CN105421835B - A method of underground garage is built using the bad status in hillside fields - Google Patents

A method of underground garage is built using the bad status in hillside fields Download PDF

Info

Publication number
CN105421835B
CN105421835B CN201510988224.2A CN201510988224A CN105421835B CN 105421835 B CN105421835 B CN 105421835B CN 201510988224 A CN201510988224 A CN 201510988224A CN 105421835 B CN105421835 B CN 105421835B
Authority
CN
China
Prior art keywords
area
garage
underground garage
underground
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510988224.2A
Other languages
Chinese (zh)
Other versions
CN105421835A (en
Inventor
袁凌翔
赵晶晶
席文涛
刘保玲
付海菊
马凌云
鲁云风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Normal University
Original Assignee
Nanyang Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Normal University filed Critical Nanyang Normal University
Priority to CN201510988224.2A priority Critical patent/CN105421835B/en
Publication of CN105421835A publication Critical patent/CN105421835A/en
Application granted granted Critical
Publication of CN105421835B publication Critical patent/CN105421835B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007—Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种利用坡地不良现状建设地下车库的方法,包括以下步骤:(1)先规划出规划区位置,根规划区位置规划出车库区,在车库区旁边预留出后期坡道区;(2)在车库区内划分出地下车库区和临街商铺区;(3)在临街商铺区的场地原自然地坪最低高程处划分出进入地下车库区的入口区和人行进出地面的台阶区;(4)确定临街商铺区商铺层高、地下车库区车库地面标高以及车库层高;(5)待步骤(4)完成后高于基础底标高的土全部挖方,然后建设地下车库区,以及临街商铺区;(6)车库顶铺设保温防水层,步骤(5)中挖方所得土壤回填并夯实。本发明合理利用了地形,节省了建筑空间,安全程度高,便捷性好。

The invention discloses a method for constructing an underground garage by utilizing the unfavorable status quo of slope land, which includes the following steps: (1) first plan the position of the planning area, plan the garage area based on the position of the planning area, and reserve a ramp area next to the garage area ; (2) Divide the underground garage area and the street-facing shop area in the garage area; (3) Divide the entrance area into the underground garage area and the step area for pedestrians to enter and exit the ground at the lowest elevation of the original natural floor in the street-facing shop area ; (4) Determine the shop storey height in the street-facing shop area, the garage floor elevation in the underground garage area, and the garage floor height; (5) Excavate all the soil higher than the foundation bottom elevation after step (4) is completed, and then build the underground garage area, and Street-facing shop area; (6) Lay the thermal insulation and waterproof layer on the roof of the garage, and backfill and compact the soil obtained from the excavation in step (5). The invention makes reasonable use of terrain, saves building space, has high safety and good convenience.

Description

一种利用坡地不良现状建设地下车库的方法A method of constructing underground garage by utilizing the bad situation of slope land

技术领域technical field

本发明涉及建筑领域,特别涉及一种利用坡地不良现状建设地下车库的方法。The invention relates to the field of construction, in particular to a method for constructing an underground garage by utilizing the unfavorable current situation of slope land.

背景技术Background technique

随着城市化的发展和人民生活水平的提高,使得城市土地具有一定的稀缺性,然而汽车的人均拥有量越来越高,难以建造足够的停车空间,所建造的停车位的成本也越来越高,在之前建造的办公、商业和生活区中,建造设计中就没有考虑大量停车的问题,导致后来的商户或者居民无处停车,随意的停放在小区中、道路旁或者绿化带中间,给周围人群的生活带来极大的不便,并且占用了大量的公共用地。另外,大量无处停放的机动车停放在行人道、非机动车道或者机动车道,挤占了机动车的行驶空间也带来了道路的不通畅,如果解决了居民区和公共道路上的停车问题,将其移放到不占用公用空间的地下,将会给城市提供更多的行驶、绿化和商业用地和空间。With the development of urbanization and the improvement of people's living standards, urban land has a certain scarcity. However, the per capita ownership of cars is getting higher and higher, making it difficult to build enough parking spaces, and the cost of the built parking spaces is also increasing. The higher, in the previously built office, commercial and living areas, the construction design did not consider the problem of a large number of parking lots, resulting in nowhere for later merchants or residents to park, and they parked randomly in the community, beside the road or in the middle of the green belt. It brings great inconvenience to the lives of the surrounding people and takes up a lot of public land. In addition, a large number of motor vehicles with nowhere to park are parked on sidewalks, non-motor vehicle lanes or motor vehicle lanes, occupying the driving space of motor vehicles and causing road congestion. If the problem of parking in residential areas and public roads is solved, Moving it underground without occupying public space will provide the city with more driving, greening and commercial land and space.

现有的解决方案一般有两种,一种向空中发展,一种向地下延伸。在空中建造的停车库的技术方案中,最常用的方案实建造组合式车库,但这种车库设置在地面上,占用地上空间较多,在地面空间不足的情况下,尤其是中国南部的城市,很不适合,而且该车库影响周边环境和小区美观、设备投资较大;更重要的问题是该车库由于建造在空中,稳定性较差,不能建造足够高,地基建造又不能深入,空间利用有限,实用性较差;在建设地下延伸的停车库的方案中,由于其具有很好的地下空间利用性,使得地下车库成为较为实用的车库建设方向。There are generally two kinds of existing solutions, one is to develop into the air, and the other is to extend underground. Among the technical schemes of parking garages built in the air, the most commonly used scheme is to build a combined garage, but this kind of garage is set on the ground and takes up more space on the ground. In the case of insufficient ground space, especially in cities in southern China , it is very inappropriate, and the garage affects the surrounding environment and the beauty of the community, and the investment in equipment is large; the more important problem is that the garage is built in the air, the stability is poor, it cannot be built high enough, and the foundation construction cannot be deep. Limited and poor practicability; in the scheme of building an underground extended parking garage, due to its good underground space utilization, the underground garage has become a more practical garage construction direction.

目前国内在坡度2%~8%的地势间进行地下车库的建设,主要有两种常规设计以及方法,其中常规设计方法1如图2~4所示,此方法对场地不进行大规模的填方挖方,依照斜坡修建建筑物,建筑物底层设计为半地下室或地下室,建筑物之间通过设置有坡度道路和台阶以解决高度差问题,但是此种设计方法具有一定的缺点:1.场地内停车只能设在院内和高程低处的建筑一层处;2.场地内道路有坡度,行车不便,人行也是通过有坡度的道路通行,造成人车不分流,有安全隐患;3.场地地势低于相邻场地,相邻场地积水会流入本场地,排水不便;4.建筑视觉上没有相邻场地高。常规设计方法2如图5~6所示,此方法对场地进行大规模的填方,在高程低处做挡土墙,将场地高程统一修整至场地最高高程位置,建筑物一层可做一般性房屋、车库或商铺等,填方后的场地平整,道路景观处无高差,在场地高程低处进入场地内位置修建坡道可以解决车和人出入问题,但是此种设计方法具有一定的缺点:1.场地内停车只能设在院内和建筑一层处;2.人车不分流,有安全隐患;3.大规模填方,需要购买土方,土方需要从外边往场地区运,增大运输量,填方加大施工量,增长施工周期,工程造价高。At present, there are mainly two conventional designs and methods for the construction of underground garages in the terrain with a slope of 2% to 8%. Among them, the conventional design method 1 is shown in Figures 2 to 4. This method does not require large-scale filling of the site. Excavation, building buildings according to the slope, the ground floor of the building is designed as a semi-basement or basement, and slope roads and steps are set between buildings to solve the problem of height difference, but this design method has certain disadvantages: 1. Parking can only be located in the courtyard and on the first floor of the low-elevation building; 2. The roads in the site have slopes, which makes it inconvenient for vehicles to pass, and pedestrians also pass through the sloped roads, causing pedestrians and vehicles to be separated, which poses a safety hazard; 3. The terrain of the site It is lower than the adjacent site, and the accumulated water in the adjacent site will flow into the site, causing inconvenient drainage; 4. The building is not as high as the adjacent site visually. Conventional design method 2 is shown in Fig. 5~6. In this method, large-scale filling of the site is carried out, and retaining walls are built at low elevations, and the elevation of the site is uniformly trimmed to the highest elevation position of the site. The first floor of the building can be used as a general For private houses, garages or shops, etc., the site after filling is flat, and there is no height difference in the road landscape. Building a ramp at the low elevation of the site to enter the site can solve the problem of vehicles and people entering and exiting, but this design method has certain limitations. Disadvantages: 1. Parking on the site can only be located in the courtyard and on the first floor of the building; 2. There is no separation of people and vehicles, which poses a safety hazard; 3. Large-scale filling requires the purchase of earthwork, which needs to be transported from the outside to the site area, increasing the cost. The large amount of transportation and filling will increase the construction volume, increase the construction period, and the project cost is high.

发明内容Contents of the invention

有鉴于此,本发明的目的是针对现有技术的不足,提供了一种利用坡地不良现状建设地下车库的方法,不仅合理利用了地形,节省了建筑空间,而且安全程度高、建造周期短、便捷性好。In view of this, the object of the present invention is to address the deficiencies of the prior art and provide a method for constructing an underground garage by utilizing the bad situation of slope land, which not only makes reasonable use of the terrain, saves construction space, but also has a high degree of safety, a short construction period, and Good convenience.

为达到上述目的,本发明采用以下技术方案:To achieve the above object, the present invention adopts the following technical solutions:

一种利用坡地不良现状建设地下车库的方法,包括以下步骤:A method for constructing an underground garage utilizing the unfavorable current situation of slope land, comprising the following steps:

(1)先规划出规划区位置,根据规划区位置规划出车库区,在车库区旁边预留出后期坡道区;(1) First plan the location of the planning area, plan the garage area according to the location of the planning area, and reserve a later ramp area next to the garage area;

(2)在车库区内划分出地下车库区和临街商铺区;(2) Divide the underground garage area and the street-facing shop area in the garage area;

(3)在临街商铺区的场地原自然地坪最低高程处划分出进入地下车库区的入口区和人行进出地面的台阶区;(3) The entrance area for entering the underground garage area and the step area for pedestrians to enter and exit the ground shall be divided at the lowest elevation of the original natural floor of the site facing the street;

(4)确定临街商铺区商铺层高,从建筑层处规划确定出临街商铺区的商铺层高、地下车库区的车库地面标高以及车库层高;(4) Determine the shop storey height of the street-front shop area, plan and determine the shop storey height of the street-front shop area, the garage floor elevation and the garage floor height of the underground garage area from the building floor;

(5)待步骤(4)完成后,在原自然地坪最低高程处定出地下车库入口位置,定出车库底层底标高,将高于基础底标高的土全部挖方,挖方得出的土先堆置在不影响施工处,然后建设地下车库区,以及临街商铺区;(5) After step (4) is completed, determine the entrance position of the underground garage at the lowest elevation of the original natural floor, determine the bottom elevation of the garage, and excavate all the soil higher than the bottom elevation of the foundation, and pile the soil obtained from the excavation first Place it in a place that does not affect the construction, and then build the underground garage area and the street-facing shop area;

(6)车库顶板建成后,铺设好保温防水层,防水层做好后,将步骤(5)中挖方所得土壤回填至车库库顶或主建筑物之外区域并夯实即可。(6) After the roof of the garage is completed, lay the insulation and waterproof layer. After the waterproof layer is completed, backfill the soil obtained from the excavation in step (5) to the roof of the garage or the area outside the main building and compact it.

优选的,所述地下车库区的入口区地面标高高于场地最低高程0.1~0.2m。Preferably, the ground elevation of the entrance area of the underground garage area is 0.1-0.2m higher than the lowest elevation of the site.

优选的,所述地下车库区的车库顶部高于周边场地2~3m。Preferably, the top of the garage in the underground garage area is 2-3m higher than the surrounding site.

优选的,所述坡道区设置直线型双向车道。Preferably, the ramp area is provided with a straight two-way lane.

优选的,所述地下车库区的出入口的两侧均设置临时停车空间。Preferably, temporary parking spaces are provided on both sides of the entrance and exit of the underground garage area.

优选的,所述地下车库区上设置屋面景观区,所述屋面景观区内间隔式设置局部敞开顶及采光井。Preferably, a roof landscape area is set on the underground garage area, and partially open roofs and light wells are arranged at intervals in the roof landscape area.

优选的,所述地下车库区临场地高程低处的车库外侧设置商铺、场地道路或实用性建筑。Preferably, shops, site roads or practical buildings are arranged on the outside of the garage at the lower elevation of the underground garage area adjacent to the site.

优选的,所述地下车库区车库顶层覆土内设置保温、给水、排水、采暖、煤气、电力和电信系统。Preferably, thermal insulation, water supply, drainage, heating, gas, electricity and telecommunication systems are set in the top layer of the underground garage area.

优选的,所述地下车库区设置疏散楼梯或电梯。Preferably, the underground garage area is provided with evacuation stairs or elevators.

本发明的有益效果是:The beneficial effects of the present invention are:

1.本发明是针对现有坡度在2%~8%之间,建筑物横向与场地斜坡方向平行的场地情况,提供在从原自然地面最底高程处建设地下汽车库以抬高场地地面高度,地下车库建成并覆土后标高高于周围和相邻场地标高,地势高于周围场地,不会造成车库积水等情况出现,且改善了原自然地面是坡地的状况,在不需要大规模挖方、填方的情况下使得建筑群形成平坦的可建设场地,有利于场地道路和景观规划,人车分流,也节省了建筑成本,缩短了建筑周期。1. The present invention is aimed at the site situation where the existing slope is between 2% and 8%, and the horizontal direction of the building is parallel to the slope direction of the site. It provides to build an underground garage at the bottom elevation from the original natural ground to raise the ground level of the site. After the underground garage is built and covered with soil, the elevation is higher than that of the surrounding and adjacent sites, and the terrain is higher than the surrounding sites, which will not cause water accumulation in the garage, and improves the situation of the original natural ground being a slope, without the need for large-scale excavation In the case of filling and filling, the building complex forms a flat and constructable site, which is conducive to site road and landscape planning, diversion of people and vehicles, and also saves construction costs and shortens the construction cycle.

2.通过应用本发明的建造方法和运行本发明的各种地下车库,在原自然地坪最低高程处定出地下车库入口位置,使得在现有商业区、办公区和居民区中均可以利用现有的通道、绿化带和楼宇间空间建造数量较大的地下停车空间,对于地势不够平坦得地方也同样可以应用本发明,更加节省空间、提高建造效率,更重要的是,使用本发明的方法或者建造本发明的结构时,考虑了如何保护以及稳固建筑的地基和地下管线,提高了场地建筑群的整体品质。2. By applying the construction method of the present invention and running various underground garages of the present invention, the entrance position of the underground garage is determined at the lowest elevation of the original natural floor, so that existing commercial areas, office areas and residential areas can be used. Some passages, green belts and spaces between buildings have a large number of underground parking spaces, and the present invention can also be applied to places where the terrain is not flat enough to save space and improve construction efficiency. More importantly, using the method of the present invention Or when constructing the structure of the present invention, consideration is given to how to protect and stabilize the foundation and underground pipelines of the building, thereby improving the overall quality of the site building complex.

3.本发明能深入地下数十米以上,从而可以建造足够多的地下停车空间。本发明的结构,可以在不影响现有环境的前提下,以低于数十天的建造时间完成地下车库的建造。3. The present invention can penetrate more than tens of meters underground, so that enough underground parking spaces can be built. The structure of the present invention can complete the construction of the underground garage in less than tens of days without affecting the existing environment.

附图说明Description of drawings

图1为坡度在2%~8%之间建筑物横向与场地斜坡方向平行的场地情况图;Figure 1 is a site situation diagram where the lateral direction of the building is parallel to the slope direction of the site with a slope between 2% and 8%;

图2为常规设计方法1平面图;Fig. 2 is conventional design method 1 plan view;

图3为常规设计方法1坡度2%时立面图;Fig. 3 is the elevation view when the slope is 2% in conventional design method 1;

图4为常规设计方法1坡度8%时立面图;Fig. 4 is the elevation view when the slope of conventional design method 1 is 8%;

图5为常规设计方法2平面图;Fig. 5 is conventional design method 2 planar views;

图6为常规设计方法2立面图;Fig. 6 is conventional design method 2 elevation view;

图7为本发明实施例1中设计方法第一步示意图;7 is a schematic diagram of the first step of the design method in Embodiment 1 of the present invention;

图8为本发明实施例1中设计方法第二步示意图;8 is a schematic diagram of the second step of the design method in Embodiment 1 of the present invention;

图9为本发明实施例1中设计方法第三步示意图;9 is a schematic diagram of the third step of the design method in Embodiment 1 of the present invention;

图10为本发明实施例1中设计方法第四步示意图;10 is a schematic diagram of the fourth step of the design method in Embodiment 1 of the present invention;

图11为本发明实施例1中设计方法第五步示意图;11 is a schematic diagram of the fifth step of the design method in Embodiment 1 of the present invention;

图12为本发明实施例2正视示意图;Figure 12 is a schematic front view of Embodiment 2 of the present invention;

图13为本发明实施例2侧面示意图;Figure 13 is a schematic side view of Embodiment 2 of the present invention;

图14为本发明实施例2剖面示意图;Fig. 14 is a schematic cross-sectional view of Embodiment 2 of the present invention;

其中,1-场地地界线,2-道路红线,3-相邻已建建筑,4-坡道区,5-拟建建筑,6-临街商铺区,7-半地下室区域,8-挖方区,9-填方区,10-临街商铺,11-地下车库区,12-入口区,13-台阶区,14-建筑层,15-地下一层车库区,16-场地内消防车道兼人行和非机动车通行道路,17-地下储藏室层,18-地下二层车库区,19-非机动车停车区,20-道路。Among them, 1-site boundary line, 2-road red line, 3-adjacent built buildings, 4-ramp area, 5-planned building, 6-street shop area, 7-semi-basement area, 8-excavation area, 9-Filling area, 10-Street-facing shops, 11-Underground garage area, 12-Entrance area, 13-Step area, 14-Building floor, 15-Garage area on the first basement floor, 16-Fire lane in the site and pedestrian and non-stop Motor vehicle access road, 17-underground storage room layer, 18-underground second floor garage area, 19-non-motor vehicle parking area, 20-road.

具体实施方式Detailed ways

下面结合附图和实施例对本发明作进一步描述。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

关于地下室、半地下室、地下汽车库、种植屋面、覆土层、层高的说明:Explanation on basement, semi-basement, underground garage, planting roof, covering soil layer, and storey height:

根据《建筑设计防火规范》GB50016-2014的解释:According to the interpretation of GB50016-2014 of "Code for Fire Protection Design of Buildings":

地下室 basement:室内地面低于室外地平面的高度超过室内净高的1/2的空间;Basement basement: the space where the height of the indoor ground below the outdoor ground level exceeds 1/2 of the indoor clear height;

半地下室 semi-basement:室内地面低于室外地平面的高度超过室内净高的1/3,且不超过1/2的空间。Semi-basement: the space where the height of the indoor ground below the outdoor ground level exceeds 1/3 of the indoor clear height and does not exceed 1/2.

根据《汽车库、修车库、停车场设计防火规范》GB 50067-2014的解释:According to the interpretation of GB 50067-2014 "Code for Fire Protection Design of Garages, Repair Garages, and Parking Lots":

地下汽车库underground garage: 室内地面低于室外地平面的高度超过该层车库净高1/2的汽车库。Underground garage: the garage whose indoor ground is lower than the outdoor ground level and exceeds 1/2 of the clear height of the garage on this floor.

根据《种植屋面工程技术规程》JGJ155-2013的解释:According to the explanation of JGJ155-2013 "Technical Regulations for Planting Roof Engineering":

种植屋面planted roof:辅以种植土或设置容器种植植物的建筑屋面或地下建筑顶板;Planted roof: the roof of a building or the roof of an underground building supplemented with planting soil or planted in containers;

覆土层overburden:建筑里的覆土是指覆盖土下有建筑(建筑不显于地面),一般常见规划区内地下车库上覆土达到要求厚度,上面做绿化后算有效的绿化面积,提高绿化率。Overburden: The overburden in the building refers to the building under the overburden (the building is not visible on the ground). Generally, the overburden of the underground garage in the common planning area reaches the required thickness. After the greening is done on it, it will be considered as an effective greening area and improve the greening rate.

根据《民用建筑设计通则》GB 50352-2005的解释:According to the interpretation of "General Rules for Civil Building Design" GB 50352-2005:

层高 storey height: 建筑物各层之间以楼、地面面层(完成面)计算的垂直距离,屋顶层由该层楼面面层(完成面)至平屋面的结构面层或至坡顶的结构面层与外墙外皮延长线的交点计算的垂直距离。Storey height: The vertical distance between the floors of a building calculated by the floor and ground surface (finished surface), and the roof layer is from the floor surface (finished surface) of this floor to the structural surface of the flat roof or to the slope top The vertical distance calculated from the intersection point of the structural surface layer and the extension line of the exterior skin.

在如图1所示,坡度为8%时建筑物横向与场地斜坡方向平行的场地情况下:As shown in Figure 1, when the slope is 8%, the horizontal direction of the building is parallel to the slope direction of the site:

如图3和4所示,常规设计方法1没有对场地进行大规模的填方挖方,放弃可以考虑挖方的挖方区8,而是沿着斜坡修建房屋,房屋底层设计为半地下室区域7或地下室区域,建筑物之间通过设置有坡度道路和台阶以解决高度差问题,这种设计方法使得场地内停车只能设在院内和高程低处的建筑一层处,场地地势低于相邻场地,场地积水只能由高处流向低处,排水不便,相邻场地积水会流入本场地,建筑视觉上没有相邻场地高,根据图1中所示,在规划出场地地界线1、道路红线2以及相邻已建建筑3的前提下,如图2中平面图所示,场地内设置车库出入口,建筑物之间、场地内道路和车库不同区域内均设置有坡道区4,行人和车辆从场地内消防车道兼人行和非机动车通行道路16出入时均需要从坡道区4进出,行车不便,人行也是通过有坡度的道路通行,造成人车不分流,有安全隐患。As shown in Figures 3 and 4, conventional design method 1 does not carry out large-scale filling and excavation of the site, and abandons the excavation area 8 where excavation can be considered, but builds houses along the slope, and the ground floor of the house is designed as a semi-basement area 7 or basement In the area, sloped roads and steps are set between buildings to solve the problem of height difference. This design method makes parking on the site only in the courtyard and on the first floor of the building at a low elevation. The site is lower than the adjacent site. The accumulated water in the site can only flow from the high place to the low place, and the drainage is inconvenient. The accumulated water in the adjacent site will flow into the site. The building is not as high as the adjacent site visually. According to Figure 1, after the planned site boundary 1, road On the premise of red line 2 and adjacent built buildings 3, as shown in the plan view in Figure 2, garage entrances and exits are set in the site, and ramp areas 4 are set in different areas between buildings, roads in the site, and garages. Pedestrians and When vehicles enter and exit from the fire lane and pedestrian and non-motor vehicle access road 16 in the site, they all need to enter and exit from the ramp area 4, which is inconvenient for driving.

如图5和6所示,常规设计方法2则通过对场地进行大规模的填方,在高程低处填方区9做挡土墙,将场地高程统一修整至场地最高高程位置,拟建建筑5一层可做一般性房屋、车库或商铺等,填方后的场地平整,道路景观处无高差,在场地高程低处进入场地内位置修建坡道以解决车和人出入问题,但是这种设计方法使得场地内停车只能设在院内和建筑一层处,最严重的是需要大规模进行挖方和填方,需要购买大量土方,而土方更需要从外边往场地建设区运送,增大了运输量和施工量,增长了施工周期,工程造价高。As shown in Figures 5 and 6, the conventional design method 2 is to carry out large-scale filling of the site, build retaining walls in the filling area 9 at the low elevation, and uniformly trim the site elevation to the highest elevation position of the site, and the proposed building 5 The first floor can be used as general houses, garages or shops, etc. After filling, the site is flat, and there is no height difference at the road landscape. This design method makes parking on the site only in the courtyard and on the first floor of the building. The most serious thing is that large-scale excavation and filling are required, and a large amount of earthwork needs to be purchased, and the earthwork needs to be transported from the outside to the construction area of the site, increasing the The amount of transportation and construction is increased, the construction period is increased, and the project cost is high.

实施例1Example 1

如图7~11所示一种利用坡地坡度为8%时建设地下车库的方法,包括规划区,规划区内设置车库区和坡道区4,车库区内设置地下车库区11和临街商铺区6,临街商铺区6的场地原自然地坪最低高程处设置进入地下车库区的入口区12和人行进出地面的台阶区13。As shown in Figures 7-11, a method of building an underground garage using a slope with a slope of 8%, including a planning area, a garage area and a ramp area 4 are set in the planning area, and an underground garage area 11 and a street-facing shop area are set in the garage area 6. The entrance area 12 for entering the underground garage area and the step area 13 for pedestrians to enter and exit the ground are set at the lowest elevation of the original natural floor of the street-facing shop area 6.

具体规划建设步骤包括:(1)先规划出规划区位置,根据规划区位置规划出地下车库区11,在地下车库区11旁边预留出后期坡道区4,建设时沿地下车库区11的外墙可以铺设多条直线型双向场地内消防车道兼人行和非机动车通行道路16,当有火灾或者其他安全情况出现时,有利于消防车、救护车等车辆或安全措施的进行;The specific planning and construction steps include: (1) First plan out the location of the planning area, plan the underground garage area 11 according to the location of the planning area, reserve a later ramp area 4 next to the underground garage area 11, and build along the underground garage area 11 The outer wall can be paved with multiple straight-line two-way internal fire lanes and roads for pedestrians and non-motor vehicles 16, which is beneficial to fire trucks, ambulances and other vehicles or safety measures when there is a fire or other safety situations;

(2)在车库区内划分出地下车库区11和临街商铺区6,地下车库区11外侧临低高程处,可建设部分民用建筑或商用建筑,如临街商铺10,因地制宜的最大限度利用空间、节约土地;(2) In the garage area, the underground garage area 11 and the street-facing shop area 6 are divided. Some civil buildings or commercial buildings can be built on the outside of the underground garage area 11 at low elevations, such as the street-facing shops 10, to maximize the use of space according to local conditions, save land;

(3)在临街商铺区的场地原自然地坪最低高程处划分出进入地下车库区11的入口区12和人行进出地面的台阶区13,车库入口需要比自然地坪高0.1m,以起到挡水作用,将车库区和人行区分开,车辆可以通过道路20直接进入地下车库,避免在地下车库上和地上场地绕行,人行通过台阶上至地下汽车库顶,顺着车库顶规划的道路分流至各自建筑的地上,再从各自建筑物的出入口进入拟建建筑5内,车辆进入地下车库后,顺这车库内车道,进入各个停车位,停放妥当后,人员可以通过建筑物与地下车库连通的疏散楼梯或电梯,上至建筑物一层,上至一层后,人员可以选择继续上楼或到车库顶部景观区域内,这样使得人车得以分流,有利于人行的安全,也缓解了道路压力,除此之外还可以在地下车库区11的出口(或者入口)的两侧布置临时停车空间,用于车辆临时移位至该处,以避免堵塞出口,影响停出车效率;(3) The entrance area 12 for entering the underground garage area 11 and the step area 13 for pedestrians to enter and exit the ground are divided at the lowest elevation of the original natural floor in the street-facing shop area. The garage entrance needs to be 0.1m higher than the natural floor to achieve The water retaining function separates the garage area from the pedestrian area. Vehicles can directly enter the underground garage through the road 20, avoiding detours on the underground garage and the ground site, and pedestrians go up to the top of the underground garage through the steps and follow the planned road on the top of the garage. The traffic is diverted to the ground of each building, and then enters the proposed building 5 from the entrance and exit of each building. After the vehicle enters the underground garage, it goes along the lane in the garage and enters each parking space. After parking properly, personnel can pass through the building and the underground garage. Connected evacuation stairs or elevators go up to the first floor of the building. After going up to the first floor, personnel can choose to continue to go upstairs or to the landscape area on the top of the garage. In addition to road pressure, temporary parking spaces can also be arranged on both sides of the exit (or entrance) of the underground garage area 11 for vehicles to temporarily move there, so as to avoid blocking the exit and affecting the efficiency of parking and exiting;

(4)从建筑层14处可以规划确定出临街商铺区6的商铺层高、地下车库区11的车库地面标高以及车库层高,商铺一般需要建成双层,上边一层可做商铺也可做办公或物业等其它用途,商铺一层可定为4.2m(可更高),二层可定为3.9m(可更高),室内外高差0.3m;车库柱网依放3辆车为宜,两辆柱网太窄不经济,4辆柱网太宽实现不易,所以可以设计为3辆车,按照车库设计规范计算得出8.1m柱网比较合适,8.1m柱网梁高0.9m左右,通风设备高0.4m,消防桥架高0.25m,消防管高0.5m,单层停车按照规范最小高度为2.2m,因此可以推算出车库层高大约为0.9+0.3+0.25+2.2=3.75,车库顶板上需要覆土,覆土中需铺设管道,可以设置最小覆土厚度0.9m,从安全问题考虑设计地上商铺时商铺二层需要直接向院内疏散,所以商铺二层楼板需要高出覆土层0.3m以上,于是可规划出车库底部底标高为大约0.5m;(4) From the building floor 14, it is possible to plan and determine the height of the shops in the street-facing shop area 6, the floor elevation of the garage in the underground garage area 11, and the height of the garage. The shops generally need to be built as double floors, and the upper floor can be used as a shop or as a For other purposes such as office or real estate, the first floor of the shop can be set at 4.2m (can be higher), the second floor can be set at 3.9m (can be higher), and the indoor and outdoor height difference is 0.3m; Yes, two column nets are too narrow and uneconomical, and four column nets are too wide to be realized, so it can be designed as 3 vehicles. According to the calculation of the garage design specification, the column net of 8.1m is more suitable, and the beam height of the 8.1m column net is 0.9m Left and right, the height of the ventilation equipment is 0.4m, the height of the fire bridge is 0.25m, the height of the fire pipe is 0.5m, and the minimum height of the single-storey parking is 2.2m according to the specification, so it can be calculated that the garage floor height is about 0.9+0.3+0.25+2.2=3.75, The roof of the garage needs to be covered with soil, and pipes need to be laid in the covered soil. The minimum thickness of the covered soil can be set to 0.9m. Considering safety issues, the second floor of the shop needs to be evacuated directly to the courtyard when designing the above-ground store, so the second floor of the shop needs to be higher than the covered soil layer by more than 0.3m , so the bottom elevation of the garage can be planned to be about 0.5m;

(5)定出车库标高后在原自然地坪最低高程处定出地下车库入口位置,根据车库层高定出地下一层车库底部底标高,将高于车库入口位置的土全部挖方,挖方得出的土先堆置在不影响施工处,然后建设地下一层车库区15,以及临街商铺区6,车库顶板建成后,铺设好保温防水层,对于北方,车辆在气温较低的室外容易受冻,难以打火,在地表和地下车库整体之间布置防冻保温层,可以很好的保证地下车库内部恒温,保温防水层做好后,把原本挖方所得的土回填置除主楼之外区域并夯实,场地平整后可自由规划道路、景观区域以及非机动车停车区19,并合理进行场地地面排水设计,排水坡度的大小以及长短的控制,景观区域也可进行如假山,亭台的建设,景观区内间隔式设置局部敞开顶及采光井,在井下设置排水机构,用于将流入的水抽出,或者在入口内部的略高于地表路面的位置设置排出沟,以使沿着入口内壁流入的水直接从该排出沟流出,这样可以增加车库内的自然采光、排水及通风,保护环境的同时增加了建筑的安全性和实用性。(5) After determining the garage elevation, determine the entrance position of the underground garage at the lowest elevation of the original natural floor, and determine the bottom elevation of the basement floor garage according to the garage floor height, and excavate all the soil higher than the garage entrance position, and the excavation results The soil should be piled up at the place where the construction will not be affected, and then the garage area 15 on the basement floor and the shop area 6 facing the street will be built. After the roof of the garage is completed, a thermal insulation and waterproof layer will be laid. For the north, vehicles are prone to freezing outdoors in low temperature. , it is difficult to start a fire, and an antifreeze insulation layer is arranged between the surface and the underground garage as a whole, which can ensure a constant temperature inside the underground garage. After the insulation and waterproof layer is completed, the soil obtained from the original excavation is backfilled in areas other than the main building and compacted After the site is leveled, roads, landscape areas and non-motor vehicle parking areas can be freely planned19, and the ground drainage design of the site, the size and length of the drainage slope can be controlled reasonably, and the landscape area can also be constructed such as rockery, pavilions, landscape Partially open roofs and lighting wells are arranged at intervals in the area, and a drainage mechanism is installed underground to pump out the inflowing water, or a drainage ditch is set at a position slightly higher than the surface road inside the entrance, so that the water flowing in along the inner wall of the entrance The water flows directly from the drainage ditch, which can increase the natural lighting, drainage and ventilation in the garage, protect the environment and increase the safety and practicality of the building.

实施例2Example 2

实施例2与实施例1的设计方法大致相同,建筑构造也大致相同,不同的是:如图12~14所示,地下车库区11可以设置为地下一层也可以设置为地下两层,地下一层的车库高以及最低地面标高均可按照实施例1中计算而得,在地下一层车库区15内设计进入地下二层车库区18的坡道,坡道坡度15%,车库间的坡道口用耐火极限不小于3小时的防火卷闸隔开。The design method of embodiment 2 is roughly the same as that of embodiment 1, and the building structure is also roughly the same. The difference is that, as shown in Figures 12 to 14, the underground garage area 11 can be set as one floor underground or two floors underground. The garage height of one floor and minimum ground elevation all can be calculated according to embodiment 1, design the ramp that enters underground second-floor garage district 18 in the garage district 15 of the first floor, the slope of the ramp is 15%, and the slope between the garages Crossings are separated by fire-resistant roller shutters with a fire resistance rating of not less than 3 hours.

地下车库区11上部拟建建筑5地面因防水防潮要求,需要高出车库顶板覆土层,这样主楼下部与地下车库区11一层间的高度就比景观区域和道路区要高出一些,但是若将主楼一层之下空间高度设计过高,不仅结构安全无法得到保障,而且还大大浪费了空间,因此考虑在主楼一层之下空间设置合乎规范要求以及高低要求的地下储藏室层17。The ground of the proposed building 5 in the upper part of the underground garage area 11 needs to be higher than the covering soil layer of the garage roof due to waterproof and moisture-proof requirements, so the height between the lower part of the main building and the first floor of the underground garage area 11 is higher than that of the landscape area and road area. If the height of the space under the first floor of the main building is designed too high, not only the structural safety cannot be guaranteed, but also the space is greatly wasted. Therefore, it is considered to set up an underground storage room floor 17 that meets the code requirements and height requirements in the space under the first floor of the main building.

高度设计如下:将地下第一层车库层高定为3.2m,地下一层最上层比最低地面标高高出1.75m,地下一层车库底部底标高为1.45m,地下二层车库层高定为3.8m,由此可得地下二层车库底部底标高为5.25m,在地下一层车库上加设一层储藏室,地下储藏室层17高2.9m,储藏室下部地下第一层车库不影响位置还可以停放车辆,覆土层面层比院内主楼一层地面低0.45m,由此可规划出主楼外车库区域车库层总体要比最低地面标高高出大约为4.2m。The height design is as follows: the height of the first underground garage is set at 3.2m, the uppermost floor of the underground floor is 1.75m higher than the lowest ground level, the bottom elevation of the underground garage is 1.45m, and the floor height of the second underground garage is set at 3.8m, so the bottom elevation of the second-floor underground garage can be obtained as 5.25m. A storage room is added on the first-floor garage. The height of the underground storage room is 2.9m. The location can also be used to park vehicles, and the covering soil level is 0.45m lower than the first floor of the main building in the courtyard. From this, it can be planned that the garage level in the garage area outside the main building is generally about 4.2m higher than the lowest ground level.

双层车库优点是可设计更多的车位,但是建造设备、土建建设成本和后期运营成本有所增加,因此地下车库的建设应根据地上建筑面积和功能,使用人数合理考虑。The advantage of double-deck garages is that more parking spaces can be designed, but construction equipment, civil construction costs, and later operating costs have increased. Therefore, the construction of underground garages should be considered reasonably based on the building area and functions on the ground, and the number of users.

最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其他修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solution of the present invention without limitation, other modifications or equivalent replacements made by those skilled in the art to the technical solution of the present invention, as long as they do not depart from the spirit and spirit of the technical solution of the present invention All should be included in the scope of the claims of the present invention.

Claims (8)

1.一种利用坡地不良现状建设地下车库的方法,其特征在于:包括以下步骤:1. A method for building an underground garage utilizing the bad present situation of slope land, is characterized in that: comprise the following steps: (1)先规划出规划区位置,根据规划区位置规划出车库区,在车库区旁边预留出后期坡道区;(1) First plan the location of the planning area, plan the garage area according to the location of the planning area, and reserve a later ramp area next to the garage area; (2)在车库区内划分出地下车库区和临街商铺区;(2) Divide the underground garage area and the street-facing shop area in the garage area; (3)在临街商铺区的场地原自然地坪最低高程处划分出进入地下车库区的入口区和人行进出地面的台阶区;(3) The entrance area for entering the underground garage area and the step area for pedestrians to enter and exit the ground shall be divided at the lowest elevation of the original natural floor of the site facing the street; (4)确定临街商铺区商铺层高,从建筑层处规划确定出临街商铺区的商铺层高、地下车库区的车库地面标高以及车库层高,所述地下车库区的入口区地面标高高于场地最低高程0.1~0.2m;(4) Determine the shop storey height of the street-facing shop area, plan and determine the shop floor height of the street-facing shop area, the garage floor elevation of the underground garage area, and the garage floor height from the building floor plan. The ground elevation of the entrance area of the underground garage area is higher than The lowest elevation of the site is 0.1~0.2m; (5)待步骤(4)完成后,在原自然地坪最低高程处定出地下车库入口位置,定出车库底层底标高,将高于基础底标高的土全部挖方,挖方得出的土先堆置在不影响施工处,然后建设地下车库区,以及临街商铺区;(5) After step (4) is completed, determine the entrance position of the underground garage at the lowest elevation of the original natural floor, determine the bottom elevation of the garage, and excavate all the soil higher than the bottom elevation of the foundation, and pile the soil obtained from the excavation first Place it in a place that does not affect the construction, and then build the underground garage area and the street-facing shop area; (6)车库顶板建成后,铺设好保温防水层,防水层做好后,将步骤(5)中挖方所得土壤回填至车库库顶或主建筑物之外区域并夯实即可。(6) After the roof of the garage is completed, lay the insulation and waterproof layer. After the waterproof layer is completed, backfill the soil obtained from the excavation in step (5) to the roof of the garage or the area outside the main building and compact it. 2.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述地下车库区的车库顶部高于周边场地2~3m。2. A method for building an underground garage by utilizing the unfavorable current situation of slope land as claimed in claim 1, characterized in that: the top of the garage in the underground garage area is 2-3m higher than the surrounding site. 3.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述坡道区设置直线型双向车道。3. A method for constructing an underground garage by utilizing the unfavorable current situation of slope land as claimed in claim 1, characterized in that: said ramp area is provided with a straight two-way lane. 4.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述地下车库区的出入口的两侧均设置临时停车空间。4. A method for constructing an underground garage by utilizing the unfavorable current situation of slope land as claimed in claim 1, characterized in that: temporary parking spaces are provided on both sides of the entrance and exit of the underground garage area. 5.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述地下车库区上设置屋面景观区,所述屋面景观区内间隔式设置局部敞开顶及采光井。5. A method for constructing an underground garage by utilizing the unfavorable status quo of the sloping land as claimed in claim 1, characterized in that: a roof landscape area is set on the underground garage area, and a partially open roof and lighting are arranged at intervals in the roof landscape area well. 6.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述地下车库区的临场地高程低处的车库外侧设置商铺、场地道路或实用性建筑。6. A method for building an underground garage by utilizing the unfavorable current situation of slope land as claimed in claim 1, characterized in that: shops, site roads or practical buildings are arranged outside the garage at the lower elevation of the underground garage area. 7.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述地下车库区的车库顶层覆土内设置保温、给水、排水、采暖、煤气、电力和电信系统。7. A method for building an underground garage utilizing the poor current situation of slope land as claimed in claim 1, characterized in that: thermal insulation, water supply, drainage, heating, gas, electric power and telecommunication systems are arranged in the top layer of the garage in the underground garage area . 8.如权利要求1所述的一种利用坡地不良现状建设地下车库的方法,其特征在于:所述地下车库区设置疏散楼梯或电梯。8. A method for building an underground garage by utilizing the unfavorable current situation of slope land as claimed in claim 1, characterized in that: said underground garage area is provided with evacuation stairs or elevators.
CN201510988224.2A 2015-12-28 2015-12-28 A method of underground garage is built using the bad status in hillside fields Expired - Fee Related CN105421835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510988224.2A CN105421835B (en) 2015-12-28 2015-12-28 A method of underground garage is built using the bad status in hillside fields

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510988224.2A CN105421835B (en) 2015-12-28 2015-12-28 A method of underground garage is built using the bad status in hillside fields

Publications (2)

Publication Number Publication Date
CN105421835A CN105421835A (en) 2016-03-23
CN105421835B true CN105421835B (en) 2018-12-04

Family

ID=55500340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510988224.2A Expired - Fee Related CN105421835B (en) 2015-12-28 2015-12-28 A method of underground garage is built using the bad status in hillside fields

Country Status (1)

Country Link
CN (1) CN105421835B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442757A (en) * 2018-04-27 2018-08-24 中铁第四勘察设计院集团有限公司 A kind of depot of urban railway transit vehicles structure of combination alpine terrain
CN111457932B (en) * 2019-01-21 2024-03-08 阿里巴巴集团控股有限公司 Interest point identification method, device and navigation method, system and equipment
CN114439267B (en) * 2022-02-16 2024-03-22 浙大城市学院 Transformation of oversized independent underground garage into road structure and construction method thereof
CN118607066A (en) * 2024-06-18 2024-09-06 重庆大学 A design method for a composite functional three-dimensional parking garage that can flexibly adapt to mountainous terrain

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4683901A (en) * 1986-01-06 1987-08-04 Mitchell Robert W Cover for floating boat dock
CN2929069Y (en) * 2006-07-26 2007-08-01 邓海燕 A Garage Structure Added to the Renovation of an Old Residential Area
CN202164847U (en) * 2010-12-06 2012-03-14 淄博东升房地产开发有限公司 Overground garage for double-row integral villas
CN102434011B (en) * 2011-10-21 2013-09-11 成都万华投资集团有限公司 Tableland type low-rise dwelling group suitable for hilly ground
CN203129650U (en) * 2012-10-24 2013-08-14 中铁第四勘察设计院集团有限公司 Underground open type rail traffic vehicle park

Also Published As

Publication number Publication date
CN105421835A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN106869549B (en) Eccentric spiral three-dimensional parking lot and its underground construction method
CN105421835A (en) Method for building underground garage by using poor situation of slope
CN103643607A (en) Totally-closed full-interchange rapid public transport road system
CN110607927A (en) A split-level parking garage
CN106192640A (en) A kind of urban planning method utilizing open type sinking road
CN106436755A (en) Four-layer stair-like city underground comprehensive body
CN209874591U (en) Underground shaft type stereo bicycle/electric garage
CN107605195A (en) Circularly descend intelligent parking garage
CN211948551U (en) An underground parking garage and urban tunnel joint construction structure
CN210685524U (en) Split-level parking garage
CN113863745A (en) Modular split-level garage building design method suitable for residential area
CN107859060A (en) A kind of mechanical underground parking of inclined shaft
CN202500346U (en) Reconstruction structures for old building zone multi-unit underground space
CN208121811U (en) Pipe gallery integration exploitation and subway are total to the open-cut station of structure
CN201137308Y (en) Human and vehicle shunting type villa group
CN106013938B (en) Overground and underground urban traffic and pipe network complex
CN216076557U (en) Self-propelled stereo garage
CN111441614B (en) High-rise residential district and construction method thereof
CN203639771U (en) Totally-enclosed all-interchange rapid bus road system
CN2929069Y (en) A Garage Structure Added to the Renovation of an Old Residential Area
CN111560979A (en) An underground parking garage and urban tunnel joint construction structure
CN114277843A (en) Underground passage structure and construction method
CN210066387U (en) Space utilization system based on three-dimensional traffic and utility tunnel
CN107059918A (en) Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex
CN102434011B (en) Tableland type low-rise dwelling group suitable for hilly ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181204

Termination date: 20211228