JP2010170481A - 製造ラインの工程管理方法および工程管理システム - Google Patents
製造ラインの工程管理方法および工程管理システム Download PDFInfo
- Publication number
- JP2010170481A JP2010170481A JP2009014490A JP2009014490A JP2010170481A JP 2010170481 A JP2010170481 A JP 2010170481A JP 2009014490 A JP2009014490 A JP 2009014490A JP 2009014490 A JP2009014490 A JP 2009014490A JP 2010170481 A JP2010170481 A JP 2010170481A
- Authority
- JP
- Japan
- Prior art keywords
- processing
- process management
- time
- workpiece
- lot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 120
- 238000007726 management method Methods 0.000 title claims abstract description 75
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 71
- 230000001186 cumulative effect Effects 0.000 claims abstract description 18
- 238000003754 machining Methods 0.000 claims description 20
- 238000004364 calculation method Methods 0.000 abstract description 11
- 238000012384 transportation and delivery Methods 0.000 description 30
- 238000003860 storage Methods 0.000 description 11
- 238000004891 communication Methods 0.000 description 5
- 230000001133 acceleration Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】1以上のワークを複数の処理装置2に臨ませて処理を行う製造ラインの工程管理方法であって、各処理装置2の処理履歴から求めた各処理装置2の平均実処理時間を取得する実処理時間取得ステップと、ワークごとに、ワークの製造工程において、現時点以降に当該ワークを臨ませる各処理装置2の平均実処理時間を順に累積した累積値を算出する累積値算出ステップと、ワークごとに、目標となる目標製造時間から、平均実処理時間の累積値を徐算して、必要な加工倍率を算出する加工倍率算出ステップと、を備え、算出した各加工倍率に基づいて、ワーク製造における工程管理を行う。
【選択図】図1
Description
Claims (4)
- 1以上のワークを複数の処理装置に臨ませて処理を行う製造ラインの工程管理方法であって、
前記各処理装置の処理履歴から求めた前記各処理装置の平均実処理時間を取得する実処理時間取得ステップと、
前記ワークごとに、前記ワークの製造工程において、前記現時点以降に前記当該ワークを臨ませる前記各処理装置の前記平均実処理時間を順に累積した累積値を算出する累積値算出ステップと、
前記ワークごとに、目標となる目標製造時間から、前記平均実処理時間の累積値を徐算して、必要な加工倍率を算出する加工倍率算出ステップと、を備え、
算出した前記各加工倍率に基づいて、ワーク製造における工程管理を行うことを特徴とする製造ラインの工程管理方法。 - 前記ワークごとに、前記加工倍率を表示する加工倍率表示ステップを、更に備えたことを特徴とする請求項1に記載の製造ラインの工程管理方法。
- 前記ワークごとの前記加工倍率に基づいて、前記各処理装置における処理優先度を判断する優先度判断ステップを、更に備えたことを特徴とする請求項1または2に記載の製造ラインの工程管理方法。
- 1以上のワークを複数の処理装置に臨ませて処理を行う製造ラインの工程管理システムであって、
前記各処理装置の処理履歴から求めた前記各処理装置の平均実処理時間を取得する実処理時間取得手段と、
前記ワークごとに、前記ワークの製造工程において、前記現時点以降に当該ワークを臨ませる前記各処理装置の前記平均実処理時間を順に累積した累積値を算出する累積値算出手段と、
前記ワークごとに、目標となる目標製造時間から、前記平均実処理時間の累積値を徐算して、必要な加工倍率を算出する加工倍率算出手段と、を備え、
算出した前記各加工倍率に基づいて、ワーク製造における工程管理を行うことを特徴とする製造ラインの工程管理システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009014490A JP5359312B2 (ja) | 2009-01-26 | 2009-01-26 | 製造ラインの工程管理方法および工程管理システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009014490A JP5359312B2 (ja) | 2009-01-26 | 2009-01-26 | 製造ラインの工程管理方法および工程管理システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010170481A true JP2010170481A (ja) | 2010-08-05 |
JP5359312B2 JP5359312B2 (ja) | 2013-12-04 |
Family
ID=42702560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009014490A Expired - Fee Related JP5359312B2 (ja) | 2009-01-26 | 2009-01-26 | 製造ラインの工程管理方法および工程管理システム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5359312B2 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014070891A (ja) * | 2012-09-28 | 2014-04-21 | Technoalpin Holding Spa | 人工雪製造プラントのための制御システム |
CN116167593A (zh) * | 2023-04-21 | 2023-05-26 | 鲁东大学 | 用于零等待作业车间调度的工件加工时刻获取方法及设备 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0966442A (ja) * | 1995-08-30 | 1997-03-11 | Nec Yamagata Ltd | 工程管理装置 |
JPH1050571A (ja) * | 1996-08-05 | 1998-02-20 | Nec Corp | 生産制御方法及び生産制御装置 |
-
2009
- 2009-01-26 JP JP2009014490A patent/JP5359312B2/ja not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0966442A (ja) * | 1995-08-30 | 1997-03-11 | Nec Yamagata Ltd | 工程管理装置 |
JPH1050571A (ja) * | 1996-08-05 | 1998-02-20 | Nec Corp | 生産制御方法及び生産制御装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014070891A (ja) * | 2012-09-28 | 2014-04-21 | Technoalpin Holding Spa | 人工雪製造プラントのための制御システム |
CN116167593A (zh) * | 2023-04-21 | 2023-05-26 | 鲁东大学 | 用于零等待作业车间调度的工件加工时刻获取方法及设备 |
CN116167593B (zh) * | 2023-04-21 | 2023-08-04 | 鲁东大学 | 用于零等待作业车间调度的工件加工时刻获取方法及设备 |
Also Published As
Publication number | Publication date |
---|---|
JP5359312B2 (ja) | 2013-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111984426B (zh) | 任务调度方法、装置、电子设备及存储介质 | |
EP3502814B1 (en) | Processing loads balancing of control and monitoring functions | |
CN107862469B (zh) | 精密加工触屏可视化操作管理方法、移动终端和介质 | |
JP5779537B2 (ja) | 生産シミュレーション装置、生産シミュレーション方法及び、生産シミュレーションプログラム | |
JP7509659B2 (ja) | 生産情報管理システムおよび生産情報管理方法 | |
JP5196991B2 (ja) | 製造工程管理装置、製造工程管理方法、及びコンピュータプログラム | |
JP5359312B2 (ja) | 製造ラインの工程管理方法および工程管理システム | |
JP2016181039A (ja) | 計画決定方法、計画決定プログラムおよび計画決定装置 | |
JP5758166B2 (ja) | 処理支援装置及び方法、半導体の製造支援装置及び方法、並びにプログラム | |
JP5359311B2 (ja) | ワークの製造時間予測方法、製造日時予測方法、到達時間予測方法および到達日時予測方法、並びにワークの製造時間予測装置および到達時間予測装置 | |
CN111931965A (zh) | 疫苗接种的推荐方法、装置、电子设备及存储介质 | |
CN111191999A (zh) | 产品研发管理方法、装置、计算机设备及存储介质 | |
JP5455049B2 (ja) | 優先度決定装置 | |
JP2008250826A (ja) | プロセス管理システム、プロセス管理方法及びプロセス管理プログラム | |
US20190235467A1 (en) | Machining time prediction device | |
JP5839662B2 (ja) | 納期達成条件自動検証システム | |
JP4966631B2 (ja) | 工程管理支援方法、工程管理支援プログラム、および、工程管理支援装置 | |
JP2011018738A (ja) | 生産管理システム | |
JP4945010B1 (ja) | 半導体の製造ラインにおける棚管理システムおよび棚管理プログラム | |
JP2021093053A (ja) | 作業指示システムおよび作業指示方法 | |
WO2023176416A1 (ja) | 情報処理方法及び情報処理装置 | |
JP2008077370A (ja) | 生産管理システムおよび生産管理方法 | |
JP7221796B2 (ja) | 生産管理装置及び方法 | |
JP2013164645A (ja) | 情報出力装置、情報出力方法、及びプログラム | |
JP2019101598A (ja) | 中間在庫量監視装置および方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20111205 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130117 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130122 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130325 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20130325 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20130325 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130806 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130819 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5359312 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |