JP4503995B2 - Reheat steam turbine plant and operation method thereof - Google Patents
Reheat steam turbine plant and operation method thereof Download PDFInfo
- Publication number
- JP4503995B2 JP4503995B2 JP2003403643A JP2003403643A JP4503995B2 JP 4503995 B2 JP4503995 B2 JP 4503995B2 JP 2003403643 A JP2003403643 A JP 2003403643A JP 2003403643 A JP2003403643 A JP 2003403643A JP 4503995 B2 JP4503995 B2 JP 4503995B2
- Authority
- JP
- Japan
- Prior art keywords
- steam
- turbine
- pressure turbine
- valve
- reheat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 32
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000010248 power generation Methods 0.000 description 4
- 230000007423 decrease Effects 0.000 description 3
- 238000011017 operating method Methods 0.000 description 3
- TVZRAEYQIKYCPH-UHFFFAOYSA-N 3-(trimethylsilyl)propane-1-sulfonic acid Chemical compound C[Si](C)(C)CCCS(O)(=O)=O TVZRAEYQIKYCPH-UHFFFAOYSA-N 0.000 description 2
- 239000000470 constituent Substances 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000013021 overheating Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 239000002918 waste heat Substances 0.000 description 2
- 238000003723 Smelting Methods 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 239000000498 cooling water Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
Images
Landscapes
- Control Of Turbines (AREA)
Description
本発明は、再熱蒸気タービンプラントおよびその運転方法に係り、特に、起動時に高圧タービンおよび中圧タービンのいずれにも蒸気を流すことにより、起動時間の短縮を図ることが可能な再熱蒸気タービンプラントおよびその運転方法に関する。 The present invention relates to a reheat steam turbine plant and a method for operating the reheat steam turbine plant, and in particular, a reheat steam turbine capable of reducing start-up time by flowing steam to both a high-pressure turbine and an intermediate-pressure turbine at start-up. The present invention relates to a plant and an operation method thereof.
近時の発電プラントでは、原子力発電プラントをベースロード用として運用し、火力発電プラントをピークロード用として運用する運転パターンを採るようになってきた。 Recent power plants have come to adopt an operation pattern in which a nuclear power plant is operated for base load and a thermal power plant is operated for peak load.
このため、火力発電プラントでは、運転パターンの改善策として、タービンバイパス装置を利用してDSS運転(Daily Start Stоp:1日1回起動停止運転)が実施されており、その実績に関し、例えば、文献“火力原子力発電”「タービンバイパス起動方式の改良と運転実績」(社団法人火力原子力発電技術協会、1991年6月号68頁〜83頁)(非特許文献1)に報告されている。 For this reason, in a thermal power plant, as a measure for improving the operation pattern, DSS operation (Daily Start Start: once a day start / stop operation) is performed using a turbine bypass device. “Thermal Nuclear Power Generation” “Improvement and Operational Performance of Turbine Bypass Startup Method” (Thermal and Nuclear Power Engineering Association, June 1991, pages 68 to 83) (Non-Patent Document 1).
従来、DSS運転を行う再熱蒸気タービンプラントは、図4に示すように、例えば、ボイラ等の蒸気発生器1内に組み込まれた加熱器2および再熱器3、高圧タービン4、中圧タービン5、低圧タービン6、復水器7、給水ポンプ8を備え、蒸気発生器1の加熱器2で発生した蒸気のうち、一部を主蒸気止め弁9、蒸気加減弁10を備えた主蒸気系11を介して高圧タービン4に供給し、ここで膨張仕事をして動力を発生させた後、高圧タービン排気として、その一部を逆止弁12を備えた低温再熱蒸気系13を介して再熱器3に供給する。
Conventionally, a reheat steam turbine plant that performs DSS operation includes, for example, a heater 2 and a reheater 3 incorporated in a steam generator 1 such as a boiler, a high pressure turbine 4, and an intermediate pressure turbine, as shown in FIG. 5, a low pressure turbine 6, a condenser 7, a feed water pump 8, and a part of the steam generated by the heater 2 of the steam generator 1 is a main steam provided with a main
また、主蒸気系11から分岐された残りの蒸気は、高圧バイパス弁14を備えた高圧タービンバイパス系15を介して低温再熱蒸気系13で高圧タービン3から排出される高圧タービン排気の一部と合流する。
The remaining steam branched from the main steam system 11 is part of the high-pressure turbine exhaust discharged from the high-pressure turbine 3 in the low-temperature
また、高圧タービン3から排出される高圧タービン排気の残りは、ベンチレータ弁16を備えたベンチレータ系17を介して復水器7に供給される。
The remainder of the high-pressure turbine exhaust discharged from the high-pressure turbine 3 is supplied to the condenser 7 via a
なお、ベンチレータ弁16およびベンチレータ系17は、蒸気量の少ない、例えば、起動時、高圧タービンの回転中に発生する風損に伴う高圧タービン排気室の異常高温を抑制するものであり、定格負荷運転時、閉じている。
The
また、再熱器3を出た再熱蒸気は、再熱蒸気止め弁20、インターセプト弁21を備えた再熱蒸気系22を介して中圧タービン23に供給され、ここで膨張仕事をして動力を発生させ、さらに低圧タービン6でも再び膨張仕事をして動力を発生させた後、低圧タービン排気として復水器7に供給され、海水等の冷却水で凝縮され復水となる。
Further, the reheat steam that has exited the reheater 3 is supplied to the
一方、再熱器3を出た再熱蒸気は、その一部を低圧バイパス弁18を備えた低圧タービンバイパス系19を介して復水器7に供給される。
On the other hand, a part of the reheated steam exiting the reheater 3 is supplied to the condenser 7 via a low pressure
低圧タービン5、低圧タービンバイパス弁18、ベンチレータ系17のそれぞれから復水器7に供給された蒸気を凝縮させた復水は、給水ポンプ8で昇圧させて再び蒸気発生器1に戻される。
Condensate obtained by condensing the steam supplied to the condenser 7 from each of the low-pressure turbine 5, the low-pressure
このような構成を備えた再熱蒸気タービンプラントにおいて、起動時、蒸気発生器1における加熱器2および再熱器3のそれぞれから発生する蒸気圧力は、表1に示すように、定格負荷運転時に較べて低くなっている。
ここで、起動時、低圧バイパス弁18により圧力制御が行われ再熱器3から発生する再熱蒸気の圧力約0.7MPaは、タービン負荷5%〜50%程度の途中負荷帯に相当しており、圧力制御運転下、ちょうど低圧バイパス弁18が全閉したときの圧力に設定される。
Here, at the time of start-up, the pressure of the reheat steam generated from the reheater 3 is controlled by the low
また、再熱蒸気タービンプラントでは、起動時、高圧バイパス弁14と低圧バイパス弁18によるタービンバイパス運転(上流側の圧力制御)を行い、蒸気加減弁10を全閉させたままインターセプト弁21を開弁させて流量制御し、タービンの回転を上昇させ負荷運転を開始する。
In the reheat steam turbine plant, at the time of start-up, the turbine bypass operation (upstream pressure control) is performed by the high
このとき、高圧タービン4は、蒸気発生器1の加熱器2からの蒸気が供給されないまま回転しているので、回転に伴う風損によってタービン最終段落からタービン排気室にかけて室温が上昇し、過加熱状態になる。 At this time, the high-pressure turbine 4 rotates without being supplied with steam from the heater 2 of the steam generator 1, so that the room temperature rises from the final stage of the turbine to the turbine exhaust chamber due to windage caused by the rotation, and overheating occurs. It becomes a state.
このため、再熱蒸気タービンプラントは、ベンチレータ系17のベンチレータ弁16を開弁させ、復水器7と連通させ、高圧タービン4を真空に維持させ、高圧タービン内の温度上昇を抑制している。
For this reason, the reheat steam turbine plant opens the
高圧タービン4に膨張仕事の開始指令があると、再熱蒸気タービンプラントは、蒸気加減弁10を開弁させ、蒸気発生器1の加熱器2から高圧タービン4に主蒸気系11を介して蒸気を供給し、低温再熱蒸気系13の逆止弁12が全開するまでの間、高圧タービン排気をベンチレータ系17のベンチレータ弁16を介して復水器6に排出させ、高圧タービン最終段落および高圧タービン内を冷却させている。そして、予め定められた負荷になると、再熱蒸気タービンプラントは、ベンチレータ弁16を閉弁させて高圧タービン4、中圧タービン5および低圧タービン6のそれぞれを定格負荷に至らしめる。
When the high-pressure turbine 4 is instructed to start expansion work, the reheat steam turbine plant opens the
このように、従来の再熱蒸気タービンプラントは、タービンバイパス系を有効に活用し、起動特性の改善や蒸気発生器負荷とタービン負荷との吸収調整を図っていた。
図4で示した再熱蒸気タービンプラントは、高圧タービンバイパス系、低圧タービンバイパス系を有効に活用して起動特性等を改善させたものであるが、それでもまだ起動時間を短縮させるなどの改善の余地が残されている。 Reheat steam turbine plant shown in FIG. 4, a high pressure turbine bypass system, but those with an improved starting characteristics or the like by effectively using a low-pressure turbine bypass system, but still the improvements such as to shorten the still start time There is room for it.
また、例えば、定格負荷運転中、何らかの事情でトリップ等の指令があり、タービンの運転を停止させた後、ここから再起動させるには、表1に示すように、高圧タービンバイパス系15の蒸気圧力が約8.0MPaにならないと高圧バイパス弁14が開弁しないし、また、低圧タービンバイパス系19の蒸気圧力が約0.7MPaにならないと低圧バイパス弁18が開弁しない再起動開始条件になっている。
Further, for example, during a rated load operation, there is a command such as a trip for some reason, and after restarting the turbine after stopping the operation of the turbine, as shown in Table 1, the steam of the high-pressure
他方、最近の火力発電プラントでは、ボイラ等に代って排熱回収ボイラを用い、ガスタービンの排熱ガスを利用して蒸気を発生させるコンバインドサイクル発電プラントの稼動実績がより多くなっている。 On the other hand, in a recent thermal power plant, an operation record of a combined cycle power plant that uses a waste heat recovery boiler instead of a boiler or the like and generates steam using the exhaust heat gas of a gas turbine is increasing.
この排熱回収ボイラから発生した蒸気は、発電用のほかに、製紙工場、厚延工場、アルミ精錬工場等のプロセス蒸気に使用したり、またコジェネレーションの地域暖冷房蒸気に使用することがある。 The steam generated from this waste heat recovery boiler may be used not only for power generation, but also for process steam at paper mills, Atsunobu mill, aluminum smelting mill, etc., and for district heating / cooling steam for cogeneration. .
しかし、再熱蒸気タービンプラントは、再起動運転が表1に示した蒸気圧力まで降下しなければ開始できないことを考えると、この間、プロセス蒸気や地域暖冷暖房蒸気が全く使用できなくなる等の支障を来していた。 However, considering that the reheat steam turbine plant cannot be started unless the restart operation is reduced to the steam pressure shown in Table 1, during this time, process steam and district heating / cooling steam cannot be used at all. It was coming.
本発明は、このような事情に基づいてなされたものであり、起動時間をより短縮可能な再熱蒸気タービンプラントを提供するとともに、他の系統に蒸気の供給を行う再熱蒸気タービンプラントにおいては、蒸気タービンにトリップや負荷遮断等の停止指令があっても、蒸気発生器から発生する蒸気の圧力を高く維持させたまま、他の系統に蒸気の安定供給を行わせる再熱蒸気タービンプラントの運転方法を提供することを目的とする。 The present invention has been made based on such circumstances, and in addition to providing a reheat steam turbine plant that can further shorten the startup time, in a reheat steam turbine plant that supplies steam to other systems, , even if a stop command, such as trips and load shedding in the steam turbine, while high to maintain the pressure of the steam generated from the steam generator, the reheat steam turbine plant to perform a stable supply of steam to the other strains The purpose is to provide a driving method.
本発明に係る再熱蒸気タービンプラントは、上述の目的を達成するために、請求項1に記載したように、高圧タービンと中圧タービンを互いに接続させるベンチレータ系と、蒸気発生器の主蒸気系における高圧タービンバイパス系の分岐点と主蒸気止め弁との間から分岐する第1の蒸気供給系と、前記蒸気発生器の高温再熱蒸気系における低圧タービンバイパス系の分岐点と再熱蒸気止め弁との間から分岐する第2の蒸気供給系とを備えたものである。 In order to achieve the above object, a reheat steam turbine plant according to the present invention includes a ventilator system that connects a high-pressure turbine and an intermediate-pressure turbine to each other, and a main steam system of a steam generator. A first steam supply system that branches from between the branch point of the high-pressure turbine bypass system and the main steam stop valve, and the branch point and reheat steam stop of the low-pressure turbine bypass system in the high-temperature reheat steam system of the steam generator And a second steam supply system that branches from the valve.
また、本発明に係る再熱蒸気タービンプラントは、上述の目的を達成するために、請求項2に記載したように、ベンチレータ系は、ベンチレータ弁を備えるとともに、このベンチレータ弁を主蒸気系に設けた蒸気加減弁の弁開度および高温再熱蒸気系に設けたインターセプト弁の弁開度動作と各々逆動作させる構成にしたものである。 In order to achieve the above-mentioned object, the reheat steam turbine plant according to the present invention includes a ventilator valve and a ventilator valve provided in the main steam system as described in claim 2. The valve opening degree of the steam control valve and the valve opening degree operation of the intercept valve provided in the high-temperature reheat steam system are respectively reversed.
また、本発明に係る再熱蒸気タービンプラントの運転方法は、上述の目的を達成するために、請求項3に記載したように、第1の蒸気供給系は、プロセス用蒸気として供給するものである。 Moreover, in order to achieve the above-mentioned object, the operation method of the reheat steam turbine plant according to the present invention supplies the first steam supply system as process steam as described in claim 3. is there.
また、本発明に係る再熱蒸気タービンプラントの運転方法は、上述の目的を達成するために、請求項4に記載したように、第2の蒸気供給系は、熱供給用蒸気として供給するものである。 Moreover, in order to achieve the above-described object, the reheat steam turbine plant operating method according to the present invention is such that the second steam supply system supplies heat supply steam as described in claim 4. It is.
また、本発明に係る再熱蒸気タービンプラントの運転方法は、上述の目的を達成するために、請求項5に記載したように、起動時、蒸気発生器の加熱器から発生した蒸気の一部を主蒸気系を介して高圧タービンに供給し、残りを高圧タービンバイパス系に供給し、前記高圧タービンを出た高圧タービン排気の一部をベンチレータ系のベンチレータ弁を介して中圧タービンに供給し、残りを前記高圧タービンバイパス系からの蒸気と低温再熱蒸気系で合流させるとともに、その合流蒸気を前記蒸気発生器の再熱器に供給して再熱蒸気を発生させ、発生させた再熱蒸気の一部を高温再熱蒸気系に供給し、残りを低圧タービンバイパス系に供給する再熱蒸気タービンプラントの運転方法において、予め定められたタービン負荷になるまで前記主蒸気系に設けた蒸気加減弁によりタービン回転数制御を行い、予め定められたタービン負荷を超えると、前記主蒸気系に設けた蒸気加減弁と前記高温再熱蒸気系に設けたインターセプト弁とでタービン回転数制御を行う方法である。 Moreover, in order to achieve the above-mentioned object, the operation method of the reheat steam turbine plant according to the present invention provides a part of the steam generated from the heater of the steam generator at start-up as described in claim 5. Is supplied to the high-pressure turbine via the main steam system, the rest is supplied to the high-pressure turbine bypass system, and a part of the high-pressure turbine exhaust exiting the high-pressure turbine is supplied to the intermediate-pressure turbine via the ventilator valve of the ventilator system. The remaining steam is combined with the steam from the high-pressure turbine bypass system in the low-temperature reheat steam system, and the combined steam is supplied to the reheater of the steam generator to generate reheat steam, and the generated reheat is generated. In the operation method of the reheat steam turbine plant in which a part of the steam is supplied to the high-temperature reheat steam system and the rest is supplied to the low-pressure turbine bypass system, the main steam is used until a predetermined turbine load is reached. When the turbine speed is controlled by a steam control valve provided in the engine and a predetermined turbine load is exceeded, the turbine speed is controlled by the steam control valve provided in the main steam system and the intercept valve provided in the high-temperature reheat steam system. This is a method of performing number control.
また、本発明に係る再熱蒸気タービンプラントの運転方法は、上述の目的を達成するために、請求項6に記載したように、起動時、蒸気発生器の加熱器から発生した蒸気の一部を主蒸気系を介して高圧タービンに供給し、残りを高圧タービンバイパス系に供給し、前記高圧タービンを出た高圧タービン排気の一部をベンチレータ系のベンチレータ弁を介して中圧タービンに供給し、残りを前記高圧タービンバイパス系からの蒸気と低温再熱蒸気系で合流させるとともに、その合流蒸気を前記蒸気発生器の再熱器に供給して再熱蒸気を発生させ、発生させた再熱蒸気の一部を高温再熱蒸気系に供給し、残りを低圧タービンバイパス系に供給する再熱蒸気タービンプラントの運転方法において、予め定められたタービン負荷になるまで前記主蒸気系に設けた蒸気加減弁によりタービン回転数制御を行い、予め定められたタービン負荷を超えると、前記ベンチレータ弁と前記高温再熱蒸気系に設けたインターセプト弁とのそれぞれに弁開度の連動関係を持たせて協調制御を行わせる方法である。 Moreover, in order to achieve the above-mentioned object, the reheat steam turbine plant operating method according to the present invention provides a part of the steam generated from the heater of the steam generator at start-up as described in claim 6. Is supplied to the high-pressure turbine via the main steam system, the rest is supplied to the high-pressure turbine bypass system, and a part of the high-pressure turbine exhaust exiting the high-pressure turbine is supplied to the intermediate-pressure turbine via the ventilator valve of the ventilator system. The remaining steam is combined with the steam from the high-pressure turbine bypass system in the low-temperature reheat steam system, and the combined steam is supplied to the reheater of the steam generator to generate reheat steam, and the generated reheat is generated. In the operation method of the reheat steam turbine plant in which a part of the steam is supplied to the high-temperature reheat steam system and the rest is supplied to the low-pressure turbine bypass system, the main steam is used until a predetermined turbine load is reached. When the turbine speed is controlled by a steam control valve provided in the engine, and a predetermined turbine load is exceeded, the ventilator valve and the intercept valve provided in the high-temperature reheat steam system have an interlocking relationship between the valve openings. This is a method for carrying out cooperative control.
本発明に係る再熱蒸気タービンプラントは、高圧タービンと中圧タービンとを直接結ぶベンチレータ系を設け、起動運転中、高圧タービンに供給される蒸気をベンチレータ系を介して中圧タービンに直接供給し、高圧タービンを冷却させている間に、再熱蒸気の圧力、温度を高めてインターセプト弁を開弁させるので、中圧タービンに安定した再熱蒸気を供給することができ、起動時間を短縮させることができる。また、主蒸気系の高圧タービンバイパス系の分岐点と主蒸気止め弁との間から分岐し第1の蒸気供給系を設けるとともに、高温再熱蒸気系の低圧タービンバイパス系の分岐点と再熱蒸気止め弁との間から分岐して第2の蒸気供給系を設け、他の系統に蒸気の供給を行う再熱蒸気タービンプラントにおいては、高圧の蒸気および再熱蒸気のそれぞれを蒸気供給系のそれぞれにそのまま供給できる構成にしたので、負荷運転中、たとえタービントリップ指令があっても安定した高圧の蒸気および再熱蒸気のそれぞれを蒸気供給系のそれぞれに安定供給することができる。 Reheat steam turbine plant according to the present invention, only setting the ventilator system connecting the intermediate pressure turbine and the high pressure turbine directly, during the starting operation, supply direct steam supplied to the high pressure turbine to the medium-pressure turbine via a ventilator system While the high-pressure turbine is being cooled, the intercept valve is opened by increasing the pressure and temperature of the reheat steam, so that stable reheat steam can be supplied to the intermediate pressure turbine and the startup time is shortened. Can be made . In addition, a first steam supply system is provided by branching between the branch point of the high-pressure turbine bypass system of the main steam system and the main steam stop valve, and the branch point and reheat of the low-pressure turbine bypass system of the high-temperature reheat steam system are provided. In a reheat steam turbine plant that branches from the steam stop valve to provide a second steam supply system and supplies steam to other systems, each of the high pressure steam and reheat steam is supplied to the steam supply system. Since each of the components can be supplied as it is, stable high-pressure steam and reheated steam can be stably supplied to each of the steam supply systems even during a load operation even if there is a turbine trip command.
以下、本発明に係る再熱蒸気タービンプラントおよびその運転方法を図面および図面に付した符号を引用して説明する。 Hereinafter, a reheat steam turbine plant and an operation method thereof according to the present invention will be described with reference to the drawings and reference numerals attached to the drawings.
図1は、本発明に係る再熱蒸気タービンプラントの第1実施形態を示す概略系統図である。 FIG. 1 is a schematic system diagram showing a first embodiment of a reheat steam turbine plant according to the present invention.
本実施形態に係る再熱蒸気タービンプラントは、蒸気発生器22内に組み込まれた加熱器23および再熱器24、高圧タービン25、中圧タービン26、低圧タービン27、復水器28、給水ポンプ29を備え、蒸気発生器22の加熱器23で発生した蒸気のうち、一部を主蒸気止め弁30、蒸気加減弁31を備えた主蒸気系32を介して高圧タービン25に供給し、ここで膨張仕事をして動力を発生させた後、高圧タービン排気としてその一部を逆止弁33を備えた低温再熱蒸気系34を介して再熱器24に供給する。
The reheat steam turbine plant according to this embodiment includes a
また、主蒸気系33から分岐された残りの蒸気は、高圧バイパス弁35を備えた高圧タービンバイパス系36を介して低温再熱蒸気系34で高圧タービン25から排出される高圧タービン排気の一部と合流する。
The remaining steam branched from the
低温再熱蒸気系34で高圧タービンバイパス系36からの蒸気と合流した高圧タービン排気は、再熱器24で再熱され、再熱蒸気として一部が低圧バイパス弁37を備えた低圧タービンバイパス系38を介して復水器28に供給され、残りが再熱蒸気止め弁39、インターセプト弁40を備えた高温再熱蒸気系41を介して中圧タービン26にそれぞれ供給される。
The high-pressure turbine exhaust combined with the steam from the high-pressure
このような構成を備えて起動を開始する再熱蒸気タービンプラントは、中圧タービン26で高温再熱蒸気系41からの再熱蒸気に膨張仕事をさせて動力を発生させ、さらに低圧タービン27でも膨張仕事をさせて動力を発生させ、膨張仕事を終えた低圧タービン排気を復水器28で凝縮させて復水にし、その復水を給水ポンプ29で昇圧して給水にし、その給水を再び蒸気発生器22に戻している。
In the reheat steam turbine plant having such a configuration and starting to start, the
そして、起動運転が良好に行うことができるように、再熱蒸気タービンプラントでは、高圧タービン25の高圧タービン排気室または高圧タービン中間段落の抽気口から中圧タービン26の入口、例えばノズルボックスまたは中圧タービン中間段落の蒸気室に接続し、途中にベンチレータ弁42を介装させたベンチレータ系43を備えている。
In order to ensure good start-up operation, in the reheat steam turbine plant, the high-pressure turbine exhaust chamber of the high-pressure turbine 25 or the extraction port of the high-pressure turbine intermediate stage to the inlet of the intermediate-
このベンチレータ系43は、起動中、高圧タービン25を冷却するものであり、主蒸気系32から供給される蒸気の圧力が再熱器24から低圧タービンバイパス系38を流れる再熱蒸気の圧力よりも低く、低温再熱蒸気系34の逆止弁33が閉弁しているとき、ベンチレータ弁42を開弁させて中圧タービン26に蒸気を流し、高圧タービン25の回転中に発生する風損に伴う高圧タービン最終段落および高圧タービン排気室の過加熱を抑制するようになっている。
The
次に、本実施形態に係る再熱蒸気タービンプラントの運転方法を説明する。 Next, an operation method of the reheat steam turbine plant according to the present embodiment will be described.
図2は、縦軸にタービン回転数、タービン負荷、各種弁開度を示し、横軸に無次元化した時間を示す本実施形態に係る再熱蒸気タービンプラントの運転方法を説明するためのタイムチャートである。 FIG. 2 is a time for explaining the operation method of the reheat steam turbine plant according to the present embodiment, in which the vertical axis indicates the turbine rotation speed, the turbine load, and various valve openings, and the horizontal axis indicates the dimensionless time. It is a chart.
まず、起動運転開始時のT1において、ベンチレータ弁42は全開、蒸気加減弁31は全閉、インターセプト弁40は全閉、高圧タービン25の出口側で、低温再熱蒸気系34に設けた逆止弁33は全閉、高圧タービンバイパス系36の高圧バイパス弁35および低圧タービンバイパス系38の低圧バイパス弁37はともに蒸気量および再熱蒸気量の流量度合に応じて圧力制御できるように開閉制御される。
First, at T 1 at the start of start-up operation, the
なお、ここで主蒸気止め弁30および再熱蒸気止め弁39は、非常時のみ急速閉鎖させるだけのものであり、起動当初から全開させている。
Here, the main
時間がT1からT2のタービン昇速過程に入ると、再熱蒸気タービンプラントは、目標速度(定格回転数)に向って蒸気加減弁31の弁開閉制御の下、回転数制御を行いながらタービン回転数を上昇させる。
When the time enters the turbine speed increasing process of T 2 from T 1, the reheat steam turbine plant, under towards the target speed (rated speed) the valve opening and closing control of the
一方、高圧バイパス弁35および低圧バイパス弁37は、弁開度を徐々に絞る。このとき、蒸気発生器22の加熱器23から発生した蒸気は、より多く主蒸気系32の蒸気加減弁31を介して高圧タービン25に供給される。その後、時間T2になると、タービン回転数は定格に至り、以後、定速度制御に入る。
On the other hand, the high
時間T2からT3になるまでの間、再熱蒸気タービンプラントは、タービン負荷運転を開始し、タービン負荷が予め定められた負荷になるまで蒸気加減弁31を徐々に微開させ、この間、蒸気加減弁31による回転数制御が行われ、時間T3までに予め定められたタービン負荷(目標負荷)に至らしめる。
From time T 2 to T 3 , the reheat steam turbine plant starts turbine load operation and gradually opens the
時間T3になると、再熱蒸気タービンプラントは、タービン負荷運転を行いながら、蒸気発生器22の再熱器24から発生した再熱蒸気を高温再熱蒸気系41を介して中圧タービン26に供給する準備を開始する。
When the time becomes T 3, the reheat steam turbine plant, while the turbine load operation, the reheat steam generated from the
また、ベンチレータ弁42は、時間T3における全開位置から時間T6における全閉位置まで予め定められた閉弁速度レートに従って閉弁する。
Furthermore,
時間T3〜T4までの間に、再熱蒸気を用いた再熱蒸気運転が開始されるので、ベンチレータ弁42は、上述の閉弁速度レートに従って弁開度が絞られる。ベンチレータ弁42の弁開度が絞られるにつれて、中圧タービン26に供給される再熱蒸気は、流量減少になり、タービン負荷降下に陥る。このとき、再熱蒸気タービンプラントは、図示しない自動負荷調節装置(ALR)を作動させ、蒸気加減弁31の弁開度を増開させ、流入蒸気量を増加させ、上述のタービン負荷降下分を促すようにし、ALRによるタービン負荷一定制御から負荷増加制御に変更させる。
Since the reheat steam operation using the reheat steam is started between the times T 3 and T 4 , the
時間T4に至ると、再熱蒸気タービンプラントは、インターセプト弁40を開弁させるとともに、低圧タービンバイパスバイパス系38による圧力制御を終了させるため、低圧バイパス弁37を閉弁させる。
Reaches the time T 4, the reheat steam turbine plant, with to open the
時間T4〜T5までの間に、再熱蒸気タービンプラントは、図示しないタービン制御装置からタービン負荷要求信号に従ってインターセプト弁40を開弁させ、蒸気発生器22の再熱器24から発生する再熱蒸気を中圧タービン26に供給する。
Between times T 4 and T 5 , the reheat steam turbine plant opens the
ここで、中圧タービン26に供給される再熱蒸気の流量は、ベンチレータ弁42が閉弁することによって減少する流量と、インターセプト弁40が開弁して増加する流量とが同一、またはタービン負荷要求に応じてそれ以上になるようにしている。すなわち、タービン負荷の降下がないように、ベンチレータ弁42とインターセプト弁40との弁開度は連動関係を持たせ、協調制御を行わせている。
Here, the flow rate of the reheat steam supplied to the
ベンチレータ弁42とインターセプト弁40との弁開度を連動させている間、再熱蒸気タービンプラントは、蒸気加減弁31とインターセプト弁40に回転数制御を行わせ、タービン負荷を上昇させる。
While the valve openings of the
このとき、低圧バイパス弁37は、既に全閉し、再熱器24から出る再熱蒸気の圧力制御を解除している。
At this time, the low-
このような運転状況のときに、再熱蒸気タービンプラントはインターセプト弁40を開弁させると、中圧タービン26に供給されている再熱蒸気量が増加するものの、再熱器24から出る再熱蒸気の圧力が急激に低下し、運転上支障を来す。
In such an operating situation, when the reheat steam turbine plant opens the
すなわち、再熱蒸気の圧力低下は、再熱蒸気の相変化、つまり乾き蒸気から湿り蒸気に変化させるため、中圧タービン26も含めて中圧タービン26以降の低圧タービン27、復水器28の性能低下の要因になる。
That is, the pressure drop of the reheat steam changes the phase of the reheat steam, that is, changes from dry steam to wet steam, so that the
このため、インターセプト弁40には、入口蒸気圧力制御装置(IPC)が設けられ、この入口蒸気圧力制御装置(IPC)の作動によってタービン回転数の突変、タービン負荷変動等の不安定運転に対して中圧タービン26に供給される再熱蒸気の圧力をすぐさま回復させて安定供給ができるようになっている。
Therefore, the
時間T5〜T6までの間に、再熱蒸気タービンプラントは、再熱器24から出る再熱蒸気の全量を中圧タービン26に供給しており、タービン負荷の増減要求に対し、蒸気加減弁31の開閉制御によって対応させている。
Between times T 5 and T 6 , the reheat steam turbine plant supplies all the reheat steam from the
一方、ベンチレータ系43のベンチレータ弁42は、閉弁動作を続け、この間、中圧タービン26への蒸気の供給を徐々に減少させる。ベンチレータ弁42が全閉の直前になると、再熱蒸気タービンプラントは、低温再熱蒸気系34に設けていた逆止弁33の弁前後の圧力がバランスし、やがて弁前圧力が上廻ってくると、逆止弁33が急開する。
On the other hand, the
その後、ベンチレータ弁42が全閉し、時間T6以後になると、再熱蒸気タービンプラントは、中圧タービン26に負荷上昇させるとともに、高圧タービンバイパス系36の高圧バイパス弁35を全閉させる。
Thereafter, it closed
このように、本実施形態に係る再熱蒸気タービンプラントおよびその運転方法は、高圧タービン25の出口側で、低温再熱蒸気系34に設けた逆止弁33の上流側から分岐し、途中にベンチレータ弁42を備えたベンチレータ系43を中圧タービン26に接続させ、起動運転の際、高圧タービン25からの高圧タービン排気をベンチレータ系43を介して、直接、中圧タービン26に供給し、高圧タービン25のタービン内を冷却させている間に再熱蒸気の圧力、温度を高めてインターセプト弁40を開弁させているので、中圧タービンに安定した再熱蒸気を供給することができ、起動時間を短縮させることができる。
As described above, the reheat steam turbine plant and the operation method thereof according to the present embodiment branch from the upstream side of the
図3は、本発明に係る再熱蒸気タービンプラントの第2実施形態を示す概略系統図である。 FIG. 3 is a schematic system diagram showing a second embodiment of the reheat steam turbine plant according to the present invention.
本実施形態に係る再熱蒸気タービンプラントは、主蒸気系32の高圧タービンバイパス系35の分岐点と主蒸気止め弁30との間から分岐する、例えば、工場内のプロセス蒸気供給系44(以下、第1のプロセス蒸気供給系)を設けるとともに、高温再熱蒸気系41の低圧タービンバイパス系38の分岐点と再熱蒸気止め弁39との間から分岐する、例えば、コジェネレーション用の熱供給系45(以下、第2のプロセス蒸気供給系)を設けたものである。なお、他の構成要素は、第1実施形態の構成要素と同一なので、第1実施形態で用いた符号と同一符号を用い、ここでは重複説明を省略する。
The reheat steam turbine plant according to the present embodiment branches from between a branch point of the high-pressure
このような構成を備えた再熱蒸気タービンプラントは、表2に示すように、定格運転時に加熱器23から発生する蒸気圧力とタービントリップ等のタービン停止状態からの再起動運転に高圧バイパス弁35の設定圧力とが同一圧力に維持されており、また、定格負荷運転に再熱器24から発生する再熱蒸気圧力とタービントリップ等のタービン停止状態からの再起動運転に、低圧バイパス弁37の設定圧力とが同一圧力に維持されている。
したがって、第2実施形態は、高圧バイパス弁35の設定圧力および低圧バイパス弁37の設定圧力をともに高く設定させており、負荷運転中、例えばタービントリップ指令があっても加熱器23や再熱器24から出る蒸気および再熱蒸気の圧力が高くなっているので、そのまま第1のプロセス蒸気供給系44および第2のプロセス蒸気供給系45のうち、少なくともいずれか一方に供給することができ、安定した主蒸気および再熱蒸気のそれぞれを供給することができる。
Therefore, in the second embodiment, both the set pressure of the high-
なお、表2に示す蒸気条件から、再び再起動する場合、図2に示したタイムチャートに従い、再起動を開始すればよい。この場合、既に、高圧バイパス弁35および低圧バイパス弁37は、圧力制御中であるものの、閉弁中なので、図2に示したタイムチャート上、蒸気加減弁31、ベンチレータ弁42、インターセプト弁40のみの弁開閉動作に注目すればよい。この結果、蒸気タービン側は、定格の蒸気条件からの起動が可能となる。
In addition, what is necessary is just to start restart according to the time chart shown in FIG. 2, when restarting again from the steam conditions shown in Table 2. In this case, although the high-
1 蒸気発生器
2 加熱器
3 再熱器
4 高圧タービン
5 中圧タービン
6 低圧タービン
7 復水器
8 給水ポンプ
9 主蒸気止め弁
10 蒸気加減弁
11 主蒸気系
12 逆止弁
13 低温再熱蒸気系
14 高圧バイパス弁
15 高圧タービンバイパス系
16 ベンチレータ弁
17 ベンチレータ系
18 低圧バイパス弁
19 低圧タービンバイパス
20 再熱蒸気止め弁
21 インターセプト弁
22 蒸気発生器
23 加熱器
24 再熱器
25 高圧タービン
26 中圧タービン
27 低圧タービン
28 復水器
29 給水ポンプ
30 主蒸気止め弁
31 蒸気加減弁
32 主蒸気系
33 逆止弁
34 低温再熱蒸気系
35 高圧バイパス弁
36 高圧タービンバイパス系
37 低圧バイパス弁
38 低圧タービンバイパス系
39 再熱蒸気止め弁
40 インターセプト弁
41 高温再熱蒸気系
42 ベンチレータ弁
43 ベンチレータ系
44 第1のプロセス蒸気供給系
45 第2のプロセス蒸気供給系
DESCRIPTION OF SYMBOLS 1 Steam generator 2 Heater 3 Reheater 4 High pressure turbine 5 Medium pressure turbine 6 Low pressure turbine 7 Condenser 8
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003403643A JP4503995B2 (en) | 2003-12-02 | 2003-12-02 | Reheat steam turbine plant and operation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003403643A JP4503995B2 (en) | 2003-12-02 | 2003-12-02 | Reheat steam turbine plant and operation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005163628A JP2005163628A (en) | 2005-06-23 |
JP4503995B2 true JP4503995B2 (en) | 2010-07-14 |
Family
ID=34726895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003403643A Expired - Lifetime JP4503995B2 (en) | 2003-12-02 | 2003-12-02 | Reheat steam turbine plant and operation method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4503995B2 (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100473805C (en) * | 2007-06-11 | 2009-04-01 | 上海外高桥第三发电有限责任公司 | Electric generating set small side road system and control method thereof |
US20090158738A1 (en) * | 2007-12-20 | 2009-06-25 | Tailai Hu | Methods and apparatus for starting up combined cycle power system |
JP2010242673A (en) * | 2009-04-08 | 2010-10-28 | Toshiba Corp | Steam turbine system and method for operating the same |
US8528314B2 (en) * | 2010-02-02 | 2013-09-10 | General Electric Company | Method and apparatus for combined cycle power plant startup |
JP5727951B2 (en) * | 2011-04-20 | 2015-06-03 | 新日鐵住金株式会社 | Steam supply system and method for controlling steam supply system |
JP5792087B2 (en) * | 2011-04-20 | 2015-10-07 | 新日鐵住金株式会社 | Steam supply system and control method thereof |
JP5872821B2 (en) * | 2011-08-26 | 2016-03-01 | 三菱Fbrシステムズ株式会社 | Steam reheating system for power plant |
PL2597275T3 (en) * | 2011-11-22 | 2016-12-30 | Steam turbine plant for district heating applications | |
JP6264128B2 (en) | 2014-03-20 | 2018-01-24 | 三菱日立パワーシステムズ株式会社 | Combined cycle plant, control method thereof, and control device thereof |
JP6603526B2 (en) * | 2015-09-18 | 2019-11-06 | 株式会社東芝 | Steam turbine equipment and operation method of steam turbine equipment |
CN106401658A (en) * | 2016-06-22 | 2017-02-15 | 西安热工研究院有限公司 | Wide steam turbine system and operating method |
CN111042879B (en) * | 2018-10-12 | 2024-04-12 | 上海明华电力科技有限公司 | High-load high-efficiency turbine unit with high and medium pressure cylinders cut off by separate cylinders |
CN112412557B (en) * | 2020-11-09 | 2022-09-06 | 大庆石油管理局有限公司 | Steam turbine high-side flexible heat supply system with auxiliary frequency modulation function |
CN112832879A (en) * | 2020-12-28 | 2021-05-25 | 东方电气集团东方汽轮机有限公司 | Steam turbine power generation system capable of switching high-pressure cylinder |
CN114941552B (en) * | 2022-05-13 | 2023-05-23 | 华电电力科学研究院有限公司 | Large supercritical reheating type double-pumping back pressure unit-based rapid switching control method for heat supply without stopping furnace when shutdown |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52143305A (en) * | 1976-05-26 | 1977-11-29 | Hitachi Ltd | Turbine bypass operation method and its system |
-
2003
- 2003-12-02 JP JP2003403643A patent/JP4503995B2/en not_active Expired - Lifetime
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52143305A (en) * | 1976-05-26 | 1977-11-29 | Hitachi Ltd | Turbine bypass operation method and its system |
Also Published As
Publication number | Publication date |
---|---|
JP2005163628A (en) | 2005-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3481983B2 (en) | How to start a steam turbine | |
JP3913328B2 (en) | Operation method of combined cycle power plant and combined cycle power plant | |
JP4503995B2 (en) | Reheat steam turbine plant and operation method thereof | |
JP3800384B2 (en) | Combined power generation equipment | |
JPH06264763A (en) | Combined plant system | |
JP2010261389A (en) | Single shaft combined cycle power plant start-up method an single shaft combined cycle power plant | |
JP3694530B2 (en) | Single-shaft combined cycle plant and operation method thereof | |
US8387388B2 (en) | Turbine blade | |
US5435138A (en) | Reduction in turbine/boiler thermal stress during bypass operation | |
JPH05163960A (en) | Combined cycle power generation plant | |
JP2012167571A (en) | Uniaxial combined cycle power generation plant, and method of operating the same | |
JP2015183536A (en) | Combined cycle plant, its controlling method and its control device | |
JP2010242673A (en) | Steam turbine system and method for operating the same | |
JPH0763010A (en) | Starting method for single type combined cycle power generating facility | |
JPS5925853B2 (en) | Power plant operation control method and device for implementing this method | |
JP2004245184A (en) | Reheat steam turbine plant and starting method for the plant | |
JPH08338205A (en) | Combined cycle, electric power plant | |
JPH10311206A (en) | Combined cycle power generation plant | |
JPH09303113A (en) | Combined cycle generating plant | |
JP2001280103A (en) | Turbine equipment | |
JPH02259301A (en) | Waste heat recovery boiler | |
JP2005344528A (en) | Combined cycle power generating plant and method for starting the same | |
JP2003343213A (en) | Combined plant constructed with closed steam cooling gas turbine | |
JP2019173697A (en) | Combined cycle power generation plant and operation method of the same | |
JP2019173696A (en) | Combined cycle power generation plant, and operation method of the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20061016 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090831 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090908 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091008 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100330 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100422 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 4503995 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130430 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140430 Year of fee payment: 4 |
|
EXPY | Cancellation because of completion of term |