KR100641583B1 - The method of building the reinforced earth wall - Google Patents

The method of building the reinforced earth wall Download PDF

Info

Publication number
KR100641583B1
KR100641583B1 KR1020040039391A KR20040039391A KR100641583B1 KR 100641583 B1 KR100641583 B1 KR 100641583B1 KR 1020040039391 A KR1020040039391 A KR 1020040039391A KR 20040039391 A KR20040039391 A KR 20040039391A KR 100641583 B1 KR100641583 B1 KR 100641583B1
Authority
KR
South Korea
Prior art keywords
retaining wall
reinforcement
soil
arch
arch block
Prior art date
Application number
KR1020040039391A
Other languages
Korean (ko)
Other versions
KR20050114166A (en
Inventor
김옥민
Original Assignee
(주)그라스본
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)그라스본 filed Critical (주)그라스본
Priority to KR1020040039391A priority Critical patent/KR100641583B1/en
Publication of KR20050114166A publication Critical patent/KR20050114166A/en
Application granted granted Critical
Publication of KR100641583B1 publication Critical patent/KR100641583B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0007PVC
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0051Including fibers
    • E02D2300/0053Including fibers made from glass

Abstract

본 발명은 인공토를 이용한 성토부 및 절토부의 보강토 옹벽 전면 녹화 방법 및 그 축조 방법에 관한 것으로, 더욱 상세하게는 인공토 및 보강토체 뒤채움흙의 쏘일 아칭(soil arching) 효과를 이용하여 성토부 및 절토부 옹벽에 적용하여 친환경적인 녹화를 통하여 늘푸른옹벽을 축조하는 것을 특징으로 하며, 특히 절토부에서는 쏘일네일(soil nail) 및 앵커(anchor)와 결합하여 녹화 및 축조가 가능한 것을 특징으로 한다. 이를 위하여 본 발명은, 옹벽 전면에 식생이 가능하도록 아치형태의 보강토 옹벽용 블록과 유리섬유(또는 토목섬유) 그리드 보강재, 띠 유리섬유(또는 토목섬유)보강재, 아연도금된 와이어 로프 보강재를 연결 바(bar), 와이어 클립과 결합하고 아치블록과 블록 사이 및 배면 뒤채움 인공토의 아칭 효과(arching effect)를 이용하여 성토부 및 절토부에 녹화할 수 있는 친환경적인 보강토 옹벽 공법으로서, 중장비 다짐(compaction)으로 인한 벽체 수평변형 및 배부름(bulging) 현상이 방지되며, 자갈뒤채움이 필요없으며, 지진 발생 지역에서도 안정성이 확보되며, 호안 및 해안의 수리 구조물 옹벽의 기능을 할 수 있는 특징이 있다. 특히 절토부 적용시 쏘일 네일 및 앵커 공법에서 필요한 쇼크리트(shotcrete), 와이어 메쉬(wire mesh), 캡(cap), 라이닝 콘크리트(lining concrete), 지압판을 제외하여 아치블록으로 형성된 보강토 옹벽과 결합하여 시공이 가능한 공법을 특징으로 한다.The present invention relates to a front greening method of the reinforcement soil retaining wall and the construction method of the fill and cut section using artificial soil, and more specifically, using the soil arching effect of the soil filling backing soil And it is applied to the cut retaining wall is characterized in that the evergreen green wall is constructed through eco-friendly greening, in particular, the cut is characterized in that the greening and construction is possible by combining with a nail (soil nail) and anchor (anchor). To this end, the present invention, connecting the arch-shaped reinforcement retaining wall block and glass fiber (or geo-fiber) grid reinforcement, strip glass fiber (or geo-fiber) reinforcement, galvanized wire rope reinforcement to allow vegetation on the front of the retaining wall (bar), an eco-friendly reinforcement retaining wall construction that can be combined with wire clips and record on the fill and cut areas using the arching effect between the arch block and the block and the back fill artificial soil. It prevents the horizontal deformation and bulging of the wall due to), does not need to fill the gravel, and ensures stability even in the earthquake-prone area, and it can function as the retaining wall of the shoreline and coastal repair structure. In particular, it is combined with reinforcement earth retaining wall formed of arch block except for shotcrete, wire mesh, cap, lining concrete and pressure plate, which are needed for the nailing and anchoring process It is characterized by the construction method which can be constructed.

보강토 옹벽, 인공토, 녹화, 식생, 절토부, 유리섬유, 토목섬유, 그리드 보강재, 띠보강재, 와이어 로프 보강재, 늘푸른옹벽, 아치블록, 아칭효과Reinforced soil retaining wall, artificial soil, greening, vegetation, cut section, glass fiber, civil fiber, grid reinforcement, band reinforcement, wire rope reinforcement, evergreen retaining wall, arch block, arching effect

Description

보강토 옹벽 축조 방법 {The method of building the reinforced earth wall }Reinforced earth retaining wall construction method {The method of building the reinforced earth wall}

도 1a는 인공토를 이용하여 녹화 완료된 보강토 옹벽 축조 단면도, 도 1b는 아치블록을 수평 이격거리 없이 축조한 단면도, 도 1c는 인공토체, 보강토체, 배면토체의 구분 평면도,Figure 1a is a sectional view of the reinforced earth retaining wall construction completed using artificial soil, Figure 1b is a cross-sectional view of the construction of the arch block without a horizontal separation distance, Figure 1c is a top planar view of the artificial earth, reinforced earth, backing soil,

도 2a는 중간 걸림턱이 있는 아치블록 사시도, 도 2b는 끝 걸림턱이 있는 아치블록 평면도, 도 2c, 도 2d는 중간 걸림턱과 끝 걸림턱이 있는 아치블록과 띠 보강재 연결 평면도, 도 2e는 아치블록과 그리드 보강재 연결 측면도Figure 2a is a perspective view of the arch block with an intermediate jaw, Figure 2b is a top view of the arch block with the end jaw, Figure 2c, Figure 2d is a plan view connecting the arch block and the band reinforcement with the intermediate jaw and the end jaw, Figure 2e Side view of archblock and grid reinforcement connection

도 3a, 도3b, 도 3c는 절토부 적용시 와이어 로프 보강재와 쏘일 네일 및 앵커의 연결상세도Figures 3a, 3b, 3c is a connection detail of the wire rope reinforcement and the saw nail and anchor when applying the cut

도 4a, 도 4b, 도 4c, 도 4d, 도 4e는 본 발명의 보강토 옹벽 축조 구체예.Figures 4a, 4b, 4c, 4d, 4e is a reinforced earth retaining wall construction example of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>

100 : 보강토 옹벽 벽체 110 : 아치블록100: reinforcement retaining wall wall 110: arch block

210 : 와이어 클립 300 : 그리드 보강재210: wire clip 300: grid reinforcement

310 : 띠 보강재 400 : 쏘일 네일 및 앵커310: strip reinforcement 400: saw nail and anchor

410 : 연결 철근 500 : 녹화410: connection bar 500: recording

본 발명은 인공토를 이용한 성토부 및 절토부의 보강토 옹벽 전면 녹화 방법 및 그 축조 방법에 관한 것으로, 더욱 상세하게는 인공토 및 보강토체 뒤채움흙의 쏘일 아칭(soil arching) 효과를 이용하여 성토부 및 절토부 옹벽에 적용하여 친환경적인 녹화를 통하여 옹벽을 늘 푸르게 하는 방법 및 그 축조 방법에 관한 것이다.The present invention relates to a front greening method of the reinforcement soil retaining wall and the construction method of the fill and cut section using artificial soil, and more specifically, using the soil arching effect of the soil filling backing soil And it is applied to the cut portion retaining wall relates to a method for ever-greening the retaining wall through environmentally friendly greening and its construction method.

일반적으로 보강토 옹벽의 전면 식생 및 녹화 방법으로는 옹벽용 블록을 뒷물림(setback) 적층하여 그 뒷물림 공간에 식생을 하는 화분형 식생 방법으로 대한민국 실용신안 등록 제 0335073호, 실용신안등록 제 0297571호가 있고, 옹벽용 블록과 블록 사이에 화분형태를 결합하여 식생하는 방법으로 대한민국 실용신안 등록 제0341395호, 실용신안등록 제 0324831호가 있다. 상기 이 두 형태의 식생 방법은 연중 수분이 공급되는 물가 지역에서 초기에 다소 식생이 가능하나, 햇볕의 복사열로 인한 블록 자체의 온도 상승으로 식물이 말라 고사하고 뿌리가 충분히 내리기에 블록 화분의 깊이가 얕아 영구적인 식생이 되기에는 문제점이 있다. 또한 이것과 유사한 식생 방법으로는 다공성 콘크리트 블록을 이용하여 그 공간으로 식물의 뿌리가 내리는 식생 방법으로 대한민국 특허 등록 제 0322869호, 특허등록 제 0322868호, 실용신안등록 제 0304540호가 있으며, 이 다공성 콘크리트(또는 고로슬래그) 블록은 다공질 알갱이로 블록을 형성하므로 재령 28일 압축강도가 150kg/cm2 이하로 발휘되어, 블록의 균열이 발생하므로 높이 2m 이상의 옹벽을 축조하기에 어려움이 있다. 또한 다공질 알갱이 사이로 식물의 뿌리가 통과하여야 하기 때문에 식생에 장애가 발생하며, 강 알칼리성의 콘크리트(또는 고로슬래그)를 중화할 수 있는 혼화재를 첨가하여야 한다. 한편 이러한 다공성 콘크리트 블록을 이용한 식생방법은 계속적으로 수분이 공급되는 지역에서만 영구적으로 식생이 가능하므로, 일반적으로 호안 이외의 보강토 옹벽이 적용되는 지역에서는 식물이 고사하는 식생의 문제점이 있다. 또한 콘크리트 알갱이 사이로 식물의 뿌리가 내리게 하는 방법과 유사하게 블록의 중공을 통하여 식생이 되도록 하는 대한민국 특허등록 제 0408850호는 블록 배면의 토체와 연속하여 식생이 되도록 고안된 기술인데, 이러한 식생 방법은 의도한 바 대로 식생 되지 않는 문제점이 있다. 상기 이러한 식생 방법과 유사하게 대한민국 특허 등록 제 0377449호, 특허 공보 1995-0011723은 철망 벽체 배면에 매트(부직포)를 설치하여 식물성장에 적합한 토양으로 전면 녹화 하는 방법으로, 식물이 뿌리를 내려 매트와 철망을 통과하여 식생되기에 매트(부직포) 자체가 상당한 장애 요소로 실제적으로 식생되기에 어려움 뿐만 아니라, 철망의 낮은 강성(stiffness)으로 인하여 중장비 다짐시 철망이 옹벽 전면방향으로 밀리는 현상과 철망과 철망이 상, 하, 좌, 우로 중첩된 부분에서 특히 배부름 현상이 발생되어 옹벽 선형을 맞추기가 어려우므로 강관 파이프로 구성된 비계(scaffold)와 같은 지지 장비를 사용하여 선형을 정리하여야 하는 현장 시공의 어려움이 있다. 또한 대한민국 특허등록 제 0393515호는 콘크리트 빔을 적층하여 그 적층 공간사이로 자연적인 식생이 되도록 고안한 기술인데, 이 기술은 콘크리트 빔의 조적 경사로 인하 여 콘크리트 빔 사이로 수분이 공급되기가 실제로 어렵고 비탈면과 콘크리트 빔 사이의 뒤채움흙 폭이 깊지 않아, 식생이 어려운 문제점이 있다.In general, the front vegetation and greening method of reinforcement soil retaining wall is a potted vegetation method in which the retaining wall blocks are laminated with setback, and vegetation is carried out in the back biting space. Korea Utility Model Registration No. 0335073, Utility Model Registration No. 0297571 In addition, there is a Korean Utility Model Registration No. 0341395 and Utility Model Registration No. 0324831 as a method of planting by combining the potted form between the retaining wall block and the block. These two types of vegetation method can be planted somewhat in the waterside area where water is supplied throughout the year, but the block pot depth is shallow because the plant dries up due to the increase of the temperature of the block itself due to the sun's radiant heat and the roots fall sufficiently. There is a problem with being a permanent vegetation. In addition, as a vegetation method similar to this, there is a vegetation method in which plants are rooted in the space using a porous concrete block, and Korean Patent Registration No. 0322869, Patent Registration No. 0322868, Utility Model Registration No. 0304540, and the porous concrete ( Or blast furnace slag) blocks form blocks with porous granules, so that the compressive strength is lowered to 150 kg / cm 2 for 28 days, and it is difficult to build a retaining wall having a height of 2 m or more because a crack occurs in the block. In addition, since the roots of plants must pass through the porous grains, there are obstacles to vegetation, and a mixed material capable of neutralizing strong alkaline concrete (or blast furnace slag) should be added. On the other hand, since the vegetation method using the porous concrete block can be permanently vegetated only in the region where water is continuously supplied, there is a problem of vegetation that the plant dies in the region where the reinforcement soil retaining wall is generally applied except the lake. In addition, Korean Patent Registration No. 0408850, which allows vegetation through hollows of blocks, is similar to the method of letting the roots of plants fall between concrete grains, and is designed to continuously vegetate the soil on the back of the block. There is a problem that is not vegetation as it is. Similar to the above vegetation method, Korean Patent Registration No. 0377449, Patent Publication No. 1995-0011723 installs a mat (non-woven fabric) on the back of the wire mesh wall to record the front of the plant with soil suitable for plant growth. The mat (nonwoven) itself is a considerable obstacle because it is vegetated through the wire mesh, and it is difficult to actually vegetation, and due to the low stiffness of the wire mesh, the wire mesh is pushed toward the front of the retaining wall when the heavy equipment is compacted. In particular, it is difficult to align the retaining wall linearity due to the fact that there is a hungry phenomenon in the overlapped part of the top, bottom, left and right, so that it is difficult to construct the site by using the supporting equipment such as scaffold composed of steel pipe pipe. There is this. In addition, the Republic of Korea Patent Registration No. 0393515 is a technology designed to be a natural vegetation between the laminated spaces by stacking the concrete beams, this technology is actually difficult to supply moisture between the concrete beams due to the sloping slope of the concrete beams and slopes and concrete Since the backfill soil width between the beams is not deep, vegetation is difficult.

절토부 옹벽 적용에 대하여, 대한민국 특허등록 제 0372821호, 특허등록 제 062689호는 블록과 콘크리트 패널을 비탈면에 각 각 적용할 수 있도록 고안된 기술인데, 이 기술은 전면벽체에 식생이 불가능하여 절토부 적용시 시각적 안정감 뿐만아니라 환경친화적이지 못한 단점이 있다.Regarding the application of cut retaining wall, Korean Patent Registration No. 0372821 and Patent Registration No. 062689 are designed to apply blocks and concrete panels to slopes, respectively. In addition to visual stability, it is not environmentally friendly.

본 발명은 상기와 같은 보강토 옹벽 전면 벽체 식생 방법의 문제점을 해소하기 위해 인공토를 이용하여 성토부 및 절토부의 보강토 옹벽 전면을 녹화할 수 있는 방법과 축조방법을 제공하는 데 본 발명의 목적이 있는 것이다.An object of the present invention to provide a method and a construction method for recording the front surface of the reinforced soil retaining wall using the artificial soil in order to solve the problems of the reinforcement soil retaining wall front wall vegetation method as described above. will be.

이와같은 목적을 달성하기 위한 본 발명은, 대기중의 햇볕으로 인하여 블록 자체의 온도 상승으로 식물이 고사하는 것을 방지하고, 식물이 뿌리를 잘 내릴 수 있도록 장애가 되는 장애물을 제거하여 벽체 전면으로 녹화가 가능하고, 양분과 수분이 충분히 공급되어 옹벽이 늘 푸르게 녹화될 수 있도록 하는 보강토 옹벽 전면 식생 방법과 그 축조 방법을 제공하는 것이다.The present invention for achieving the above object is to prevent the plant from dying due to the rise of the temperature of the block itself due to the sunlight in the air, and to remove the obstacles so that the plant can take root well, the greening to the front of the wall It is possible to provide a vegetation retaining wall front vegetation method and a method of constructing the reinforced soil retaining wall so that nutrients and moisture are sufficiently supplied so that the retaining wall is always greened.

삭제delete

본 발명은 상단이 아치형인 전면부; 및 전단은 상기 전면부에 연결되고, 상단과 후면이 트여있는 박스형 공간이 형성된 흙받이부; 로 구성된 아치블록을 이용하여 녹화(綠化)된 벽면을 갖는 옹벽을 축조하는 방법에서, (a) 상기 아치블록을 옹벽 축조라인에 일정간격으로 이격 배치하여 한층의 아치블록을 쌓는 단계; (b) 마사토, 슬러지, CMC를 배합한 인공토에 꽃씨, 콩과류 등을 혼합하여 상기 아치블록 흙받이부, 아치블록 사이 및 아치블록 배면에 일정한 폭으로 포설한 후 다져 인공토층을 형성하는 단계; (c) 상기 인공토층의 배면에 보강토를 포설한 후 다져 보강토층을 형성하는 단계; (d) 아래층의 아치블록 2개에 거치되도록 한 층의 아치블록을 더 쌓아올리는 단계; 및 (e) 상기 (b)단계 내지 (d)단계를 반복하여 성토지반을 형성하며 소요높이까지 옹벽을 쌓는 단계; 로 이루어지는 것을 특징으로 하는 보강토 옹벽 축조 방법을 제공한다.
상기 보강토 옹벽의 보강을 위해서는, 상기 아치블록은 상기 흙받이부의 양측면 내측에 형성된 걸림턱; 및 흙받이부의 상부에 연결홈; 을 더 포함하여 구성되고, 상기 (d)단계는, PVC 파이프 또는 유리섬유바(bar)로 이루어진 연결바를 상기 아치블록 걸림턱 사이의 간격 이하의 폭을 갖고, 폭방향을 따라 봉재(sewing)공간이 형성된 띠 보강재의 봉재공간에 끼우고, 상기 연결바를 아치블록의 걸림턱에 걸어 고정시킨 후 상기 띠 보강재를 아치블록의 배면으로 잡아당기며 두는 공정을 더 포함시킬 수 있다.
한편, 상기 (d)단계에서는, 아치블록을 쌓기 전에, 그리드 보강재를 아래층의 인공토층 및 보강토층 위에 평탄하게 깔아 놓는 공정을 더 포함시키거나 PVC 파이프 또는 유리섬유바로 이루어진 연결바를 그리드 보강재로 감아싸 상기 연결홈에 끼워 넣고 상기 그리드 보강재를 아치블록의 배면으로 잡아당겨 두는 공정을 더 포함시킴으로서 보강토 옹벽을 더욱 강하게 보강할 수 있다.
한편, 상기 보강토 옹벽 축조방법을 절토면 등의 사면의 전면에 적용할 수 있다. 이 때, 상기 사면에는 사면에는 일정간격으로 앵커가 박혀있고, 상기 앵커의 두부에는 연결철근이 가로방향으로 결합되어 있어야 하는데, 이는 상기 (d)단계에 PVC 파이프 또는 유리섬유바로 이루어진 연결바를 상기 아치블록의 걸림턱에 걸어 고정시킨 후, 아연도금된 와이어 로프를 상기 연결철근과 연결바에 각각 팽팽하게 결속시키는 공정을 포함시키거나, 상기 와이어 로프를 상기 연결철근과 다수개의 연결바에 지그재그로 걸어 결속시키는 공정을 포함시킴으로서 보강토 옹벽을 보강하도록 하기 위함이다. 이 때, 상기 와이어 로프는 와이어 클립을 이용하여 결속시킬 수 있다.
이하 첨부된 도면에 의해 상세히 설명하면 다음과 같다.
본 발명은 아치블록(110)을 설치하기 전 아치블록의 유연성과 지반의 연약정도에 따라 기초(150)를 설치하지 않거나, 설치하여 기초(150) 위에 아치블록(110)으로 형성된 보강토 옹벽벽체(100)를 적층하면서 인공토(120) 및 보강토체(130)를 뒤채움한후, 상기 보강토 옹벽 벽체와의 정착수단에 의하여 연결되는 보강재를 아치블록 옹벽 벽체 배면에 설치하는 단계 및 소요높이까지 아치블록으로 구성된 보강토 옹벽 벽체를 설치한 후 마무리하는 단계를 포함한다.
The present invention is the upper portion of the arcuate front; And a front end is connected to the front portion, the fender portion formed with a box-shaped space is open top and rear; In the method of constructing a retaining wall having a green wall using an arch block consisting of: (a) arranging the arch block by arranging the arch block spaced apart at regular intervals on the retaining wall construction line; (b) mixing flower seeds, legumes, and the like, with artificial soil containing masato, sludge, and CMC, and laying them in a predetermined width on the arch block mudguard, between the arch blocks, and on the back of the arch block to form an artificial earth layer. step; (c) laying reinforcement soil on the back side of the artificial soil layer to form a reinforcement soil layer; (d) further stacking one layer of archblocks to be mounted on the two lower archblocks; And (e) repeating the steps (b) to (d) to form a fill ground and stacking the retaining wall to the required height; It provides a reinforced soil retaining wall construction method characterized in that it consists of.
In order to reinforce the reinforcing soil retaining wall, the arch block includes a locking step formed on both sides of the fender portion; And connecting groove in the upper part of the fender; It is configured to further include, the step (d), the connecting bar made of PVC pipe or glass fiber bar (bar) has a width less than the gap between the arch block engaging jaw, the sealing space along the width direction (sewing) Inserting into the bar space of the formed strip reinforcing material, the connecting bar is fixed to the hanging jaw of the arch block and then the step of pulling the band reinforcing material to the back of the arch block may be further included.
On the other hand, in the step (d), before stacking the arch block, further comprising the step of laying the grid reinforcement flat on the artificial earth layer and the reinforced earth layer of the lower layer or wrap the connecting bar made of PVC pipe or glass fiber bar with the grid reinforcement By inserting the connection groove and pulling the grid reinforcement to the back of the arch block can further strengthen the retaining soil retaining wall.
On the other hand, the reinforced soil retaining wall construction method can be applied to the front surface of the slope, such as cut surface. At this time, the slope is anchored to the slope at regular intervals, the head of the anchor should be coupled to the connecting rebar in the transverse direction, which is the connection bar made of PVC pipe or glass fiber bar in the step (d) the arch After fastening by hanging on the locking jaw of the block, including the step of tightening the galvanized wire rope to the connecting bar and the connecting bar, respectively, or to zigzag to bind the wire rope to the connecting bar and the plurality of connecting bars. To include the process to reinforce the reinforced earth retaining wall. At this time, the wire rope can be bound using a wire clip.
Hereinafter, described in detail by the accompanying drawings as follows.
According to the present invention, the foundation 150 is not installed or installed based on the flexibility of the arch block and the softness of the ground before the installation of the arch block 110. The reinforced soil retaining wall formed of the arch block 110 on the foundation 150 ( After filling the artificial soil 120 and the reinforcement earth 130 while stacking 100, the step of installing the reinforcement connected by the fixing means with the reinforcement earth retaining wall wall on the back of the arch block retaining wall wall and the arch to the required height Finishing after installing the reinforced earth retaining wall wall consisting of blocks.

먼저, 보강토 옹벽을 축조해야할 지반에 기초(150) 터파기를 하고, 그 기초 터파기면에 기초를 설치한 후 아치블록(110)으로 이루어진 옹벽 벽체(100)를 차례로 소요의 높이까지 적층한다. 이 때 옹벽 벽체(100) 축조 방법의 경우 본 발명에서는 2가지 형태가 이용될 수 있는데, 도 1a와 같이 아치블록과 아치블록을 뒤채움흙의 종류에 따라 최대 23cm까지 수평으로 이격하여 인공토(120) 및 뒤채움흙의 쏘일 아칭 효과(soil arching effect)가 최대한 발휘될 수 있는 공간이 확보할 수 있도록 하는 녹화 축조방법과 도 1b와 같이 아치블록간 수평 이격거리 없이 상호 엇갈려 적층하는 축조방법으로 나눌 수 있다. 도 1a와 도 1b의 축조 방법 차이는 보강토 옹벽이 설치되는 지역의 물의 유속(water velocity)에 의해 결정될 수 있으며, 유속이 느린 지역에서는 도 1a와 같은 축조 방법을 따르고, 유속이 빠른 지역에서는 도 1b와 같은 축조 방법을 따른다.First, the foundation 150 is excavated on the ground on which the reinforcing soil retaining wall is to be constructed, and after the foundation is installed on the foundation excavation surface, the retaining wall wall 100 made of the arch block 110 is sequentially stacked to the required height. In this case, in the case of the retaining wall wall 100 construction method, two forms may be used in the present invention. As shown in FIG. 1A, the arch block and the arch block are spaced horizontally up to 23 cm according to the type of backfilling soil. 120) and the greening construction method to secure a space where the soil arching effect of the backfilling soil can be maximized, and the mutually stacked construction method without the horizontal separation distance between the arch blocks as shown in FIG. Can be divided. The difference in the construction method of FIG. 1A and FIG. 1B may be determined by the water velocity of water in the area where the reinforcement soil retaining wall is installed, and follows the same construction method as in FIG. 1A in a slow flow rate, and FIG. 1B in a fast flow rate area. Follow the construction method as follows.

도 1a와 같은 축조 방법을 따를 때는 도 1c와 같이 아치블록(110) 배면에 아치블록에 평행하게 인공토(120)와 보강재 길이 방향의 폭까지 보강토체(130), 그 배면으로 배면토체를 다짐(compaction)하여 보강토옹벽 벽체(100)를 축조한다. 또한 도 1b와같은 축조 방법을 따를 때는 인공토 없이 보강토체(130)와 배면토체(140)로 이루어진 성토체로 보강토옹벽 벽체(100)를 축조한다.When following the construction method as shown in Figure 1a as shown in Figure 1c to the back of the arch block 110, the reinforcement soil 130 to the width of the artificial soil 120 and the reinforcement longitudinal direction in parallel to the arch block, compacted the backing soil to the back (compaction) to build a reinforced earth retaining wall wall (100). In addition, when following the construction method as shown in Figure 1b to build a reinforced soil retaining wall wall 100 with a fill body consisting of the reinforcement soil 130 and the backing soil 140 without artificial soil.

상기 인공토(120)는 식물이 잘 자랄 수 있도록 마사토, 슬러지, CMC로 이루어져 있으며, 보강토 옹벽 시공시 이 배합된 인공토에 지역 및 계절에 따른 꽃씨, 콩과류 등을 혼합하여 아치블록(110) 속, 아치블록 사이 및 아치블록 배면으로부터 아치블록에 평행하게 10cm∼30cm 폭으로 포설, 다짐하고 블록 자체의 온도 상승이나, 장애요소 없이 아치블록 사이로 수분과 영양분이 공급되어 녹화가 되며, 뒤채움흙의 쏘일 아칭 효과로 흙이 옹벽 전면으로 쏟아지지 않도록 아치블록간 수평이격 거리를 최대 23cm 까지 조절할 수 있다.
여기서 CMC란 카르복시메틸셀룰로오스의 약어로서, 과립상의 분말로 존재하며 화학적으로 매우 안정하고 인체에 무해하여 증량제, 유화분산제, 접착제, 현탁제 등 일반 공업용으로 사용됨은 물론, 식품첨가제, 약품첨가물, 사료첨가물 등으로 폭넓게 사용되는 물질이다.
The artificial soil 120 is made of masato, sludge, CMC so that the plant grows well, the arch block (110) by mixing the flower seeds, legumes and the like according to the region and season in the artificial earth mixed with the reinforced earth retaining wall construction ) 10cm ~ 30cm in width and parallel to the archblock from inside, between the archblocks and from the back of the archblock, and the greening is completed by supplying moisture and nutrients between the archblocks without increasing the temperature of the block itself or obstacles. With the soil arching effect, the horizontal separation distance between the arch blocks can be adjusted up to 23cm so that the soil does not spill to the front of the retaining wall.
Here, CMC is an abbreviation of carboxymethyl cellulose, which is present as a granular powder and is chemically very stable and harmless to human body. It is widely used as a material.

상기 보강토 옹벽벽체는(100)는 크게 옹벽 벽체(100)를 구성하는 아치블록(110)과 정착수단에 의하여 결합되며, 도 3내지 도4와 같이 그리드 보강재(300), 띠 보강재(310), 와이어 로프 보강재(320)를 이용하여 보강토 옹벽벽체를 축조할 수 있다.The reinforcement retaining wall wall 100 is largely coupled by the arch block 110 and the fixing means constituting the retaining wall wall 100, the grid reinforcement 300, the strip reinforcement 310, as shown in Figs. The reinforcement earth retaining wall wall may be constructed using the wire rope reinforcement 320.

상기 보강토 옹벽 벽체(100)를 이루고 있는 아치블록(110)은 도 2a 및 도2c 같이 수평으로부터 옹벽 경사를 최대 76도까지 적층할 수 있도록 제어하는 옹벽 경사 조절턱(111), 띠 보강재와 결속되는 중간 걸림턱(113), 시공 중간 손잡이(116), 그리드 보강재(300) 연결홈(112)으로 구성되어 있으며, 이것과 유사하게 도 2b 및 도 2d와 같이 띠 보강재 길이를 조절할 수 있는 끝 걸림턱(114), 끝 걸림턱 주위에 있는 시공 끝 손잡이(115)이가 따로 있는 두 형태가 있다.Arch block 110 constituting the reinforcement retaining wall wall 100 is coupled to the retaining wall inclination adjustment jaw 111, the belt reinforcement to control the stacking the retaining wall inclination up to 76 degrees from the horizontal as shown in Figures 2a and 2c Intermediate locking jaw 113, construction intermediate handle 116, grid reinforcement 300 is composed of a connecting groove 112, and similar to this end stop jaw to adjust the length of the belt reinforcement as shown in Figure 2b and 2d 114, the construction end handle 115 around the end stopper has two forms are separate.

상기 그리드 보강재(300)와 띠 보강재(310)는 유리섬유 및 토목섬유가 사용되며, 와이어 로프 보강재(320)는 뒤채움 흙에 의해 포설되므로 수분 등의 원인으로 부식되어 결과적으로 옹벽 벽체에 작용하는 뒤채움에 의한 토압을 지지하지 못 한다는 단점이 있으므로, 아연 도금 또는 에폭시 코팅된것을 이용하거나, 재료적으로 부식되지 않는 복합재료 즉 보강 플라스틱 제품을 사용하는 것이 바람직하다.The grid reinforcement 300 and the strip reinforcement 310 is used for glass fibers and geosynthetic fibers, wire rope reinforcement 320 is installed by the backfilling soil, so as to corrode due to moisture, resulting in acting on the retaining wall wall Since there is a drawback of not supporting earth pressure by backfilling, it is preferable to use zinc plated or epoxy coated, or to use a composite material that is not corroded materially, that is, a reinforced plastic product.

그리드 보강재(300)와 보강토 옹벽 벽체(100) 아치블록과의 정착수단에 의하여 옹벽벽체에 정착되며, 상기 정착수단은 도 2e와 같이 아치블록(110)의 상부에 존재하는 그리드 연결홈(112)을 이용하여 PVC 파이프 또는 유리섬유바(bar)로 이루어진 연결바(220)를 그리드 보강재(300)로 감아싸 연결홈에 끼워 넣는 기계적 저항(mechanical resistance) 체결 방식과 그리드 보강재를 아치블록(110) 하부 바닥 및 상부에 올려놓는 마찰 저항(frictional resistance) 체결 방식을 이용한다.The grid reinforcing member 300 and the reinforcement earth retaining wall wall 100 are fixed to the retaining wall by the fixing means of the arch block, the fixing means is a grid connecting groove 112 existing in the upper portion of the arch block 110 as shown in FIG. Using a mechanical pipe (mechanical resistance) fastening method and the grid reinforcement to wrap the connecting bar 220 made of PVC pipe or glass fiber bar (bar) with the grid reinforcement 300 and inserted into the connection groove arch block 110 A frictional resistance fastening method is used that is placed on the bottom and top of the bottom.

상기 띠 보강재(310)가 아치블록과 연결될 때 도 2c 및 도 2d와 같이 띠 보강재 상부와 하부에 있는 봉재(311, sewing) 공간에 PVC 파이프 또는 유리섬유바(bar)를 삽입하여 아치블록과 중간 걸림턱(113)과 끝 걸림턱(114)에 걸어 정착할 수 있다.When the strip reinforcement 310 is connected to the arch block, a PVC pipe or a glass fiber bar is inserted into the bar space 311 and sewing space at the upper and lower portions of the strip reinforcement as shown in FIGS. 2C and 2D. It can be fixed by walking on the locking jaw 113 and the end locking jaw (114).

상기 와이어 로프 보강재(320)가 절토부에 사용될 경우, 도 3과 같이 비탈면에 설치되어 있는 쏘일 네일 및 앵커(400)에서 와이어 메쉬, 쇼크리트, 라이닝 콘크리트, 캡, 지압판 없이 아치블록(110), 와이어 로프 보강재(320), 정착수단을 이용하여 절토부보강토 옹벽을 축조할 수 있다.When the wire rope reinforcement 320 is used in the cut portion, the arch block 110, without wire mesh, shock concrete, lining concrete, cap, acupressure plate in the nail and anchor 400 is installed on the slope as shown in FIG. Using the wire rope reinforcement 320, the fixing means can build the cut section reinforced soil retaining wall.

상기 정착수단은 도 3a 및 도 3b와 같이 쏘일 네일 및 앵커(400) 두부에 연결 철근(410)을 용접하여 와이어 로프 보강재(320)를 단독 또는 지그재그식으로 연속적으로 연결철근과 아치블록에 결속하고, PVC 파이프 또는 유리섬유바(bar)로 이루어진 연결바(220)를 이용하여 양 쪽에 와이어 클립(210)으로 고정시켜 쏘일 네일 및 앵커와 보강토 옹벽벽체(100)를 결속할 수 있다.The fixing means welds the connecting bars 410 to the head of the nail and anchor 400 as shown in FIGS. 3A and 3B to bind the wire rope reinforcement 320 to the connecting bars and the arch block continuously or zigzag continuously. By using a connection bar 220 made of PVC pipe or glass fiber bar (bar) by fixing the wire clip 210 on both sides can be bonded to the nail nail and anchor and the reinforced earth retaining wall wall 100.

상기 아치블록(110), 그리드 보강재(300), 띠 보강재(310), 와이어 로프 보강재(320), 여러 정착수단을 이용하여 성토부 및 절토부에 적용하여 보강토 옹벽 전면벽체를 녹화 및 축조가 가능하며, 그 구체적 예는;The arch block 110, grid reinforcing material 300, strip reinforcing material 310, wire rope reinforcing material 320, using the various fixing means to apply to the fill section and cut section reinforcement soil retaining wall front wall can be greening and construction Specific examples thereof;

도 4a와 같이 그리드 보강재(300)를 이용한 성토부 적용, 도 4b와 같이 띠 보강재(310)를 이용한 성토부 적용, 도 4c와 같이 그리드 보강재와 띠 보강재를 혼합한 성토부 적용, 도 4d와 같이 와이어 로프 보강재(320)와 와이어 클립(210)를 이용하여 쏘일 네일 및 앵커(400)에 연결하여 축조된 절토부 적용, 도 4e는 하안 에 적용한 구체적 예를 보이고 있다. 상기 보강토 옹벽 축조방법을 하안(河岸)岸)에 적용할 때는, 보강토 옹벽 중 수면의 아래부분은 아치블록간에 간격을 두거나 간격을 두지 않고 배치하며, 수면 위에서 인공토층이 형성되는 부위에 대응하는 부위는 자갈로 뒤채움하여 적층하는 방식을 취한다.Apply the fill section using the grid reinforcement 300 as shown in Figure 4a, apply the fill section using the band reinforcement 310 as shown in Figure 4b, apply the fill section mixed with the grid reinforcement and the band reinforcement as shown in Figure 4c, as shown in Figure 4d Using the wire rope reinforcement 320 and the wire clip 210 connected to the nail and anchor 400, cut cut application, Figure 4e shows a specific example applied to the lower eye. When the reinforcement soil retaining wall construction method is applied to the lower eye, the lower part of the surface of the reinforcement soil retaining wall is arranged with no space or space between the arch blocks, and the part corresponding to the site where the artificial soil layer is formed on the water surface. Takes the way of lamination by filling with gravel.

이상에서 상술한 바와같이 본 발명은, 아치 형태의 블록을 이용하여 블록 배면에 10∼30cm 폭으로 포설되는 마사토, CMC, 슬러지, 계절별 꽃씨, 콩과류 등을 지역에 따라 식생이 가능하도록 적합하게 배합된 인공토와 그 배면 보강토체 뒤채움흙의 아칭 효과(arching effect)를 이용하여 아치블록과 아치블록 사이를 일정한 간격의 거리를 두고 상호 엇갈려 쌓아 축조함으로써 성토체의 자갈 사용 없이도 블록 배면에 바로 접근하여 중장비 다짐이 가능하고, 기존의 블록식 보강토 옹벽에서 발생하는 벽체 배부름(bulging) 현상을 방지할 수 있으며, 성토부 및 절토부에서 보강토 옹벽 시공시 그리드(grid) 보강재, 띠(strip) 보강재, 와이어 로프 보강재 등의 다양한 보강재를 옹벽 높이와 적용 지역 및 환경에 따라 선택, 또는 조합하여 보강토 옹벽의 안정성을 확보하는 동시에 인공토로 인하여 영구적으로 유지관리가 필요없이 보강토 옹벽 전면이 자연적으로 녹화가 가능하다.As described above, the present invention, using the arch-shaped block, Masato, CMC, sludge, seasonal flower seeds, legumes, etc., which are laid on the back of the block 10 to 30 cm in width, so as to be suitable for vegetation depending on the region By using the arching effect of the mixed artificial soil and its backing soil, the arching effect is built between the arch block and the arch block by staggering each other at regular intervals and built directly on the back of the block without using gravel. It is possible to compact heavy equipment by approaching it, and to prevent wall bulging occurring in existing block type reinforcement retaining wall. Grid reinforcement, strip when constructing reinforcement retaining wall in fill part and cut part Various reinforcement materials such as reinforcement and wire rope reinforcement are selected or combined according to the retaining wall height and the application area and environment to secure the stability of the reinforcement earth retaining wall. At the same time, the front surface of the reinforced earth retaining wall can be naturally greened without requiring permanent maintenance due to the artificial soil.

Claims (8)

상단이 아치형인 전면부; 및 전단은 상기 전면부에 연결되고, 상단과 후면이 트여있는 박스형 공간이 형성된 흙받이부; 로 구성된 아치블록을 이용하여 녹화(綠化)된 벽면을 갖는 옹벽을 축조하는 방법에서,An arcuate front portion; And a front end is connected to the front portion, the fender portion formed with a box-shaped space is open top and rear; In the method of constructing a retaining wall having a green wall using an arch block composed of (a) 상기 아치블록을 옹벽 축조라인에 일정간격으로 이격 배치하여 한층의 아치블록을 쌓는 단계;(a) arranging the arch blocks by arranging the arch blocks at regular intervals on the retaining wall construction line; (b) 마사토, 슬러지, CMC를 배합한 인공토에 꽃씨, 콩과류 등을 혼합하여 상기 아치블록 흙받이부, 아치블록 사이 및 아치블록 배면에 일정한 폭으로 포설한 후 다져 인공토층을 형성하는 단계;(b) mixing flower seeds, legumes, and the like, with artificial soil containing masato, sludge, and CMC, and laying them in a predetermined width on the arch block mudguard, between the arch blocks, and on the back of the arch block to form an artificial earth layer. step; (c) 상기 인공토층의 배면에 보강토를 포설한 후 다져 보강토층을 형성하는 단계; (c) laying reinforcement soil on the back side of the artificial soil layer to form a reinforcement soil layer; (d) 아래층의 아치블록 2개에 거치되도록 한 층의 아치블록을 더 쌓아올리는 단계; 및(d) further stacking one layer of archblocks to be mounted on the two lower archblocks; And (e) 상기 (b)단계 내지 (d)단계를 반복하여 성토지반을 형성하며 소요높이까지 옹벽을 쌓는 단계; 로 이루어지는 것을 특징으로 하는 보강토 옹벽 축조 방법. (e) repeating steps (b) to (d) to form a fill ground and stacking the retaining wall to the required height; Reinforcement earth retaining wall construction method characterized in that consisting of. 제1항에서,In claim 1, 상기 아치블록은 상기 흙받이부의 양측면 내측에 형성된 걸림턱; 및 흙받이부의 상부에 연결홈; 을 더 포함하여 구성되고,The arch block is a locking step formed on both sides of the fender portion; And connecting groove in the upper part of the fender; It is configured to include more 상기 (d)단계는, PVC 파이프 또는 유리섬유바(bar)로 이루어진 연결바를 상기 아치블록 걸림턱 사이의 간격 이하의 폭을 갖고, 폭방향을 따라 봉재(sewing)공간이 형성된 띠 보강재의 봉재공간에 끼우고, 상기 연결바를 아치블록의 걸림턱에 걸어 고정시킨 후 상기 띠 보강재를 아치블록의 배면으로 잡아당기며 두는 공정을 더 포함하는 것을 특징으로 하는 보강토 옹벽 축조 방법.In the step (d), a connecting bar made of a PVC pipe or a glass fiber bar (bar) has a width less than or equal to the gap between the arch block locking jaws, and a bar space of a strip reinforcing material having a sealing space formed along a width direction thereof. And a step of pulling the strip reinforcement toward the back of the arch block after fixing the connecting bar by hanging on the locking jaw of the arch block. 제2항에서, 상기 (d)단계는,The method of claim 2, wherein step (d) 아치블록을 쌓기 전에, 그리드 보강재를 아래층의 인공토층 및 보강토층 위에 평탄하게 깔아 놓는 공정을 더 포함하는 것을 특징으로 하는 보강토 옹벽 축조 방법. Reinforcing soil retaining wall construction method further comprising the step of laying the grid reinforcement flat on the artificial earth layer and the reinforcement soil layer of the lower layer before the arch block is stacked. 제2항에서,In claim 2, 상기 (d)단계는, PVC 파이프 또는 유리섬유바로 이루어진 연결바를 그리드 보강재로 감아싸 상기 연결홈에 끼워 넣고 상기 그리드 보강재를 아치블록의 배면으로 잡아당겨 두는 공정을 더 포함하는 것을 특징으로 하는 보강토 옹벽 축조 방법.The step (d), reinforcement earth retaining wall further comprises the step of wrapping the connecting bar made of PVC pipe or glass fiber bar with a grid reinforcement material inserted into the connecting groove and pulling the grid reinforcement to the back of the arch block. How to build. 제2항에서, 상기 보강토 옹벽 축조방법은 절토면 등의 사면의 전면에 적용되는 것으로서,The method of claim 2, wherein the reinforced soil retaining wall construction method is applied to the front surface of a slope such as a cut surface, 상기 사면은 일정간격으로 앵커가 박혀있고, 상기 앵커의 두부에는 연결철근이 가로방향으로 결합되어 있어, The slope is anchored at regular intervals, the reinforcing bar is coupled to the head of the anchor in the transverse direction, 상기 (d)단계는, PVC 파이프 또는 유리섬유바로 이루어진 연결바를 상기 아치블록의 걸림턱에 걸어 고정시킨 후, 아연도금된 와이어 로프를 상기 연결철근과 연결바에 각각 팽팽하게 결속시키는 공정을 더 포함하는 것을 특징으로 하는 보강토 옹벽 축조 방법. The step (d) further includes a step of fastening the connecting bar made of PVC pipe or glass fiber bar to the hooking jaw of the arch block, and tightening the galvanized wire rope to the connecting bar and the connecting bar, respectively. Reinforcement earth retaining wall construction method characterized in that. 제2항에서, 상기 보강토 옹벽 축조방법은 절토면 등의 사면의 전면에 적용되는 것으로서,The method of claim 2, wherein the reinforced soil retaining wall construction method is applied to the front surface of a slope such as a cut surface, 상기 사면은 일정간격으로 앵커가 박혀있고, 상기 앵커의 두부에는 연결철근이 가로방향으로 결합되어 있어, The slope is anchored at regular intervals, the reinforcing bar is coupled to the head of the anchor in the transverse direction, 상기 (d)단계는, PVC 파이프 또는 유리섬유바로 이루어진 연결바를 상기 아치블록의 걸림턱에 걸어 고정시킨 후, 아연도금된 와이어 로프를 상기 연결철근과 다수개의 연결바에 지그재그로 걸어 결속시키는 공정을 더 포함하는 것을 특징으로 하는 보강토 옹벽 축조 방법.In the step (d), the connecting bar made of PVC pipe or fiberglass bar is fixed to the hanging jaw of the arch block, and then the galvanized wire rope is zigzag and connected to the connecting bars and the plurality of connecting bars. Reinforced soil retaining wall construction method comprising a. 제1항 내지 제6항 중 어느 한 항에서, 상기 보강토 옹벽 축조방법은 하안(河岸) 또는 해안(海岸)에 적용되는 것으로서,The method according to any one of claims 1 to 6, wherein the reinforced soil retaining wall construction method is applied to the riverbank or the coast, 보강토 옹벽 중 수면의 아래부분은 아치블록간에 간격을 두거나 간격을 두지 않고 배치하며, 수면 위에서 인공토층이 형성되는 부위에 대응하는 부위는 자갈로 뒤채움하여 적층하는 것을 특징으로 하는 보강토 옹벽 축조 방법.Reinforcement earth retaining wall construction method characterized in that the lower portion of the surface of the reinforcement soil retaining wall is arranged without space or spaced between the arch blocks, the portion corresponding to the portion of the artificial earth layer formed on the surface of the reinforcement earth retaining wall. 제5항 또는 제6항에서, In claim 5 or 6, 상기 와이어 로프는 와이어 클립을 이용하여 결속시키는 것을 특징으로 하는 보강토 옹벽 축조 방법.Reinforcement earth retaining wall construction method characterized in that the wire rope is bound using a wire clip.
KR1020040039391A 2004-05-31 2004-05-31 The method of building the reinforced earth wall KR100641583B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040039391A KR100641583B1 (en) 2004-05-31 2004-05-31 The method of building the reinforced earth wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040039391A KR100641583B1 (en) 2004-05-31 2004-05-31 The method of building the reinforced earth wall

Publications (2)

Publication Number Publication Date
KR20050114166A KR20050114166A (en) 2005-12-05
KR100641583B1 true KR100641583B1 (en) 2006-11-02

Family

ID=37288552

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040039391A KR100641583B1 (en) 2004-05-31 2004-05-31 The method of building the reinforced earth wall

Country Status (1)

Country Link
KR (1) KR100641583B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330908A (en) * 2017-01-18 2018-07-27 吴金栋 A kind of stacked shore protection bank protection building method and implementing process
CN111719587B (en) * 2020-07-20 2023-10-20 浙江绿艺建设有限公司 Ecological retaining wall and construction method
KR102294088B1 (en) * 2021-06-28 2021-08-27 다성기업(주) Gravity retaining wall block unit consists of prefab blocks which can be used separately or combined to adapt to site conditions

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4379659A (en) 1980-09-05 1983-04-12 Steiner Silidur A.G. Building blocks

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4379659A (en) 1980-09-05 1983-04-12 Steiner Silidur A.G. Building blocks

Also Published As

Publication number Publication date
KR20050114166A (en) 2005-12-05

Similar Documents

Publication Publication Date Title
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
KR100920027B1 (en) Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails
CN105113518B (en) Construction method for ecological slope protecting base material by arranging slot pits in slope surface
GB2185769A (en) Flexible ground cover structure
KR101162547B1 (en) Reinforcement mattress gabion for afforestation environment and construction method
EP2556196B1 (en) Method of protecting a soil from erosion
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN110839368A (en) Plant growth bag device for slope ecological restoration, protective structure and construction method
CN112075249A (en) Slope greening planting V-shaped groove and construction method thereof
KR100860748B1 (en) Honey cell greening works
JP3083250B2 (en) Slope reinforcement and greening
CN104164854A (en) Method for ecologically re-greening hardened slope
KR100972549B1 (en) A riverside barrier frame
CN211621621U (en) Plant biological bag protection device for high and steep rocky slope
KR20090065039A (en) A vegetation slope structure
KR100641583B1 (en) The method of building the reinforced earth wall
JP2008038369A (en) Soil improvement construction method by combination of vegetation net and soft framework
CN105756015B (en) Method for restoring biodiversity dynamic landscape ecological composite system
CN212324853U (en) Slope planting technique V type groove
CN114635432A (en) Construction method of composite ecological slope protection of foundation pit
CN212405193U (en) Ecological protection structure suitable for high and steep side slope in cold area
CN212316949U (en) Supporting construction of side slope
CN110663397B (en) High steep side slope matrix skin constraint vegetation structure
CN112931075A (en) Construction process of mining area foreign soil hanging net spray-seeding greening structure
CN110939141A (en) Supporting construction of side slope

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
J121 Written withdrawal of request for trial
FPAY Annual fee payment

Payment date: 20130426

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131023

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150427

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160328

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee