JP4367138B2 - How to create a new station square - Google Patents

How to create a new station square Download PDF

Info

Publication number
JP4367138B2
JP4367138B2 JP2004013969A JP2004013969A JP4367138B2 JP 4367138 B2 JP4367138 B2 JP 4367138B2 JP 2004013969 A JP2004013969 A JP 2004013969A JP 2004013969 A JP2004013969 A JP 2004013969A JP 4367138 B2 JP4367138 B2 JP 4367138B2
Authority
JP
Japan
Prior art keywords
station
square
building
traffic
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004013969A
Other languages
Japanese (ja)
Other versions
JP2005207087A (en
JP2005207087A5 (en
Inventor
孝幸 久保田
哲 甲斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2004013969A priority Critical patent/JP4367138B2/en
Publication of JP2005207087A publication Critical patent/JP2005207087A/en
Publication of JP2005207087A5 publication Critical patent/JP2005207087A5/ja
Application granted granted Critical
Publication of JP4367138B2 publication Critical patent/JP4367138B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Description

本発明は、駅前交通広場に関し、特に敷地を確保する上で用地買収手段を最小限とすることのできるものに係るものである。   The present invention relates to a traffic square in front of a station, and particularly relates to one capable of minimizing land acquisition means in securing a site.

既存の密集市街地の中にある鉄道駅においては、市街地の成長とともに、徒歩圏のみでなく、徒歩圏外からの利用者の増加に伴い、バス、タクシーなどの公共交通機関、あるいはマイカーなどの乗り入れによるアプローチが必要となっており、駅前交通広場が必要となっている。   At the railway station in the existing crowded urban area, along with the growth of the urban area, not only the walking area but also the increase in the number of users from outside the walking area, due to the use of public transportation such as buses, taxis, or private cars An approach is needed, and a station square is needed.

ところで、既存の駅ではそのような大規模な敷地が十分に確保されているとは限らず、駅前交通広場を新設する場合には、再開発や、土地区画整理などのプランを駅前の土地権利者に提示した上で地権者を一人一人説得することによって、敷地を確保するのが通常の駅前再開発の手法である。   By the way, such large-scale sites are not always secured at existing stations, and when a new station square is constructed, plans such as redevelopment and land readjustment can be made. The usual redevelopment technique in front of the station is to secure the site by persuading the landowners one by one after presenting them.

しかしながら、一般に、このような駅前広場を構築するには、大規模な敷地を確保しなければならない反面、駅周辺にはすでに数多くの土地権利者が存在し、また駅周辺は繁華街であるのが一般的であることから、飲食や物販などの営業をしているなど、個々人の事情なども複雑に絡み合っているため、その権利調整には非常に長い期間と費用を費やさなければならない。   However, in general, in order to build such a station square, it is necessary to secure a large site, but there are already many land owners around the station, and the area around the station is a downtown area. Therefore, it is necessary to spend a very long period of time and money on the right adjustment because the circumstances of each individual are intricately intertwined.

このため、駅前交通広場の実現にはかなりの時間を要し、その間、駅利用者は不便な状況を我慢しなければならなかった。また、工事が始まった場合には、工事区域を迂回した通路をとらざるを得ず施工者にとっても利用者にとっても不便を強いられるものとなっていた。   For this reason, it took a considerable amount of time to realize the station square in front of the station. In addition, when construction begins, it is necessary to take a path that bypasses the construction area, which is inconvenient for both the installer and the user.

本発明は、以上の課題を解決するもので、駅前交通広場を新設する上で、鉄道敷地の上部空間を有効に活用することにより、用地買収を最小にできるようにした駅前交通広場を新設する方法を提供するものである。 The present invention solves the above-mentioned problems, and newly establishes a station square traffic square that minimizes the acquisition of land by effectively utilizing the upper space of the railway site when establishing a station square square . A method is provided .

本発明に係る駅前交通広場を新設する方法は、
鉄道敷地上に設けられた鉄道レールをまたいで構築された高架状の駅舎と、
前記駅舎前に面して構築された自由通路である連絡橋と、
前記連絡橋に到達する、前記鉄道敷地の両側または片側から前記駅舎に到達する階段またはエスカレータないしはエレベータ等の昇降機構と、
前記鉄道レールと交叉する一般道路と、
が配置された既存の区画に、駅前交通広場を新設する方法であって、
駅利用者が前記階段または前記昇降機構を通じて前記駅舎前にアプローチできる状態で、前記階段または前記昇降機構とは反対側の位置において一端が前記連絡橋に接続し、他端が前記一般道路に接続する連絡道路を新設し、
駅利用者が前記階段または前記昇降機構を通じて前記駅舎前にアプローチできる状態で、前記連絡道路の前記一端及び前記連絡橋と同一レベルの高架デッキを前記鉄道敷地上に新設し、
前記高架状の駅舎の前に駅前交通広場を設けることを特徴とする。
また、前記連絡道路は、スロープ状であることが好ましい。
The method of newly establishing a station square traffic square according to the present invention is as follows.
An elevated station building built across the railroad rails on the railway site;
A connecting bridge that is a free passage constructed facing the station building,
Elevating mechanism such as stairs or escalators or elevators reaching the station building from both sides or one side of the railway site, reaching the connecting bridge;
A general road intersecting with the railroad rail,
Is a new method of building a station square in the existing area where
In a state where the station user can approach the station building through the stairs or the lifting mechanism, one end is connected to the connecting bridge at the position opposite to the stairs or the lifting mechanism, and the other end is connected to the general road. A new connecting road
In a state where a station user can approach the station building through the stairs or the lifting mechanism, an elevated deck at the same level as the one end of the connecting road and the connecting bridge is newly installed on the railway site,
A traffic square in front of the station is provided in front of the elevated station building.
Moreover, it is preferable that the said connecting road is slope shape.

前記駅前交通広場は、前記駅舎と平面的に連接し同一の床レベルであることが好ましい It is preferable that the station square is connected to the station building in a plane and has the same floor level .

また、前記駅前交通広場は、前記駅舎側の歩行者用通路と、車両用通路とに区画されていることが好ましい。The station square is preferably divided into a pedestrian passage and a vehicle passage on the station building side.
また、前記駅前交通広場または前記連絡道路の下方空間を駐輪場または防災備蓄庫とすることが好ましい。  The space in front of the station square or the connecting road is preferably a bicycle parking lot or a disaster prevention storage.

本発明では、交通広場を構成する敷地の大部分が鉄道敷地上に構築した人工地盤となる。また、本発明では、工事期間中は利用者の既存駅舎へのアプローチは従前と変わらず、工事に伴う迂回などを伴わない利点がある。   In the present invention, most of the site constituting the traffic plaza is the artificial ground constructed on the railway site. In the present invention, the user's approach to the existing station building is the same as before, and there is an advantage that there is no detour associated with the construction.

以下、本発明を実施するための最良の形態につき添付図面を参照して詳細に説明する。図1は本発明の施工手順を示す。同図(a)は施工前の駅及びその周辺を示し、現況では平行設置された複々線鉄道レール1aが敷設された鉄道敷地1をまたいで高架状の駅舎2がレール1と直交ないしは交差して構築され、かつ鉄道敷地1の両側には駅舎2前に面して構築された自由通路である連絡橋3に到達する階段4が設けられており、駅舎2の下部に設けた二本のプラットホーム5に図示しない連絡階段を通じて接続している。   The best mode for carrying out the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 shows the construction procedure of the present invention. The figure (a) shows the station before construction and its surroundings. In the present situation, the elevated station building 2 crosses the rail 1 at right angles or crosses the railway site 1 where the multi-rail rails 1a installed in parallel are laid. On both sides of the railway site 1, there are stairs 4 that reach the connecting bridge 3, which is a free passage built in front of the station building 2, and two platforms provided at the lower part of the station building 2. 5 is connected through a communication staircase (not shown).

現況においては、この駅の両側周辺の広場6はかなり狭隘となっており、鉄道敷地1を囲んで多数の店舗ビルが取り囲んでいる状態となっているほか、前記階段4の架設位置とは反対方向において鉄道敷地1と交叉して市街地各部に連絡する幹線道路7(地上の一般道路)が配置された区画となっているものと想定しており、これらは大都市圏に通ずる発展型の地方都市によくみられる光景である。なお、同図では、幹線道路7は、踏切によって鉄道レール1aと交差しているが、鉄道レール1aを跨ぐ橋、鉄道レール1aをくぐる地下道のいずれであってもよい。   In the present situation, the square 6 on both sides of this station is quite narrow, and is surrounded by a large number of store buildings surrounding the railway site 1 and is opposite to the construction position of the stairs 4. It is assumed that it is a section where main roads 7 (general roads on the ground) crossing the railway site 1 in the direction and connecting to each part of the city are arranged. This is a scene often seen in cities. In the figure, the main road 7 intersects with the rail 1a by a railroad crossing, but may be either a bridge over the rail 1a or an underpass that passes through the rail 1a.

この状態から、工事を始めるには、まず(b)に示すように、前記階段4とは反対側の位置において一端が前記連絡橋3と同一レベルであって、他端が前記幹線道路7に接続するスロープ状の一対の連絡道路8を鉄道敷地1の両側部に沿って構築する。なお、この用地が鉄道敷地以外の敷地である場合には、この分の用地買収は不可欠であるが、比較的細長い敷地であるため、従来に比べ、用地買収に係る手間及び費用は著しく軽減することができる。また、幹線道路7が鉄道レール1aを跨ぐ跨線橋である場合には、連絡道路8はスロープ状とする必要がないことは勿論である。   In order to start construction from this state, first, as shown in (b), one end is at the same level as the connecting bridge 3 at the opposite side of the stairs 4 and the other end is connected to the main road 7. A pair of connecting roads 8 in the form of slopes are constructed along both sides of the railway site 1. In addition, if this site is a site other than the railway site, it is indispensable to purchase this site, but since it is a relatively long site, the labor and costs related to the site acquisition will be significantly reduced compared to the past. be able to. Of course, when the main road 7 is a bridge over the railway rail 1a, the connecting road 8 does not need to have a slope shape.

連絡道路8の構築後は、(c)に示すように、連絡道路8及び連絡橋3と同一レベルの免震性高架デッキ9を鉄道敷地1上に順次展開しつつ構築し、(d)に示すように、鉄道敷地1内にあって、例えば駅舎2から略半円形に突出する形で人工地盤からなる駅前交通広場10が完成する。   After construction of the connecting road 8, as shown in (c), the seismic isolation elevated deck 9 of the same level as the connecting road 8 and the connecting bridge 3 is built on the railway site 1 in sequence, As shown, a station square in front of a station 10 is completed which is in the railway site 1 and is made of artificial ground so as to protrude from the station building 2 in a substantially semicircular shape.

なお,各工事中における養生箇所はプラットホーム5および鉄道敷地1の上部のみであり、駅利用者は迂回路を通ることなく従前と同様に、階段4を通じて駅前にアプローチできる。   In addition, only the upper part of the platform 5 and the railway site 1 is used for curing during each construction, and the station user can approach the station through the stairs 4 as before without passing through the detour.

駅前交通広場10の完成後は、連絡橋3との垣根を取り去り、駅舎2側の中央がへこんだ部分を歩道たる自由通路11とし、連絡道路8に両側を連通する側をほぼ円盤状のモータープール12とする車道に分離する。これにより、駅舎2の全幅に渡って駅舎2の前方側に自由通路11が開けることになる。   After completion of the station square 10, the barrier with the connecting bridge 3 is removed, the indented part of the center of the station building 2 is used as a free passage 11 as a sidewalk, and the side that connects both sides to the connecting road 8 is a substantially disk-shaped motor. The road is separated into a pool 12. As a result, the free passage 11 is opened on the front side of the station building 2 over the entire width of the station building 2.

その後は、図2に示すようにモータープール12の縁に沿って植裁用の垣根14を形成し、またモータープル12の中央部分には交通整理用の分離帯15を構築し、それぞれに植裁を施すことにより、全工事を完了し、その後連絡道路8を幹線道路7側に連通させることにより広場10と幹線道路7とが往来自由となる。   After that, as shown in FIG. 2, a hedge 14 for planting is formed along the edge of the motor pool 12, and a separation zone 15 for traffic control is constructed in the central portion of the motor pull 12, and planted in each. By performing the decision, all the construction work is completed, and then the communication road 8 is connected to the main road 7 side, so that the plaza 10 and the main road 7 can freely come and go.

また、完成した状態では自由通路11の中央部分のへこみに沿った部分はバスの停車場としてバス停などに利用でき、またモータープール12の半円形に突出する部分はタクシープールなどに利用できる。   In the completed state, the portion along the recess of the central portion of the free passage 11 can be used as a bus stop for a bus stop or the like, and the portion of the motor pool 12 protruding in a semicircle can be used for a taxi pool or the like.

なお、図では、連絡道路8を二車線道路としているが、鉄道敷地1そのものの面積が小さく、駅前交通広場10の面積が小さい場合には、双方とも単線道路とし、その一方を駅交通前広場10に対するアプローチ用道路とし、他方を駅前交通広場10からのエスケープ用道路とするなどの交通規制を取り決めておくことにより、スムーズな交通を行うことができる。いずれも利用者は駅舎2とバス停はあるいはタクシー乗り場とが直結し、幹線道路7を通じて移動可能であるため、アプローチが格段に便利なものとなり、高齢者や障害者にとって、よりやさしいバリアフリーな環境となる。   In the figure, the connecting road 8 is a two-lane road. However, when the area of the railway site 1 itself is small and the area of the traffic square 10 in front of the station is small, both roads are single roads, and one of them is the station traffic square. Smooth traffic can be performed by arranging traffic regulations such as the road for approaching 10 and the other road for escaping from the station square. In both cases, the station building 2 and the bus stop or taxi stand are directly connected and can be moved through the main road 7, making the approach much more convenient and a more barrier-free environment for the elderly and the disabled. It becomes.

ところで、従来の駅舎においては、鉄道レールと直交ないしは交差して連絡橋が配置され、鉄道レールの両側または片側に駅舎が配置されていることが多いため、電車からホームに降りた乗客は、階段を昇った後、連絡橋にて進行方向を90度変更して鉄道レールの片側に向かい、さらに進行方向を90度変更して階段を降りるという動作が必須であった。この場合、動線が錯雑となり、逆方向に進行する客もいることからさらに錯雑となることは自明であった。   By the way, in conventional station buildings, connecting bridges are arranged orthogonally or intersecting with railroad rails, and station buildings are often arranged on both sides or one side of railroad rails. After climbing up, it was necessary to change the direction of travel by 90 degrees at the connecting bridge, head toward one side of the rail, and further change the direction of travel by 90 degrees and go down the stairs. In this case, it was obvious that the flow line became more complicated, and there were some customers traveling in the opposite direction, which made it more complicated.

これに対し、本実施例によれば、ホームから階段を昇った乗客は、進行方向を変更することなく、真っ直ぐに進めば駅前交通広場10に出られるので、動線が錯雑とすることはない。   On the other hand, according to the present embodiment, the passenger who has climbed the stairs from the platform can go straight to the station square 10 without changing the direction of travel, so that the traffic line is not complicated. .

図3は同駅前交通広場10の断面図、図4は同斜視図を示すものである。同図において、連絡道路8及び駅前交通広場10の下部には空間16が形成されることから、この空間を全面的に利用して公共駐輪場を構築できる。この駐輪場は最も高い位置で図3に示すごとく3階建とし、スロープに応じて2階、1階とすることで、駅の下部周囲を全て駐輪場にすることができ、駐輪台数を十分に確保でき、駅前繁華街の固有の問題である違法駐輪などに十分に対処できることになる。なお、駐輪場に代えて又はこれと併設して防災備蓄庫を設けることもできる。   FIG. 3 is a sectional view of the station square 10 and FIG. 4 is a perspective view thereof. In the figure, since a space 16 is formed in the lower part of the connecting road 8 and the station square in front of the station 10, a public bicycle parking lot can be constructed by using this space entirely. This bicycle parking lot is at the highest position and has a three-story structure as shown in Fig. 3. By setting the second floor and the first floor according to the slope, the entire area around the lower part of the station can be turned into a bicycle parking lot. It can be secured, and it can sufficiently cope with illegal parking, which is an inherent problem in the downtown area of the station. In addition, it can replace with a bicycle parking lot, or can also install a disaster prevention storage warehouse with this.

さらに、広大な駅前交通広場10ができることから、この広場10に対する降雨などは単に排水することなく、雨水貯留機能をもたらせ、この水をパッシブ制震装置として利用したり、駅内のトイレ用水などの中水道としても利用できる。   Furthermore, since a vast station square 10 can be created, it is possible to provide rainwater storage function without draining the rain on the square 10 and use this water as a passive vibration control device, or toilet water in the station. It can also be used as a middle water supply.

なお、本実施形態では、駅舎2の改良工事は省略したが、この改良工事、あるいはデッキ上に跨がる駅ビルや公園などの施工も可能であり、交通広場施工後の拡張性はきわめて高いものとなる。   In this embodiment, the improvement work of the station building 2 is omitted, but this improvement work or construction of a station building or a park over the deck is also possible, and the expandability after construction of the traffic plaza is extremely high. It will be a thing.

(a)〜(d)は本発明の施工手順を示す平面図である。(A)-(d) is a top view which shows the construction procedure of this invention. 完成状態を示す平面図である。It is a top view which shows a completion state. 図2のA−A線における正断面説明図である。It is front sectional explanatory drawing in the AA of FIG. 同完成状態における斜視図である。It is a perspective view in the same completion state.

符号の説明Explanation of symbols

1 鉄道敷地
1a 鉄道レール
2 駅舎
3 連絡橋
4 階段
5 プラットホーム
7 幹線道路
8 連絡道路
9 高架デッキ
10 駅前交通広場(人工地盤)
11 自由通路
12 モータープール
16 下部空間(駐輪場)
1 Railroad site 1a Railroad rail 2 Station building 3 Connecting bridge 4 Stairs 5 Platform 7 Main road 8 Connecting road 9 Elevated deck 10 Traffic square in front of station (artificial ground)
11 Free passage 12 Motor pool 16 Lower space (bicycle parking)

Claims (5)

鉄道敷地上に設けられた鉄道レールをまたいで構築された高架状の駅舎と、
前記駅舎前に面して構築された自由通路である連絡橋と、
前記連絡橋に到達する、前記鉄道敷地の両側または片側から前記駅舎に到達する階段またはエスカレータないしはエレベータ等の昇降機構と、
前記鉄道レールと交叉する一般道路と、
が配置された既存の区画に、駅前交通広場を新設する方法であって、
駅利用者が前記階段または前記昇降機構を通じて前記駅舎前にアプローチできる状態で、前記階段または前記昇降機構とは反対側の位置において一端が前記連絡橋に接続し、他端が前記一般道路に接続する連絡道路を新設し、
駅利用者が前記階段または前記昇降機構を通じて前記駅舎前にアプローチできる状態で、前記連絡道路の前記一端及び前記連絡橋と同一レベルの高架デッキを前記鉄道敷地上に新設し、
前記高架状の駅舎の前に駅前交通広場を設けることを特徴とする、駅前交通広場を新設する方法。
An elevated station building built across the railroad rails on the railway site;
A connecting bridge that is a free passage constructed facing the station building,
Elevating mechanism such as stairs or escalators or elevators reaching the station building from both sides or one side of the railway site, reaching the connecting bridge;
A general road intersecting with the railroad rail,
Is a new method of building a station square in the existing area where
In a state where the station user can approach the station building through the stairs or the lifting mechanism, one end is connected to the connecting bridge at the position opposite to the stairs or the lifting mechanism, and the other end is connected to the general road. A new connecting road
In a state where a station user can approach the station building through the stairs or the lifting mechanism, an elevated deck at the same level as the one end of the connecting road and the connecting bridge is newly installed on the railway site,
A method for newly establishing a station square traffic square, comprising providing a station square traffic square in front of the elevated station building.
前記連絡道路は、スロープ状であることを特徴とする請求項1に記載の、駅前交通広場を新設する方法。     The method for newly establishing a station square traffic square according to claim 1, wherein the connecting road has a slope shape. 前記駅前交通広場は、前記駅舎と平面的に連接し同一の床レベルであることを特徴とする請求項1又は請求項2に記載の、駅前交通広場を新設する方法。     The method according to claim 1 or 2, wherein the station square traffic square is connected to the station building in a planar manner and has the same floor level. 前記駅前交通広場は、前記駅舎側の歩行者用通路と、車両用通路とに区画されていることを特徴とする請求項1〜3のいずれか1項に記載の、駅前交通広場を新設する方法。   The said station square traffic plaza is divided into the passage for pedestrians by the side of the said station building, and the channel | path for vehicles, The newly established station square traffic plaza of any one of Claims 1-3 characterized by the above-mentioned. Method. 前記駅前交通広場または前記連絡道路の下方空間を駐輪場または防災備蓄庫とすることを特徴とする請求項1〜4のいずれか1項に記載の、駅前交通広場を新設する方法。   The method for newly establishing a station square traffic square according to any one of claims 1 to 4, wherein a space below the station square or the connecting road is used as a bicycle parking lot or a disaster prevention storage.
JP2004013969A 2004-01-22 2004-01-22 How to create a new station square Expired - Fee Related JP4367138B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004013969A JP4367138B2 (en) 2004-01-22 2004-01-22 How to create a new station square

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004013969A JP4367138B2 (en) 2004-01-22 2004-01-22 How to create a new station square

Publications (3)

Publication Number Publication Date
JP2005207087A JP2005207087A (en) 2005-08-04
JP2005207087A5 JP2005207087A5 (en) 2006-01-05
JP4367138B2 true JP4367138B2 (en) 2009-11-18

Family

ID=34899889

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004013969A Expired - Fee Related JP4367138B2 (en) 2004-01-22 2004-01-22 How to create a new station square

Country Status (1)

Country Link
JP (1) JP4367138B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442757A (en) * 2018-04-27 2018-08-24 中铁第四勘察设计院集团有限公司 A kind of depot of urban railway transit vehicles structure of combination alpine terrain
CN109519001B (en) * 2019-01-04 2023-02-17 江苏中设集团股份有限公司 Urban comprehensive passenger transport hub combined security inspection system
JP7299446B2 (en) * 2020-03-18 2023-06-28 Mhiエンジニアリング株式会社 Track-based transportation system and construction method for track-based transportation system
CN113802917B (en) * 2021-09-27 2023-03-10 杭州中联筑境建筑设计有限公司 Three-dimensional composite building structure in front of railway passenger station

Also Published As

Publication number Publication date
JP2005207087A (en) 2005-08-04

Similar Documents

Publication Publication Date Title
AU2006317502B2 (en) Traffic control intersection
WO2005031069A1 (en) A full interchange urban road system and the traffic method of using it
US20140205376A1 (en) Strategic subterranean underpass and method
EP1325192A1 (en) Multi-layer road system
WO2006060950A1 (en) A road traffic facility and a construction method therefor
JPH04336102A (en) Intersection structure separating sidewalk and driveway above and under
JP4367138B2 (en) How to create a new station square
CN104895396A (en) First-tower skyscraping diagonal-tensile upright grid urban sky railway
RU108046U1 (en) NETWORK OF TRANSPORT HIGHWAYS FOR LARGE CITIES AND THEIR SUBURBS
CN1834352B (en) City system having man and vehicles fully separated
US11434610B2 (en) Urban transportation and logistics system
RU2379404C2 (en) Building complex
RU2286416C2 (en) Pedestrian, traffic and railroad flow divider assembly installed at motor-road and railroad crossing
RU2286417C2 (en) Divider assembly for traffic and pedestrian flow division at road crossing
KR20080006066U (en) The structure of a main track and platform in monorail
JP2000290907A (en) Bicycle traffic system
KR100202458B1 (en) Sestem and block for bicycle road
CN219430496U (en) Assembled overpass road structure
Design et al. In this chapter
JP3176909U (en) A network of roads for big cities and their suburbs
JP2815056B2 (en) Sky Pavement
RU2078169C1 (en) Construction of pedestrian crossing overpass
JP2006214172A (en) Roofed outdoor parking lot
Pandit et al. Bicycle Tracks
Wallace-Hadrill 11 How open was the Roman city?

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051115

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080616

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080624

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080808

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090217

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090409

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090804

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090817

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120904

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120904

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120904

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120904

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130904

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130904

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140904

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees