JP4625763B2 - 主桁とプレキャスト床版の合成構造 - Google Patents

主桁とプレキャスト床版の合成構造 Download PDF

Info

Publication number
JP4625763B2
JP4625763B2 JP2005364529A JP2005364529A JP4625763B2 JP 4625763 B2 JP4625763 B2 JP 4625763B2 JP 2005364529 A JP2005364529 A JP 2005364529A JP 2005364529 A JP2005364529 A JP 2005364529A JP 4625763 B2 JP4625763 B2 JP 4625763B2
Authority
JP
Japan
Prior art keywords
main girder
steel plate
strength bolt
floor slab
upper flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2005364529A
Other languages
English (en)
Other versions
JP2007169886A (ja
Inventor
道也 高田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sho Bond Corp
Original Assignee
Sho Bond Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sho Bond Corp filed Critical Sho Bond Corp
Priority to JP2005364529A priority Critical patent/JP4625763B2/ja
Publication of JP2007169886A publication Critical patent/JP2007169886A/ja
Application granted granted Critical
Publication of JP4625763B2 publication Critical patent/JP4625763B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、橋梁の合成桁における主桁と工場で製作されたプレキャスト床版の合成構造に関する。
主桁の断面力は、主桁上フランジ上にスタッドボルトを溶植して、当該部分にコンクリート又はモルタルを打設して主桁と床版を合成した構造である。
特許第2941632号
鋼・コンクリート複合構造の理論と設計(1)基礎編:理論編 土木学会 33頁
プレキャスト床版における課題は、主桁との合成にある。具体的にはプレキャスト床版のハンチに起因する。橋梁においては縦横断勾配がありプレキャスト床版の設置の調整はこのハンチ高さを変化させて対応している。具体的には、プレキャスト床版の下面鋼板を折り曲げて加工していた。パネルごとに縦横断勾配は異なっているので、ハンチ付きプレキャスト床版の製作は一枚一枚の製作となりコストアップとなる。
床版打ち替えで合成桁の場合は既設のスタッドボルト、または型鋼を用いたずれ止めを切断して、新たにスタッドボルトを溶植しなければならない。このとき溶植位置は既設位置を外さないと溶植の品質が落ちるため、新たなスタッドボルト配置に苦慮する。
床版打ち替えで合成桁の場合であって、交通規制を日々開放して行わざるを得ないとき、主桁とプレキャスト床版の合成構造をその日毎に完成させなければならない。工程上タイトになり品質に問題を残す。
従来の主桁との合成構造(ハンチ付プレキャスト床版と主桁との間隙に無収縮モルタルを充填)では間隙(3cm以上)が大きくなると合成効果が低下する。ハンチが高いと疲労でスタッドボルトに曲げ作用してスタッドボルト一本あたりのせん断耐力が低下する。その対応として一本当りのスタッドボルトの許容力を低減して本数を増やしている。
本発明は、上述したようなプレキャスト床版のハンチに起因する課題を解決しようとするものである。
基本的には、橋軸直角方向両側略端部に上下面を貫通する高力ボルト挿通孔を主桁方向に適宜の間隔で穿孔した接続折曲部を形成した連結鋼板を、プレキャスト床版の底鋼板下面からコンクリート中に接続折曲部に穿孔した高力ボルト挿通孔から挿通した高力ボルトと螺合する高力ボルト結合用ナットを主桁方向に適宜の間隔で埋め込んだプレキャスト床版の底鋼板下面と、主桁上フランジの略両側端部に上下面を貫通する高力ボルト挿通孔を主桁方向に適宜の間隔で穿孔した主桁上フランジ上面にハンチ状に架け渡し、プレキャスト床版と連結鋼板、主桁上フランジと連結鋼板とを、それぞれプレキャスト床版に埋め込んだ高力ボルト結合用ナットと連結鋼板に穿孔した高力ボルト挿通孔、主桁上フランジと連結鋼板に穿孔した高力ボルト挿通孔を介して高力ボルトで締結し、プレキャスト床版と連結鋼板と主桁で囲まれる内空間に、この内空間相当個所の主桁方向に適宜の間隔でコンクリートの上面から底鋼板を貫通するコンクリート充填孔よりコンクリートを充填することを特徴とする主桁とプレキャスト床版の合成構造を提供する。
好ましくは、上記において、主桁上フランジに締結する連結鋼板の接続折曲部に穿孔した高力ボルト挿通孔位置の上方から接続折曲部にナットを添付けした主桁とプレキャスト床版の合成構造を提供する。
この合成構造にあって、主桁の断面応力は、主桁の上フランジとプレキャスト床版間にそれぞれ高力ボルトによる摩擦接合で添接した連結鋼板を設置することによる主桁とプレキャスト床版の合成作用となる。
本発明は、つぎのような効果を有する。
請求項1及び請求項において、縦横断勾配に対するプレキャスト床版のハンチ高さの調整は、連結鋼板のみを加工することで対応することができる。また、プレキャスト床版一枚一枚について曲げ加工を行わないのでコストの軽減につながる。
請求項1及び請求項2において、床版の合成作用は、主桁上フランジとコンクリートの界面に発生する作用せん断力に対して、主桁上フランジ部の高力ボルト、プレキャスト床版側の摩擦力と連結板の引張及びせん断剛性、埋め込みナットによりなされ、充填コンクリートにより平面保持されることで発揮される。したがって、主桁とプレキャスト床版用のスタッドボルトは不要である。
請求項1及び請求項において、床版スパンほぼ中央で添接可能なので、床版打ち替え工事において、プレキャスト床版を日々開放で設置することができる。
請求項1及び請求項において、主桁にスタッドボルトを使用せず、連結鋼板でせん断力を伝達するので、プレキャスト床版と主桁の間隙が大きくなっても合成効果の低下を抑えることができる。
請求項2において、主桁フランジに締結される連結鋼板の接続折曲部に穿孔した高力ボルト挿通孔位置の上方から接続折曲部にナットを添接してあるので、主桁フランジの下面からのボルト・ナットの結合を容易にする。
図1乃至図3は、本発明の一実施の形態を示すもので、図1は概略斜視図、図2はプレキャスト床版のコンクリート充填孔間位置での主桁方向を見た断面図、図3はプレキャスト床版のコンクリート充填孔位置での主桁方向を見た断面図である。
1はプレキャスト床版、2、3はコンクリート床版下面と主桁4の上フランジとともにハンチ形状を形成する一対の連結鋼板、4は主桁である。
プレキャスト床版1はコンクリート1aの下面に底鋼板1bを合成してなり、プレキャスト床版1と連結鋼板2・3と主桁4で囲まれる内空間の相当個所の主桁4方向に適宜の間隔でコンクリート1a上面から底鋼板1bを貫通するコンクリート充填孔1cが穿孔されてなる。
このプレキャスト床版1には、底鋼板1bの下面からコンクリート1aにかけて、主桁4方向に適宜の間隔で主桁4の上フランジ4aと底鋼板1bに架け渡される連結鋼板2・3の接続折曲部2a・3aとを締結する高力ボルト用の内ねじが螺設してある筒状のナット5が埋め込んである。
連結鋼板2・3は、プレキャスト床版1の長さ方向の長さを有し、橋軸直角方向の両側にプレキャスト床版1の底鋼板1bと主桁4上フランジに接続する接続折曲部2a・3aが折曲して形成されてなる。
接続折曲部2a・3aには、主桁4方向に適宜の間隔でプレキャスト床版1と主桁4の上フランジ4aとを高力ボルト6により締結するための高力ボルト挿通孔2b・3bを穿孔してある。また、主桁4の上フランジの高力ボルト挿通孔2b・3bには接続折曲部2a・3a側からナット7が添付してある。接続折曲部2a・2a間、接続折曲部3a・3a間の板幅は、ハンチ高さに応じた幅に加工してある。
主桁4は、上フランジ4a、ウエブ4b、下フランジ4cとからなり、上フランジ4aには主桁4方向に適宜の間隔でプレキャスト床版1と主桁4の上フランジ4aとの接続のための連結鋼板2・3の接続折曲部2a・3aの高力ボルト挿通孔2b・3bと合致する高力ボルト挿通孔4dが穿孔してある。
このようにしてなるプレキャスト床版1と一対の連結鋼板2・3と主桁4とはつぎのようにして締結される。
プレキャスト床版1と連結鋼板2・3とは、プレキャスト床版1に埋め込んである高力ボルト用ナット5と高力ボルト挿通孔2a・3aとを合致させてそれぞれ高力ボルト6を連結鋼板2・3の下面側より挿通して高力ボルト6の外ねじと高力ボルト用ナット5の内ねじとを螺合する。
連結鋼板2・3と主桁4とは、連結鋼板2・3のもう一方の高力ボルト挿通孔2a・3aと主桁4の上フランジ4aの高力ボルト挿通孔2b・3bとを合致させて上フランジ4aの下面から高力ボルト5を挿通し、高力ボルト5の外ねじとナット7の内ねじを螺合する。
プレキャスト床版1のコンクリート充填孔1c位置には、必要に応じ、主桁4の上フランジ4a上に浮き上り防止用のスラブアンカー8を植設してある。
プレキャスト床版1と連結鋼板2・3と主桁4とが締結された後は、プレキャスト床版1を貫通するコンクリート充填孔1cよりコンクリートを充填する。
かくして、プレキャスト床版1と主桁4との合成構造が形成される。
プレキャスト床版1同士の接続は、例えば公知添接鋼板を用いて行えばよい。
図4及び図5は、本発明の別の実施の形態を示すもので、図3は側面図(右側面図又は左側面図)、図5はプレキャスト床版のコンクリート充填孔間位置での主桁方向を見た断面図である。
この実施の形態においては、連結鋼板2・3の接続折曲部2a・2a間、3a・3a間の板幅の主桁4方向には、適宜の間隔でハンドホール9が開口してあるところが先の実施の形態と異なる。ハンドホール9が開口することにより連結鋼板2・3の主桁4の上フランジ4aに位置する接続折曲部2b・3bの上面にナット7を添接しなくてもハンドホール9から手を入れて主桁4の上フランジ4a側から挿入された高力ボルト6にナット7を螺合することができる。
なお、10は必要に応じてプレキャスト床版1の底鋼板と主桁4の上フランジ間の空間を維持するために嵌挿したスペーサーである。
本発明は、上述のようにしてなるので、現場ではつぎの手順で施工される。
1.一日で打ち替え可能範囲の既設床版を撤去後、既設スタッドまたはスラブアンカーを撤去する。
2.主桁4の上フランジ4aへの連結鋼板2・3の接続折曲部2a・3aをグラインダー等で所定の摩擦係数が得られるように下地処理を行う。
3.主桁4の上フランジ4aに所定の位置に浮き上がり防止用のスラブアンカー8を溶植する。
4.工場で作製された鋼・コンクリートプレキャスト床版1を所定の位置に設置する。なお、事前に高さ調整用のFRP製のスペーサー10を主桁4の上フランジ4aに両面テープ等にて固定しておく。
5.主桁4の上フランジに床版仮固定に必要な高力ボルト用挿通孔4d(1本/m程度)をあける。
6.連結鋼板2・3を高力ボルト6にて上フランジ4aと鋼・コンクリートプレキャスト床版1に締結する。このとき、上フランジ側の高力ボルト6の締め付けは連結鋼板2・3に施されてハンドホール9を介して行う。完成後の合成構造として必要な高力ボルト挿通孔4dは、床版架設後交通開放した状態で足場等から上向きに孔明し、連結鋼板2・3に設けたハンドホール9を介して高力ボルト6で締結する。
7.新旧の継ぎ目は復工板を施設して交通開放を行う。
8.一単位(ジョイントからジョイントまで)の鋼・コンクリートプレキャスト床版1の架設が完了した時点で相互の連結(添接版)を行う。
9.連結完了後、鋼・コンクリートプレキャスト床版1に施されたコンクリート充填孔1cよりコンクリート打設し合成効果を確実にする。
10.コンクリート養生後、二次施工側の床版を同様に取り替える。
11.二次施工側の架設が完了後、施工分割位置の連結を行う。
12.全ての床版取替えが完了後、橋面工(防水、舗装、伸縮継手)を行い完成させる。
本発明の一実施の形態を示す概略斜視図である。 同プレキャスト床版のコンクリート充填孔間位置での主桁方向を見た断面図である。 同プレキャスト床版のコンクリート充填孔位置での主桁方向を見た断面図である。 本発明の別の実施の形態を示す側面図(右側面図又は左側面図)である。 同プレキャスト床版のコンクリート充填孔間位置での主桁方向を見た断面図である。
1 プレキャスト床版
1a コンクリート
1b 底鋼板
1c コンクリート充填孔
2 連結鋼板
2a 接続折曲部
2b 高力ボルト挿通孔
3 連結鋼板
3a 接続折曲部
3b 高力ボルト挿通孔
4 主桁
4a 上フランジ
4b ウエブ
4c 下フランジ
4d 高力ボルト挿通孔
5 高力ボルト用ナット
6 高力ボルト
7 ナット
8 スラブアンカー
9 ハンドホール
10 スペーサー
11 添接鋼板

Claims (2)

  1. 橋軸直角方向両側略端部に上下面を貫通する高力ボルト挿通孔を主桁方向に適宜の間隔で穿孔した接続折曲部を形成した連結鋼板を、プレキャスト床版の底鋼板下面からコンクリート中に接続折曲部に穿孔した高力ボルト挿通孔から挿通した高力ボルトと螺合する高力ボルト結合用ナットを主桁方向に適宜の間隔で埋め込んだプレキャスト床版の底鋼板下面と、主桁上フランジの略両側端部に上下面を貫通する高力ボルト挿通孔を主桁方向に適宜の間隔で穿孔した主桁上フランジ上面にハンチ状に架け渡し、プレキャスト床版と連結鋼板、主桁上フランジと連結鋼板とを、それぞれプレキャスト床版に埋め込んだ高力ボルト結合用ナットと連結鋼板に穿孔した高力ボルト挿通孔、主桁上フランジと連結鋼板に穿孔した高力ボルト挿通孔を介して高力ボルトで締結し、プレキャスト床版と連結鋼板と主桁で囲まれる内空間に、この内空間相当個所の主桁方向に適宜の間隔でコンクリートの上面から底鋼板を貫通するコンクリート充填孔よりコンクリートを充填することを特徴とする主桁とプレキャスト床版の合成構造。
  2. 主桁上フランジに締結する連結鋼板の接続折曲部に穿孔した高力ボルト挿通孔位置の上方から接続折曲部にナットを添付けしたことを特徴とする請求項1に記載の主桁とプレキャスト床版の合成構造。
JP2005364529A 2005-12-19 2005-12-19 主桁とプレキャスト床版の合成構造 Active JP4625763B2 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005364529A JP4625763B2 (ja) 2005-12-19 2005-12-19 主桁とプレキャスト床版の合成構造

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005364529A JP4625763B2 (ja) 2005-12-19 2005-12-19 主桁とプレキャスト床版の合成構造

Publications (2)

Publication Number Publication Date
JP2007169886A JP2007169886A (ja) 2007-07-05
JP4625763B2 true JP4625763B2 (ja) 2011-02-02

Family

ID=38296798

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005364529A Active JP4625763B2 (ja) 2005-12-19 2005-12-19 主桁とプレキャスト床版の合成構造

Country Status (1)

Country Link
JP (1) JP4625763B2 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152564A (zh) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 一种用于楼板的抗震管道安装机构

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103614964B (zh) * 2013-12-10 2016-02-03 东南大学 钢箱梁正交异性桥面板
JP6316665B2 (ja) * 2014-06-03 2018-04-25 オリエンタル白石株式会社 鋼桁とプレキャスト床版との合成構造及びその施工方法
CN105040577B (zh) * 2015-09-02 2017-01-04 江苏明福钢结构有限公司 一种多元合金共渗桥梁预埋钢构件
JP6792415B2 (ja) * 2016-11-02 2020-11-25 鹿島建設株式会社 コンクリート床版の撤去方法及びコンクリート床版の新設方法
JP7028639B2 (ja) * 2017-12-28 2022-03-02 大林道路株式会社 継手部の充填施工方法
CN109779111A (zh) * 2019-03-06 2019-05-21 湖南城市学院 一种装配式钢-混凝土组合楼盖板及其装配连接方法
CN109898413A (zh) * 2019-04-11 2019-06-18 福州大学 组合梁与混凝土桥面板连接结构及其施工方法
JP7309509B2 (ja) * 2019-08-05 2023-07-18 株式会社大林組 主桁とコンクリート床版の合成化構造、及び主桁とコンクリート床版の再合成化方法
JP7024130B1 (ja) 2021-06-14 2022-02-22 オリエンタル白石株式会社 PCa床版下の充填型枠
CN114197324B (zh) * 2022-01-12 2023-12-01 深圳大学 适于工业化制造装配的钢砼连接件及组合梁建造方法
CN115094745A (zh) * 2022-06-24 2022-09-23 中冶建工集团有限公司 现浇整体型钢-砼组合梁

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54119218U (ja) * 1978-02-09 1979-08-21
JPH0790970A (ja) * 1993-07-28 1995-04-04 Sumitomo Metal Ind Ltd 複合床版、その施工方法、及び複合床版の継手部
JPH083933A (ja) * 1994-06-17 1996-01-09 Ishikawajima Constr Materials Co Ltd 橋桁への床版の設置方法および床版受け台
JPH11190062A (ja) * 1997-12-25 1999-07-13 Nippon Steel Corp 鋼管トラス部材の格点部接合構造
JP2000120021A (ja) * 1998-10-14 2000-04-25 Nichia Steel Works Ltd 橋梁の床版架設部構造
JP2001011820A (ja) * 1999-06-30 2001-01-16 Kondo Kozai Kk 橋床ハンチの施工方法
JP2001040782A (ja) * 1999-07-30 2001-02-13 Hitachi Zosen Corp 補強材の接合構造
JP2001254319A (ja) * 2000-03-09 2001-09-21 Nkk Corp 橋梁等の上部構造及びその施工方法
JP2001288712A (ja) * 2000-04-05 2001-10-19 Sankyu Inc コンクリート床版の補強方法および装置
JP2002004221A (ja) * 2000-06-23 2002-01-09 Hitachi Zosen Corp 合成床版
JP2003147726A (ja) * 2001-11-09 2003-05-21 Sumitomo Metal Ind Ltd 複合床版の施工方法および該施工方法に用いる床版パネル
JP2005273289A (ja) * 2004-03-25 2005-10-06 Jfe Engineering Kk 2方向性合成床版
JP2006009412A (ja) * 2004-06-25 2006-01-12 Ttk Corp 鋼床版の補修方法および補強方法

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54119218U (ja) * 1978-02-09 1979-08-21
JPH0790970A (ja) * 1993-07-28 1995-04-04 Sumitomo Metal Ind Ltd 複合床版、その施工方法、及び複合床版の継手部
JPH083933A (ja) * 1994-06-17 1996-01-09 Ishikawajima Constr Materials Co Ltd 橋桁への床版の設置方法および床版受け台
JPH11190062A (ja) * 1997-12-25 1999-07-13 Nippon Steel Corp 鋼管トラス部材の格点部接合構造
JP2000120021A (ja) * 1998-10-14 2000-04-25 Nichia Steel Works Ltd 橋梁の床版架設部構造
JP2001011820A (ja) * 1999-06-30 2001-01-16 Kondo Kozai Kk 橋床ハンチの施工方法
JP2001040782A (ja) * 1999-07-30 2001-02-13 Hitachi Zosen Corp 補強材の接合構造
JP2001254319A (ja) * 2000-03-09 2001-09-21 Nkk Corp 橋梁等の上部構造及びその施工方法
JP2001288712A (ja) * 2000-04-05 2001-10-19 Sankyu Inc コンクリート床版の補強方法および装置
JP2002004221A (ja) * 2000-06-23 2002-01-09 Hitachi Zosen Corp 合成床版
JP2003147726A (ja) * 2001-11-09 2003-05-21 Sumitomo Metal Ind Ltd 複合床版の施工方法および該施工方法に用いる床版パネル
JP2005273289A (ja) * 2004-03-25 2005-10-06 Jfe Engineering Kk 2方向性合成床版
JP2006009412A (ja) * 2004-06-25 2006-01-12 Ttk Corp 鋼床版の補修方法および補強方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152564A (zh) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 一种用于楼板的抗震管道安装机构

Also Published As

Publication number Publication date
JP2007169886A (ja) 2007-07-05

Similar Documents

Publication Publication Date Title
JP4625763B2 (ja) 主桁とプレキャスト床版の合成構造
KR100703134B1 (ko) 조립식 피시 빔 교량 및 그것의 시공 방법
KR101198812B1 (ko) 프리플렉스 거더를 이용한 합성형 라멘교의 시공방법
KR101107826B1 (ko) 프리캐스트 콘크리트 중공 슬래브(slab)형 횡방향 연결 박스 거더 및 이를 이용한 교량시공방법
JP2014177767A (ja) 橋梁用コンクリートプレキャスト床版の段階施工方法
KR100988074B1 (ko) 교대 벽체와 일체화 시공되는 피에스씨 거더교 및 그 시공방법
JP2872346B2 (ja) プレハブ床版の設置工法
KR101831733B1 (ko) 거더 연결 시공방법
JP4416337B2 (ja) 打ち替え合成床版鋼桁橋の施工方法
JP2006265976A (ja) 波形鋼板ウェブuコンポ橋およびその構築方法
JP3737475B2 (ja) 箱桁橋構造およびその構築方法
KR100814958B1 (ko) 신축이음장치의 재설치공법
KR100565384B1 (ko) 빔 연결부재와 강재가로보를 이용한 프리캐스트 피에스씨빔의 연속화 구조 및 이를 이용한 교량시공방법
JP6655746B2 (ja) 橋梁の構造および床版取替え方法
KR20070001410A (ko) 콘크리트 다주형 교량의 강재가로보 설치 구조
KR20120003729U (ko) 시스템서포트 헤드
KR100696646B1 (ko) 조립식 가로보에 정착 및 지지된 긴장재에 의한 ps 콘크리트 합성거더 교량의 외부긴장 공법
JP2006112086A (ja) 橋梁の構造およびその架け替え方法
JP4627383B2 (ja) 張り替え鋼床版橋
JP7010709B2 (ja) プレハブ構造およびコンクリート構造物の構築方法
KR20090084376A (ko) 프리스트레스 합성형교의 연속지점부상의 강-콘크리트 합성거더 및 그 시공방법
KR200333777Y1 (ko) 빔 연결부재와 강재가로보를 이용한 프리캐스트 피에스씨빔의 연속화 구조
KR101479612B1 (ko) 자중을 이용하여 이음부에 긴장력을 도입하는 조립식 프리캐스트 강합성 바닥판 및 그 체결 방법
KR102602176B1 (ko) 철골 매립형 프리스트레스트 pc 합성보
KR200397849Y1 (ko) 조립식 피시 빔 교량

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100722

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100804

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100929

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101020

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101108

R150 Certificate of patent or registration of utility model

Ref document number: 4625763

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250