JP2015117545A - Construction method for underground tunnel - Google Patents

Construction method for underground tunnel Download PDF

Info

Publication number
JP2015117545A
JP2015117545A JP2013262840A JP2013262840A JP2015117545A JP 2015117545 A JP2015117545 A JP 2015117545A JP 2013262840 A JP2013262840 A JP 2013262840A JP 2013262840 A JP2013262840 A JP 2013262840A JP 2015117545 A JP2015117545 A JP 2015117545A
Authority
JP
Japan
Prior art keywords
top plate
segment
side wall
tunnel
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013262840A
Other languages
Japanese (ja)
Other versions
JP6186267B2 (en
Inventor
大久保 憲二
Kenji Okubo
憲二 大久保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2013262840A priority Critical patent/JP6186267B2/en
Publication of JP2015117545A publication Critical patent/JP2015117545A/en
Application granted granted Critical
Publication of JP6186267B2 publication Critical patent/JP6186267B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method for an underground tunnel in which a tunnel construction space is excavated without installing a strut and a tunnel is constructed using a precast member, in an attempt to curtail the construction period and reduce the construction costs significantly.SOLUTION: A pair of side walls 2 is formed by installing a plurality of side wall segments 1 in a ground 55. Next, a pile cap 20 is formed by alternately constructing a pile cap segment 25 and a pile cap segment 41 on the top edge of the pair of side walls 2, in the tunnel axial direction. Then, a rod 77 for ground improvement is made to pass through an opening 73 made on the pile cap 20 and a through-hole 51 for base ground improvement pierced through the pile cap segment 41, from the top surface side to the bottom surface side of the pile cap 20. Finally, the ground 55 between the pair of side walls 2 is excavated for forming a bottom slab above a preceding underground beam 83, by casting bottom slab concrete 91.

Description

本発明は、プレキャスト部材を用いた地下トンネルの構築方法に関する。   The present invention relates to a method for constructing an underground tunnel using a precast member.

近年、都市部の道路整備工事等において、既設道路直下に通過交通用の地下トンネルを構築する計画が増加している。図9は、一般的な開削工法の構造を示す図である。計画中の地下トンネルの土かぶりが浅い場合、図9に示すような開削工法が用いられる。図9に示す開削工法では、まず、地下トンネルの躯体の外側に土留壁103を構築し、内部に中間杭107を打設する。そして、路面覆工を設置し、必要に応じて止水や先行地中梁としての底盤改良109を行い、切梁105を設置しながらトンネル構築スペースを掘削する。その後、掘削したトンネル構築スペースに現場打ちコンクリート111を打設して、トンネル躯体を構築する。   In recent years, there are increasing plans to construct underground tunnels for passing traffic directly under existing roads in urban road maintenance works and the like. FIG. 9 is a diagram showing the structure of a general cutting method. When the ground cover of the planned underground tunnel is shallow, an excavation method as shown in FIG. 9 is used. In the excavation method shown in FIG. 9, first, the retaining wall 103 is constructed outside the frame of the underground tunnel, and the intermediate pile 107 is placed inside. Then, a road surface lining is installed, and if necessary, the bottom plate improvement 109 as a water stop or a preceding underground beam is performed, and the tunnel construction space is excavated while the beam 105 is installed. Thereafter, the cast-in-place concrete 111 is placed in the excavated tunnel construction space to construct the tunnel frame.

現場打ちコンクリートでトンネル躯体を構築するには、土留め壁として設置したH型コンクリート杭に頂版アーチの型枠を取り付け、H型コンクリート杭相互間の内部空間に頂版鉄筋の端部を挿入し、内部空間と頂版アーチの型枠内にコンクリートを打設して側壁と頂版とを一体に結合させる方法(例えば、特許文献1参照)等もある。   To construct the tunnel frame with cast-in-place concrete, attach the formwork of the top arch to the H-shaped concrete pile installed as a retaining wall, and insert the end of the top rebar into the internal space between the H-shaped concrete piles In addition, there is a method (for example, see Patent Document 1) in which concrete is placed in the inner space and the formwork of the top plate arch so that the side wall and the top plate are integrally coupled.

特許第4865300号公報Japanese Patent No. 4865300

しかしながら、切梁を設置しながらトンネル構築スペースを掘削する場合、掘削までの仮設構造の構築に時間がかかり、工費も嵩む。また、現場打ちコンクリートによりトンネル躯体を構築する場合、型枠や鉄筋の組み立て、コンクリートの養生等に多くの手間と時間を要する。   However, when excavating a tunnel construction space while installing a beam, it takes time to construct a temporary structure until excavation, and the construction cost increases. Moreover, when constructing a tunnel frame by using cast-in-place concrete, it takes a lot of labor and time for assembling the formwork and reinforcing bars and curing the concrete.

本発明は、前述した問題点に鑑みてなされたもので、その目的は、切梁を設置せずにトンネル構築スペースを掘削し、プレキャスト部材を用いてトンネルを構築することにより、大幅な工期短縮と工費削減を図れる地下トンネルの構築方法を提供することである。   The present invention has been made in view of the above-described problems, and its purpose is to significantly reduce the work period by excavating a tunnel construction space without installing a beam and constructing a tunnel using a precast member. To provide an underground tunnel construction method that can reduce the construction cost.

前述した目的を達成するための本発明は、地盤中に複数の側壁セグメントを設置して、一対の側壁を形成する工程aと、前記一対の側壁の上端に複数の頂版セグメントを架設して頂版を形成する工程bと、前記頂版に設けられた開口または孔を介して、前記頂版の上面側から下面側に地盤改良用のロッドを貫通させ、前記一対の側壁の間の地盤を改良して先行地中梁を形成する工程cと、前記一対の側壁の間の地盤を掘削し、前記先行地中梁の上方に、底版を形成する工程dと、を具備することを特徴とする地下トンネルの構築方法である。   In order to achieve the above-mentioned object, the present invention includes a step a in which a plurality of side wall segments are installed in the ground to form a pair of side walls, and a plurality of top plate segments are installed on the upper ends of the pair of side walls. A step b for forming a top plate, and a ground improvement rod through the top plate from the upper surface side to the lower surface side through an opening or hole provided in the top plate, and the ground between the pair of side walls And c) forming a preceding underground beam and excavating the ground between the pair of side walls to form a bottom plate above the preceding underground beam. It is the construction method of the underground tunnel.

本発明では、工程bで形成した頂版や工程cで形成した先行地中梁を、工程dで地盤を掘削する際に土留めとして用いる。そのため、仮設の土留めを設置するための工期・工費が不要となる。また、プレキャスト製のセグメントを用いて頂版および側壁を形成する。そのため、型枠等の設置・撤去やコンクリートの養生期間が不要となるうえ、天候の影響を受けずに施工を進めることができ、大幅な工期短縮・工費削減を図ることができる。   In the present invention, the top plate formed in the step b and the preceding underground beam formed in the step c are used as earth retaining when excavating the ground in the step d. This eliminates the need for a construction period and cost for installing a temporary earth retaining. Moreover, a top plate and a side wall are formed using a precast segment. This eliminates the need for installation / removal of formwork and the like and the curing period of the concrete, and allows the construction to proceed without being affected by the weather, thereby significantly reducing the construction period and cost.

前記工程bでは、例えば、開口のない第1の頂版セグメントと開口を有する第2の頂版セグメントとをトンネル軸方向に交互に配置して前記頂版を形成する。
開口を有する頂版セグメントを用いることにより、工程cで、頂版の上面側から下面側に地盤改良用のロッドを容易に貫通させることができる。
In the step b, for example, the top plate is formed by alternately arranging first top plate segments having no openings and second top plate segments having openings in the tunnel axis direction.
By using the top plate segment having an opening, the ground improvement rod can be easily penetrated from the upper surface side to the lower surface side of the top plate in step c.

工程bで開口のない第1の頂版セグメントと開口を有する第2の頂版セグメントとを用いる場合、例えば、前記第1の頂版セグメントが、トンネル幅方向に複数に分割されており、前記工程bで、分割された前記第1の頂版セグメントを、ほぞを噛み合わせて連結する。
頂版セグメントを複数に分割することにより、部材を軽量化できる。また、ほぞを噛み合わせることにより、分割されたセグメント同士を確実に連結できる。
When using the first top plate segment having no opening and the second top plate segment having the opening in step b, for example, the first top plate segment is divided into a plurality in the tunnel width direction, In step b, the divided first top plate segments are connected by engaging tenons.
A member can be reduced in weight by dividing | segmenting a top plate segment into plurality. Moreover, the divided segments can be reliably connected by engaging the tenon.

前記頂版セグメントは、例えばアーチ状である。
構造上有利なアーチ形状を採用することにより、部材厚を薄くすることができる。
The top plate segment has, for example, an arch shape.
By adopting an arch shape that is structurally advantageous, the thickness of the member can be reduced.

前記工程aでは、例えば、前記側壁セグメント同士をほぞを噛み合わせて連結して側壁を形成する。
ほぞを噛み合わせることにより、隣接する側壁セグメント同士を確実に連結し、目違いを防止できる。
In the step a, for example, the side wall segments are connected to each other by engaging tenons with each other to form a side wall.
By engaging the tenon, the adjacent side wall segments can be reliably connected to each other, and the mistake can be prevented.

前記工程bでは、例えば、前記側壁セグメントと前記頂版セグメントとを、アンカボルトを用いて接合する。
側壁セグメント、頂版セグメントに、アンカボルトを設置するための機構をあらかじめ設けておけば、側壁セグメントと頂版セグメントとを容易かつ確実に接合できる。
In the step b, for example, the side wall segment and the top plate segment are joined using an anchor bolt.
If a mechanism for installing anchor bolts is provided in advance in the side wall segment and the top plate segment, the side wall segment and the top plate segment can be joined easily and reliably.

本発明では、前記工程aと前記工程bとの間に、前記一対の側壁の間の地盤を所定の深さまで掘削し、前記工程bと前記工程cとの間に、前記一対の側壁の間の地盤内で発生したスライムを用いて、前記頂版の上部の埋め戻しを行うことが望ましい。
現地で発生したスライムを埋め戻しに用いることにより、産業廃棄物の削減と材料費の削減が可能となる。
In the present invention, the ground between the pair of side walls is excavated to a predetermined depth between the step a and the step b, and the gap between the pair of side walls is between the step b and the step c. It is desirable to backfill the upper part of the top plate using slime generated in the ground.
By using slime generated locally for backfilling, it is possible to reduce industrial waste and material costs.

また、前記工程dでは、例えば、前記側壁セグメントと鉄筋継手を用いて接合して前記底版を形成する。
側壁セグメントに鉄筋継手をあらかじめ設けておけば、底版の鉄筋を側壁セグメントに容易に定着できる。
Further, in the step d, for example, the bottom plate is formed by joining the side wall segment using a reinforcing bar joint.
If a reinforcing bar joint is provided in advance on the side wall segment, the reinforcing bar of the bottom plate can be easily fixed on the side wall segment.

本発明によれば、切梁を設置せずにトンネル構築スペースを掘削し、プレキャスト部材を用いてトンネルを構築することにより、大幅な工期短縮と工費削減を図れる地下トンネルの構築方法を提供することができる。   According to the present invention, it is possible to provide a method for constructing an underground tunnel capable of significantly shortening a construction period and reducing a construction cost by excavating a tunnel construction space without installing a beam and constructing a tunnel using a precast member. Can do.

プレキャスト製の側壁セグメント1の構造を示す図The figure which shows the structure of the side wall segment 1 made from precast プレキャスト製の頂版セグメント25、41の構造を示す図The figure which shows the structure of the top plate segments 25 and 41 made from precast 側壁2を形成する工程を示す図The figure which shows the process of forming the side wall 2 地盤55の一次掘削を行う工程を示す図The figure which shows the process of performing the primary excavation of the ground 55 頂版20を形成する工程を示す図The figure which shows the process of forming the top plate 20 先行地中梁83を形成する工程を示す図The figure which shows the process of forming the preceding underground beam 83 トンネル内部を掘削する工程を示す図Diagram showing the process of excavating inside the tunnel 底版コンクリート91等を形成する工程を示す図The figure which shows the process of forming bottom slab concrete 91 grade 一般的な開削工法の構造を示す図Diagram showing the structure of a general cutting method

以下、図面に基づいて、本発明の実施形態について説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(側壁セグメント)
本実施の形態では、地盤中に複数の側壁セグメント1を連結して設置して、一対の側壁を形成する。図1は、プレキャスト製の側壁セグメント1の構造を示す図である。図1(a)は、側壁セグメント1を内側面3側から見た正面図である。図1(b)は、側壁セグメント1の側面図である。図1(c)は、側壁セグメント1を上側から見た平面図である。
(Sidewall segment)
In the present embodiment, a plurality of side wall segments 1 are connected and installed in the ground to form a pair of side walls. FIG. 1 is a diagram showing the structure of a precast side wall segment 1. FIG. 1A is a front view of the side wall segment 1 as viewed from the inner side surface 3 side. FIG. 1B is a side view of the side wall segment 1. FIG.1 (c) is the top view which looked at the side wall segment 1 from the upper side.

図1に示すように、側壁セグメント1は、本体19の内側面3(トンネルの内周面を構成する面)の上端付近に、後述する頂版セグメント(図2)の端部を受けるための切欠部13が設けられる。側壁セグメント1の切欠部13の下面15には、頂版セグメントとの接合に用いるアンカ17が設けられる。アンカ17は、アンカ用孔、アンカプラグ等である。   As shown in FIG. 1, the side wall segment 1 is for receiving an end portion of a top plate segment (FIG. 2), which will be described later, near the upper end of the inner side surface 3 (surface constituting the inner peripheral surface of the tunnel) of the main body 19. A notch 13 is provided. An anchor 17 used for joining the top plate segment is provided on the lower surface 15 of the notch 13 of the side wall segment 1. The anchor 17 is an anchor hole, an anchor plug, or the like.

側壁セグメント1の下部には、現場打ちの底版の鉄筋を定着させるための鉄筋継手23が設けられる。鉄筋継手23は、L字型の機械式継手であり、側壁セグメント1の内側面3の下部に端部が位置するように埋設される。鉄筋継手23は、側壁セグメント1の内部で上方に曲がる鉄筋継手23aと、下方に曲がる鉄筋継手23bとからなる。   Reinforcing bar joints 23 are provided at the lower part of the side wall segment 1 for fixing the reinforcing bars of the bottom plate on the spot. The reinforcing bar joint 23 is an L-shaped mechanical joint, and is embedded so that the end portion is located below the inner side surface 3 of the side wall segment 1. The reinforcing bar joint 23 includes a reinforcing bar joint 23a that bends upward in the side wall segment 1 and a reinforcing bar joint 23b that bends downward.

側壁セグメント1は、側壁セグメント1同士を連結して側壁を形成する際に隣接するセグメントとの目違いを防ぐために、側面7aにほぞ9が設けられ、側面7bにほぞ穴11が設けられる。
側壁セグメント1の外側面5側には、本体19の上方に延びるパラペット21が設けられる。
The side wall segment 1 is provided with a tenon 9 on the side surface 7a and a mortise hole 11 on the side surface 7b in order to prevent a difference from the adjacent segment when the side wall segments 1 are connected to form a side wall.
A parapet 21 extending above the main body 19 is provided on the outer surface 5 side of the side wall segment 1.

側壁セグメント1同士の接合面(側面7a、7b)や、側壁セグメント1と頂版セグメント25や頂版セグメント41との接合面(切欠部13の下面15)には、必要に応じて、図示しない止水用パッキンが設けられる。   The joint surfaces (side surfaces 7a and 7b) of the side wall segments 1 and the joint surfaces of the side wall segment 1 and the top plate segment 25 and the top plate segment 41 (the lower surface 15 of the notch portion 13) are not shown as necessary. A waterproofing packing is provided.

(頂版セグメント)
本実施の形態では、開口のない第1の頂版セグメント25と開口を有する第2の頂版セグメント41とをトンネル軸方向に交互に配置して頂版を形成する。図2は、プレキャスト製の頂版セグメント25、頂版セグメント41の構造を示す図である。図2(a)は、頂版セグメント25を上側から見た平面図である。図2(b)は、頂版セグメント25の側面図である。図2(c)は、頂版セグメント41を上側から見た平面図である。図2(d)は、頂版セグメント41の側面図である。
(Vertical segment)
In the present embodiment, the top plate is formed by alternately arranging the first top plate segment 25 having no opening and the second top plate segment 41 having the opening in the tunnel axis direction. FIG. 2 is a view showing the structure of the precast top plate segment 25 and the top plate segment 41. FIG. 2A is a plan view of the top plate segment 25 as viewed from above. FIG. 2B is a side view of the top plate segment 25. FIG. 2C is a plan view of the top segment 41 as viewed from above. FIG. 2D is a side view of the top plate segment 41.

図2に示すように、頂版セグメント25は、アーチ状である。頂版セグメント25の両側部には、上面27から下面までを貫通するボルト穴39が設けられる。   As shown in FIG. 2, the top plate segment 25 has an arch shape. Bolt holes 39 penetrating from the upper surface 27 to the lower surface are provided on both sides of the top plate segment 25.

頂版セグメント25は、頂部の上面27側に凸部29を有する。頂版セグメント25は、凸部29の位置でトンネル幅方向に2つに分割され、図2(a)、図2(b)において右半部に図示される頂版セグメント25aと、図2(a)、図2(b)において左半部に図示される頂版セグメント25bとからなる。頂版セグメント25aは、頂版セグメント25bとの接合面33にほぞ穴37が設けられる。頂版セグメント25bは、頂版セグメント25aとの接合面33にほぞ35が設けられる。   The top plate segment 25 has a convex portion 29 on the top surface 27 side of the top portion. The top plate segment 25 is divided into two in the tunnel width direction at the position of the convex portion 29, and the top plate segment 25a shown in the right half in FIGS. 2 (a) and 2 (b), and FIG. a) and a top plate segment 25b shown in the left half of FIG. 2 (b). The top plate segment 25a is provided with a mortise 37 on the joint surface 33 with the top plate segment 25b. The top plate segment 25b is provided with a tenon 35 on the joint surface 33 with the top plate segment 25a.

頂版セグメント25aの凸部29、頂版セグメント25bの凸部29には、それぞれ、凸部29を貫通する連結ボルト用穴31が設けられる。頂版セグメント25aの連結ボルト用穴31と頂版セグメント25aの連結ボルト用穴31とは、頂版セグメント25aのほぞ穴37と頂版セグメント25bのほぞ35とを噛み合わせると連通する。   The convex portion 29 of the top plate segment 25a and the convex portion 29 of the top plate segment 25b are provided with connecting bolt holes 31 penetrating the convex portion 29, respectively. The connecting bolt hole 31 of the top plate segment 25a and the connecting bolt hole 31 of the top plate segment 25a communicate with each other when the tenon 37 of the top plate segment 25a and the tenon 35 of the top plate segment 25b are engaged with each other.

図2に示すように、頂版セグメント41は、アーチ状である。頂版セグメント41の両側部には、上面43から下面までを貫通するボルト穴53が設けられる。   As shown in FIG. 2, the top segment 41 has an arch shape. Bolt holes 53 that penetrate from the upper surface 43 to the lower surface are provided on both sides of the top plate segment 41.

頂版セグメント41は、頂部に開口73を有する。頂版セグメント41は、開口73によってトンネル幅方向に2つに分割され、図2(c)、図2(d)において右半部に図示される頂版セグメント41aと、図2(c)、図2(d)において左半部に図示される頂版セグメント41bとからなる。頂版セグメント41a、頂版セグメント41bは、上面43側に開口73に沿って凸部45が設けられる。頂版セグメント41a、頂版セグメント41bの凸部45の上面には、開口73に沿って、パラペット47が設けられる。凸部45およびパラペット47は、頂版セグメント41の両側面49から張り出すように設けられる。   The top plate segment 41 has an opening 73 at the top. The top plate segment 41 is divided into two in the tunnel width direction by the opening 73, and the top plate segment 41a shown in the right half in FIGS. 2 (c) and 2 (d), and FIG. 2 (c), It consists of the top plate segment 41b illustrated in the left half part in FIG.2 (d). The top plate segment 41 a and the top plate segment 41 b are provided with a convex portion 45 along the opening 73 on the upper surface 43 side. A parapet 47 is provided along the opening 73 on the top surface of the convex portion 45 of the top plate segment 41a and the top plate segment 41b. The convex portion 45 and the parapet 47 are provided so as to protrude from both side surfaces 49 of the top plate segment 41.

頂版セグメント41a、頂版セグメント41bの中央付近には、それぞれ、上面43から下面までを貫通する底盤改良用孔51が設けられる。   In the vicinity of the center of the top plate segment 41a and the top plate segment 41b, a bottom plate improving hole 51 penetrating from the upper surface 43 to the lower surface is provided.

頂版セグメント25aと頂版セグメント25bとの接合面33、頂版セグメント25と頂版セグメント41との接合面、頂版セグメント25や頂版セグメント41と側壁セグメント1のセグメントとの接合面等には、必要に応じて、図示しない止水用パッキンが設けられる。   For joining surface 33 of top plate segment 25a and top plate segment 25b, joining surface of top plate segment 25 and top plate segment 41, joining surface of top plate segment 25 or top plate segment 41 and side wall segment 1, etc. If necessary, a water-stopping packing (not shown) is provided.

(地下トンネルの構築方法)
本実施の形態では、上述した側壁セグメント1、頂版セグメント25、頂版セグメント41を用いて地下トンネルを構築する。以下に、図3から図8を用いて地下トンネルの構築方法について説明する。
(How to build an underground tunnel)
In the present embodiment, an underground tunnel is constructed using the side wall segment 1, the top plate segment 25, and the top plate segment 41 described above. Below, the construction method of an underground tunnel is demonstrated using FIGS. 3-8.

図3は、側壁2を形成する工程を示す図である。図3(a)はトンネル計画用地の平面図を、図3(b)は図3(a)に示す矢印A−Aによる断面図を示す。図3に示す用地境界57の内側に地下トンネルを構築するには、まず、側壁の構築予定箇所の両側方の地表付近に、H型鋼等によりガイドウォール59を設置する。そして、側壁の構築予定箇所の地盤55を連続地中壁掘削機により掘削して一対の溝61を形成する。掘削した溝61には、孔壁を安定させるため、ベントナイト等を用いた安定液63を満たす。   FIG. 3 is a diagram illustrating a process of forming the side wall 2. FIG. 3A is a plan view of the tunnel planning site, and FIG. 3B is a cross-sectional view taken along arrow AA shown in FIG. In order to construct an underground tunnel inside the site boundary 57 shown in FIG. 3, first, a guide wall 59 is installed with H-shaped steel or the like near the ground surface on both sides of the planned construction site of the side wall. And the ground 55 of the construction plan location of the side wall is excavated by a continuous underground wall excavator to form a pair of grooves 61. The excavated groove 61 is filled with a stabilizing liquid 63 using bentonite or the like in order to stabilize the hole wall.

次に、溝61内の下部を、地盤55の強度以上となるソイルモルタルで置換する。その後、溝61内に複数の側壁セグメント1を順次挿入し、図1に示すほぞ9とほぞ穴11とを噛み合わせることによって、隣接する側壁セグメント1同士を目違いが生じないように連結し、地盤55に一対の側壁2を形成する。なお、挿入した側壁セグメント1は、ガイドウォール59に設置した図示しない沈下防止用金具によって、所定の深さに固定しておく。そして、溝61内の下部のソイルモルタルが硬化した後、側壁セグメント1と溝61の孔壁との間の部分を、ソイルモルタルに置換する。   Next, the lower part in the groove 61 is replaced with a soil mortar having a strength higher than that of the ground 55. Thereafter, by sequentially inserting the plurality of side wall segments 1 into the groove 61 and engaging the tenon 9 and the tenon hole 11 shown in FIG. 1, the adjacent side wall segments 1 are connected so as not to make a mistake, A pair of side walls 2 is formed on the ground 55. The inserted side wall segment 1 is fixed to a predetermined depth by a not-shown settlement-preventing fitting installed on the guide wall 59. After the lower soil mortar in the groove 61 is cured, the portion between the side wall segment 1 and the hole wall of the groove 61 is replaced with the soil mortar.

図4は、地盤55の一次掘削を行う工程を示す図である。図4(a)はトンネル計画用地の平面図を、図4(b)は図4(a)に示す矢印B−Bによる断面図を示す。図4に示す工程では、まず、一対の側壁2の間の地盤55を、図2に示す頂版セグメント25、頂版セグメント41が設置可能となる深さ67まで掘削する。深さ67は、例えば5m程度とする。深さは、両側の側壁2で土圧を支持可能な深さである。そして、地盤55の掘削面に地盤改良用のスライムピット65を削孔する。スライムピット65の大きさは、例えば1m×1m程度とする。スライムピット65は、図5に示す後続の工程で側壁2に架設される頂版セグメント41の開口73や底盤改良用孔51に対応する位置に削孔する。   FIG. 4 is a diagram illustrating a process of performing primary excavation of the ground 55. 4A is a plan view of the tunnel planning site, and FIG. 4B is a cross-sectional view taken along arrows BB shown in FIG. 4A. In the step shown in FIG. 4, first, the ground 55 between the pair of side walls 2 is excavated to a depth 67 at which the top plate segment 25 and the top plate segment 41 shown in FIG. The depth 67 is about 5 m, for example. The depth is a depth at which the earth pressure can be supported by the side walls 2 on both sides. Then, a slime pit 65 for ground improvement is drilled in the excavation surface of the ground 55. The size of the slime pit 65 is, for example, about 1 m × 1 m. The slime pits 65 are drilled at positions corresponding to the openings 73 of the top plate segments 41 and the bottom plate improvement holes 51 installed on the side wall 2 in the subsequent process shown in FIG.

図5は、頂版20を形成する工程を示す図である。図5(a)、図5(c)は、トンネル計画用地の平面図を、図5(b)、図5(d)は、トンネル計画用地の鉛直方向断面図を示す。図5に示す工程では、一対の側壁2の上端に、開口のない頂版セグメント25と開口73を有する頂版セグメント41とをトンネル軸方向に交互に配置して、頂版20を形成する。   FIG. 5 is a diagram illustrating a process of forming the top plate 20. 5A and 5C are plan views of the tunnel planning site, and FIGS. 5B and 5D are vertical sectional views of the tunnel planning site. In the step shown in FIG. 5, the top plate 20 is formed by alternately arranging the top plate segments 25 having no openings and the top plate segments 41 having the openings 73 at the upper ends of the pair of side walls 2.

頂版セグメント25と頂版セグメント41とを側壁2の上端にトンネル軸方向に交互に架設するには、図5(a)に示すように、先行して架設した頂版セグメント25nの隣に頂版セグメント41nを設置するための間隔50を確保しつつ、頂版セグメント25(n+1)を配置する。図5(b)に示すように、頂版セグメント25は、頂版セグメント25aと頂版セグメント25bとを、図2に示すほぞ穴37とほぞ35とを噛み合わせ、連結ボルト用穴31にボルトを挿入して締結することによって連結した状態で、側壁2に架設される。   In order to alternately install the top plate segment 25 and the top plate segment 41 in the tunnel axis direction on the upper end of the side wall 2, as shown in FIG. 5A, the top plate segment 25 and the top plate segment 41 are arranged next to the top plate segment 25n installed in advance. The top plate segment 25 (n + 1) is arranged while securing the interval 50 for installing the plate segment 41n. As shown in FIG. 5B, the top plate segment 25 has a top plate segment 25a and a top plate segment 25b meshed with a tenon hole 37 and a tenon 35 shown in FIG. It is constructed in the side wall 2 in the state connected by inserting and fastening.

側壁2の上端では、側壁セグメント1の切欠部13の下面15が頂版セグメント25の両端部を受ける。側壁セグメント1と頂版セグメント25とは、図2に示す頂版セグメント25のボルト穴39と図1に示す側壁セグメント1のアンカ17とを用いてアンカボルトで接合される。   At the upper end of the side wall 2, the lower surface 15 of the notch 13 of the side wall segment 1 receives both ends of the top plate segment 25. The side wall segment 1 and the top plate segment 25 are joined with an anchor bolt using the bolt hole 39 of the top plate segment 25 shown in FIG. 2 and the anchor 17 of the side wall segment 1 shown in FIG.

頂版セグメント25(n+1)を架設した後、図5(c)に示すように、頂版セグメント25nと頂版セグメント25(n+1)との間に頂版セグメント41nを架設する。このとき、頂版セグメント41aと頂版セグメント41bとを、図5(d)に示すように同時に架設してもよいし、図5(c)に示すように順に架設してもよい。   After the top plate segment 25 (n + 1) is installed, as shown in FIG. 5C, the top plate segment 41n is installed between the top plate segment 25n and the top plate segment 25 (n + 1). At this time, the top plate segment 41a and the top plate segment 41b may be installed simultaneously as shown in FIG. 5 (d), or may be installed in order as shown in FIG. 5 (c).

頂版セグメント41nの凸部45は、頂版セグメント41nの両側面49から張り出しているため、張り出した部分は、隣接する頂版セグメント25nおよび頂版セグメント25(n+1)の上面に配置される。頂版セグメント41の凸部45の張り出し長さは、パラペット47がトンネル軸方向に連続するように設定される。   Since the convex portion 45 of the top plate segment 41n projects from both side surfaces 49 of the top plate segment 41n, the overhanging portion is disposed on the top surfaces of the adjacent top plate segment 25n and top plate segment 25 (n + 1). The protruding length of the convex portion 45 of the top plate segment 41 is set so that the parapet 47 is continuous in the tunnel axis direction.

側壁2の上端では、側壁セグメント1の切欠部13の下面15が頂版セグメント41の両端部を受ける。側壁セグメント1と頂版セグメント41とは、図2に示す頂版セグメント41のボルト穴53と図1に示す側壁セグメント1のアンカ17とを用いてアンカボルトで接合される。   At the upper end of the side wall 2, the lower surface 15 of the notch 13 of the side wall segment 1 receives both ends of the top plate segment 41. The side wall segment 1 and the top plate segment 41 are joined by an anchor bolt using the bolt hole 53 of the top plate segment 41 shown in FIG. 2 and the anchor 17 of the side wall segment 1 shown in FIG.

図6は、先行地中梁83を形成する工程を示す図である。図6(a)は、トンネル計画用地の平面図を、図6(b)は、トンネル計画用地の鉛直方向断面図を示す。図6に示す工程では、まず、頂版セグメント41の底盤改良用孔51に底盤改良用さや管69を設置し、地盤55の表面まで立ち上げる。そして、一対の側壁2の間の地盤55内で発生したスライムをスライムピット65から回収し、回収したスライムに土やセメントを混合した流動化処理土71を用いて、頂版20の上部の埋め戻しを行う。パラペット47は、埋め戻し時に土留めとして機能する。流動化処理土71で埋め戻すことにより、頂版セグメント25と頂版セグメント41との間の止水性を確保できる。   FIG. 6 is a diagram illustrating a process of forming the preceding underground beam 83. 6A is a plan view of the tunnel planning site, and FIG. 6B is a vertical sectional view of the tunnel planning site. In the process shown in FIG. 6, first, a bottom plate improvement sheath pipe 69 is installed in the bottom plate improvement hole 51 of the top plate segment 41, and rises to the surface of the ground 55. Then, the slime generated in the ground 55 between the pair of side walls 2 is recovered from the slime pit 65, and the upper portion of the top plate 20 is filled using the fluidized soil 71 obtained by mixing soil and cement with the recovered slime. Do the return. The parapet 47 functions as a soil retaining when backfilling. By backfilling with the fluidized soil 71, the water stoppage between the top plate segment 25 and the top plate segment 41 can be secured.

その後、頂版20に設けられた開口を介して、地上に設置した地盤改良施工機75のロッド77を頂版20の上面側から下面側に貫通させる。そして、ロッド77を用いて削孔および噴射注入を行って複数の高圧噴射撹拌杭79を形成することにより、一対の側壁2の下部の間の地盤55を改良し、先行地中梁83を形成する。   Thereafter, the rod 77 of the ground improvement construction machine 75 installed on the ground is passed from the upper surface side to the lower surface side of the top plate 20 through the opening provided in the top plate 20. Then, drilling and injection injection are performed using the rod 77 to form a plurality of high-pressure injection stirring piles 79, thereby improving the ground 55 between the lower portions of the pair of side walls 2, and forming a preceding underground beam 83 To do.

頂版20に設けられた開口とは、開口73や、底盤改良用さや管69(底盤改良用孔51)である。トンネルの中央部に高圧噴射撹拌杭79を形成する際には、開口73に図示しない施工機受桁を渡して地盤改良施工機75を設置し、開口73にロッド77を貫通させる。また、トンネルの側部に高圧噴射撹拌杭79を形成する際には、図6(b)に示すように、底盤改良用さや管69にロッド77を貫通させる。いずれの場合にも、削孔時に生じるスライムの排出は開口73から行う。   The openings provided in the top plate 20 are the opening 73 and the bottom plate improvement sheath pipe 69 (the bottom plate improvement hole 51). When the high-pressure jet stirring pile 79 is formed in the center of the tunnel, a ground improvement construction machine 75 is installed by passing a construction machine receiving girder (not shown) to the opening 73, and the rod 77 is passed through the opening 73. Further, when the high-pressure jet stirring pile 79 is formed on the side portion of the tunnel, as shown in FIG. 6 (b), the rod 77 is passed through the bottom plate improvement sheath tube 69. In any case, the slime generated during drilling is discharged from the opening 73.

図6に示す工程では、高圧噴射撹拌杭79の形成終了後に、頂版セグメント41の底盤改良用孔51にコンクリートを充填し、底盤改良用さや管69内に流動化処理土を充填する。そして、底盤改良用さや管69を撤去する。   In the step shown in FIG. 6, after the formation of the high-pressure jet stirring pile 79 is completed, the bottom plate improvement hole 51 of the top plate segment 41 is filled with concrete, and the bottom plate improvement sheath pipe 69 is filled with fluidized soil. Then, the sheath for improving the bottom plate is removed.

図7は、トンネル内部を掘削する工程を示す図である。図7(a)は、トンネル計画用地の平面図を、図7(b)は、トンネル計画用地の鉛直方向断面図を示す。図7に示す工程では、トンネル内に小型バックホウ87を入れ、トンネル内部の土砂85を掘削する。このとき、頂版20や先行地中梁83が掘削時の背面土圧に対抗する。また、地上にテレスコクラム89を設置し、開口73を用いて掘削土砂の揚上を行う。   FIG. 7 is a diagram illustrating a process of excavating the inside of the tunnel. FIG. 7A is a plan view of the tunnel planning site, and FIG. 7B is a vertical sectional view of the tunnel planning site. In the process shown in FIG. 7, the small backhoe 87 is put in the tunnel, and the earth and sand 85 inside the tunnel is excavated. At this time, the top plate 20 and the preceding underground beam 83 oppose the back earth pressure at the time of excavation. In addition, a telescopic crumb 89 is installed on the ground, and excavated sediment is lifted using the opening 73.

図8は、底版コンクリート91等を形成する工程を示す図である。図8(a)は、トンネル計画用地の平面図を、図8(b)は、トンネル計画用地の鉛直方向断面図を示す。図8に示す工程では、必要に応じて、先行地中梁83上に図示しない均しコンクリートを打設した後、その上方に底版の鉄筋の組み立てを行う。底版の鉄筋は、図1に示す側壁セグメント1の鉄筋継手23を用いて側壁セグメント1に定着される。   FIG. 8 is a diagram illustrating a process of forming the bottom slab concrete 91 and the like. FIG. 8A is a plan view of the tunnel planning site, and FIG. 8B is a vertical sectional view of the tunnel planning site. In the step shown in FIG. 8, if necessary, leveled concrete (not shown) is placed on the preceding underground beam 83, and then the reinforcing bars of the bottom slab are assembled thereabove. The reinforcing bar of the bottom plate is fixed to the side wall segment 1 using the reinforcing bar joint 23 of the side wall segment 1 shown in FIG.

次に、底版コンクリート91を打設して底版を形成する。底版コンクリート91の打設時には、温度収縮を考慮し、20m程度のブロックに分割して打設し、施工継ぎ目に目地を設けることが望ましい。さらに、トンネル内舗装93および地上部舗装95を行って、トンネルの仕上げを行う。トンネル完成後、パラペット47は手すりとして機能する。   Next, bottom slab concrete 91 is cast to form a bottom slab. When placing the bottom slab concrete 91, it is desirable to divide it into blocks of about 20 m in consideration of temperature shrinkage and provide joints at the construction seams. Further, tunnel pavement 93 and ground pavement 95 are performed to finish the tunnel. After the tunnel is completed, the parapet 47 functions as a handrail.

本実施の形態では、頂版20や先行地中梁83を、トンネル内部の土砂85の掘削時の土留めとして用いるため、仮設の土留めを設置するための工期・工費が不要となる。また、プレキャスト製の頂版セグメント25や頂版セグメント41を用いて頂版20を形成し、側壁セグメント1を用いて側壁2を形成するため、型枠等の設置・撤去やコンクリートの養生期間が不要となるうえ、天候の影響を受けずに施工を進めることができ、大幅な工期短縮・工費削減を図ることができる。   In the present embodiment, the top plate 20 and the preceding underground beam 83 are used as earth retaining when excavating the earth and sand 85 inside the tunnel, so that the construction period and work cost for installing the temporary earth retaining are not required. Moreover, since the top plate 20 is formed using the precast top plate segment 25 and the top plate segment 41 and the side wall 2 is formed using the side wall segment 1, installation / removal of the formwork and the like and a concrete curing period are required. In addition to being unnecessary, construction can proceed without being affected by the weather, and the construction period can be greatly shortened.

本実施の形態では、開口のない頂版セグメント25と開口を有する頂版セグメント41とをトンネル軸方向に交互に配置して頂版20を形成する。開口73や底盤改良用孔51等の開口を有する頂版セグメント41を用いることにより、頂版20の上面側から下面側に地盤改良用のロッド77を容易に貫通させることができる。   In the present embodiment, the top plate 20 is formed by alternately arranging the top plate segments 25 having no openings and the top plate segments 41 having openings in the tunnel axis direction. By using the top plate segment 41 having openings such as the opening 73 and the bottom plate improving hole 51, the ground improving rod 77 can be easily penetrated from the upper surface side to the lower surface side of the top plate 20.

本実施の形態では、頂版セグメント25、頂版セグメント41をアーチ状とする。また、頂版セグメント25を頂版セグメント25aと頂版セグメント25bとに分割する。構造上有利なアーチ形状を採用して部材厚を薄くしたり、セグメントを複数に分割したりすることにより、部材を軽量化でき、運搬等が容易となる。   In the present embodiment, the top plate segment 25 and the top plate segment 41 are arched. Further, the top plate segment 25 is divided into a top plate segment 25a and a top plate segment 25b. By adopting an arch shape that is structurally advantageous to reduce the thickness of the member or to divide the segment into a plurality of segments, the member can be reduced in weight and can be easily transported.

本実施の形態では、側壁セグメント1同士をほぞを噛み合わせて連結して側壁2を形成する。また、側壁セグメント1と頂版セグメント25や頂版セグメント41とを、あらかじめ設けられたアンカ17を用いてアンカボルトで接合する。さらに、側壁セグメント1にあらかじめ設けられた鉄筋継手23を用いて底版の鉄筋を側壁セグメント1に接合する。これらにより、部材同士を確実かつ容易に連結できる。   In the present embodiment, the side wall segments 1 are connected to each other by engaging tenons with each other to form the side wall 2. Moreover, the side wall segment 1 and the top plate segment 25 and the top plate segment 41 are joined with an anchor bolt using an anchor 17 provided in advance. Further, the reinforcing bar 23 provided in advance on the side wall segment 1 is used to join the reinforcing bar of the bottom plate to the side wall segment 1. By these, members can be connected reliably and easily.

本実施の形態では、一対の側壁2の間の地盤55内で発生したスライムを用いて、頂版20の上部の埋め戻しを行う。現地で発生したスライムを用いることにより、産業廃棄物の削減と材料費の削減が可能となる。   In the present embodiment, the top of the top plate 20 is backfilled using slime generated in the ground 55 between the pair of side walls 2. By using slime generated locally, it is possible to reduce industrial waste and material costs.

なお、本実施の形態では、頂版セグメント25と頂版セグメント41とをトンネル軸方向に交互に配置したが、頂版20の形成に用いる頂版セグメントは、これらに限らない。頂版セグメントは、開口が設けられた頂版20を形成できるようなものであればよい。また、頂版セグメント25をトンネル軸方向に2つに分割したが、分割は必須ではない。   In the present embodiment, the top plate segments 25 and the top plate segments 41 are alternately arranged in the tunnel axis direction, but the top plate segments used for forming the top plate 20 are not limited to these. The top plate segment may be any as long as it can form the top plate 20 provided with openings. Further, although the top plate segment 25 is divided into two in the tunnel axis direction, the division is not essential.

本実施の形態では、頂版セグメント41にパラペット47をあらかじめ一体化したが、パラペット47は後付けでもよい。パラペット47は、図6に示す流動化処理土71による埋め戻しの際に土留めとして機能するので、埋め戻し前に設置すればよい。   In the present embodiment, the parapet 47 is integrated with the top plate segment 41 in advance, but the parapet 47 may be retrofitted. Since the parapet 47 functions as a soil retaining when backfilling with the fluidized soil 71 shown in FIG. 6, it may be installed before backfilling.

本実施の形態では。高圧噴射撹拌杭79を一対の側壁2の間の全面に隙間なく形成したが、所定の改良効果が得られれば、高圧噴射撹拌杭79同士の間に隙間があってもよい。但し、側壁2の縁には高圧噴射撹拌杭79を切れ目なく形成することが望ましい。また、底盤改良用孔51は、頂版セグメント25に形成してもよい。   In this embodiment. The high-pressure jet stirring piles 79 are formed without gaps on the entire surface between the pair of side walls 2, but there may be gaps between the high-pressure jet stirring piles 79 as long as a predetermined improvement effect is obtained. However, it is desirable to form the high-pressure jet agitation pile 79 at the edge of the side wall 2 without any breaks. Further, the bottom plate improving hole 51 may be formed in the top plate segment 25.

以上、添付図を参照しながら、本発明の実施形態を説明したが、本発明の技術的範囲は、前述した実施形態に左右されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although embodiment of this invention was described referring an accompanying drawing, the technical scope of this invention is not influenced by embodiment mentioned above. It is obvious for those skilled in the art that various modifications or modifications can be conceived within the scope of the technical idea described in the claims. It is understood that it belongs.

1………側壁セグメント
2………側壁
9、35………ほぞ
11、37………ほぞ穴
13………切欠部
17………アンカ
20………頂版
21、47………パラペット
23………鉄筋継手
25、25a、25b、41、41a、41b………頂版セグメント
29、45………凸部
31………連結用ボルト穴
39、53………ボルト穴
51………底盤改良用孔
71………流動化処理土
77………ロッド
79………高圧噴射撹拌杭
83………先行地中梁
85………土砂
91………底版コンクリート
1 ……… Sidewall segment 2 ………… Sidewall 9, 35 ……… Mozon 11, 37 ……… Mozon 13 ……… Notch 17 ……… Anchor 20 ……… Top plate 21, 47 ……… Parapet 23 ......... Reinforcing bar joint 25, 25a, 25b, 41, 41a, 41b ......... Top plate segment 29, 45 ......... Protrusions 31 ......... Connecting bolt holes 39, 53 ......... Bolt holes 51 ... ... Bottom plate improvement hole 71 .... Fluidized soil 77 ... ... Rod 79 ... ... High-pressure injection stirring pile 83 ... ... Preceding underground beam 85 ... ... Earth and sand 91 ... ... Bottom slab concrete

Claims (8)

地盤中に複数の側壁セグメントを設置して、一対の側壁を形成する工程aと、
前記一対の側壁の上端に複数の頂版セグメントを架設して頂版を形成する工程bと、
前記頂版に設けられた開口または孔を介して、前記頂版の上面側から下面側に地盤改良用のロッドを貫通させ、前記一対の側壁の間の地盤を改良して先行地中梁を形成する工程cと、
前記一対の側壁の間の地盤を掘削し、前記先行地中梁の上方に、底版を形成する工程dと、
を具備することを特徴とする地下トンネルの構築方法。
A step a in which a plurality of side wall segments are installed in the ground to form a pair of side walls;
Forming a top plate by laying a plurality of top plate segments on the upper ends of the pair of side walls; and
Through an opening or hole provided in the top plate, a ground improvement rod is passed through from the upper surface side to the lower surface side of the top plate, and the ground between the pair of side walls is improved to provide a preceding underground beam. Forming step c;
Excavating the ground between the pair of side walls and forming a bottom plate above the preceding underground beam; and
An underground tunnel construction method characterized by comprising:
前記工程bで、開口のない第1の頂版セグメントと開口を有する第2の頂版セグメントとをトンネル軸方向に交互に配置して前記頂版を形成することを特徴とする請求項1記載の地下トンネルの構築方法。   2. The top plate is formed by alternately arranging a first top plate segment having no opening and a second top plate segment having an opening in the tunnel axis direction in the step b. To build underground tunnels. 前記第1の頂版セグメントが、トンネル幅方向に複数に分割されており、
前記工程bで、分割された前記第1の頂版セグメントを、ほぞを噛み合わせて連結することを特徴とする請求項2記載の地下トンネルの構築方法。
The first top segment is divided into a plurality of tunnel width directions;
The method for constructing an underground tunnel according to claim 2, wherein in the step b, the divided first top plate segments are connected by engaging tenons.
前記頂版セグメントがアーチ状であることを特徴とする請求項1から請求項3のいずれかに記載の地下トンネルの構築方法。   The method for constructing an underground tunnel according to any one of claims 1 to 3, wherein the top segment is arched. 前記工程aで、前記側壁セグメント同士をほぞを噛み合わせて連結して側壁を形成することを特徴とする請求項1から請求項4のいずれかに記載の地下トンネルの構築方法。   The method for constructing an underground tunnel according to any one of claims 1 to 4, wherein, in the step a, the side wall segments are engaged with each other to form a side wall. 前記工程bで、前記側壁セグメントと前記頂版セグメントとを、アンカボルトを用いて接合することを特徴とする請求項1から請求項5のいずれかに記載の地下トンネルの構築方法。   The method for constructing an underground tunnel according to any one of claims 1 to 5, wherein in the step b, the side wall segment and the top plate segment are joined using an anchor bolt. 前記工程aと前記工程bとの間に、前記一対の側壁の間の地盤を所定の深さまで掘削し、
前記工程bと前記工程cとの間に、前記一対の側壁の間の地盤内で発生したスライムを用いて、前記頂版の上部の埋め戻しを行うことを特徴とする請求項1から請求項6のいずれかに記載の地下トンネルの構築方法。
Excavating the ground between the pair of side walls to a predetermined depth between the step a and the step b,
The upper portion of the top plate is backfilled using slime generated in the ground between the pair of side walls between the step b and the step c. The construction method of the underground tunnel in any one of 6.
前記工程dで、前記側壁セグメントと鉄筋継手を用いて接合して前記底版を形成することを特徴とする請求項1から請求項7のいずれかに記載の地下トンネルの構築方法。   The method for constructing an underground tunnel according to any one of claims 1 to 7, wherein, in the step d, the bottom plate is formed by joining the side wall segment with a reinforced joint.
JP2013262840A 2013-12-19 2013-12-19 How to build an underground tunnel Expired - Fee Related JP6186267B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013262840A JP6186267B2 (en) 2013-12-19 2013-12-19 How to build an underground tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013262840A JP6186267B2 (en) 2013-12-19 2013-12-19 How to build an underground tunnel

Publications (2)

Publication Number Publication Date
JP2015117545A true JP2015117545A (en) 2015-06-25
JP6186267B2 JP6186267B2 (en) 2017-08-23

Family

ID=53530532

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013262840A Expired - Fee Related JP6186267B2 (en) 2013-12-19 2013-12-19 How to build an underground tunnel

Country Status (1)

Country Link
JP (1) JP6186267B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193120A (en) * 2016-08-26 2016-12-07 杭州江润科技有限公司 Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN107178088A (en) * 2017-04-18 2017-09-19 武汉志和岩土工程有限公司 A kind of basement waterproofing foundation pit structure and its construction method
JP2017206882A (en) * 2016-05-19 2017-11-24 鹿島建設株式会社 Method of constructing underground structure
CN112681374A (en) * 2020-12-21 2021-04-20 武汉市市政工程机械化施工有限公司 Shallow-buried underground-excavated channel cover excavation top-down construction method under complex conditions
CN114790758A (en) * 2022-03-22 2022-07-26 中交一公局集团有限公司 Prefabricated top plate and cushion layer for cover and excavation construction and construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080294A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5170919A (en) * 1974-11-12 1976-06-19 Alpina Spa
JPS59233016A (en) * 1983-06-17 1984-12-27 Taisei Corp Construction work of continuous underground wall
JPH0551929A (en) * 1991-08-15 1993-03-02 Koichi Uemura Open shield construction and concrete caisson for its construction
JPH07216917A (en) * 1994-02-04 1995-08-15 Ishikawajima Constr Materials Co Ltd Precast concrete slab-based tunnel structure
JPH08277520A (en) * 1995-04-05 1996-10-22 Kajima Corp Construction of building foundation
JP2001012194A (en) * 1999-06-30 2001-01-16 Geostr Corp Hollow structure
JP2001254353A (en) * 2000-03-08 2001-09-21 Hanshin Expressway Public Corp Earth retaining wall/rc composite structure and its construction method
US20030143029A1 (en) * 2002-01-30 2003-07-31 Con/Span Bridge Systems Ltd. Precast concrete culvert system
JP2003530499A (en) * 2000-04-11 2003-10-14 フレシネ アンテルナショナル (エステーユーペー) Bunker structure
JP2006132219A (en) * 2004-11-08 2006-05-25 Toda Constr Co Ltd Underground structure construction method, underground structure, and precast concrete side wall or intermediate wall/pole for use in the same
JP2011202373A (en) * 2010-03-24 2011-10-13 Taisei Corp Earth retaining structure and construction method of the same

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5170919A (en) * 1974-11-12 1976-06-19 Alpina Spa
JPS59233016A (en) * 1983-06-17 1984-12-27 Taisei Corp Construction work of continuous underground wall
JPH0551929A (en) * 1991-08-15 1993-03-02 Koichi Uemura Open shield construction and concrete caisson for its construction
JPH07216917A (en) * 1994-02-04 1995-08-15 Ishikawajima Constr Materials Co Ltd Precast concrete slab-based tunnel structure
JPH08277520A (en) * 1995-04-05 1996-10-22 Kajima Corp Construction of building foundation
JP2001012194A (en) * 1999-06-30 2001-01-16 Geostr Corp Hollow structure
JP2001254353A (en) * 2000-03-08 2001-09-21 Hanshin Expressway Public Corp Earth retaining wall/rc composite structure and its construction method
JP2003530499A (en) * 2000-04-11 2003-10-14 フレシネ アンテルナショナル (エステーユーペー) Bunker structure
US20030143029A1 (en) * 2002-01-30 2003-07-31 Con/Span Bridge Systems Ltd. Precast concrete culvert system
JP2006132219A (en) * 2004-11-08 2006-05-25 Toda Constr Co Ltd Underground structure construction method, underground structure, and precast concrete side wall or intermediate wall/pole for use in the same
JP2011202373A (en) * 2010-03-24 2011-10-13 Taisei Corp Earth retaining structure and construction method of the same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017206882A (en) * 2016-05-19 2017-11-24 鹿島建設株式会社 Method of constructing underground structure
CN106193120A (en) * 2016-08-26 2016-12-07 杭州江润科技有限公司 Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN106193120B (en) * 2016-08-26 2018-04-06 杭州江润科技有限公司 Basement is encorbelmented, and bottom plate is inverse to make structure and construction method
CN107178088A (en) * 2017-04-18 2017-09-19 武汉志和岩土工程有限公司 A kind of basement waterproofing foundation pit structure and its construction method
CN112681374A (en) * 2020-12-21 2021-04-20 武汉市市政工程机械化施工有限公司 Shallow-buried underground-excavated channel cover excavation top-down construction method under complex conditions
CN114790758A (en) * 2022-03-22 2022-07-26 中交一公局集团有限公司 Prefabricated top plate and cushion layer for cover and excavation construction and construction method
CN114790758B (en) * 2022-03-22 2024-06-04 中交一公局集团有限公司 Prefabricated top plate and cushion layer for cover excavation construction and construction method

Also Published As

Publication number Publication date
JP6186267B2 (en) 2017-08-23

Similar Documents

Publication Publication Date Title
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
JP6186267B2 (en) How to build an underground tunnel
KR101274974B1 (en) Earth retaining wall and construction method thereof
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
JP6543176B2 (en) Building method
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR20140055639A (en) A execution method of architecture beam
KR101149895B1 (en) Reinforcement block for pillar of tunnel
CN102966356A (en) Method for controlling upward flotation and deformation of liquefiable ground operating tunnel under action of earthquake
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR102196532B1 (en) Under ground structure construction method using composite steel pile underground column wall and top-down under ground structure therewith
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR20070052109A (en) Down-ward construction method of the underground slabs and retaining walls by the slim-type composit floor system consisted of the architectural conposit deep deck and unsymmetric h-beam without preliminary wall-attached support beams and sub-beams of the floor
KR100965795B1 (en) Structure of composite type steel temporary construction and method for constructing thereof
KR101902791B1 (en) Under ground structure construction method using composite steel pile and under ground structure therewith
JP5915074B2 (en) How to form an underground space under a ground transportation
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
KR101234270B1 (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
JP2017206882A (en) Method of constructing underground structure
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
JP2011157719A (en) Earth retaining method
KR101524302B1 (en) Construction method for underground structure without temporary structure
KR101520771B1 (en) H-pile composited with v-shape steel plate and reinforced concrete for open cut construction
KR101516746B1 (en) Construction method for girder and construction method for underground structure without temporary structure using the same
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160715

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170530

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170531

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170706

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170725

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170731

R150 Certificate of patent or registration of utility model

Ref document number: 6186267

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees