CN202543953U - Supporting structure for shallow tunnel in overpass operation - Google Patents

Supporting structure for shallow tunnel in overpass operation Download PDF

Info

Publication number
CN202543953U
CN202543953U CN 201220131077 CN201220131077U CN202543953U CN 202543953 U CN202543953 U CN 202543953U CN 201220131077 CN201220131077 CN 201220131077 CN 201220131077 U CN201220131077 U CN 201220131077U CN 202543953 U CN202543953 U CN 202543953U
Authority
CN
China
Prior art keywords
shallow tunnel
tunnel
braced structures
stride
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220131077
Other languages
Chinese (zh)
Inventor
龚彦峰
陈立保
徐向东
王克金
程鹏九
王春梅
游龙飞
孙春光
唐雄俊
胡威东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Holding Co of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
中铁第四勘察设计院集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁第四勘察设计院集团有限公司 filed Critical 中铁第四勘察设计院集团有限公司
Priority to CN 201220131077 priority Critical patent/CN202543953U/en
Application granted granted Critical
Publication of CN202543953U publication Critical patent/CN202543953U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a supporting structure for a shallow tunnel in overpass operation, which is used for supporting a newly constructed traffic line over the existing shallow tunnel. The supporting structure comprises a supporting slab and a plurality of foundation piles, the foundation piles are arranged by both sides of the existing shallow tunnel and buried in a foundation, and the supporting slab is anchored on the top ends of the foundation piles and buried in the foundation. The span of the supporting structure for the shallow tunnel in overpass operation is small, the line elevation is low, construction is convenient, the construction cost is low, and moreover, the affection on the safe operation of the existing tunnel is little.

Description

On stride the braced structures of the shallow tunnel in the operation
Technical field
The utility model relate to operation in the newly-built traffic route that intersects of shallow tunnel, relate in particular to the braced structures of striding the shallow tunnel in the operation on a kind of.
Background technology
The tunnel is huge branch system on the engineering.According to the construction information investigation of a large amount of construction of tunnel, tunnel or section that the not enough Mao Dong of upper cover layer strides in the hole twice belong to shallow embedding formula tunnel.In order to make urban traffic more convenient, tend on existing shallow tunnel, build new traffic route, as, highway, railway, town road and city rail etc.
When building new traffic route above the existing shallow tunnel in operation; Safety in order to ensure the tunnel in the operation; The form of striding on the roadbed of new traffic route is commonly used promptly adopts Longspan Bridge across existing shallow tunnel, and on Longspan Bridge, builds new traffic route.Yet Longspan Bridge exists that span is big, the circuit absolute altitude is than shortcomings such as higher and cost height.
Therefore, be necessary to provide the braced structures of striding the shallow tunnel in the operation on a kind of to overcome above-mentioned defective.
The utility model content
The purpose of the utility model provides that a kind of span is little, the route absolute altitude is low, easy construction, cost is low and can guarantee the existing tunnel operation security on stride the braced structures of the shallow tunnel in the operation.
To achieve these goals; The utility model provides the braced structures of striding the shallow tunnel in the operation on a kind of; Be used for above the existing shallow tunnel of operation, supporting newly-built traffic route; It comprises gripper shoe and the stake of many foundation, and many said foundation piles are located at the both sides of existing shallow tunnel and are embedded in the ground, and said gripper shoe is anchored at the upper end of many said foundation piles and is embedded in the ground.
Preferably, the braced structures of striding the shallow tunnel in the operation on the utility model also comprises the vibration isolation plate, and said vibration isolation plate is located between said foundation pile and the said gripper shoe.Said vibration isolation plate can be used for reducing during newly-built line construction and the operation vibration for the tunnel.
Preferably, said vibration isolation plate is the foam concrete plate.
Preferably, said foundation pile comprises long sleeve, is perfused with concrete in the long sleeve.
Preferably, said foundation pile also comprises enlarged footing, and said enlarged footing is fixed on the lower end of said long sleeve.Said enlarged footing can increase the contact area of foundation pile and ground, thereby, reduce pressure to soil layer.
Preferably, said foundation pile is an end bearing pile.
Preferably, said gripper shoe is an armored concrete slab.
Preferably, the distance between the tunnel wall of the said foundation pile of vicinity of said foundation pile and existing shallow tunnel is more than or equal to 5 meters, and the distance between the tunnel wall at said gripper shoe and existing shallow tunnel top is more than or equal to 5 meters.
Compared with prior art; Can bear the load of whole or most of newly-built route owing to the gripper shoe in the braced structures of striding the shallow tunnel in the operation on the utility model; Foundation pile can be used as force transferring structure; The load of newly-built route is reached the operation tunnel below, thereby on the braced structures of the utility model, building traffic route can be to guaranteeing the safety of existing shallow tunnel.In addition, because the lower end of foundation pile is to be embedded in the ground, thereby the span of braced structures of striding the shallow tunnel in the operation on the utility model is little, easy construction, and the route absolute altitude is low and cost is low.
Through following description and combine accompanying drawing, it is more clear that the utility model will become, and these accompanying drawings are used to explain the embodiment of the utility model.
Description of drawings
Lateral view when Fig. 1 builds above existing shallow tunnel for the braced structures of striding the shallow tunnel in the operation on the utility model.
Vertical view when Fig. 2 builds above existing shallow tunnel for the braced structures of striding the shallow tunnel in the operation on the utility model.
The specific embodiment
With reference now to accompanying drawing, describe the embodiment of the utility model, the similar elements label is represented similar elements in the accompanying drawing.
Shown in Fig. 1-2, the braced structures of striding the shallow tunnel in the operation on the utility model is used for above the existing shallow tunnel of operation, supporting newly-built traffic route, and it comprises gripper shoe 10, vibration isolation plate 11 and many foundation stake 12.Many said foundation piles 12 are symmetrically set in the both sides of existing shallow tunnel 20 and are embedded in the ground.Particularly, said foundation pile 12 comprises long sleeve 121 and enlarged footing 122, and said enlarged footing 122 is fixed on the lower end of said long sleeve 121, is perfused with concrete in the said long sleeve 121.Said gripper shoe 10 is anchored at the upper end of many said foundation piles 12 and is embedded in the ground, and said vibration isolation plate 11 is located between said foundation pile 12 and the said gripper shoe 10.And the distance H between the tunnel wall at said gripper shoe 10 and existing shallow tunnel 20 tops is more than or equal to 5 meters, and the distance L between the tunnel wall of the said foundation pile 12 of vicinity of said foundation pile 12 and existing shallow tunnel 20 is more than or equal to 5 meters.
In the present embodiment, said gripper shoe 10 is an armored concrete slab, and said vibration isolation plate 11 is the foam concrete plate, and said foundation pile 12 is an end bearing pile.
Can know by technique scheme; Can bear the load of whole or most of newly-built route owing to the gripper shoe 10 in the braced structures of striding the shallow tunnel in the operation on the utility model; Foundation pile 12 can be used as force transferring structure; The load of newly-built route is reached the operation tunnel below, thereby on the braced structures of the utility model, building traffic route can be to guaranteeing the safety of existing shallow tunnel.In addition, because the lower end of foundation pile 12 is to be embedded in the ground, thereby the span of braced structures of striding the shallow tunnel in the operation on the utility model is little, easy construction, and the route absolute altitude is low and cost is low.
More than combine most preferred embodiment that the utility model is described, but the utility model is not limited to the embodiment of above announcement, and should contains various modification, equivalent combinations of carrying out according to the essence of the utility model.

Claims (9)

1. stride the braced structures of the shallow tunnel in the operation on one kind; Be used for above the existing shallow tunnel of operation, supporting newly-built traffic route; It is characterized in that; Comprise the stake of gripper shoe and many foundation, many said foundation piles are located at the both sides of existing shallow tunnel and are embedded in the ground, and said gripper shoe is anchored at the upper end of many said foundation piles and is embedded in the ground.
2. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 1, it is characterized in that, also comprise the vibration isolation plate, said vibration isolation plate is located between said foundation pile and the said gripper shoe.
3. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 2, it is characterized in that, said vibration isolation plate is the foam concrete plate.
According to claim 1 or claim 2 on stride the braced structures of the shallow tunnel in the operation, it is characterized in that said foundation pile comprises long sleeve, be perfused with concrete in the long sleeve.
5. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 4, it is characterized in that, said foundation pile also comprises enlarged footing, and said enlarged footing is fixed on the lower end of said long sleeve.
6. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 5, it is characterized in that, said foundation pile is an end bearing pile.
7. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 1, it is characterized in that, said gripper shoe is an armored concrete slab.
8. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 1, it is characterized in that, the distance between the tunnel wall of the said foundation pile of vicinity of said foundation pile and existing shallow tunnel is more than or equal to 5 meters.
9. stride the braced structures of the shallow tunnel in the operation on as claimed in claim 1, it is characterized in that, the distance between the tunnel wall at said gripper shoe and existing shallow tunnel top is more than or equal to 5 meters.
CN 201220131077 2012-03-31 2012-03-31 Supporting structure for shallow tunnel in overpass operation Expired - Lifetime CN202543953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220131077 CN202543953U (en) 2012-03-31 2012-03-31 Supporting structure for shallow tunnel in overpass operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220131077 CN202543953U (en) 2012-03-31 2012-03-31 Supporting structure for shallow tunnel in overpass operation

Publications (1)

Publication Number Publication Date
CN202543953U true CN202543953U (en) 2012-11-21

Family

ID=47164607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220131077 Expired - Lifetime CN202543953U (en) 2012-03-31 2012-03-31 Supporting structure for shallow tunnel in overpass operation

Country Status (1)

Country Link
CN (1) CN202543953U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846838A (en) * 2015-04-10 2015-08-19 中铁建大桥工程局集团第一工程有限公司 Construction method for rebuilding building above super shallow-buried tunnel
CN105040746A (en) * 2015-08-26 2015-11-11 济南轨道交通集团有限公司 Frame type isolation protection system and construction method thereof
CN106930775A (en) * 2017-02-22 2017-07-07 宁波交通工程建设集团有限公司 The firm structure building enclosure of shallow embedding mountain highway tunnel gate-type campshed and its construction method
CN108204240A (en) * 2018-01-17 2018-06-26 中国铁路设计集团有限公司 Newly built tunnels closely on across existing tunnel anti-floating reinforcement system and its reinforcement means
CN109252877A (en) * 2018-09-05 2019-01-22 中国建筑土木建设有限公司 Bilayer two lining in proximity tunnel combines contignation multi-step construction method
CN113006814A (en) * 2021-04-28 2021-06-22 西南交通大学 Pressure reducing structure and construction method for newly-built tunnel to span existing traffic tunnel
CN114855697A (en) * 2022-05-31 2022-08-05 黄河勘测规划设计研究院有限公司 Embankment structure spanning existing underground structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846838A (en) * 2015-04-10 2015-08-19 中铁建大桥工程局集团第一工程有限公司 Construction method for rebuilding building above super shallow-buried tunnel
CN105040746A (en) * 2015-08-26 2015-11-11 济南轨道交通集团有限公司 Frame type isolation protection system and construction method thereof
CN106930775A (en) * 2017-02-22 2017-07-07 宁波交通工程建设集团有限公司 The firm structure building enclosure of shallow embedding mountain highway tunnel gate-type campshed and its construction method
CN106930775B (en) * 2017-02-22 2019-10-25 宁波交通工程建设集团有限公司 The rigid structure building enclosure of shallow embedding mountain highway tunnel gate-type campshed and its construction method
CN108204240A (en) * 2018-01-17 2018-06-26 中国铁路设计集团有限公司 Newly built tunnels closely on across existing tunnel anti-floating reinforcement system and its reinforcement means
CN108204240B (en) * 2018-01-17 2024-01-23 中国铁路设计集团有限公司 Anti-floating reinforcement system and reinforcement method for newly-built tunnel to span existing tunnel in short distance
CN109252877A (en) * 2018-09-05 2019-01-22 中国建筑土木建设有限公司 Bilayer two lining in proximity tunnel combines contignation multi-step construction method
CN113006814A (en) * 2021-04-28 2021-06-22 西南交通大学 Pressure reducing structure and construction method for newly-built tunnel to span existing traffic tunnel
CN113006814B (en) * 2021-04-28 2021-10-15 西南交通大学 Pressure reducing structure and construction method for newly-built tunnel to span existing traffic tunnel
CN114855697A (en) * 2022-05-31 2022-08-05 黄河勘测规划设计研究院有限公司 Embankment structure spanning existing underground structure
CN114855697B (en) * 2022-05-31 2024-01-30 黄河勘测规划设计研究院有限公司 Embankment structure crossing existing underground structure

Similar Documents

Publication Publication Date Title
CN202543953U (en) Supporting structure for shallow tunnel in overpass operation
CN201962558U (en) High-steepness side slope subgrade structure for mountainous area
CN202416329U (en) Retaining structure of combined reinforced soil pile wall
CN202849876U (en) Overhead-type roadbed pile board structure for high speed railway
CN202577157U (en) Simple support arch bridge straining beam construction support system
CN202644575U (en) Pile foundation framework type retaining wall
CN203960700U (en) The closed road structure of stake holder U-lag
CN202830942U (en) Combined supporting structure with anchor cables and cast-in-situ bored piles
CN106835879B (en) Highway is laterally without support type peg board formula without dirt road base and its construction method
CN102146676A (en) High-steep side slope subgrade structure for mountain area
CN101922158B (en) Device and method for integrally underpinned vibration isolation device of subway underpass building foundation
CN203613426U (en) Groove-shaped embankment structure
CN105421477A (en) Construction method for tower crane foundation
CN101311413A (en) Process for using underground passage combined with roads on ground as passage of trolley bus
CN203096545U (en) Pile composite foundation of soft soil layer of expressway
CN103578346B (en) A kind of simply supported girder bridge teaching simulation structure
CN205443976U (en) Prevent wind and hinder husky fence
CN2913433Y (en) Tridimensional traffic lines and elevated track utilizing road middle and edge space
CN202369930U (en) Door opening type bearing framed bent device for multiplayer concrete box girder
CN202849877U (en) Split type roadbed structure
CN202370001U (en) Shoring structure
CN201169781Y (en) Cap digging pit structure
CN210117646U (en) Frame bridge for high-fill existing railway line
CN103696370B (en) A kind of Quick bridge construction method and structure
CN203654193U (en) Quick bridge construction structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170703

Address after: 510600 No. 6 Gonghe West Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: Guangzhou Holding Company of The China Railway Siyuan Survey and Design Group Co., Ltd.

Address before: Tiesiyuan Technology Center No. 745 Yang Park Peace Avenue 430080 in Hubei province Wuhan city Wuchang District

Patentee before: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121121