CN201193027Y - Underground toques channel combined with ground road - Google Patents

Underground toques channel combined with ground road Download PDF

Info

Publication number
CN201193027Y
CN201193027Y CNU2008200090559U CN200820009055U CN201193027Y CN 201193027 Y CN201193027 Y CN 201193027Y CN U2008200090559 U CNU2008200090559 U CN U2008200090559U CN 200820009055 U CN200820009055 U CN 200820009055U CN 201193027 Y CN201193027 Y CN 201193027Y
Authority
CN
China
Prior art keywords
underground
passage way
underground passage
passage
surface road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200090559U
Other languages
Chinese (zh)
Inventor
马兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200090559U priority Critical patent/CN201193027Y/en
Application granted granted Critical
Publication of CN201193027Y publication Critical patent/CN201193027Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to the field of the municipal and transportation engineering, and relates to an underground trolleybus passage that is combined with the ground road, and adopts the technical proposal that an integrated passage is arranged by using the shallow underground space of the ground road and combining the ground road; the cross section of the underground integrated passage is of a rectangular shape, and is provided with a single layer in the vertical direction, and is provided with a single hole or multiple holes in the transverse direction that is used as the passage for the trolleybus; the top of the roof plate of the underground passage is buried with a surface layer that is used as the ground road; the underground passage is provided with two or more than two lanes. The underground passage has the advantages that 1) the underground space of the ground road is adequately used, and the urban road resource is enlarged; 2) the underground passage has the effect of the public transportation lane; 3) the underground passage is free from waste gas emission, and has low noise and low pollution; 4) the underground passage can save the ground transportation space, thereby releasing the ground traffic pressure. The underground passage is suitable for the city to develop the underground trolleybus transportation, and can be used as the main public transportation form in the middle and small cities and as the auxiliary public transportation form in the large cities.

Description

The underground trolley bus tunnel that combines with surface road
Technical field:
The utility model belongs to the traffic engineering field of having stable political situation, city, particularly relates to a kind of underground trolley bus tunnel that combines with surface road.
Background technology:
Trackless trolley car directly utilizes electric power as power, does not have explosive motor, not discharging waste gas, noise is little, pollute little, since being born, because of its plurality of advantages obtains using comparatively widely in various countries' urban ground traffic, occupied critical role, but also had the following disadvantages:
1, because trackless trolley car is connected power supply by the fixing rod pantagraph current collector of overhead type contact system and vehicle (be commonly called as plait, also claim current colector, be made up of with trolley head trolley pole).
1) fixedly overhead type contact system must be set, as web, it is bigger that difficulty is set, and landscape effect is not good, and maintenance is also bigger.
2) necessary fixed vehicle running route and track, the alerting ability of circulation line adjustment and combination is relatively poor.
2, because trackless trolley car and other vehicles mix row, and the trackless trolley car speed of a motor vehicle is lower, can not adapt to the requirement of modern city ground communications, also aggravated blocking up of urban ground traffic simultaneously.
3, because traffic lights are controlled, vehicle pass-through speed more can't be mentioned in the same breath with track traffic.
Because above-mentioned deficiency, along with the maximization in city, the increase of road number of track-lines, the raising that goes out line speed, the application of trackless trolley car more and more is restricted in the urban ground traffic in recent years, and the diesel oil motorcoach is propagated its belief on a large scale on the contrary, obtained fast development, when bringing quick, motor-driven, flexible advantage, its strong noise, maximum discharge, high pollution have also brought comparatively serious waste gas, noise emission to the city, become a big problem in puzzlement city, various countries, simultaneously also expend a large amount of oil resources, aggravated the anxiety of oil supply.
The utility model content:
Problem at the background technology existence, the utility model people proposes, if utilize the underground space of surface road, be arranged to the underground passage way that combines with surface road, designated lane as trackless trolley car, then fixedly the setting of overhead type contact system and with the contacting of trackless trolley car rod pantagraph current collector, problems such as track will be out of question, passage rate can improve greatly, add the non-exhaust emission that trackless trolley car itself is had, low noise, oligosaprobic advantage, then trackless trolley car still has very strong survivability, still can in the city traffic system, play a significant role, can also vacate the ground communications space, alleviate the ground communications pressure that the vehicle sharp increase based on dolly brings.
In addition, compare, have following characteristics with track traffic:
1, passage rate and carrying capacity: effect with public transportation lane, the trackless trolley car passage rate is a little less than even not being lower than track traffic, single track carrying capacity is lower slightly, can adopt the super wide vehicle or the double-decker that are similar to the airport ferry bus, improve bicycle carrying capacity, major urban arterial highway can be provided with two and come two to go to four tracks, whole carrying capacity higher (be equivalent to track traffic about 50%).
2, passage building cost and construction period: underground passage way can adopt foundation ditch open cut method, pit top-down, foundation ditch cap excavation method or put sloping cut and cover tunneling, and cost is low, and speed is fast, and risk is little.And shield method or subsurface excavation method are generally adopted in the underground rail traffic, and speed is slow, and the cost height has a big risk.
3, vehicle manufacturing cost and cycle: the vehicle cost is well below rail traffic vehicles, and domestic trackless trolley car vehicle manufacturing technology is very ripe, and the manufacturing cycle is short, can meet the demands fast.
4, operating cost: the passage maintenance is little during the operation, expense is low, and the trackless trolley car Operating Expenses is also lower.
5, the property extended: along with widening of surface road, underground trolley bus tunnel also can correspondingly be widened, and increases the track.The underground rail traffic then is difficult to widen.
6, the utilization of the underground space: the trackless trolley car turn radius is little, hill climbing ability is big, its passage can utilize the underground space setting of surface road fully, the general underground space that does not need to pass through other surrounding buildings because of the turn radius problem, and passage and station setting depth as shallow, take underground space depth as shallow, personnel are comparatively convenient up and down.And underground rail traffic turn radius is big, often need to pass through the underground space of other surrounding buildings during turning, and because tunnel structure needs, climbing needs, the tunnel and the station setting degree of depth are dark because of the turn radius problem, it is big to take the underground space degree of depth, and personnel are also not too convenient up and down.
7, resultant effect: can make full use of the underground space, can be in conjunction with transforming surface road, the performance of surface road and durability can reach the level of elevated line.
In sum, technical problem to be solved in the utility model provides the underground trolley bus tunnel that combines with surface road, solves the application problem of trackless trolley car in the modern city traffic.
The technical solution of the utility model is to utilize the shallow-layer underground space of surface road, the combined ground road is provided with underground passage way, the underground passage way section is a rectangle, vertical is individual layer, laterally is single hole or porous, and underground passage way is as the passage of trackless trolley car, surface layer is laid at the top board top of underground passage way, as surface road, underground passage way top board bottom is provided with the overhead type contact system, by powering with contacting to trackless trolley car of trackless trolley car pantagraph current collector.
Described underground passage way clear height generally is not less than 4m, clear height preferred value 〉=4.5m ,≤5.5m, the clear span of underground passage way is not less than 7m, clear span preferred value 〉=9m.
Described underground passage way is provided with moving traffic lane and sudden stop band, and moving traffic lane is no less than 2, and the sudden stop band is no less than 1, during moving traffic lane 〉=4, the sudden stop band is set is no less than 2.
Described underground passage way adopts the box culvert structure, is made up of top board, side wall and base plate; Section is that the underground passage way of porous rectangle is provided with partition wall or column and bent cap; Underground passage way can further be provided with pile foundation; Utilize the deadweight of underground passage way to satisfy the stability against floating requirement, or utilize the deadweight of underground passage way and pile foundation to satisfy the stability against floating requirement jointly; Top board, side wall, base plate, partition wall, bent cap adopt reinforced concrete structure or prestressed reinforced concrete structure, and column adopts reinforced concrete structure.
Described underground passage way adopts the unitized construction of whole dock type structure and prestress panel, is made up of side wall, base plate, support and prestress panel; Section is that pory underground passage way is provided with partition wall or column and bent cap; Underground passage way can further be provided with pile foundation; Utilize the deadweight of underground passage way to satisfy the stability against floating requirement, or utilize the deadweight of underground passage way and pile foundation to satisfy the stability against floating requirement jointly; Side wall, base plate, partition wall, bent cap adopt reinforced concrete structure or prestressed reinforced concrete structure, column adopts reinforced concrete structure, support and adopt reinforced concrete structure or steel structure, the prestress panel adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
Described underground passage way adopts the unitized construction of board-like supporting and prestress panel, is made of the side wall of the board-like supporting double as underground passage way that base plate is above board-like supporting, lining cutting, support, prestress panel and base plate; Section is that pory underground passage way is provided with partition wall or column and bent cap; Underground passage way can further be provided with pile foundation; Utilize deadweight, pile foundation and board-like supporting to satisfy the stability against floating requirement jointly; Base plate, partition wall, bent cap adopt reinforced concrete structure or prestressed reinforced concrete structure, lining cutting, column adopt reinforced concrete structure, support and adopt reinforced concrete structure or steel structure, the prestress panel adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
The unitized construction of described box culvert structure, whole dock type structure and prestress panel, its foundation pit construction adopt puts sloping open cut method, or foundation pit enclosure open cut method, foundation pit enclosure contrary sequence method, foundation pit enclosure cap excavation method.Foundation pit enclosure comprises gravity type boat davit supporting and board-like supporting etc.Foundation pit enclosure contrary sequence method, foundation pit enclosure cap excavation method can satisfy the needs that resume traffic as early as possible.
The unitized construction of described board-like supporting and prestress panel, its foundation pit construction adopt board-like supporting open cut method, or board-like supporting contrary sequence method, board-like supporting cap excavation method.Board-like supporting comprises continuous concrete wall, bored concrete pile campshed, perfusion stake continuously, reinforced concrete sheet pile, steel sheet pile etc.Board-like supporting cap excavation method can directly utilize the prestress panel as cover plate.Board-like supporting contrary sequence method, board-like supporting cap excavation method can satisfy the needs that resume traffic as early as possible.
Described pile foundation adopts the one or more combination of root pile, reinforced concrete pile, prestressed reinforced concrete stake, PHC pile tube, PC pile tube, bored concrete pile, steel pipe pile.
Intersection between the described underground passage way can adopt the level crossing mode, and traffic lights control is set, and also can adopt the mode of grade separation up and down of not intercommunication.
The described trackless trolley car of underground passage way that runs on is according to existing trackless trolley car technology bar, technical standards such as the lane width of underground passage way, bending spring, flat vertical curve are according to the urban highway technical standard, also can adopt width〉2.5m ,≤individual layer or the double-deck trackless trolley car of 4m, to improve traffic potential, then technical standards such as the lane width of underground passage way, bending spring, flat vertical curve are determined according to the vehicle technology condition.
Described underground passage way and trackless trolley car at glancing impact, are converted into electric energy with trackless trolley car kinetic energy, by contacting of trackless trolley car pantagraph current collector and overhead type contact system, feed back and give electrical network, with energy savings.
Technique effect of the present utility model is 1) fully in conjunction with the urban ground road, make full use of the space, enlarge the urban highway resource; 2) solve the urban highway electric car problems such as overhead type contact system and track are set; 3) have the effect of public transportation lane, passage rate can improve greatly, and whole carrying capacity is higher; 4) non-exhaust emission, low noise, the low pollution; 5) can vacate the ground communications space, alleviate the ground communications pressure that the vehicle sharp increase based on dolly brings; 6) has extendability preferably.The utility model is fit to the traffic of urban development underground trolley bus, as the auxiliary public transport form of main public transport form in small and medium-sized cities and big city.
Description of drawings:
Fig. 1 is the cross sectional drawing of the utility model embodiment one
Fig. 2 is the cross sectional drawing of the utility model embodiment two
Fig. 3 is the cross sectional drawing of the utility model embodiment three
Fig. 4 is the cross sectional drawing of the utility model embodiment four
Fig. 5 is the cross sectional drawing of the utility model embodiment five
Fig. 6 is the cross sectional drawing of the utility model embodiment six
Fig. 7 is the cross sectional drawing of the utility model embodiment seven
Fig. 8 is the cross sectional drawing of the utility model embodiment eight
Among the figure: 1, underground passage way, the top board of 2a, box culvert structure, 2b, prestress panel, the side wall of 3a, box culvert structure or whole dock type structure, 3b, board-like supporting, 3c, partition wall or column, 3d, lining cutting, 3e, bent cap, 4, base plate, 5, support 6, pile foundation, 7, surface road, 8, overhead type contact system, 9, trackless trolley car, 10, the trackless trolley car pantagraph current collector, 11, moving traffic lane, 12, the sudden stop band, 13, land vehicle.
The specific embodiment:
Implement embodiment of the present utility model below in conjunction with description of drawings:
Embodiment one
Referring to Fig. 1, underground passage way 1 section is a rectangle, vertically is individual layer, laterally is single hole, and underground passage way 1 adopts the box culvert structure, is made up of the top board 2a of box culvert structure, the side wall 3a and the base plate 4 of box culvert structure.Utilize the shallow-layer underground space of surface road 7, combined ground road 7 is provided with underground passage way 1, underground passage way 1 is as the passage of trackless trolley car 9, surface layer is laid at the top board 2a top of box culvert structure, as surface road 7, the top board 2a bottom of box culvert structure is provided with overhead type contact system 8, by powering with contacting to trackless trolley car 9 of trackless trolley car pantagraph current collector 10.Underground passage way 1 clear height 〉=4m, clear span 〉=9m establishes 2 moving traffic lane 11 and 1 sudden stop band 12.Underground passage way 1 utilizes deadweight to satisfy the stability against floating requirement, or utilizes deadweight and pile foundation 6 to satisfy the stability against floating requirement jointly.The top board 2a of box culvert structure, side wall 3a and base plate 4 adopt reinforced concrete structure or prestressed reinforced concrete structure.
Embodiment two
Referring to Fig. 2, underground passage way 1 section is a rectangle, vertically is individual layer, laterally is single hole, and underground passage way 1 adopts the unitized construction of whole dock type structure and prestress panel 2b, is made up of side wall 3a, support 5 and the base plate 4 of prestress panel 2b, whole dock type structure.Utilize the shallow-layer underground space of surface road 7, combined ground road 7 is provided with underground passage way 1, underground passage way 1 is as the passage of trackless trolley car 9, surface layer is laid at prestress panel 2b top, as surface road 7, prestress panel 2b bottom is provided with overhead type contact system 8, by powering with contacting to trackless trolley car 9 of trackless trolley car pantagraph current collector 10.Underground passage way 1 clear height 〉=4m, clear span 〉=9m establishes 2 moving traffic lane 11 and 1 sudden stop band 12.Underground passage way 1 utilizes deadweight to satisfy the stability against floating requirement, or utilizes deadweight and pile foundation 6 to satisfy the stability against floating requirement jointly.Side wall 3a and base plate 4 adopt reinforced concrete structure or prestressed reinforced concrete structure; Support 5 and adopt reinforced concrete structure or steel structure; Prestress panel 2b adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
Embodiment three
Referring to Fig. 3, underground passage way 1 section is a rectangle, vertical is individual layer, be single hole laterally, underground passage way 1 adopts the unitized construction of board-like supporting 3b and prestress panel 2b, form the side wall of the board-like supporting 3b double as underground passage way 1 of base plate more than 4 by board-like supporting 3b, lining cutting 3d, base plate 4, support 5 and prestress panel 2b.Utilize the shallow-layer underground space of surface road 7, combined ground road 7 is provided with underground passage way 1, underground passage way 1 is as the passage of trackless trolley car 9, surface layer is laid at prestress panel 2b top, as surface road 7, prestress panel 2b bottom is provided with overhead type contact system 8, by powering with contacting to trackless trolley car 9 of trackless trolley car pantagraph current collector 10.Underground passage way 1 clear height 〉=4m, clear span 〉=9m establishes 2 moving traffic lane 11 and 1 sudden stop band 12.Underground passage way 1 utilizes deadweight and board-like supporting 3b to satisfy the stability against floating requirement jointly.Base plate 4 adopts reinforced concrete structure or prestressed reinforced concrete structure; Lining cutting 3d adopts reinforced concrete structure; Support 5 and adopt reinforced concrete structure or steel structure; Prestress panel 2b adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
Embodiment four
Referring to Fig. 4, underground passage way 1 section is a rectangle, vertically is individual layer, laterally is single hole, clear height 〉=4m, and clear span 〉=20m establishes 4 moving traffic lane 11 and 2 or 2 above sudden stop bands 12.All the other are with embodiment two.
Embodiment five
Referring to Fig. 5, underground passage way 1 section is a rectangle, vertically is individual layer, laterally is single hole, clear height 〉=4m, and clear span 〉=20m establishes 4 moving traffic lane 11 and 2 or 2 above sudden stop bands 12.All the other are with embodiment three.
Embodiment six
Referring to Fig. 6, underground passage way 1 section is a rectangle, vertically is individual layer, laterally is diplopore, and underground passage way 1 adopts the box culvert structure, is made up of top board 2a, side wall 3a, partition wall or column 3c, bent cap 3e and the base plate 4 of box culvert structure.Underground passage way clear height 〉=4m, total clear span 〉=20m establishes 4 moving traffic lane 11 and 2 or 2 above sudden stop bands 12.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment one.
Embodiment seven
Referring to Fig. 7, underground passage way 1 section is a rectangle, vertically is individual layer, laterally is diplopore, underground passage way 1 adopts the unitized construction of whole dock type structure and prestress panel 2b, is made up of side wall 3a, partition wall or column 3c, bent cap 3e, support 5 and the base plate 4 of prestress panel 2b, whole dock type structure.Underground passage way 1 clear height 〉=4m, total clear span 〉=20m establishes 4 moving traffic lane 11 and 2 or 2 above sudden stop bands 12.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment two.
Embodiment eight
Referring to Fig. 8, underground passage way 1 section is a rectangle, vertical is individual layer, be diplopore laterally, underground passage way 1 adopts the unitized construction of board-like supporting 3b and prestress panel 2b, form the side wall of the board-like supporting 3b double as underground passage way 1 of base plate more than 4 by board-like supporting 3b, lining cutting 3d, partition wall or column 3c, bent cap 3e, base plate 4, support 5 and prestress panel 2b.Underground passage way 1 clear height 〉=4m, total clear span 〉=20m establishes 4 moving traffic lane 11 and 2 or 2 above sudden stop bands 12.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment three.
Embodiment one, two, four, six, seven, and the foundation pit construction of its underground passage way 1 (not shown on the figure) adopts puts sloping open cut method, or foundation pit enclosure open cut method, foundation pit enclosure contrary sequence method, foundation pit enclosure cap excavation method, and foundation pit enclosure comprises gravity type boat davit supporting and board-like supporting etc.Foundation pit enclosure contrary sequence method, foundation pit enclosure cap excavation method can satisfy the needs that resume traffic as early as possible.
The foundation pit construction of all the other embodiment (not shown on the figure) adopts board-like supporting open cut method, or board-like supporting contrary sequence method, board-like supporting cap excavation method.Board-like supporting 3b comprises continuous concrete wall, bored concrete pile campshed, perfusion stake continuously, reinforced concrete sheet pile, steel sheet pile etc.Board-like supporting cap excavation method can directly utilize prestress panel 2b as cover plate.Board-like supporting contrary sequence method, board-like supporting cap excavation method can satisfy the needs that resume traffic as early as possible.
Described pile foundation 6 adopts the one or more combination of root pile, reinforced concrete pile, prestressed reinforced concrete stake, PHC pile tube, PC pile tube, bored concrete pile, steel pipe pile.
According to existing trackless trolley car engineering factor, technical standards such as the lane width of underground passage way 1, bending spring, flat vertical curve are according to the urban highway technical standard at the trackless trolley car 9 of underground passage way 1 operation; Also can adopt width〉2.5m ,≤individual layer or the double-deck trackless trolley car of 4m, to improve traffic potential, then technical standards such as the lane width of underground passage way 1, bending spring, flat vertical curve are determined according to the vehicle technology condition.
Certainly, the specific embodiment also has many combinations, as long as the combined ground road is provided with underground passage way, underground passage way is as the passage of trackless trolley car, and the top board top of underground passage way is as surface road, all within the utility model protection domain.

Claims (8)

1. the underground trolley bus tunnel that combines with surface road, it is characterized in that: the shallow-layer underground space of utilizing surface road, the combined ground road is provided with underground passage way, and the underground passage way section is a rectangle, vertically is individual layer, be single hole or porous laterally, underground passage way is as the passage of trackless trolley car, and surface layer is laid at the top board top of underground passage way, as surface road, underground passage way top board bottom is provided with the overhead type contact system, by powering with contacting to trackless trolley car of trackless trolley car pantagraph current collector.
2. the underground trolley bus tunnel that combines with surface road according to claim 1, it is characterized in that: underground passage way is provided with moving traffic lane and sudden stop band, and moving traffic lane is no less than 2, and the sudden stop band is no less than 1, during moving traffic lane 〉=4, the sudden stop band is set is no less than 2.
3. the underground trolley bus tunnel that combines with surface road according to claim 1 and 2 is characterized in that: underground passage way adopts the box culvert structure, is made up of top board, side wall and base plate; Section is that pory underground passage way is provided with partition wall or column and bent cap; Underground passage way can further be provided with pile foundation.
4. the underground trolley bus tunnel that combines with surface road according to claim 1 and 2 is characterized in that: underground passage way adopts the unitized construction of whole dock type structure and prestress panel, is made up of side wall, support, prestress panel and base plate; Section is that pory underground passage way is provided with partition wall or column and bent cap; Underground passage way can further be provided with pile foundation.
5. the underground trolley bus tunnel that combines with surface road according to claim 1 and 2, it is characterized in that: underground passage way adopts the unitized construction of board-like supporting and prestress panel, form the side wall of the board-like supporting double as underground passage way that base plate is above by board-like supporting, lining cutting, support, prestress panel and base plate; Section is that pory underground passage way is provided with partition wall or column and bent cap; Underground passage way can further be provided with pile foundation.
6. the underground trolley bus tunnel that combines with surface road according to claim 1 and 2 is characterized in that: the intersection between the underground passage way can adopt the level crossing mode, and traffic lights control is set, and also can adopt the mode of grade separation up and down of not intercommunication.
7. the underground trolley bus tunnel that combines with surface road according to claim 1 and 2, it is characterized in that: the trackless trolley car that runs on underground passage way is according to existing trackless trolley car engineering factor, and technical standards such as the lane width of underground passage way, bending spring, flat vertical curve are according to the urban highway technical standard.
8. the underground trolley bus tunnel that combines with surface road according to claim 1 and 2, it is characterized in that: the trackless trolley car that runs on underground passage way adopts width〉2.5m ,≤individual layer or the double-deck trackless trolley car of 4m, technical standards such as the lane width of underground passage way, bending spring, flat vertical curve are determined according to the vehicle technology condition.
CNU2008200090559U 2008-04-06 2008-04-06 Underground toques channel combined with ground road Expired - Fee Related CN201193027Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200090559U CN201193027Y (en) 2008-04-06 2008-04-06 Underground toques channel combined with ground road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200090559U CN201193027Y (en) 2008-04-06 2008-04-06 Underground toques channel combined with ground road

Publications (1)

Publication Number Publication Date
CN201193027Y true CN201193027Y (en) 2009-02-11

Family

ID=40392570

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200090559U Expired - Fee Related CN201193027Y (en) 2008-04-06 2008-04-06 Underground toques channel combined with ground road

Country Status (1)

Country Link
CN (1) CN201193027Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011596A (en) * 2010-11-29 2011-04-13 中铁三局集团有限公司 Shield originating or receiving end tunnel portal maintenance process
CN109795509A (en) * 2019-03-14 2019-05-24 上海师范大学 A kind of top is the shallow-layer Rail Transit System on glass road surface

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011596A (en) * 2010-11-29 2011-04-13 中铁三局集团有限公司 Shield originating or receiving end tunnel portal maintenance process
CN109795509A (en) * 2019-03-14 2019-05-24 上海师范大学 A kind of top is the shallow-layer Rail Transit System on glass road surface

Similar Documents

Publication Publication Date Title
CN101634126A (en) Ground-road combined comprehensive tunnel for underground pipeline and trolley bus
WO2008077319A1 (en) Underground tunnel combined with ground road
CN101311413A (en) Process for using underground passage combined with roads on ground as passage of trolley bus
CN202090639U (en) Underground garage with double-spiral one-way lanes
CN106758579A (en) The building in three-dimensional city and traffic integrated system
CN106013221A (en) Four-layer rectangle-like urban underground complex
CN106013215A (en) Three-layer rectangle-like urban underground complex
CN202543953U (en) Supporting structure for shallow tunnel in overpass operation
CN201778275U (en) Dual-lane cableway bridge
CN201317908Y (en) Double deck cable stayed bridge of separation type
CN206110182U (en) Three large -scale arcading city utility tunnel
CN102383348A (en) Urban multilayer stereoscopic public traffic line
CN201193027Y (en) Underground toques channel combined with ground road
CN101307659A (en) Storied building type channel
CN101372825A (en) Method for using underground passage combined with ground road as trolley bus passage
CN106677207A (en) Staggered type underground traffic pipe gallery car entrance and exit structure
CN201065504Y (en) Underground trolleybus channel connected with ground surface road
CN101413237A (en) Underground pipeline and trolleybus integrated channel combined with ground road
CN101581159A (en) Building channel
CN201193026Y (en) Underground pipeline and toques integrated channel combined with ground road
CN201065503Y (en) Underground pipeline and trolleybus integrated channel connected with ground surface road
CN101634127A (en) Underground trolley bus tunnel combined with ground roads
CN114194981A (en) Road traffic transportation and electric power energy storage system based on heavy-duty automobile lifting
CN106013938A (en) Overground and underground urban traffic and pipe network complex
CN207469031U (en) A kind of overhead ecological cycle track

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 701 room 21, Lane 801, Lane 201204, Sakura Road, Shanghai

Patentee after: Ma Xinghua

Address before: 201204, room 81, No. 478, Lane 402, Fanghua Road, Shanghai, Pudong New Area

Patentee before: Ma Xinghua

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090211

Termination date: 20100406