Removal method of ceiling plate in tunnel and stage car used for it

Info

Publication number
JP2576950B2
JP2576950B2 JP24477494A JP24477494A JP2576950B2 JP 2576950 B2 JP2576950 B2 JP 2576950B2 JP 24477494 A JP24477494 A JP 24477494A JP 24477494 A JP24477494 A JP 24477494A JP 2576950 B2 JP2576950 B2 JP 2576950B2
Authority
JP
Japan
Prior art keywords
tunnel
ceiling plate
ceiling
plate
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24477494A
Other languages
Japanese (ja)
Other versions
JPH0886200A (en
Inventor
実 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YKK Corp
Original Assignee
Yoshida Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yoshida Kogyo KK filed Critical Yoshida Kogyo KK
Priority to JP24477494A priority Critical patent/JP2576950B2/en
Publication of JPH0886200A publication Critical patent/JPH0886200A/en
Application granted granted Critical
Publication of JP2576950B2 publication Critical patent/JP2576950B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、トンネル内の上部を通
気洞とするために、トンネル内空間を区画する金属製の
天井板を設けたトンネルにおいて、その通気洞改良等の
理由によって、その天井板を撤去する場合に用いる天井
板の撤去作業方法と、それに用いるステージ車に関する
ものである。
BACKGROUND OF THE INVENTION The present invention relates to a tunnel provided with a metal ceiling plate for partitioning a space inside a tunnel in order to make the upper part of the tunnel a ventilation tunnel. The present invention relates to a method for removing a ceiling plate used when removing a ceiling plate, and a stage car used for the method.

【0002】[0002]

【従来の技術】自動車が走行するトンネルには、セメン
ト壁のトンネル内の上部に、車輌の通行空間部となるト
ンネル室と区画する金属製の天井板を設け、その天井板
の上部空間を通気洞となす構造のものが多数存在してい
る。そして、その天井板区画の通気洞構造を新規のトン
ネル換気システムに改良するために、その天井板を撤去
する作業が近年行なわれている。
2. Description of the Related Art In a tunnel in which a car travels, a metal ceiling plate is provided above a cement wall in the tunnel to define a tunnel room serving as a vehicle traffic space, and the upper space of the ceiling plate is ventilated. There are many cavernous structures. In order to improve the ventilation tunnel structure of the ceiling panel section to a new tunnel ventilation system, an operation of removing the ceiling panel has been performed in recent years.

【0003】しかし、その天井板撤去作業は、当該分野
において従来の実績がなく、専用の工法・専用の作業機
器も開発されていないので、長いトンネル内の天井板を
手作業によって順次溶断し、撤去屑をリフト車でトンネ
ル外へ順次運び出す作業方法が採用されている。
[0003] However, since the ceiling panel removal work has not been performed in the field in the past, and a dedicated construction method and dedicated work equipment have not been developed, the ceiling board in a long tunnel is sequentially blown manually. A work method is adopted in which debris is sequentially carried out of the tunnel by a lift truck.

【0004】[0004]

【発明が解決しようとする課題】以上の従来のトンネル
内天井板の撤去作業方法によると、狭いトンネル内での
手作業に頼るので、作業が危険にして作業能率が極めて
悪く、コスト高になると共に、工期が長くなる難点があ
り、その上、溶断された撤去屑によって路面やトンネル
内壁を損傷することがあり、さらに、走行2車線のトン
ネルでも、その2車線を通行止にして工事をせざるを得
ない不具合がある。
According to the above-mentioned conventional method of removing ceiling panels in a tunnel, manual work is required in a narrow tunnel, which makes the operation dangerous and extremely inefficient and increases the cost. At the same time, there is a disadvantage that the construction period is prolonged. In addition, the road surface and the inner wall of the tunnel may be damaged by the debris that has been blown away. There is an inevitable problem.

【0005】本発明は、以上の従来技術の諸難点を解消
するトンネル内天井板の撤去作業方法と、それに用いる
ステージ車を提供するものである。
The present invention provides a method of removing a ceiling plate in a tunnel and a stage car used for the method, which solves the above-mentioned drawbacks of the prior art.

【0006】[0006]

【課題を解決するための手段】以上の技術課題を解決す
る本発明は「トンネル内の金属製の天井板を撤去するに
おいて、トンネル内にカッター車と、前記天井板に開口
部を臨ませて撤去工事ゾーンの下方を覆うバケット部を
有するステージ車を進行させ、前記カッター車のカッタ
ー部によって前記天井板を切断分離して、下方のステー
ジ車に投入収容し、前記ステージ車内の切断屑を、トラ
ック等に随時移載してトンネル外に搬出し、前記天井板
を順次撤去することを特徴とするトンネル内天井板の撤
去作業方法」と、
The present invention for solving the above-mentioned technical problem is disclosed in "Removing a metal ceiling plate in a tunnel, with a cutter wheel in the tunnel and an opening facing the ceiling plate. Advance the stage car having a bucket section covering the lower part of the removal construction zone, cut and separate the ceiling plate by the cutter section of the cutter car, put it into the lower stage car, accommodate it, and cut chips in the stage car, A method of removing the ceiling plate inside the tunnel, which is transferred to a truck or the like at any time and carried out of the tunnel, and the ceiling plate is sequentially removed.

【0007】「トンネルの左右側壁に臨む傾斜状の左右
側板を立設伸長すると共に、前記左右側板は上端を開口
部になす下方縮幅のバケット形状をなし、さらに、前記
立設長を伸縮調整自在になす側板長調整機構と、前記側
板の傾斜角を調整自在になす傾斜角調整機構をもうけた
構造を特徴とする前記トンネル内天井板の撤去作業方法
に用いるステージ車」になっている。
The inclined left and right side plates facing the left and right side walls of the tunnel are erected and extended, and the left and right side plates are formed in a downwardly narrowed bucket shape having an upper end as an opening. A stage vehicle used in the method for removing the ceiling plate in the tunnel, characterized by having a structure in which a side plate length adjustment mechanism that can be freely adjusted and an inclination angle adjustment mechanism that can freely adjust the inclination angle of the side plate are provided.

【0008】即ち、前記の本発明のトンネル内天井板の
撤去作業方法は、撤去すべき天井板を所要サイズに切断
するカッター車と、その天井板の切断片を受け入れ収容
するステージ車をトンネル内に進行させて、天井板を順
次撤去することを要旨となし、そのステージ車のバケッ
ト部のサイズを必要量に設定して、トンネル内道路の車
線別に撤去工事したり、2車線分の天井板の一括撤去を
行ったりする。そして、その天井板とトンネル内壁との
接続部分等にモルタルが充填されているトンネル構造の
場合は、前記のステージ車の進行に先だって、そのモル
タル除去作業が天井板撤去の予備作業として行なわれ、
さらに、天井板をトンネル壁に保持する吊りボルト等の
天井板付属物は、前記のステージ車に後続する作業車に
よって「天井板撤去」の後始末工事として行なわれる。
[0008] That is, the above-mentioned method for removing a ceiling plate in a tunnel according to the present invention comprises a cutter wheel for cutting a ceiling plate to be removed to a required size, and a stage vehicle for receiving and accommodating cut pieces of the ceiling plate in the tunnel. The main purpose is to remove the ceiling panels in sequence, set the bucket size of the stage car to the required amount, and perform removal work for each lane of the road in the tunnel, or two-lane ceiling panels Or to remove all at once. And, in the case of a tunnel structure in which mortar is filled in a connection portion between the ceiling plate and the inner wall of the tunnel, etc., prior to the advancement of the stage vehicle, the mortar removal operation is performed as a preliminary operation for removing the ceiling plate,
Further, ceiling plate accessories such as suspension bolts for holding the ceiling plate to the tunnel wall are carried out by a work vehicle following the stage vehicle as a post-removal work of “ceiling plate removal”.

【0009】[0009]

【作用】以上の本発明のトンネル内天井板の撤去作業方
法は、トンネル内を進行させるカッター車と、前記要件
のバケット部を有するステージ車によって、天井板を適
宜分断して収納するので、従来の手作業による天井板撤
去作業より、作業能率が格段に向上すると共に、作業の
安全性が向上し、その上、切断屑の落下・接触によるト
ンネル内壁・トンネル内路面の損傷が防止できる。
According to the above-described method of removing the ceiling plate in the tunnel according to the present invention, the ceiling plate is appropriately divided and housed by the cutter wheel for traveling in the tunnel and the stage vehicle having the bucket part of the above requirements. The work efficiency is remarkably improved as compared with the manual work of removing the ceiling plate, the work safety is improved, and damage to the inner wall of the tunnel and the inner road surface of the tunnel due to falling and contact of cutting chips can be prevented.

【0010】そして、そのステージ車はトンネル側壁に
臨む側板を立設して、撤去工事ゾーンの下方を覆うバケ
ット部を有するので、撤去した切断屑を的確に収容し、
ステージ車側方への収容切断屑のはみ出しがないので、
上下2車線のトンネルにおいて、1車線の通行を安全確
保した車線毎工事が可能になる。
[0010] Then, the stage car has a bucket portion that stands upright on the side wall facing the tunnel side wall and covers the lower part of the removal work zone, so that the removed cutting waste can be properly accommodated.
Since there is no protrusion of stored cutting waste to the side of the stage car,
In a tunnel with two lanes in the upper and lower lanes, it is possible to perform lane-by-lane construction while ensuring the safety of one lane.

【0011】さらに、前記構成のステージ車は、左右側
板の立設長調整機構と、傾斜角調整機構を有するので、
その両機構によって、工事すべきトンネル形状に整合し
たサイズ・形状のステージ車に設定できるので、多様な
形状サイズが存在するトンネルの天井板撤去工事に共用
できる。
Further, since the stage vehicle having the above-described structure has a vertical length adjusting mechanism for the left and right side plates and a tilt angle adjusting mechanism,
With both mechanisms, the stage can be set to the size and shape that matches the shape of the tunnel to be constructed, so it can be used for tunnel ceiling plate removal work with various shapes and sizes.

【0012】[0012]

【実施例】以下、実施例に基づいて詳しく説明する。ま
ず、本発明のトンネル内天井板の撤去作業方法の一実施
例の概念を示す図1を参照して、この実施例は単線車線
の自動車用道路のトンネル1の金属製の天井板2の撤去
作業の工事例であり、まず、この工事に用いるステージ
車3は、撤去すべき天井板2の工事ゾーン(後述するカ
ッター車9によって工事する部分)の下方を覆う側板4
A・4Bからなるバケット部5を有する車輪6つき車体
にして、前記の工事ゾーンを充分に覆うに足る長さを有
して、前後方向を開放し先導する索引車10によって、
トンネル1内を進行し、分断撤去した天井板2を、バケ
ット部5へ収納する構造を有している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a detailed description will be given based on embodiments. First, referring to FIG. 1 showing the concept of an embodiment of a method of removing a ceiling plate in a tunnel according to the present invention, this embodiment removes a metal ceiling plate 2 of a tunnel 1 of a single-lane automobile road. First, a stage car 3 used for this work is a side plate 4 that covers a lower part of a work zone (a part to be constructed by a cutter car 9 described later) of a ceiling plate 2 to be removed.
A body with wheels 6 having a bucket portion 5 composed of A and 4B, having a length sufficient to sufficiently cover the above-mentioned construction zone, being opened in the front-rear direction and being driven by a prime mover 10,
It has a structure in which the ceiling plate 2 which has been advanced in the tunnel 1 and separated and removed is stored in the bucket portion 5.

【0013】そして、このステージ車3を用いて以下の
手順・工法によって天井板2の撤去作業がなされる。即
ち、先導車10にけん引されるステージ車3と、自力走
行のカッター車9をトンネル1内に進行させ、撤去すべ
き天井板2の下方位置に停止させ、カッター車9のカッ
ター刃8によって、天井板2を所要サイズに切断して、
下方のステージ車3のバケット部5へ投入する。
Using the stage car 3, the ceiling panel 2 is removed by the following procedure and method. That is, the stage wheel 3 towed by the leading wheel 10 and the self-propelled cutter wheel 9 are advanced into the tunnel 1 and stopped at a position below the ceiling plate 2 to be removed. Cut the ceiling board 2 to the required size,
It is thrown into the bucket unit 5 of the lower stage car 3.

【0014】そして、ステージ車3の停止位置の作業範
囲の天井板2が撤去されると、油圧シヨベル車11等に
よって、バケット部5内の切断屑13をトラック12に
移載してトンネル1外へ搬出して廃却すると共に、ステ
ージ車3とカッター車9は次の作業ゾーンに進行して、
同じく天井板2の撤去作業をなし、以下、順次繰り返え
してトンネル1内の天井板2の全体が撤去される。
When the ceiling plate 2 in the working range at the stop position of the stage car 3 is removed, the cutting chips 13 in the bucket portion 5 are transferred to the truck 12 by the hydraulic shovel wheel 11 or the like, and To the next work zone, the stage car 3 and the cutter car 9
Similarly, the ceiling plate 2 is removed, and thereafter, the entire ceiling plate 2 in the tunnel 1 is removed in order.

【0015】なお、この工事を施行したトンネル1は、
天井板2の上部の一部にモルタルが充填されているの
で、ステージ車3の進行に先立って、そのモルタルを手
作業除去し、カッター車9による天井板2の切断除去を
円滑にする予備作業が行なわれる。そして、天井板2を
除去した後、除去前の天井板2とトンネル内壁間に設け
られた天井板2の付属物の外桁15・吊りボルト16・
中間梁17等は、ステージ車3に後続する作業車19に
よって、後始末工事として除去される。なお、図中の1
8は工事用照明車である。
The tunnel 1 where this construction was implemented
Since part of the upper part of the ceiling plate 2 is filled with mortar, the mortar is manually removed prior to the advance of the stage car 3, and a preliminary operation for smoothly cutting and removing the ceiling plate 2 by the cutter wheel 9. Is performed. Then, after the ceiling plate 2 is removed, the outer girder 15, the suspension bolts 16, and the attachments of the ceiling plate 2 provided between the ceiling plate 2 before the removal and the inner wall of the tunnel are provided.
The intermediate beam 17 and the like are removed by the work vehicle 19 following the stage vehicle 3 as post-cleaning work. In addition, 1 in the figure
Reference numeral 8 denotes a construction lighting vehicle.

【0016】以上の実施例の撤去作業方法によると、従
来の手作業撤去工事に比べて、作業能率が2〜3倍に格
段に向上すると共に、工期が著しく短縮される。そし
て、工事ゾーンの下方をステージ車3が覆うので、切断
して天井板の破片が路面上に落下したり、トンネル内壁
に接触することがないので、路面・トンネル内壁の損傷
がなく、工事の安全性が充分に確保できる。
According to the removal method of the above embodiment, the work efficiency is remarkably improved by a factor of 2 to 3 and the construction period is significantly shortened as compared with the conventional manual removal work. And since the stage car 3 covers the lower part of the construction zone, it does not cut and the fragments of the ceiling plate fall on the road surface and do not contact the inner wall of the tunnel. Safety can be sufficiently ensured.

【0017】つぎに、図2に基づいて本発明の他のトン
ネル内天井板の撤去作業方法の他の実施例をを説明す
る。即ち、この実施例は2車線トンネル内において、車
線毎に工事をなすもので、ステージ車3は単車線の天井
板2の下方を覆うサイズを有し、センターライン27で
区画する片側車線内で撤去工事が行なわれる。この実施
例によると、安全な片側通行を確保して、天井板2の撤
去工事ができる。
Next, another embodiment of a method for removing a ceiling plate in a tunnel according to the present invention will be described with reference to FIG. That is, in this embodiment, construction is performed for each lane in a two-lane tunnel, and the stage vehicle 3 has a size to cover the lower part of the single-lane ceiling plate 2 and is in a one-side lane divided by the center line 27. Removal work is performed. According to this embodiment, it is possible to secure the safe one-way traffic and remove the ceiling panel 2.

【0018】続いて、図3を参照して本発明の他の実施
例のステージ車3を説明する。即ち、図3のステージ車
3は、上方開口方向に拡口傾斜する側板4A・4Bが、
台板25にヒンジ連結された下部板20と下部板20に
対してスライド自在に連結された上部板21との組合せ
からなり、側板4A・4Bの外側に設けた伸縮部22に
よって、下部板20と上部板21からなる側板4A・4
Bの長さを調整セットして、ステージ車3の高さHを調
整可能にした側板立設長調整機構と、同じく側板4A・
4Bの外側に設けて側板4A・4Bを支承する長さ調整
自在の支承バー23からなる側板傾斜角調整機構を有し
ている。さらに、このステージ車3には、台板25の側
方に突出してトンネル1の内壁と接触するガイドローラ
ーからなる走行案内26を設け、ステージ車3をトンネ
ル1の内壁に沿って円滑に移動できるようにすることが
ある。
Next, a stage car 3 according to another embodiment of the present invention will be described with reference to FIG. That is, the stage car 3 of FIG. 3 has side plates 4A
The lower plate 20 is composed of a combination of a lower plate 20 hinged to a base plate 25 and an upper plate 21 slidably connected to the lower plate 20, and the lower plate 20 is provided by an elastic portion 22 provided outside the side plates 4A and 4B. Side plates 4A and 4 comprising the upper plate 21
A side plate standing length adjustment mechanism that adjusts and sets the length of B to make the height H of the stage car 3 adjustable;
A side plate inclination angle adjusting mechanism including a length-adjustable support bar 23 provided outside the 4B and supporting the side plates 4A and 4B is provided. Further, the stage car 3 is provided with a traveling guide 26 composed of a guide roller projecting to the side of the base plate 25 and coming into contact with the inner wall of the tunnel 1, so that the stage car 3 can be moved smoothly along the inner wall of the tunnel 1. There are times when you do.

【0019】この図3実施例のステージ車3は、可変と
なる高さHと側板4A・4Bの傾斜角θの設定によっ
て、形状・サイズの異なる多様構造のトンネルに共用で
きる。
The stage wheel 3 of the embodiment shown in FIG. 3 can be commonly used for tunnels of various structures having different shapes and sizes by setting the variable height H and the inclination angles θ of the side plates 4A and 4B.

【0020】[0020]

【発明の効果】以上の説明のとおり、本発明のトンネル
内天井板の撤去作業方法と、それに用いるステージ車
は、トンネル内天井板の撤去作業を格段に能率化・工期
短縮して当該工事の生産性を特段に向上し、併せて、天
井板撤去作業が安全にしてトンネル・路面の損傷もな
く、その上、走行車線毎の天井板撤去作業を可能にする
等の多大の効果がある。
As described above, the method for removing the ceiling plate in the tunnel and the stage car used in the method according to the present invention are much more efficient and the construction period is shortened. The productivity is particularly improved, and at the same time, the ceiling panel removal work is safe, there is no damage to tunnels and road surfaces, and in addition, there is a great effect that the ceiling panel removal work for each traveling lane is enabled.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明一実施例のトンネル内天井板の撤去作業
方法を示し、(A)はその工法・手順を説明する正面
図、(B)はその工法を示すトンネル横断面図
1A and 1B show a method of removing a ceiling plate in a tunnel according to an embodiment of the present invention, wherein FIG. 1A is a front view illustrating the method and procedure, and FIG. 1B is a cross-sectional view of the tunnel showing the method.

【図2】本発明の他の実施例の天井板の撤去作業方法を
示すトンネル横断面図
FIG. 2 is a cross-sectional view of a tunnel showing a method of removing a ceiling plate according to another embodiment of the present invention.

【図3】本発明の他の実施例のステージ車の側面図FIG. 3 is a side view of a stage vehicle according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 トンネル 2 天井板 3 ステージ車 4A・4B 側板 5 バケット部 6 車輪 8 カッター刃 9 カッター車 10 先導車 12 トラック 13 切断屑 15 外桁 16 吊りボルト 17 中間梁 19 作業車 20 下部板 21 上部板 22 伸縮部 23 支承バー 25 台板 27 センターライン DESCRIPTION OF SYMBOLS 1 Tunnel 2 Ceiling board 3 Stage car 4A, 4B side plate 5 Bucket part 6 Wheel 8 Cutter blade 9 Cutter car 10 Leader car 12 Truck 13 Cutting waste 15 Outer girder 16 Hanging bolt 17 Intermediate beam 19 Work vehicle 20 Lower plate 21 Upper plate 22 Telescopic part 23 Bearing bar 25 Base plate 27 Center line

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネル内の金属製の天井板を撤去する
において、トンネル内にカッター車と、前記天井板に開
口部を臨ませて撤去工事ゾーンの下方を覆うバケット部
を有するステージ車を進行させ、前記カッター車のカッ
ター部によって前記天井板を切断分離して、下方のステ
ージ車に投入収容し、前記ステージ車内の切断屑を、ト
ラック等に随時移載してトンネル外に搬出し、前記天井
板を順次撤去することを特徴とするトンネル内天井板の
撤去作業方法。
When removing a metal ceiling plate in a tunnel, a stage car having a cutter wheel in the tunnel and a bucket portion covering an opening portion of the ceiling plate and covering a lower part of a removal work zone is advanced. Then, the ceiling plate is cut and separated by the cutter unit of the cutter wheel, and is put into and accommodated in a lower stage vehicle, and cutting chips in the stage vehicle are transferred to a truck or the like as needed and carried out of the tunnel. A method for removing ceiling panels in a tunnel, characterized by sequentially removing the ceiling panels.
【請求項2】 トンネルの左右側壁に臨む傾斜状の左右
側板を立設伸長すると共に、前記左右側板は上端を開口
部になす下方縮幅のバケット形状をなし、さらに、前記
立設長を伸縮調整自在になす側板長調整機構と、前記側
板の傾斜角を調整自在になす傾斜角調整機構を設けた構
造を特徴とする請求項1のトンネル内天井板の撤去作業
方法に用いるステージ車。
2. An inclined left and right side plate facing the left and right side walls of the tunnel is erected and extended, and the left and right side plates have a downwardly narrowed bucket shape having an upper end as an opening, and furthermore, the erected length is expanded and contracted. 2. The stage vehicle used in the method for removing a ceiling plate in a tunnel according to claim 1, wherein a structure is provided with a side plate length adjusting mechanism that is adjustable and a tilt angle adjusting mechanism that is capable of adjusting the tilt angle of the side plate.
JP24477494A 1994-09-13 1994-09-13 Removal method of ceiling plate in tunnel and stage car used for it Expired - Fee Related JP2576950B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24477494A JP2576950B2 (en) 1994-09-13 1994-09-13 Removal method of ceiling plate in tunnel and stage car used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24477494A JP2576950B2 (en) 1994-09-13 1994-09-13 Removal method of ceiling plate in tunnel and stage car used for it

Publications (2)

Publication Number Publication Date
JPH0886200A JPH0886200A (en) 1996-04-02
JP2576950B2 true JP2576950B2 (en) 1997-01-29

Family

ID=17123721

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24477494A Expired - Fee Related JP2576950B2 (en) 1994-09-13 1994-09-13 Removal method of ceiling plate in tunnel and stage car used for it

Country Status (1)

Country Link
JP (1) JP2576950B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4689376B2 (en) * 2005-07-07 2011-05-25 株式会社奥村組 Concrete piece unloading device in tunnel and concrete piece unloading method in tunnel
JP6066063B2 (en) * 2013-02-04 2017-01-25 株式会社大林組 Removal method of tunnel partition
JP6061191B2 (en) * 2013-02-04 2017-01-18 株式会社大林組 Removal method of tunnel partition
JP6535474B2 (en) * 2015-02-04 2019-06-26 株式会社大林組 How to remove the ceiling board
JP6718392B2 (en) * 2017-02-02 2020-07-08 株式会社奥村組 How to suspend and remove concrete slabs
JP6718393B2 (en) * 2017-02-02 2020-07-08 株式会社奥村組 Mechanism for suspending and removing concrete slabs from the ceiling of tunnels
JP6718391B2 (en) * 2017-02-02 2020-07-08 株式会社奥村組 How to suspend and remove concrete slabs

Also Published As

Publication number Publication date
JPH0886200A (en) 1996-04-02

Similar Documents

Publication Publication Date Title
US3811147A (en) Mobile roadway repair unit
JP2576950B2 (en) Removal method of ceiling plate in tunnel and stage car used for it
US5230270A (en) Machine for cutting concrete barriers
KR100495730B1 (en) A working device for assembly tunnel soundproofed wall
JP2524537Y2 (en) Multifunctional tunnel construction equipment
JPH10252376A (en) Hot line tunnel widening device and widening method
US6155649A (en) Process for demolishing a bridge structure
CA1235150A (en) Circular heading machine
JPH06173574A (en) Excavation method for bottom floor in tunnel
JP3151116B2 (en) Tunnel excavation method and gantry used for this method
US6397423B1 (en) Apparatus for catching debris while demolishing a bridge structure
JP2003239697A (en) Tunnel interior-finish working device
JPH082871A (en) Lifting jig for curb block
JP2004051335A (en) Vehicle for high lift work
KR102448491B1 (en) A vehicle for pruning trees equipped with a cutter system capable of individually adjusting angles
JP2004092237A (en) Protector apparatus and method of discharging muck on protector apparatus
JP7249216B2 (en) CONCRETE WALL REMOVAL DEVICE AND CONCRETE WALL REMOVAL METHOD
JPH0110098Y2 (en)
JP3135807B2 (en) Launching equipment for shaft excavators
BE1006679A3 (en) Method and device for finishing a wall
JPS60164504A (en) Construction of track beam
JPS59150803A (en) Construction in track
CN114542127A (en) Tunnel support machine with wide application range
JPH0141770Y2 (en)
JP2516870B2 (en) All-weather construction method for underground construction

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees