JP2012512459A - プロジェクトスケジュール視覚化方法及びシステム - Google Patents
プロジェクトスケジュール視覚化方法及びシステム Download PDFInfo
- Publication number
- JP2012512459A JP2012512459A JP2011540742A JP2011540742A JP2012512459A JP 2012512459 A JP2012512459 A JP 2012512459A JP 2011540742 A JP2011540742 A JP 2011540742A JP 2011540742 A JP2011540742 A JP 2011540742A JP 2012512459 A JP2012512459 A JP 2012512459A
- Authority
- JP
- Japan
- Prior art keywords
- plan information
- project
- information
- milestone
- bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/14—Digital output to display device ; Cooperation and interconnection of the display device with other functional units
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Human Computer Interaction (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】プロジェクト情報を、プロジェクトに関連した電子的な計画情報を受信することによって表示することができ、電子的な計画情報は、プロジェクトの二つ以上の段階に関連するとともにこれらの二つ以上の段階中に生じる少なくとも一つのマイルストーンを有する。その後、ユーザに対する視覚的な表示及びユーザにより知覚的に提示するために、受信した電子的な計画情報を、受信した電子的な計画情報のグラフ表示に変換する。グラフ表示は、二つ以上の段階に対応する二つ以上のバーと、マイルストーンが生じる時間に対応する二つ以上のバーの間の接続部と、を有する。
【選択図】図3
Description
Claims (20)
- プロジェクト情報を表示する方法であって、
プロジェクトに関連した電子的な計画情報を受信するステップであって、受信した前記電子的な計画情報は、少なくとも一つのマイルストーンを有し、前記少なくとも一つのマイルストーンは、前記プロジェクトの二つ以上の段階に関連し、前記二つ以上の段階中に生じるステップと、
ユーザに視覚的な表示を行うために、受信した前記電子的な計画情報を、受信した前記電子的な計画情報のグラフ表示に変換するステップと、
ユーザによる知覚のために、受信した前記電子的な計画情報の前記グラフ表示を行うステップであって、前記グラフ表示は、前記二つ以上の段階に対応する二つ以上のバーと、前記マイルストーンが生じるときに対応する前記二つ以上のバーの間の接続部と、を有するステップと、
を備えることを特徴とする方法。 - 前記接続部を形成するために、前記グラフ表示の前記二つ以上のバーが交差する請求項1に記載の方法。
- 前記二つ以上のバーは、第1の方向に延在する第1の直線部及び前記第1の方向と異なる第2の方向に延在する第2の直線部を有する第1のバーと、を有する請求項2に記載の方法。
- 前記二つ以上のバーは、第3の方向に延在する第3の直線部を有する第2のバーを有する請求項3に記載の方法。
- 前記接続部を形成するために、前記第1のバーの第2の直線部及び前記第2のバーの第3の直線部が交差する請求項4に記載の方法。
- 前記グラフ表示は、前記二つ以上のバーの交差部に配置されたマイルストーンに対応する記号を更に有する請求項2に記載の方法。
- 前記グラフ表示は、前記接続部を形成するために前記二つ以上のバーに交差する接続線を更に有する請求項1に記載の方法。
- 前記接続線は、前記マイルストーンが生じるときに対応する軸線に沿って延在する請求項7に記載の方法。
- 前記グラフ表示は、前記接続線及び前記二つ以上のバーの交差部に配置されたマイルストーンに対応する記号を更に有する請求項7に記載の方法。
- 前記グラフ表示を行うステップは、前記グラフ表示を視覚表示装置に表示するステップを備える請求項1に記載の方法。
- 前記変換するステップは、コンピュータプロセッサによって、受信した前記電子的な計画情報を前記グラフ表示に変換するステップを備える請求項1に記載の方法。
- 前記受信するステップは、前記コンピュータプロセッサによって、前記電子的な計画情報を受信するステップを備える請求項12に記載の方法。
- プロジェクト情報を表示するシステムであって、
プロジェクトに関連した電子的な計画情報を受信する手段であって、受信した前記電子的な計画情報は、少なくとも一つのマイルストーンを有し、前記少なくとも一つのマイルストーンは、前記プロジェクトの二つ以上の段階に関連し、前記二つ以上の段階中に生じる手段と、
ユーザに視覚的な表示を行うために、受信した前記電子的な計画情報を、受信した前記電子的な計画情報のグラフ表示に変換する手段と、
ユーザによる知覚のために、受信した前記電子的な計画情報の前記グラフ表示を行う手段であって、前記グラフ表示は、前記二つ以上の段階に対応する二つ以上のバーと、前記マイルストーンが生じるときに対応する前記二つ以上のバーの間の接続部と、を有する手段と、
を備えることを特徴とするシステム。 - 前記グラフ表示を行う手段は、前記グラフ表示を視覚表示装置に表示する手段を備える請求項13に記載のシステム。
- 前記変換する手段は、コンピュータプロセッサによって、受信した前記電子的な計画情報を前記グラフ表示に変換する手段を備える請求項13に記載のシステム。
- 前記受信する手段は、前記コンピュータプロセッサによって、前記電子的な計画情報を受信する手段を備える請求項15記載のシステム。
- コンピュータ読取可能記憶媒体であって、前記コンピュータ読取可能記憶媒体は、プロジェクト情報を表示するために、
プロジェクトに関連した電子的な計画情報を受信する動作であって、受信した前記電子的な計画情報は、少なくとも一つのマイルストーンを有し、前記少なくとも一つのマイルストーンは、前記プロジェクトの二つ以上の段階に関連し、前記二つ以上の段階中に生じる動作と、
ユーザに視覚的な表示を行うために、受信した前記電子的な計画情報を、受信した前記電子的な計画情報のグラフ表示に変換する動作と、
ユーザによる知覚のために、受信した前記電子的な計画情報の前記グラフ表示を行う動作であって、前記グラフ表示は、前記二つ以上の段階に対応する二つ以上のバーと、前記マイルストーンが生じるときに対応する前記二つ以上のバーの間の接続部と、を有する動作と、
を実行するためのコンピュータ実行可能な命令を有することを特徴とするコンピュータ読取可能記憶媒体。 - 前記グラフ表示を行う動作は、前記グラフ表示を視覚表示装置に表示する請求項17に記載のコンピュータ読取可能記憶媒体。
- 前記変換する動作は、コンピュータプロセッサによって、受信した前記電子的な計画情報を前記グラフ表示に変換する請求項17に記載のコンピュータ読取可能記憶媒体。
- 前記受信する動作は、前記コンピュータプロセッサによって、前記電子的な計画情報を受信する手段を備える請求項19記載のコンピュータ読取可能記憶媒体。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/334,652 US8346581B2 (en) | 2008-12-15 | 2008-12-15 | Project timeline visualization methods and systems |
US12/334,652 | 2008-12-15 | ||
PCT/US2009/063051 WO2010071716A1 (en) | 2008-12-15 | 2009-11-03 | Project timeline visualization methods and systems |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2012512459A true JP2012512459A (ja) | 2012-05-31 |
Family
ID=41514722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011540742A Pending JP2012512459A (ja) | 2008-12-15 | 2009-11-03 | プロジェクトスケジュール視覚化方法及びシステム |
Country Status (9)
Country | Link |
---|---|
US (1) | US8346581B2 (ja) |
EP (1) | EP2377079A1 (ja) |
JP (1) | JP2012512459A (ja) |
KR (1) | KR20110104956A (ja) |
CN (1) | CN102246191A (ja) |
AU (1) | AU2009327509A1 (ja) |
CA (1) | CA2745567A1 (ja) |
IL (1) | IL213428A0 (ja) |
WO (1) | WO2010071716A1 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105809411A (zh) * | 2016-03-02 | 2016-07-27 | 广州支点网络科技股份有限公司 | 计划控制方法和装置 |
CN113780860B (zh) * | 2021-09-17 | 2022-11-29 | 上海易立德信息技术股份有限公司 | 一种里程碑的进度显示方法、系统和存储介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10275187A (ja) * | 1997-03-31 | 1998-10-13 | Hitachi Plant Eng & Constr Co Ltd | 作業工程図の表示方法及びその装置 |
JP2000034835A (ja) * | 1998-05-12 | 2000-02-02 | Takiya Kensetsu Kogyo Kk | 工事管理システム及び工事管理方法並びにコンピュ―タ可読媒体 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060095457A1 (en) | 2001-01-12 | 2006-05-04 | Glasspool David W | Interactive tool for knowledge-based support of planning under uncertainty |
US7761288B2 (en) * | 2001-04-30 | 2010-07-20 | Siebel Systems, Inc. | Polylingual simultaneous shipping of software |
US6993712B2 (en) | 2001-09-28 | 2006-01-31 | Siebel Systems, Inc. | System and method for facilitating user interaction in a browser environment |
US7131113B2 (en) | 2002-12-12 | 2006-10-31 | International Business Machines Corporation | System and method on generating multi-dimensional trace files and visualizing them using multiple Gantt charts |
US20050222881A1 (en) * | 2004-04-05 | 2005-10-06 | Garry Booker | Management work system and method |
US20060044307A1 (en) | 2004-08-24 | 2006-03-02 | Kyuman Song | System and method for visually representing project metrics on 3-dimensional building models |
US7921026B2 (en) * | 2005-03-01 | 2011-04-05 | Microsoft Corporation | Method and system for generating a timeline associated with a project schedule |
US20080127195A1 (en) * | 2006-11-28 | 2008-05-29 | Siemens Ag | Project-process-transformer |
US20080221946A1 (en) * | 2007-01-05 | 2008-09-11 | Robert Balon | Method and system for evaluating and summarizing weekly project progress |
-
2008
- 2008-12-15 US US12/334,652 patent/US8346581B2/en active Active
-
2009
- 2009-11-03 JP JP2011540742A patent/JP2012512459A/ja active Pending
- 2009-11-03 KR KR1020117016238A patent/KR20110104956A/ko not_active Application Discontinuation
- 2009-11-03 WO PCT/US2009/063051 patent/WO2010071716A1/en active Application Filing
- 2009-11-03 CN CN2009801502905A patent/CN102246191A/zh active Pending
- 2009-11-03 EP EP09756086A patent/EP2377079A1/en not_active Withdrawn
- 2009-11-03 AU AU2009327509A patent/AU2009327509A1/en not_active Abandoned
- 2009-11-03 CA CA2745567A patent/CA2745567A1/en not_active Abandoned
-
2011
- 2011-06-06 IL IL213428A patent/IL213428A0/en unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10275187A (ja) * | 1997-03-31 | 1998-10-13 | Hitachi Plant Eng & Constr Co Ltd | 作業工程図の表示方法及びその装置 |
JP2000034835A (ja) * | 1998-05-12 | 2000-02-02 | Takiya Kensetsu Kogyo Kk | 工事管理システム及び工事管理方法並びにコンピュ―タ可読媒体 |
Also Published As
Publication number | Publication date |
---|---|
WO2010071716A1 (en) | 2010-06-24 |
CN102246191A (zh) | 2011-11-16 |
IL213428A0 (en) | 2011-07-31 |
US8346581B2 (en) | 2013-01-01 |
CA2745567A1 (en) | 2010-06-24 |
US20100153159A1 (en) | 2010-06-17 |
KR20110104956A (ko) | 2011-09-23 |
AU2009327509A1 (en) | 2010-06-24 |
EP2377079A1 (en) | 2011-10-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI479437B (zh) | 排程機會預視器 | |
US8799796B2 (en) | System and method for generating graphical dashboards with drill down navigation | |
US8063904B2 (en) | Project timeline visualization methods and systems | |
US20130010575A1 (en) | Systems and methods of managing electronic calendar applications | |
US20090235194A1 (en) | Multi-step progress indicator and method for indicating progress in a multi-step computer application | |
JP2012527693A (ja) | トップダウンプロジェクト計画のためのサマリタスク | |
EP2024822A1 (en) | Visual workflow process notation and layout | |
KR20090018927A (ko) | 차트를 포맷하는 방법, 차트를 수정하는 시스템, 및 컴퓨터판독가능 매체 | |
US20100138268A1 (en) | Progress management platform | |
KR20100126508A (ko) | 자원 할당의 일정을 예약하는 사용자 인터페이스 | |
TW200907779A (en) | Method for providing functional context within an actively scrolling view pane | |
US20130009963A1 (en) | Graphical display of data with animation | |
US20130054299A1 (en) | User interface for dynamic workflow state management | |
Seaton | The construction technology handbook | |
CN112598391A (zh) | 业务流程创建方法、装置、电子设备及存储介质 | |
JP2012512459A (ja) | プロジェクトスケジュール視覚化方法及びシステム | |
JP2013242880A (ja) | ワークフロー管理サーバおよびワークフロー管理サーバの制御方法およびプログラムおよび記録媒体 | |
Huang et al. | Visualization techniques for schedule comparison | |
US20130152052A1 (en) | Linking diagnostic visualizations to application code | |
JP6552162B2 (ja) | 情報処理装置、情報処理方法、およびプログラム | |
JP2010244374A (ja) | 組織管理支援装置 | |
JP2006185316A (ja) | 業務分析支援プログラム、業務分析支援装置および業務分析支援方法 | |
US9471901B2 (en) | Accessible white space in graphical representations of information | |
JP2008065428A (ja) | サムネイル表示システム | |
JP2006139751A (ja) | 生産管理装置、生産管理用プログラム及び生産管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20120817 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20121102 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130805 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130813 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20140128 |