JP3053376U - Seawall - Google Patents

Seawall

Info

Publication number
JP3053376U
JP3053376U JP1998001906U JP190698U JP3053376U JP 3053376 U JP3053376 U JP 3053376U JP 1998001906 U JP1998001906 U JP 1998001906U JP 190698 U JP190698 U JP 190698U JP 3053376 U JP3053376 U JP 3053376U
Authority
JP
Japan
Prior art keywords
mat
mats
stone
pass
string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1998001906U
Other languages
Japanese (ja)
Inventor
順一郎 齋藤
Original Assignee
東洋興産株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東洋興産株式会社 filed Critical 東洋興産株式会社
Priority to JP1998001906U priority Critical patent/JP3053376U/en
Application granted granted Critical
Publication of JP3053376U publication Critical patent/JP3053376U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

(57)【要約】 (修正有) 【課題】 コンクリートを使わない多自然型の護岸覆工
を提供する。 【解決手段】 ベースマット1の上面に石塊2を接着す
る。マット1の主体はポリエステル不織布であり、その
目は、土はほとんど通過できないが、水分は通過できる
ような粗さになっている。ポリエステル不織布は2枚重
ねになっており、その間に目の粗い補強ネットが挟み込
んである。石塊2は不定形の自然石をカッタで二分した
ものであり、そのカット面に接着剤を塗ってマット1に
貼り付ける。このマットを地面に固定するため、アンカ
ーを土の中に埋め込み、アンカーとアンカーの間に碁盤
の目のように線条体を張る。隣のマット同士連結するた
めに、各マットの周縁に沿って、マットと同一材料で作
った紐通し9を縫い付けておく。
(57) [Summary] (Modified) [Problem] To provide a natural revetment lining without using concrete. SOLUTION: A stone mass 2 is adhered to an upper surface of a base mat 1. The main body of the mat 1 is a polyester non-woven fabric, and its eyes are rough enough to allow almost no soil to pass but moisture to pass. The polyester nonwoven fabric is a two-ply structure, and a coarse reinforcing net is sandwiched between the two nonwoven fabrics. The stone block 2 is obtained by bisecting an amorphous natural stone with a cutter, and the cut surface is coated with an adhesive and attached to the mat 1. In order to fix this mat to the ground, the anchor is embedded in the soil, and a striated body is put between the anchors like a grid. To connect adjacent mats, a string pass 9 made of the same material as the mats is sewn along the periphery of each mat.

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

この考案は、河川や湖沼の法面に敷き詰めてその崩壊を防ぐための護岸覆工に 関する。 The invention concerns the revetment lining to cover the slopes of rivers and lakes and prevent their collapse.

【0002】[0002]

【従来の技術】[Prior art]

以前の護岸工事は、表面をコンクリートですっかり覆ってしまうものがほとん どであったが、最近は、自然をできるだけ保全するために、コンクリートを使わ ずに、自然石や木材を主体とする工事に変わりつつある。 一例を挙げれば、河川の法面ににまず吸出し防止マットを敷き、その上に鉄線 かご(布団籠)や木製の枠体を置き、その中に玉石を詰める。枠体の場合、玉石 が流れないよう、上を鉄線網で覆う。しかし、このような方法では、かごや枠体 が必要であり、これに現場で石詰めしなければならないので、工期が長く、工事 費も高いものにつく。また、金網や鉄線かごが上に表われるので、自然の景観を 損う。 Most revetment work used to cover the entire surface with concrete, but recently, in order to protect nature as much as possible, instead of using concrete, the work was mainly made of natural stone and wood. It is changing. As an example, first, a suction-prevention mat is laid on the slope of a river, and an iron wire basket (futon basket) or a wooden frame is placed on top of it, and cobblestone is stuffed into it. In the case of a frame, cover the top with a wire net to prevent the boulders from flowing. However, such a method requires a basket and a frame, which must be stuffed at the site, resulting in a long construction period and a high construction cost. In addition, wire mesh and iron wire baskets appear on the top, which impairs the natural scenery.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the invention]

この考案は、コンクリートを使わずに工事が容易で、工事費が安く、しかも、 自然の景観を損ねない、植生等による生物が共生ができる環境整備のための護岸 覆工を提供することを課題とする。 The purpose of the present invention is to provide a seawall lining for the maintenance of an environment in which creatures can coexist with vegetation, etc., which can be easily constructed without using concrete, have low construction costs, and do not impair the natural scenery. And

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

この考案の護岸覆工は、水分は通過できるが土砂は通過できない程度の目の粗 さを持ったベースマットの上面に、底を平坦に形成した不定形の石塊を密に接着 したものであり、この石塊の連結体を法面に敷き詰める。 The revetment lining of the present invention consists of a base mat that has enough coarseness to pass moisture but not earth and sand, and densely adhered irregularly shaped stone blocks with a flat bottom. Yes, this block of stone blocks is laid on the slope.

【0005】 これらのマットを地面にしっかりと固定するには、地中にはアンカーを埋め込 み、アンカーの間に線条体を張り渡し、この線条体にマットを支持させるように するとよい。 マットとマットを結合するには、マットの周囲に紐通しを設け、相隣接するマ ットの紐通しに互い違いに紐を通して結合するようにするとよい。このようにマ ットを結合したとき、マットの縁が重なり合うよう、紐通しはマットの周縁より 内側に設けることが好ましい。In order to fix these mats firmly to the ground, it is advisable to embed an anchor in the ground, stretch a striated body between the anchors, and support the mat with the striated body. . In order to connect the mats with each other, it is preferable to provide a string around the mat so that the mats are connected alternately through the strings. When the mats are joined in this manner, it is preferable that the stringing be provided inside the periphery of the mats so that the edges of the mats overlap.

【0006】[0006]

【考案の実施の形態】[Embodiment of the invention]

図1に示すように、ベースマット1の上面に石塊2を接着する。マット1の主 体はポリエステル不織布であり、その目は、土はほとんど通過できないが、水分 は通過できるような粗さになっている。ポリエステル不織布は2枚重ねになって おり、その間に延びの少ない材料(例えばアラミド繊維)で作った目の粗い補強 ネット1aが挟み込んである。 As shown in FIG. 1, a stone block 2 is adhered to an upper surface of a base mat 1. The main body of the mat 1 is a polyester non-woven fabric, and its eyes are rough enough to allow almost no soil to pass but moisture to pass. The polyester non-woven fabric is made of two layers, and a coarse reinforcing net 1a made of a material (for example, aramid fiber) with little extension is sandwiched between the two layers.

【0007】 このベースマットに接着する石塊2は、直径が15〜35cm前後の不定形の自然石 (玉石をはじめ、割石、野面石など)をカッタで二分したものであり、そのカッ ト面に接着剤を塗ってマット1に貼り付ける。こうすると接着剤がマットの中に 滲み込み、ポリエステル不織布と補強ネットが互いに接着されて一体になり、石 塊の保持および土砂の崩壊に対して充分な強度を持つようになる。石塊2はマッ ト全面にほぼ密に貼り付ける。 1枚のベースマット1は縦横2.0×1.5mの大きさであり、石塊2を張り付けた ときの重量は300〜1000kgほどになる。運搬はパレットに載せて行う。[0007] The stone block 2 adhered to the base mat is obtained by bisecting an amorphous natural stone having a diameter of about 15 to 35 cm (cobble stone, split stone, field stone, etc.) by a cutter. The surface is coated with an adhesive and attached to the mat 1. This causes the adhesive to ooze into the mat, bonding the polyester non-woven fabric and the reinforcing net together and providing sufficient strength for holding stones and collapsing earth and sand. Stone block 2 is attached almost completely over the entire surface of the mat. Each base mat 1 has a size of 2.0 × 1.5 m in length and width, and the weight when the stone mass 2 is attached is about 300 to 1000 kg. Transport is carried on pallets.

【0008】 このマットを地面に固定するため、図2に示すようにアンカー5を土の中に埋 め込み、アンカーとアンカーの間に碁盤の目のように線条体6を張る。アンカー 本体5aは鋼板であり、これに鋼棒5bを立て、その上端にリングプレートを5 cを固定し、これに線条体6を結合する。線条体6は13mm径鋼棒であり、途中に 設けたターンバックル7で線条体を緊張させる。使用する鋼材はすべて亜鉛メッ キ等の防錆処理を施し、耐久性を持たせる。In order to fix the mat to the ground, an anchor 5 is embedded in the soil as shown in FIG. 2, and a striated body 6 is stretched between the anchors like a grid. The anchor main body 5a is a steel plate, on which a steel rod 5b is erected, a ring plate 5c is fixed to the upper end thereof, and the striated body 6 is connected thereto. The striated body 6 is a 13 mm diameter steel rod, and the striated body is tensioned by a turnbuckle 7 provided in the middle. All the steel materials used shall be treated with rust prevention treatment such as zinc plating to make them durable.

【0009】 こうして線条体6で囲まれた一つの桝目(大きさは、6m×4.5m)に、図3に示 すように、縦横三枚ずつ合計9枚のマット1をそれぞれ敷き並べる。隣のマット 同士連結するために、図4に示すように、各マットの周縁に沿って、マットと同 一材料で作った紐通し9を縫い付けておく。紐通し9は、等間隔で切込み9aを 入れておき、隣接するマットの紐通しに紐(例えば、ステンレスロープ)10を 互い違いに通す。こうしておいて紐10を引き絞り、図5に断面で示すように、 マット同士結合する。紐10の端は、図2に示すように、線条体6に止める。な お、マット1とマット1の縁が重なり合って間に隙間ができないよう、紐通し9 はマットの周縁より少し内側に引っ込んだところに縫い付ける。 9枚のマットを結合したら、さらに、外周の紐通しに紐(ステンレスロープ) 10を通し、この紐を線条体6といっしょにリング11で結束する(図6)。As shown in FIG. 3, a total of nine mats 1 each having a length and width of three mats 1 are laid out in one cell (the size is 6 m × 4.5 m) surrounded by the striated body 6. In order to connect adjacent mats, a string pass 9 made of the same material as the mats is sewn along the periphery of each mat as shown in FIG. Cuts 9a are made at regular intervals in the string passing 9, and strings (for example, stainless steel ropes) 10 are alternately passed through the string passing of the adjacent mat. In this manner, the string 10 is drawn and squeezed, and the mats are joined together as shown in the cross section in FIG. The end of the cord 10 is fixed to the striatum 6 as shown in FIG. In order to prevent the gap between the mat 1 and the mat 1 from overlapping, there is no gap between the mat 1 and the string pass 9 is sewn to a position slightly inward from the periphery of the mat. After the nine mats are joined, a string (stainless steel rope) 10 is further passed through a string thread on the outer periphery, and the string is bound together with the striated body 6 by a ring 11 (FIG. 6).

【0010】 こうして、図7に示すように、法面(および河床の一部)を石塊を接着したマ ットで覆う。符号12は水面である。石塊2の間には砂利や土砂を詰め、好まし くは、植物の種をまいてマットの上を植栽で覆うようにする。石塊2はベースマ ット1に接着されており、ベースマット1はアンカー5によって地面に固定され ているので、水に洗われても、石塊は押し流されることなく、法面や河床を洗掘 から保護する。石塊の間に詰めた砂利や土砂も、石塊に支えられ、押し流され難 い。 ベースマット1は、石塊2の間から土が吸し出されるのを防止する。マットの 上を植栽で覆った場合、植栽の根がマット1の目を通過して、土の中にまで伸び 、マットを法面に強固に固定するので、一層強固な護岸となる。[0010] Thus, as shown in FIG. 7, the slope (and a part of the riverbed) is covered with a mat to which a stone mass is adhered. Reference numeral 12 denotes a water surface. Gravel or earth and sand is filled between the blocks of stone 2, and preferably, seeds of plants are sowed and covered on the mat by planting. Since the stone blocks 2 are adhered to the base mat 1 and the base mat 1 is fixed to the ground by the anchors 5, even when washed with water, the stone blocks are not washed away and the slopes and riverbeds are washed. Protect from digging. Gravel and earth and sand packed between stone blocks are also supported by the stone blocks and are not easily washed away. The base mat 1 prevents the soil from being sucked out from between the stone blocks 2. If the top of the mat is covered with planting, the roots of the plant will pass through the eyes of the mat 1 and extend into the soil, and the mat will be firmly fixed to the slope, providing a stronger revetment.

【0011】[0011]

【考案の効果】[Effect of the invention]

請求項1の護岸覆工は、ベースマットの上面に、石塊を接着したものであり、 これで河川の法面等を覆うことにより簡単に護岸工事を行うことができる。石塊 は不定形のものを使用するので、自然に近い景観が得られ、また、石塊の底を平 坦に形成してマットに接着するようにしたので、高い接着強度が得られる。 In the revetment lining according to the first aspect, a stone block is adhered to the upper surface of the base mat. With this, the revetment work can be easily performed by covering the slope of the river. Since the stone blocks are of irregular shape, a landscape close to nature can be obtained, and the bottom of the stone blocks is formed flat and bonded to the mat, so high bonding strength can be obtained.

【0012】 請求項2は、マットの周囲に紐通しを設け、相隣接するマットの紐通しに互い 違いに紐を通して結合するようにしたものであり、マット同士をしっかりと結合 することができる。また、マットの縁が重なり合うよう、紐通しはマットの周縁 より内側に設けたので、結合部から土の吸出しが起こらない。[0012] According to a second aspect of the present invention, a string is provided around the mats so that the mats are connected alternately with the strings of adjacent mats, so that the mats can be firmly connected to each other. In addition, since the stringing is provided inside the periphery of the mat so that the edges of the mat overlap, no soil is sucked out from the joint.

【0013】 請求項3は、地中にアンカーを埋め込み、アンカーの間に線条体を張り渡し、 この線条体にマットを支持させるようにしたものであり、マットを地面に強固に 固定することができる。According to a third aspect of the present invention, the anchor is embedded in the ground, a striated body is stretched between the anchors, and the mat is supported by the striated body. The mat is firmly fixed to the ground. be able to.

【提出日】平成10年6月24日[Submission date] June 24, 1998

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents] 【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

この考案は、河川や湖沼の法面に敷き詰めてその崩壊を防ぐための護岸石覆に 関する。The present invention relates to seawall covering to cover the slopes of rivers and lakes and prevent their collapse.

【0002】[0002]

【従来の技術】[Prior art]

以前の護岸工事は、表面をコンクリートですっかり覆ってしまうものがほとん どであったが、最近は、自然をできるだけ保全するために、コンクリートを使わ ずに、自然石や木材を主体とする工事に変わりつつある。 一例を挙げれば、河川の法面ににまず吸出し防止マットを敷き、その上に鉄線 かご(布団篭)や木製の枠体を置き、その中に玉石を詰める。枠体の場合、玉石 が流れないよう、上を鉄線網で覆う。しかし、このような方法では、かごや枠体 が必要であり、これに現場で石詰めしなければならないので、工期が長く、工事 費も高いものにつく。また、金網や鉄線かごが上に表われるので、自然の景観を 損う。 Most revetment work used to cover the surface completely with concrete, but recently, in order to preserve nature as much as possible, instead of using concrete, construction work was mainly made of natural stone and wood. It is changing. As an example, first, a suction-prevention mat is laid on the slope of a river, and then an iron wire basket (futon basket) or a wooden frame is placed on top of it, and cobblestone is packed in it. In the case of a frame, cover the top with a wire net to prevent the boulders from flowing. However, such a method requires a basket and a frame, which must be stuffed at the site, resulting in a long construction period and a high construction cost. In addition, wire mesh and iron wire baskets appear on the top, which impairs the natural scenery.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the invention]

この考案は、コンクリートを使わずに工事が容易で、工事費が安く、しかも、 自然の景観を損ねない、植生等による生物が共生ができる環境整備のための護岸 石覆 を提供することを課題とする。 This device is easy to construct without using concrete, the construction cost is low, and it does not impair the natural scenery. Stone covering The task is to provide

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

この考案の護岸石覆は、水分は通過できるが土砂は通過できない程度の目の粗 さを持ったベースマットの上面に、底を平坦に形成した不定形の石塊を密に接着 したものであり、この石塊の連結体を法面に敷き詰める。The revetment stone covering of this invention consists of a base mat that has a coarseness enough to allow water to pass through but not earth and sand, and densely adhered irregularly shaped stone blocks with a flat bottom. Yes, this block of stone blocks is laid on the slope.

【0005】 これらのマットを地面にしっかりと固定するには、地中にはアンカーを埋め込 み、アンカーの間に線条体を張り渡し、この線条体にマットを支持させるように するとよい。 マットとマットを結合するには、マットの周囲に紐通しを設け、相隣接するマ ットの紐通しに互い違いに紐を通して結合するようにするとよい。このようにマ ットを結合したとき、マットの縁が重なり合うよう、紐通しはマットの周縁より 内側に設けることが好ましい。In order to fix these mats firmly to the ground, it is advisable to embed an anchor in the ground, stretch a striated body between the anchors, and support the mat with the striated body. . In order to connect the mats with each other, it is preferable to provide a string around the mat so that the mats are connected alternately through the strings. When the mats are joined in this manner, it is preferable that the stringing be provided inside the periphery of the mats so that the edges of the mats overlap.

【0006】[0006]

【考案の実施の形態】[Embodiment of the invention]

図1に示すように、ベースマット1の上面に石塊2を接着する。マット1の主 体はポリエステル不織布であり、その目は、土はほとんど通過できないが、水分 は通過できるような粗さになっている。ポリエステル不織布は2枚重ねになって おり、その間に延びの少ない材料(例えばアラミド繊維)で作った目の粗い補強 ネット1aが挟み込んである。 As shown in FIG. 1, a stone block 2 is adhered to an upper surface of a base mat 1. The main body of the mat 1 is a polyester non-woven fabric, and its eyes are rough enough to allow almost no soil to pass but moisture to pass. The polyester non-woven fabric is made of two layers, and a coarse reinforcing net 1a made of a material (for example, aramid fiber) with little extension is sandwiched between the two layers.

【0007】 このベースマットに接着する石塊2は、直径が15〜35cm前後の不定形の自然石 (玉石をはじめ、割石、野面石など)をカッタで二分したものであり、そのカッ ト面に接着剤を塗ってマット1に貼り付ける。こうすると接着剤がマットの中に 滲み込み、ポリエステル不織布と補強ネットが互いに接着されて一体になり、石 塊の保持および土砂の崩壊に対して充分な強度を持つようになる。石塊2はマッ ト全面にほぼ密に貼り付ける。 1枚のベースマット1は縦横2.0×1.5mの大きさであり、石塊2を張り付けた ときの重量は300〜1000kgほどになる。運搬はパレットに載せて行う。[0007] The stone block 2 adhered to the base mat is obtained by bisecting an amorphous natural stone having a diameter of about 15 to 35 cm (cobble stone, split stone, field stone, etc.) by a cutter. The surface is coated with an adhesive and attached to the mat 1. This causes the adhesive to ooze into the mat, bonding the polyester non-woven fabric and the reinforcing net together and providing sufficient strength for holding stones and collapsing earth and sand. Stone block 2 is attached almost completely over the entire surface of the mat. Each base mat 1 has a size of 2.0 × 1.5 m in length and width, and the weight when the stone mass 2 is attached is about 300 to 1000 kg. Transport is carried on pallets.

【0008】 このマットを地面に固定するため、図2に示すようにアンカー5を土の中に埋 め込み、アンカーとアンカーの間に碁盤の目のように線条体6を張る。アンカー 本体5aは鋼板であり、これに鋼棒5bを立て、その上端にリングプレートを5 cを固定し、これに線条体6を結合する。線条体6は13mm径鋼棒であり、途中に 設けたターンバックル7で線条体を緊張させる。使用する鋼材はすべて亜鉛メッ キ等の防錆処理を施し、耐久性を持たせる。In order to fix the mat to the ground, an anchor 5 is embedded in the soil as shown in FIG. 2, and a striated body 6 is stretched between the anchors like a grid. The anchor main body 5a is a steel plate, on which a steel rod 5b is erected, a ring plate 5c is fixed to the upper end thereof, and the striated body 6 is connected thereto. The striated body 6 is a 13 mm diameter steel rod, and the striated body is tensioned by a turnbuckle 7 provided in the middle. All the steel materials used shall be treated with rust prevention treatment such as zinc plating to make them durable.

【0009】 こうして線条体6で囲まれた一つの桝目(大きさは、6m×4.5m)に、図3に示 すように、縦横三枚ずつ合計9枚のマット1をそれぞれ敷き並べる。隣のマット 同士連結するために、図4に示すように、各マットの周縁に沿って、マットと同 一材料で作った紐通し9を縫い付けておく。紐通し9は、等間隔で切込み9aを 入れておき、隣接するマットの紐通しに紐(例えば、ステンレスロープ)10を 互い違いに通す。こうしておいて紐10を引き絞り、図5に断面で示すように、 マット同士結合する。紐10の端は、図2に示すように、線条体6に止める。な お、マット1とマット1の縁が重なり合って間に隙間ができないよう、紐通し9 はマットの周縁より少し内側に引っ込んだところに縫い付ける。 9枚のマットを結合したら、さらに、外周の紐通しに紐(ステンレスロープ) 10を通し、この紐を線条体6といっしょにリング11で結束する(図6)。As shown in FIG. 3, a total of nine mats 1 each having a length and width of three mats 1 are laid out in one cell (the size is 6 m × 4.5 m) surrounded by the striated body 6. In order to connect adjacent mats, a string pass 9 made of the same material as the mats is sewn along the periphery of each mat as shown in FIG. Cuts 9a are made at regular intervals in the string passing 9, and strings (for example, stainless steel ropes) 10 are alternately passed through the string passing of the adjacent mat. In this manner, the string 10 is drawn and squeezed, and the mats are joined together as shown in the cross section in FIG. The end of the cord 10 is fixed to the striatum 6 as shown in FIG. In order to prevent the gap between the mat 1 and the mat 1 from overlapping, there is no gap between the mat 1 and the string pass 9 is sewn to a position slightly inward from the periphery of the mat. After the nine mats are joined, a string (stainless steel rope) 10 is further passed through a string thread on the outer periphery, and the string is bound together with the striated body 6 by a ring 11 (FIG. 6).

【0010】 こうして、図7に示すように、法面(および河床の一部)を石塊を接着したマ ットで覆う。符号12は水面である。石塊2の間には砂利や土砂を詰め、好まし くは、植物の種をまいてマットの上を植栽で覆うようにする。石塊2はベースマ ット1に接着されており、ベースマット1はアンカー5によって地面に固定され ているので、水に洗われても、石塊は押し流されることなく、法面や河床を洗掘 から保護する。石塊の間に詰めた砂利や土砂も、石塊に支えられ、押し流され難 い。 ベースマット1は、石塊2の間から土が吸し出されるのを防止する。マットの 上を植栽で覆った場合、植栽の根がマット1の目を通過して、土の中にまで伸び 、マットを法面に強固に固定するので、一層強固な護岸となる。[0010] Thus, as shown in FIG. 7, the slope (and a part of the riverbed) is covered with a mat to which a stone mass is adhered. Reference numeral 12 denotes a water surface. Gravel or earth and sand is filled between the blocks of stone 2, and preferably, seeds of plants are sowed and covered on the mat by planting. Since the stone blocks 2 are adhered to the base mat 1 and the base mat 1 is fixed to the ground by the anchors 5, even when washed with water, the stone blocks are not washed away and the slopes and riverbeds are washed. Protect from digging. Gravel and earth and sand packed between stone blocks are also supported by the stone blocks and are not easily washed away. The base mat 1 prevents the soil from being sucked out from between the stone blocks 2. If the top of the mat is covered with planting, the roots of the plant will pass through the eyes of the mat 1 and extend into the soil, and the mat will be firmly fixed to the slope, providing a stronger revetment.

【0011】[0011]

【考案の効果】[Effect of the invention]

請求項1の護岸石覆は、ベースマットの上面に、石塊を接着したものであり、 これで河川の法面等を覆うことにより簡単に護岸工事を行うことができる。石塊 は不定形のものを使用するので、自然に近い景観が得られ、また、石塊の底を平 坦に形成してマットに接着するようにしたので、高い接着強度が得られる。The revetment stone wall according to the first aspect is obtained by bonding a stone mass to the upper surface of the base mat. With this, the revetment work can be easily performed by covering the slope of the river. Since the stone blocks are of indeterminate shape, a landscape close to nature can be obtained, and since the bottom of the stone blocks is formed flat and bonded to the mat, high bonding strength can be obtained.

【0012】 請求項2は、マットの周囲に紐通しを設け、相隣接するマットの紐通しに互い 違いに紐を通して結合するようにしたものであり、マット同士をしっかりと結合 することができる。また、マットの縁が重なり合うよう、紐通しはマットの周縁 より内側に設けたので、結合部から土の吸出しが起こらない。[0012] According to a second aspect of the present invention, a string is provided around the mats so that the mats are connected alternately with the strings of adjacent mats, so that the mats can be firmly connected to each other. In addition, since the stringing is provided inside the periphery of the mat so that the edges of the mat overlap, no soil is sucked out from the joint.

【0013】 請求項3は、地中にアンカーを埋め込み、アンカーの間に線条体を張り渡し、 この線条体にマットを支持させるようにしたものであり、マットを地面に強固に 固定することができる。According to a third aspect of the present invention, the anchor is embedded in the ground, a striated body is stretched between the anchors, and the mat is supported by the striated body. The mat is firmly fixed to the ground. be able to.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 護岸覆工の要部斜視図である。FIG. 1 is a perspective view of a main part of a revetment lining.

【図2】 アンカーの斜視図である。FIG. 2 is a perspective view of an anchor.

【図3】 張り渡したロッドの平面図である。FIG. 3 is a plan view of a stretched rod.

【図4】 マットを結合している斜視図である。FIG. 4 is a perspective view in which mats are connected.

【図5】 互いに結合したマットの断面図である。FIG. 5 is a cross-sectional view of mats joined together.

【図6】 ロッドと結合したマットの断面図である。FIG. 6 is a sectional view of a mat connected to a rod.

【図7】 護岸覆工の施工状態を示す断面図である。FIG. 7 is a sectional view showing a construction state of a revetment lining.

【符号の説明】[Explanation of symbols]

1 ベースマット 2 石塊 5 アンカー 6 線条体(ロッド) 9 紐通し 10 紐(ステンレスロープ) Reference Signs List 1 base mat 2 stone block 5 anchor 6 striatum (rod) 9 string passing 10 string (stainless steel rope)

【手続補正書】[Procedure amendment]

【提出日】平成10年6月24日[Submission date] June 24, 1998

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【書類名】 明細書[Document Name] Statement

【考案の名称】 護岸石覆 [Name of device] Seawall stone covering

【実用新案登録請求の範囲】[Utility model registration claims]

【図面の簡単な説明】[Brief description of the drawings]

【図1】 護岸石覆の要部斜視図である。FIG. 1 is a perspective view showing a main part of the revetment stone covering.

【図2】 アンカーの斜視図である。FIG. 2 is a perspective view of an anchor.

【図3】 張り渡したロッドの平面図である。FIG. 3 is a plan view of a stretched rod.

【図4】 マットを結合している斜視図である。FIG. 4 is a perspective view in which mats are connected.

【図5】 互いに結合したマットの断面図である。FIG. 5 is a cross-sectional view of mats joined together.

【図6】 ロッドと結合したマットの断面図である。FIG. 6 is a sectional view of a mat connected to a rod.

【図7】 護岸石覆の施工状態を示す断面図である。FIG. 7 is a sectional view showing a construction state of a revetment stone covering ;

【符号の説明】 1 ベースマット 2 石塊 5 アンカー 6 線条体(ロッド) 9 紐通し 10 紐(ステンレスロープ)[Description of Signs] 1 Base mat 2 Stone block 5 Anchor 6 Striatal body (rod) 9 String passing 10 String (stainless steel rope)

Claims (3)

【実用新案登録請求の範囲】[Utility model registration claims] 【請求項1】 水分は通過するが土砂は通過しない程度
の目の粗さを持ったベースマットの上面に、底を平坦に
形成した不定形の石塊を密に接着した護岸覆工。
1. A revetment lining in which an irregularly shaped stone block having a flat bottom is densely adhered to an upper surface of a base mat having a coarseness enough to allow moisture to pass through but not to pass through earth and sand.
【請求項2】 該マットの周囲に紐通しを設け、相隣接
するマットの紐通しに互い違いに紐を通して結合するよ
うにし、このように結合したとき、マットの縁が重なり
合うよう、紐通しはマットの周縁より内側に設けた請求
項1に記載の護岸覆工。
2. A string is provided around the mat so that the strings are alternately connected to the strings of adjacent mats, and the mats are overlapped so that the mats overlap when joined in this manner. The seawall lining according to claim 1, which is provided inside the periphery of the seawall.
【請求項3】 地中にアンカーを埋め込み、該アンカー
の間に線条体を張り渡し、この線条体に該マットを支持
させるようにした請求項1または2に記載の護岸覆工。
3. The seawall lining according to claim 1, wherein an anchor is embedded in the ground, a striated body is stretched between the anchors, and the mat is supported by the striated body.
JP1998001906U 1998-03-13 1998-03-13 Seawall Expired - Lifetime JP3053376U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1998001906U JP3053376U (en) 1998-03-13 1998-03-13 Seawall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1998001906U JP3053376U (en) 1998-03-13 1998-03-13 Seawall

Publications (1)

Publication Number Publication Date
JP3053376U true JP3053376U (en) 1998-10-27

Family

ID=43187461

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1998001906U Expired - Lifetime JP3053376U (en) 1998-03-13 1998-03-13 Seawall

Country Status (1)

Country Link
JP (1) JP3053376U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190002530U (en) 2018-03-29 2019-10-10 가부시키가이샤 시마세이키 세이사쿠쇼 Yarn retaining and cutting device for a flat knitting machine
KR20200007693A (en) 2018-07-13 2020-01-22 가부시키가이샤 시마세이키 세이사쿠쇼 Flat knitting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190002530U (en) 2018-03-29 2019-10-10 가부시키가이샤 시마세이키 세이사쿠쇼 Yarn retaining and cutting device for a flat knitting machine
KR20200007693A (en) 2018-07-13 2020-01-22 가부시키가이샤 시마세이키 세이사쿠쇼 Flat knitting machine

Similar Documents

Publication Publication Date Title
JP6680461B2 (en) Slope protection tool and slope protection method
GB2185769A (en) Flexible ground cover structure
KR101219289B1 (en) A vegetation bag containing seeds of green manure grass crop
JP2001064937A (en) Gabion work for civil engineering work, protection work using the same, and filling method for filler
NO300648B1 (en) Duvet-shaped tablecloths comprising a sleeve of a flexible and stretch-resistant cloth material
EP3555373B1 (en) Sack for civil engineering works, method for its manufacture, and realisation of such works
JP3053376U (en) Seawall
JP2002363990A (en) Slope seeding and planting method
KR102235064B1 (en) Construction Method for Vegetable Soil Bag Wall using Earth Anchors and Grids
JPH11256546A (en) Revetment covering
JP4264162B2 (en) River vegetation revetment method and river vegetation revetment
CN101016745A (en) Construction structure of abrupt slope flexible hedge ridge
KR100994740B1 (en) Vegetation net pad constructing on inclined plane or waterside and the method thereof
JP2006249659A (en) Ground reinforcing frame and its manufacturing method
JP4364063B2 (en) Construction method of earth retaining bag and retaining wall
JP3528842B2 (en) Seawall material
JP2000152719A (en) Bag body for greening and vegetation, and greening, vegetation and protection of face of slope of shallow water region
JP3285292B2 (en) Vegetation net structure
JPH10280360A (en) Mat having mass bodies arranged in connected state
JP2600010Y2 (en) Gabion for civil engineering
KR200306409Y1 (en) the earth, sand, stone us manufacture of dike protect gabion
JP7352605B2 (en) Construction method of civil engineering or architectural sheet and method of fixing civil engineering or architectural sheet
JPS6351527A (en) Slope stabilization work
JPH11152727A (en) Laying structure using stone
JP2020094492A (en) Slope protection tool and slope protection method

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term