CN203129650U - Underground open type rail traffic vehicle park - Google Patents

Underground open type rail traffic vehicle park Download PDF

Info

Publication number
CN203129650U
CN203129650U CN 201220546979 CN201220546979U CN203129650U CN 203129650 U CN203129650 U CN 203129650U CN 201220546979 CN201220546979 CN 201220546979 CN 201220546979 U CN201220546979 U CN 201220546979U CN 203129650 U CN203129650 U CN 203129650U
Authority
CN
China
Prior art keywords
open type
underground
type rail
rail traffic
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220546979
Other languages
Chinese (zh)
Inventor
杨清林
缪东
殷勤
雷鸣
王俊
周小斌
范永光
代刚
涂汉卿
姚应峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN 201220546979 priority Critical patent/CN203129650U/en
Application granted granted Critical
Publication of CN203129650U publication Critical patent/CN203129650U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a rail traffic vehicle park, in particular to an underground open type rail traffic vehicle park which is high in land resource utilization rate and convenient to operate. The underground open type rail traffic vehicle park comprises a pit which sinks into the ground and provided with multiple rails in a laid mode. An open type rail zone is arranged in the pit. An application warehouse is arranged behind the open type rail zone. The rails stretch into the application warehouse by passing through the open type rail zone. A ground park is arranged on the top of the application warehouse and connected with a road through a connecting bridge. The underground open type rail traffic vehicle park solves the problems that the ground park is low in land resource utilization rate and not convenient to operate and has the advantages of being scientific in construction, beneficial to people and friendly to environment.

Description

A kind of underground open type rail traffic vehicles parking lot
Technical field
The utility model relates to a kind of rail traffic vehicles parking lot, relates in particular to a kind of land resources utilization rate height, operation underground open type rail traffic vehicles parking lot easily.
Background technology
Raising along with living standards of the people, track traffic, especially the underground rail traffic is not overlapping with other transportation systems with its travel route, the characteristics of intersecting, the traffic that its driving is subjected to is disturbed less, can save in a large number and travel frequently the time, more and more be subjected to people's welcome, under the global warming problem, subway is best popular transport facility, and, because the subway road speed is stable, punctual efficient, make the common people be happy to take, also saved the energy that many drivings consume, therefore, the underground rail transport development is rapid, needs increasing railcar parking lot.The railcar parking lot, generally be used for parking and safeguarding vehicle, need unimpeded passage and operation space, at present, the railcar parking lot mostly is positioned at more than the ground, along with the growing tension of land resources, particularly in bustling location, the parking lot is arranged on ground can causes the serious waste of land resources undoubtedly, undergroundly can make parking lot operation very inconvenient and be arranged on fully.
Summary of the invention
The utility model mainly is at the above-mentioned technical problem of existing in prior technology, and a kind of land resources utilization rate height, operation underground open type rail traffic vehicles parking lot easily is provided.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: a kind of underground open type rail traffic vehicles parking lot, comprise a pit that is equipped with many tracks that is absorbed in ground, be provided with an open type track regions in the described pit, described open type track regions rear is provided with and uses the storehouse, described track stretches into through the open type track regions and uses in the storehouse, top, described utilization storehouse is provided with surface parking lots, and described surface parking lots are connected with road by connecting bridge.Using the storehouse is the storehouse of a slice sealing, be used for the daily railcar of parking and safeguard, the top in utilization storehouse arranges surface parking lots and is used for parking the common ground vehicles such as bus, land resources is fully utilized, improved land utilization ratio, enough operation spaces are provided, and traffic on the ground and underground traffic have organically been connected, make public transport more convenient, the Huimin environmental protection.The utility model adopts a kind of parking lot of the novel comprehensive utilization soil between underground and ground to solve the low and inconvenient problem of underground parking operation of surface parking lots land resources utilization rate.
As preferably, be provided with retaining wall around the described pit, described retaining wall is provided with escape canal outward.This structure has reduced the influence that pit is subjected to outside geological disaster, avoids rainwater to flow into pit inside.
As preferably, be provided with drainage pipe around the described surface parking lots, described drainage pipe feeds escape canal through retaining wall.This structure makes the waste water of surface parking lots can flow directly into the outer escape canal of pit, reduces the interior rainwater of pit to greatest extent and takes out liter, reduces the flood in parking lot, saves simultaneously and takes out the expense of liter and the energy.
As preferably, be provided with underground passage between described utilization storehouse and the pit sidewall, described underground passage is connected with ground by the ramp.This structure make pit inner and and ground between have unimpeded traffic, convenient operation.
As preferably, described pit bottom is connected with ground by escape ladder.This structure makes the pedestrian more convenient up and down, is convenient to operation, guarantees safety.
As preferably, described connection bridge comprises that garage connects bridge and is connected bridge with People's Bank of China.This structure makes traffic safer unobstructed human and vehicle shunting.
As preferably, be provided with the transition road between described connection bridge and the road.This structure make vehicle can be more convenient safe enter surface parking lots, stop the potential safety hazard on the road.
As preferably, the degree of depth of described pit is 3 ~ 3.5 meters.Reducing amount of excavation as far as possible, and satisfy to use under the condition of library facility needs, absolute altitude be set to 3 ~ 3.5 meters proper.
The utility model adopts a kind of parking lot of the novel comprehensive utilization soil between underground and ground to solve the low and inconvenient problem of underground parking operation of surface parking lots land resources utilization rate, has the characteristics of the science of constructing, Huimin environmental protection.
Description of drawings
Accompanying drawing 1 is the structural representation in a kind of underground open type rail traffic vehicles of the utility model parking lot.
Accompanying drawing 2 is the structured flowchart in a kind of underground open type rail traffic vehicles of the utility model parking lot.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail, obviously, described embodiment only is part embodiment of the present utility model.
Embodiment 1:
Referring to accompanying drawing 1 and Fig. 2, a kind of underground open type rail traffic vehicles of the utility model parking lot comprises a pit that is equipped with many tracks 14 that is absorbed in 3.2 meters on ground, and the degree of depth of described pit can also be the arbitrary degree of depth between 3 ~ 3.5 meters.Be provided with an open type track regions 3 in the described pit, described open type track regions 3 rears are provided with and use storehouse 2, described track 14 stretches into through open type track regions 3 and uses in the storehouse 2,2 tops, described utilization storehouse are provided with surface parking lots 1, described surface parking lots 1 are connected bridge 5 by two garages' connection bridges 4 with three People's Bank of China and are connected with transition road 6, and transition road 6 is connected with road 7.Use between storehouse 2 and the pit sidewall and be provided with underground passage 8, described underground passage 8 is connected with ground by ramp 9, and described pit bottom is connected with ground by escape ladder 13.Using the storehouse is the storehouse of a slice sealing, be used for the daily railcar of parking and safeguard, the top in utilization storehouse arranges surface parking lots and is used for parking the common ground vehicles such as bus, land resources is fully utilized, improved land utilization ratio, enough operation spaces are provided, and traffic on the ground and underground traffic have organically been connected, make public transport more convenient, the Huimin environmental protection.
Be provided with retaining wall 10 around the pit, the described retaining wall 10 outer escape canals 11 that are provided with are provided with drainage pipe 12 around the described surface parking lots 1, and described drainage pipe 12 feeds escape canal 11 through retaining wall 10.This structure has reduced the influence that pit is subjected to outside geological disaster, make the waste water of rainwater and surface parking lots can flow directly into the outer escape canal of pit simultaneously, reduce the interior rainwater of pit to greatest extent and take out liter, reduce the flood in parking lot, save simultaneously and take out the expense of liter and the energy.
Therefore, the utility model adopts a kind of parking lot of the novel comprehensive utilization soil between underground and ground to solve the low and inconvenient problem of underground parking operation of surface parking lots land resources utilization rate, has the characteristics of the science of constructing, Huimin environmental protection.
Should be understood that above-described embodiment only is used for explanation the utility model and is not used in the scope of the present utility model that limits.Should be understood that in addition those skilled in the art can make various changes or modifications the utility model after the content of having read the utility model instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.

Claims (8)

1. underground open type rail traffic vehicles parking lot, it is characterized in that: comprise a pit that is equipped with many tracks (14) that is absorbed in ground, be provided with an open type track regions (3) in the described pit, described open type track regions (3) rear is provided with and uses storehouse (2), described track (14) stretches into through open type track regions (3) and uses in the storehouse (2), top, described utilization storehouse (2) is provided with surface parking lots (1), and described surface parking lots (1) is connected with road (7) by connecting bridge.
2. underground open type rail traffic vehicles according to claim 1 parking lot is characterized in that: be provided with retaining wall (10) around the described pit, the outer escape canal (11) that is provided with of described retaining wall (10).
3. underground open type rail traffic vehicles according to claim 2 parking lot, it is characterized in that: described surface parking lots (1) is provided with drainage pipe (12) all around, and described drainage pipe (12) feeds escape canal (11) through retaining wall (10).
4. underground open type rail traffic vehicles according to claim 1 parking lot, it is characterized in that: be provided with underground passage (8) between described utilization storehouse (2) and the pit sidewall, described underground passage (8) is connected with ground by ramp (9).
5. according to claim 1 or 4 described underground open type rail traffic vehicles parking lots, it is characterized in that: described pit bottom is connected with ground by escape ladder (13).
6. underground open type rail traffic vehicles according to claim 1 parking lot, it is characterized in that: described connection bridge comprises that garage connects bridge (4) and is connected bridge (5) with People's Bank of China.
7. according to claim 1 or 6 described underground open type rail traffic vehicles parking lots, it is characterized in that: be provided with transition road (6) between described connection bridge and the road (7).
8. underground open type rail traffic vehicles according to claim 1 parking lot, it is characterized in that: the degree of depth of described pit is 3 ~ 3.5 meters.
CN 201220546979 2012-10-24 2012-10-24 Underground open type rail traffic vehicle park Expired - Lifetime CN203129650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220546979 CN203129650U (en) 2012-10-24 2012-10-24 Underground open type rail traffic vehicle park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220546979 CN203129650U (en) 2012-10-24 2012-10-24 Underground open type rail traffic vehicle park

Publications (1)

Publication Number Publication Date
CN203129650U true CN203129650U (en) 2013-08-14

Family

ID=48937642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220546979 Expired - Lifetime CN203129650U (en) 2012-10-24 2012-10-24 Underground open type rail traffic vehicle park

Country Status (1)

Country Link
CN (1) CN203129650U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421835A (en) * 2015-12-28 2016-03-23 南阳师范学院 Method for building underground garage by using poor situation of slope
CN107878469A (en) * 2017-10-20 2018-04-06 中铁第四勘察设计院集团有限公司 A kind of motor-car uses institute's system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421835A (en) * 2015-12-28 2016-03-23 南阳师范学院 Method for building underground garage by using poor situation of slope
CN107878469A (en) * 2017-10-20 2018-04-06 中铁第四勘察设计院集团有限公司 A kind of motor-car uses institute's system

Similar Documents

Publication Publication Date Title
CN204174530U (en) Bridge rain drainage structure
CN107326926A (en) A kind of city emergency drainage system with rapid transit and underground pipe gallery function
CN203129650U (en) Underground open type rail traffic vehicle park
CN103485251B (en) The urban road that a kind of people's car separates
CN201695296U (en) Floor tile with rapid draining
CN202227749U (en) Underground automatic parking area for track traffic
CN103469707B (en) A kind of multifunctional city road
CN203113850U (en) Aerial parking space enabling user to park above green belt and being capable of being hidden in off working state
CN202689615U (en) Through type multifunctional air parking lot
CN207079625U (en) A kind of city emergency drainage system with rapid transit and underground pipe gallery function
CN203782508U (en) Precast type road intersection structure system
CN204343747U (en) The dolly parking lot in overhead, a kind of street
CN204728227U (en) The special snow hurdle of a kind of railway
CN204960478U (en) Urban traffic who takes non -motor underground parking garage transfers system
CN206090618U (en) Semi -underground flood control utility tunnel
CN201942972U (en) Multifunctional tunnel and parking multiple-use building
CN206503042U (en) Micro-overpass
CN201193027Y (en) Underground toques channel combined with ground road
CN204252260U (en) Multi-functional flood control gully structure
CN101372825A (en) Method for using underground passage combined with ground road as trolley bus passage
CN205591061U (en) Two -way high highway protective structure that varies in mountain area
CN204849503U (en) Underground bus station system suitable for city primary and secondary arterial highway intersection
CN202659279U (en) Turntable type flat parking lot for mine tunnel
CN102677559A (en) Special electromobile road system in house building
CN203514148U (en) Road surface edgestone capable of improving road surface drainage speed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130814

CX01 Expiry of patent term