JP6718393B2 - Mechanism for suspending and removing concrete slabs from the ceiling of tunnels - Google Patents

Mechanism for suspending and removing concrete slabs from the ceiling of tunnels Download PDF

Info

Publication number
JP6718393B2
JP6718393B2 JP2017017577A JP2017017577A JP6718393B2 JP 6718393 B2 JP6718393 B2 JP 6718393B2 JP 2017017577 A JP2017017577 A JP 2017017577A JP 2017017577 A JP2017017577 A JP 2017017577A JP 6718393 B2 JP6718393 B2 JP 6718393B2
Authority
JP
Japan
Prior art keywords
concrete slab
support
tunnel
ceiling
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017017577A
Other languages
Japanese (ja)
Other versions
JP2018123608A (en
Inventor
治 山口
治 山口
通男 高島
通男 高島
西山 宏一
宏一 西山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2017017577A priority Critical patent/JP6718393B2/en
Publication of JP2018123608A publication Critical patent/JP2018123608A/en
Application granted granted Critical
Publication of JP6718393B2 publication Critical patent/JP6718393B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、トンネル天井部コンクリート版の吊降し撤去機構に関し、特に、トンネルの天井版を形成する既存のコンクリート版を、順次吊り降ろして撤去してゆく際に用いるトンネル天井部コンクリート版の吊降し撤去機構に関する。 The present invention relates to a mechanism for suspending and removing a tunnel ceiling concrete slab, and in particular, for suspending and removing existing concrete slabs forming a tunnel ceiling slab in order to suspend and remove a tunnel ceiling concrete slab. Regarding the drop-off mechanism.

上部に円弧状の断面形状部分を含む、馬蹄形や円形の断面形状を備える既存のトンネルでは、上部を天井版で仕切って平坦な天井面を形成すると共に、天井版よりも上方の、円弧状の断面形状部分との間の弓形の断面形状を有する中空部分を、換気用の空間や、配管・配線用の空間等として利用できるようにしたものが多く見受けられるが、このような天井版を設けたトンネルでは、天井版の老朽化や換気システムの変更等に伴って、天井版を撤去する工事が行なわれることがある。 In existing tunnels that have a horseshoe-shaped or circular cross-sectional shape that includes an arc-shaped cross-section at the upper part, the upper part is partitioned by a ceiling slab to form a flat ceiling surface, and an arc-shaped upper part above the ceiling slab. It is often found that the hollow part having an arcuate cross section between the cross section and the cross section can be used as a space for ventilation, a space for piping and wiring, etc. In tunnels, construction work may be performed to remove the ceiling slab due to deterioration of the ceiling slab and changes in the ventilation system.

このようなトンネルの天井版は、予め工場等において製造された、天井版が設置される位置におけるトンネルの横幅と同様の長さを有する、横長の矩形状の平面形状を備えるプレキャストコンリート製のコンクリート版を、これの両端部をトンネルの側壁部から内側に張り出して設けられた支持部材に支持させて、トンネルの軸方向に沿った連設方向に多数連設して配置することによって形成されている。 A ceiling slab for such a tunnel is made of precast concrete, which is manufactured in advance in a factory or the like and has a horizontally long rectangular planar shape having a width similar to the width of the tunnel at the position where the ceiling slab is installed. The plate is formed by arranging a large number of the plates in a continuous direction along the axial direction of the tunnel by supporting both ends of the plate on support members provided so as to project inward from the side wall of the tunnel. There is.

また、このような既存のトンネルの天井版を形成するコンクリート版を撤去する方法として、例えば、ジャッキ付き昇降台を備える移動式の特殊車両である多軸運搬車等を用いて、下方から支えながら、トンネルの軸方向に沿って連設するコンクリート版を、連設方向の先端部に位置するものから順次撤去してゆく方法が開発されている(例えば、特許文献1参照)。 In addition, as a method of removing the concrete slab forming the ceiling slab of such an existing tunnel, for example, using a multi-axis transport vehicle, which is a movable special vehicle equipped with a lifting platform with a jack, while supporting it from below. A method has been developed in which concrete slabs that are continuously provided along the axial direction of the tunnel are sequentially removed from the concrete slabs that are located at the tip of the continuous direction (see, for example, Patent Document 1).

特開2016−142098号公報JP, 2016-142098, A

しかしながら、ジャッキ付き昇降台を備える移動式の特殊車両によって下方から支えながら、連設するコンクリート版を順次撤去してゆく方法では、重量物であるコンクリート版をバランス良く支持しながら昇降させるための制御が難しく、特に特殊車両が移動するトンネルの路面には、縦断勾配や横断勾配があるため、コンクリート版をバランス良く支持しながら昇降させるための制御がさらに難しくなる。 However, in the method of sequentially removing the concrete slabs that are connected while supporting it from below by a movable special vehicle equipped with a lifting platform with jacks, a control for raising and lowering while supporting a heavy concrete slab in a well-balanced manner. However, since the road surface of the tunnel where the special vehicle moves has vertical and cross slopes, it becomes more difficult to control the concrete slab to ascend and descend while supporting it in good balance.

また、移動式のクレーン等を用いて、コンクリート版を上方から吊り上げながら撤去する方法も考えられるが、天井版の上方の、トンネルの天面部との間のスペースの大きさが限られるため、クレーン等のブームをコンクリート版の上方に配置することが難しく、十分な吊り代を確保することが困難になると共に、コンクリート版を吊り上げたり吊り降ろしたりする際に、ブームやコンクリート版が既設の構造物等と接触しないようにする操作に多くの手間がかかることになる。 It is also possible to use a mobile crane to remove the concrete slab while hoisting it, but since the space between the ceiling slab and the top of the tunnel is limited, the crane It is difficult to place a boom above the concrete slab, and it is difficult to secure a sufficient hanging allowance.When the concrete slab is lifted or lowered, the boom or concrete slab is an existing structure. It takes a lot of time and effort to avoid contact with such objects.

さらに、狭いスペースでも相当の吊り代を確保することが可能な、簡易な吊上げ用の装置として、例えばホイストクレーンを用いることも考えられるが、ホイストクレーンを用いる場合、ホイストクレーンを支持する鋼材を固定するためのアンカー部材を、トンネルの天面部に打ち込む必要を生じて、トンネルの天面部を損傷することになると共に、アンカー部材をトンネルの天面部に打ち込むことで鋼材を固定するだけでは、十分な支持力を確保することが困難になる。 Furthermore, as a simple hoisting device that can secure a considerable hoisting allowance even in a narrow space, for example, a hoist crane can be used, but when using a hoist crane, the steel material that supports the hoist crane is fixed. It is necessary to drive the anchor member to the top surface of the tunnel and damage the top surface of the tunnel, and it is sufficient to fix the steel material by driving the anchor member into the top surface of the tunnel. It will be difficult to secure support.

本発明は、撤去されるコンクリート版を上方から吊り上げることで、コンクリート版をバランス良く支持しながら昇降させる操作を容易にすると共に、トンネルの天面部を損傷することなく、十分な支持力を確保することのできるトンネル天井部コンクリート版の吊降し撤去機構を提供することを目的とする。 INDUSTRIAL APPLICABILITY The present invention facilitates an operation of lifting a concrete slab to be removed from above while supporting the concrete slab in a well-balanced manner, and secures sufficient supporting force without damaging the top surface portion of the tunnel. It is an object of the present invention to provide a mechanism for hanging and removing concrete slabs for tunnel ceilings.

本発明は、トンネルの側壁部から内側に張り出して設けられた支持部材に両端部を支持させて、連設方向に多数連設して配置された、トンネルの天井版を形成する既存のコンクリート版を、連設方向の先端側のコンクリート版から順次吊り降ろして撤去してゆく際に用いるトンネル天井部コンクリート版の吊降し撤去機構であって、連設する既存のコンクリート版の上に設置されて、前記連設方向に移動可能な支持架台と、該支持架台に取り付けられ、撤去されるコンクリート版を吊上げ吊降し可能な昇降装置と、該昇降装置から吊り下げて設けられ、吊り下げられた撤去されるコンクリート版を回転可能に支持する回転冶具とを含んで構成されており、前記支持架台は、アーチ形状を備えると共に、両端部が既存のコンクリート版の両端部に配置される、前記連設方向に間隔をおいて設けられた少なくとも一対の支持本体部と、これらの支持本体部の上部に前記連設方向に延設して設けられて、これらの支持本体部を連結すると共に、前記昇降装置が取り付けられている連結支持ビーム部とを含んで構成されているトンネル天井部コンクリート版の吊降し撤去機構を提供することにより、上記目的を達成したものである。 The present invention is an existing concrete slab that forms a ceiling slab of a tunnel, in which a plurality of support members provided inwardly projecting from the side wall of a tunnel support both ends thereof and are arranged in a row in a direction in which they are continuously installed. Is a mechanism for suspending and removing the tunnel ceiling concrete slab that is used to remove the concrete slab from the concrete slab on the tip side in the direction of continuous installation. A support frame movable in the continuous installation direction, an elevating device capable of hoisting and suspending a concrete plate attached to the support frame and removed, and a hoisting device provided and suspended from the hoisting device. And a rotating jig for rotatably supporting the concrete slab to be removed, wherein the support base has an arch shape, and both ends are arranged at both ends of an existing concrete slab, At least a pair of support main body portions provided at intervals in the continuous installation direction, and provided extending above the support main body portions in the continuous installation direction to connect these support main body portions, The above object is achieved by providing a mechanism for suspending and removing a tunnel ceiling concrete slab that includes a connecting support beam portion to which the lifting device is attached.

そして、本発明のトンネル天井部コンクリート版の吊降し撤去機構は、前記連結支持ビーム部が、前記連設方向の先端部に設けられた前記支持本体部から、先端側にさらに張り出して設けられており、前記昇降装置を、前記連結支持ビーム部の張り出した部分に沿って、前記連設方向に移動可能に取り付けることもできる。 Further, in the mechanism for suspending and removing the tunnel ceiling concrete slab of the present invention, the connection support beam portion is provided by further projecting to the tip side from the support main body portion provided at the tip portion in the continuous direction. Therefore, the elevating device can be attached so as to be movable in the continuous installation direction along the projecting portion of the connection support beam portion.

また、本発明のトンネル天井部コンクリート版の吊降し撤去機構は、前記連結支持ビーム部が、前記支持本体部における同様の高さ位置に、一対設けられており、各々の前記連結支持ビーム部に、前記昇降装置が取り付けられていることが好ましい。 Further, in the mechanism for suspending and removing the tunnel ceiling concrete slab of the present invention, a pair of the connection support beam portions are provided at the same height position in the support main body portion, and each of the connection support beam portions is provided. It is preferable that the elevating device is attached.

さらに、本発明のトンネル天井部コンクリート版の吊降し撤去機構は、前記回転冶具が、前記昇降装置から吊り下げられる上部ビーム部と、撤去されるコンクリート版を吊り下げる下部ビーム部とからなり、該下部ビーム部は、前記上部ビーム部と回転可能に連結していることにより、吊り下げられた撤去されるコンクリート版を、前記上部ビーム部に対して回転させるようになっていることが好ましい。 Further, the suspension removal mechanism of the tunnel ceiling concrete slab of the present invention, the rotating jig, an upper beam portion that is suspended from the lifting device, and a lower beam portion that suspends the concrete slab to be removed, It is preferable that the lower beam part is rotatably connected to the upper beam part so that the suspended concrete slab to be removed is rotated with respect to the upper beam part.

さらにまた、本発明のトンネル天井部コンクリート版の吊降し撤去機構は、前記支持本体部の両端部に、車輪部材が各々取り付けられていることが好ましい。 Furthermore, in the mechanism for suspending and removing concrete slabs for a tunnel ceiling part of the present invention, it is preferable that wheel members are attached to both ends of the support body part.

また、本発明のトンネル天井部コンクリート版の吊降し撤去機構は、前記コンクリート版の両端部に、前記支持本体部の両端部が外側にずれるのを防止すると共に、前記支持架台の前記連設方向への移動を案内するずれ止めガイド部材が、前記連設方向に沿って延設して各々設けられていることが好ましい。 Also, the mechanism for suspending and removing the tunnel ceiling concrete slab of the present invention prevents both ends of the support main body from being displaced outward at both ends of the concrete slab, and the continuous installation of the support frame. It is preferable that shift preventing guide members that guide the movement in the direction are provided so as to extend along the continuous direction.

さらに、本発明のトンネル天井部コンクリート版の吊降し撤去機構は、各々の前記支持本体部の両端部を互いに連結する間隔保持部材が、前記支持架台の下端部に配置されて設けられていることが好ましい。 Further, in the mechanism for suspending and removing the concrete slab of the tunnel ceiling portion of the present invention, the space holding member for connecting both end portions of each of the support body portions to each other is provided at the lower end portion of the support frame. It is preferable.

本発明のトンネル天井部コンクリート版の吊降し撤去機構によれば、撤去されるコンクリート版を上方から吊り上げることで、コンクリート版をバランス良く支持しながら昇降させる操作を容易にすると共に、トンネルの天面部を損傷することなく、十分な支持力を確保することができる。 According to the hanging and removing mechanism of the tunnel ceiling concrete slab of the present invention, by lifting the concrete slab to be removed from above, it is possible to facilitate the operation of lifting the concrete slab while supporting it in a well-balanced manner, A sufficient supporting force can be secured without damaging the surface portion.

本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構の構成を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。A structure of a mechanism for suspending and removing a concrete slab for a ceiling part of a tunnel according to a first preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, (b) is a schematic vertical cross-section inside the tunnel FIG. 1C is a schematic plan sectional view of the inside of the tunnel. 図1(a)のA部拡大図である。It is an A section enlarged view of Drawing 1 (a). 本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構により天井版が撤去されるトンネルの、(a)は略示横断面図、(b)は天井版の部分を上方から視た略示平面図である。(A) is a schematic cross-sectional view of the tunnel in which the ceiling slab is removed by the suspension and removal mechanism of the tunnel ceiling concrete slab according to the first preferred embodiment of the present invention, and (b) is the ceiling slab portion. It is a schematic plan view seen from above. 本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。The step of removing the concrete slab by using the hanging and removing mechanism of the tunnel ceiling concrete slab according to the first preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG. 本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。The step of removing the concrete slab by using the hanging and removing mechanism of the tunnel ceiling concrete slab according to the first preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG. 図5(a)のB部拡大図である。It is a B section enlarged view of FIG. 本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。The step of removing the concrete slab by using the hanging and removing mechanism of the tunnel ceiling concrete slab according to the first preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG. 本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。The step of removing the concrete slab by using the hanging and removing mechanism of the tunnel ceiling concrete slab according to the first preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG. 本発明の好ましい第2実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構の構成を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。The construction of the mechanism for suspending and removing the concrete slab of the tunnel ceiling part according to the second preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, (b) is a schematic vertical cross-section inside the tunnel FIG. 1C is a schematic plan sectional view of the inside of the tunnel. 本発明の好ましい第2実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。A process of removing the concrete slab by using the suspension removing mechanism for the tunnel ceiling concrete slab according to the second preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG. 本発明の好ましい第2実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。A process of removing the concrete slab by using the suspension removing mechanism for the tunnel ceiling concrete slab according to the second preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG. 本発明の好ましい第2実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構を用いてコンクリート版を撤去する工程を説明する、(a)はトンネルの略示横断面図、(b)はトンネル内部の略示縦断面図、(c)はトンネル内部の略示平断面図である。A process of removing the concrete slab by using the suspension removing mechanism for the tunnel ceiling concrete slab according to the second preferred embodiment of the present invention will be described. (a) is a schematic cross-sectional view of the tunnel, and (b) is FIG. 3 is a schematic vertical sectional view of the inside of the tunnel, and FIG.

本発明の好ましい第1実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構10は、図1(a)〜(c)に示すように、上部に天井版20が設けられた既存の道路トンネル50として、上部に円弧状の断面形状部分を含む馬蹄形の断面形状を備える道路トンネルにおいて、例えば天井版20の老朽化や、天井版20よりも上方の空間を利用した換気システムの変更等に伴って、天井版20を撤去する必要を生じた際に、道路トンネル50の軸方向に多数連設されて天井版20を形成しているプレキャストコンリート製のコンクリート版21を、連設方向Xの先端側に配置されたものから、順次効率良く撤去してゆくことができるようにする機構として採用されたものである。本第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10は、撤去されるコンクリート版21を、バランス良く支持しながら吊り下げて、昇降させる操作を容易にすると共に、道路トンネル50の天面部を損傷することなく、コンクリート版21の昇降時に十分な支持力を確保できるようにする機能を備えている。 As shown in FIGS. 1(a) to 1(c), an existing road with a ceiling slab 20 provided on an upper portion of a hanging and removing mechanism 10 for a tunnel ceiling concrete slab according to the first preferred embodiment of the present invention. In a road tunnel having a horseshoe-shaped cross-section including an arc-shaped cross-section as an upper part of the tunnel 50, for example, the deterioration of the ceiling slab 20 and the change of the ventilation system using the space above the ceiling slab 20 are performed. Accordingly, when it becomes necessary to remove the ceiling slab 20, the precast concrete slabs 21 made of precast concrete, which are continuously provided in the axial direction of the road tunnel 50 to form the ceiling slab 20, are installed in the continuous direction X. This mechanism was adopted as a mechanism that enables efficient removal from the one arranged on the tip side. The mechanism for suspending and removing the concrete slab of the tunnel ceiling part of the first embodiment facilitates the operation of suspending and lifting the concrete slab 21 to be removed while supporting the concrete slab 21 to be removed in a well-balanced manner. It has the function of ensuring a sufficient supporting force when the concrete slab 21 is moved up and down without damaging the top surface portion.

そして、本第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10は、道路トンネル50の例えば側壁部51から内側に張り出して設けられた支持部材22に両端部を支持させて、連設方向Xに多数連設して配置された、道路トンネル50の天井版20を形成する既存のコンクリート版21を、連設方向Xの先端側のコンクリート版21から順次吊り降ろして撤去してゆく際に用いる撤去機構であって、図1(a)〜(c)に示すように、連設する既存のコンクリート版21の上に設置されて、連設方向Xに移動可能な支持架台30と、支持架台30に取り付けられ、撤去されるコンクリート版21を吊上げ吊降し可能な昇降装置31と、昇降装置31から吊り下げて設けられ、吊り下げられた撤去されるコンクリート版21を回転可能に支持する回転冶具32とを含んで構成されている。支持架台30は、アーチ形状を備えると共に、両端部30cが既存のコンクリート版21の両端部21bに配置される、連設方向Xに間隔をおいて設けられた少なくとも一対(本第1実施形態では、一対)の支持本体部30aと、これらの支持本体部30aの上部に連設方向Xに延設して設けられて、これらの支持本体部30aを連結すると共に、昇降装置31が取り付けられている連結支持ビーム部30bとを含んで構成されている。 Then, the mechanism for suspending and removing the concrete slab of the tunnel ceiling portion of the first embodiment makes the support member 22 provided so as to project inwardly from, for example, the side wall portion 51 of the road tunnel 50 to support both ends thereof, and to connect them. The existing concrete slabs 21 forming the ceiling slab 20 of the road tunnel 50, which are arranged in a row in the installation direction X, are sequentially hung from the concrete slab 21 on the tip side in the installation direction X and removed. A removal mechanism used in this case, as shown in FIGS. 1A to 1C, is installed on an existing concrete slab 21 to be continuously installed, and is provided with a support base 30 movable in the continuous direction X. , A lifting device 31 attached to the support frame 30 and capable of hoisting and lifting the concrete plate 21 to be removed, and a concrete plate 21 to be removed that is hung from the lifting device 31 and can be rotated The rotary jig 32 for supporting is included. The support base 30 has an arch shape, and both ends 30c are arranged at both ends 21b of the existing concrete slab 21 and are spaced apart in the continuous direction X (at least one pair (in the first embodiment, in the first embodiment). , A pair of) support main body portions 30a, and provided in the upper part of these support main body portions 30a so as to extend in the continuous direction X. The support main body portions 30a are connected and the lifting device 31 is attached. The connecting support beam portion 30b is included.

また、本第1実施形態では、連結支持ビーム部30bは、支持本体部30aにおける同様の高さ位置に、一対設けられており、各々の連結支持ビーム部30bに、昇降装置31が取り付けられている。 In addition, in the first embodiment, a pair of the connection support beam portions 30b are provided at the same height position in the support body portion 30a, and the lifting device 31 is attached to each connection support beam portion 30b. There is.

さらに、本第1実施形態では、回転冶具32は、昇降装置31から吊り下げられる上部ビーム部33と、撤去されるコンクリート版21の本体部分21aを吊り下げる下部ビーム部34とからなり、下部ビーム部34は、上部ビーム部33と回転連結部34aを介して回転可能に連結していることにより、吊り下げられた撤去されるコンクリート版21を、上部ビーム部33に対して回転させることができるようになっている(図7(a)参照)。 Further, in the first embodiment, the rotary jig 32 includes an upper beam portion 33 suspended from the lifting device 31 and a lower beam portion 34 suspending the main body portion 21a of the concrete slab 21 to be removed. The portion 34 is rotatably connected to the upper beam portion 33 via the rotation connecting portion 34a, so that the suspended concrete slab 21 to be removed can be rotated with respect to the upper beam portion 33. (See FIG. 7A).

本第1実施形態では、図3(a)、(b)に示すように、トンネル天井部コンクリート版の吊降し撤去機構10によって撤去される天井版20は、予め工場等において製造された、プレキャストコンリート製のコンクリート版21を、道路トンネル50の軸方向に沿った連設方向Xに、多数連設して配置することによって形成されている。コンクリート版21は、各々、例えば1500mm程度の長さの短辺と、天井版20が設置される高さ位置における道路トンネル50の横幅と同様の長さとして、例えば8000mmの長さの長辺とを備える、横長の矩形状の平面形状を有している。コンクリート版21は、道路トンネル50の側壁部51から内側に張り出して設けられた、後述する支持部材22に、長辺方向の両端部21bを支持させると共に、短辺方向を連設方向Xとして、長辺部分を互いに当接させた状態で、多数連設配置されて設置されている。また、これらの連設配置されたコンクリート版21は、例えばPC鋼線、連結鋼棒、連結ボルト等(図示せず)を用いて、公知の方法によって、複数のコンクリート版21が、連設方向Xに適宜一体化された状態で設けられている。 In the first embodiment, as shown in FIGS. 3A and 3B, the ceiling slab 20 to be removed by the hanging and removing mechanism 10 for the tunnel ceiling concrete slab is manufactured in advance in a factory or the like. It is formed by arranging a large number of precast concrete slabs 21 in a continuous direction X along the axial direction of the road tunnel 50. Each concrete slab 21 has, for example, a short side having a length of about 1500 mm and a long side having a length similar to the lateral width of the road tunnel 50 at a height position where the ceiling slab 20 is installed, for example, 8000 mm. It has a horizontally long rectangular planar shape. The concrete slab 21 supports both ends 21b in the long side direction on a support member 22 which is provided so as to project inward from the side wall portion 51 of the road tunnel 50, and the short side direction is the continuous direction X, A large number of the long side portions are in contact with each other and arranged in series. In addition, the concrete slabs 21 arranged in succession are, for example, PC steel wires, connecting steel rods, connecting bolts (not shown) and the like, by a known method. It is provided in a state where it is appropriately integrated with X.

コンクリート版21の長辺方向の両端部を支持する支持部材22は、図2にも示すように、H形鋼等の公知の鋼材を適宜加工することによって形成された、公知の道路トンネル用のブラケット部材を用いることができる。ブラケット部材22は、道路トンネル50の側壁部51の円弧状の断面形状に沿った、湾曲する外周面形状を備える接合基部22aと、接合基部22aから内側に張り出して設けられた、受台部22bとを含んで形成されている。接合基部22aは、これの外周面を、天井版20が設置される高さ位置における道路トンネル50の側壁部51の内側面に密着させた状態で、例えば接合固定ボルト(図示せず)を、側壁部51に向けて締着させることによって、ブラケット部材22を、受台部22bを内側に張り出させた状態で、道路トンネル50の側壁部51の所定の位置に強固に接合固定できるようにする。 As shown in FIG. 2, the supporting member 22 for supporting both ends in the long side direction of the concrete slab 21 is formed by appropriately processing a known steel material such as an H-section steel and is used for a known road tunnel. Bracket members can be used. The bracket member 22 is provided with a joining base portion 22a having a curved outer peripheral surface shape along the arcuate cross-sectional shape of the side wall portion 51 of the road tunnel 50, and a cradle portion 22b provided so as to project inward from the joining base portion 22a. It is formed including and. The joining base portion 22a is, for example, a joining fixing bolt (not shown) in a state where the outer peripheral surface of the joining base portion 22a is in close contact with the inner side surface of the side wall portion 51 of the road tunnel 50 at the height position where the ceiling slab 20 is installed. By tightening the bracket member 22 toward the side wall portion 51, the bracket member 22 can be firmly joined and fixed to a predetermined position of the side wall portion 51 of the road tunnel 50 in a state in which the cradle portion 22b is projected inward. To do.

ブラケット部材22は、本実施形態では、図3(a)、(b)に示すように、道路トンネル50の両側の側壁部51における所定の高さ位置において、コンクリート版21の連設方向Xである道路トンネル50の軸方向に、コンクリート版21の短辺の長さと同様のピッチで、間隔をおいて複数の箇所に各々取り付けらており、これらの受台部22bに、コンクリート版21の両端部21bを載置させることで、多数のコンクリート版21を、各々下方から支持できるようになっている。 In the present embodiment, the bracket member 22 is, in a predetermined height position in the side wall portions 51 on both sides of the road tunnel 50 in the continuous direction X of the concrete slab 21, as shown in FIGS. Along the axial direction of a road tunnel 50, the same pitch as the length of the short side of the concrete slab 21 is attached to each of a plurality of places at intervals, and these pedestals 22b are attached to both ends of the concrete slab 21. By mounting the portion 21b, it is possible to support a large number of concrete slabs 21 from below.

ブラケット部材22の受台部22bは、コンクリート版21の端部を載置させる平坦な載置面22cを備えており(図2参照)、載置面22cは、例えば縦横400mm程度の大きさの、矩形状(正方形状)の平面形状を備えている(図3(b)参照)。各々コンクリート版21は、各々のブラケット部材22の受台部22bに、各隣接する一対のコンクリート版21の端部角部分を、載置面22cを2分割した領域にそれぞれ載置することにより取り付けられている。これによって、各々のコンクリート版21は、4箇所の端部角部分を、4箇所のブラケット部材22の受台部22bにそれぞれ載置することで、これらの各4箇所のブラケット部材22によって下方から支持されて、安定した状態で取り付けられている。各々のコンクリート版21は、載置面22cに載置された4箇所の端部角部分において、受台部22bに向けて固定アンカー23を締着することによって、ブラケット部材22に強固に固定されている。 The cradle part 22b of the bracket member 22 has a flat mounting surface 22c on which the end of the concrete slab 21 is mounted (see FIG. 2), and the mounting surface 22c has a size of, for example, about 400 mm in length and width. , And has a rectangular (square) planar shape (see FIG. 3B). Each concrete slab 21 is attached to the pedestal portion 22b of each bracket member 22 by placing the end corners of each pair of adjacent concrete slabs 21 in the two divided regions of the placement surface 22c. Has been. Thereby, each of the concrete slabs 21 is placed from the bottom by the bracket members 22 at each of these four locations by placing the four corners of the corner on the pedestals 22b of the bracket members 22 at the four locations. It is supported and mounted in a stable condition. Each concrete slab 21 is firmly fixed to the bracket member 22 by fastening the fixed anchors 23 toward the pedestal portion 22b at the four corners of the end placed on the placing surface 22c. ing.

本第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10を構成する支持架台30は、上述のように、コンクリート版21の連設方向Xに間隔をおいて設けられた一対の支持本体部30aと、これらの支持本体部30aを連結する連結支持ビーム部30bと、連結支持ビーム部30bに取り付けられた昇降装置31とを備えている。一対の支持本体部30aは、各々、例えばH−200のH形鋼を、馬蹄形の断面形状を備える道路トンネル50の上部内側面の弧状の湾曲形状に沿った湾曲形状を有するように、アーチ形状に曲折加工されることによって形成されている。各々のアーチ形状の支持本体部30aには、下端部でもある両端部30cに、鋼製の隅角ピース部材38が、溶接等により接合されることにより、一体として取り付けられている。 As described above, the support pedestal 30 that constitutes the hanging and removing mechanism 10 for the tunnel ceiling concrete slab of the first embodiment has a pair of supports provided at intervals in the continuous direction X of the concrete slab 21. It is provided with a main body portion 30a, a connection support beam portion 30b connecting these support main body portions 30a, and an elevating device 31 attached to the connection support beam portion 30b. Each of the pair of support body portions 30a has an H shape steel of H-200, for example, and has an arch shape so as to have a curved shape along an arcuate curved shape of an upper inner surface of the road tunnel 50 having a horseshoe-shaped cross section. It is formed by bending. A corner piece member 38 made of steel is integrally attached to each arch-shaped support body portion 30a by welding or the like to both end portions 30c which are also lower end portions.

支持本体部30aの両端部30cに接合された隅角ピース部材38は、図2に示すように、支持本体部30aの両端部30cとの接合面が、水平方向に対して所定の角度を有するように形成されている。支持架台30は、支持本体部30aの両端部30cに隅角ピース部材38が接合されていることで、支持本体部30aから負荷される荷重を、両端部30cにおいて、水平方向と鉛直方向の荷重に分散させて、コンクリート版21の両端部21bに伝えることができるようになっている。 As shown in FIG. 2, the corner piece member 38 joined to both end portions 30c of the support body portion 30a has a joint surface with both end portions 30c of the support body portion 30a that has a predetermined angle with respect to the horizontal direction. Is formed. In the support base 30, since the corner piece members 38 are joined to both ends 30c of the support body 30a, a load applied from the support body 30a is applied to both ends 30c in a horizontal direction and a vertical direction. And can be transmitted to both ends 21b of the concrete slab 21.

また、本第1実施形態では、これらの隅角ピース部材38の下端面に接合されて、好ましくは公知のチルタンクからなる移動用の車輪部材37が、各々の支持本体部30aの両端部30cに一体として取り付けられている。各々の支持本体部30aの両端部30cに車輪部材37が取り付けられていることにより、支持架台30を、昇降装置31や回転冶具32と共に、コンクリート版21の連設方向Xに移動させる際に、例えば作業員の力で押し出すことにみによってでも、スムーズに移動させることが可能になる。 Further, in the first embodiment, the moving wheel member 37, which is preferably a known chill tank and is joined to the lower end surfaces of the corner piece members 38, is provided at both end portions 30c of the respective support body portions 30a. It is attached as a unit. When the wheel members 37 are attached to both end portions 30c of each of the support body portions 30a, when the support frame 30 is moved in the continuous direction X of the concrete slab 21 together with the lifting device 31 and the rotary jig 32, For example, even if it is pushed out by the force of the worker, it can be moved smoothly.

一対の支持本体部30aを連結する連結支持ビーム部30bは、例えば300mm程度の高さを有するI形鋼からなり、これの上端フランジ部の端部を、各々の支持本体部30aの上部内周面に、溶接等により接合することで、一対の支持本体部30aに跨るように配置されて、コンクリート版21の連設方向Xに延設すると共に、これらの支持本体部30aを連結した状態で取り付けられる。本第1実施形態では、連結支持ビーム部30bは、支持本体部30aの上部における同様の高さ位置に、平行に延接して一対設けられており、これらの連結支持ビーム部30bに、昇降装置31が各々取り付けられている。これによって、撤去されるコンクリート版21の支持本体部30aを、昇降装置31を介して支持架台30から、より安定した状態で吊り下げて、吊り上げたり吊り降ろしたりすることが可能になる。 The connection support beam portion 30b connecting the pair of support body portions 30a is made of, for example, an I-shaped steel having a height of about 300 mm, and the end portion of the upper end flange portion of the connection support beam portion 30b is connected to the upper inner circumference of each support body portion 30a. By being joined to the surface by welding or the like, it is arranged so as to straddle the pair of support main body portions 30a, extends in the continuous direction X of the concrete slab 21 and is connected to these support main body portions 30a. It is attached. In the first embodiment, a pair of the connection support beam portions 30b are provided in parallel with each other at the same height position in the upper portion of the support body portion 30a so as to extend in parallel with each other. 31 are attached respectively. As a result, it becomes possible to suspend the support main body 30a of the concrete slab 21 to be removed from the support frame 30 via the elevating device 31 in a more stable state, and to hang it up or down.

なお、一対の支持本体部30aは、これの上部に取り付けられる連結支持ビーム部30bに加えて、例えば下端部分やその他の部分に、これらの支持本体部30aを間隔を置いた状態で互いに連結する連結部材(図示せず)を取り付けることによって、より強固に連結一体化されて、支持架台30を形成することが可能になる。 The pair of support body portions 30a are connected to each other at, for example, the lower end portion and other portions in addition to the connection support beam portion 30b attached to the upper portion thereof, with the support body portions 30a being spaced apart from each other. By attaching a connecting member (not shown), it is possible to more firmly connect and integrate and form the support base 30.

支持架台30の連結支持ビーム部30bに取り付けられる昇降装置31は、例えば公知のホイストクレーンからなり、走行装置31aを介して、連結支持ビーム部30bに沿ってコンクリート版21の連設方向Xにスライド移動可能な状態で、連結支持ビーム部30bの下端フランジ部の下方に配置されて、一対の連結支持ビーム部30bに各々設けられている。一対の昇降装置31の下方には、釣りワイヤー31bを介してこれらの昇降装置31から吊り下げられて、回転冶具32が設けられている。 The lifting device 31 attached to the connection support beam portion 30b of the support frame 30 is composed of, for example, a known hoist crane, and slides in the connecting direction X of the concrete slab 21 along the connection support beam portion 30b via the traveling device 31a. In a movable state, it is disposed below the lower end flange portion of the connection support beam portion 30b and is provided on each of the pair of connection support beam portions 30b. A rotating jig 32 is provided below the pair of lifting devices 31 and is suspended from the lifting devices 31 via a fishing wire 31b.

回転冶具32は、上述のように、釣りワイヤー31b(図1(a)参照)を介して、一対の昇降装置31から吊り下げられる上部ビーム部33と、撤去されるコンクリート版21の本体部分21aを吊り下げる下部ビーム部34とからなっている。上部ビーム部33は、例えば矩形状の中空断面形状を備える角形鋼管からなり、コンクリート版21の連設方向Xと垂直な、コンクリート版21の長辺方向に沿って延設した状態で、昇降装置31から吊り下げられている。下部ビーム部34は、上部ビーム部33と同様の例えば矩形状の中空断面形状を備える角形鋼管からなり、鉛直方向を回転軸とする回転連結部34aを介して、上部ビーム部33に回転可能に連結されている。下部ビーム部34が上部ビーム部33に回転可能に連結されることにより、回転冶具32は、吊り下げられた撤去されるコンクリート版21を、上部ビーム部33に対して回転させることができるようになっている。 As described above, the rotating jig 32 includes the upper beam portion 33 suspended from the pair of lifting devices 31 via the fishing wire 31b (see FIG. 1A) and the main body portion 21a of the concrete slab 21 to be removed. And a lower beam portion 34 for suspending. The upper beam part 33 is made of, for example, a rectangular steel pipe having a rectangular hollow cross-sectional shape, and extends and descends in a state of being extended along the long side direction of the concrete slab 21 perpendicular to the continuous direction X of the concrete slab 21. It is suspended from 31. The lower beam part 34 is made of a rectangular steel tube having a rectangular hollow cross-sectional shape similar to that of the upper beam part 33, and is rotatable with respect to the upper beam part 33 via a rotary connecting part 34a having a vertical axis as a rotation axis. It is connected. The lower beam portion 34 is rotatably connected to the upper beam portion 33, so that the rotating jig 32 can rotate the suspended concrete slab 21 with respect to the upper beam portion 33. Has become.

本第1実施形態では、さらに、天井版20を形成する連設配置されたコンクリート版21の両端部21bに、図2に示すように、支持本体部30aの両端部30cが外側にずれるのを防止すると共に、コンクリート版21の連設方向への支持架台30の移動を案内するずれ止めガイド部材36が、連設方向Xに沿って延設して各々設けられている。 In the first embodiment, further, as shown in FIG. 2, both end portions 30c of the support main body portion 30a are displaced to the outside at both end portions 21b of the concrete slabs 21 that are continuously arranged to form the ceiling slab 20. A slip prevention guide member 36 is provided extending along the continuous installation direction X to prevent the movement of the support frame 30 in the continuous installation direction of the concrete slab 21.

ずれ止めガイド部材36は、例えばL形鋼からなり、コンクリート版21の両端部21bにおいて、コンクリート版21の連設方向Xに延設して配置されると共に、延設方向に所定の間隔をおいて、アンカー部材36aをコンクリート版21に向けて締着させることによって、コンクリート版21の両端部21bに強固に固定される。例えばずれ止めガイド部材36を形成するL形鋼の立設辺部には、支持本体部30aの両端部30cに接合された隅角ピース部材38の外側面を当接係止させたり、車輪部材37の外側部分を鋼製やゴム製の緩衝部材37aを介在させて当接係止させたりすることができる。これによって、後述するように、支持架台30からコンクリート版21の本体部分21aを吊り下げた際に、支持本体部30aの両端部30cに取り付けられた車輪部材37が、コンクリート版21の本体部分21aの重量により間隔を広げるようにして、外側にずれることになるのを効果的に回避することが可能になると共に、車輪部材37を案内して、支持架台30を、コンクリート版21の連設方向Xに、よりスムーズに移動させることが可能になる。 The anti-displacement guide member 36 is made of, for example, L-shaped steel, is arranged to extend in the continuous direction X of the concrete slabs 21 at both ends 21b of the concrete slab 21, and has a predetermined interval in the extending direction. Then, the anchor member 36a is fastened to the concrete slab 21 so as to be firmly fixed to both end portions 21b of the concrete slab 21. For example, an outer side surface of a corner piece member 38 joined to both end portions 30c of the support body portion 30a is brought into abutting engagement with the standing side portion of the L-shaped steel forming the shift prevention guide member 36, or a wheel member. The outer portion of 37 can be abutted and locked by interposing a buffer member 37a made of steel or rubber. Thereby, as will be described later, when the main body portion 21a of the concrete slab 21 is suspended from the support frame 30, the wheel members 37 attached to the both end portions 30c of the support main body portion 30a have the main body portion 21a of the concrete slab 21. It becomes possible to effectively prevent the outer side from being displaced by increasing the distance by the weight of the wheel base 37 and guiding the wheel member 37 so that the support frame 30 is connected to the concrete slab 21 in the connecting direction. It becomes possible to move to X more smoothly.

また、本第1実施形態では、支持架台30からコンクリート版21の本体部分21aを吊り下げた際に、支持本体部30aの両端部30cに取り付けられた車輪部材37が、間隔を広げるようにして外側にずれることになるのを回避できるようにするための、各々の支持本体部30aの両端部30cを互いに連結する間隔保持部材39を、支持架台30の下端部に配置して設けることもできる。間隔保持部材39としては、公知の引張り補強鋼材である、タイロッドを用いることができ、これの両端部を、例えば図2に示すように、支持本体部30aの両端部30cに取り付けられた隅角ピース部材38の外側面に各々締着させることによって、車輪部材37が外側にずれることになるのを効果的に回避することが可能になる。 Further, in the first embodiment, when the main body portion 21a of the concrete slab 21 is suspended from the support frame 30, the wheel members 37 attached to the both end portions 30c of the support main body portion 30a are arranged so as to widen the space. A spacing member 39 for connecting both end portions 30c of the respective support main body portions 30a to each other so as to avoid shifting to the outside may be provided at the lower end portion of the support frame 30. .. A tie rod, which is a known tensile reinforcing steel material, can be used as the spacing member 39, and both end portions of the tie rod are attached to both end portions 30c of the support main body portion 30a as shown in FIG. 2, for example. By fastening the outer surfaces of the piece members 38 to each other, it is possible to effectively prevent the wheel member 37 from shifting outward.

上述の構成を備える本第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10によれば、例えば後述する架台設置工程(図4(a)〜(c)参照)と、コンクリート版切断工程(図5(a)〜(c)参照)と、本体部吊降し工程(図7(a)〜(c)参照)と、両端部撤去工程(図8(a)〜(c)参照)とを含む吊降し撤去方法によって、天井版20を形成する多数のコンクリート版21を、順次吊り降ろして撤去することができる。 According to the suspension and removal mechanism 10 for a tunnel ceiling concrete slab of the first embodiment having the above-described configuration, for example, a gantry installation step (see FIGS. 4A to 4C) described later and concrete slab cutting. Process (see FIGS. 5A to 5C), main body suspension process (see FIGS. 7A to 7C), and both end removal process (see FIGS. 8A to 8C). ) And a method of suspending and removing, the large number of concrete slabs 21 forming the ceiling slab 20 can be sequentially suspended and removed.

架台設置工程では、昇降装置31を取り付けた支持架台30を、両端部30cをコンクリート版21の両端部21bに各々載置して、連設方向Xに移動可能状態で、撤去すべき既存の天井版20の上に設置する。すなわち、架台設置工程では、ウィンチ等の簡易な装置を用いて作業員の手作業により組み立て可能な大きさや重量の構成部材に分解した状態で、支持架台30や吊降し撤去機構10を、図4(a)〜(c)に示すように、運搬車両55によって道路トンネル50の施工箇所まで運搬すると共に、運搬されてきた支持架台30や吊降し撤去機構10の構成部材を、例えば小型クレーン56を用いて吊り上げて、撤去すべき既存の天井版20の上に搬送する。また、後述する切断装置としてのコンクリートカッター装置35やウィンチ等の、その他の必要な装置や機器を、同様に例えば小型クレーン56を用いて吊り上げて、撤去すべき既存の天井版20の上に搬送する。 In the gantry installation step, the support gantry 30 to which the lifting device 31 is attached is placed at both ends 30c on both ends 21b of the concrete slab 21, respectively, and the existing ceiling to be removed is movable in the continuous direction X. It is installed on the plate 20. That is, in the gantry installation step, the support gantry 30 and the hanging-up/removing mechanism 10 are disassembled in a state in which they are disassembled into constituent members of a size and weight that can be manually assembled by a worker using a simple device such as a winch. As shown in FIGS. 4(a) to 4(c), the transport vehicle 55 transports the construction material of the road tunnel 50 to the construction site, and the components of the support frame 30 and the suspension removal mechanism 10 that have been transported are, for example, a small crane. It is lifted using 56 and conveyed on the existing ceiling slab 20 to be removed. Further, other necessary devices and equipment such as a concrete cutter device 35 as a cutting device and a winch, which will be described later, are similarly lifted by using, for example, a small crane 56, and transported onto the existing ceiling slab 20 to be removed. To do.

しかる後に、既存の天井版20の上での作業によって、作業員が、搬送された装置や機器を用いて、分解された支持架台30や吊降し撤去機構10の構成部材から、上述の構成を備える当該支持架台30や吊降し撤去機構10を組み立てる。 Then, by the work on the existing ceiling slab 20, the worker uses the transported device or equipment to disassemble the above-described configuration from the disassembled support platform 30 or the constituent members of the suspension removal mechanism 10. Assemble the support frame 30 and the suspension removal mechanism 10 having the above.

コンクリート版切断工程では、図5(a)〜(c)及び図6(a)、(b)に示すように、連設方向Xの先端部のコンクリート版21を、支持架台30から昇降装置31を介して支持させた状態で、コンクリート版21の両端部分20cにおいて、支持架台30が載置された両端部21bよりも内側に、切断装置35により切断線40を各々形成して、コンクリート版21の本体部分21aを両端部分20cから切り離す。 In the concrete slab cutting step, as shown in FIGS. 5A to 5C and FIGS. 6A and 6B, the concrete slab 21 at the tip end in the continuous direction X is moved from the support frame 30 to the lifting device 31. In the state of being supported through the concrete slab 21, the cutting lines 35 are respectively formed by the cutting device 35 at both end portions 20c of the concrete slab 21 inside the both end portions 21b on which the support frame 30 is placed. The main body portion 21a of is separated from both end portions 20c.

すなわち、コンクリート版切断工程では、連設方向Xの先端部のコンクリート版21の、両端部21bの間の本体部分21aの所定の位置に、アンカー(図示せず)を打ち込み、打ち込んだアンカーに、回転冶具32の下部ビーム部34に取り付けられた吊りワイヤー34bの下端部を係止することによって、支持架台30の支持本体部30aから、昇降装置31及び回転冶具32を介してコンクリート版21を支持した状態とする。この状態で、切断装置として、例えばコンクリート切断用の装置として公知のコンクリートカッター装置35を用いて、先端部のコンクリート版21の両端部分20cにおける両端部21bよりも内側の部分に、連設方向Xに延設させて、コンクリート版21を横断する切断線40を、厚さ方向に貫通させて形成する。これによって、両側の切断線40により挟まれる部分の本体部分21aを、両端部分20cから切り離すことができる。 That is, in the concrete slab cutting step, an anchor (not shown) is driven at a predetermined position of the main body portion 21a between both ends 21b of the concrete slab 21 at the tip in the continuous direction X, and the anchor anchor is driven, By supporting the lower end portion of the hanging wire 34b attached to the lower beam portion 34 of the rotating jig 32, the concrete slab 21 is supported from the supporting main body portion 30a of the support frame 30 via the lifting device 31 and the rotating jig 32. It will be in the state where it did. In this state, as a cutting device, for example, a concrete cutter device 35 known as a device for cutting concrete is used, and the end portion 20c of the concrete slab 21 at the tip portion is located inside the both end portions 21b in the continuous direction X. And a cutting line 40 that extends across the concrete slab 21 and penetrates in the thickness direction. As a result, the main body portion 21a sandwiched by the cutting lines 40 on both sides can be separated from both end portions 20c.

ここで、コンクリート版切断工程では、コンクリート版21の両端部分21cの切断線40による切断面40aを、下方に向けて外側に傾斜させるように各々形成することが好ましい(図4(a)参照)。これによって、後述する本体部分吊降し工程において、残置される両端部分20cから切断線40により切り離された、切断線40による切断面40aで挟まれるこれらの間の本体部分21aを、残置される両端部分20cからスムーズに離間させて、下方に容易に吊り降してゆくことが可能になる。下方に向けて外側に傾斜する切断面40aは、コンクリート版21の両端部分21cを切断する際に、例えばコンクリート版21の上に傾斜した咬ませ部材41を取り付けることで、コンクリートカッター装置35を傾斜させて設置して、カッターブレード35aを外側に向けて傾けた状態で、コンクリートカッター装置35を移動させることによって、容易に形成することができる。 Here, in the concrete slab cutting step, it is preferable to form the cut surfaces 40a of the both end portions 21c of the concrete slab 21 by the cutting lines 40 so as to be inclined downward toward the outside (see FIG. 4A). .. As a result, in the main body portion suspending step described later, the main body portion 21a, which is separated by the cutting line 40 from the both end portions 20c to be left and which is sandwiched between the cutting surfaces 40a by the cutting line 40, is left. It is possible to smoothly separate from both end portions 20c and easily hang downward. The cutting surface 40a which inclines outward toward the lower side, when cutting the both end portions 21c of the concrete slab 21, for example, attaches the inclined bite member 41 on the concrete slab 21 to incline the concrete cutter device 35. It can be easily formed by moving the concrete cutter device 35 with the cutter blade 35a tilted outward.

本体部吊降し工程では、図7(a)〜(c)に示すように、両端部分21cから切り離したコンクリート版21の本体部分21aを、両端部分21cを残置させた状態で、昇降装置31により下方に吊り降ろす。 In the main body suspension step, as shown in FIGS. 7A to 7C, the main body portion 21a of the concrete slab 21 separated from the both end portions 21c is left in the state where the both end portions 21c are left, and the lifting device 31 is used. To hang it down.

すなわち、本体部吊降し工程では、上述のコンクリート版切断工程によって、支持架台30の支持本体部30aから吊り下げて支持した状態で、両端部分21cから切り離されたコンクリート版21の本体部分21aを、支持架台30に取り付けられたホイストクレーン等による昇降装置31を作動させることによって、回転冶具32と共に下方に吊り降ろす。 That is, in the main body suspension step, the main body portion 21a of the concrete slab 21 separated from both end portions 21c is suspended from the support main body portion 30a of the support frame 30 and supported by the concrete slab cutting step described above. The hoisting crane 31 or the like attached to the support frame 30 is operated to lower and lower the rotary jig 32 together with the rotary jig 32.

ここで、本体部吊降し工程では、コンクリート版21の両端部分21cを残置させて、本体部分21aのみを下方に吊り降ろしてゆくので、道路トンネル50が馬蹄形の断面形状を備えていて、コンクリート版21が取り付けられていた上部のトンネル幅よりも、これよりも下方部分のトンネル幅の方が狭くなっていても、吊り降ろされる本体部分21aの両端部が、道路トンネル50の側壁部に引っ掛かることになるのを回避して、本体部分21aをスムーズに吊り降ろしてゆくことが可能になる。 Here, in the main body suspension step, since both end portions 21c of the concrete slab 21 are left and only the main body portion 21a is suspended downward, the road tunnel 50 has a horseshoe-shaped cross-sectional shape. Even if the tunnel width of the lower portion is narrower than the tunnel width of the upper portion where the plate 21 is attached, both ends of the main body portion 21a to be hung are caught on the side wall portion of the road tunnel 50. By avoiding this, the main body portion 21a can be smoothly hung down.

また、本体部吊降し工程では、切り離した本体部分21aは、道路トンネル50における残置された両端部分21cよりも下方の空間領域において、回転冶具32の下部ビーム部34を、上部ビーム部33に対して回転させることにより(図7(a)参照)、好ましくはこれの長手方向Lが連設方向Xに沿うようにスムーズに回転移動された後に、さらに下方に吊り降ろされるようになっている。これによって、道路トンネル50の内部において、縦長の荷台部57aを道路トンネル50の軸方向であるコンクリート版21の連設方向Xに延設させて、支持架台30の直下部分に移動させたトレーラ等の搬出車両57の荷台部57aに、吊り降ろされて撤去されるコンクリート版21の本体部分21aを、スムーズに積み込ませて、搬出させることが可能になる。 Further, in the main body suspension process, the separated main body portion 21a moves the lower beam portion 34 of the rotary jig 32 to the upper beam portion 33 in the space region below the left and right end portions 21c of the road tunnel 50. By rotating them in relation to each other (see FIG. 7A), preferably, the longitudinal direction L thereof is smoothly rotationally moved along the continuous installation direction X and then further hung down. .. As a result, inside the road tunnel 50, the vertically long cargo bed portion 57a is extended in the continuous direction X of the concrete slab 21 which is the axial direction of the road tunnel 50, and moved to the portion directly below the support frame 30. It becomes possible to smoothly load and carry out the main body portion 21a of the concrete slab 21 to be hung and removed from the loading platform portion 57a of the unloading vehicle 57.

吊り降ろしたコンクリート版21の本体部分21aを、搬出車両57の荷台部57aに積み込んだら、下部ビーム部34を上部ビーム部33に対して回転させて、上部ビーム部33と平行な元の位置に戻すと共に、昇降装置31により回転冶具32を上昇させて、元の位置に戻した状態で、支持架台30を連設方向Xの後方側に移動させる。これによって、次の連設方向Xの先端部のコンクリート版21の本体部分21aを撤去する作業を、引き続き行なうことが可能になる。 After the main body portion 21a of the concrete slab 21 that has been hung down is loaded on the loading platform 57a of the unloading vehicle 57, the lower beam portion 34 is rotated with respect to the upper beam portion 33 to return to the original position parallel to the upper beam portion 33. At the same time as returning, the rotating jig 32 is raised by the elevating device 31 and is moved to the rear side in the continuous installation direction X in the state where it is returned to the original position. This makes it possible to continue the work of removing the main body portion 21a of the concrete slab 21 at the leading end in the continuous installation direction X.

本第1実施形態では、上述のコンクリート版切断工程と、本体部分吊降し工程とを、支持架台30やコンクリートカッター装置35を連設方向Xの後方側に移動させながら、所定回数繰り返して、連設方向Xの先端側から所定数のコンクリート版21を吊り降ろして撤去したら、図8(a)〜(c)に示すように、支持架台30を連設方向Xの後端側にさらに移動させた後に、両端部分撤去工程によって、残置したコンクリート版21の両端部分21cを先端側から順次撤去する作業を行なう。 In the first embodiment, the concrete slab cutting step and the main body part suspending step are repeated a predetermined number of times while moving the support frame 30 and the concrete cutter device 35 to the rear side in the continuous installation direction X, When a predetermined number of concrete slabs 21 are hung and removed from the front end side in the continuous direction X, the support base 30 is further moved to the rear end side in the continuous direction X as shown in FIGS. After this, the both ends 21c of the remaining concrete slab 21 are sequentially removed from the front end side by the both ends removing step.

両端部分撤去工程では、例えば高所作業車58の作業床部58aに乗り込んだ作業員による作業によって、残置したコンクリート版21の両端部分21cから、ずれ止めガイド部材36や固定アンカー23等を取り外すと共に、例えばクラッシャ重機59の先端アタッチメント部59aによってコンクリート版21の両端部分21cを挟み込んで持ち上げることにより、残置したコンクリート版21の両端部分21cを、容易に撤去することできる。 In the step of removing both end portions, for example, by a work performed by a worker who gets on the work floor portion 58a of the work vehicle 58 at a high place, the shift prevention guide member 36, the fixed anchor 23, and the like are removed from both end portions 21c of the remaining concrete slab 21. For example, the both end portions 21c of the concrete slab 21 can be easily removed by sandwiching and lifting both end portions 21c of the concrete slab 21 by the tip attachment portion 59a of the crusher heavy machine 59.

両端部分撤去工程で残置したコンクリート版21の両端部分21cを撤去して、予定していた全てのコンクリート版21を撤去したら、連設方向Xの後方側に移動させた支持架台30やコンクリートカッター装置35等を、高所作業車58の作業床部58aに乗り込んだ作業員による作業や、小型クレーン56を用いた作業によって、解体、撤去して、例えば老朽化や換気システムの変更等に伴って撤去する必要を生じた天井版20を撤去する工事が終了する。 After removing both end portions 21c of the concrete slab 21 left in the both end portion removing step and removing all the planned concrete slabs 21, the support frame 30 and the concrete cutter device moved to the rear side in the continuous installation direction X 35, etc. are dismantled and removed by work by a worker who has boarded the work floor 58a of the aerial work vehicle 58, or work by using the small crane 56. For example, due to deterioration and change of ventilation system. The construction for removing the ceiling slab 20 that needs to be removed is completed.

そして、上述の構成を備える本第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10によれば、連設して配置されて道路トンネル50の天井版20を形成する多数のコンクリート版21を、バランス良く支持しながら昇降させる操作を容易にすると共に、トンネルの天面部を損傷することなく、十分な支持力を確保することが可能になる。 Then, according to the hanging and removing mechanism 10 for a tunnel ceiling concrete slab of the first embodiment having the above-described configuration, a large number of concrete slabs that are arranged in series to form the ceiling slab 20 of the road tunnel 50 are provided. It becomes possible to facilitate the operation of raising and lowering 21 while supporting it in a well-balanced manner, and to secure a sufficient supporting force without damaging the top surface portion of the tunnel.

すなわち、本第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10は、連設する既存のコンクリート版21の上に設置されて、連設方向Xに移動可能な支持架台30と、支持架台30に取り付けられて、撤去されるコンクリート版21を吊上げ吊降し可能な昇降装置31と、昇降装置31から吊り下げられて、撤去されるコンクリート版21を回転可能に支持する回転冶具32とを含んで構成されており、支持架台30は、アーチ形状を備えると共に、両端部30cが既存のコンクリート版21の両端部21bに配置される一対の支持本体部30aと、支持本体部30aを連結すると共に、昇降装置31が取り付けられている連結支持ビーム部30bとを含んで構成されている。 That is, the hanging and removing mechanism 10 for the tunnel ceiling concrete slab of the first embodiment is installed on the existing concrete slab 21 that is continuously installed, and the support base 30 that is movable in the continuous installation direction X, An elevating device 31 attached to the support frame 30 and capable of hoisting and suspending the concrete slab 21 to be removed, and a rotary jig 32 rotatably supporting the concrete slab 21 to be removed, suspended from the elevating device 31. The support pedestal 30 has an arch shape, and has a pair of support main body portions 30a whose both end portions 30c are arranged at both end portions 21b of the existing concrete slab 21 and a support main body portion 30a. It is configured to include a connecting support beam portion 30b to which the lifting device 31 is attached while being connected.

したがって、本第1実施形態によれば、道路トンネル50の天井版20よりも上方のスペースに配置された、アーチ形状を備える支持本体部30aを有する支持架台30から吊り下げるようにして、撤去するコンクリート版21を支持させるので、既存のトンネルの天面部を損傷することなく、十分な支持力で、且つ安定した状態で、撤去するコンクリート版21を上方からバランス良く支持することが可能になると共に、回転冶具32を介することで、既設の構造物等と接触させたりしないようにしながら、連設方向Xに多数連設する多数のコンクリート版21を、順次効率良く吊り降ろして、容易に撤去してゆくことが可能になる。 Therefore, according to the first embodiment, the road tunnel 50 is removed by suspending it from the support pedestal 30 having the arch-shaped support main body 30a arranged in the space above the ceiling slab 20. Since the concrete slab 21 is supported, the concrete slab 21 to be removed can be supported from above in a well-balanced manner with a sufficient supporting force and in a stable state without damaging the top surface portion of the existing tunnel. By using the rotary jig 32, while not contacting existing structures and the like, a large number of concrete slabs 21 that are continuously arranged in the continuous direction X are efficiently hung down efficiently and easily removed. It becomes possible to go.

図9(a)〜(c)は、本発明の好ましい第2実施形態に係るトンネル天井部コンクリート版の吊降し撤去機構10’を例示するものである。本第2実施形態のトンネル天井部コンクリート版の吊降し撤去機構10’では、支持架台30’の構成、及び昇降装置31の配設位置が異なっている他は、上記第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10と同様の構成を備えている。本第2実施形態のトンネル天井部コンクリート版の吊降し撤去機構10’については、上記第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10と異なる構成部分について主として説明し、同様の構成部分については同一の符号を付して説明を省略する。特に言及しない構成部分については、上記第1実施形態のトンネル天井部コンクリート版の吊降し撤去機構10に関する説明が適宜適用される。 9(a) to 9(c) exemplify a suspension and removal mechanism 10' for a tunnel ceiling concrete slab according to a second preferred embodiment of the present invention. In the suspension and removal mechanism 10' for the tunnel ceiling concrete slab of the second embodiment, the configuration of the support frame 30' and the installation position of the lifting device 31 are different, and the tunnel of the first embodiment described above. The ceiling concrete slab has the same structure as the hanging and removing mechanism 10. With regard to the hanging and removing mechanism 10' of the tunnel ceiling concrete slab of the second embodiment, the different parts from the hanging and removing mechanism 10 of the tunnel ceiling concrete slab of the first embodiment will be mainly described, and the same applies. The same reference numerals are given to the constituent parts of the above and description thereof will be omitted. The description of the mechanism for suspending and removing the tunnel ceiling concrete slab of the first embodiment described above is appropriately applied to components that are not particularly referred to.

そして、本第2実施形態のトンネル天井部コンクリート版の吊降し撤去機構10’では、支持本体部30aを連結すると共に、昇降装置31が取り付けられている連結支持ビーム部30b’は、コンクリート版21の連設方向Xの先端部に設けられた支持本体部30a’から、先端側にさらに張り出して設けられており、昇降装置31は、連結支持ビーム部30b’の張り出した部分である張り出しビーム部30d’に沿って、連設方向Xに移動可能に取り付けられている。 Then, in the hanging and removing mechanism 10' for the tunnel ceiling concrete slab of the second embodiment, the support beam portion 30b' to which the elevating device 31 is attached is connected to the support main body portion 30a. 21 is further provided so as to project further to the tip side from a support main body portion 30a′ provided at the tip end in the continuous installation direction X, and the elevating device 31 is an overhanging beam that is the projecting portion of the connection support beam portion 30b′. It is attached so as to be movable in the continuous direction X along the portion 30d'.

すなわち、本第2実施形態では、支持架台30’は、図9(a)〜(c)及び図12(a)〜(c)に示すように、アーチ形状を備えると共に、両端部30c’が、天井版20を形成する既存のコンクリート版21の両端部21bに配置される、連設方向Xに間隔をおいて設けられた3体のH形鋼等からなる支持本体部30a’と、これらの支持本体部30a’の上部に連設方向Xに延設して設けられて、これらの支持本体部30a’を連結すると共に、昇降装置31が取り付けられている、I形鋼等からなる連結支持ビーム部30b’とを含んで構成されている。連結支持ビーム部30b’は、連設方向Xの先端部の支持本体部30a’よりも、さらに先端側に張り出すように延設して設けられており、張り出した部分が、昇降装置31が取り付けられる張り出しビーム部30d’となっている。 That is, in the second embodiment, the support frame 30′ has an arched shape as shown in FIGS. 9(a) to (c) and FIGS. 12(a) to (c), and has both end portions 30c′. , Support body portions 30a' made of three H-shaped steel and the like, which are arranged at both end portions 21b of the existing concrete slab 21 forming the ceiling slab 20 and are spaced apart in the continuous direction X, and Of the I-shaped steel or the like, which is provided on the upper part of the support main body 30a' of the above to extend in the continuous direction X to connect the support main body 30a' and to which the lifting device 31 is attached. The support beam portion 30b' is included. The connection support beam portion 30b′ is provided so as to extend further toward the tip side than the support body portion 30a′ at the tip end in the continuous direction X, and the protruding portion is the lift device 31. It is an overhanging beam portion 30d' to be attached.

本第2実施形態のトンネル天井部コンクリート版の吊降し撤去機構10’では、例えば後述する架台設置工程(図10(a)〜(c)参照)と、コンクリート版吊降し工程(図11(a)〜(c)参照)と、支持部材撤去工程(図12(a)〜(c)参照)とを含む吊降し撤去方法によって、天井版20を形成する多数のコンクリート版21を、順次吊り降ろして撤去することができる。 In the hanging and removing mechanism 10' of the tunnel ceiling concrete slab of the second embodiment, for example, a gantry installation step (see FIGS. 10A to 10C) described later and a concrete slab hanging step (FIG. 11). (A) to (c)) and a supporting member removing step (see FIGS. 12(a) to (c)), a large number of concrete slabs 21 that form the ceiling slab 20 by a suspension removal method. It can be suspended and removed in sequence.

架台設置工程(図10(a)〜(c)参照)では、上述の第1実施形態のトンネル天井部コンクリート版の撤去機構10による架台設置工程と同様に、ウィンチ等の簡易な装置を用いて作業員の手作業により組み立て可能な大きさや重量の部材に分解した状態で、支持架台30’や降し撤去機構10’の構成部材を、運搬車両55によって道路トンネル50の施工箇所まで運搬し、運搬された構成部材等を、例えば小型クレーン56を用いて吊り上げて、撤去すべき既存の天井版20の上に搬送し既存の天井版20の上での作業によって、作業員が、搬送された装置や機器を用いて、上述の構成を備える昇降装置31、回転冶具32、支持架台30’等を備える吊降し撤去機構10を組み立てる。 In the gantry installation process (see FIGS. 10A to 10C), a simple device such as a winch is used as in the gantry installation process by the tunnel ceiling concrete slab removal mechanism 10 of the first embodiment described above. In a state of being disassembled into a member having a size and weight that can be assembled manually by a worker, the supporting member 30' and the constituent members of the drop-off mechanism 10' are transported by the transport vehicle 55 to the construction site of the road tunnel 50, The transported components are lifted by using, for example, a small crane 56, transported to the existing ceiling slab 20 to be removed, and the worker is transported by the work on the existing ceiling slab 20. Using the device or equipment, the suspending/removing mechanism 10 including the elevating device 31, the rotating jig 32, and the support frame 30′ having the above-described configuration is assembled.

また、上述の第1実施形態と同様に、複数のアーチ形状の支持本体部30a’の両端部30c’に、移動用の車輪部材37として、好ましくは公知のチルタンクを取り付けておくと共に、連設配置された既存の天井版20を形成するコンクリート版21の両端部21bに、コンクリート版21の連設方向Xに沿って延設させて、例えばL形鋼からなるずれ止めガイド部材を、各々取り付けておく。 Further, similarly to the above-described first embodiment, preferably a well-known chill tank is attached as a wheel member 37 for movement to both end portions 30c' of the plurality of arch-shaped support main body portions 30a', and they are continuously provided. At both ends 21b of the concrete slab 21 that forms the existing ceiling slab 20 that has been arranged, extend along the continuous direction X of the concrete slab 21 and attach slip prevention guide members made of, for example, L-shaped steel, respectively. Keep it.

コンクリート版吊降し工程では、図11(a)〜(c)に示すように、支持架台30’を、連設方向Xの先端部のコンクリート版21よりも後端部側のコンクリート版21の上に設置して、各々の連結支持ビーム部30b’の張り出しビーム部30d’に取り付けられた昇降装置31によって先端部のコンクリート版21を一旦持ち上げた後に、昇降装置31によりブラケット部材22をかわせる位置まで先端部のコンクリート版21を移動させてから、先端部のコンクリート版21をブラケット部材22よりも下方に吊り降ろす。 In the concrete slab hanging step, as shown in FIGS. 11A to 11C, the support pedestal 30 ′ is mounted on the rear side of the concrete slab 21 on the rear end side of the concrete slab 21 at the front end in the continuous direction X. A position where the concrete member 21 at the tip end is once lifted by the lifting device 31 installed on the projecting beam part 30d' of each connecting support beam part 30b', and then the bracket member 22 is replaced by the lifting device 31. After moving the concrete slab 21 at the tip end to, the concrete slab 21 at the tip end is hung below the bracket member 22.

また、コンクリート版吊降し工程では、例えば連設方向Xの先端部に設けられた支持架台30’の支持本体部30a’が、連設方向Xの先端部のコンクリート版21よりも後端部側に隣接するコンクリート版21の上に設置されるように、支持架台30’を移動させたら、移動させた位置で支持架台30’を固定することが好ましい。支持架台30’の固定は、連設方向Xの後端部の支持本体部30a’を、コンクリート版21の両端部21bおいて連設方向Xに延設させたずれ止めガイド部材に固定したり、連設方向Xの後端部の支持本体部30a’を、コンクリート版21に直接固定したりすることによって行うことができる。これによって、先端部のコンクリート版21を、各々の連結支持ビーム部30b’の張り出しビーム部30d’に取り付けられた昇降装置31により吊り上げた際に、支持架台30の後端部側が浮き上がって支持架台30’が不安定になるのを、効果的に回避することが可能になる。 In the concrete slab suspension process, for example, the support main body portion 30a′ of the support pedestal 30′ provided at the tip in the continuous direction X has a rear end portion more than the concrete slab 21 at the tip in the continuous direction X. After moving the support frame 30' so that it is installed on the concrete plate 21 adjacent to the side, it is preferable to fix the support frame 30' at the moved position. The support base 30' is fixed by fixing the support body portion 30a' at the rear end of the continuous installation direction X to the shift prevention guide member extending in the continuous installation direction X at both ends 21b of the concrete slab 21. The supporting main body portion 30a′ at the rear end portion in the continuous direction X can be directly fixed to the concrete slab 21. As a result, when the concrete slab 21 at the tip portion is lifted by the lifting device 31 attached to the projecting beam portion 30d' of each connecting support beam portion 30b', the rear end side of the support pedestal 30 floats up and the support pedestal 30 is lifted. It becomes possible to effectively avoid the instability of 30'.

本第2実施形態では、支持架台30’を連設方向Xの後端部側のコンクリート版21の上に設置したら、各々の連結支持ビーム部30b’の張り出しビーム部30d’に取り付けられた昇降装置31によって、撤去すべき先端部のコンクリート版21を吊り上げるようにして一旦持ち上げる。先端部のコンクリート版21を持ち上げるには、これの所定の位置にアンカー部材(図示せず)を打ち込み、打ち込んだアンカー部材に、先端部のコンクリート版21の直上部分まで張り出しビーム部30d’に沿って移動させた昇降装置31から吊り下げられた回転冶具32から、さらに下方に延設させた、吊りワイヤー34bの下端部を係止する。 In the second embodiment, when the support pedestal 30′ is installed on the concrete slab 21 on the rear end side of the continuous direction X, the lifting/lowering attached to the overhanging beam portion 30d′ of each connection support beam portion 30b′. With the device 31, the concrete slab 21 at the tip end to be removed is lifted and lifted. In order to lift the concrete slab 21 at the tip, an anchor member (not shown) is driven into a predetermined position of the concrete slab 21, and the anchor member is struck along the beam portion 30d' to a portion directly above the concrete slab 21 at the tip. The lower end of the hanging wire 34b extended further downward is locked from the rotary jig 32 that is hung from the lifting device 31 that has been moved.

しかる後に、ブラケット部材22の受台部22bにコンクリート版21を固定していた固定アンカー23を取り外すと共に、隣接するコンクリート版21同士を連結していた連結ボルト等を取り外し、さらに、先端部のコンクリート版21に取り付けられていたずれ止めガイド部材36を取り除いた後に、昇降装置31を作動させることで、先端部のコンクリート版21を、回転冶具32を介在させた状態で、昇降装置31によって容易に上方に持ち上げることが可能になる。 After that, the fixing anchor 23 that fixes the concrete slab 21 to the pedestal portion 22b of the bracket member 22 is removed, and the connecting bolts and the like that connect the adjacent concrete slabs 21 to each other are removed. After removing the slip prevention guide member 36 attached to the plate 21, by operating the elevating device 31, the concrete plate 21 at the tip end can be easily moved by the elevating device 31 with the rotary jig 32 interposed. It is possible to lift up.

先端部のコンクリート版21を、昇降装置31によって一旦持ち上げたら、昇降装置31を連結支持ビーム部30b’の張り出しビーム部30d’に沿って連設方向Xの先端側に移動させることで、吊り上げた先端部のコンクリート版21を、当該先端部のコンクリート版21を下方から支持していた、残置された先端側のブラケット部材22をかわせる位置まで、回転冶具32と共に移動させる。これによって、吊り上げた先端部のコンクリート版21の下方に、吊り降ろしの障害となるブラケット部材22が存在しなくなるので、昇降装置31によって、先端部のコンクリート版21をスムーズに下方に吊り降ろしてゆくことが可能になる。 Once the concrete slab 21 at the tip end is lifted by the elevating device 31, the elevating device 31 is lifted by moving the elevating device 31 along the projecting beam part 30d' of the connecting support beam part 30b' to the tip side in the continuous installation direction X. The concrete slab 21 at the tip is moved together with the rotary jig 32 to a position where the remaining bracket member 22 on the tip side that supports the concrete slab 21 at the tip is replaced. As a result, the bracket member 22 that hinders the lifting is not present below the hoisted concrete slab 21. Therefore, the elevating device 31 smoothly hoists the tip concrete slab 21 downward. It will be possible.

コンクリート版吊降し工程では、吊り降ろされる先端部のコンクリート版21は、残置されたブラケット部材22よりも下方の空間領域において、回転冶具32の下部ビーム部34を、上部ビーム部33に対して回転させることにより(図11(a)参照)、好ましくはこれの長手方向Lが連設方向Xに沿うようにスムーズに回転移動された後に、さらに下方に吊り降ろされるようになっている。これによって、道路トンネル50の内部において、縦長の荷台部57aを道路トンネル50の軸方向であるコンクリート版21の連設方向Xに延設させて、張り出しビーム部30d’の直下部分に移動させたトレーラ等の搬出車両57の荷台部57aに、吊り降ろされて撤去されるコンクリート版21を、スムーズに積み込ませて、搬出させることが可能になる。 In the concrete plate suspending step, the concrete plate 21 at the tip end to be hung down has the lower beam portion 34 of the rotary jig 32 with respect to the upper beam portion 33 in the space region below the remaining bracket member 22. By rotating (see FIG. 11(a)), preferably, the longitudinal direction L thereof is smoothly rotationally moved along the continuous installation direction X and then further hung down. As a result, in the inside of the road tunnel 50, the vertically long loading platform 57a is extended in the continuous direction X of the concrete slab 21 which is the axial direction of the road tunnel 50, and moved to the portion directly below the overhanging beam portion 30d'. It is possible to smoothly load and unload the concrete slab 21 to be hung and removed on the loading platform 57a of the unloading vehicle 57 such as a trailer.

吊り降ろしたコンクリート版21の本体部分21aを、搬出車両57の荷台部57aに積み込んだら、下部ビーム部34を上部ビーム部33に対して回転させて、上部ビーム部33と平行な元の位置に戻すと共に、昇降装置31により回転冶具32を上昇させて、元の位置に戻した状態で、支持架台30’を連設方向Xの後方側に移動させる。これによって、次の連設方向Xの先端部のコンクリート版21を撤去する作業を、引き続き行なうことが可能になる。 After the main body portion 21a of the concrete slab 21 that has been hung down is loaded on the loading platform 57a of the unloading vehicle 57, the lower beam portion 34 is rotated with respect to the upper beam portion 33 to return to the original position parallel to the upper beam portion 33. At the same time as returning, the rotary jig 32 is raised by the elevating device 31 and is moved to the rear side in the continuous direction X in a state where the rotary jig 32 is returned to the original position. As a result, it becomes possible to continue the work of removing the concrete slab 21 at the leading end in the next continuous installation direction X.

支持部材撤去工程では、図12(a)〜(c)に示すように、コンクリート版吊降し工程の後に、吊り降ろした先端部のコンクリート版21の両端部21bを支持していた4箇所のブラケット部材22のうち、残置された先端側両側の2箇所のブラケット部材22を撤去する。支持部材撤去工程では、例えば高所作業車58の作業床部58aに乗り込んだ作業員による作業によって、残置したブラケット部材22を、容易に撤去することできる。 In the support member removing step, as shown in FIGS. 12A to 12C, after the concrete plate hanging step, four end portions 21b of the concrete plate 21 of the suspended tip end are supported at four positions. Of the bracket members 22, the remaining two bracket members 22 on both sides of the tip side are removed. In the support member removing step, the remaining bracket member 22 can be easily removed by, for example, work performed by a worker who has boarded the work floor portion 58a of the aerial work vehicle 58.

上述の本体部分吊降し工程と支持部材撤去工程とを所定回数繰り返して、予定していた全てのコンクリート版21及びブラケット部材22を撤去したら、上述の第1実施形態のトンネル天井部コンクリート版の撤去機構10による吊降し撤去方法と同様に、連設方向Xの後方側に移動させた支持架台30’等を、高所作業車58の作業床部58aに乗り込んだ作業員による作業や、小型クレーン56を用いた作業によって、解体、撤去して、例えば老朽化や換気システムの変更等に伴って撤去する必要を生じた天井版20を撤去する工事が終了する。 When all the planned concrete slabs 21 and bracket members 22 are removed by repeating the above-mentioned main body part suspending step and the supporting member removing step a predetermined number of times, the above-mentioned tunnel ceiling concrete slab of the first embodiment is removed. Similar to the method of suspending and removing by the removing mechanism 10, work performed by a worker who has loaded the support platform 30′ and the like moved to the rear side in the continuous direction X on the work floor 58a of the aerial work vehicle 58, The work using the small crane 56 completes the work of dismantling and removing the ceiling slab 20 that needs to be removed due to, for example, deterioration and change of the ventilation system.

そして、上述の構成を備える本第2実施形態のトンネル天井部コンクリート版の吊降し撤去機構10’によっても、道路トンネル50の天井版20よりも上方のスペースに配置された、アーチ形状を備える支持本体部30a’を有する支持架台30’から吊り下げるようにして、撤去するコンクリート版21を支持させることにより、既存のトンネルの天面部を損傷することなく、十分な支持力で、且つ安定した状態で、撤去するコンクリート版21を上方からバランス良く支持することが可能になると共に、回転冶具32を介することで、既設の構造物等と接触させたりしないようにしながら、連設方向Xに連設する多数のコンクリート版21を、順次効率良く吊り降ろして、容易に撤去してゆくことが可能になるので、上述の第1実施形態のトンネル天井部コンクリート版の撤去機構10と同様の作用効果が奏される。 The tunnel ceiling concrete slab suspension/removal mechanism 10 ′ of the second embodiment having the above-described configuration also has an arch shape arranged in a space above the ceiling slab 20 of the road tunnel 50. By supporting the concrete slab 21 to be removed by suspending it from the support pedestal 30′ having the support main body 30a′, the top surface of the existing tunnel is not damaged, and the supporting force is stable and stable. In this state, the concrete slab 21 to be removed can be supported in a well-balanced manner from above, and the rotation jig 32 is used to prevent the concrete slab 21 from contacting with an existing structure or the like in the connecting direction X. A large number of concrete slabs 21 to be installed can be efficiently hung down sequentially and easily removed. Therefore, the same effect as that of the tunnel ceiling concrete slab removal mechanism 10 of the first embodiment described above. Is played.

なお、本発明は上記各実施形態に限定されることなく種々の変更が可能である。例えば、本発明の吊降し撤去機構によって撤去される、支持部材により両端部を支持させて、連設方向に多数連設して配置されるコンクリート版は、道路トンネルのトンネル天井版を形成するものである必要は必ずしも無く、その他のトンネル天井版を形成するものであっても良い。 It should be noted that the present invention is not limited to the above-described embodiments, and various modifications can be made. For example, a concrete slab that is removed by the suspending and removing mechanism of the present invention and that is arranged in a row in the connecting direction with both ends supported by support members forms a tunnel ceiling slab of a road tunnel. It does not necessarily have to be one, and may form another tunnel ceiling slab.

また、支持本体部の両端部に、車輪部材や間隔保持部材が取り付けられている必要は必ずしもなく、コンクリート版の両端部に、ずれ止めガイド部材が設けられている必要は必ずしもない。 Further, the wheel member and the spacing member need not be attached to both ends of the support body, and the slip prevention guide members need not be provided on both ends of the concrete slab.

10,10’ トンネル天井部コンクリート版の吊降し撤去機構
20 天井版
21 コンクリート版
21a 本体部分
21b 両端部
22 ブラケット部材(支持部材)
22a 接合基部
22b 受台部
22c 載置面
23 固定アンカー
30,30’ 支持架台
30a,30a’ 支持本体部
30b,30b’ 連結支持ビーム部
30c,30c’ 両端部
30d’ 張り出しビーム部
31 昇降装置
32 回転冶具
33 上部ビーム部
34 下部ビーム部
34a 回転連結部
34b 吊りワイヤー
37 車輪部材
50 道路トンネル
55 運搬車両
56 小型クレーン
57 搬出車両
57a 荷台部
58 高所作業車
58a 作業床部
X 連設方向
L コンクリート版の本体部分の長手方向
10, 10' A mechanism for suspending and removing a tunnel ceiling concrete slab 20 Ceiling slab 21 Concrete slab 21a Main body 21b Both ends 22 Bracket members (supporting members)
22a Joining base 22b Cradle 22c Mounting surface 23 Fixed anchor 30, 30' Supporting cradle 30a, 30a' Support body 30b, 30b' Connecting support beam 30c, 30c' Both ends 30d' Overhanging beam 31 Lifting device 32 Rotating jig 33 Upper beam part 34 Lower beam part 34a Rotational connection part 34b Hanging wire 37 Wheel member 50 Road tunnel 55 Transport vehicle 56 Small crane 57 Carry-out vehicle 57a Loading platform 58 High-level work vehicle 58a Working floor X Consecutive direction L Concrete Longitudinal direction of plate body

Claims (7)

トンネルの側壁部から内側に張り出して設けられた支持部材に両端部を支持させて、連設方向に多数連設して配置された、トンネルの天井版を形成する既存のコンクリート版を、連設方向の先端側のコンクリート版から順次吊り降ろして撤去してゆく際に用いるトンネル天井部コンクリート版の吊降し撤去機構であって、
連設する既存のコンクリート版の上に設置されて、前記連設方向に移動可能な支持架台と、該支持架台に取り付けられ、撤去されるコンクリート版を吊上げ吊降し可能な昇降装置と、該昇降装置から吊り下げて設けられ、吊り下げられた撤去されるコンクリート版を回転可能に支持する回転冶具とを含んで構成されており、
前記支持架台は、アーチ形状を備えると共に、両端部が既存のコンクリート版の両端部に配置される、前記連設方向に間隔をおいて設けられた少なくとも一対の支持本体部と、これらの支持本体部の上部に前記連設方向に延設して設けられて、これらの支持本体部を連結すると共に、前記昇降装置が取り付けられている連結支持ビーム部とを含んで構成されているトンネル天井部コンクリート版の吊降し撤去機構。
The existing concrete slabs that form the ceiling slab of the tunnel are arranged in a row, with both ends supported by the support members that extend inward from the side wall of the tunnel, and are arranged in a row in the direction of the connection. A mechanism for suspending and removing the tunnel ceiling concrete slab that is used when the concrete slab on the tip side in the direction is sequentially hung and removed.
Installed on an existing concrete slab to be continuously connected, a support frame movable in the connection direction, a lifting device capable of lifting and hanging a concrete plate attached to the support frame and removed, It is provided by being suspended from the lifting device, and is configured to include a rotating jig that rotatably supports the suspended concrete plate to be removed,
The support base has an arch shape, and both ends thereof are arranged at both ends of an existing concrete slab, and at least a pair of support main bodies provided at intervals in the connecting direction, and these support main bodies. A tunnel ceiling part that is provided on the upper part of the part so as to extend in the connecting direction, connects these support main body parts, and includes a connection support beam part to which the lifting device is attached. A mechanism for hanging and removing concrete slabs.
前記連結支持ビーム部は、前記連設方向の先端部に設けられた前記支持本体部から、先端側にさらに張り出して設けられており、前記昇降装置は、前記連結支持ビーム部の張り出した部分に沿って、前記連設方向に移動可能に取り付けられている請求項1記載のトンネル天井部コンクリート版の吊降し撤去機構。 The connecting support beam portion is provided so as to further project toward the tip side from the support main body portion provided at the tip portion in the connecting direction, and the lifting device is provided at the protruding portion of the connecting support beam portion. The suspension removing mechanism for a concrete ceiling of a tunnel ceiling according to claim 1, which is attached so as to be movable along the connecting direction. 前記連結支持ビーム部は、前記支持本体部における同様の高さ位置に、一対設けられており、各々の前記連結支持ビーム部に、前記昇降装置が取り付けられている請求項1又は2記載のトンネル天井部コンクリート版の吊降し撤去機構。 The tunnel according to claim 1 or 2, wherein a pair of the connection support beam portions are provided at the same height position in the support body portion, and the elevating device is attached to each of the connection support beam portions. A mechanism for suspending and removing the ceiling concrete slab. 前記回転冶具は、前記昇降装置から吊り下げられる上部ビーム部と、撤去されるコンクリート版を吊り下げる下部ビーム部とからなり、該下部ビーム部は、前記上部ビーム部と回転可能に連結していることにより、吊り下げられた撤去されるコンクリート版を、前記上部ビーム部に対して回転させる請求項1〜3のいずれか1項記載のトンネル天井部コンクリート版の吊降し撤去機構。 The rotating jig includes an upper beam portion that is suspended from the lifting device and a lower beam portion that suspends a concrete slab to be removed, and the lower beam portion is rotatably connected to the upper beam portion. The hanging and removing mechanism for a concrete ceiling of a tunnel ceiling part according to any one of claims 1 to 3, wherein the suspended concrete plate to be removed is rotated with respect to the upper beam part. 前記支持本体部の両端部に、車輪部材が各々取り付けられている請求項1〜4のいずれか1項記載のトンネル天井部コンクリート版の吊降し撤去機構。 The suspension removal mechanism for a tunnel ceiling concrete slab according to any one of claims 1 to 4, wherein wheel members are attached to both ends of the support body. 前記コンクリート版の両端部に、前記支持本体部の両端部が外側にずれるのを防止すると共に、前記支持架台の前記連設方向への移動を案内するずれ止めガイド部材が、前記連設方向に沿って延設して各々設けられている請求項5記載のトンネル天井部コンクリート版の吊降し撤去機構。 At both ends of the concrete slab, while preventing the both ends of the support main body from being displaced outward, a shift prevention guide member for guiding the movement of the support frame in the continuous direction is provided in the continuous direction. The mechanism for suspending and removing a concrete slab of a tunnel ceiling part according to claim 5, wherein the mechanism is provided so as to extend along each other. 各々の前記支持本体部の両端部を互いに連結する間隔保持部材が、前記支持架台の下端部に配置されて設けられている請求項1〜6のいずれか1項記載のトンネル天井部コンクリート版の吊降し撤去機構。 The tunnel ceiling concrete slab according to any one of claims 1 to 6, wherein a spacing member that connects both end portions of each of the support body portions to each other is arranged and provided at a lower end portion of the support frame. Lifting and removing mechanism.
JP2017017577A 2017-02-02 2017-02-02 Mechanism for suspending and removing concrete slabs from the ceiling of tunnels Active JP6718393B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017017577A JP6718393B2 (en) 2017-02-02 2017-02-02 Mechanism for suspending and removing concrete slabs from the ceiling of tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017017577A JP6718393B2 (en) 2017-02-02 2017-02-02 Mechanism for suspending and removing concrete slabs from the ceiling of tunnels

Publications (2)

Publication Number Publication Date
JP2018123608A JP2018123608A (en) 2018-08-09
JP6718393B2 true JP6718393B2 (en) 2020-07-08

Family

ID=63111097

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017017577A Active JP6718393B2 (en) 2017-02-02 2017-02-02 Mechanism for suspending and removing concrete slabs from the ceiling of tunnels

Country Status (1)

Country Link
JP (1) JP6718393B2 (en)

Also Published As

Publication number Publication date
JP2018123608A (en) 2018-08-09

Similar Documents

Publication Publication Date Title
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JP5912828B2 (en) Vertical excavation and excavation method and vertical excavation and excavation equipment
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP5890060B1 (en) Bridge dismantling method using erection girder
JP6718393B2 (en) Mechanism for suspending and removing concrete slabs from the ceiling of tunnels
JP2008248664A (en) Hoisting method of curtain wall
JP6718391B2 (en) How to suspend and remove concrete slabs
JP4221341B2 (en) Lifting magnet type lifting device and transport crane
JP6718392B2 (en) How to suspend and remove concrete slabs
JP6172636B2 (en) Scaffolding system
JP4414806B2 (en) Bridge member suspension jig, bridge member transportation and installation device, and bridge member transportation and installation method
JP2010242308A (en) Method for demolishing high-rise building of concrete slab structure, and concrete slab demolition equipment
JP4904927B2 (en) Renewal method of storage tank side plate
JP2019214858A (en) Floor slab erection machine
KR101048036B1 (en) Electric hoist
JP6186221B2 (en) Crane height change structure and height change method
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
JP5880341B2 (en) Tower tank construction equipment and construction method
JP7045936B2 (en) Hanger unit in deck erection machine
JP2000145129A (en) Staging provided with load lifter
JP6974233B2 (en) Floor slab replacement method and floor slab replacement device
JP2011094456A (en) Load bearing base, supporting material, and load bearing method
JP2001213584A (en) Large-scale elevation stage and lifting method and reversely driving technique using the same
JP2022103586A (en) Formwork installation device and formwork installation method using this

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190731

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200422

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200526

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200612

R150 Certificate of patent or registration of utility model

Ref document number: 6718393

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150