40を示す斜視図で、この排水材40をトンネル周辺に連続して設置することによって排水を円滑にする。   FIG. 5a shows a strip drainage 40 installed between a tunnel excavation surface and a piece plate 30 when a lining is formed using a truss plate knitted with a reinforcing bar and a short cleat in the tunnel method of the present invention. In the perspective view shown, the drainage is smoothed by continuously installing the drainage material 40 around the tunnel.

図5b及び図5cは、本発明のトンネル工法において、プレキャストピース版と掘削面間の空間に設置された排水装置70を示す図で、排水装置70は、ピース版30とトンネルの掘削ライン20との間に設置され、等間隔に“T”字状連結管71を媒介にして連結された排水管72と、排水管72の“T”字状連結管71に連結されて掘削ライン20に対して放射状に配列され、外周面に多数の通穴73aが形成された水抜管73と、水抜管73において通穴73aの形成されていない部分である下部外周面に挿入され、グラウティング液74aが上部の通穴73a側に流れていくのを防止するラッパ状の漏斗74と、水抜管73の上部面をカバーするキャップ75と、で構成されている。このような排水装置70は、トンネル内の湧き出し水による地盤侵食及び余掘を減少させることができ、ピース版30背面のグラウティング時にグラウティング液74aが水抜管73の通穴73aを塞ぐのを防止するように、水抜管73の下端外周面に設置されたラッパ状の漏斗74がチェックバルブの役割を果たすため、排水管72が塞がることなく円滑に排水される。図5aに示す実施例の排水装置及び図5bに示す実施例の排水装置は、併用しても良く、いずれか一つのみを地盤条件とライニング条件に応じて選択的に適用しても良い。   5b and 5c are views showing the drainage device 70 installed in the space between the precast piece plate and the excavation surface in the tunneling method of the present invention. The drainage device 70 includes the piece plate 30 and the tunnel excavation line 20. Between the drain pipe 72 and the “T” -shaped connecting pipe 71 of the drain pipe 72 connected to the excavation line 20. The water draining pipe 73 having a large number of through holes 73a formed on the outer peripheral surface and the lower outer peripheral surface of the water draining pipe 73 where the through holes 73a are not formed are inserted into the draining pipe 73. A trumpet-shaped funnel 74 that prevents the flow from flowing to the upper through hole 73a side, and a cap 75 that covers the upper surface of the drain pipe 73 are configured. Such a drainage device 70 can reduce ground erosion and excessive excavation due to spring water in the tunnel, and the grouting liquid 74a blocks the through hole 73a of the drain pipe 73 when grouting on the back of the piece plate 30. Since the trumpet-shaped funnel 74 installed on the outer peripheral surface of the lower end of the drain pipe 73 serves as a check valve, the drain pipe 72 is smoothly drained without being blocked. The drainage device of the embodiment shown in FIG. 5a and the drainage device of the embodiment shown in FIG. 5b may be used in combination, or only one of them may be selectively applied depending on the ground condition and the lining condition.

図6は、本発明のトンネル工法においてプレストレス型先支保材とピース版のようなシェル形成部材を支圧版で連結して締め付けるとき、先支保材にプレストレスを加えることによる効果を示す断面図であり、図7は、プレストレスを加えることができるプレストレス型先支保材60を示す断面図である。図6及び図7に示すように、プレストレス型先支保材60は、引張材である鋼棒61で構成され、その外周面に設置されたポリエチレン管67内に挿入された状態で、外周面に突起63が突設された鋼管パイプ62内に配置される。鋼管パイプ62と鋼棒61との間には、防錆潤滑油65を塗布して防錆及び引張変形を自由にした。このようなプレストレス型先支保材60の取込みは、油圧ジャッキでに支圧版11を押しつけながら引張材である鋼棒61を引っ張り、定着具12で締め付けるか、ナットのトルク値で引張を与えることができる。原地盤のプレストレス型先支保材60の定着は、突起63が突設された鋼管パイプ62とグラウティング66の摩擦力によって固定されるようにする。   FIG. 6 is a cross-sectional view showing the effect of applying prestress to a pre-support material when a pre-stress type pre-support material and a shell forming member such as a piece plate are connected and tightened by a support plate in the tunnel method of the present invention. FIG. 7 is a cross-sectional view showing a prestress type support material 60 that can apply prestress. As shown in FIGS. 6 and 7, the prestress type support material 60 is composed of a steel rod 61 that is a tensile material, and is inserted into a polyethylene pipe 67 installed on the outer peripheral surface thereof. The projection 63 is disposed in the steel pipe 62 having the projection. A rust preventive lubricating oil 65 was applied between the steel pipe 62 and the steel rod 61 to prevent rust prevention and tensile deformation. The prestress type support material 60 is taken in by pulling the steel rod 61 as a tensile material while pressing the support plate 11 with a hydraulic jack and tightening it with the fixing tool 12 or applying tension by the torque value of the nut. be able to. The prestressed pre-support material 60 of the original ground is fixed by the frictional force between the steel pipe pipe 62 and the grouting 66 provided with the protrusion 63.

本発明の先支保材10とピース版30のようなシェル形成部材を支圧版11で締め付けて連結する時、先支保材10にプレストレス(Prestress)を加えることによって、地盤沈下を低減し且つアーチング効果を増大させるわけである。   When a shell forming member such as the support plate 10 and the piece plate 30 of the present invention is fastened and connected by the support plate 11, by applying prestress to the support material 10, ground subsidence is reduced and This increases the arching effect.

図10a乃至図10eでは、本発明による先支保トンネルの施工順序を示している。まず、地上から予定されたトンネルの掘削ライン20に向かって先支保材10を放射状及び鉛直方向に穿孔設置し(図10a)、トンネルの掘削ラインに沿ってトンネルの上部断面を掘削し(図10b)、アーチングラインにある先支保材10ごとにピース版30を支圧版11と定着具12で連結して締め付け(図10c)、トンネルの下部半断面にトンネル内でロックボルト50を施工し(図10d)、各ロックボルト50ごとにピース版30を支圧版11と定着具12で連結して締め付けることで、施工を完了する(図10e)。   10a to 10e show the construction sequence of the pre-support tunnel according to the present invention. First, the support material 10 is pierced and installed in a radial and vertical direction from the ground toward the tunnel excavation line 20 (FIG. 10a), and the upper section of the tunnel is excavated along the tunnel excavation line (FIG. 10b). ), The piece plate 30 is connected to the support plate 11 and the fixing tool 12 for each support material 10 in the arching line and tightened (FIG. 10c), and the lock bolt 50 is installed in the lower half section of the tunnel in the tunnel ( 10d), the construction is completed by connecting and tightening the piece plate 30 with the bearing plate 11 and the fixing tool 12 for each lock bolt 50 (FIG. 10e).

図8に示す5〜6メートル以内の土被りを持つ超浅層トンネルは、トンネル上部地表面に設置されたピース版30またはコンクリートスラブ80に、プレストレス型先支保材60の鋼棒61を固定し、プレストレス型先支保材60の一端を坑内で掘削しながらピース版30を当てて締め付けることによって、プレストレスを発生させる。このような工法は、土砂トンネルにおいて先支保材の周辺で発生する摩擦力を十分に確保できない土砂地盤に適用し、トンネル周辺の完壁なアーチング効果とせん断強度の増加、沈下低減をもたらすことができる。   In the super shallow tunnel with a covering of 5-6 meters shown in FIG. 8, the steel bar 61 of the prestress type support material 60 is fixed to the piece plate 30 or the concrete slab 80 installed on the ground surface above the tunnel. Then, prestress is generated by tightening the piece plate 30 against the one end of the prestress type support material 60 while excavating one end of the prestress type support material 60 in the mine. Such a construction method can be applied to earth and sand ground where the frictional force generated around the pre-support material in the earth and sand tunnel cannot be secured sufficiently, resulting in a perfect arching effect around the tunnel, an increase in shear strength, and a decrease in settlement. it can.

図11aは、本発明の大断面トンネルで、導坑内で放射状に穿孔された穿孔穴に先支保材が挿入された状態を示す断面図であり、図11bは、本発明の大断面トンネルで先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとにピース版を連結し締め付けた様子を示す断面図であり、図11cは、本発明の大断面トンネルにおいて先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとに鉄筋で編んだトラス版を連結して締め付けた様子を示す断面図であり、図11dは、本発明の大断面トンネルで先支保材を施工し、トンネルの横方向に等間隔に多数のパイプルーフで補強した後トンネルを掘削し、トンネルの掘削ラインにトンネルの縦方向に等間隔にアーチ型スチールリブを施工した後、先支保材と連結して締め付けた様子を示す断面図である。   FIG. 11a is a cross-sectional view illustrating a state in which a pre-support material is inserted into a drilled hole that is radially drilled in a guide shaft, and FIG. 11b is a front view of the large-section tunnel of the present invention. FIG. 11c is a cross-sectional view showing a state in which a tunnel is excavated after construction of the support material, and a piece plate is connected and tightened to the tunnel excavation line for each support material, and FIG. 11c is a pre-support material in the large cross-section tunnel of the present invention. 11d is a cross-sectional view showing a state where a tunnel is excavated after construction, and a truss plate knitted with a reinforcing bar for each support material is connected to the tunnel excavation line and tightened, and FIG. After constructing the pre-support material, reinforced with a number of pipe roofs at equal intervals in the lateral direction of the tunnel, after excavating the tunnel, and after constructing arched steel ribs at equal intervals in the vertical direction of the tunnel on the tunnel excavation line, It is a sectional view showing a state in which tightened in conjunction with pre-supports.

図11bに示すように、本発明による先支保トンネル工法は、大断面トンネル内に導坑21を掘削する段階と、導坑21内で先支保材10を設置するために放射状に多数の穿孔穴22を形成する段階と、この段階で形成された放射状の穿孔穴22に先支保材10を挿入した後、グラウティングし養生する段階と、前記大断面トンネルの掘削ライン20に沿ってトンネルを掘削し、その掘削面に排水材40を設置する段階と、前記排水材40の下端に先支保材10ごとにピース版30を連続して噛合って設置するものの、各ピース版30の側面に形成された噛合突起31と噛合溝32が互いに噛み合ってライニングが形成されるように設置する段階と、前記ピース版30を貫通した先支保材10に支圧版11を当てて定着具12を締め付けて先支保材10にピース版30を圧着固定する段階と、からなる。   As shown in FIG. 11 b, the pre-support tunnel method according to the present invention includes a step of excavating a guide pit 21 in a large-section tunnel, and a large number of radial holes for installing the support material 10 in the guide pit 21. 22, the step of inserting the pre-support material 10 into the radial drill holes 22 formed at this stage, then grouting and curing, and excavating the tunnel along the excavation line 20 of the large section tunnel The drain plate 40 is placed on the excavation surface, and the piece plate 30 is continuously engaged with the bottom support member 10 at the lower end of the drain member 40, but is formed on the side surface of each piece plate 30. A step of installing the meshing protrusion 31 and the meshing groove 32 so as to mesh with each other to form a lining, and applying the support plate 11 to the support material 10 penetrating the piece plate 30 to tighten the fixing device 12. Ahead The method comprising crimped piece plate 30 to Hozai 10 consists.

図11cに示すように、本発明の先支保トンネル工法は、大断面トンネル内に導坑21を掘削する段階と、導坑21内で先支保材10を設置するために放射状に多数の穿孔穴22を形成する段階と、この段階で形成された放射状の穿孔穴22に先支保材10を挿入した後、グラウティングし養生する段階と、前記大断面トンネルの掘削ライン20に沿ってトンネルを掘削し、その掘削面に排水材40を設置する段階と、前記排水材40の下端に前記先支保材10ごとに鉄筋で編んだトラス版33を連続して設置するものの、トラス版33を貫通した先支保材10に支圧版11を当てて定着具12を締め付けて鉄筋トラス版33を圧着固定する段階と、トラス版33内にショートクリート37を打設する段階と、からなる。   As shown in FIG. 11 c, the pre-support tunnel method of the present invention includes a step of excavating a guide pit 21 in a large cross-section tunnel, and a plurality of radial holes for installing the support material 10 in the guide pit 21. 22, the step of inserting the pre-support material 10 into the radial drill holes 22 formed at this stage, then grouting and curing, and excavating the tunnel along the excavation line 20 of the large section tunnel Then, although the drainage material 40 is installed on the excavation surface, and the truss plate 33 knitted with the reinforcing bar for each of the support materials 10 is continuously installed at the lower end of the drainage material 40, the truss plate 33 is penetrated. It consists of a stage in which the support plate 11 is applied to the support material 10 and the fixing device 12 is tightened to fix the rebar truss plate 33 by pressure, and a step in which a short cleat 37 is placed in the truss plate 33.

図11dに示すように、大断面トンネル内に導坑21を掘削する段階と、導坑21内で先支保材10を設置するために放射状に多数の穿孔穴22を形成する段階と、この段階で形成された放射状の穿孔穴22に先支保材10を挿入した後、グラウティングし養生する段階と、前記大断面トンネルの横方向に等間隔のパイプルーフ34をトンネルの進行方向にまず設置した後、トンネルを掘削しながらパイプルーフ34の下端面に排水材40を設置し、排水材40を介在してパイプルーフ40の下端にはトンネルの横方向にアーチ形状のスチールリブ35をトンネルの進行方向に設置し、これら多数のスチールリブ35同士間にはスチールプレート36が設置されてこれらスチールリブ35同士を結着させたのち支圧版11と定着具12を締め付けて圧着固定する段階と、前記パイプルーフ34とスチールプレート36との間にショートクリート37を打設する段階と、からなる。   As shown in FIG. 11d, the step of excavating the guide shaft 21 in the large cross-section tunnel, the step of forming a large number of perforated holes 22 radially to install the pre-support material 10 in the guide shaft 21, and this step After inserting the pre-support material 10 into the radial perforated holes 22 formed in step 1, a step of grouting and curing, and pipe roofs 34 at equal intervals in the transverse direction of the large cross-section tunnel were first installed in the tunnel traveling direction. After that, a drainage material 40 is installed on the lower end surface of the pipe roof 34 while excavating the tunnel, and an arch-shaped steel rib 35 is extended to the lower end of the pipe roof 40 via the drainage material 40 in the lateral direction of the tunnel. The steel plate 36 is installed between the many steel ribs 35 and the steel ribs 35 are bonded together, and then the bearing plate 11 and the fixing tool 12 are tightened. The method comprising crimped only by the steps of pouring a short cleat 37 between the pipe roof 34 and steel plate 36, made of.

上記で先支保材とは、鋼棒型、鋼線型、プレストレス型の先支保材に区分され、図12aは本発明の中空鋼棒型先支保材を詳細に示す断面図であり、図12bは、図12aのE−E線に沿った断面図である。 In the above, the support material is divided into a steel bar type, a steel wire type, and a prestress type support material, and FIG. 12a is a cross-sectional view showing the hollow steel bar type support material of the present invention in detail, and FIG. These are sectional drawings along the EE line of Drawing 12a.

このような中空鋼棒型先支保材を用いた加圧グラウティング装置について詳細に説明する。先支保トンネルを掘削施工するために、導坑21内で放射状に穿孔された穿孔穴22に先支保材10を挿設し、穿孔穴22内を加圧グラウティングする加圧グラウティング装置は、外周面に螺糸山110aが形成された棒状のもので、中間外周面に穿孔穴22のセンター間隔を維持するための外方に膨らんだ多数の突部111を持つセンターライザー112が挿入され、カプラー113によって多数個が連結され、穿孔穴22内の内側面にグラウティング液74aを注入して加圧グラウティングする中空鋼棒型先支保材110と、穿孔穴22の入口側に位置した中空鋼棒型先支保材110の螺糸山に結合され、中空鋼棒型先支保材110を介して穿孔穴22の内部にグラウティング液74aを注入して充填した後、穿孔穴22の入口をパッキングするパッカー手段120と、を備えて構成される。   A pressure grouting apparatus using such a hollow steel rod type support material will be described in detail. In order to excavate the pre-support tunnel, the pressure grouting apparatus for inserting the pre-support material 10 into the drill holes 22 pierced radially in the guide shaft 21 and performing pressure grouting in the drill holes 22 A center riser 112 having a large number of protrusions 111 bulging outward to maintain the center interval of the perforated holes 22 is inserted into the intermediate outer peripheral surface of the rod-shaped member having a thread ridge 110a formed on the outer peripheral surface. A plurality of steel plates 113 are connected to each other, and a hollow steel rod-type support material 110 for injecting a grouting liquid 74a into the inner surface of the perforated hole 22 and performing pressure grouting, and a hollow steel positioned on the inlet side of the perforated hole 22 After being connected to the thread of the rod type tip support material 110 and filling the hole 22 with the grouting liquid 74a through the hollow steel rod type tip support material 110, the inlet of the hole 22 is packed. Configured with a packer means 120 for grayed, the.

パッカー手段120は、中空鋼棒型先支保材110の螺糸山110aに結合されたドーナツ状の第1ストッパー121と、第1ストッパー121の一側である先支保材110の螺糸山110aに結合されて穿孔穴22の入口側に向くように設置されたゴムラッパ管を持つゴムパッカー122と、ゴムパッカー122の一側である中空鋼棒型先支保材11の外周面に挿入され、移動しつつゴムパッカー122のゴムラッパ管を穿孔穴22の内周面に密着させるように釘状のゴムパッキング123aが外周面に挿入された端管123と、ゴムパッキング123aの一側でありながら、端管123の外周面に挿入されて釘状ゴムパッキング123aに一側面が引っ掛かるようにゴムパッキング123aをゴムパッカー122のゴムラッパ管内に密着させる役割を担うドーナツ状の第2ストッパー124と、端管123の一側からゴムパッキング123aが前記ゴムパッカー122のゴムラッパ管に向かって移動するように中空鋼棒型先支保材110の螺糸山110aに螺合された挿入用パイプ125と、を備えて構成される。   The packer means 120 is coupled to a donut-shaped first stopper 121 coupled to the thread 110 a of the hollow steel rod type supporting member 110 and a thread 110 a of the supporting member 110 which is one side of the first stopper 121. The rubber packer 122 having a rubber trumpet tube installed so as to face the inlet side of the perforated hole 22, and inserted into the outer peripheral surface of the hollow steel bar type tip support material 11 on one side of the rubber packer 122, the rubber while moving An end tube 123 in which a nail-like rubber packing 123a is inserted into the outer peripheral surface so that the rubber wrapper tube of the packer 122 is in close contact with the inner peripheral surface of the perforation hole 22, and one end of the rubber packing 123a, The rubber packing 123a is closely attached to the rubber wrapper tube of the rubber packer 122 so that one side surface is caught by the nail-like rubber packing 123a by being inserted into the outer peripheral surface. The donut-shaped second stopper 124 that plays a role of the knitting, and the thread 110a of the hollow steel rod type support material 110 so that the rubber packing 123a moves from one side of the end tube 123 toward the rubber wrapper tube of the rubber packer 122. And an insertion pipe 125 that is screwed together.

カプラー113は、中空鋼棒型先支保材110を多数個連結する部分である螺糸山110aの外周面に設置され、先支保材110の連結状態が解除されないようにその内周面にロックピン113aが挿入されている。   The coupler 113 is installed on the outer peripheral surface of the screw thread 110a, which is a part for connecting a plurality of hollow steel rod type tip support members 110, and a lock pin 113a is provided on the inner peripheral surface thereof so that the connected state of the tip support members 110 is not released. Has been inserted.

一方、図12cは、本発明の鋼棒型先支保材を詳細に示す断面図であり、図12dは、本発明の鋼線型先支保材を詳細に示す断面図であり、図12eは、図12dのF−F線に沿った断面図であり、図12fは、図12dのG−G線に沿った断面図である。   On the other hand, FIG. 12c is a sectional view showing in detail the steel rod type tip support material of the present invention, FIG. 12d is a sectional view showing the steel wire type tip support material of the present invention in detail, and FIG. 12d is a cross-sectional view taken along line FF in FIG. 12d, and FIG. 12f is a cross-sectional view taken along line GG in FIG. 12d.

図12cで鋼棒型先支保材114は中空ホールがないため、グラウティング液74aを穿孔穴22内に注入するグラウトホース114aが鋼棒型先支保材114の側面に沿って結合されている。   In FIG. 12 c, since the steel rod type support material 114 does not have a hollow hole, a grout hose 114 a for injecting the grouting liquid 74 a into the hole 22 is coupled along the side surface of the steel rod type support material 114.

そして、図12d乃至図12fに示すように、鋼線型先支保材115は、穿孔穴22の中央を通過するグラウトホース114aが、第1及び第2スペーサ115a,115bの中央ホールに挿支されており、第1及び第2スペーサ115a,115bの外周面に多数の鋼線115cが挿入されている。   Then, as shown in FIGS. 12d to 12f, the steel wire type pre-support material 115 has a grout hose 114a passing through the center of the perforated hole 22 inserted in the center holes of the first and second spacers 115a and 115b. A number of steel wires 115c are inserted into the outer peripheral surfaces of the first and second spacers 115a and 115b.

図13aは、挿入用パイプ125を示す断面図で、挿入用パイプ125は、中空鋼棒先支保材110の中空ホールを通してグラウティング液が注入されて穿孔穴22内に充填された後、ゴムパッキング123aを持つ端管123を図13cのようにゴムパッカー122のゴムラッパ管内側に密着させるように、中空鋼棒型先支保材110の螺糸山110aに螺合し、グラウティング液の注入が終了するとその螺合を解除しなければならず、このような作動を容易にするために、挿入用パイプ125の内部面は潤滑油125aで防錆されており、多数の取り外し防止用カプラー125bで結着されている。そして、導坑21内に位置する挿入用パイプ125の端部には挿入用パイプ125を解体時に回すように取り取り外しレバー125cが結合されている。 FIG. 13 a is a cross-sectional view showing the insertion pipe 125. The insertion pipe 125 is filled with a grouting liquid through a hollow hole of the hollow steel rod tip support material 110 and filled in the perforated hole 22, and then rubber packing. the Tankan 123 with 123a so as to close contact with the Gomurappa tube inside the rubber packer 122 as shown in FIG. 13c, screwed into Nishiitoyama 110a of the hollow steel rod type pre-support 110, the injection of grouting fluid is completed In order to facilitate such operation, the inner surface of the insertion pipe 125 is rust-proofed with lubricating oil 125a and is attached with a number of anti-removal couplers 125b. Has been. And the removal lever 125c is couple | bonded with the edge part of the insertion pipe 125 located in the guide shaft 21 so that the insertion pipe 125 may be rotated at the time of disassembly.

図14aは、本発明の中空鋼棒型先支保材に対するエアーパッカー装置の作動前状態を示す断面図であり、図14bは、本発明の中空鋼棒型先支保材に対するエアーパッカー装置の作動後状態を示す断面図である。図14a及び図14bに示すように、パッカー手段120は、穿孔穴22の入口側である中空鋼棒型先支保材110の螺糸山110aに結合された中空型パイプ131と、中空型パイプ131の外周面に結合されて空気を充填して穿孔穴22の内周面を密着パッキングするエアーパッカー132と、エアーパッカー132の一側面に結合されたドーナツ状の第3ストッパー133と、穿孔穴22の入口側であるエアーパッカー132の他側面に結合され、パッカー加圧ホース134を通してエアーパッカー132に空気を充填する流入口が形成されたドーナツ状の第4ストッパー135と、で構成されている。   FIG. 14a is a sectional view showing a state before the operation of the air packer device with respect to the hollow steel rod type tip support material of the present invention, and FIG. 14b is after the operation of the air packer device with respect to the hollow steel rod type tip support material of the present invention. It is sectional drawing which shows a state. As shown in FIGS. 14 a and 14 b, the packer means 120 includes a hollow pipe 131 coupled to a thread 110 a of the hollow steel rod type support material 110 on the inlet side of the hole 22, and a hollow pipe 131. An air packer 132 that is coupled to the outer peripheral surface and is filled with air to tightly pack the inner peripheral surface of the hole 22, a doughnut-shaped third stopper 133 that is bonded to one side of the air packer 132, and the hole 22 A donut-shaped fourth stopper 135 is formed which is coupled to the other side of the air packer 132 on the inlet side and has an inlet for filling the air packer 132 with air through the packer pressurizing hose 134.

図15aは、本発明による大断面トンネルの導坑においてメイントンネル掘削ラインまでの穿孔穴に装薬孔を設置した様子を示す断面図であり、図15bは、図15aの平面図であり、図15cは、図15bの“I”部を詳細に示す断面図である。   15a is a cross-sectional view showing a state in which a charge hole is installed in a drilling hole to a main tunnel excavation line in a large tunnel tunnel according to the present invention, and FIG. 15b is a plan view of FIG. 15a. 15c is a cross-sectional view showing in detail the “I” portion of FIG. 15b.

大断面トンネルの導坑21で、メイントンネル掘削ライン20までの穿孔穴22に装薬を設置して装薬を発破時に、発破によって先支保材110が破損するのを防止する先支保材保護装置は、メイントンネル掘削ライン20の外側に形成された穿孔穴22に挿入された中空鋼棒型先支保材110の外周面にいる端管123の外周面にポリエチレンフォームパイプ141を挿入し、中空鋼棒型先支保材110の入口側端部に破圧減衰のためのポリエチレンフォーム142aと砂142bが順次に込められたてん塞袋142を配置し、てん塞袋142の一側に低速爆薬の装薬143と砂てん塞144を繰り返してん塞して発破する。   A pre-support material protection device that prevents the pre-support material 110 from being damaged by blasting when the charge is blasted by installing the charge in the drilling hole 22 up to the main tunnel excavation line 20 in the guide tunnel 21 of the large section tunnel. Inserts a polyethylene foam pipe 141 into the outer peripheral surface of the end pipe 123 on the outer peripheral surface of the hollow steel rod type tip support material 110 inserted into the drilling hole 22 formed outside the main tunnel excavation line 20, A filling bag 142 in which polyethylene foam 142a and sand 142b for rupture pressure attenuation are sequentially placed is arranged at the inlet side end of the rod-type support material 110, and a low-velocity explosive is loaded on one side of the filling bag 142. The medicine 143 and the sand fortification 144 are repeatedly forcibly blasted.

図16aは、本発明の大断面トンネルの導坑内で放射状に穿孔穴を穿孔する穿孔装置を示す断面図であり、図16bは、本発明の大断面トンネルの穿孔装置のガイドビームに結合された穿孔ロッドが回転角度の変化によって回転する様子を示す断面図であり、図16cは、本発明の穿孔装置を示す平面図である。   FIG. 16a is a cross-sectional view showing a drilling device that pierces drill holes radially in the shaft of the large-section tunnel of the present invention, and FIG. 16b is coupled to the guide beam of the drilling device of the large-section tunnel of the present invention. FIG. 16c is a cross-sectional view showing a state where the piercing rod rotates according to a change in the rotation angle, and FIG. 16c is a plan view showing the piercing device of the present invention.

先支保トンネルを掘削施工するために導坑内に多数個設置され、トンネルの掘削ラインに向かって放射状に穿孔穴を穿孔する穿孔装置は、導坑の長さ方向に設置された動力伝達装置を持つ本体151と、本体151の両側前後側に設置されてこれを支持しながら上下に高さを調節するアウト油圧リフト152と、導坑21の長さ方向の中心線上に位置しながら本体151の中心部に回転可能に支持された中心軸153と、中心軸153の前方側一端に垂直に結合され、導坑21の横方向に回転しながら放射状に多数の穿孔穴22を穿孔する穿孔手段154と、中心軸153の後方側一端に結合され、本体151の水平状態をチェックして前記アウト油圧リフト152を調節するために設置された水準器155と、を備えて構成される。   A large number of drilling devices that are installed in the shaft to excavate the pre-support tunnel and pierce the drill holes radially toward the tunnel excavation line have a power transmission device installed in the length direction of the tunnel. A main body 151, an out hydraulic lift 152 which is installed on both front and rear sides of the main body 151 and adjusts the height while supporting the main body 151, and the center of the main body 151 while being positioned on the longitudinal center line of the guide shaft 21 A central shaft 153 rotatably supported by the section, and a drilling means 154 vertically coupled to one end on the front side of the central shaft 153 and drilling a large number of drilling holes 22 while rotating in the lateral direction of the guide shaft 21; And a spirit level 155 that is connected to one end on the rear side of the central shaft 153 and is installed to check the horizontal state of the main body 151 and adjust the out hydraulic lift 152.

穿孔手段154は、中心軸153の前方側一端に軸回転装置154aを介在して垂直に結合されたガイドビーム154bと、ガイドビーム154bに結合されて穿孔穴22を穿孔し、ガイドビーム154bが放射状に回転して水平線を基準にした回転角度αが鈍角になると、軸回転装置154aによって180度回転するガイドビーム154bとともに回転する穿孔ロッド154cと、からなる。   The piercing means 154 has a guide beam 154b vertically coupled to one end on the front side of the central shaft 153 with a shaft rotating device 154a interposed therebetween, and is coupled to the guide beam 154b to pierce the piercing hole 22, and the guide beam 154b is radial. When the rotation angle α with reference to the horizontal line becomes an obtuse angle, the shaft rotation device 154a rotates with the guide beam 154b rotated 180 degrees, and the piercing rod 154c rotates.

導坑21はメイントンネル掘削ライン20のクラウン部20aの半径中心点が導坑21のクラウン部21aの半径中心点と一致するように導坑21の断面を掘削する。   The guide shaft 21 excavates the cross section of the guide shaft 21 so that the radial center point of the crown portion 20 a of the main tunnel excavation line 20 coincides with the radial center point of the crown portion 21 a of the guide shaft 21.

この穿孔装置は、導坑21内で正確なシステムで先支保材を設置するための手段で、このような機械化施工とするためには、まず、トンネル設計に当たってトンネル断面は可能な限り一つの半径に設計することが有利であり、少なくとも120度のクラウン部20a,21aは一つの半径に設計されなければならない。   This drilling device is a means for installing the pre-support material in the guide shaft 21 with an accurate system. In order to perform such mechanized construction, first, the tunnel cross section has a radius as much as possible in the tunnel design. The crown portions 20a, 21a of at least 120 degrees must be designed with one radius.

本発明のトンネル工法においてトンネルの掘削前地表面から予定されたトンネルの掘削ラインに向かって先支保材を様々に施工した様子を示す断面図である。It is sectional drawing which shows a mode that the tip support material was variously constructed toward the excavation line of the tunnel planned from the surface before tunnel excavation in the tunnel construction method of this invention. 本発明のトンネル工法においてトンネルの掘削前地表面から予定されたトンネルの掘削ラインに向かって先支保材を様々に施工した様子を示す断面図である。It is sectional drawing which shows a mode that the tip support material was variously constructed toward the excavation line of the tunnel planned from the surface before tunnel excavation in the tunnel construction method of this invention. 本発明のトンネル工法においてトンネルの掘削前地表面から予定されたトンネルの掘削ラインに向かって先支保材を様々に施工した様子を示す断面図である。It is sectional drawing which shows a mode that the tip support material was variously constructed toward the excavation line of the tunnel planned from the surface before tunnel excavation in the tunnel construction method of this invention. 3アーチ掘削2アーチトンネルのピラー部を先支保材で施工した様子を示す断面図である。It is sectional drawing which shows a mode that the pillar part of 3 arch excavation 2 arch tunnel was constructed with the pre-support material. 本発明のトンネル工法において先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとにピース版を連結して締め付けた様子を示す断面図である。It is sectional drawing which shows a mode that the tunnel was excavated after construction of the support material in the tunnel construction method of this invention, and the piece plate was connected and tightened for every support material to the excavation line of the tunnel. 本発明のトンネル工法において先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとに鉄筋で編んだトラス版を連結して締め付けた様子を示す断面図である。It is sectional drawing which shows a mode that the tunnel was excavated after construction of the support material in the tunnel construction method of this invention, and the truss plate knitted with the reinforcing bar for each support material was connected and tightened to the tunnel excavation line. 本発明のトンネル工法において先支保材を施工し、トンネルの横方向に等間隔に多数のパイプルーフ(pipe roof)で補強した後にトンネルを掘削し、トンネルの掘削ラインにトンネルの縦方向に等間隔にアーチ型スチールリブ(steel rib)を施工した後、先支保材と連結して締め付けた様子を示す断面図である。In the tunnel construction method of the present invention, a pre-support material is constructed and reinforced with a number of pipe roofs at equal intervals in the lateral direction of the tunnel, then the tunnel is excavated, and the tunnel excavation line is equally spaced in the vertical direction of the tunnel. It is sectional drawing which shows a mode that it connected with the tip support material and tightened, after constructing an arch type steel rib (steel rib). 本発明のトンネル工法において先支保材をトンネルの掘削ラインの周辺まで到達するようにして多数のパイプルーフと干渉しないように施工した断面図である。It is sectional drawing constructed so that it may not interfere with many pipe roofs so that a pre-support material may reach the circumference of a tunnel excavation line in the tunnel construction method of the present invention. 本発明のトンネル工法においてトンネルから横方向に等間隔に多数のパイプルーフを施工した後に、トンネルの掘削ラインにトンネルの縦方向に等間隔にアーチ型スチールリブを施工したのち先支保材と連結して締め付けた様子を示す斜視図である。In the tunnel construction method of the present invention, after constructing a large number of pipe roofs at equal intervals in the lateral direction from the tunnel, after constructing arched steel ribs at equal intervals in the vertical direction of the tunnel on the tunnel excavation line, it is connected to the tip support material. It is a perspective view which shows a mode that it tightened. 本発明の多数のスチールリブをスチールプレートで連結する様子を示す斜視図である。It is a perspective view which shows a mode that many steel ribs of this invention are connected with a steel plate. 図2eのA−A線に沿った断面図である。It is sectional drawing along the AA line of FIG. 2e. 本発明のトンネル工法においてトンネルの掘削ラインの下部からロックボルトを施工する様子を示す断面図である。It is sectional drawing which shows a mode that a rock bolt is constructed from the lower part of the excavation line of a tunnel in the tunnel construction method of this invention. 本発明のトンネル工法において切羽内の自立補強のために先支保材をトンネルの掘削ラインよりも深く穿孔設置した様子を示す部分断面図である。It is a fragmentary sectional view which shows a mode that the pre-support material was pierced and installed deeper than the tunnel excavation line for the self-supporting reinforcement in a face in the tunnel construction method of this invention. 図4aのB−B線に沿った断面図である。FIG. 4b is a cross-sectional view taken along line BB of FIG. 4a. 図4aのC−C線に沿った断面図である。4b is a cross-sectional view taken along the line CC of FIG. 4a. FIG. 本発明のトンネル工法において鉄筋で編んだトラス版とショートクリートを用いてライニングを形成する場合、掘削面とピース版との間に帯状の排水材をトンネル周辺に連続して設置した様子を示す斜視図である。In the tunnel construction method of the present invention, when forming a lining using a truss plate knitted with reinforcing bars and a short cleat, a perspective view showing a state in which a belt-shaped drainage material is continuously installed around the tunnel between the excavation surface and the piece plate FIG. 本発明のトンネル工法においてトンネルの排水装置を示す断面図である。It is sectional drawing which shows the drainage apparatus of a tunnel in the tunnel construction method of this invention. 図5bの排水装置を拡大して示す断面図である。It is sectional drawing which expands and shows the drainage apparatus of FIG. 5b. 本発明のトンネル工法においてプレストレス型先支保材とピース版のようなシェル形成部材を支圧版で連結して締め付ける時、先支保材にプレストレスを加えることによる効果を示す断面図である。It is sectional drawing which shows the effect by applying a prestress to a pre-support material, when a shell formation member like a prestress type pre-support material and a piece plate is connected and clamped in the tunnel construction method of this invention. 図6のD部分の先端支持プレストレス型先支保材を詳細に示す断面図である。It is sectional drawing which shows the front-end | tip support prestress type front support material of D part of FIG. 6 in detail. 本発明のトンネル工法において土被りの浅い浅層トンネルに施工された先支保材を示す断面図である。It is sectional drawing which shows the pre-support material constructed | assembled in the shallow tunnel with a shallow earth covering in the tunnel construction method of this invention. 本発明のトンネル工法において鉄筋トラス版を示す斜視図である。It is a perspective view which shows a reinforcing bar truss board in the tunnel construction method of this invention. 図9aのX−X線に沿った断面図である。FIG. 9b is a cross-sectional view taken along line XX of FIG. 9a. 図9aのY−Y線に沿った断面図である。It is sectional drawing along the YY line of FIG. 9a. 本発明のトンネル工法において先支保材の施工順序を示す図である。It is a figure which shows the construction order of a pre-support material in the tunnel construction method of this invention. 本発明のトンネル工法において先支保材の施工順序を示す図である。It is a figure which shows the construction order of a pre-support material in the tunnel construction method of this invention. 本発明のトンネル工法において先支保材の施工順序を示す図である。It is a figure which shows the construction order of a pre-support material in the tunnel construction method of this invention. 本発明のトンネル工法において先支保材の施工順序を示す図である。It is a figure which shows the construction order of a pre-support material in the tunnel construction method of this invention. 本発明のトンネル工法において先支保材の施工順序を示す図である。It is a figure which shows the construction order of a pre-support material in the tunnel construction method of this invention. 本発明の大断面トンネルで導坑内で放射状に穿孔された穿孔穴に先支保材が挿入された状態を示す断面図である。It is sectional drawing which shows the state in which the pre-support material was inserted in the drilling hole drilled radially in the guide shaft by the large section tunnel of the present invention. 本発明の大断面トンネルで先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとにピース版を連結して締め付けた様子を示す断面図である。It is sectional drawing which shows a mode that the tunnel was excavated after construction of a support material with the large section tunnel of this invention, and the piece plate was connected and tightened for every support material to the tunnel excavation line. 本発明の大断面トンネルで先支保材を施工後にトンネルを掘削し、トンネルの掘削ラインに各先支保材ごとに鉄筋で編んだトラス版を連結して締め付けた様子を示す断面図である。It is sectional drawing which shows a mode that the tunnel was excavated after construction of the support material in the large cross section tunnel of this invention, and the truss plate knitted with the reinforcing bar for each support material was connected and tightened to the tunnel excavation line. 本発明の大断面トンネルで先支保材を施工し、トンネルの横方向に広い間隔を持つパイプルーフをトンネルの進行方向に補強した後にトンネルを掘削し、トンネルの掘削ラインにトンネルの縦方向に等間隔にアーチ型スチールリブを施工したのち先支保材と連結して締め付けた様子を示す断面図である。In the large cross-section tunnel of the present invention, a pre-support material is constructed, a pipe roof having a wide interval in the lateral direction of the tunnel is reinforced in the traveling direction of the tunnel, the tunnel is excavated, and the tunnel is excavated in the longitudinal direction of the tunnel. It is sectional drawing which shows a mode that it connected with the tip support material, and tightened, after constructing an arch-shaped steel rib in the space | interval. 本発明の中空鋼棒型先支保材を詳細に示す断面図である。It is sectional drawing which shows the hollow steel rod type tip support material of this invention in detail. 図12aのE−E線に沿った断面図である。It is sectional drawing along the EE line of FIG. 12a. 本発明の鋼棒型先支保材を詳細に示す断面図である。It is sectional drawing which shows the steel rod type tip support material of this invention in detail. 本発明の鋼線型先支保材を詳細に示す断面図である。It is sectional drawing which shows the steel wire type tip support material of this invention in detail. 図12dのF−F線に沿った断面図である。It is sectional drawing along the FF line of FIG. 12d. 図12dのG−G線に沿った断面図である。It is sectional drawing along the GG line of FIG. 12d. 本発明の先支保材挿入管を示す断面図である。It is sectional drawing which shows the pre-support material insertion pipe | tube of this invention. 本発明の先支保材挿入管が締付け作動される前の図12aの“H”部を詳細に示す断面図である。It is sectional drawing which shows the "H" part of FIG. 12a in detail before the advance support material insertion pipe | tube of this invention is clamped. 本発明の先支保材挿入管が締付け作動された後の図12aの“H”部を詳細に示す断面図である。It is sectional drawing which shows the "H" part of FIG. 12a after the front support material insertion pipe | tube of this invention was clamped | operated. 本発明の中空鋼棒型先支保材に対するエアーパッカー装置の作動前状態を示す断面図である。It is sectional drawing which shows the state before the operation | movement of the air packer apparatus with respect to the hollow steel rod type tip support material of this invention. 本発明の中空鋼棒型先支保材に対するエアーパッカー装置の作動後状態を示す断面図である。It is sectional drawing which shows the state after the action | operation of the air packer apparatus with respect to the hollow steel rod type tip support material of this invention. 本発明による大断面トンネルの導坑においてメイントンネル掘削ラインまでの穿孔穴に装薬孔を設置した様子を示す断面図である。It is sectional drawing which shows a mode that the charge hole was installed in the drilling hole to the main tunnel excavation line in the guiding tunnel of the large section tunnel by this invention. 図15aの平面図である。FIG. 15b is a plan view of FIG. 15a. 図15bの“I”部を詳細に示す断面図である。It is sectional drawing which shows the "I" part of FIG. 15b in detail. 本発明の大断面トンネルの導坑内において放射状に穿孔穴を穿孔する穿孔装置を示す断面図である。It is sectional drawing which shows the piercing | piercing apparatus which pierces | pierces a piercing hole radially within the guide shaft of the large section tunnel of this invention. 本発明の大断面トンネルの穿孔装置のガイドビームに結合された穿孔ロッドが回転角度の変化によって回転する様子を示す断面図である。It is sectional drawing which shows a mode that the piercing | rod rod couple | bonded with the guide beam of the piercing | piercing apparatus of the large section tunnel of this invention rotates with the change of a rotation angle. 本発明の穿孔装置を示す平面図である。It is a top view which shows the punching apparatus of this invention.

符号の説明Explanation of symbols

10 先支保材
11 支圧版
12 定着具
20 掘削ライン
21 導坑
22 穿孔穴
30 ピース版
31 噛合突起
32 噛合溝
33 トラス版
34 パイプルーフ
35 スチールリブ
36 スチールプレート
37 ショートクリート
40 排水材
50 ロックボルト
60 プレストレス型先支保材
61 鋼棒
62 鋼管パイプ
63 突起
65 防錆潤滑油
66 グラウティング
67 ポリエチレン管
70 排水装置
71 “T”字状連結管
72 排水管
73 水抜管
73a 通穴
74 ラッパ状漏斗
74a グラウティング液
110 中空鋼棒型先支保材
110a 螺糸山
111 突部
112 センターライザー
113 カプラー
113a ロックピン
120 パッカー手段
121,124 第1及び第2ストッパー
122 ゴムパッカー
123 端管
123a ゴムパッキング
125 挿入用パイプ
131 中空型パイプ
132 エアーパッカー
133,135 第3及び第4ストッパー
134 パッカー加圧ホース
141 ポリエチレンフォームパイプ
142 てん塞袋
142a ポリエチレンフォーム
142b 砂
143 装薬
144 砂てん塞
151 本体
152 アウト油圧リフト
153 中心軸
154 穿孔手段
154a 軸回転装置
154b ガイドビーム
154c 穿孔ロッド
155 水準器
DESCRIPTION OF SYMBOLS 10 Support material 11 Supporting plate 12 Fixing tool 20 Excavation line 21 Drilling hole 22 Drilling hole 30 Piece plate 31 Engagement protrusion 32 Engagement groove 33 Truss plate 34 Pipe roof 35 Steel rib 36 Steel plate 37 Short cleat 40 Drainage material 50 Rock bolt 60 Prestress type support material 61 Steel bar 62 Steel pipe pipe 63 Protrusion 65 Rust preventive oil 66 Grouting 67 Polyethylene pipe 70 Drainage device 71 “T” -shaped connecting pipe 72 Drain pipe 73 Drain pipe 73a Through hole 74 Trumpet-shaped funnel 74a Grouting liquid 110 Hollow steel rod type support material 110a Screw thread 111 Projection 112 Center riser 113 Coupler 113a Lock pin 120 Packer means 121, 124 First and second stoppers 122 Rubber packer 123 End tube 123a Rubber pad King 125 Insertion pipe 131 Hollow pipe 132 Air packer 133, 135 Third and fourth stoppers 134 Packer pressure hose 141 Polyethylene foam pipe 142 Filled bag 142a Polyethylene foam 142b Sand 143 Packing 144 Sand fill 151 Main body 152 Out Hydraulic lift 153 Central shaft 154 Drilling means 154a Shaft rotating device 154b Guide beam 154c Drilling rod 155 Level

Claims (12)

地表面から予定されたトンネルの掘削ラインに向かって多数の先支保材を穿孔設置してグラウティングする段階と、
前記トンネルの掘削ラインに沿ってトンネルを掘削する段階と、
前記先支保材ごとにピース版を連続して噛合って設置して、各ピース版の側面に形成された噛合突起と噛合溝が互いに噛み合ってライニングが形成されるように設置する段階と、
前記ピース版を貫通した先支保材に支圧版を当てて定着具を締め付けて先支保材にピース版を圧着固定する段階と、
を含むことを特徴とする先支保トンネル工法。
Drilling a number of support materials from the ground surface toward the planned tunnel excavation line and grouting;
Drilling a tunnel along the tunnel excavation line;
Installing each piece of the support plate in such a way that the piece plates are continuously engaged with each other, and the engagement protrusions and engagement grooves formed on the side surfaces of each piece plate are engaged with each other to form a lining; and
Applying a pressure plate to the support material penetrating the piece plate and tightening the fixing tool to fix the piece plate to the support material by pressure bonding; and
A pre-supported tunnel construction method characterized by including
地表面から予定されたトンネルの掘削ラインに向かって多数の先支保材を穿孔設置してグラウティングする段階と、
前記トンネルの掘削ラインに沿ってトンネルを掘削する段階と、
前記先支保材ごとに鉄筋で編んだトラス版を連続して設置するものの、前記トラス版を貫通した先支保材に支圧版を当てて定着具を締め付けて前記鉄筋トラス版を圧着固定する段階と、
前記トラス版内にショートクリートを打設する段階と、
を含むことを特徴とする先支保トンネル工法。
Drilling a number of support materials from the ground surface toward the planned tunnel excavation line and grouting;
Drilling a tunnel along the tunnel excavation line;
Although the truss plates knitted with reinforcing bars are continuously installed for each of the support members, the step of applying the support plate to the support material penetrating the truss plate and tightening the fixing tool to fix the reinforcing bar truss plates by pressure When,
Placing a short cleat in the truss plate;
A pre-supported tunnel construction method characterized by including
地表面から予定されたトンネルの掘削ラインに向かって多数の先支保材を穿孔設置してグラウティングする段階と、
前記トンネルの横方向に等間隔のパイプルーフをトンネルの進行方向にまず設置した後、トンネルを掘削しながらアーチ形状のスチールリブをトンネルの進行方向に設置し、
前記多数のスチールリブ同士間にはスチールプレートが設置してこれらのスチールリブを互いに結着させた後に支圧版と定着具を締め付けて圧着固定する段階と、
前記パイプルーフとスチールプレートとの間にショートクリートを打設する段階と、を含むことを特徴とする先支保トンネル工法。
Drilling a number of support materials from the ground surface toward the planned tunnel excavation line and grouting;
After first installing pipe roofs at equal intervals in the lateral direction of the tunnel in the traveling direction of the tunnel, arched steel ribs are installed in the traveling direction of the tunnel while excavating the tunnel,
A step in which a steel plate is installed between the plurality of steel ribs and these steel ribs are bonded to each other, and then the pressure plate and the fixing tool are fastened and fixed by pressure bonding;
Placing a short cleat between the pipe roof and the steel plate, and a pre-supported tunnel construction method.
前記先支保材は、メイントンネル掘削ラインの上側周辺まで設置してパイプルーフと干渉しないようにすることを特徴とする、請求項3に記載の先支保トンネル工法。The pre-support tunnel construction method according to claim 3, wherein the pre-support material is installed up to the upper periphery of the main tunnel excavation line so as not to interfere with the pipe roof. 前記先支保材は、切羽の自立補強のためにトンネルの掘削ラインよりも下側に深く穿孔設置する段階をさらに含むことを特徴とする、請求項1から3のいずれかに記載の先支保トンネル工法。The pre-supporting tunnel according to any one of claims 1 to 3 , wherein the pre-support material further includes a step of drilling deeply below a tunnel excavation line for self-supporting reinforcement of the face. Construction method. 前記先支保材は、トンネル側壁を補強するためにトンネル側壁に垂直方向にトンネルの底面まで根入設置することを特徴とする、請求項1から3のいずれかに記載の先支保トンネル工法。The pre-supporting tunnel construction method according to any one of claims 1 to 3, characterized in that the pre-supporting material is installed up to the bottom surface of the tunnel in a direction perpendicular to the tunnel side wall in order to reinforce the tunnel side wall. 前記先支保材は、支圧版を反力で加圧するとき、プレストレスが発生するようにするプレストレス型先支保材で施工することを特徴とする、請求項1から3のいずれかに記載の先支保トンネル工法。The pre-support, when pressurizing the pressure bearing plate by the reaction force, characterized in that it applied by prestressing type pre-support to allow prestressing occurs, according to any one of claims 1 to 3 The pre-support tunnel construction method. 前記プレストレス型先支保材の施工は、地表面からトンネルの掘削ラインに向かって穿孔し、プレストレス型先支保材を挿入する段階と、
潤滑管内に挿入された引張材である鋼棒の一端を、外周面に多数の突起が突設された鋼管パイプの内周面に固定配置させ、前記鋼管パイプ内の鋼棒が変形自由なように鋼棒の外周面と鋼管パイプの内周面に防錆潤滑油を塗布したプレストレス型先支保材を、上記の段階で穿孔されたホール内に挿入する段階と、
前記段階で挿入された前記プレストレス型先支保材の外周面である穿孔されたホール内にグラウティングする段階と、
を含むことを特徴とする、請求項7に記載の先支保トンネル工法。
Construction of the prestress type support material, drilling from the ground surface toward the tunnel excavation line, inserting the prestress type support material,
One end of a steel rod, which is a tensile material inserted into the lubrication pipe, is fixedly arranged on the inner peripheral surface of a steel pipe pipe with a number of protrusions on the outer peripheral surface so that the steel rod in the steel pipe pipe can be freely deformed. A step of inserting a pre-stress type support material coated with a rust-preventive lubricating oil on the outer peripheral surface of the steel rod and the inner peripheral surface of the steel pipe pipe into the hole drilled in the above step;
Grouting into a perforated hole which is an outer peripheral surface of the prestress type pre-support material inserted in the step;
The pre-supported tunnel construction method according to claim 7 , comprising:
前記プレストレス型先支保材を土被りの浅いトンネルで施工する時、前記プレストレス型先支保材の一端を、地表面に設置されたコンクリートスラブに固定することを特徴とする、請求項7または8に記載の先支保トンネル工法。When construction the prestressing type pre-support shallow tunnel of overburden, the end of the prestressing type pre-support, characterized in that secured to the installed concrete slab on the ground surface, according to claim 7 or 8. The pre-support tunnel construction method according to 8 . 前記先支保材を3アーチ掘削2アーチトンネルに施工する時、地表面から前記先支保材をトンネルの施工基面よりも深く設置するものの、3アーチ掘削2アーチトンネルの中央に垂直に穿孔設置される先支保材は、3アーチ掘削2アーチトンネルの掘削前にトンネルのピラー部を形成するように施工されることを特徴とする、請求項1から3のいずれかに記載の先支保トンネル工法。When the pre-support material is constructed in a 3-arch excavation 2-arch tunnel, the pre-support material is installed deeper than the construction base surface of the tunnel from the ground surface. The pre-support tunnel construction method according to any one of claims 1 to 3 , wherein the pre-support material is constructed so as to form a pillar portion of the tunnel before excavation of the three-arch excavation and the two-arch tunnel. 前記トラス版は、トンネルの縦・横方向にトラス形態に溶接されており、トラス版同士が鉄筋の重ね継ぎによって連続して設置することを特徴とする、請求項2に記載の先支保トンネル工法。The pre-supported tunnel construction method according to claim 2, wherein the truss plates are welded in a truss form in the vertical and horizontal directions of the tunnel, and the truss plates are continuously installed by lap joints of reinforcing bars. . 前記トンネルの掘削の時、湧出水の有る場合、トンネル掘削面に排水材を設置する段階を追加することを特徴とする、請求項1から3のいずれかに記載の先支保トンネル工法。The pre-supported tunnel construction method according to any one of claims 1 to 3 , further comprising a step of installing a drainage material on a tunnel excavation surface when there is spring water at the time of excavation of the tunnel.
JP2007542920A 2004-11-29 2005-11-29 Pre-support tunnel construction method and equipment adapted to it Active JP4768747B2 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
KR20040098686 2004-11-29
KR10-2004-0098686 2004-11-29
KR10-2005-0114621 2005-11-29
PCT/KR2005/004050 WO2006057545A1 (en) 2004-11-29 2005-11-29 Tunnelling method using pre-support concept and an adjustable apparatus thereof
KR1020050114621A KR100740200B1 (en) 2004-11-29 2005-11-29 Tunnelling method using pre-support concept and an adjustable apparatus thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2010250737A Division JP5103516B2 (en) 2004-11-29 2010-11-09 Pre-support tunnel construction method for large section tunnel

Publications (2)

Publication Number Publication Date
JP2008522058A JP2008522058A (en) 2008-06-26
JP4768747B2 true JP4768747B2 (en) 2011-09-07

Family

ID=36498252

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2007542920A Active JP4768747B2 (en) 2004-11-29 2005-11-29 Pre-support tunnel construction method and equipment adapted to it
JP2010250737A Active JP5103516B2 (en) 2004-11-29 2010-11-09 Pre-support tunnel construction method for large section tunnel

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2010250737A Active JP5103516B2 (en) 2004-11-29 2010-11-09 Pre-support tunnel construction method for large section tunnel

Country Status (3)

Country Link
JP (2) JP4768747B2 (en)
KR (1) KR100740200B1 (en)
WO (1) WO2006057545A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756893A (en) * 2018-04-19 2018-11-06 济南城建集团有限公司 A kind of city shallow tunnel vault soil stabilization method
CN109975157A (en) * 2019-04-15 2019-07-05 盾构及掘进技术国家重点实验室 It is a kind of for testing the force measuring structure and method of shield cutter cutting plastic drain bar

Families Citing this family (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100760293B1 (en) * 2007-03-23 2007-09-19 주식회사 영신토건 Tunnel construction method for shallow overburden tunnel
KR100922333B1 (en) * 2007-11-07 2009-10-21 주식회사사이텍이엔씨 Tunnel supporting method using precast concrete panel
KR100992597B1 (en) 2008-06-20 2010-11-05 주식회사 다산컨설턴트 The support material for a tunnel and tunnel support
KR100969513B1 (en) 2009-12-30 2010-07-12 코오롱건설주식회사 A method for construting tunel using polyamide fiber having two layer for reinforcing
KR101066641B1 (en) * 2009-07-10 2011-09-21 서동현 Pre-stressing tunneling method using presupport concept and thereof apparatus
KR101148331B1 (en) * 2009-08-24 2012-05-21 서동현 Excavation method for pre-nailed tunneling
KR101247702B1 (en) * 2010-07-09 2013-03-28 (주)한국투아치 Multi-Step Tunnel Constructing Method Using Pilot Tunnel
KR101251240B1 (en) * 2010-08-09 2013-04-08 서동현 Method of grouting by double packer in pre-stressed tunnel
KR101233794B1 (en) * 2010-08-30 2013-02-18 이승수 Tunnel reinforcing method by multi-forepoling
KR101219448B1 (en) * 2011-01-10 2013-01-11 주식회사 티에스테크노 Rockbolt and connector for the same
CN102155234B (en) * 2011-04-08 2012-12-26 中铁上海设计院集团有限公司 Excavation construction method for unsymmetrical small-space tunnel
CN102226398A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
KR101149895B1 (en) * 2011-09-26 2012-05-30 주식회사 성우사면 Reinforcement block for pillar of tunnel
CN102644466B (en) * 2012-04-27 2014-10-22 北京城建设计发展集团股份有限公司 Joist arching method for constructing ultra-shallow buried large-span underground excavated subway station in rocky stratum
KR102137389B1 (en) * 2012-07-11 2020-07-24 주식회사 주연엔지니어링 Reinforcement connection structure and method of underground box structure
CN103174443B (en) * 2013-03-27 2015-04-22 山东大学 Positioning device and positioning method applied to prefabricate anchor rod in underground construction model test
KR101531754B1 (en) * 2013-07-22 2015-06-25 서동현 Method of construction a shallow tunnel using pre-support beam
KR101407965B1 (en) * 2013-09-16 2014-06-17 주식회사 성우사면 Reinforced Upper Tunnel Using Pre-support Structure and its Construction Method
KR101531766B1 (en) * 2013-12-17 2015-06-25 (주)현이앤씨 Method of Pre-supported tunnel costructed in a soft ground
CN103939107B (en) * 2014-04-28 2015-12-09 山东黄金矿业(玲珑)有限公司 A kind of inbreak loose rock mass Zhong Cheng lane method
CN103982190B (en) * 2014-05-28 2017-01-18 北京市政建设集团有限责任公司 Bored tunnel variable cross-section stress conversion construction method
CN105019920B (en) * 2015-07-27 2017-03-01 浙江大学 A kind of stratum deformation pilot system under shallow-depth-excavation tunnel advance reinforcement
JP6636774B2 (en) * 2015-11-02 2020-01-29 株式会社奥村組 Integrated structure of pipe roof material
KR101671123B1 (en) * 2015-11-25 2016-10-31 서민규 Tunnel construction method by using pre-support and post-support, and suitable device therefor
CN106049644B (en) * 2016-07-25 2018-04-17 上海市城市排水有限公司 A kind of concrete drain tile contains the quick reparation erecting device of detection drilling and its restorative procedure
CN106112324B (en) * 2016-07-28 2017-11-14 中国建筑第六工程局有限公司 The preparation method of Mining Method preliminary bracing grid steel frame weld mold
KR102215505B1 (en) * 2016-12-07 2021-02-10 서동현 Construction method of internal pre-support tunnel for complete blocking water of all directions of the tunnel
CN106761832A (en) * 2016-12-30 2017-05-31 陈建强 A kind of subway tunnel safe construction method
CN106988748B (en) * 2017-03-15 2019-10-29 中铁二院工程集团有限责任公司 High-order parallel heading construction and capacity expansion revamping are the construction method of double line tunnel
CN108868820A (en) * 2018-09-30 2018-11-23 西南石油大学 A kind of soft soil foundation shield tunnel subsidence control structure and application method
CN112360503B (en) * 2020-09-28 2022-12-16 中煤科工开采研究院有限公司 Roadway surrounding rock supporting method and device based on sealing film and atmospheric pressure
KR102273122B1 (en) * 2020-10-30 2021-07-05 강릉건설 주식회사 New Austrian Tunneling Method tunnel reinforcement method using pilot tunnel
CN113605901A (en) * 2021-07-20 2021-11-05 西南交通大学 Strong anchor middle pilot tunnel construction method based on extra-large section tunnel construction
CN114483050B (en) * 2022-01-26 2024-04-23 中国国家铁路集团有限公司 Three-step full-procedure mechanized construction method for large-section tunnel
KR102502171B1 (en) * 2022-09-07 2023-02-21 주식회사 하이콘코리아 Preparing Method for Functional grout and Functional grout of Prepare by the same, Reclamation Method thereof
CN116220700B (en) * 2023-05-06 2023-07-21 山东建筑大学 Prestressed active support control method for underground excavation underground engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55129593A (en) * 1979-03-29 1980-10-07 Minoru Yamamoto Method of constructing earth and sand tunnel near its entrance slightly covered with earth and sand
JPS55148894A (en) * 1979-05-07 1980-11-19 Kensetsu Fastener Kk Method of excavating tunnel and lockup anchor
JPH0464688A (en) * 1990-07-04 1992-02-28 Maeda Corp Tunneling method
JPH0771184A (en) * 1993-06-28 1995-03-14 Toyo Constr Co Ltd Tunnel constructing method
JPH0813997A (en) * 1994-06-30 1996-01-16 P C Frame:Kk Tunnel construction method
JP2001032671A (en) * 1999-07-16 2001-02-06 Okumura Corp Tunnel prelining construction method
US6554536B1 (en) * 2000-01-05 2003-04-29 Channeline Sewer Systems Limited Linings for sewers

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53144128A (en) * 1977-05-20 1978-12-15 Akira Kanematsu Underground excavating method
JPH066878B2 (en) * 1986-09-02 1994-01-26 清水建設株式会社 Tunnel or underground cavity lining structure
JPH0645998B2 (en) * 1987-07-28 1994-06-15 有限会社川島鉄工所 Support member for tunnel
JPH02171497A (en) * 1988-12-23 1990-07-03 Toko Tekko Kk Primary shotcrete formation method for inner wall of tunneling rock bed
JPH04319198A (en) * 1991-04-19 1992-11-10 Rikiyou:Kk Construction method of tunnel
JP2721950B2 (en) * 1993-09-07 1998-03-04 株式会社大阪防水建設社 Ground improvement method for tunnel excavation and surrounding area
JP2723469B2 (en) * 1994-06-07 1998-03-09 鹿島建設株式会社 Excavation method of large section tunnel by preceding rock bolt construction and loosening blasting
JP3120001B2 (en) * 1994-07-12 2000-12-25 株式会社奥村組 Tunnel lining method
JPH08128293A (en) * 1994-10-28 1996-05-21 Dowa Koei Kk Quick excavation construction method of tunnel with large section
JPH094362A (en) * 1995-06-21 1997-01-07 Sato Kogyo Co Ltd Construction method for large-cross section tunnel
JPH0960498A (en) * 1995-08-25 1997-03-04 Shimizu Corp Structure and execution method for timbering wall
JPH09217594A (en) * 1996-02-13 1997-08-19 Fujita Corp Timbering method for tunnel
KR100201598B1 (en) * 1997-03-12 1999-06-15 신현주 A method for establighing a lining on the wall of tunnel
JP4017711B2 (en) * 1997-08-20 2007-12-05 岐阜工業株式会社 Tunnel lining method and tunnel lining apparatus used for carrying out tunnel lining
JPH11287099A (en) * 1998-04-02 1999-10-19 Kajima Corp Supporting method of under ground cavern and wall body of the cavern
JP4298853B2 (en) * 1999-07-08 2009-07-22 清水建設株式会社 Long tip receiving method
JP3780847B2 (en) * 2000-12-25 2006-05-31 株式会社大林組 Tie rod method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55129593A (en) * 1979-03-29 1980-10-07 Minoru Yamamoto Method of constructing earth and sand tunnel near its entrance slightly covered with earth and sand
JPS55148894A (en) * 1979-05-07 1980-11-19 Kensetsu Fastener Kk Method of excavating tunnel and lockup anchor
JPH0464688A (en) * 1990-07-04 1992-02-28 Maeda Corp Tunneling method
JPH0771184A (en) * 1993-06-28 1995-03-14 Toyo Constr Co Ltd Tunnel constructing method
JPH0813997A (en) * 1994-06-30 1996-01-16 P C Frame:Kk Tunnel construction method
JP2001032671A (en) * 1999-07-16 2001-02-06 Okumura Corp Tunnel prelining construction method
US6554536B1 (en) * 2000-01-05 2003-04-29 Channeline Sewer Systems Limited Linings for sewers

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756893A (en) * 2018-04-19 2018-11-06 济南城建集团有限公司 A kind of city shallow tunnel vault soil stabilization method
CN109975157A (en) * 2019-04-15 2019-07-05 盾构及掘进技术国家重点实验室 It is a kind of for testing the force measuring structure and method of shield cutter cutting plastic drain bar
CN109975157B (en) * 2019-04-15 2021-09-24 盾构及掘进技术国家重点实验室 Force measuring structure and method for testing plastic drainage plate cut by shield cutter

Also Published As

Publication number Publication date
JP5103516B2 (en) 2012-12-19
WO2006057545A1 (en) 2006-06-01
KR20060059833A (en) 2006-06-02
JP2008522058A (en) 2008-06-26
KR100740200B1 (en) 2007-07-18
JP2011052536A (en) 2011-03-17

Similar Documents

Publication Publication Date Title
JP4768747B2 (en) Pre-support tunnel construction method and equipment adapted to it
AU2005200758A1 (en) Earth Retention and Piling Systems
KR101750273B1 (en) Tunnel Reinforcement structure and Tunnel Reinforcement methods using the same
JP3824114B2 (en) Whale bone method for large section tunnel
WO2014182074A1 (en) Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method
KR101536209B1 (en) Steel Pipe Multi Step Grouting device Open and cut and NATM complex excavation tunnel construction method
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
US7025537B2 (en) Subterranean structures and methods for constructing subterranean structures
CN107044135A (en) A kind of tunnel portal excavates the construction method built
KR20210009502A (en) Cast-in-place pile using Pressurized grouting and construction method
KR102647214B1 (en) Prestressed pile for retaining wall with easy resource recovery and construction method thereof
KR101283663B1 (en) Method for digging two arch type tunnel
JP2008050779A (en) Construction method for forming widened section of shield tunnel, and structure of widened section of shield tunnel
JPH02200917A (en) Landslide suppressing well cylinder and its building method
JP3602998B2 (en) Tunnel construction method and tunnel
JP6560105B2 (en) Method for forming pressure-resistant supporting ground body in pipe roof
JP6636774B2 (en) Integrated structure of pipe roof material
JP2594864B2 (en) Widening method of underground tunnel
JP5012149B2 (en) Ground support structure and ground support method
JP3930954B2 (en) Construction method of structure
JPH0424398A (en) Construction of underground space with arched member
JP2697762B2 (en) Tunnel structure and construction method
KR100441966B1 (en) Applying Method of Casing as the Concrete Filled Tube
AU2012202472B2 (en) Earth Retention and Piling Systems
JP3801229B2 (en) Underground bending member and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081128

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20081128

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090202

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100810

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110531

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110616

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4768747

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140624

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250