JP2017536073A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2017536073A5 JP2017536073A5 JP2017522182A JP2017522182A JP2017536073A5 JP 2017536073 A5 JP2017536073 A5 JP 2017536073A5 JP 2017522182 A JP2017522182 A JP 2017522182A JP 2017522182 A JP2017522182 A JP 2017522182A JP 2017536073 A5 JP2017536073 A5 JP 2017536073A5
- Authority
- JP
- Japan
- Prior art keywords
- power
- power grid
- load
- intermittent
- supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SG10201406883UA SG10201406883UA (en) | 2014-10-23 | 2014-10-23 | "Power Grid System And Method Of Consolidating Power Injection And Consumption In A Power Grid System" |
| SG10201406883U | 2014-10-23 | ||
| PCT/SG2015/050153 WO2016064342A1 (en) | 2014-10-23 | 2015-06-10 | Power grid system and method of consolidating power injection and consumption in a power grid system |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2017536073A JP2017536073A (ja) | 2017-11-30 |
| JP2017536073A5 true JP2017536073A5 (enExample) | 2018-07-19 |
| JP6563491B2 JP6563491B2 (ja) | 2019-08-21 |
Family
ID=55761238
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017522182A Expired - Fee Related JP6563491B2 (ja) | 2014-10-23 | 2015-06-10 | 電力グリッドシステムおよび電力グリッドシステムにおける電力の投入および消費を統合する方法 |
| JP2017522180A Pending JP2017531998A (ja) | 2014-10-23 | 2015-06-10 | 電力網システムにおけるpv電力の投入及び消費のための監査の方法及びシステム、並びに供給の方法及びシステム |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017522180A Pending JP2017531998A (ja) | 2014-10-23 | 2015-06-10 | 電力網システムにおけるpv電力の投入及び消費のための監査の方法及びシステム、並びに供給の方法及びシステム |
Country Status (11)
| Country | Link |
|---|---|
| US (2) | US10916967B2 (enExample) |
| EP (2) | EP3210272A4 (enExample) |
| JP (2) | JP6563491B2 (enExample) |
| CN (2) | CN107182219A (enExample) |
| AU (3) | AU2015337130A1 (enExample) |
| CA (2) | CA2965490A1 (enExample) |
| HK (4) | HK1243555A1 (enExample) |
| PH (1) | PH12017500760A1 (enExample) |
| SG (3) | SG10201406883UA (enExample) |
| TW (2) | TW201624866A (enExample) |
| WO (2) | WO2016064341A1 (enExample) |
Families Citing this family (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020131497A1 (en) * | 2018-12-21 | 2020-06-25 | Navio International, Inc. | Edge intelligence powered security solutions and other applications for a smart city |
| US11790762B2 (en) | 2016-04-19 | 2023-10-17 | Navio International, Inc. | Edge intelligence powered security solutions and other applications for a smart city |
| US10234885B2 (en) * | 2016-06-13 | 2019-03-19 | Sun Electric Digital Stream Ltd. | Method and system for facilitating auditing of power generation and allocation thereof to consumption loads |
| US11574372B2 (en) | 2017-02-08 | 2023-02-07 | Upstream Data Inc. | Blockchain mine at oil or gas facility |
| US20190123580A1 (en) * | 2017-10-23 | 2019-04-25 | Sigora International Inc. | Management of a power-distribution system |
| CA3088184A1 (en) | 2018-01-11 | 2019-07-18 | Lancium Llc | Method and system for dynamic power delivery to a flexible datacenter using unutilized energy sources |
| US10873211B2 (en) | 2018-09-14 | 2020-12-22 | Lancium Llc | Systems and methods for dynamic power routing with behind-the-meter energy storage |
| US11016553B2 (en) | 2018-09-14 | 2021-05-25 | Lancium Llc | Methods and systems for distributed power control of flexible datacenters |
| US11025060B2 (en) | 2018-09-14 | 2021-06-01 | Lancium Llc | Providing computational resource availability based on power-generation signals |
| US11031787B2 (en) | 2018-09-14 | 2021-06-08 | Lancium Llc | System of critical datacenters and behind-the-meter flexible datacenters |
| CN109390946B (zh) * | 2018-10-08 | 2020-07-28 | 重庆大学 | 一种基于多参数规划理论的最优概率潮流快速计算方法 |
| US11031813B2 (en) | 2018-10-30 | 2021-06-08 | Lancium Llc | Systems and methods for auxiliary power management of behind-the-meter power loads |
| US10367353B1 (en) | 2018-10-30 | 2019-07-30 | Lancium Llc | Managing queue distribution between critical datacenter and flexible datacenter |
| US10452127B1 (en) | 2019-01-11 | 2019-10-22 | Lancium Llc | Redundant flexible datacenter workload scheduling |
| US11128165B2 (en) | 2019-02-25 | 2021-09-21 | Lancium Llc | Behind-the-meter charging station with availability notification |
| CA3139776A1 (en) | 2019-05-15 | 2020-11-19 | Upstream Data Inc. | Portable blockchain mining system and methods of use |
| US11868106B2 (en) | 2019-08-01 | 2024-01-09 | Lancium Llc | Granular power ramping |
| US11397999B2 (en) | 2019-08-01 | 2022-07-26 | Lancium Llc | Modifying computing system operations based on cost and power conditions |
| US10618427B1 (en) | 2019-10-08 | 2020-04-14 | Lancium Llc | Behind-the-meter branch loads for electrical vehicle charging |
| BR112022008082A2 (pt) | 2019-10-28 | 2022-07-12 | Enphase Energy Inc | Sistema de gerenciamento de energia |
| US10608433B1 (en) | 2019-10-28 | 2020-03-31 | Lancium Llc | Methods and systems for adjusting power consumption based on a fixed-duration power option agreement |
| US11042948B1 (en) | 2020-02-27 | 2021-06-22 | Lancium Llc | Computing component arrangement based on ramping capabilities |
| CA3076653A1 (en) | 2020-03-21 | 2021-09-21 | Upstream Data Inc. | Portable blockchain mining systems and methods of use |
| WO2022036239A1 (en) | 2020-08-14 | 2022-02-17 | Lancium Llc | Power aware scheduling |
| CN114462983B (zh) * | 2022-04-12 | 2022-07-12 | 国网浙江省电力有限公司 | 适用于配网工程的审计数据处理方法 |
| ES2923589R1 (es) * | 2022-07-01 | 2022-10-21 | Crowd Solar S L | Sistema de eficiencia energetica unificador de puntos con capacidad de balancear consumos y excedente de produccion energetica, con preferencia renovable |
| JP7607106B1 (ja) | 2023-12-06 | 2024-12-26 | 株式会社Across Digital | 電力供給システム、および、電力供給方法 |
Family Cites Families (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3875149B2 (ja) | 2002-06-10 | 2007-01-31 | 三菱電機株式会社 | 太陽光発電システム |
| JP3889679B2 (ja) | 2002-06-28 | 2007-03-07 | 三菱電機株式会社 | 電力関連表示装置およびこれを用いた自家発電システム |
| US7156377B2 (en) * | 2003-05-01 | 2007-01-02 | Chapman Teddie C | Water aeration device and method |
| JP2005207629A (ja) | 2004-01-20 | 2005-08-04 | Matsushita Electric Works Ltd | 掘ごたつ用ヒータの収容構造。 |
| JP2005219084A (ja) | 2004-02-05 | 2005-08-18 | Sanyo Special Steel Co Ltd | 内面品質が良好な熱間押出継目無鋼管の製造方法 |
| US7274975B2 (en) * | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
| US7890436B2 (en) | 2006-10-17 | 2011-02-15 | Clean Power Finance, Inc. | Billing and payment methods and systems enabling consumer premises equipment |
| IES20080292A2 (en) | 2007-04-17 | 2008-10-29 | Timothy Patrick Cooper | A load management controller |
| US20090055300A1 (en) * | 2007-07-17 | 2009-02-26 | Mcdowell Grant | Method and system for remote generation of renewable energy |
| US20090160187A1 (en) | 2007-12-19 | 2009-06-25 | Scholte-Wassink Hartmut | Control system and method for operating a wind farm in a balanced state |
| JP4703736B2 (ja) * | 2009-03-02 | 2011-06-15 | 株式会社東芝 | エネルギー管理システム及び方法 |
| JP5659486B2 (ja) | 2009-12-17 | 2015-01-28 | 富士電機株式会社 | 発電計画作成方法および発電計画作成システム |
| JP5533343B2 (ja) | 2010-06-28 | 2014-06-25 | 富士通株式会社 | 電力平準化システム |
| DE102012103081B4 (de) | 2011-04-08 | 2021-12-30 | Sma Solar Technology Ag | Optimiertes Lastmanagement |
| EP2719049A2 (en) | 2011-06-07 | 2014-04-16 | N.V. Nederlandsche Apparatenfabriek NEDAP | A power control device for an electrical installation of a building and a method of power controlling an electrical installation of a building |
| US8689020B2 (en) * | 2011-08-16 | 2014-04-01 | General Electric Company | Method, system and computer program product for scheduling demand events |
| US10387985B2 (en) | 2011-10-07 | 2019-08-20 | Lennox Industries, Inc. | Distributed renewable energy metering |
| US9358896B2 (en) * | 2011-12-27 | 2016-06-07 | Mitsubishi Electric Corporation | Energy management system |
| JP5842994B2 (ja) * | 2012-03-12 | 2016-01-13 | 富士通株式会社 | 運転計画作成方法、運転計画作成プログラムおよび運転計画作成装置 |
| JP2013192401A (ja) | 2012-03-14 | 2013-09-26 | Toshiba Corp | 電力需給制御装置 |
| WO2013188517A2 (en) * | 2012-06-13 | 2013-12-19 | S&C Electric Company | Power grid photo-voltaic integration using distributed energy storage and management |
| US8849715B2 (en) | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
| JP6013076B2 (ja) | 2012-08-10 | 2016-10-25 | 京セラ株式会社 | エネルギー管理装置、エネルギー管理システムおよびエネルギー管理方法 |
| JP2014068426A (ja) | 2012-09-25 | 2014-04-17 | Hitachi Ltd | エネルギー需給バランス維持システム |
| JP2014143835A (ja) | 2013-01-24 | 2014-08-07 | Toshiba Corp | 電力系統の制御システム |
| US20140214219A1 (en) * | 2013-01-31 | 2014-07-31 | Kabushiki Kaisha Toshiba | Energy management system, energy management method, medium, and server |
| JP2014192981A (ja) * | 2013-03-26 | 2014-10-06 | Clean Craft:Kk | サーバ装置及びエネルギー流通システム |
| CN103530473A (zh) * | 2013-10-25 | 2014-01-22 | 国家电网公司 | 一种含大规模光伏电站的电力系统随机生产模拟方法 |
| JP5822363B2 (ja) | 2014-02-28 | 2015-11-24 | サミー株式会社 | ぱちんこ遊技機 |
| GB2510735B (en) * | 2014-04-15 | 2015-03-04 | Reactive Technologies Ltd | Frequency response |
-
2014
- 2014-10-23 SG SG10201406883UA patent/SG10201406883UA/en unknown
-
2015
- 2015-06-10 SG SG11201703224RA patent/SG11201703224RA/en unknown
- 2015-06-10 CN CN201580070777.8A patent/CN107182219A/zh active Pending
- 2015-06-10 SG SG11201703223TA patent/SG11201703223TA/en unknown
- 2015-06-10 US US15/520,904 patent/US10916967B2/en active Active
- 2015-06-10 HK HK18102746.3A patent/HK1243555A1/zh unknown
- 2015-06-10 EP EP15851794.6A patent/EP3210272A4/en not_active Withdrawn
- 2015-06-10 AU AU2015337130A patent/AU2015337130A1/en not_active Abandoned
- 2015-06-10 WO PCT/SG2015/050152 patent/WO2016064341A1/en not_active Ceased
- 2015-06-10 WO PCT/SG2015/050153 patent/WO2016064342A1/en not_active Ceased
- 2015-06-10 JP JP2017522182A patent/JP6563491B2/ja not_active Expired - Fee Related
- 2015-06-10 HK HK18102747.2A patent/HK1243556A1/zh unknown
- 2015-06-10 CN CN201580068491.6A patent/CN107112753A/zh active Pending
- 2015-06-10 EP EP15851698.9A patent/EP3210271A4/en not_active Withdrawn
- 2015-06-10 HK HK18102748.1A patent/HK1243557A1/zh unknown
- 2015-06-10 CA CA2965490A patent/CA2965490A1/en not_active Abandoned
- 2015-06-10 HK HK18102749.0A patent/HK1243558A1/zh unknown
- 2015-06-10 US US15/520,914 patent/US20170372438A1/en not_active Abandoned
- 2015-06-10 JP JP2017522180A patent/JP2017531998A/ja active Pending
- 2015-06-10 CA CA2965492A patent/CA2965492A1/en not_active Abandoned
- 2015-06-10 AU AU2015337129A patent/AU2015337129A1/en not_active Abandoned
- 2015-10-23 TW TW104134858A patent/TW201624866A/zh unknown
-
2016
- 2016-04-15 TW TW105111842A patent/TW201712998A/zh unknown
-
2017
- 2017-04-24 PH PH12017500760A patent/PH12017500760A1/en unknown
-
2020
- 2020-06-25 AU AU2020204246A patent/AU2020204246A1/en not_active Abandoned
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2017536073A5 (enExample) | ||
| JP6563491B2 (ja) | 電力グリッドシステムおよび電力グリッドシステムにおける電力の投入および消費を統合する方法 | |
| US20140094983A1 (en) | Method and system for allocating energy | |
| NZ595321A (en) | Phase balancing system comprising a load forecasting module, a phase unbalance identification module and a demand response module | |
| JP6699719B2 (ja) | 制御装置、発電制御装置、制御方法、システム、及び、プログラム | |
| PH12012500710B1 (en) | Method and system for managing thermal policies of a portable computing device | |
| PH12019500944A1 (en) | Cause determination device, power amount management system and cause determination method | |
| FR3050278B1 (fr) | Procede de determination de la valeur de parametres relatifs a l’etat d’un accumulateur d’une batterie, batterie et systeme de gestion electronique d’une batterie | |
| CN105634077A (zh) | 一种充电方法和电子设备 | |
| CY1117907T1 (el) | Εικονικος σταθμος παραγωγης ηλεκτρικης ενεργειας | |
| BR112019009026A2 (pt) | método e sistema de regulação em tempo real do revestimento de secador yankee baseado na transferência de revestimento natural prevista | |
| GB2555743A (en) | Predicting wellbore operation parameters | |
| Gjorgiev et al. | Multi-objective unit commitment with introduction of a methodology for probabilistic assessment of generating capacities availability | |
| MX2024002279A (es) | Sistemas y métodos para determinar instalaciones comerciales disponibles para que el cliente recoja sus pedidos. | |
| JP6524235B2 (ja) | 水素供給管理装置および水素供給管理方法 | |
| EP2584486A3 (en) | Meter access management system | |
| JP2017530686A (ja) | 電力グリッドシステムおよび電力グリッドシステムにおける一つまたは複数の建物接続部での電力消費量を決定する方法 | |
| CN105716885A (zh) | 面向全过程的高速铁路桥梁安全评估方法 | |
| MX2021000183A (es) | Sistema y método para generar certificado para solicitud de viajes fuera de línea. | |
| Polataiko et al. | Conceptual model for the virtual points of commercial gas accounting automated system | |
| Schlör et al. | Integrated Sustainability Assessment of Climate Impact, Land, Energy and Water Use in Germany against the Background of the UN Green Economy Model and Germany's Sustainability Strategy | |
| Pukhkal et al. | Selection of hot water supply metering devices for residential buildings | |
| JP2017096755A (ja) | 電力計測システム、電力計測装置、及び外部装置 | |
| Lee | Multivariate spatial cluster analysis using Mahalanobis distance | |
| Battisti et al. | Technological energy and environmental refurbishment of historical Italian libraries| Riqualificazione tecnologica, energetica ed ambientale delle biblioteche storiche italiane |