JP3086874U - Revetment lining - Google Patents

Revetment lining

Info

Publication number
JP3086874U
JP3086874U JP2001008336U JP2001008336U JP3086874U JP 3086874 U JP3086874 U JP 3086874U JP 2001008336 U JP2001008336 U JP 2001008336U JP 2001008336 U JP2001008336 U JP 2001008336U JP 3086874 U JP3086874 U JP 3086874U
Authority
JP
Japan
Prior art keywords
mat
bolts
stone
revetment
holding plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001008336U
Other languages
Japanese (ja)
Inventor
順一郎 斎藤
Original Assignee
東洋興産株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東洋興産株式会社 filed Critical 東洋興産株式会社
Priority to JP2001008336U priority Critical patent/JP3086874U/en
Application granted granted Critical
Publication of JP3086874U publication Critical patent/JP3086874U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

(57)【要約】 (修正有) 【課題】 上面に石塊を接着して法面に敷き並べたマッ
トを相互に連結するための金具を提供する。 【解決手段】 石塊を貼り付けたマットを法面に隙間な
く敷き並べ、隣のマットの周縁部同士をほぼ一定間隔を
置いて連結金具3で連結する。連結金具3は上下一対の
細長い挟持板5、6を有し、下側の挟持板5には、間隔
をあけて2本のボルト7が植設され、上側の挟持板6に
は、これらボルトが通る孔があいている。ボルト7の先
端は、マット1を突き通すことができるよう円錐状に尖
っている。相隣接するマット1の周縁部1aを重ね合わ
せ、その下にボルト付の挟持板5をあてがい、2本のボ
ルト7をマット1の下から突き通す。こうして、マット
1の上に現れたボルト7に、孔のあいた挟持板6を通
し、各ボルト7にナット9を螺合して締め付ける。
(57) [Summary] (with correction) [PROBLEMS] To provide a metal fitting for bonding mats laid on a slope by bonding a stone block to an upper surface thereof. SOLUTION: A mat on which a stone mass is stuck is laid out on a slope without gaps, and peripheral edges of adjacent mats are connected with a connection fitting 3 at substantially constant intervals. The connection fitting 3 has a pair of upper and lower elongate holding plates 5 and 6, two bolts 7 are planted at intervals on the lower holding plate 5, and these bolts are mounted on the upper holding plate 6. There is a hole through which The tip of the bolt 7 is sharpened in a conical shape so that the mat 1 can be penetrated. The peripheral portions 1a of the adjacent mats 1 are overlapped, and a holding plate 5 with bolts is applied thereunder, and two bolts 7 are pierced from under the mat 1. In this way, the bolts 7 appearing on the mat 1 are passed through the holding plate 6 with holes, and the nuts 9 are screwed into the bolts 7 and fastened.

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

この考案は、河川や海岸の堤防を覆って、洗掘や崩壊を防ぐための護岸覆工に 関する。 This invention relates to revetment lining to cover rivers and coastal dikes to prevent scouring and collapse.

【0002】[0002]

【従来の技術】[Prior art]

以前の護岸工事は、表面をコンクリートですっかり覆ってしまって生態系を 分断してしまうものがほとんどであったが、最近は、自然をできるだけ保全する ために、コンクリートを使わずに、自然石や木材を主体とする工事に変わりつつ ある。例えば、河川の法面にまず吸出し防止マットを敷き、その上に鉄線かご( ふとんかご)や木製の枠体を置き、その中に玉石を詰める。しかし、このような 方法では、現場で石詰めしなければならないので、工期が長く、工事費も高いも のにつく。また、設置した金網や鉄線かごが表に現れるので、自然の景観を損う 。 In previous revetment works, the surface was almost completely covered with concrete and the ecosystem was divided, but recently, in order to preserve nature as much as possible, natural stone and natural stones were used instead of concrete. The construction is mainly changing to wood. For example, firstly, a suction-prevention mat is laid on the slope of a river, and an iron wire basket (futon basket) or a wooden frame is placed on top of the mat, and cobblestone is stuffed into it. However, such a method requires long work time and high construction cost because it must be packed on site. In addition, the installed wire mesh or iron wire basket appears on the surface, which impairs the natural scenery.

【0003】 そこで、本実用新案登録出願人は先の特許出願(特開平11−256546号 公報)で、透水性のマットの上面に、底を平坦に形成した石塊を密に接着し、こ れを法面に敷き詰める護岸覆工を提案した。このものでは、マットを敷くだけで 護岸工事を行うことができ、石塊は不定形のものを使用すれば、自然に近い景観 が得られる。しかし、隣のマット同士を連結するために紐を用いるようにしたが 、この構造では施工がたいへん面倒であった。[0003] In view of the above, the applicant for the present invention for utility model registration disclosed in a previous patent application (Japanese Patent Application Laid-Open No. H11-256546) a stone mass having a flat bottom formed on the upper surface of a permeable mat. We proposed revetment lining to cover the slope. In this case, revetment works can be performed simply by laying mats, and the use of irregularly shaped stone blocks can provide a landscape close to nature. However, strings were used to connect adjacent mats, but this construction was very troublesome.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the invention]

この考案は、上面に石塊を接着したマットの施工性を改善することを主な課題 とする。 The main purpose of this invention is to improve the workability of mats with stone blocks adhered to the upper surface.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

石塊を接着したマットを地面に敷き詰めた後、マットの間に隙間ができないよ うマットの周縁部同士を連結するが、この考案では、その結合手段を、マットを 挟む上下2枚の細長い挟持板と、下側の挟持板に間隔をあけて植設され、マット を突き通すように先端が尖っている複数本のボルトと、上側の挟持板に設けた孔 から突出するボルトに螺合緊締するナットから構成する(請求項1)。このもの では、隣同士のマットの縁部を重ね合わせ、下からボルトを突き通し、ボルトに 挟持板を挿通した後、ナットを螺合緊締する。こうすることで、隣同士のマット が上下の挟持板の間には挟持され、互いにずれることがない。特に、ボルトの先 を尖らせてあるので、マットに孔をあけるまでもなく、ボルトの先をマットに当 てて、力を加えれば、簡単にボルトをマットに突き通すことができるので、作業 性が優れる。ボルトの尖った先端は、そのままでは危険なので、ナットを締め終 わってから、切断工具を使って切り落とす。 After laying the mat to which the stone blocks are attached on the ground, the peripheries of the mats are connected to each other so that there is no gap between the mats. The bolts are planted at intervals on the plate and the lower holding plate, and are screwed and tightened to a plurality of bolts with sharp tips to penetrate the mat and bolts protruding from the holes provided in the upper holding plate. It is composed of a nut (claim 1). In this method, the edges of adjacent mats are overlapped, bolts are pierced from below, the clamping plate is inserted through the bolts, and the nuts are screwed and tightened. By doing so, the adjacent mats are sandwiched between the upper and lower sandwiching plates, and are not displaced from each other. In particular, the point of the bolt is sharpened, so the bolt can be easily penetrated into the mat by applying the force by hitting the tip of the bolt against the mat without drilling holes in the mat. Is excellent. The sharp tip of the bolt is dangerous as it is, so after tightening the nut, cut it off with a cutting tool.

【0006】 2枚の該挟持板は、横断面で見たとき、山型に形成すれば(請求項2)、マッ ト同士をさらに確実に挟持し、相互にずれることがない。また、2枚のうちの少 なくとも1枚の挟持板の対向面に凸部を形成しても(請求項3)、同様の効果が 得られる。When the two holding plates are formed in a mountain shape when viewed in a cross section (claim 2), the mats are more securely held between the mats and do not shift from each other. The same effect can be obtained even if a convex portion is formed on the facing surface of at least one of the two holding plates (claim 3).

【0007】 マットを地面に固定するために、後部が逆U字形に折曲され、杭の先端および 後端が尖っている杭を用いる(請求項4)。このような杭は、鉄筋などに用いら れている鋼棒を曲げ加工して安価に作ることができ、しかも、杭の後部がU字に 曲がっていて、後端は尖っているので、後端がマットに突き刺さり、マットがし っかりと地面に固定され、めくれあがることがない。In order to fix the mat to the ground, a pile having a rear end bent in an inverted U shape and having a sharpened tip and a rear end is used (claim 4). Such piles can be made inexpensively by bending steel rods used for reinforcing bars, etc. In addition, the rear of the pile is bent in a U shape and the rear end is sharp, so The edge pierces the mat, the mat is firmly fixed to the ground and does not turn up.

【0008】 ところで、マットの上に接着する石塊は、従来、天然石(例えば、花崗岩、安 山岩、玄武岩)を用いているが、このように直径が数十センチもある天然石は安 価には手に入らない。また、大量の天然石を採掘するとなると、少なからず自然 破壊を招くことになる。そこで、本実用新案登録出願人は天然石と同等のものを 人工的に作ることを試みて成功した。原料は、ニッケル、マンガンなど鉱物の溶 融精錬の際に溶融金属から分離してその上に浮かぶ溶融スラグである。この溶融 スラグを炉の外に取り出し、大気中でゆっくり冷やし、鉱物を結晶化させる。結 晶化には、特に1000℃から800℃の温度領域が重要であり、この領域を2〜4時 間位の長い時間をかけて通過させるようにする。こうしてできる岩石を所望の大 きさに割って、石材として使用する。また、溶融スラグを型(モールド)に入れ て徐冷すれば、底が平らのものなど所望の形状の石材が得られ、加工コストが軽 減される。こうして得られる石材は、天然石と成分、強度等がほとんど同じあり 、天然石と区別なく使用することができる。[0008] By the way, the stones to be adhered on the mat are conventionally made of natural stones (eg, granite, andesite, basalt), but natural stones having a diameter of several tens of centimeters are inexpensive. Is not available. Mining a large amount of natural stone will cause considerable destruction of nature. Therefore, the applicant for the present utility model registration has succeeded in artificially producing a natural stone equivalent. The raw material is molten slag that is separated from the molten metal during the smelting of minerals such as nickel and manganese and floats on it. The molten slag is taken out of the furnace and cooled slowly in the atmosphere to crystallize the mineral. For crystallization, a temperature range of 1000 ° C. to 800 ° C. is particularly important, and it is necessary to pass through this range over a long time of about 2 to 4 hours. The resulting rock is divided into desired sizes and used as stone. In addition, if the molten slag is put into a mold and gradually cooled, a stone having a desired shape such as a flat bottom can be obtained, and the processing cost can be reduced. The stone thus obtained has almost the same components, strength and the like as natural stone, and can be used without distinction from natural stone.

【0009】 溶融スラグは、ゴミ(産業廃棄物や家庭ゴミ)を焼却処理したときに出る焼却 灰を溶融して無害化するときにも得られる。焼却灰は、ダイオキシンや重金属等 有害物質が含まれており、そのままでは捨てられない厄介者である。この焼却灰 を塩基度調整剤(ドロマイト、石灰石、貝殻など)および還元剤(粉状コークス )と共に電気炉に入れて、1400〜1500℃前後の高温で還元溶融する。こうすると 、焼却灰は液状化しマグマのような状態になり、灰の中に含まれているダイオキ シン等の有害物質は高温に晒されて分解気化し回収処理される。また、焼却灰の 中の重金属類(カドミウム、鉛、六価クロム等)は、スラグと分離して炉底の溶 融メタル中に溶解し回収される。こうして、無害化された溶融スラグが得られる 。この溶融スラグでも、上述と同様に、徐冷して石材とすることができる。[0009] Molten slag is also obtained when incinerated ash generated when incinerating garbage (industrial waste and household garbage) is melted and rendered harmless. Incinerated ash contains harmful substances such as dioxins and heavy metals, and is a troublesome person that cannot be discarded as it is. This incinerated ash is put into an electric furnace together with a basicity adjusting agent (dolomite, limestone, shells, etc.) and a reducing agent (powder coke), and is reduced and melted at a high temperature of about 1400 to 1500 ° C. As a result, the incinerated ash liquefies and becomes a magma-like state, and harmful substances such as dioxin contained in the ash are exposed to high temperatures, decomposed and vaporized, and collected. Heavy metals (cadmium, lead, hexavalent chromium, etc.) in the incinerated ash are separated from the slag and dissolved in the molten metal at the bottom of the furnace to be recovered. In this way, detoxified molten slag is obtained. This molten slag can also be gradually cooled to a stone material as described above.

【0010】 要するに、マットの上面に接着する石塊は、溶融スラグを炉の外に取り出して 徐冷することで得られる人工石を用いることができる(請求項5)。このような 人工石を用いれば、天然石の採掘のために自然破壊を招くことがなく、また、量 産化すれば、コスト的にも天然石に太刀打ちできる可能性がある。さらに、溶融 スラグの原料にゴミ焼却灰を用いるようにすれば、廃棄物の有効活用が図れ、一 挙両得である。[0010] In short, an artificial stone obtained by taking molten slag out of the furnace and slowly cooling it can be used as the stone mass to be adhered to the upper surface of the mat (claim 5). The use of such artificial stones does not cause natural destruction due to the mining of natural stones, and if mass-produced, it may be possible to compete with natural stones in terms of cost. Furthermore, if refuse incineration ash is used as the raw material for the molten slag, effective use of waste can be achieved, which is both advantageous.

【0011】[0011]

【考案の実施の形態】[Embodiment of the invention]

図1に示すように、上面に石塊2を接着するマット1は、補強ネットを上に 、ポリエステル不織布を下にして張り合わせたものであり、ポリエステル不織布 の目は、土はほとんど通過できないが、水分は通過できるような粗さになってお り、補強ネットは、延びの少ない材料、例えばアラミド繊維やポリエステル繊維 などで作られている。マット1の周縁部1aは、約10cm幅で折り返し、縫い止め て補強する。 As shown in FIG. 1, a mat 1 on which a stone block 2 is adhered to an upper surface is a laminate in which a reinforcing net is placed on top and a polyester nonwoven fabric is placed below. The reinforcement net is made of a material with low elongation, such as aramid fiber or polyester fiber, so that moisture can pass through. The periphery 1a of the mat 1 is folded back at a width of about 10 cm and sewn to reinforce.

【0012】 マット1に接着する石塊2は、直径が15〜50cm前後の自然石(玉石をはじめ、 割石、野面石など)をカッタで二分したものであり、そのカット面(平面)2a に接着剤を塗ってマット1に貼り付ける。石塊2は、天然石ではなく、上述のよ うに溶融スラグを徐冷した人工石でもよい。石塊2は周縁部1aを残してマット 全面にほぼ密に貼り付ける。The stone mass 2 to be bonded to the mat 1 is a natural stone having a diameter of about 15 to 50 cm (cobble stone, split stone, field stone, or the like) bisected by a cutter, and its cut surface (flat surface) 2a And apply it to the mat 1. The stone block 2 may be an artificial stone obtained by gradually cooling the molten slag as described above, instead of the natural stone. The stone blocks 2 are adhered almost completely over the entire surface of the mat except for the peripheral portion 1a.

【0013】 なお、1枚のマット1は縦横2.0×1.5mの大きさであり、石塊2を張り付けた ときの重量は300〜1500kgほどになる。運搬はパレットに載せて行う。One mat 1 has a size of 2.0 × 1.5 m in length and width, and a weight of the stone mass 2 when attached is about 300 to 1500 kg. Transport is carried on pallets.

【0014】 このように、石塊を貼り付けたマットを図2に示すように、法面に隙間なく敷 き並べ、隣のマットの周縁部同士をほぼ一定間隔を置いて連結金具3で連結する 。連結金具3は、図3に示すように、上下一対の細長い挟持板5、6を有し、下 側の挟持板5には、間隔をあけて2本のボルト7が植設されており、上側の挟持 板6には、これらボルトが通る孔8があいている。ボルト7の先端は、マット1 を突き通すことができるよう円錐状に尖っている。As shown in FIG. 2, the mat to which the stone blocks are attached is laid out on the slope without any gaps, and the peripheral portions of the adjacent mats are connected with the connection fitting 3 at substantially constant intervals. To As shown in FIG. 3, the connection fitting 3 has a pair of upper and lower elongated holding plates 5, 6, and two bolts 7 are planted on the lower holding plate 5 at intervals. The upper holding plate 6 has a hole 8 through which these bolts pass. The tip of the bolt 7 is pointed in a conical shape so that the mat 1 can be penetrated.

【0015】 連結金具3の使い方は、図4に示すように、相隣接するマット1の周縁部1a を重ね合わせ、その下にボルト付の挟持板5をあてがい、2本のボルト7をマッ ト1の下から突き通す。こうして、マット1の上に現れたボルト7に、孔8のあ いた挟持板6を通し、各ボルト7にナット9を螺合して締め付ける。こうするこ とで、2枚のマットは、上下の挟持板5、6の間にしっかりと挟み込まれ連結さ れる。マットの挟み込みをより確実にするために、2枚の挟持板5、6は単なる 平板ではなく、図示のように山型断面に形成するとよい。また、挟持板の対向面 に間隔を存して小さな凸部10を形成しても効果がある。なお、ボルト7は、先 端が尖っていて危険なので、ナット9を締め終わったら、ナットの先に突き出て いる部分を、カッター工具を用いて切り取る(図4鎖線)。このように先を切り 落とすと、その部分でボルトのねじ山が潰れるので、ナットの脱落を防止する効 果もある。As shown in FIG. 4, the connecting bracket 3 is used in such a manner that adjacent peripheral portions 1 a of the mat 1 are overlapped, and a holding plate 5 with bolts is applied thereunder, and two bolts 7 are mated. 1 penetrate from below. In this manner, the bolts 7 appearing on the mat 1 are passed through the holding plate 6 having the holes 8, and the nuts 9 are screwed into the bolts 7 and fastened. In this manner, the two mats are firmly sandwiched between the upper and lower holding plates 5 and 6 to be connected. In order to more securely insert the mat, the two holding plates 5 and 6 are not simply flat plates but may be formed in a mountain-shaped cross section as shown in the figure. It is also effective to form small projections 10 at intervals on the opposing surface of the holding plate. Since the bolt 7 has a sharp pointed end and is dangerous, when the nut 9 has been tightened, the protruding portion of the nut is cut off using a cutter tool (dotted line in FIG. 4). If the tip is cut off in this way, the thread of the bolt is crushed at that point, which also has the effect of preventing the nut from falling off.

【0016】 次いで、マット1を地面に固定するために要所要所に杭11を打つ。図5に示 すように、杭11は先端が尖った金属製の棒であり、後部はU字型11aに折曲 しており、後端も先端同様尖っている。このような杭を、マットの周縁部1aを 貫くように地中に打ち込む。杭は、その後端もマットを貫いて地中に入るまで、 打ち込む。こうして、マットは、杭の後部U字型部11aでしっかり抑えられる ので、マットが地面からめくれあがることがない。杭の本数は、マット1枚当た り、1.5〜2本位でよい。Next, a stake 11 is hit at a required position to fix the mat 1 to the ground. As shown in FIG. 5, the stake 11 is a metal rod having a sharp pointed tip, the rear part is bent into a U-shape 11a, and the rear end is pointed like the tip. Such a pile is driven into the ground so as to penetrate the periphery 1a of the mat. The stake is driven in until the trailing edge also penetrates the mat into the ground. In this way, the mat is firmly held by the rear U-shaped portion 11a of the pile, so that the mat does not turn up from the ground. The number of piles per mat is 1.5 to 2 piles.

【0017】 図7は、このようにしてマットを施工した護岸を示す。なお、水辺では、マッ トの上に間詰の砂利を敷き、石塊と石塊の間の隙間をこの砂利で埋めるようにす る。こうすれば、一つ一つの石塊2が動きにくくなり、全体として流れに対し強 度が増す。特に河床部では洗掘に備えて、マットの上に充分厚く寄せ石12を敷 く。水辺より上にはマット上に覆土をし、さらに好ましくは植栽を施す。植物の 根はマットを通ってその下にまで延びるので、マットが地面に強固に固定される 。法面肩部では、マットに充分な量の覆土13を被せ、マットがめくりあがらな いようにする。FIG. 7 shows the revetment on which the mat is constructed in this manner. At the waterside, a shingled gravel will be laid on the mat and the gap between the stone blocks will be filled with this gravel. In this way, each stone block 2 becomes difficult to move, and the strength against the flow as a whole increases. In particular, in the riverbed, a parquet stone 12 is spread thick enough on the mat in preparation for scouring. Above the waterside, cover the soil on a mat, and more preferably plant. The roots of the plant extend through and under the mat, so that the mat is firmly fixed to the ground. At the slope shoulder, a sufficient amount of cover soil 13 is placed on the mat so that the mat does not turn over.

【0018】 このような護岸では、石塊2が、杭によって地面に固定されたマット1に接着 されており、流水に洗われても、石塊は押し流されることなく、法面や河床を洗 掘から保護する。石塊の間に詰めた砂利も、石塊に支えられ、押し流されること はない。他方、マット1は、石塊2の間から土が吸し出されるのを防止する。マ ットの上を植栽で覆った場合、植栽の根がマット1の目を通過して、土の中にま で伸び、マットを法面に強固に固定するので、一層強固な護岸となる。In such a revetment, the stone blocks 2 are adhered to the mat 1 fixed to the ground by piles, and even when washed by running water, the stone blocks are not washed away and the slopes and riverbeds are washed. Protect from digging. The gravel packed between the blocks is also supported by the blocks and is not washed away. On the other hand, the mat 1 prevents the soil from being sucked out from between the stone blocks 2. If the top of the mat is covered with planting, the roots of the plant will pass through the eyes of the mat 1 and extend into the soil, and the mat will be firmly fixed to the slope, making the bank more revetment. Becomes

【図面の簡単な説明】[Brief description of the drawings]

【図1】 石塊を接着したマットの要部斜視図である。FIG. 1 is a perspective view of a main part of a mat to which a stone block is adhered.

【図2】 マットの施工状態を平面および断面で示した
ものである。
FIG. 2 is a plan view and a sectional view showing a construction state of a mat.

【図3】 接続金具の斜視図である。FIG. 3 is a perspective view of a connection fitting.

【図4】 接続金具の使用状態断面図である。FIG. 4 is a sectional view of a use state of the connection fitting.

【図5】 杭の立面図である。FIG. 5 is an elevation view of a pile.

【図6】 護岸覆工の施工状態を示す断面図である。FIG. 6 is a cross-sectional view showing a construction state of revetment lining.

【符号の説明】[Explanation of symbols]

1 マット 2 石塊 3 連結金具(結合手段) 5 下部挟持板 6 上部挟持板 7 ボルト 8 孔 9 ナット 10 凸部 11 杭(固定手段) 11a 杭のU字部 DESCRIPTION OF SYMBOLS 1 Mat 2 Stone block 3 Connecting metal fitting (connection means) 5 Lower holding plate 6 Upper holding plate 7 Bolt 8 Hole 9 Nut 10 Convex part 11 Pile (fixing means) 11a U-shaped part of pile

Claims (5)

【実用新案登録請求の範囲】[Utility model registration claims] 【請求項1】 上面に石塊を接着したマットと、地面に
敷き詰められた該マットの周縁部同士を結合する手段
と、該マットを地面に固定する手段を備えた護岸覆工に
おいて、該結合手段が、該マットを挟む上下2枚の細長
い挟持板と、下側の該挟持板に間隔をあけて植設され、
該マットを突き通すように先端が尖っている複数本のボ
ルトと、上側の該挟持板に設けた孔から突出する該ボル
トに螺合緊締するナットから成ることを特徴とする護岸
覆工。
1. A revetment lining comprising a mat having a stone mass adhered to an upper surface thereof, means for joining peripheral edges of the mat laid on the ground, and means for fixing the mat to the ground. Means are implanted in the upper and lower two elongated holding plates sandwiching the mat and the lower holding plate at intervals.
A seawall lining, comprising: a plurality of bolts, each having a sharp tip so as to penetrate the mat, and a nut screwed into the bolt protruding from a hole provided in the upper holding plate.
【請求項2】 2枚の該挟持板が、横断面で見たとき、
山型をなしている請求項1に記載の護岸覆工。
2. When the two holding plates are viewed in cross section,
The revetment lining according to claim 1, wherein the revetment has a mountain shape.
【請求項3】 2枚のうちの少なくとも1枚の該挟持板
の対向面に凸部を形成した請求項1に記載の護岸覆工。
3. The revetment lining according to claim 1, wherein a convex portion is formed on an opposing surface of at least one of the two holding plates.
【請求項4】 該固定手段が杭で構成され、該杭は、後
部が逆U字形に折曲され、先端だけでなく後端も尖って
いる請求項1に記載の護岸覆工。
4. The revetment lining according to claim 1, wherein the fixing means is constituted by a pile, and the pile is bent in an inverted U-shape, and not only the tip but also the rear end is pointed.
【請求項5】 該石塊が溶融スラグを炉の外に取り出し
て徐冷した人工石から成る請求項1に記載の護岸覆工。
5. The revetment lining according to claim 1, wherein said mass of stone is made of artificial stone which has been taken out of a furnace and gradually cooled.
JP2001008336U 2001-12-21 2001-12-21 Revetment lining Expired - Lifetime JP3086874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001008336U JP3086874U (en) 2001-12-21 2001-12-21 Revetment lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001008336U JP3086874U (en) 2001-12-21 2001-12-21 Revetment lining

Publications (1)

Publication Number Publication Date
JP3086874U true JP3086874U (en) 2002-07-05

Family

ID=43238250

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001008336U Expired - Lifetime JP3086874U (en) 2001-12-21 2001-12-21 Revetment lining

Country Status (1)

Country Link
JP (1) JP3086874U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0558529U (en) * 1992-01-22 1993-08-03 株式会社三ツ葉電機製作所 Arrangement structure of wash hose in wiper arm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0558529U (en) * 1992-01-22 1993-08-03 株式会社三ツ葉電機製作所 Arrangement structure of wash hose in wiper arm

Similar Documents

Publication Publication Date Title
CN105103843B (en) Prevent and treat the vegetation arrangement method of dry-hot valley Mine production soil erosion
CN105839649B (en) Ecological restoration method for metal mine waste storage yard
JP5235793B2 (en) Protective net construction method for falling rocks, etc.
GB2185769A (en) Flexible ground cover structure
US11117075B2 (en) Composite filter sock anchors, compost filter sock assemblies and method of forming same
CN111919677A (en) Mining area waste land ecological restoration system and construction method
CN201027311Y (en) Water discharge type anchor stock frame beam for reinforcing side slope
CN102919010A (en) TEPS (Total Ecology Protection System) for vegetation and construction method of TEPS
JP3083250B2 (en) Slope reinforcement and greening
CN109898528A (en) A kind of high slope piling strtucture and constructing operation method
JP3086874U (en) Revetment lining
JP2002173926A (en) Revetment lining
JP3714885B2 (en) Protection structures for slopes, walls, shores, etc.
CN108396752A (en) A kind of assembled side slope protection flexible net and its construction method
JP2002309543A (en) Stairs and step stone connecting unit
CN110234813A (en) Barricade with reinforced earth
JP3081829U (en) Stairs and steps unit
CN210263090U (en) Side slope protection and ecological green covering combined symbiotic universal constraint structure
CN211472454U (en) Structure is administered to soil crack
CN110089303A (en) One kind moving spliced mining junkyard and temporarily plants raw repair module and its construction method
CN114319395A (en) Ecological bag modified expansive soil flexible ecological slope protection structure and construction method
JP4372632B2 (en) Slope greening method
KR100641583B1 (en) The method of building the reinforced earth wall
CA2136422A1 (en) Organic geotextile
JP3053376U (en) Seawall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080410

Year of fee payment: 6