JP2012510124A - プロジェクトスケジュール視覚化方法及びシステム - Google Patents

プロジェクトスケジュール視覚化方法及びシステム Download PDF

Info

Publication number
JP2012510124A
JP2012510124A JP2011538610A JP2011538610A JP2012510124A JP 2012510124 A JP2012510124 A JP 2012510124A JP 2011538610 A JP2011538610 A JP 2011538610A JP 2011538610 A JP2011538610 A JP 2011538610A JP 2012510124 A JP2012510124 A JP 2012510124A
Authority
JP
Japan
Prior art keywords
project
information
resource data
lines
actual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2011538610A
Other languages
English (en)
Japanese (ja)
Other versions
JP2012510124A5 (https=
Inventor
ロナルド リーナム,ジェフ
Original Assignee
アイティーティー マニュファクチャリング エンタープライジーズ, インコーポレイテッド
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アイティーティー マニュファクチャリング エンタープライジーズ, インコーポレイテッド filed Critical アイティーティー マニュファクチャリング エンタープライジーズ, インコーポレイテッド
Publication of JP2012510124A publication Critical patent/JP2012510124A/ja
Publication of JP2012510124A5 publication Critical patent/JP2012510124A5/ja
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/00Two-dimensional [2D] image generation
    • G06T11/20Drawing from basic elements
    • G06T11/26Drawing of charts or graphs
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/14Digital output to display device ; Cooperation and interconnection of the display device with other functional units
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Human Computer Interaction (AREA)
  • Data Mining & Analysis (AREA)
  • Software Systems (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • User Interface Of Digital Computer (AREA)
  • Information Transfer Between Computers (AREA)
JP2011538610A 2008-11-26 2009-09-17 プロジェクトスケジュール視覚化方法及びシステム Pending JP2012510124A (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US12/324,054 2008-11-26
US12/324,054 US8063904B2 (en) 2008-11-26 2008-11-26 Project timeline visualization methods and systems
PCT/US2009/057268 WO2010062442A1 (en) 2008-11-26 2009-09-17 Project timeline visualization methods and systems

Publications (2)

Publication Number Publication Date
JP2012510124A true JP2012510124A (ja) 2012-04-26
JP2012510124A5 JP2012510124A5 (https=) 2012-11-01

Family

ID=42195821

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011538610A Pending JP2012510124A (ja) 2008-11-26 2009-09-17 プロジェクトスケジュール視覚化方法及びシステム

Country Status (9)

Country Link
US (1) US8063904B2 (https=)
EP (1) EP2370907A4 (https=)
JP (1) JP2012510124A (https=)
KR (1) KR20110091557A (https=)
CN (1) CN102265270A (https=)
AU (1) AU2009320257A1 (https=)
CA (1) CA2744528A1 (https=)
IL (1) IL213015A0 (https=)
WO (1) WO2010062442A1 (https=)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017109863A1 (ja) * 2015-12-22 2017-06-29 株式会社日立製作所 リソース融通装置、スケジュール管理装置およびリソース融通システム

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102981842B (zh) * 2012-11-08 2015-06-10 北京空间飞行器总体设计部 一种生成可交互横道图的方法
US20140240320A1 (en) * 2013-02-04 2014-08-28 Eddy Malik Smart Timelines
US9726750B2 (en) 2013-08-26 2017-08-08 Specialty Electrical, Llc Method and apparatus for multi-mode tracking and display of personnel locations in a graphical model
JP6287018B2 (ja) * 2013-10-04 2018-03-07 富士通株式会社 可視化方法、表示方法、情報処理装置、可視化プログラム及び表示プログラム
US9740457B1 (en) * 2014-02-24 2017-08-22 Ca, Inc. Method and apparatus for displaying timeline of software development data
KR101927424B1 (ko) * 2016-01-08 2018-12-10 한국전자통신연구원 멀티 코어 시스템에서 스케줄링 결과의 시각화 방법 및 장치
US20190266765A1 (en) * 2016-10-28 2019-08-29 Nec Corporation Process management apparatus, process management method, and storage medium
GB201621971D0 (en) * 2016-12-22 2017-02-08 Lingo Unite Ltd See Heidari Zainab Lookiimedia (Uk) Ltd Dynamic timeline display
CN116168116B (zh) * 2023-04-19 2023-07-21 巴斯夫一体化基地(广东)有限公司 用于对测试执行计划进行可视化显示的方法及装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000034835A (ja) * 1998-05-12 2000-02-02 Takiya Kensetsu Kogyo Kk 工事管理システム及び工事管理方法並びにコンピュ―タ可読媒体
JP2004227147A (ja) * 2003-01-21 2004-08-12 Ricoh Co Ltd リソース管理装置、リソース管理方法、プログラム及び記録媒体、及びこれらを用いて設計/製造されたシステム

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7082605B2 (en) * 2000-03-31 2006-07-25 Vidus Limited Contingency planning in a scheduling process
US20060095457A1 (en) * 2001-01-12 2006-05-04 Glasspool David W Interactive tool for knowledge-based support of planning under uncertainty
US6993712B2 (en) * 2001-09-28 2006-01-31 Siebel Systems, Inc. System and method for facilitating user interaction in a browser environment
US7028036B2 (en) * 2002-06-28 2006-04-11 Microsoft Corporation System and method for visualization of continuous attribute values
US7131113B2 (en) * 2002-12-12 2006-10-31 International Business Machines Corporation System and method on generating multi-dimensional trace files and visualizing them using multiple Gantt charts
US7263474B2 (en) * 2003-01-29 2007-08-28 Dancing Rock Trust Cultural simulation model for modeling of agent behavioral expression and simulation data visualization methods
US7353223B2 (en) * 2003-08-28 2008-04-01 Sap Aktiengesellschaft Directed graph for distribution of time-constrained data
US20050165881A1 (en) * 2004-01-23 2005-07-28 Pipelinefx, L.L.C. Event-driven queuing system and method
US20050222881A1 (en) * 2004-04-05 2005-10-06 Garry Booker Management work system and method
US20060044307A1 (en) 2004-08-24 2006-03-02 Kyuman Song System and method for visually representing project metrics on 3-dimensional building models
KR20060021055A (ko) * 2004-09-02 2006-03-07 삼성전자주식회사 액정 표시 장치, 액정 표시 장치용 구동 장치 및 방법
US7471293B2 (en) * 2005-02-09 2008-12-30 International Business Machines Corporation Method, system, and computer program product for displaying calendar-based SLO results and breach values
JP5219378B2 (ja) * 2007-01-18 2013-06-26 株式会社日立製作所 インタラクションデータ表示装置、処理装置及び表示方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000034835A (ja) * 1998-05-12 2000-02-02 Takiya Kensetsu Kogyo Kk 工事管理システム及び工事管理方法並びにコンピュ―タ可読媒体
JP2004227147A (ja) * 2003-01-21 2004-08-12 Ricoh Co Ltd リソース管理装置、リソース管理方法、プログラム及び記録媒体、及びこれらを用いて設計/製造されたシステム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017109863A1 (ja) * 2015-12-22 2017-06-29 株式会社日立製作所 リソース融通装置、スケジュール管理装置およびリソース融通システム
JPWO2017109863A1 (ja) * 2015-12-22 2017-12-21 株式会社日立製作所 リソース融通装置、スケジュール管理装置およびリソース融通システム
US11393050B2 (en) 2015-12-22 2022-07-19 Hitachi, Ltd. Resource accommodation device, schedule management device, and resource accommodation system

Also Published As

Publication number Publication date
EP2370907A1 (en) 2011-10-05
IL213015A0 (en) 2011-07-31
CA2744528A1 (en) 2010-06-03
KR20110091557A (ko) 2011-08-11
EP2370907A4 (en) 2013-11-27
WO2010062442A8 (en) 2010-09-10
US8063904B2 (en) 2011-11-22
CN102265270A (zh) 2011-11-30
AU2009320257A1 (en) 2010-06-03
WO2010062442A1 (en) 2010-06-03
US20100128040A1 (en) 2010-05-27

Similar Documents

Publication Publication Date Title
JP2012510124A (ja) プロジェクトスケジュール視覚化方法及びシステム
CN103020421B (zh) 能量仪表板
US7385605B2 (en) Computer display system for dynamically modifying stacked area line graphs to change the order or presence of a set of stacked areas in the graph respectively representative of the proportions contributed to a total by each of a set of time dependent variables
US20120311497A1 (en) System for business portfolio modeling and analysis
WO2017040249A1 (en) Interactive charts with dynamic progress monitoring, notification and resource allocation
US20120297330A1 (en) Method and System for Generating Reports
WO2009111859A1 (en) System, method and product for graphically displaying project status information
Tsai et al. Workflow re-engineering of design-build projects using a BIM tool
Ivanov et al. Design of a Dashboard of Software Metrics for Adaptable, Energy Efficient Applications (S).
Lee et al. Visualization of construction progress monitoring
Benjaoran et al. Enhancing visualization of 4D CAD model compared to conventional methods
CN107710242A (zh) 顾客信息提供系统及其控制方法以及计算机程序
JP2012512459A (ja) プロジェクトスケジュール視覚化方法及びシステム
O'Brien et al. Cognitive task analysis of superintendent's work: Case study and critique of supporting information technologies.
Huang et al. Visualization techniques for schedule comparison
JP2015095203A (ja) 作業状況可視化システム
RU2013152141A (ru) Способ управления процессами подготовки и эксплуатации сложных технических объектов и система для его осуществления
US9471901B2 (en) Accessible white space in graphical representations of information
St Germain et al. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management
JP2006185316A (ja) 業務分析支援プログラム、業務分析支援装置および業務分析支援方法
US20140136272A1 (en) System and method for providing gantt-trend chart in a supply chain management environment
SHAW SITUATIONAL AWARENESS–THE NEXT LEAP IN INDUSTRIAL HUMAN MACHINE INTERFACE DESIGN
Lee et al. Developing effective visual representations to monitor project performance
JP2025033312A (ja) 業務負荷可視化システム及び業務の負荷の可視化方法
Schneider et al. A-Plan: Integrating interactive visualization with automated planning for cooperative resource scheduling

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20120817

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120914

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120914

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130904

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131029

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20140401