JP2018026069A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2018026069A5 JP2018026069A5 JP2016159006A JP2016159006A JP2018026069A5 JP 2018026069 A5 JP2018026069 A5 JP 2018026069A5 JP 2016159006 A JP2016159006 A JP 2016159006A JP 2016159006 A JP2016159006 A JP 2016159006A JP 2018026069 A5 JP2018026069 A5 JP 2018026069A5
- Authority
- JP
- Japan
- Prior art keywords
- task
- charge
- similar
- person
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016159006A JP6790577B2 (ja) | 2016-08-12 | 2016-08-12 | 情報処理装置、情報処理システム、情報処理プログラム及び情報処理方法 |
| US15/653,383 US20180046969A1 (en) | 2016-08-12 | 2017-07-18 | Task execution support device, task execution support system, and non-transitory computer-readable storage medium |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016159006A JP6790577B2 (ja) | 2016-08-12 | 2016-08-12 | 情報処理装置、情報処理システム、情報処理プログラム及び情報処理方法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2018026069A JP2018026069A (ja) | 2018-02-15 |
| JP2018026069A5 true JP2018026069A5 (https=) | 2019-06-27 |
| JP6790577B2 JP6790577B2 (ja) | 2020-11-25 |
Family
ID=61159191
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016159006A Expired - Fee Related JP6790577B2 (ja) | 2016-08-12 | 2016-08-12 | 情報処理装置、情報処理システム、情報処理プログラム及び情報処理方法 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20180046969A1 (https=) |
| JP (1) | JP6790577B2 (https=) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20190026663A1 (en) * | 2017-07-20 | 2019-01-24 | Ca, Inc. | Inferring time estimates in workflow tracking systems |
| JP2019204243A (ja) * | 2018-05-22 | 2019-11-28 | Nttテクノクロス株式会社 | タスク管理装置及びタスク管理システム |
| CN109191028A (zh) * | 2018-11-12 | 2019-01-11 | 青海盐湖工业股份有限公司 | 一种人力资源管理系统 |
| JP7249318B2 (ja) * | 2020-08-27 | 2023-03-30 | ヤフー株式会社 | 情報処理装置、情報処理方法および情報処理プログラム |
| JP7528788B2 (ja) * | 2021-01-07 | 2024-08-06 | トヨタ自動車株式会社 | 情報処理装置、情報処理システム、情報処理方法、及び端末装置 |
| JP7628624B2 (ja) * | 2021-02-26 | 2025-02-10 | リミニ ストリート、インコーポレイテッド | クライアント・サポート・プロフェッショナルにリアルタイム案件アシスタンスを提供するためにロボティック・プロセス自動化を使用する方法及びシステム |
| CN119294719A (zh) * | 2024-09-19 | 2025-01-10 | 深圳市酷开网络科技股份有限公司 | 一种基于闭环数字化管理的任务处理方法及系统 |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3204063B2 (ja) * | 1996-01-10 | 2001-09-04 | 日本電気株式会社 | スケジュール管理システム |
| US7349863B1 (en) * | 2001-06-14 | 2008-03-25 | Massachusetts Institute Of Technology | Dynamic planning method and system |
| JP2003044642A (ja) * | 2001-07-30 | 2003-02-14 | Nec Soft Ltd | 人材供給最適化方法 |
| US20040158568A1 (en) * | 2002-12-12 | 2004-08-12 | Renzo Colle | Scheduling resources for performing a service |
| US7881957B1 (en) * | 2004-11-16 | 2011-02-01 | Amazon Technologies, Inc. | Identifying tasks for task performers based on task subscriptions |
| JP4275102B2 (ja) * | 2005-05-16 | 2009-06-10 | 株式会社日立情報システムズ | 作業工数見積および人材割当システム、ならびにその方法 |
| JP2009223833A (ja) * | 2008-03-18 | 2009-10-01 | Ricoh Co Ltd | ワークフロー管理システム |
| US8918789B2 (en) * | 2011-10-26 | 2014-12-23 | International Business Machines Corporation | Task assignment using ranking support vector machines |
| JP5773554B2 (ja) * | 2012-02-27 | 2015-09-02 | 株式会社日立製作所 | タスク管理方法及びタスク管理装置 |
-
2016
- 2016-08-12 JP JP2016159006A patent/JP6790577B2/ja not_active Expired - Fee Related
-
2017
- 2017-07-18 US US15/653,383 patent/US20180046969A1/en not_active Abandoned
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2018026069A5 (https=) | ||
| Yu et al. | Joint-level vision-based ergonomic assessment tool for construction workers | |
| JP6790577B2 (ja) | 情報処理装置、情報処理システム、情報処理プログラム及び情報処理方法 | |
| JP5773554B2 (ja) | タスク管理方法及びタスク管理装置 | |
| Ryu et al. | Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason’s risk hump | |
| CN110991990A (zh) | 一种工程项目造价管理系统 | |
| JP2013045308A (ja) | 工事進捗管理支援システム及び方法 | |
| JP2015532495A5 (https=) | ||
| RU2014115455A (ru) | Система и способ запуска виртуальной машины | |
| RU2015152790A (ru) | Способ и система выбора 3-d устройства интерфейса пациента | |
| JP2016520384A5 (https=) | ||
| JP2014199595A (ja) | 作業負荷推定プログラム、作業負荷推定方法、及び情報処理装置 | |
| RU2015134854A (ru) | Способ и устройство многоцелевой оптимизации | |
| RU2014135209A (ru) | Система контроля технического обслуживания совокупности машин(ы), связанные с ней способ и компьютерная программа | |
| KR20160030807A (ko) | 헬스케어 데이터 통합모델을 기반으로 한 데이터 융합장치 및 그 방법 | |
| JP2019153169A5 (https=) | ||
| Gondo et al. | Accelerometer-based activity recognition of workers at construction sites | |
| CN108205730A (zh) | 决定分配人数的装置、方法和非暂时计算机可读存储介质 | |
| JP2017076376A5 (https=) | ||
| JPWO2022107207A5 (ja) | 情報収集装置、情報収集方法及びプログラム | |
| JP2021130399A5 (https=) | ||
| Seo et al. | Construction operation simulation reflecting workers’ muscle fatigue | |
| Hovanec et al. | Tecnomatix for successful application in the area of simulation manufacturing and ergonomics | |
| Lingard et al. | The impact of tool selection on back and wrist injury risk in tying steel reinforcement bars: a single case experiment | |
| JPWO2021084745A5 (https=) |