JP2015068763A - 状態監視装置、状態監視方法 - Google Patents
状態監視装置、状態監視方法 Download PDFInfo
- Publication number
- JP2015068763A JP2015068763A JP2013204841A JP2013204841A JP2015068763A JP 2015068763 A JP2015068763 A JP 2015068763A JP 2013204841 A JP2013204841 A JP 2013204841A JP 2013204841 A JP2013204841 A JP 2013204841A JP 2015068763 A JP2015068763 A JP 2015068763A
- Authority
- JP
- Japan
- Prior art keywords
- current
- voltage
- unit
- current measurement
- timing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
- Measurement Of Current Or Voltage (AREA)
- Tests Of Electric Status Of Batteries (AREA)
Abstract
【解決手段】二次電池30の状態を監視する状態監視装置50であって、電流センサ40から一定の送信周期Nで送信される二次電池30の電流計測値を受信する通信部80と、前記二次電池30の電圧を計測する電圧計測部70と、制御部60と、を備える。前記制御部60は、前記電流センサ40の電流計測タイミングに対する前記電圧計測部70の電圧計測タイミングのズレが所定の範囲内になるように、前記電流センサ40から送信される電流計測値の受信タイミングを基準として、前記電圧計測部70に対して電圧計測の実行を指示する実行指示処理と、前記電流センサ40の電流計測値と前記電圧計測部70の電圧計測値とに基づいて、前記二次電池30の状態を推定する推定処理とを行う。
【選択図】図2
Description
本発明は上記のような事情に基づいて完成されたものであって、電流計測部(あるいは電圧計測部)が制御部から独立している場合でも、電流と電圧の同時計測することにより、蓄電素子の状態の推定精度を向上させることを目的とする。
初めに、本実施形態の状態監視装置の概要について説明する。本状態監視装置では、電流計測部から送信される電流計測値の受信タイミングを基準として、電圧計測部に対して電圧計測の実行を指示することにより、電流計測部の電流計測タイミングに対する電圧計測部の電圧計測タイミングのズレを所定範囲内とする。そのため、電流計測部が制御部から独立している構成でも、電圧と電流の計測タイミングのズレを抑えることが出来るので、蓄電素子の状態の推定精度を高めることが出来る。
<実施形態1>
実施形態1について図1ないし図4を参照して説明する。
1.電池パックの構成
図1は、本実施形態における電池パック20の構成を示す図である。本実施形態の電池パック20は、例えば電気自動車やハイブリッド自動車に搭載され、電気エネルギーで作動する動力源に電力を供給するものである。
BM50は、電流センサ40の計測する電流計測値と、電圧計測部70の計測する電圧計測値に基づいて、二次電池30の内部抵抗を推定する。二次電池30の内部抵抗の推定精度を高めるには、電流と電圧を同時に計測することが好ましい。
T1+T2=N−TA・・・・・・・・(1)
T1=N−TA−T2・・・・・・・・(2)
次に内部抵抗の推定シーケンスについて、図3、図4を参照して説明する。内部抵抗の推定シーケンスは、図4に示すようにS10〜S50の5ステップから構成されている。
「V」は、二次電池30の電圧計測値(端子電圧)である。
「E」は、二次電池30の開放電圧である。
「r」は、二次電池30の内部抵抗である。
「I」は、二次電池30の電流計測値である。
以上説明したように、BM50によれば、二次電池30の電流と電圧を同時に計測することが出来るので、内部抵抗の推定精度を高めることが可能となる。
次に実施形態2を図5によって説明する。
実施形態1のBM50は、通信の遅れによるタイミングのズレが出ないように、初回以降の電圧計測については、「制御部60内の基準タイミング」から、送信周期Nが経過するごとに、制御部60から電圧計測部70に対して電圧計測の実行を指示することで、電圧計測タイミングを電流計測タイミングに一致させるようにした。
次に実施形態3を図6によって説明する。実施形態2の内部抵抗の推定シーケンスでは、S10にて、これから実行する内部抵抗の推定処理が、初回かどうかを判定し、初回の場合は、電流センサ40から送信される「電流計測値の受信タイミング」を基準として、電圧計測部70に対して電圧計測の実行を指示した。そして、初回以降は、「制御部60内の基準タイミング」を基準として、電圧計測部70に対する電圧計測の実行を指示するようにした。
本発明は上記記述及び図面によって説明した実施形態に限定されるものではなく、例えば次のような実施形態も本発明の技術的範囲に含まれる。
Claims (7)
- 蓄電素子の状態を監視する状態監視装置であって、
電流計測部と通信可能に接続され、前記電流計測部から一定の送信周期で送信される前記蓄電素子の電流計測値を受信する通信部と、
前記蓄電素子の電圧を計測する電圧計測部と、
制御部と、を備え、
前記制御部は、前記電流計測部の電流計測タイミングに対する前記電圧計測部の電圧計測タイミングのズレが所定の範囲内になるように、前記電流計測部から送信される電流計測値の受信タイミングを基準として、前記電圧計測部に対して電圧計測の実行を指示する実行指示処理と、
前記電流計測部の電流計測値と前記電圧計測部の電圧計測値とに基づいて、前記蓄電素子の状態を推定する推定処理とを行う状態監視装置。 - 請求項1に記載の状態監視装置であって、
前記制御部は、
少なくとも、初回の電圧計測時は、前記実行指示処理を行い、
前記実行指示処理の実行時に、前記電流計測部から送信される電流計測値の受信タイミングを基準として、同制御部内の基準タイミングを設定し、
前記基準タイミングを設定した以降は、設定した前記制御部内の基準タイミングから、前記送信周期が経過するごとに、前記電圧計測部に対して電圧計測の実行を指示する状態監視装置。 - 請求項2に記載の状態監視装置であって、
前記制御部は、前記制御部内の基準タイミングを設定してから所定時間が経過した場合、前記制御部内の基準タイミングを、前記電流計測部から送信される電流計測値の受信タイミングを基準に再設定する状態監視装置。 - 請求項2又は請求項3に記載の状態監視装置であって、
前記制御部内の基準タイミングを設定又は再設定する処理を、前記電流計測部から送信される電流計測値の受信周期が安定している期間に行う状態監視装置。 - 請求項1から請求項4のいずれか一項に記載の状態監視装置であって、
前記制御部が前記電流計測部から前記電流計測値を受信してから前記電圧計測部に電圧計測の実行を指示するまでの時間をT1とし、
前記電圧計測部が前記電圧計測の指示を受けてから電圧を計測するまでの時間をT2とし、
前記電流計測部が前記電流計測値を送信する送信周期をNとし、
前記電流計測部が電流を計測してから送信するまでの時間をTAとした場合、
前記電圧計測を指示するまでの時間T1は、
前記送信周期Nから、前記電流を計測してから送信するまでの時間TAと、前記電圧を計測するまでの時間T2を引いた時間である状態監視装置。 - 蓄電素子の状態を監視する状態監視方法であって、
電流計測部の電流計測タイミングに対する電圧計測部の電圧計測タイミングのズレが所定の範囲内になるように、前記電流計測部から送信される電流計測値の受信タイミングを基準として、前記電圧計測部に対して電圧計測の実行を指示する実行指示ステップと、
前記電流計測部の電流計測値と前記電圧計測部の電圧計測値とに基づいて、前記蓄電素子の状態を推定する推定ステップとを行う状態監視方法。 - 蓄電素子の状態を監視する状態監視装置であって、
電圧計測部と通信可能に接続され、前記電圧計測部から一定の送信周期で送信される前記蓄電素子の電圧計測値を受信する通信部と、
前記蓄電素子の電流を計測する電流計測部と、
制御部と、を備え、
前記制御部は、前記電圧計測部の電圧計測タイミングに対する前記電流計測部の電流計測タイミングのズレが所定の範囲内になるように、前記電圧計測部から送信される電圧計測値の受信タイミングを基準として、前記電流計測部に対して電流計測の実行を指示する実行指示処理と、
前記電流計測部の電流計測値と前記電圧計測部の電圧計測値とに基づいて、前記蓄電素子の状態を推定する推定処理とを行う状態監視装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013204841A JP6156029B2 (ja) | 2013-09-30 | 2013-09-30 | 状態監視装置、状態監視方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013204841A JP6156029B2 (ja) | 2013-09-30 | 2013-09-30 | 状態監視装置、状態監視方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015068763A true JP2015068763A (ja) | 2015-04-13 |
JP6156029B2 JP6156029B2 (ja) | 2017-07-05 |
Family
ID=52835557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013204841A Active JP6156029B2 (ja) | 2013-09-30 | 2013-09-30 | 状態監視装置、状態監視方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6156029B2 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017083227A (ja) * | 2015-10-26 | 2017-05-18 | 株式会社デンソー | 組電池制御装置 |
JP2022077901A (ja) * | 2020-11-12 | 2022-05-24 | プライムアースEvエナジー株式会社 | 電池監視システム |
WO2023095411A1 (ja) * | 2021-11-24 | 2023-06-01 | 株式会社デンソーテン | 電池監視システム、電池監視装置、および電池監視方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007187649A (ja) * | 2005-12-12 | 2007-07-26 | Yazaki Corp | 電圧検出装置及び絶縁インタフェース |
JP2009156845A (ja) * | 2007-12-28 | 2009-07-16 | Sanyo Electric Co Ltd | 電圧測定装置及びこれを具えた組電池システム |
JP2011214973A (ja) * | 2010-03-31 | 2011-10-27 | Primearth Ev Energy Co Ltd | 二次電池の電流電圧検出装置 |
JP2011229265A (ja) * | 2010-04-19 | 2011-11-10 | Panasonic Electric Works Co Ltd | 非接触電力伝送装置 |
US20120310566A1 (en) * | 2011-05-31 | 2012-12-06 | Masayuki Hoshino | Calculation method, calculation system, and calculation apparatus |
JP2013130504A (ja) * | 2011-12-22 | 2013-07-04 | Mitsubishi Heavy Ind Ltd | 電池システム |
-
2013
- 2013-09-30 JP JP2013204841A patent/JP6156029B2/ja active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007187649A (ja) * | 2005-12-12 | 2007-07-26 | Yazaki Corp | 電圧検出装置及び絶縁インタフェース |
JP2009156845A (ja) * | 2007-12-28 | 2009-07-16 | Sanyo Electric Co Ltd | 電圧測定装置及びこれを具えた組電池システム |
JP2011214973A (ja) * | 2010-03-31 | 2011-10-27 | Primearth Ev Energy Co Ltd | 二次電池の電流電圧検出装置 |
JP2011229265A (ja) * | 2010-04-19 | 2011-11-10 | Panasonic Electric Works Co Ltd | 非接触電力伝送装置 |
US20120310566A1 (en) * | 2011-05-31 | 2012-12-06 | Masayuki Hoshino | Calculation method, calculation system, and calculation apparatus |
JP2013130504A (ja) * | 2011-12-22 | 2013-07-04 | Mitsubishi Heavy Ind Ltd | 電池システム |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017083227A (ja) * | 2015-10-26 | 2017-05-18 | 株式会社デンソー | 組電池制御装置 |
JP2022077901A (ja) * | 2020-11-12 | 2022-05-24 | プライムアースEvエナジー株式会社 | 電池監視システム |
JP7253521B2 (ja) | 2020-11-12 | 2023-04-06 | プライムアースEvエナジー株式会社 | 電池監視システム |
WO2023095411A1 (ja) * | 2021-11-24 | 2023-06-01 | 株式会社デンソーテン | 電池監視システム、電池監視装置、および電池監視方法 |
Also Published As
Publication number | Publication date |
---|---|
JP6156029B2 (ja) | 2017-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6634854B2 (ja) | 蓄電素子管理装置、蓄電素子管理方法、蓄電素子モジュール、蓄電素子管理プログラム及び移動体 | |
JP6155774B2 (ja) | 状態推定装置及び状態推定方法 | |
US20160097819A1 (en) | Battery Control Device | |
JP6200359B2 (ja) | 二次電池内部温度推定装置および二次電池内部温度推定方法 | |
JP2014160015A (ja) | 充電状態推定装置、充電状態推定方法 | |
JP6577047B2 (ja) | 参照エネルギープロファイルを決定する方法および電池を形成するための装置 | |
JP2012154641A (ja) | 電池状態監視装置 | |
WO2017056732A1 (ja) | 電池制御装置及び電池システム | |
JP6958965B2 (ja) | バッテリーsoc推定装置及び方法 | |
JP6156029B2 (ja) | 状態監視装置、状態監視方法 | |
JP2015224975A (ja) | バッテリ充放電電流検出装置 | |
JP6489366B2 (ja) | 組電池の監視装置、組電池の容量均等化方法。 | |
JP6452403B2 (ja) | 二次電池状態検出装置および二次電池状態検出方法 | |
JP2015041513A (ja) | 蓄電池制御装置 | |
JP5851514B2 (ja) | 電池制御装置、二次電池システム | |
JP5999409B2 (ja) | 状態推定装置及び状態推定方法 | |
JP2014109535A (ja) | 内部抵抗推定装置、充電装置、放電装置、内部抵抗推定方法 | |
JP2013051823A (ja) | 電池状態監視システムおよび方法 | |
WO2014038555A1 (ja) | 電池残量検出装置、電池システム、電池残量検出方法およびプログラム | |
KR102005399B1 (ko) | 배터리 연결 상태 판단 장치 및 방법 | |
WO2024036432A1 (zh) | 电池的直流阻抗检测方法、系统、设备及存储介质 | |
JP2020056756A (ja) | 電流センサの異常検出方法 | |
JP2018132369A (ja) | 電池状態推定装置及び電源装置 | |
KR101953907B1 (ko) | 모듈 전압 센싱을 이용한 센싱 라인 단선 검출 시간 단축 장치 및 방법 | |
JP2013247023A (ja) | 温度推定装置及び温度推定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160413 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20161215 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170208 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170509 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170522 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6156029 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |