JP2013044329A5 - - Google Patents

Download PDF

Info

Publication number
JP2013044329A5
JP2013044329A5 JP2012180698A JP2012180698A JP2013044329A5 JP 2013044329 A5 JP2013044329 A5 JP 2013044329A5 JP 2012180698 A JP2012180698 A JP 2012180698A JP 2012180698 A JP2012180698 A JP 2012180698A JP 2013044329 A5 JP2013044329 A5 JP 2013044329A5
Authority
JP
Japan
Prior art keywords
steam
temperature
power generation
operating
generation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012180698A
Other languages
English (en)
Japanese (ja)
Other versions
JP2013044329A (ja
JP6118048B2 (ja
Filing date
Publication date
Priority claimed from US13/214,915 external-priority patent/US8567175B2/en
Application filed filed Critical
Publication of JP2013044329A publication Critical patent/JP2013044329A/ja
Publication of JP2013044329A5 publication Critical patent/JP2013044329A5/ja
Application granted granted Critical
Publication of JP6118048B2 publication Critical patent/JP6118048B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2012180698A 2011-08-22 2012-08-17 発電システムのための排出物予測システム Active JP6118048B2 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US13/214,915 2011-08-22
US13/214,915 US8567175B2 (en) 2011-08-22 2011-08-22 Emissions prediction system for power generation system

Publications (3)

Publication Number Publication Date
JP2013044329A JP2013044329A (ja) 2013-03-04
JP2013044329A5 true JP2013044329A5 (enExample) 2015-09-17
JP6118048B2 JP6118048B2 (ja) 2017-04-19

Family

ID=47225918

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012180698A Active JP6118048B2 (ja) 2011-08-22 2012-08-17 発電システムのための排出物予測システム

Country Status (5)

Country Link
US (1) US8567175B2 (enExample)
EP (1) EP2562371B1 (enExample)
JP (1) JP6118048B2 (enExample)
CN (1) CN102955980B (enExample)
BR (1) BR102012020957A8 (enExample)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150121888A1 (en) * 2013-11-05 2015-05-07 General Electric Company Gas turbine online wash control
US9581086B2 (en) * 2013-12-20 2017-02-28 General Electric Company Turbine operational flexibility
JP6266361B2 (ja) * 2014-01-27 2018-01-24 三菱重工業株式会社 燃料供給装置、燃焼器、ガスタービン、及び燃料供給方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5954711A (ja) * 1982-09-24 1984-03-29 Toshiba Corp コンバインドサイクルタービンプラントの蒸気噴射制御装置
US4473536A (en) * 1982-12-27 1984-09-25 General Electric Company Catalytic pollution control system for gas turbine exhaust
JPS61104107A (ja) * 1984-10-25 1986-05-22 Hitachi Ltd 発電プラントのNOx制御方法
JPH0713472B2 (ja) * 1985-01-25 1995-02-15 株式会社日立製作所 タービンの運転制御方法、および複合サイクル原動機プラント
JPS64326A (en) * 1987-06-23 1989-01-05 Hitachi Ltd Nox abating type gas turbine plant
JP3672339B2 (ja) * 1994-05-16 2005-07-20 株式会社東芝 一軸型コンバインドサイクルプラントの起動方法及び起動装置
JP3666036B2 (ja) * 1994-11-04 2005-06-29 株式会社日立製作所 火力発電プラント起動制御システム及び起動制御方法
US6644011B2 (en) * 2000-03-24 2003-11-11 Cheng Power Systems, Inc. Advanced Cheng Combined Cycle
JP3858267B2 (ja) * 2002-06-14 2006-12-13 マツダ株式会社 排気浄化装置
DE10310954A1 (de) * 2003-03-13 2004-09-23 Robert Bosch Gmbh Verfahren zur Diagnose eines NOx-Sensors
US6978620B2 (en) 2004-02-09 2005-12-27 General Electric Company Start-up method for power plant
US7756591B2 (en) * 2006-04-25 2010-07-13 Pegasus Technologies, Inc. System for optimizing oxygen in a boiler
US8042340B2 (en) * 2007-09-19 2011-10-25 General Electric Company Method and system for modulating the modified wobbe index of a fuel
US8352148B2 (en) 2008-05-21 2013-01-08 General Electric Company System for controlling input profiles of combined cycle power generation system

Similar Documents

Publication Publication Date Title
JP2009281381A5 (enExample)
JP2014174993A5 (enExample)
JP2011069356A5 (enExample)
EP2124113A3 (en) Control of combined cycle power generation system
JP2016512294A5 (enExample)
JP2012062891A5 (enExample)
EP2657468A3 (en) Power plant operation enhancement
PH12016500006A1 (en) System and method for diagnosing and controlling incineration facility and solid fuel boiler and managing life cycle of facility through heat exchange and design program and operation mode analysis of operator
Koppauer et al. Modeling and optimal steady-state operating points of an ORC waste heat recovery system for diesel engines
JP2012068014A5 (enExample)
JP2012036889A5 (enExample)
RU2013125362A (ru) Система и метод активного контроля температуры в паровой турбине
JP2013217215A (ja) ランキンサイクルエンジンを備えるガスタービンエンジン装置
JP2013044329A5 (enExample)
JP2015090091A5 (enExample)
MX2013010106A (es) Metodo para operar una central termoelectrica.
Verda et al. Thermoeconomic approach for the analysis of control system of energy plants
RU2013104504A (ru) Система и способ тестирования показателя работы паровой турбины
Bernardos et al. Assessing the potential of hybrid fossil–solar thermal plants for energy policy making: Brayton cycles
JP2017068408A5 (enExample)
JP2017089623A (ja) 蒸気タービン入口温度制御システム、コンピュータプログラム並びに関連方法
JP2013139767A5 (enExample)
JP6118048B2 (ja) 発電システムのための排出物予測システム
WO2013126279A8 (en) Optimization of gas turbine combustion systems low load performance on simple cycle and heat recovery steam generator applications
JP5482405B2 (ja) ボイラ性能評価装置及び方法