JP2010001730A - Replacing guard fence column for bridge in existing ground-covering concrete - Google Patents

Replacing guard fence column for bridge in existing ground-covering concrete Download PDF

Info

Publication number
JP2010001730A
JP2010001730A JP2009065734A JP2009065734A JP2010001730A JP 2010001730 A JP2010001730 A JP 2010001730A JP 2009065734 A JP2009065734 A JP 2009065734A JP 2009065734 A JP2009065734 A JP 2009065734A JP 2010001730 A JP2010001730 A JP 2010001730A
Authority
JP
Japan
Prior art keywords
anchor bolt
concrete
ground
bolt insertion
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009065734A
Other languages
Japanese (ja)
Other versions
JP5663142B2 (en
Inventor
Katsuhiko Takagi
勝彦 高木
Hiromichi Fukuda
宏道 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fm Railing Kk
Original Assignee
Fm Railing Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fm Railing Kk filed Critical Fm Railing Kk
Priority to JP2009065734A priority Critical patent/JP5663142B2/en
Publication of JP2010001730A publication Critical patent/JP2010001730A/en
Application granted granted Critical
Publication of JP5663142B2 publication Critical patent/JP5663142B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a replacing guard fence column for a bridge in an existing ground-covering concrete in which a hole shape for inserting an anchoring bolt inserted through the plate of the guard fence column is formed so that a hole position of the anchoring bolt can be adjustable to the plate. <P>SOLUTION: In the gurard fence column 1 for the bridge, an anchoring bolt 4 is embedded in the existing ground-covering concrete 3 where the existing guard fence is removed, and the guard fence column is erected on a top face of the ground-covering concrete 3 by the anchoring bolt 4. In holes 5 for inserting the anchoring bolt formed in a plate 2, at least one of which the long holes formed on lateral side along the longitudinal direction of the ground-covering concrete 3 is formed at a tilt angle against the longitudinal direction of the ground-covering concrete 3. <P>COPYRIGHT: (C)2010,JPO&amp;INPIT

Description

本発明は、既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱に関する。詳しくは既設の地覆コンクリートに埋設される鉄筋に当たることなくアンカーボルトを設置することを実現する既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱に係るものである。   The present invention relates to a protective fence post for a bridge for replacement in existing underground concrete. Specifically, the present invention relates to a protective fence post for a bridge for replacement in existing ground concrete that realizes the installation of anchor bolts without hitting a reinforcing bar buried in the existing ground concrete.

橋梁用防護柵は、自動車が誤って衝突しても、乗用車の安全を図ると共に、その車体が車道の外に飛び出す事態を防ぐため、衝突エネルギーを吸収すると共に、破断しないことが求められている。
そして、従来の橋梁用防護柵の施工は、例えば特許文献1に記載されている。具体的には図9に示すように、車道の路肩に橋梁用防護柵支柱105を立設するための地覆コンクリート101が設置され、この地覆コンクリート101内には鉄筋(図示せず。)が配筋され、この鉄筋と当接しない位置にアンカーボルト103が配置された状態で地覆コンクリート101が形成されている。
Bridge guard fences are required to absorb collision energy and not break, in order to ensure the safety of passenger cars and prevent the car body from jumping out of the roadway even if a car accidentally collides. .
And the construction of the conventional guard fence for bridges is described in patent document 1, for example. Specifically, as shown in FIG. 9, a ground concrete 101 for erecting a bridge guard fence column 105 is installed on the shoulder of the roadway, and a reinforcing bar (not shown) is provided in the ground concrete 101. The ground-covering concrete 101 is formed in a state where the anchor bolts 103 are arranged at positions where the reinforcing bars are not in contact with the reinforcing bars.

また、図10に示すように、地覆コンクリート101内に配筋された鉄筋(図示せず。)と当接しないように抜け防止板102が設けられた防護柵支柱105が埋設されている。   Further, as shown in FIG. 10, a protective fence column 105 provided with a removal prevention plate 102 is embedded so as not to come into contact with a reinforcing bar (not shown) arranged in the ground concrete 101.

このような橋梁用防護柵は風雨に晒されることによる老朽化や事故などによる破損によって取り替える必要が生じてくる。この際の橋梁用防護柵の取替え作業では掘削機などで既存の地覆コンクリートおよび橋梁用防護柵を取り崩して新たな地覆コンクリートを施工して橋梁用防護柵を取り付けている。   Such bridge protection fences need to be replaced due to aging or damage due to accidents caused by exposure to wind and rain. In the replacement work of the guard fence for the bridge at this time, an existing excavation machine or the like is used to destroy the existing cover concrete and the guard fence for the bridge, to construct a new cover concrete, and to attach the guard fence for the bridge.

ところが、橋梁用防護柵の取替え作業では既存の地覆コンクリートの取崩し、および新たな地覆コンクリートの施工のために工事期間が長くなり、工事期間中には片側通行などによる長期の交通規制を行わなければならない問題が生ずる。   However, the replacement work of the protective fences for bridges requires the construction period to be long due to the collapse of the existing underground concrete and the construction of new underground concrete. During the construction period, long-term traffic regulations such as one-sided traffic are performed. Problems that must be generated arise.

また、橋梁用防護柵の取替えのために地覆コンクリートを取り壊し、新たに地覆コンクリートを施工するのは工事費の負担がかかるというのが現状である。   In addition, the current situation is that it is incurred in the construction cost to demolish the ground-covering concrete and replace the ground-covering concrete in order to replace the protective fence for the bridge.

そのため、既存の地覆コンクリート上の橋梁用防護柵を取外した後に、新たな橋梁用防護柵を取り付ける取替工事が提案されている。この取替え工事では橋梁用防護柵の解体を行った後に、橋梁用防護柵支柱と地覆コンクリート上面との境界線上をガスバーナー等により切断し地覆コンクリート内に橋梁用防護柵支柱の根元部分を残置した状態で、残置穴にモルタル等を流し込んで地覆コンクリート上面と同一面に補修した後に新たな橋梁用防護柵の取り付け工事が行われている。   Therefore, replacement work for installing a new bridge protection fence after removing the bridge protection fence on the existing concrete has been proposed. In this replacement work, after dismantling the bridge guard fence, the boundary line between the bridge guard fence and the top surface of the concrete is cut with a gas burner, etc., and the base part of the bridge guard fence is placed in the ground concrete. After the mortar is poured into the remaining hole and repaired to the same surface as the top surface of the concrete, the installation work of a new protection fence for the bridge is being carried out.

なお、この新たな橋梁用防護柵の取り付け工事では図11に示すように、地覆コンクリート101内に鉄筋104が縦横に埋設されているために、この鉄筋104に当接しない位置にアンカーボルト穴(図示せず。)を穿孔する必要がある。   As shown in FIG. 11, in this new work for installing the guard fence for bridges, since the reinforcing bars 104 are embedded vertically and horizontally in the ground-covered concrete 101, anchor bolt holes are provided at positions where they do not contact the reinforcing bars 104. (Not shown) needs to be drilled.

特開2001−234515号公報JP 2001-234515 A

しかしながら、橋梁用防護柵支柱105のプレート板106に貫設される4個のアンカーボルト挿通用穴107の位置は予め決まっており、これらのアンカーボルト挿通用穴107に対応するアンカーボルト穴(図示せず。)を鉄筋104に当接しない位置に穿孔し、アンカーボルト103を埋め込むには超音波装置等によって鉄筋104の位置を確かめながら全てのアンカーボルト挿通用穴107に対応するアンカーボルト穴が鉄筋104に当たらない位置となるように設定しなければならず非常に煩雑な作業となる問題がある。   However, the positions of the four anchor bolt insertion holes 107 penetrating the plate plate 106 of the bridge guard fence column 105 are determined in advance, and the anchor bolt holes corresponding to these anchor bolt insertion holes 107 (see FIG. In order to embed the anchor bolt 103, the anchor bolt holes corresponding to all the anchor bolt insertion holes 107 are confirmed while confirming the position of the reinforcing bar 104 with an ultrasonic device or the like. There is a problem that it is necessary to set the position so as not to hit the reinforcing bar 104, which is a very complicated operation.

本発明は、以上の点に鑑みて創案されたものであって、橋梁用防護柵支柱底面に設けられたプレート板に貫設されるアンカーボルト挿通用穴の形状を、これに対するアンカーボルト穴の位置を任意方向に調整できるように形成した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱を提供することを目的とするものである。   The present invention was devised in view of the above points, and the shape of an anchor bolt insertion hole penetrating through a plate plate provided on the bottom surface of a bridge protection fence post is defined as an anchor bolt hole corresponding thereto. It is an object of the present invention to provide a protective fence post for a bridge for replacement in existing underground concrete formed so that the position can be adjusted in an arbitrary direction.

上記の目的を達成するために、本発明に係る既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱は、既設の防護柵が取り除かれた既設の地覆コンクリート上に立設される既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱において、橋梁用防護柵支柱底面に設けられたアンカーボルトに挿通可能なアンカーボルト挿通用穴が開設されたプレート板を有し、プレート板に開設されたアンカーボルト挿通用穴は、地覆コンクリートの長手方向に沿って長穴に形成される。   In order to achieve the above-described object, the bridge guard fence post for replacement in the existing cover concrete according to the present invention is provided on the existing cover concrete from which the existing guard fence is removed. In the protective fence post for bridges for replacement in underground concrete, it has a plate plate with an anchor bolt insertion hole that can be inserted into the anchor bolt provided on the bottom of the protective fence post for bridge, and is opened in the plate plate The anchor bolt insertion hole is formed into a long hole along the longitudinal direction of the ground concrete.

ここで、地覆コンクリートの長手方向に配筋される鉄筋と直角状に配筋される鉄筋に対して、プレート板に地覆コンクリートの長手方向に沿ったアンカーボルト挿通用穴を設置することによりアンカーボルト挿通用穴におけるアンカーボルト設置位置を左右方向へ移動させることにより鉄筋に当接することなくアンカーボルトの埋設が可能となる。   Here, by installing anchor bolt insertion holes along the longitudinal direction of the ground concrete in the plate plate for the reinforcing bars that are perpendicular to the longitudinal direction of the ground concrete. By moving the anchor bolt installation position in the anchor bolt insertion hole in the left-right direction, the anchor bolt can be embedded without coming into contact with the reinforcing bar.

また、プレート板に開設されたアンカーボルト挿通用穴は、地覆コンクリートの長手方向に沿って両側に開設された長穴の少なくとも一方が地覆コンクリートの長手方向に対して傾斜角をもって形成されることにより、地覆コンクリートの長手方向に配筋される鉄筋と直角状に配筋される鉄筋に対して、傾斜角をもって形成される長穴のアンカーボルト挿通用穴におけるアンカーボルト設置位置を前後方向へ移動させることにより鉄筋に当接することなくアンカーボルトの埋設が可能となる。   In addition, the anchor bolt insertion hole provided in the plate plate is formed such that at least one of the long holes provided on both sides along the longitudinal direction of the cover concrete is inclined with respect to the longitudinal direction of the cover concrete. As a result, the anchor bolt installation position in the anchor bolt insertion hole of the long hole formed with an inclination angle with respect to the reinforcing bar arranged at right angles to the reinforcing bar arranged in the longitudinal direction of the cover concrete The anchor bolt can be embedded without being brought into contact with the reinforcing bar.

また、本発明に係る既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱は、既設の防護柵が取り除かれた既設の地覆コンクリート上に立設される既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱において、橋梁用防護柵支柱底面に設けられたアンカーボルトに挿通可能なアンカーボルト挿通用穴が開設されたプレート板を有し、プレート板に開設されたアンカーボルト挿通用穴は、地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が前記地覆コンクリート面に対してアンーボルト設置位置が任意方向へ移動可能となる形状に形成される。   Further, the bridge guard fence post for replacement in the existing underground concrete according to the present invention is used for replacement in the existing underground concrete standing on the existing underground concrete from which the existing protective fence is removed. The bridge guard fence post has a plate plate with an anchor bolt insertion hole that can be inserted into the anchor bolt provided on the bottom of the bridge guard fence post, and the anchor bolt insertion hole established in the plate plate is In addition, at least one of the anchor bolt insertion holes provided on both sides along the longitudinal direction of the ground concrete is formed in a shape that allows the unbolt installation position to move in any direction with respect to the ground concrete surface.

ここで、地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が地覆コンクリートの長手方向に対してアンーボルト設置位置が任意方向へ移動可能となる形状、例えば、L字形状、X字形状等のアンカーボルト挿通穴の形状に形成されることにより、地覆コンクリートの長手方向に配筋される鉄筋と直角状に配筋される鉄筋に対して、アンカーボルト挿通用穴におけるアンカーボルト設置位置を任意方向、例えば地覆コンクリート面に対して前後、左右方向へ移動させることにより鉄筋に当接することなくアンカーボルトの埋設が可能となる。   Here, at least one of the anchor bolt insertion holes opened on both sides along the longitudinal direction of the ground-covering concrete has a shape that allows the unbolt installation position to move in an arbitrary direction with respect to the longitudinal direction of the ground-covering concrete, for example, L Anchor bolt insertion for reinforcing bars that are arranged perpendicularly to the reinforcing bars in the longitudinal direction of the ground-covered concrete by forming the shape of anchor bolt insertion holes such as a letter shape or X shape By moving the anchor bolt installation position in the hole in an arbitrary direction, for example, in the front-rear direction and the left-right direction with respect to the ground concrete surface, the anchor bolt can be embedded without contacting the reinforcing bar.

また、本発明に係る既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱は、既設の防護柵が取り除かれた既設の地覆コンクリート上に立設される既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱において、橋梁用防護柵支柱底面に設けられたアンカーボルトに挿通可能なアンカーボルト挿通用穴が開設されたプレート板を有し、プレート板に開設されたアンカーボルト挿通用穴は、地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が前記地覆コンクリート面に対してアンカーボルト設置位置が任意方向へ移動可能となるように複数のアンカーボルト挿通用穴により形成される。
Further, the bridge guard fence post for replacement in the existing underground concrete according to the present invention is used for replacement in the existing underground concrete standing on the existing underground concrete from which the existing protective fence is removed. The bridge guard fence post has a plate plate with an anchor bolt insertion hole that can be inserted into the anchor bolt provided on the bottom of the bridge guard fence post, and the anchor bolt insertion hole established in the plate plate is A plurality of anchor bolts are inserted such that at least one of the anchor bolt insertion holes provided on both sides along the longitudinal direction of the ground concrete can move the anchor bolt installation position in an arbitrary direction with respect to the ground concrete surface. It is formed by a common hole.

ここで、プレート板に開設されたアンカーボルト挿通用穴は、地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が前記地覆コンクリートの長手方向に対してアンカーボルト設置位置が前後左右方向へ移動可能となるように複数のアンカーボルト挿通用穴により形成されることにより、地覆コンクリートの長手方向に配筋される鉄筋と直角状に配筋される鉄筋に対して、複数のアンカーボルト挿通用穴から鉄筋に当接しない位置のアンカーボルト挿通用穴を選択することにより鉄筋に当接することなくアンカーボルトの埋設が可能となる。   Here, the anchor bolt insertion hole provided in the plate plate is such that at least one of the anchor bolt insertion holes provided on both sides along the longitudinal direction of the ground concrete is anchor bolt with respect to the longitudinal direction of the ground concrete. By forming a plurality of anchor bolt insertion holes so that the installation position can be moved in the front / rear / right / left direction, the reinforcing bars are arranged perpendicularly to the reinforcing bars arranged in the longitudinal direction of the underground concrete. By selecting an anchor bolt insertion hole at a position that does not contact the reinforcing bar from a plurality of anchor bolt insertion holes, the anchor bolt can be embedded without contacting the reinforcing bar.

本発明の既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱は、既設の地覆コンクリートを取り壊さずに橋梁用防護柵の取替えを可能とするために、工期が短縮され、かつ新設の防護柵のみの資材となることから大幅なコスト低減が可能となる。   The bridge protection fence post for replacement of the existing cover concrete of the present invention can be replaced with the protection fence for the bridge without destroying the existing cover concrete. Since it is only a fence material, a significant cost reduction is possible.

また、防護柵支柱のプレート板に貫設されるアンカーボルト挿通用穴の形状が地覆コンクリートの長手方向に沿って長穴に形成されることにより、アンカーボルトの取り付け位置を任意方向に調整することができるように形成されることによりアンカーボルトを地覆コンクリート内に埋設される鉄筋に当接させることなくアンカーボルト穴の穿孔並びに設置が可能となる。   Moreover, the anchor bolt insertion position is adjusted to an arbitrary direction by forming the shape of the anchor bolt insertion hole penetrating the plate plate of the protective fence column into a long hole along the longitudinal direction of the underground concrete. By being formed so that the anchor bolt can be formed, the anchor bolt hole can be drilled and installed without causing the anchor bolt to abut against a reinforcing bar embedded in the underground concrete.

また、地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が地覆コンクリートの長手方向に対してアンーボルト設置位置が任意方向へ移動可能となる形状に形成されることにより、地覆コンクリートの長手方向に配筋される鉄筋と直角状に配筋される鉄筋に対して、アンカーボルト挿通用穴におけるアンカーボルト設置位置を任意方向へ移動させることにより鉄筋に当接することなくアンカーボルトの埋設が可能となる。   Also, at least one of the anchor bolt insertion holes established on both sides along the longitudinal direction of the ground-covering concrete is formed in a shape that allows the unbolt installation position to move in any direction with respect to the longitudinal direction of the ground-covering concrete. By moving the anchor bolt installation position in the anchor bolt insertion hole in an arbitrary direction with respect to the reinforcing bars arranged at right angles to the reinforcing bars arranged in the longitudinal direction of the ground-covering concrete, contact the reinforcing bars It is possible to embed anchor bolts.

また、地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が複数のアンカーボルト挿通用穴により形成されることにより、地覆コンクリートの長手方向に配筋される鉄筋と直角状に配筋される鉄筋に対して、複数のアンカーボルト挿通用穴から鉄筋に当接しない位置のアンカーボルト挿通用穴を選択することにより鉄筋に当接することなくアンカーボルトの埋設が可能となる。   Further, at least one of the anchor bolt insertion holes formed on both sides along the longitudinal direction of the underground concrete is formed by a plurality of anchor bolt insertion holes, thereby reinforcing the reinforcing bars arranged in the longitudinal direction of the underground concrete. Anchor bolts can be embedded without contacting the reinforcing bars by selecting the anchor bolt insertion holes that do not contact the reinforcing bars from the multiple anchor bolt insertion holes for the reinforcing bars that are arranged perpendicular to It becomes.

本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱の一例を示す説明図である。It is explanatory drawing which shows an example of the protection fence support | pillar for bridges for replacement in the existing underground concrete to which this invention is applied. 本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱のプレート板に貫設されるアンカーボルト挿通用穴のそれぞれの形態を示す説明図である。It is explanatory drawing which shows each form of the anchor bolt penetration hole penetrated by the plate board of the guard fence post for bridges in the existing underground concrete to which this invention is applied. 本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱のプレート板に貫設されるアンカーボルト挿通用穴のそれぞれの形態を示す説明図である。It is explanatory drawing which shows each form of the anchor bolt penetration hole penetrated by the plate board of the guard fence post for bridges in the existing underground concrete to which this invention is applied. 本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱のプレート板に貫設されるアンカーボルト挿通用穴のそれぞれの形態を示す説明図である。It is explanatory drawing which shows each form of the anchor bolt penetration hole penetrated by the plate board of the guard fence post for bridges in the existing underground concrete to which this invention is applied. 本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱のプレート板に貫設されるアンカーボルト挿通用穴の他の形態を示す説明図である。It is explanatory drawing which shows the other form of the hole for anchor bolt penetration penetrated by the plate plate of the protection fence post for bridges in the existing underground concrete to which this invention is applied. 既存の橋梁用防護柵支柱の取り外し工程を示す説明図である。It is explanatory drawing which shows the removal process of the existing guard fence support | pillar for bridges. 既存の地覆コンクリート上での橋梁用防護柵支柱の取り付けの一例を示す説明図である。It is explanatory drawing which shows an example of attachment of the guard fence support | pillar for bridges on the existing underground concrete. 既存の地覆コンクリート上での橋梁用防護柵支柱の取り付けの一例を示す説明図である。It is explanatory drawing which shows an example of attachment of the guard fence support | pillar for bridges on the existing underground concrete. 既存の地覆コンクリート上での橋梁用防護柵支柱の取り付けの一例を示す説明図である。It is explanatory drawing which shows an example of attachment of the guard fence support | pillar for bridges on the existing underground concrete. 本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱におけるアンカーボルトの設置工程の一例を示す説明図である。It is explanatory drawing which shows an example of the installation process of the anchor bolt in the guard fence pillar for bridge | bridging for replacement | exchange in the existing underground concrete to which this invention is applied. 従来の橋梁用防護柵支柱の取り付けの一例を示す説明図である。It is explanatory drawing which shows an example of the attachment of the conventional protection fence support | pillar for bridges. 従来の橋梁用防護柵支柱の取り付けの他の例を示す説明図である。It is explanatory drawing which shows the other example of the attachment of the conventional protection fence support | pillar for bridges. 従来の既設の地覆コンクリートにおける橋梁用防護柵支柱の取り付けの一例を示す説明図である。It is explanatory drawing which shows an example of the attachment of the guard fence support | pillar for bridges in the conventional existing ground-cover concrete.

以下、本発明の実施の形態を図面を参酌しながら説明し、本発明の理解に供する。
図1は、本発明を適用した既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱の一例を示す説明図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings to provide an understanding of the present invention.
FIG. 1 is an explanatory diagram showing an example of a bridge protection fence post for replacement in existing ground-covered concrete to which the present invention is applied.

ここで示す橋梁用防護柵支柱1は、断面H型のダクタイル鋳鉄、あるいは鋼製、アルミニウム製、ステンレス製などにより形成され、その底面には四辺形状のプレート板2が設けられている。   The bridge guard fence post 1 shown here is formed of ductile cast iron having an H-shaped section, or made of steel, aluminum, stainless steel, and the like, and a plate plate 2 having a quadrilateral shape is provided on the bottom surface thereof.

このプレート板2は、地覆コンクリート3にその基部が埋設されたアンカーボルト4の配置状態に対応したアンカーボルト挿通用穴5が4個貫設されている。   The plate plate 2 is provided with four anchor bolt insertion holes 5 corresponding to the arrangement state of the anchor bolts 4 whose base portions are embedded in the ground concrete 3.

ここで、図2A(A)は、プレート板2に貫設されるアンカーボルト挿通用穴5の一例を示すものであり、プレート板2に貫設されるアンカーボルト挿通用穴5は、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は十文字状に形成されている。   Here, FIG. 2A (A) shows an example of the anchor bolt insertion hole 5 penetrating the plate plate 2, and the anchor bolt insertion hole 5 penetrating the plate plate 2 has a ground cover. The anchor bolt insertion hole 5 on the roadway side is formed as a long hole along the longitudinal direction of the concrete 3, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed in a cross shape.

また、図2A(B)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5はU字状に形成されている。   FIG. 2A (B) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed in a U shape.

また、図2A(C)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対して直角状となる長穴が2個それぞれに形成されている。   FIG. 2A (C) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed with two long holes that are perpendicular to the respective anchor bolt insertion holes 5 on the roadway side. Yes.

また、図2A(D)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対して丸穴の4個がそれぞれに形成されている。   2A (D) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. FIG. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed with four round holes for each anchor bolt insertion hole 5 on the roadway side.

また、図2B(E)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対して平行となる長穴が2個それぞれに形成されている。   FIG. 2B (E) shows another example of the anchor bolt insertion hole 5 provided in the plate plate 2, and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The holes 5 are formed as long holes, and the anchor bolt insertion holes 5 on the opposite side of the roadway are each formed with two long holes parallel to the respective anchor bolt insertion holes 5 on the roadway side. .

また、図2B(F)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対してハ字方向となる長穴が形成されている。   FIG. 2B (F) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed with a long hole that is in a C-shaped direction with respect to each anchor bolt insertion hole 5 on the roadway side.

また、図2B(G)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対して略45度に折り曲げられた長穴が形成されている。   FIG. 2B (G) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed with a long hole bent at about 45 degrees with respect to each anchor bolt insertion hole 5 on the roadway side. .

また、図2B(H)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対して略直角に長穴が形成されている。   FIG. 2B (H) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The holes 5 are formed as long holes, and the anchor bolt insertion holes 5 on the opposite side of the roadway are formed at right angles to the respective anchor bolt insertion holes 5 on the roadway side.

また、図2C(I)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5の一端に対してハ字方向となる長穴が形成されている。   FIG. 2C (I) shows another example of the anchor bolt insertion hole 5 provided in the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed with an elongated hole that is in a C-shaped direction with respect to one end of each anchor bolt insertion hole 5 on the roadway side. .

また、図2C(J)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5の一端に対して略90度の角度で折り曲げられた長穴が形成されている。   FIG. 2C (J) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2 and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. The hole 5 is formed as a long hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway has a long hole bent at an angle of about 90 degrees with respect to one end of each anchor bolt insertion hole 5 on the roadway side. Is formed.

また、図2C(K)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側のアンカーボルト挿通用穴5は長穴に形成されると共に車道の反対側のアンカーボルト挿通用穴5は車道側のそれぞれのアンカーボルト挿通用穴5に対してX字状に形成されている。   2C (K) shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2, and is used for inserting the anchor bolt on the roadway side along the longitudinal direction of the ground covering concrete 3. FIG. The hole 5 is formed as an elongated hole, and the anchor bolt insertion hole 5 on the opposite side of the roadway is formed in an X shape with respect to each anchor bolt insertion hole 5 on the roadway side.

また、図3(A)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側および車道の反対側のそれぞれのアンカーボルト挿通用穴5がハ字方向となる長穴が形成されている。   FIG. 3A shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2, and the roadway side and the opposite side of the roadway along the longitudinal direction of the ground covering concrete 3. Each of the anchor bolt insertion holes 5 is formed with an elongated hole in a C-shaped direction.

また、図3(B)は、プレート板2に貫設されるアンカーボルト挿通用穴5の他の例を示すものであり、地覆コンクリート3の長手方向に沿って車道側にそれぞれ2個の丸穴が形成されると共に、車道側の2個の丸穴に対して車道の反対側には4個の丸穴がそれぞれに形成されている。   FIG. 3B shows another example of the anchor bolt insertion hole 5 penetrating the plate plate 2. Two anchor bolts are provided on the roadway side along the longitudinal direction of the ground covering concrete 3. Round holes are formed, and four round holes are formed on the opposite side of the roadway with respect to the two round holes on the roadway side.

次に、図4〔図4(A)は、橋梁用防護柵支柱1の設置状態を示し、図4(B)は、橋梁用防護柵支柱1の溶断状態を示し、図4(C)は、地覆コンクリート3内における残置穴の状態を示す。〕に示すように、既設の防護柵6は、道路の路肩に設けられる地覆コンクリート3上に立設された橋梁用防護柵支柱1間にボルト・ナットなどの締結部材によって取り付けられ、更に橋梁用防護柵支柱1は平板状.の抜け防止板7が基部に一体的に取り付けられた状態で地覆コンクリート3内に埋設されている。   Next, FIG. 4 [FIG. 4 (A) shows the installation state of the guard fence post 1 for bridges, FIG. 4 (B) shows the fusing state of the guard fence post 1 for bridges, and FIG. The state of the remaining hole in the ground covering concrete 3 is shown. As shown in FIG. 2, the existing protective fence 6 is attached by a fastening member such as a bolt and a nut between the bridge protective fence columns 1 erected on the cover concrete 3 provided on the shoulder of the road. The protective fence post 1 is embedded in the ground-covering concrete 3 with a flat plate-shaped drop prevention plate 7 attached integrally to the base.

そして橋梁用防護柵支柱1間に渡設される各種レール8を取外して橋梁用防護柵支柱1のみとする。そして地覆コンクリート3より露出する橋梁用防護柵支柱1の地覆コンクリート3との境界線上をガスバーナーによって溶断する。この場合には、ガスバーナーによって溶断した後に残置される橋梁用防護柵支柱1の上端が地覆コンクリート3より露出しないように更に切り下げるなどの作業を行う。   Then, the various rails 8 provided between the bridge guard fence posts 1 are removed so that only the bridge guard fence posts 1 are provided. Then, the gas barrier burns the boundary line between the protective fence support 1 for the bridge exposed from the ground concrete 3 and the ground concrete 3. In this case, the work such as further cutting down is performed so that the upper end of the bridge guard fence post 1 left after being melted by the gas burner is not exposed from the ground covering concrete 3.

そこで地覆コンクリート3より露出する橋梁用防護柵支柱1を溶断することにより残置穴9が開口されることになる。この残置穴9内をプライマー塗布並びに錆止めを行い、残置穴9内にモルタル10を充填して地覆コンクリート3の上面と同一面とし、新設の防護柵を取り付けるための取替準備工程を行うものである。   Therefore, the remaining hole 9 is opened by fusing the bridge guard fence post 1 exposed from the ground covering concrete 3. The inside of the remaining hole 9 is coated with primer and rust-prevented, and the remaining hole 9 is filled with mortar 10 so that it is flush with the upper surface of the ground concrete 3 and a replacement preparation process is performed for attaching a new protective fence. It is.

次に、図5〔図5(A)は、既存の地覆コンクリート上での橋梁用防護柵支柱の取り付けの一例を示し、図5(B)は、既存の地覆コンクリート上での橋梁用防護柵支柱の取り付けの他の例を示す。〕に示すように、前記取替準備工程により既設の橋梁用防護柵支柱1が取り除かれた既設の地覆コンクリート3内には既設の鉄筋11が縦横に配筋されている。このような地覆コンクリート3上面に橋梁用防護柵支柱1を所定間隔ごとに立設するものであるが、その前処理として、プレート板2に模した厚紙、鉄板あるいは木製の板により形成したテンプレート(図示せず。)によって地覆コンクリート3の長手方向に沿って一定間隔ごとに橋梁用防護柵支柱1のプレート板2の位置決めを行うと共に、プレート板2のアンカーボルト挿通用穴5の縁取りを行い、各アンカーボルト挿通用穴5の橋梁用防護柵支柱1のセンターに近い位置に仮の穿孔目印を付すものである。   Next, FIG. 5 [FIG. 5 (A) shows an example of attachment of a guard fence post for bridges on existing underground concrete, and FIG. 5 (B) is for bridges on existing underground concrete. The other example of the attachment of a guard fence post is shown. As shown in FIG. 2, existing reinforcing bars 11 are arranged vertically and horizontally in the existing underground concrete 3 from which the existing bridge guard fence post 1 has been removed in the replacement preparation step. The guard fence post 1 for the bridge is erected at predetermined intervals on the top surface of the ground-covering concrete 3 as a pre-treatment, and a template formed by cardboard, iron plate or wooden plate imitating the plate plate 2 (Not shown), the plate plate 2 of the guard fence post 1 for the bridge is positioned at regular intervals along the longitudinal direction of the cover concrete 3 and the edge of the anchor bolt insertion hole 5 of the plate plate 2 is trimmed. The temporary drilling mark is attached at a position close to the center of the bridge guard fence post 1 of each anchor bolt insertion hole 5.

例えば、図5(A)の場合には、車道の反対側のアンカーボルト挿通用穴5が車道側のアンカーボルト挿通用穴5に対してハの字状に傾斜されており、また、図5(B)の場合には、車道側のアンカーボルト挿通用穴5が車道の反対側のアンカーボルト挿通用穴5に対してハの字状に傾斜されている。   For example, in the case of FIG. 5A, the anchor bolt insertion hole 5 on the opposite side of the roadway is inclined in a C shape with respect to the anchor bolt insertion hole 5 on the roadway side. In the case of (B), the anchor bolt insertion hole 5 on the roadway side is inclined in a C shape with respect to the anchor bolt insertion hole 5 on the opposite side of the roadway.

ここで、地覆コンクリート3上面に仮のアンカーボルト(図示せず。)の埋設位置の目印を付した後に、テンプレートを地覆コンクリート3上面より外し、ドリル等により穿孔する。例えば、車道側の鉄筋11にドリル(図示せず。)が当接した場合には、穿孔を取り止めて鉄筋の直径(16mm、あるいは13mm)分だけアンカーボルト挿通用穴5の縁取り内にてズラした状態での穿孔を行う。また、車道の反対側の鉄筋11Aにドリルが当接した場合には、穿孔を取り止めて鉄筋の直径(16mm、あるいは13mm)分だけアンカーボルト挿通用穴5の縁取り内にてズラすことで鉄筋への当接を回避することができアンカーボルト設置穴(図示せず。)を穿孔することが可能となる。   Here, after marking the position where the temporary anchor bolt (not shown) is embedded on the upper surface of the ground concrete 3, the template is removed from the top surface of the ground concrete 3 and drilled with a drill or the like. For example, when a drill (not shown) comes into contact with the reinforcing bar 11 on the roadway side, the perforation is stopped, and the anchor bolt insertion hole 5 is displaced within the rim of the anchor bolt insertion hole 5 by the diameter (16 mm or 13 mm) of the reinforcing bar. Perforation is performed in the state. Further, when the drill comes into contact with the reinforcing bar 11A on the opposite side of the roadway, the drilling is stopped and the reinforcing bar is displaced within the rim of the anchor bolt insertion hole 5 by the diameter of the reinforcing bar (16 mm or 13 mm). It is possible to avoid contact with the anchor bolt, and it is possible to drill an anchor bolt installation hole (not shown).

また、図6に示すように、テンプレート(図示せず。)によって地覆コンクリート3の長手方向に沿って一定間隔ごとに橋梁用防護柵支柱1のプレート板2の位置決めを行うと共に、プレート板2のアンカーボルト挿通用穴5の縁取りを行い、各アンカーボルト挿通用穴5の橋梁用防護柵支柱1のセンターに近い位置に仮の穿孔目印を付すものである。
ここで、地覆コンクリート3上面に仮のアンカーボルト(図示せず。)の埋設位置の目印を付した後に、テンプレートを地覆コンクリート3上面より外し、ドリル等により穿孔し、ドリル(図示せず。)が鉄筋11、11Aのいずれかに当接した場合には、穿孔を取り止めて鉄筋の直径(16mm、あるいは13mm)分だけアンカーボルト挿通用穴5の縁取り内にてズラすことで鉄筋への当接を回避することができアンカーボルト設置穴(図示せず。)を穿孔することが可能となる。
Moreover, as shown in FIG. 6, while positioning the plate plate 2 of the guard fence post 1 for bridges at regular intervals along the longitudinal direction of the ground concrete 3 with a template (not shown), the plate plate 2 The anchor bolt insertion holes 5 are trimmed, and a temporary perforation mark is attached to a position of each anchor bolt insertion hole 5 near the center of the bridge guard fence post 1.
Here, after marking the position of the temporary anchor bolt (not shown) on the upper surface of the ground concrete 3, the template is removed from the upper surface of the ground concrete 3, drilled with a drill or the like, and the drill (not shown). .) Is in contact with either of the reinforcing bars 11 and 11A, the perforation is stopped and the inside of the anchor bolt insertion hole 5 is displaced by the diameter of the reinforcing bar (16 mm or 13 mm) to the reinforcing bar. Can be avoided, and an anchor bolt installation hole (not shown) can be drilled.

また、図7に示すように、テンプレート(図示せず。)によって地覆コンクリート3の長手方向に沿って一定間隔ごとに橋梁用防護柵支柱1のプレート板2の位置決めを行うと共に、プレート板2のアンカーボルト挿通用穴5の縁取りを行い、各アンカーボルト挿通用穴5の橋梁用防護柵支柱1のセンターに近い位置に仮の穿孔目印を付すものである。
ここで、地覆コンクリート3上面に仮のアンカーボルト(図示せず。)の埋設位置の目印を付した後に、テンプレートを地覆コンクリート3上面より外し、ドリル等により穿孔し、ドリル(図示せず。)が鉄筋11、11Aのいずれかに当接した場合には、穿孔を取り止めて鉄筋の直径(16mm、あるいは13mm)分だけアンカーボルト挿通用穴5の縁取り内にてズラした状態での穿孔を行う、あるいは複数個のアンカーボルト挿通用穴5が形成される場合にはズラした位置のアンカーボルト挿通用穴5を選択することによりアンカーボルト設置穴(図示せず。)を穿孔することが可能となる。
Further, as shown in FIG. 7, the plate (not shown) is used to position the plate 2 of the guard fence post 1 for the bridge at regular intervals along the longitudinal direction of the cover concrete 3, and the plate 2 The anchor bolt insertion holes 5 are trimmed, and a temporary perforation mark is attached to a position of each anchor bolt insertion hole 5 near the center of the bridge guard fence post 1.
Here, after marking the position of the temporary anchor bolt (not shown) on the upper surface of the ground concrete 3, the template is removed from the upper surface of the ground concrete 3, drilled with a drill or the like, and the drill (not shown). .) Is in contact with either of the reinforcing bars 11 and 11A, the drilling is stopped and the drilling is performed in a state where it is displaced within the rim of the anchor bolt insertion hole 5 by the diameter of the reinforcing bar (16 mm or 13 mm). When a plurality of anchor bolt insertion holes 5 are formed, an anchor bolt installation hole (not shown) can be drilled by selecting the anchor bolt insertion hole 5 at a shifted position. It becomes possible.

このように前記図5、図6及び図7において地覆コンクリート3上面にアンカーボルト(図示せず。)の設置穴(図示せず。)を穿孔すると共に、穿孔を取り止めた残置孔に対してはモルタル等を充填して修復を行うものである。   In this way, in FIG. 5, FIG. 6 and FIG. 7, an installation hole (not shown) for anchor bolts (not shown) is drilled on the top surface of the ground concrete 3 and against the remaining holes where the drilling is stopped. Is to repair by filling mortar and the like.

そして図8〔図8(A)は、アンカーボルト設置穴12の穿孔状態を示し、図8(B)は、アンカーボルト設置穴12内への硬化剤の注入状態を示し、図8(C)は、アンカーボルト4の設置状態を示す。〕に示すように、地覆コンクリート3上面の埋設位置の目印をコンクリート穿孔ドリル等によって真下方向へ穿孔してアンカーボルト設置穴12を設ける。更に、アンカーボルト設置穴12内の清掃後、このアンカーボルト設置穴12内に攪拌により硬化するカプセル内に収納された樹脂製硬化剤13を挿入し、アンカーボルト4を電動ハンマードリル14に装着して回転・打撃させて樹脂製硬化剤13を攪拌・混合しながらアンカーボルト設置穴12底面に到達するまで埋め込むことにより地覆コンクリート3上面にアンカーボルト4が突出した状態で取り付けられる。   8 [FIG. 8 (A) shows the drilled state of the anchor bolt installation hole 12, FIG. 8 (B) shows the injection state of the curing agent into the anchor bolt installation hole 12, and FIG. 8 (C). Indicates the installation state of the anchor bolt 4. ], The anchor bolt installation hole 12 is provided by drilling the mark of the embedding position on the upper surface of the ground-covering concrete 3 downward by a concrete drilling drill or the like. Further, after the inside of the anchor bolt installation hole 12 is cleaned, a resin curing agent 13 housed in a capsule that hardens by stirring is inserted into the anchor bolt installation hole 12, and the anchor bolt 4 is attached to the electric hammer drill 14. The anchor bolt 4 is attached to the upper surface of the ground concrete 3 so that the anchor bolt 4 protrudes on the top surface of the ground-concrete concrete 3 by rotating and striking and embedding the resin hardener 13 while stirring and mixing until reaching the bottom surface of the anchor bolt installation hole 12.

次に、地覆コンクリート3にアンカーボルト4を取付けた後に、前記図5、図6及び図7において詳述したように、橋梁用防護柵支柱1のプレート板2のアンカーボルト挿通用穴5をアンカーボルト4に挿通し、ナットなどの締結部材(図示せず。)によってプレート板2を地覆コンクリート3上面に締結固定するものである。   Next, after attaching the anchor bolt 4 to the ground-covering concrete 3, as described in detail with reference to FIGS. 5, 6 and 7, the anchor bolt insertion hole 5 of the plate plate 2 of the guard fence post 1 for the bridge is provided. The plate plate 2 is inserted into the anchor bolt 4 and fastened and fixed to the upper surface of the ground concrete 3 by a fastening member (not shown) such as a nut.

以上の構成よりなる本発明の既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱では、既設の地覆コンクリート上面において地覆コンクリート内に縦横に配筋される鉄筋に対して橋梁用防護柵支柱の位置をズラすことなく、任意方向への移動可能な空間部を有するアンカーボルト挿通用穴により縦横に配筋される鉄筋に当接することなく、アンカーボルト設置穴を穿孔することが可能となる。   In the bridge protection fence post for replacement in the existing cover concrete of the present invention having the above configuration, the bridge protection fence against the reinforcing bars arranged vertically and horizontally in the cover concrete on the upper surface of the existing cover concrete. Without shifting the position of the column, it is possible to drill the anchor bolt installation hole without coming into contact with the reinforcing bars arranged vertically and horizontally by the anchor bolt insertion hole having a space part movable in any direction. Become.

また、任意方向への移動可能な空間部を有するアンカーボルト挿通用穴により従来のように超音波装置等によって鉄筋の位置を確かめながらの作業が不要となることから作業効率が向上することになる。   In addition, the anchor bolt insertion hole having a space portion movable in an arbitrary direction eliminates the need for the work of confirming the position of the reinforcing bar by an ultrasonic device or the like as in the prior art, thereby improving work efficiency. .

1 橋梁用防護柵支柱
2 プレート板
3 地覆コンクリート
4 アンカーボルト
5 アンカーボルト挿通用穴
6 防護柵
7 抜け防止板
8 レール
9 残置穴
10 モルタル
11、11A 鉄筋
12 アンカーボルト設置穴
13 樹脂製硬化剤
14 電動ハンマードリル
DESCRIPTION OF SYMBOLS 1 Guard fence post for bridge 2 Plate board 3 Overlay concrete 4 Anchor bolt 5 Anchor bolt insertion hole 6 Guard fence 7 Fall prevention plate 8 Rail 9 Remaining hole 10 Mortar 11, 11A Reinforcement 12 Anchor bolt installation hole 13 Resin hardener 14 Electric hammer drill

Claims (4)

既設の防護柵が取り除かれた既設の地覆コンクリート上に立設される既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱において、
橋梁用防護柵支柱底面に設けられた前記アンカーボルトに挿通可能なアンカーボルト挿通用穴が開設されたプレート板を有し、
前記プレート板に開設されたアンカーボルト挿通用穴は、
前記地覆コンクリートの長手方向に沿って長穴に形成された
既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱。
In the protective fence column for the bridge for replacement in the existing underground concrete that is erected on the existing underground concrete from which the existing protective fence has been removed,
It has a plate plate in which an anchor bolt insertion hole that can be inserted into the anchor bolt provided on the bottom surface of the guard fence for the bridge is opened,
The anchor bolt insertion hole established in the plate plate is
A guard fence post for a bridge for replacement in existing ground concrete formed in a long hole along the longitudinal direction of the ground concrete.
前記プレート板に開設されたアンカーボルト挿通用穴は、
前記地覆コンクリートの長手方向に沿って両側に開設された長穴の少なくとも一方が前記地覆コンクリートの長手方向に対して傾斜角をもって形成された
請求項1記載の既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱。
The anchor bolt insertion hole established in the plate plate is
The replacement for existing ground-covered concrete according to claim 1, wherein at least one of the long holes formed on both sides along the lengthwise direction of the ground-covered concrete is formed with an inclination angle with respect to the lengthwise direction of the ground-covered concrete. Guard fence post for bridge.
既設の防護柵が取り除かれた既設の地覆コンクリート上に立設される既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱において、
橋梁用防護柵支柱底面に設けられた前記アンカーボルトに挿通可能なアンカーボルト挿通用穴が開設されたプレート板を有し、
前記プレート板に開設されたアンカーボルト挿通用穴は、
前記地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が前記地覆コンクリート面に対してアンーボルト設置位置が任意方向へ移動可能となる形状に形成された
既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱。
In the protective fence column for the bridge for replacement in the existing underground concrete that is erected on the existing underground concrete from which the existing protective fence has been removed,
It has a plate plate in which an anchor bolt insertion hole that can be inserted into the anchor bolt provided on the bottom surface of the guard fence for the bridge is opened,
The anchor bolt insertion hole established in the plate plate is
An existing ground where at least one of the anchor bolt insertion holes provided on both sides along the longitudinal direction of the ground-covered concrete is formed in a shape that allows the unbolt installation position to move in any direction with respect to the ground-concrete concrete surface. Guard fence posts for bridges for replacement in covered concrete.
既設の防護柵が取り除かれた既設の地覆コンクリート上に立設される既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱において、
橋梁用防護柵支柱底面に設けられた前記アンカーボルトに挿通可能なアンカーボルト挿通用穴が開設されたプレート板を有し、
前記プレート板に開設されたアンカーボルト挿通用穴は、
前記地覆コンクリートの長手方向に沿って両側に開設されたアンカーボルト挿通穴の少なくとも一方が前記地覆コンクリート面に対してアンカーボルト設置位置が任意方向へ移動可能となるように複数のアンカーボルト挿通用穴により形成された
既設の地覆コンクリートにおける取替え用の橋梁用防護柵支柱。
In the protective fence column for the bridge for replacement in the existing underground concrete that is erected on the existing underground concrete from which the existing protective fence has been removed,
It has a plate plate in which an anchor bolt insertion hole that can be inserted into the anchor bolt provided on the bottom surface of the guard fence for the bridge is opened,
The anchor bolt insertion hole established in the plate plate is
Insert a plurality of anchor bolts so that at least one of the anchor bolt insertion holes provided on both sides along the longitudinal direction of the ground concrete can move the anchor bolt installation position in an arbitrary direction with respect to the ground concrete surface. Guard fence posts for bridges for replacement of existing ground-covered concrete formed by common holes.
JP2009065734A 2008-05-23 2009-03-18 Guard fence post for replacement bridge in existing ground-covered concrete Active JP5663142B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009065734A JP5663142B2 (en) 2008-05-23 2009-03-18 Guard fence post for replacement bridge in existing ground-covered concrete

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2008135497 2008-05-23
JP2008135497 2008-05-23
JP2009065734A JP5663142B2 (en) 2008-05-23 2009-03-18 Guard fence post for replacement bridge in existing ground-covered concrete

Related Child Applications (3)

Application Number Title Priority Date Filing Date
JP2014214806A Division JP5694598B2 (en) 2008-05-23 2014-10-21 Guard fence post for replacement bridge in existing ground-covered concrete
JP2014214803A Division JP2015038307A (en) 2008-05-23 2014-10-21 Bridge guard fence strut for replacement in existing wheel guard concrete
JP2014214805A Division JP2015038308A (en) 2008-05-23 2014-10-21 Bridge guard fence strut for replacement in existing wheel guard concrete

Publications (2)

Publication Number Publication Date
JP2010001730A true JP2010001730A (en) 2010-01-07
JP5663142B2 JP5663142B2 (en) 2015-02-04

Family

ID=41583657

Family Applications (5)

Application Number Title Priority Date Filing Date
JP2009065734A Active JP5663142B2 (en) 2008-05-23 2009-03-18 Guard fence post for replacement bridge in existing ground-covered concrete
JP2014214805A Pending JP2015038308A (en) 2008-05-23 2014-10-21 Bridge guard fence strut for replacement in existing wheel guard concrete
JP2014214803A Pending JP2015038307A (en) 2008-05-23 2014-10-21 Bridge guard fence strut for replacement in existing wheel guard concrete
JP2014214806A Active JP5694598B2 (en) 2008-05-23 2014-10-21 Guard fence post for replacement bridge in existing ground-covered concrete
JP2015107348A Pending JP2015148148A (en) 2008-05-23 2015-05-27 Bridge guard fence strut for replacement in existing wheel guard concrete

Family Applications After (4)

Application Number Title Priority Date Filing Date
JP2014214805A Pending JP2015038308A (en) 2008-05-23 2014-10-21 Bridge guard fence strut for replacement in existing wheel guard concrete
JP2014214803A Pending JP2015038307A (en) 2008-05-23 2014-10-21 Bridge guard fence strut for replacement in existing wheel guard concrete
JP2014214806A Active JP5694598B2 (en) 2008-05-23 2014-10-21 Guard fence post for replacement bridge in existing ground-covered concrete
JP2015107348A Pending JP2015148148A (en) 2008-05-23 2015-05-27 Bridge guard fence strut for replacement in existing wheel guard concrete

Country Status (1)

Country Link
JP (5) JP5663142B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011017137A (en) * 2009-07-07 2011-01-27 Sekisui Jushi Co Ltd Guard fence
JP2011017173A (en) * 2009-07-08 2011-01-27 Sekisui Jushi Co Ltd Guard fence
JP2012154163A (en) * 2011-01-07 2012-08-16 Katsuhiko Takagi Protective fence support for bridge and support
JP2015151828A (en) * 2014-02-18 2015-08-24 三菱重工業株式会社 Apparatus attachment device and apparatus attachment method
JP2020125713A (en) * 2019-02-04 2020-08-20 株式会社荏原製作所 Base plate and water supply device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5663142B2 (en) * 2008-05-23 2015-02-04 エフエムレーリング株式会社 Guard fence post for replacement bridge in existing ground-covered concrete

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6095063A (en) * 1983-10-28 1985-05-28 不二サッシ株式会社 Replacement of support of handrail
JPH1088656A (en) * 1996-09-10 1998-04-07 Nojimakakusei Seisakusho:Kk Metal fitting for fixing column
JP2000282482A (en) * 1999-03-30 2000-10-10 Nikkeico:Kk Washer for fixing anchor bolt
JP2004003267A (en) * 2002-04-19 2004-01-08 Hoshino Kikaku:Kk Spacer for ventilation
JP2005039938A (en) * 2003-07-15 2005-02-10 Kansai Electric Power Co Inc:The Transformer chamber facility
JP2006153061A (en) * 2004-11-25 2006-06-15 Kuniaki Toyoshima Fixing device for anchor bolt
JP2006193995A (en) * 2005-01-14 2006-07-27 Nippon Steel Corp Joint structure of pile and pillar
JP2007113383A (en) * 2005-09-22 2007-05-10 Tech Taiyo Kogyo Co Ltd Columnar structure and its support
JP2008063931A (en) * 2006-08-07 2008-03-21 Fm Railing Kk Replacing construction method of protective fence for existing bridge

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6017803U (en) * 1983-07-15 1985-02-06 三幸商事株式会社 Exterior wall material mounting brackets
JPH0688409A (en) * 1993-06-14 1994-03-29 Kawatetsu Kinzoku Kogyo Kk Prefabricated wall panel attachment device
JPH0826470A (en) * 1994-07-18 1996-01-30 Masatoshi Sano Long article carrying instrument
JP4806805B2 (en) * 2004-12-13 2011-11-02 株式会社サイコン工業 Post fixing member and post support device
JP5663142B2 (en) * 2008-05-23 2015-02-04 エフエムレーリング株式会社 Guard fence post for replacement bridge in existing ground-covered concrete

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6095063A (en) * 1983-10-28 1985-05-28 不二サッシ株式会社 Replacement of support of handrail
JPH1088656A (en) * 1996-09-10 1998-04-07 Nojimakakusei Seisakusho:Kk Metal fitting for fixing column
JP2000282482A (en) * 1999-03-30 2000-10-10 Nikkeico:Kk Washer for fixing anchor bolt
JP2004003267A (en) * 2002-04-19 2004-01-08 Hoshino Kikaku:Kk Spacer for ventilation
JP2005039938A (en) * 2003-07-15 2005-02-10 Kansai Electric Power Co Inc:The Transformer chamber facility
JP2006153061A (en) * 2004-11-25 2006-06-15 Kuniaki Toyoshima Fixing device for anchor bolt
JP2006193995A (en) * 2005-01-14 2006-07-27 Nippon Steel Corp Joint structure of pile and pillar
JP2007113383A (en) * 2005-09-22 2007-05-10 Tech Taiyo Kogyo Co Ltd Columnar structure and its support
JP2008063931A (en) * 2006-08-07 2008-03-21 Fm Railing Kk Replacing construction method of protective fence for existing bridge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011017137A (en) * 2009-07-07 2011-01-27 Sekisui Jushi Co Ltd Guard fence
JP2011017173A (en) * 2009-07-08 2011-01-27 Sekisui Jushi Co Ltd Guard fence
JP2012154163A (en) * 2011-01-07 2012-08-16 Katsuhiko Takagi Protective fence support for bridge and support
JP2015151828A (en) * 2014-02-18 2015-08-24 三菱重工業株式会社 Apparatus attachment device and apparatus attachment method
JP2020125713A (en) * 2019-02-04 2020-08-20 株式会社荏原製作所 Base plate and water supply device

Also Published As

Publication number Publication date
JP2015038308A (en) 2015-02-26
JP5663142B2 (en) 2015-02-04
JP2015014192A (en) 2015-01-22
JP2015038307A (en) 2015-02-26
JP2015148148A (en) 2015-08-20
JP5694598B2 (en) 2015-04-01

Similar Documents

Publication Publication Date Title
JP5694598B2 (en) Guard fence post for replacement bridge in existing ground-covered concrete
US9598827B1 (en) Barrier rail retrofit device assembly
KR101626257B1 (en) Dyke reinforcement for mounting a holding structure
JP5190599B2 (en) Replacing existing guard fences for bridges
KR20090100867A (en) The method construction work and unit metal tubing constructing system for the road underground driveway
KR20150117041A (en) Expandable bridge sidewalk and it&#39;s construction method
JP2010121281A (en) Width expanding material for road bridge
JP4740900B2 (en) Steel rails and how to replace rails
KR101742292B1 (en) Support device for post
JP4882039B2 (en) Replacing existing guard fences for bridges
JP5519966B2 (en) Protective fence
JP2012219610A (en) Method for reinforcing corroded part of steel pipe support
JP5422344B2 (en) Supporting equipment for guard fence posts for bridges in existing underground concrete
JP4420697B2 (en) Standing structure of steel pipe columns
JP5043879B2 (en) How to install width expansion materials for road bridges
JP6360769B2 (en) Widening method of existing road bridge
JP5073081B2 (en) Steel rail
US20230349117A1 (en) System, apparatus and method for installation of street furniture
KR100473477B1 (en) Bridge guirail reinforcement method of non-dismantle for bridge curbstone
JP5829901B2 (en) Guard fence support and support for bridge
JP5554662B2 (en) How to repair gutter
JP5519967B2 (en) Protective fence
KR101148775B1 (en) Expansion path of road slant surface
KR100811732B1 (en) Support fixing structure of guard cable
FI123424B (en) System for anchoring the head of a road railing to the ground

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121102

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121225

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20130219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130501

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20130502

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20130628

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20130726

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20140916

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20140916

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141022

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141208

R150 Certificate of patent or registration of utility model

Ref document number: 5663142

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250