CN108442757A - A kind of depot of urban railway transit vehicles structure of combination alpine terrain - Google Patents

A kind of depot of urban railway transit vehicles structure of combination alpine terrain Download PDF

Info

Publication number
CN108442757A
CN108442757A CN201810394888.XA CN201810394888A CN108442757A CN 108442757 A CN108442757 A CN 108442757A CN 201810394888 A CN201810394888 A CN 201810394888A CN 108442757 A CN108442757 A CN 108442757A
Authority
CN
China
Prior art keywords
plot structure
building
field
plot
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810394888.XA
Other languages
Chinese (zh)
Inventor
胡立翔
缪东
邱海波
史明红
周小斌
肖俊
范永光
骆礼伦
姚应峰
廖永亮
代刚
石航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201810394888.XA priority Critical patent/CN108442757A/en
Publication of CN108442757A publication Critical patent/CN108442757A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of depot of urban railway transit vehicles structures of combination alpine terrain, the vehicle base structure includes plot structure before rail row plot structure and field, rail row plot structure includes a plurality of tracks structure, track storehouse, and plot structure includes Office building before field, it is characterised in that:Plot structure is it is not necessary that largely filling out excavation unifies absolute altitude before rail row plot structure and field, plot structure is based on mountain area nature ground elevation, is arranged relative to rail row plot structure faulting of slab ends before, that is, using sinkage type structure less than rail row plot structure, or is used higher than rail row plot structure and raise formula structure.Using plot structure before faulting of slab ends formula field, and two-part structure is connected by stair, elevator, garage ramp, it solves the mountain area vehicle base height difference major part cubic metre of earth and stone and fills out the investment increase and unstability problem that digging is brought, it reduces the cubic metre of earth and stone and fills out excavation and cart-away, reduce construction investment, reduce difficulty of construction, enhance foundation stability, improves land utilization ratio and traffic connection fluency.

Description

A kind of depot of urban railway transit vehicles structure of combination alpine terrain
Technical field
The invention belongs to field of urban rail, and in particular to a kind of urban rail transit vehicles of combination alpine terrain Base structure is located at mountain area rolling stock section suitable for addressing.
Background technology
Currently, depot of urban railway transit vehicles structure generally uses the entire piece of smooth land of rolling stock section to use unified absolute altitude mode, The areas Ji Guihang, Office Area unify absolute altitude, and looks high place in original place is excavated, and low place has been filled out.The mode of existing unified absolute altitude The smaller geomorphological environment of height difference is applied in general to, the addressing of vehicle base is seriously limited, is especially not used to alpine terrain.
Relative to common landforms, the excavation and embankment quantities in mountain area are huge, and difficulty of construction is big, project cost is high, Base is not sufficiently stable;And rolling stock section and neighboring area height difference are big, slope distance are brushed between enclosure wall and red line greatly, land utilization ratio in enclosure wall It is low while not smooth enough with periphery traffic connection.Therefore the vehicle base structure of alpine terrain is yet there are no, this is also assistant officer in industry Technical barrier to be solved.
Invention content
For at least one of prior art disadvantages described above or Improvement requirement, the present invention provides a kind of combination mountain area The depot of urban railway transit vehicles structure of shape is based on nature ground elevation, and vehicle base general layout is divided into unified absolute altitude Plot structure before rail row plot structure, faulting of slab ends formula field, and two-part structure is connected by stair, elevator, garage ramp, solve mountain Area's vehicle base height difference major part cubic metre of earth and stone, which is filled out, digs the investment increase brought and unstability problem, reduces the cubic metre of earth and stone and fills out excavation Engineering reduces construction investment, reduces difficulty of construction, enhances foundation stability, improves land utilization ratio and traffic connection fluency.
To achieve the above object, according to one aspect of the present invention, a kind of city rail of combination alpine terrain is provided Vehicular traffic base structure, the vehicle base structure include plot structure before rail row plot structure and field, and the rail row plot structure includes A plurality of tracks structure, track storehouse, plot structure includes Office building before the field;
Plot structure unifies absolute altitude without a large amount of excavations of filling out before the rail row plot structure and the field, plot structure base before the field In mountain area naturally face absolute altitude, relative to the rail row plot structure faulting of slab ends be arranged, that is, less than the rail row plot structure using sink Formula structure, or used higher than the rail row plot structure and raise formula structure;
Plot structure includes garage ramp, the big step of people's row before the field, is tied in the rail row plot structure and the field proparea It is connected at the faulting of slab ends of structure by the way that the garage ramp, the big step of people's row are current up and down.
Preferably, the track storehouse of the rail row plot structure includes teams and groups building and joint garage, the field proparea knot The Office building of structure is set to the teams and groups building back on the side in the joint garage, the Office building and institute It states and is connected by the big step of people's row between teams and groups building.
Preferably, plot structure is substantially rectangular before the field, and the teams and groups building is set to the long side of plot structure before the field Faulting of slab ends side, the setting garage ramp is current up and down connects the areas Gui Hang at two short side faulting of slab ends of plot structure before the field The unified absolute altitude area of structure unifies a long side in absolute altitude area at the long side, top of the slope at two garage ramps, slope foot Collectively form circular driveway.
Preferably, plot structure at the long side faulting of slab ends between the Office building and the teams and groups building, institute before the field State the big step both sides setting ladder greenbelt of people's row.
Preferably, plot structure further includes people's row staircase before the field, and the people's row staircase exists adjacent to the garage ramp, setting At the long side faulting of slab ends at one angle of the rectangle, it is used cooperatively jointly with the big step of people's row.
Preferably, plot structure further includes semi-underground service centre building and vestibule, the semi-underground service centre building before the field It is arranged in the side of the Office building, and is connected with Office building by the vestibule.
Preferably, the Office building is L-shaped, includes the secondary building of the main building of higher floor and lower floor, compared with high building Towards the track storehouse, the secondary flooring of lower floor is connected to the semi-underground service centre building and by vestibule the main building of layer It connects.
Preferably, the function room including service centre and dining room is equipped in the semi-underground service centre building.
Preferably, plot structure further includes the total library of storing before the field, is set to the Office building and described nearby By semi-underground service centre building.
Preferably, it is configured wide field, to be configured down below Office building and ground square at the Office building Room.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:
1, relative to the unified absolute altitude form for filling out excavation, faulting of slab ends structure of the invention, it is only necessary to flatten before field in plot structure Portion, is raised without plot structure entirety embankment before field or excavation reduces, and is reduced difficulty of construction, is enhanced safety;
2, it is based on the natural law of (cubic metre of earth and stone fills out digging amount=difference in height X areas), with greatly reducing low laying areas and small hill Area's cubic metre of earth and stone fills out excavation and cart-away, based on the mathematical formulae (one of natural law) of (project cost=earthwork X unit prices), reduces Construction investment;
3, the inherent laws such as interaction stood between building based on ground based component, ground and thereon (objective things One of internal rule), enhance the stability of ground and building;
4, rolling stock section and neighboring area height difference change small, and enclosure wall protect between red line to be brushed small at a distance from needed for slope, is provided More soils are used for the construction of vehicle base structure, utilize the mathematics of (land utilization ratio=effective area/gross area) public Formula (one of natural law), improves land utilization ratio, at the same with periphery traffic connection flow, do not influenced by height difference.
5, since the faulting of slab ends of plot structure 3 before field is arranged, height difference objective reality between plot structure 3 and rail row plot structure 2 before field, It is connected by the garage ramp 9 of stair (people's row big step 11), elevator (people's row staircase 12), annular between two-part structure, profit The inherent laws passed through with the height difference of objective things, solve the problems, such as the circulation between faulting of slab ends two parts, smooth traffic;
6, plot structure additionally provides perfect life and auxiliary production functional structure room before field of the invention;
7, the present invention is suitable for the larger terrain environment of vehicle base height difference, extends addressing range, particularly suitable Yushan Hill Area's landform increases economic benefit, aesthetics and safety, has under the premise of ensureing that operation technique is smoothly in vehicle base Larger economy and social benefit.
Description of the drawings
Fig. 1 is vehicle base general layout schematic diagram of the present invention;
Fig. 2 is vehicle base partial enlarged view of the present invention;
Fig. 3 a-c are the design sketch of vehicle base different visual angles of the present invention.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below It does not constitute a conflict with each other and can be combined with each other.The present invention is described in more detail With reference to embodiment.
As a kind of better embodiment of the present invention, as shown in Figs. 1-2, the present invention provides a kind of combination alpine terrain Depot of urban railway transit vehicles structure indicates its range by vehicle base land red-line 1 and vehicle base enclosure wall line 2;The vehicle Base structure includes plot structure 3 before rail row plot structure and field.In Fig. 2, including the dotted line of Office building 7 show a proparea Structure 3,3 range of preceding plot structure are outside the rail row plot structure, including a plurality of tracks structure, track storehouse.
Rolling stock section uses Vertical Design scheme, and the rail row plot structure is according to landform and the century-old unified mark of flood level setting Height, plot structure 3 unifies absolute altitude without a large amount of excavations of filling out before the field, before the field plot structure 3 be based on mountain area nature ground elevation, It is arranged relative to the rail row plot structure faulting of slab ends, that is, use sinkage type structure less than the rail row plot structure, or be higher than the rail Row plot structure uses and raises formula structure.
Relative to the unified absolute altitude form for filling out excavation, faulting of slab ends structure of the invention, it is only necessary to flatten before field in plot structure 3 Portion raises without the whole embankment of plot structure before field 3 or excavation reduces, reduces difficulty of construction, enhance safety;Based on (soil The cubic meter of stone fills out digging amount=difference in height X areas) the natural law, greatly reduce low laying areas and the small hill area cubic metre of earth and stone fill out excavation work Journey reduces construction investment based on the mathematical formulae (one of natural law) of (project cost=earthwork X unit prices);Based on ground The inherent laws (one of internal rule of objective things) such as based component, ground and interaction vertical between building thereon, increase The strong stability of ground and building;Rolling stock section changes small, protection brush slope institute between enclosure wall and red line with neighboring area height difference The distance needed is small, provides construction of more soils for vehicle base structure, utilize (land utilization ratio=effective area/ The gross area) mathematical formulae (one of natural law), improve land utilization ratio, at the same with periphery traffic connection flow, not by Height difference influences.
(Fig. 3 is the sunk type schematic diagram in faulting of slab ends, and the formula of raising is not shown) as Figure 2-3, plot structure 3 wraps before the field Garage ramp 9, the big step 11 of people's row are included, passes through the vehicle at the faulting of slab ends of plot structure 3 before the rail row plot structure and the field Row ramp 9, the current connection of big about 11 step of people's row.The track storehouse of the rail row plot structure includes teams and groups building 13 and connection Garage 14 is closed, the Office building 7 of plot structure 3 is set to the teams and groups building 13 back on the joint garage before the field 14 side is connected between the Office building 7 and the teams and groups building 13 by the big step 11 of people's row.The field proparea Structure 3 is substantially rectangular, and the teams and groups building 13 is set to the long side faulting of slab ends side of plot structure 3 before the field, the field proparea knot The current unified absolute altitude area 4 for connecting the rail row plot structure in about the 9 garage ramp is set at two short side faulting of slab ends of structure 3, A long side for unifying absolute altitude area 4 at a long side, top of the slope at two garage ramps 9, slope foot collectively forms annular vehicle Road.Plot structure 3 at the long side faulting of slab ends between the Office building 7 and the teams and groups building 13, people's row are big before the field Ladder greenbelt 10 is arranged in 11 both sides of step.Plot structure 3 further includes people's row staircase 12 before the field, and the people's row staircase 12 is adjacent to institute Garage ramp 9 is stated, is arranged at the long side faulting of slab ends at one angle of the rectangle, is used cooperatively jointly with the big step of people's row 11.
Since the faulting of slab ends of plot structure 3 before field is arranged, height difference objective reality between plot structure 3 and rail row plot structure 2 before field, two It is connected by the garage ramp 9 of stair (people's row big step 11), elevator (people's row staircase 12), annular between part-structure, is utilized The inherent laws that the height difference of objective things is passed through, solve the problems, such as the circulation between faulting of slab ends two parts, smooth traffic.
Plot structure 3 also has the function of a variety of lives and auxiliary production before the field of the present invention, specifically, plot structure before the field 3 remaining absolute altitude do not reduce region, and to ensure effectively to be connected with Office building 7, plot structure 3 further includes semi-underground clothes before the field Business center floor 5 and vestibule 6, which is arranged in the side of the Office building 7, and passes through the vestibule 6 Connect with Office building 7.The Office building 7 is L-shaped, includes the secondary building of the main building of higher floor and lower floor, compared with The main building of high-storey to the semi-underground service centre building 5 and passes through company towards the track storehouse, the secondary flooring of lower floor Corridor 6 connects.For example, three layers (but also other floors) of the Office building 7 are contour with the road of the rail row plot structure;Institute It is two layers to state semi-underground service centre building 5, and the double-deck vestibule upper layer can lead to the top layer in semi-underground service centre building 5.Half ground It is equipped with the function room including service centre and dining room in lower service centre building 5, space availability ratio is provided.The field proparea Structure 3 further includes the total library 15 of storing, is set to nearby by the Office building 7 and the semi-underground service centre building 5.Institute It states and is configured wide field at Office building 7, basement 8 is set below Office building 7 and ground square, can be used for people's air defense work Journey or underground garage.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, all within the spirits and principles of the present invention made by all any modification, equivalent and improvement etc., should all include Within protection scope of the present invention.

Claims (10)

1. a kind of depot of urban railway transit vehicles structure of combination alpine terrain, which includes rail row plot structure With plot structure before field (3), the rail row plot structure includes a plurality of tracks structure, track storehouse, and plot structure (3) includes before the field Office building (7), it is characterised in that:
Plot structure (3) unifies absolute altitude without a large amount of excavations of filling out before the rail row plot structure and the field, plot structure (3) before the field It is arranged based on mountain area nature ground elevation, relative to the rail row plot structure faulting of slab ends, that is, under being used less than the rail row plot structure Heavy formula structure, or used higher than the rail row plot structure and raise formula structure;
Plot structure (3) includes garage ramp (9), the big step of people's row (11) before the field, in the rail row plot structure and the field It is connected at the faulting of slab ends of preceding plot structure (3) by the way that the garage ramp (9), the big step of people's row (11) are current up and down.
2. combining the depot of urban railway transit vehicles structure of alpine terrain as described in claim 1, it is characterised in that:It is described The track storehouse of rail row plot structure includes teams and groups building (13) and combines garage (14), and plot structure (3) is described before the field Office building (7) is set to the teams and groups building (13) back on the side of joint garage (14), the Office building (7) it is connect by the big step of people's row (11) between the teams and groups building (13).
3. combining the depot of urban railway transit vehicles structure of alpine terrain as claimed in claim 2, it is characterised in that:It is described Plot structure (3) is substantially rectangular before, and the teams and groups building (13) is set to the long side faulting of slab ends side of plot structure (3) before the field, The garage ramp (9) the current connection areas the Gui Hang knot up and down is set before the field at two short side faulting of slab ends of plot structure (3) The unified absolute altitude area (4) of structure unifies absolute altitude area (4) at the long side, top of the slope at two garage ramps (9), slope foot One long side collectively forms circular driveway.
4. combining the depot of urban railway transit vehicles structure of alpine terrain as claimed in claim 3, it is characterised in that:It is described Plot structure (3) at the long side faulting of slab ends between the Office building (7) and the teams and groups building (13), big of people's row before Ladder greenbelt (10) is arranged in rank (11) both sides.
5. combining the depot of urban railway transit vehicles structure of alpine terrain as claimed in claim 3, it is characterised in that:It is described Plot structure (3) further includes people's row staircase (12) before, and the neighbouring garage ramp (9) of the people's row staircase (12) is arranged described At the long side faulting of slab ends at one angle of rectangle, it is used cooperatively jointly with the big step of people's row (11).
6. the depot of urban railway transit vehicles structure of combination alpine terrain as described in any one in claim 1-5, feature It is:Plot structure (3) further includes semi-underground service centre building (5) and vestibule (6), the semi-underground service centre building before the field (5) setting connects in the side of the Office building (7), and by the vestibule (6) with Office building (7).
7. combining the depot of urban railway transit vehicles structure of alpine terrain as claimed in claim 6, it is characterised in that:It is described Office building (7) is L-shaped, includes the secondary building of the main building of higher floor and lower floor, the main building of higher floor is towards described The secondary flooring of track storehouse, lower floor is connected to the semi-underground service centre building (5) and by vestibule (6).
8. combining the depot of urban railway transit vehicles structure of alpine terrain as claimed in claim 6, it is characterised in that:It is described The function room including service centre and dining room is equipped in semi-underground service centre building (5).
9. combining the depot of urban railway transit vehicles structure of alpine terrain as claimed in claim 6, it is characterised in that:It is described Plot structure (3) further includes the total library of storing (15) before, is set to the Office building (7) and the semi-underground service nearby Center floor (5) is other.
10. the depot of urban railway transit vehicles structure of combination alpine terrain as described in any one in claim 1-5, feature It is:It is configured wide field, basement to be arranged below Office building (7) and ground square at the Office building (7) (8)。
CN201810394888.XA 2018-04-27 2018-04-27 A kind of depot of urban railway transit vehicles structure of combination alpine terrain Pending CN108442757A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810394888.XA CN108442757A (en) 2018-04-27 2018-04-27 A kind of depot of urban railway transit vehicles structure of combination alpine terrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810394888.XA CN108442757A (en) 2018-04-27 2018-04-27 A kind of depot of urban railway transit vehicles structure of combination alpine terrain

Publications (1)

Publication Number Publication Date
CN108442757A true CN108442757A (en) 2018-08-24

Family

ID=63201928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810394888.XA Pending CN108442757A (en) 2018-04-27 2018-04-27 A kind of depot of urban railway transit vehicles structure of combination alpine terrain

Country Status (1)

Country Link
CN (1) CN108442757A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059342A (en) * 2022-06-08 2022-09-16 中铁二院工程集团有限责任公司 Urban rail transit overhead type large-frame vehicle base arrangement structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005207087A (en) * 2004-01-22 2005-08-04 Ohbayashi Corp Station traffic square
CN105421835A (en) * 2015-12-28 2016-03-23 南阳师范学院 Method for building underground garage by using poor situation of slope

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005207087A (en) * 2004-01-22 2005-08-04 Ohbayashi Corp Station traffic square
CN105421835A (en) * 2015-12-28 2016-03-23 南阳师范学院 Method for building underground garage by using poor situation of slope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
涂汉卿: "大梨园车辆段场坪竖向设计优化", 《北京交通大学学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059342A (en) * 2022-06-08 2022-09-16 中铁二院工程集团有限责任公司 Urban rail transit overhead type large-frame vehicle base arrangement structure

Similar Documents

Publication Publication Date Title
CN202369864U (en) Salinized soil railroad bed structure
CN106515743A (en) Line layout structure for two metro lines transfer
CN106192640A (en) A kind of urban planning method utilizing open type sinking road
Strickland The 1961 Zoning revision and the template of the ideal city
CN108442757A (en) A kind of depot of urban railway transit vehicles structure of combination alpine terrain
CN101067295A (en) Method for utilizing underground souterrain combined with ground road to be as trolley bus passageway
CN207419173U (en) A kind of composite road bed structure of lightweight
Finkelstein Observations on the layout of Iron Age Samaria
CN105421835B (en) A method of underground garage is built using the bad status in hillside fields
CN103790596B (en) Double-layer interchange tunnel
CN204567664U (en) The semi-underground station of platform open type
Praticò The analysis of the new strategic area of Hamburg: the redevelopment project of the Hafencity’s waterfront
CN203096539U (en) Three-dimensional transportation system for urban trunk road
Kullmann The emergence of suburban terracing on coastal dunes: Case studies along the Perth Northern Corridor, Western Australia, 1930–2010
CN112253161A (en) T-shaped transfer subway station jointly built with municipal tunnel
CN217266687U (en) Soft soil roadbed and normal roadbed juncture prevent subsiding structure
CN219773770U (en) Subway interval structure comprising ground combined type depressurization station
Gavin Gateway to the City: Reconnecting Center City Philadelphia to the Delaware River Waterfront
CN213502265U (en) Underground space large-section traffic transportation system
CN202266044U (en) Small-face width and large-depth land-saving low-rise residential building with large courtyards
Al-Hussaini et al. Geotechnical considerations and prospects for underground construction in Dhaka City
CN207660342U (en) One kind is with slope steel structure stereo garage
Lunardi et al. Sustainable and resilient city: The case study of a hypogeum stadium in a desert area
CN102330509A (en) Great wall-type building with road, business and living functions
CN106837349A (en) It is double circle overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824

RJ01 Rejection of invention patent application after publication