CN101413237A - Underground pipeline and trolleybus integrated channel combined with ground road - Google Patents

Underground pipeline and trolleybus integrated channel combined with ground road Download PDF

Info

Publication number
CN101413237A
CN101413237A CNA200810090177XA CN200810090177A CN101413237A CN 101413237 A CN101413237 A CN 101413237A CN A200810090177X A CNA200810090177X A CN A200810090177XA CN 200810090177 A CN200810090177 A CN 200810090177A CN 101413237 A CN101413237 A CN 101413237A
Authority
CN
China
Prior art keywords
underground
underground comprehensive
comprehensive tunnel
trolleybus
prestressing force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810090177XA
Other languages
Chinese (zh)
Inventor
马兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA200810090177XA priority Critical patent/CN101413237A/en
Publication of CN101413237A publication Critical patent/CN101413237A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention belongs to the field of municipal and traffic engineering, and relates to an underground pipeline and trolley bus comprehensive channel combined with ground roads. The invention adopts a technical proposal that shallow-layer underground space of a ground road is utilized; an underground comprehensive channel is arranged to be combined with the ground road; the section of the underground comprehensive channel is in a rectangular shape; the underground comprehensive channel is divided into two layers in the vertical direction, and is single or numerous in holes in the transverse direction; a lower layer is used as a trolley bus channel; an upper layer is used as a pipeline channel; and a top plate of the underground comprehensive channel is used as the ground road. The underground comprehensive channel has the technical advantages of: (1) fully utilizing the underground space of the ground road and expanding urban road resources; (2) having the effect of a public transportation lane; (3) emitting no waste gas and causing low noise and pollution; (4) vacating ground traffic space and relieving ground traffic pressure; and (5) having the effects of a pipeline common trench. The underground pipeline and the comprehensive channel is suitable for cities to develop underground trolley bus traffic, can be used as a main public traffic mode for small-medium cities and an auxiliary public traffic mode for big cities, and simultaneously solves the problems of burying and overhauling urban non-dangerous pipelines.

Description

Underground utilities that combine with ground level road and trolleybus integrated channel
Technical field:
The invention belongs to the traffic engineering field of having stable political situation, city, particularly relate to a kind of underground utilities and trolleybus integrated channel that combines with ground level road that adopt.
Background technology:
Trolleybus directly utilizes electric power as power, does not have explosive motor, not discharging waste gas, noise is little, pollute little, since being born, because of its plurality of advantages obtains using comparatively widely in various countries' urban ground traffic, occupied critical role, but also had the following disadvantages:
1, because trolleybus is connected power supply by the fixing rod pantagraph current collector of overhead type contact net and vehicle (be commonly called as plait, also claim current-collector, be made up of with trolley head trolley pole).
1) fixedly overhead type contact net must be set, as cobweb, it is bigger that difficulty is set, and landscape effect is not good, and maintenance is also bigger.
2) necessary fixed vehicle travel route and track, the flexibility of working line adjustment and combination is relatively poor.
2, because trolleybus and other vehicles mix row, and the trolleybus speed of a motor vehicle is lower, can not adapt to modern city traffic above-ground requirement, also aggravated blocking up of urban ground traffic simultaneously.
3, because traffic lights are controlled, vehicle pass-through speed more can't be mentioned in the same breath with track traffic.
Because above-mentioned deficiency, along with the maximization in city, the increase of road number of track-lines, the raising that goes out line speed, the application of trolleybus more and more is restricted in the urban ground traffic in recent years, and the diesel oil motor bus is propagated its belief on a large scale on the contrary, obtained fast development, when bringing quick, motor-driven, flexible advantage, its strong noise, maximum discharge, high pollution have also brought comparatively serious waste gas, noise pollution to the city, become a big problem in puzzlement city, various countries, simultaneously also expend a large amount of petroleum resources, aggravated the anxiety of oil supply.
In addition, urban pipelines such as electric power, communication, feedwater, draining, coal gas, natural gas mainly adopt direct-buried mode at road, greening scope difference direct-burried at present, pipeline is buried underground and overhauled certainly will need be to urban road " belly breaking ", add that pipeline buries asynchronous with the repair time underground, urban road " belly breaking " rises one after another, and urban traffic is caused have a strong impact on.
Summary of the invention:
Problem at the background technology existence, the inventor proposes, if utilize the underground space of ground level road, be arranged to the underground comprehensive tunnel that combines with ground level road, designated lane as trolleybus, then fixedly the setting of overhead type contact net and with the contacting of trolleybus rod pantagraph current collector, problems such as track will be out of question, passage rate can improve greatly, add the non-exhaust emission that trolleybus itself is had, low noise, oligosaprobic advantage, then trolleybus still has very strong vitality, still can in the urban traffic system, play a significant role, can also vacate the traffic above-ground space, alleviate the traffic above-ground pressure that the vehicle sharp increase based on dolly brings.
In addition, compare, have following characteristics with track traffic:
1, passage rate and handling capacity: effect with public transportation lane, the trolleybus passage rate is a little less than even not being lower than track traffic, single track handling capacity is lower slightly, can adopt the super wide vehicle or the double-decker that are similar to the airport ferry bus, improve bicycle carrying capacity, major urban arterial highway can be provided with two and come two to go to four tracks, whole handling capacity higher (be equivalent to track traffic about 50%).
2, passage building cost and construction period: underground comprehensive tunnel can adopt foundation ditch cut and cover method, pit top-down, foundation ditch cap excavation method or put sloping cut and cover tunneling, and cost is low, and speed is fast, and risk is little.And shield method or hidden construction process are generally adopted in the underground rail traffic, and speed is slow, and the cost height has a big risk.
3, vehicle manufacturing cost and cycle: the vehicle cost is well below rail traffic vehicles, and domestic trolleybus vehicle manufacturing technology is very ripe, and the manufacturing cycle is short, can meet the demands fast.
4, operation costs: the passage maintenance is little during the operation, expense is low, and the trolleybus cost of business operation is also lower.
5, the property extended: along with widening of ground level road, underground comprehensive tunnel also can correspondingly be widened, and the track increases.The underground rail traffic then is difficult to widen.
6, the utilization of the underground space: the trolleybus turning radius is little, climbing capacity is big, its passage can utilize the underground space setting of ground level road fully, the general underground space that does not need to pass through other surrounding buildings because of the turning radius problem, and passage and station setting depth as shallow, take underground space depth as shallow, personnel are comparatively convenient up and down.And underground rail traffic turning radius is big, often need to pass through the underground space of other surrounding buildings during turning, and because tunnel structure needs, climbing needs, the tunnel and the station setting degree of depth are dark because of the turning radius problem, it is big to take the underground space degree of depth, and personnel are also not too convenient up and down.
7, resultant effect: can make full use of the underground space, can be in conjunction with transforming ground level road and urban pipe network system, the performance of ground level road and durability can reach the level of elevated road.
In sum, technical problem to be solved by this invention provides underground utilities and the trolleybus integrated channel that combines with ground level road, solves the problem of burying underground of application problem and the city non-dangerous pipeline of trolleybus in the modern city traffic.
Technical scheme of the present invention is to utilize the shallow-layer underground space of ground level road, the combined ground road is provided with underground comprehensive tunnel, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, be single hole or porous laterally, underground comprehensive tunnel lower floor is as the passage of trolleybus, underground comprehensive tunnel upper strata is as the passage of pipeline, surface layer is laid at the top board top of underground comprehensive tunnel, as ground level road, the plate bottom is provided with the overhead type contact net in the underground comprehensive tunnel, by powering with contacting to trolleybus of trolleybus pantagraph current collector.
Described underground comprehensive tunnel lower floor clear height generally is not less than 4m, clear height preferred value 〉=4.5m ,≤5.5m; The clear span of underground comprehensive tunnel lower floor is not less than 7m, clear span preferred value 〉=9m; Underground comprehensive tunnel upper strata clear height generally is not less than 1.0m, clear height preferred value 〉=1.5m ,≤2.5m.
Described underground comprehensive tunnel lower floor is provided with runway and the band that stops in emergency, and runway is no less than 2, and the band that stops in emergency is no less than 1, and during runway 〉=4, being provided with stops in emergency is with and is no less than 2.
Described underground comprehensive tunnel adopts the box culvert structure, is made up of top board, side wall, the double support of middle plate and base plate; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation; Utilize the deadweight of underground comprehensive tunnel to satisfy the stability against floating requirement, or utilize the deadweight of underground comprehensive tunnel and pile foundation to satisfy the stability against floating requirement jointly; Reinforced concrete structure or prestressed reinforced concrete structure are adopted in the hold concurrently support, base plate, partition wall, bent cap of top board, side wall, middle plate, and column adopts reinforced concrete structure.
Described underground comprehensive tunnel adopts the combining structure of box culvert and prestressing force panel, is made up of prestressing force panel, side wall, the double support of middle plate and base plate; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation; Utilize the deadweight of underground comprehensive tunnel to satisfy the stability against floating requirement, or utilize the deadweight of underground comprehensive tunnel and pile foundation to satisfy the stability against floating requirement jointly; Reinforced concrete structure or prestressed reinforced concrete structure are adopted in the hold concurrently support, base plate, partition wall, bent cap of side wall, middle plate, column adopts reinforced concrete structure, and the prestressing force panel adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
Described underground comprehensive tunnel adopts the combining structure of whole dock type structure and prestressing force panel, is made up of plate, support, prestressing force panel in side wall, base plate, the prestressing force; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation; Utilize the deadweight of underground comprehensive tunnel to satisfy the stability against floating requirement, or utilize the deadweight of underground comprehensive tunnel and pile foundation to satisfy the stability against floating requirement jointly; Side wall, base plate, partition wall, bent cap adopt reinforced concrete structure or prestressed reinforced concrete structure, column adopts reinforced concrete structure, support and adopt reinforced concrete structure or steel work, plate, prestressing force panel adopt pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure in the prestressing force.
Described underground comprehensive tunnel adopts first kind of form of the combining structure of board-like supporting and prestressing force panel, is made of the side wall of the underground comprehensive tunnel of board-like supporting double as that base plate is above hold concurrently support, base plate and prestressing force panel of board-like supporting, lining cutting, middle plate; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation; Utilize deadweight, pile foundation and board-like supporting to satisfy the stability against floating requirement jointly; In hold concurrently support, base plate, partition wall, bent cap of plate adopt reinforced concrete structure or prestressed reinforced concrete structure, lining cutting, column adopt reinforced concrete structure, and the prestressing force panel adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
Described underground comprehensive tunnel adopts second kind of form of the combining structure of board-like supporting and prestressing force panel, form the side wall of the underground comprehensive tunnel of board-like supporting double as that base plate is above by plate, base plate, support and prestressing force panel in board-like supporting, lining cutting, the prestressing force; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation; Utilize deadweight, pile foundation and board-like supporting to satisfy the stability against floating requirement jointly; Base plate, partition wall, bent cap adopt reinforced concrete structure or prestressed reinforced concrete structure, lining cutting, column adopt reinforced concrete structure, support and adopt reinforced concrete structure or steel work, plate, prestressing force panel adopt pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure in the prestressing force.
The combining structure of the combining structure of described box culvert structure, box culvert and prestressing force panel, whole dock type structure and prestressing force panel, its foundation pit construction adopt puts sloping cut and cover method, or bracing of foundation pit cut and cover method, bracing of foundation pit contrary sequence method, bracing of foundation pit cap excavation method.Bracing of foundation pit comprises gravity supporting and board-like supporting etc.Bracing of foundation pit contrary sequence method, bracing of foundation pit cap excavation method can satisfy the needs that resume traffic as early as possible.
The combining structure of described board-like supporting and prestressing force panel, its foundation pit construction adopt board-like supporting cut and cover method, or board-like supporting contrary sequence method, board-like supporting cap excavation method.Board-like supporting comprises diaphragm wall, castinplace pile campshed, perfusion stake continuously, reinforced concrete sheet pile, steel sheet pile etc.Board-like supporting cap excavation method can directly utilize the prestressing force panel as cover plate.Board-like supporting contrary sequence method, board-like supporting cap excavation method can satisfy the needs that resume traffic as early as possible.
Described pile foundation adopts the one or more combination of root pile, reinforced concrete pile, prestressed reinforced concrete stake, PHC pile tube, PC pile tube, castinplace pile, steel pipe pile.
Intersection between the described underground comprehensive tunnel lower floor can adopt the at grade intersection mode, and traffic lights control is set, and also can adopt the graded crossing mode up and down of not intercommunication.
The described trolleybus of underground comprehensive tunnel lower floor that runs on is according to existing trolleybus technical condition, technical standards such as the lane width of underground comprehensive tunnel lower floor, bend radius, flat vertical curve are according to the urban road technical standard, also can adopt width〉2.5m ,≤individual layer or the double-deck trolleybus of 4m, improving the traffic capacity, technical standards such as the lane width of then underground comprehensive tunnel lower floor, bend radius, flat vertical curve are determined according to the vehicle technology condition.
Described underground comprehensive tunnel and trolleybus in when braking, are converted into electric energy with trolleybus kinetic energy, by contacting of trolleybus pantagraph current collector and overhead type contact net, feed back to electrical network, with energy conservation.
Technique effect of the present invention is 1) fully in conjunction with the urban ground road, make full use of the space, enlarge urban road and pipe position resource; 2) solve the urban road electric car problems such as overhead type contact net and track are set; 3) have the effect of public transportation lane, passage rate can improve greatly, and whole handling capacity is higher; 4) non-exhaust emission, low noise, the low pollution; 5) can vacate the traffic above-ground space, alleviate the traffic above-ground pressure that the vehicle sharp increase based on dolly brings; 6) has autgmentability preferably; 7) have the effect of common trench, be convenient to pipeline and bury underground and overhaul.The present invention is fit to the traffic of urban development underground trolley bus, as the auxiliary public transport form of main public transport form in small and medium-sized cities and metropolis, solves burying underground and maintenance issue of the non-dangerous pipeline in city simultaneously.
Description of drawings:
Fig. 1 is the profile of the embodiment of the invention one
Fig. 2 is the profile of the embodiment of the invention two
Fig. 3 is the profile of the embodiment of the invention three
Fig. 4 is the profile of the embodiment of the invention four
Fig. 5 is the profile of the embodiment of the invention five
Fig. 6 is the profile of the embodiment of the invention six
Fig. 7 is the profile of the embodiment of the invention seven
Fig. 8 is the profile of the embodiment of the invention eight
Fig. 9 is the profile of the embodiment of the invention nine
Figure 10 is the profile of the embodiment of the invention ten
Among the figure: 1, underground comprehensive tunnel lower floor, the top board of 2a, box culvert structure, 2b, prestressing force panel, the side wall of 3a, box culvert structure or whole dock type structure, 3b, board-like supporting, 3c, partition wall or column, 3d, lining cutting, 3e, bent cap, 4, base plate, 5, support, 6, pile foundation, 7, ground level road, 8, the overhead type contact net, 9, trolleybus, 10, trolleybus pantagraph current collector, 11, runway, 12, the band that stops in emergency, 13, surface car, 14, underground comprehensive tunnel upper strata, 15a, middle plate hold concurrently and support, plate in 15b, the prestressing force, 16, pipeline.
The specific embodiment:
Implement embodiments of the present invention below in conjunction with description of drawings:
Embodiment one
Referring to Fig. 1, utilize the shallow-layer underground space of ground level road 7, combined ground road 7 is provided with underground comprehensive tunnel, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a single hole, the upper strata laterally is a single hole, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 is as the passage of trolleybus 9, and underground comprehensive tunnel upper strata 14 is as the passage of pipeline 16, surface layer is laid at the top board 2a top of box culvert structure, as ground level road 7, the double 15a bottom of supporting of middle plate is provided with overhead type contact net 8, by powering with contacting to trolleybus 9 of trolleybus pantagraph current collector 10.Underground comprehensive tunnel lower floor 1 clear height 〉=4m, clear span 〉=9m establishes 2 runways 11 and 1 and stops in emergency and be with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the box culvert structure, is made up of top board 2a, the side wall 3a of box culvert structure, middle plate double support 15a and base plate 4.Underground comprehensive tunnel utilization deadweight and pile foundation 6 satisfy the stability against floating requirement jointly.Top board 2a, side wall 3a, middle plate are held concurrently and are supported 15a, base plate 4 adopts reinforced concrete structure or prestressed reinforced concrete structure.
Embodiment two
Referring to Fig. 2, underground comprehensive tunnel adopts the combining structure of box culvert and prestressing force panel 2b, is made up of prestressing force panel 2b, side wall 3a, middle plate double support 15a and base plate 4.Side wall 3a, middle plate are held concurrently and are supported 15a, base plate 4 adopts reinforced concrete structure or prestressed reinforced concrete structure, and the prestressing force panel adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.All the other are with embodiment one.
Embodiment three
Referring to Fig. 3, utilize the shallow-layer underground space of ground level road 7, combined ground road 7 is provided with underground comprehensive tunnel, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a single hole, the upper strata laterally is a single hole, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 is as the passage of trolleybus 9, and underground comprehensive tunnel upper strata 14 is as the passage of pipeline 16, surface layer is laid at prestressing force panel 2b top, as ground level road 7, the double 15a bottom of supporting of middle plate is provided with overhead type contact net 8, by powering with contacting to trolleybus 9 of trolleybus pantagraph current collector 10.Underground comprehensive tunnel lower floor 1 clear height 〉=4m, clear span 〉=9m establishes 2 runways 11 and 1 and stops in emergency and be with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the combining structure of board-like supporting and prestressing force panel 2b, forms the side wall of the board-like supporting 3b double as underground comprehensive tunnel of base plate more than 4 by prestressing force panel 2b, board-like supporting 3b, lining cutting 3d, middle plate double support 15a and base plate 4.Underground comprehensive tunnel utilization deadweight and board-like supporting 3b satisfy the stability against floating requirement jointly.Middle plate is held concurrently and is supported 15a, base plate 4 adopts reinforced concrete structure or prestressed reinforced concrete structures; Lining cutting 3d adopts reinforced concrete structure; Prestressing force panel 2b adopts pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure.
Embodiment four
Referring to Fig. 4, utilize the shallow-layer underground space of ground level road 7, combined ground road 7 is provided with underground comprehensive tunnel, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a single hole, the upper strata laterally is a single hole, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 is as the passage of trolleybus 9, and underground comprehensive tunnel upper strata 14 is as the passage of pipeline 16, surface layer is laid at prestressing force panel 2b top, as ground level road 7, plate 15b bottom is provided with overhead type contact net 8 in the prestressing force, by powering with contacting to trolleybus 9 of trolleybus pantagraph current collector 10.Underground comprehensive tunnel lower floor 1 clear height 〉=4m, total clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 and 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the combining structure of whole dock type structure and prestressing force panel 2b, is made up of plate 15b, support 5 and base plate 4 in prestressing force panel 2b, side wall 3a, the prestressing force.Underground comprehensive tunnel utilization deadweight and pile foundation 6 satisfy the stability against floating requirement jointly.Side wall 3a, base plate 4 adopt reinforced concrete structure or prestressed reinforced concrete structure, support 5 and adopt reinforced concrete structure or steel work, plate 15b, prestressing force panel 2b adopt pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure in the prestressing force.
Embodiment five
Referring to Fig. 5, utilize the shallow-layer underground space of ground level road 7, combined ground road 7 is provided with underground comprehensive tunnel, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a single hole, the upper strata laterally is a single hole, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 is as the passage of trolleybus 9, and underground comprehensive tunnel upper strata 14 is as the passage of pipeline 16, surface layer is laid at the top of prestressing force panel 2b, as ground level road 7, plate 15b bottom is provided with overhead type contact net 8 in the prestressing force, by powering with contacting to trolleybus 9 of trolleybus pantagraph current collector 10.Underground comprehensive tunnel lower floor 1 clear height 〉=4m, clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 or 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the combining structure of board-like supporting and prestressing force panel, form the side wall of the board-like supporting 3b double as underground comprehensive tunnel of base plate more than 4 by plate 15b, support 5 and base plate 4 in prestressing force panel 2b, board-like supporting 3b, lining cutting 3d, the prestressing force.Underground comprehensive tunnel utilization deadweight, pile foundation 6 and board-like supporting 3b satisfy the stability against floating requirement jointly.Base plate 4 adopts reinforced concrete structure or prestressed reinforced concrete structure; Lining cutting 3d adopts reinforced concrete structure; Support 5 and adopt reinforced concrete structure or steel work; Plate 15b, prestressing force panel 2b adopt pretensioning prestressed reinforced concrete structure or post-tensioning prestressed steel concrete structure in the prestressing force.
Embodiment six
Referring to Fig. 6, underground comprehensive tunnel section is rectangular, and two-layer about vertical the branch, lower floor laterally is a diplopore, and the upper strata laterally is a diplopore, also can be separated into porous (not shown on the figure).Underground comprehensive tunnel lower floor 1 clear height 〉=4m, total clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 or 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the box culvert structure, is made up of top board 2a, the side wall 3a of box culvert structure, the double support of middle plate 15a, partition wall or column 3c, bent cap 3e and base plate 4.Top board 2a, side wall 3a, middle plate are held concurrently and are supported 15a, base plate 4, partition wall 3c, bent cap 3e employing reinforced concrete structure or prestressed reinforced concrete structure, and column 3c adopts reinforced concrete structure.All the other are with embodiment one.
Embodiment seven
Referring to Fig. 7, underground comprehensive tunnel section is rectangular, and two-layer about vertical the branch, lower floor laterally is a diplopore, and the upper strata laterally is a diplopore, also can be separated into porous (not shown on the figure).Underground comprehensive tunnel lower floor 1 clear height 〉=4m, total clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 or 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts box culvert and prestressing force panel combining structure, is made up of prestressing force panel 2b, side wall 3a, the double support of middle plate 15a, partition wall or column 3c, bent cap 3e and base plate 4.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment two.
Embodiment eight
Referring to Fig. 8, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a diplopore, the upper strata laterally is a diplopore, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 clear height 〉=4m, total clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 or 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the combining structure of board-like supporting and prestressing force panel, is made up of prestressing force panel 2b, board-like supporting 3b, lining cutting 3d, the double support of middle plate 15a, partition wall or column 3c, bent cap 3e and base plate 4.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment three.
Embodiment nine
Referring to Fig. 9, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a diplopore, the upper strata laterally is a diplopore, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 clear height 〉=4m, total clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 or 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the combining structure of whole dock type structure and prestressing force panel, is made up of plate 15b, support 5, partition wall or column 3c, bent cap 3e and base plate 4 in prestressing force panel 2b, side wall 3a, the prestressing force.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment four.
Embodiment ten
Referring to Figure 10, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, lower floor laterally is a diplopore, the upper strata laterally is a diplopore, also can be separated into porous (not shown on the figure), underground comprehensive tunnel lower floor 1 clear height 〉=4m, total clear span 〉=20m establishes 4 runways 11 and stops in emergency more than 2 or 2 and is with 12.Underground comprehensive tunnel upper strata 14 clear height 〉=1.5m.Underground comprehensive tunnel adopts the combining structure of board-like supporting and prestressing force panel, is made up of plate 15b, support 5, partition wall or column 3c, bent cap 3e and base plate 4 in prestressing force panel 2b, board-like supporting 3b, lining cutting 3d, the prestressing force.Column 3c adopts reinforced concrete structure, and partition wall 3c, bent cap 3e adopt reinforced concrete structure or prestressed reinforced concrete structure.All the other are with embodiment five.
Embodiment one, two, four, six, seven, nine, and its foundation pit construction (not shown on the figure) adopts puts sloping cut and cover method, or bracing of foundation pit cut and cover method, bracing of foundation pit contrary sequence method, bracing of foundation pit cap excavation method.Bracing of foundation pit comprises gravity supporting and board-like supporting etc.Bracing of foundation pit contrary sequence method, bracing of foundation pit cap excavation method can satisfy the needs that resume traffic as early as possible.
The foundation pit construction of all the other embodiment (not shown on the figure) adopts board-like supporting cut and cover method, or board-like supporting contrary sequence method, board-like supporting cap excavation method.Board-like supporting 3b comprises diaphragm wall, castinplace pile campshed, perfusion stake continuously, reinforced concrete sheet pile, steel sheet pile etc.Board-like supporting cap excavation method can directly utilize prestressing force panel 2b as cover plate.Board-like supporting contrary sequence method, board-like supporting cap excavation method can satisfy the needs that resume traffic as early as possible.
Described pile foundation 6 adopts the one or more combination of root pile, reinforced concrete pile, prestressed reinforced concrete stake, PHC pile tube, PC pile tube, castinplace pile, steel pipe pile.
The described trolleybus 9 of underground comprehensive tunnel lower floor 1 that runs on is according to existing trolleybus technical condition, technical standards such as the lane width of underground comprehensive tunnel lower floor 1, bend radius, flat vertical curve are according to the urban road technical standard, also can adopt width〉2.5m ,≤individual layer or the double-deck trolleybus of 4m, improving the traffic capacity, technical standards such as the lane width of then underground comprehensive tunnel lower floor 1, bend radius, flat vertical curve are determined according to the vehicle technology condition.
Certainly; the specific embodiment also has many combinations; as long as combined ground road 7 is provided with underground comprehensive tunnel; two-layer about vertical the branch; underground comprehensive tunnel lower floor 1 is as the passage of trolleybus; underground comprehensive tunnel upper strata 14 is as the passage of pipeline 16, and the top board top of underground comprehensive tunnel is as ground level road 7, all within protection domain of the present invention.

Claims (10)

1, underground utilities that combine with ground level road and trolleybus integrated channel, it is characterized in that: the shallow-layer underground space of utilizing ground level road, the combined ground road is provided with underground comprehensive tunnel, underground comprehensive tunnel section is rectangular, two-layer about vertical the branch, be single hole or porous laterally, underground comprehensive tunnel lower floor is as the passage of trolleybus, underground comprehensive tunnel upper strata is as the passage of pipeline, surface layer is laid at the top board top of underground comprehensive tunnel, as ground level road, the plate bottom is provided with the overhead type contact net in the underground comprehensive tunnel, by powering with contacting to trolleybus of trolleybus pantagraph current collector.
2, underground utilities that combine with ground level road according to claim 1 and trolleybus integrated channel, it is characterized in that: underground comprehensive tunnel lower floor clear height is not less than 4m, the clear span of underground comprehensive tunnel lower floor is not less than 7m, and underground comprehensive tunnel upper strata clear height is not less than 1.5m; Underground comprehensive tunnel lower floor is provided with runway and the band that stops in emergency, and runway is no less than 2, and the band that stops in emergency is no less than 1, and during runway 〉=4, being provided with stops in emergency is with and is no less than 2.
3, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel is characterized in that: underground comprehensive tunnel adopts the box culvert structure, is made up of top board, side wall, the double support of middle plate and base plate; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation.
4, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: underground comprehensive tunnel adopts the combining structure of box culvert and prestressing force panel, is made up of prestressing force panel, side wall, the double support of middle plate and base plate; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation.
5, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: underground comprehensive tunnel adopts the combining structure of whole dock type structure and prestressing force panel, is made up of plate, support, prestressing force panel in side wall, base plate, the prestressing force; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation.
6, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: underground comprehensive tunnel adopts first kind of form of the combining structure of board-like supporting and prestressing force panel, by board-like supporting, lining cutting, the middle plate combining structure of support, base plate and prestressing force panel of holding concurrently, the side wall of the underground comprehensive tunnel of board-like supporting double as that base plate is above; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation.
7, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: underground comprehensive tunnel adopts second kind of form of the combining structure of board-like supporting and prestressing force panel, by the combining structure of plate, base plate, support and prestressing force panel in board-like supporting, lining cutting, the prestressing force, the side wall of the underground comprehensive tunnel of board-like supporting double as that base plate is above; Laterally partition wall or column and bent cap are set for the underground comprehensive tunnel of porous; Underground comprehensive tunnel can further be provided with pile foundation.
8, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: the intersection between the underground comprehensive tunnel lower floor can adopt the at grade intersection mode, and traffic lights control is set, also can adopt the graded crossing mode up and down of not intercommunication.
9, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: the trolleybus that runs on underground comprehensive tunnel lower floor is according to existing trolleybus technical condition, and technical standard such as the lane width of underground comprehensive tunnel lower floor, bend radius, flat vertical curve is according to the urban road technical standard.
10, underground utilities that combine with ground level road according to claim 1 and 2 and trolleybus integrated channel, it is characterized in that: the trolleybus that runs on underground comprehensive tunnel lower floor adopts width〉2.5m ,≤individual layer or the double-deck trolleybus of 4m, technical standards such as the lane width of underground comprehensive tunnel lower floor, bend radius, flat vertical curve are determined according to the vehicle technology condition.
CNA200810090177XA 2007-05-16 2008-04-06 Underground pipeline and trolleybus integrated channel combined with ground road Pending CN101413237A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810090177XA CN101413237A (en) 2007-05-16 2008-04-06 Underground pipeline and trolleybus integrated channel combined with ground road

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200710040736 2007-05-16
CN200710040736.1 2007-05-16
CNA200810090177XA CN101413237A (en) 2007-05-16 2008-04-06 Underground pipeline and trolleybus integrated channel combined with ground road

Publications (1)

Publication Number Publication Date
CN101413237A true CN101413237A (en) 2009-04-22

Family

ID=40593955

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810090177XA Pending CN101413237A (en) 2007-05-16 2008-04-06 Underground pipeline and trolleybus integrated channel combined with ground road

Country Status (1)

Country Link
CN (1) CN101413237A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195083A (en) * 2013-03-29 2013-07-10 上海市政工程设计研究总院(集团)有限公司 Crossing node structure of integrated pipe galleries
CN103469816A (en) * 2013-09-16 2013-12-25 铁道第三勘察设计院集团有限公司 Integrated pipe trench structure applied to interregional ground line roadbed of urban rail transit project

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195083A (en) * 2013-03-29 2013-07-10 上海市政工程设计研究总院(集团)有限公司 Crossing node structure of integrated pipe galleries
CN103195083B (en) * 2013-03-29 2015-12-23 上海市政工程设计研究总院(集团)有限公司 A kind of pipe gallery crossover node structure
CN103469816A (en) * 2013-09-16 2013-12-25 铁道第三勘察设计院集团有限公司 Integrated pipe trench structure applied to interregional ground line roadbed of urban rail transit project
CN103469816B (en) * 2013-09-16 2016-01-20 铁道第三勘察设计院集团有限公司 Be applied to the integrated pipe canal structure of the interval ground line roadbed of city track traffic engineering

Similar Documents

Publication Publication Date Title
CN101634126A (en) Ground-road combined comprehensive tunnel for underground pipeline and trolley bus
WO2008077319A1 (en) Underground tunnel combined with ground road
CN1142363C (en) underground comprehesive pipe gallery and system for comprehensive developing and utilizing underground space
CN101311413A (en) Process for using underground passage combined with roads on ground as passage of trolley bus
CN202543953U (en) Supporting structure for shallow tunnel in overpass operation
CN106013221A (en) Four-layer rectangle-like urban underground complex
CN106013223A (en) Oval-cross-section urban underground complex
CN201778275U (en) Dual-lane cableway bridge
CN206110182U (en) Three large -scale arcading city utility tunnel
CN101586346B (en) Method for constructing multi-functional metro interchange station complex
CN208605197U (en) A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
CN101372825A (en) Method for using underground passage combined with ground road as trolley bus passage
CN2913433Y (en) Tridimensional traffic lines and elevated track utilizing road middle and edge space
CN219653488U (en) Pile plate retaining wall and abutment co-building structure
CN201193027Y (en) Underground toques channel combined with ground road
CN101413237A (en) Underground pipeline and trolleybus integrated channel combined with ground road
CN202370001U (en) Shoring structure
CN201065503Y (en) Underground pipeline and trolleybus integrated channel connected with ground surface road
CN106013222A (en) Urban underground complex with three-circle cross section
CN201065504Y (en) Underground trolleybus channel connected with ground surface road
CN201193026Y (en) Underground pipeline and toques integrated channel combined with ground road
CN106677207A (en) Staggered type underground traffic pipe gallery car entrance and exit structure
CN101634127A (en) Underground trolley bus tunnel combined with ground roads
CN106013938A (en) Overground and underground urban traffic and pipe network complex
CN210657857U (en) Ground structure section of bridge tunnel transition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090422