JP5190599B2 - Replacing existing guard fences for bridges - Google Patents

Replacing existing guard fences for bridges Download PDF

Info

Publication number
JP5190599B2
JP5190599B2 JP2007063077A JP2007063077A JP5190599B2 JP 5190599 B2 JP5190599 B2 JP 5190599B2 JP 2007063077 A JP2007063077 A JP 2007063077A JP 2007063077 A JP2007063077 A JP 2007063077A JP 5190599 B2 JP5190599 B2 JP 5190599B2
Authority
JP
Japan
Prior art keywords
anchor bolt
concrete
bridge
ground concrete
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007063077A
Other languages
Japanese (ja)
Other versions
JP2008223332A (en
Inventor
勝彦 高木
英明 城戸
敏弘 岡村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIKO KENZAI LTD.
SHOWA MANUFACTURING CO., LTD.
Sekisui Jushi Corp
Sankyo Tateyama Inc
Nippon Engineering Co Ltd
Original Assignee
SHIKO KENZAI LTD.
SHOWA MANUFACTURING CO., LTD.
Sekisui Jushi Corp
Sankyo Tateyama Inc
Sumikei Nikkei Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIKO KENZAI LTD., SHOWA MANUFACTURING CO., LTD., Sekisui Jushi Corp, Sankyo Tateyama Inc, Sumikei Nikkei Engineering Co Ltd filed Critical SHIKO KENZAI LTD.
Priority to JP2007063077A priority Critical patent/JP5190599B2/en
Publication of JP2008223332A publication Critical patent/JP2008223332A/en
Application granted granted Critical
Publication of JP5190599B2 publication Critical patent/JP5190599B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、既設の橋梁用防護柵の取替え工法に関する。詳しくは既設橋における防護柵を取り替える際に、アンカーボルトを地覆コンクリート内に残置した状態で新たな防護柵を地覆コンクリート上に立て替える工法に係るものである。   The present invention relates to a method for replacing an existing bridge protective fence. Specifically, when replacing the protective fence in the existing bridge, it relates to a construction method in which a new protective fence is replaced on the underground concrete with the anchor bolt left in the underground concrete.

橋梁用防護柵は、例えば図11に示すように、車道の路肩における地覆コンクリート101に埋設されたアンカーボルト102に、防護柵103のベース板104がナット部材105によって締結固定される構成のものがある(特許文献1参照。)。   For example, as shown in FIG. 11, the bridge guard fence has a structure in which a base plate 104 of the guard fence 103 is fastened and fixed by a nut member 105 to an anchor bolt 102 embedded in the ground concrete 101 on the road shoulder. (See Patent Document 1).

特開2001−234515号公報JP 2001-234515 A

しかしながら橋梁用防護柵は風雨に晒されることによる老朽化や事故などによる破損およびアンカーボルトは、新たな防護柵の型式、あるいは錆等によって耐久性が低下し、両方とも取り替える必要が生じてくる。そこで防護柵の取り替えは、アンカーボルトとの締結を解除して防護柵を取外した後に、削岩機などによってアンカーボルト周辺の地覆コンクリートを取り壊してアンカーボルトの取り出し、新たにアンカーボルトを埋設する工法が取られているが、非常に煩雑な作業となると共に、その工事期間中には片側通行などによる長期の交通規制を行わなければならない問題が生じる。   However, bridge protection fences are deteriorated due to aging or accidents caused by exposure to wind and rain, and anchor bolts are less durable due to new protection fence types or rust, and both must be replaced. Therefore, to replace the guard fence, after releasing the fastening with the anchor bolt and removing the guard fence, the ground concrete around the anchor bolt is demolished with a rock drill etc., the anchor bolt is taken out, and the anchor bolt is newly buried. Although the construction method is adopted, it becomes very complicated work, and there arises a problem that long-term traffic regulation such as one-sided traffic must be performed during the construction period.

また、図12(イ)(ロ)にそれぞれ示すように、アンカーボルト102の露出部分を切断し、モルタル等によって修復した後に、残置されたアンカーボルト102が新たな防護柵103Aの設置に支障をきたさない位置に新たなアンカーボルト102Aを埋設して新たな防護柵103Aを設置する工法があるが、残置されたアンカーボルト102の修復個所が目立ち美観を損なうとともに、アンカーボルトの位置がずれることにより工事が煩雑となる問題がある。   In addition, as shown in FIGS. 12 (a) and 12 (b), after the exposed portion of the anchor bolt 102 is cut and repaired with mortar or the like, the remaining anchor bolt 102 hinders the installation of a new protective fence 103A. There is a construction method in which a new anchor bolt 102A is embedded in a position where it does not come out and a new protective fence 103A is installed, but the repaired portion of the remaining anchor bolt 102 is conspicuous and the aesthetic appearance is impaired, and the position of the anchor bolt is shifted. There is a problem that the construction becomes complicated.

本発明は、以上の点に鑑みて創案されたものであって、既設の地覆コンクリートを取り壊さず、あるいはアンカーボルトの埋設位置をずらすことなく防護柵の取替え作業を行うことができる既設の橋梁用防護柵の取替え工法を提供することを目的とするものである。   The present invention was devised in view of the above points, and is an existing bridge that can be used to replace a protective fence without demolishing existing ground covering concrete or without shifting the anchor bolt burying position. The purpose is to provide a replacement method for protective fences.

上記の目的を達成するために、本発明に係る既設の橋梁用防護柵の取替え工法は、地覆コンクリートに埋設されたアンカーボルトに橋梁用防護柵の支柱の下端が締結固定される既設の橋梁用防護柵の取替え工法において、前記地覆コンクリートに埋設されたアンカーボルトより既設の橋梁用防護柵の支柱を取外す工程と、地覆コンクリートより露出するアンカーボルトと地覆コンクリートとの境界線上を切断して地覆コンクリート内に残置されるアンカーボルト上端面をモルタルにより覆設する工程と、前記残置されたアンカーボルト周囲にアンカーボルト設置穴を穿孔する工程と、前記地覆コンクリート上に突設するアンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を締結固定して橋梁用防護柵を取り付ける工程を備える。   In order to achieve the above object, the method for replacing an existing bridge guard fence according to the present invention is an existing bridge in which the lower end of the bridge guard fence is fastened and fixed to an anchor bolt embedded in the underground concrete. In the protective fence replacement method, the step of removing the pillars of the existing bridge protective fence from the anchor bolts embedded in the above ground concrete and cutting the boundary line between the anchor bolt exposed from the ground concrete and the ground concrete Then, a step of covering the upper end surface of the anchor bolt left in the ground covering concrete with mortar, a step of drilling an anchor bolt installation hole around the remaining anchor bolt, and projecting on the ground covering concrete A process of attaching a guard fence for a bridge by fastening and fixing a new column with an anchor bolt insertion slot that can be inserted into the anchor bolt Provided.

ここで、既設の防護柵をアンカーボルトより取り外し、残置されたアンカーボルトを切断し、該残置されたアンカーボルトの周囲に新たなアンカーボルトを設置することにより既設の地覆コンクリートを取り壊すことなく、新設の橋梁用防護柵の取替えを行うことができる。   Here, the existing guard fence is removed from the anchor bolts, the remaining anchor bolts are cut, and new anchor bolts are installed around the remaining anchor bolts without demolishing the existing underground concrete, New protection fences for bridges can be replaced.

また、上記の目的を達成するために、本発明に係る既設の橋梁用防護柵の取替え工法は、地覆コンクリートに埋設されたアンカーボルトに橋梁用防護柵の支柱の下端が締結固定される既設の橋梁用防護柵の取替え工法において、地覆コンクリートより露出するアンカーボルトと地覆コンクリートとの境界線上を切断して地覆コンクリート内に残置されるアンカーボルト上端面をモルタルにより覆設する工程と、前記残置されたアンカーボルトの両側にアンカーボルト設置穴を穿孔する工程と、前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、前記アンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を、前記地覆コンクリート上に突設するアンカーボルトに挿通されるとともに、前記地覆コンクリートの橋梁外側へ張り出した状態で固定される支柱接合プレート上に締結固定して橋梁用防護柵を取り付ける工程を備える。   In addition, in order to achieve the above object, the method for replacing an existing bridge guard fence according to the present invention includes an anchor bolt embedded in the underground concrete and the lower end of the bridge guard fence post fastened and fixed. In the replacement method of the protective fence for bridges, the process of cutting the boundary line between the anchor bolt exposed from the ground concrete and the ground concrete and covering the upper end surface of the anchor bolt left in the ground concrete with mortar A step of drilling anchor bolt installation holes on both sides of the remaining anchor bolt, a step of inserting and fixing the anchor bolt with a hardener in the anchor bolt installation hole, and an anchor bolt insertion length that can be inserted into the anchor bolt A new support column having a hole is inserted into an anchor bolt projecting on the cover concrete, and the front Was fastened to the strut junction plates is fixed in a state of projecting to the bridges outer Jibuku concrete comprising the step of attaching the bridge for protective fence.

ここで、既設の地覆コンクリート幅が狭い場合には、地覆コンクリート上に橋梁の外側へ張り出すような支柱接合プレートを取り付けることにより、新設の橋梁用防護柵の取替え施工が可能となる。   Here, when the existing cover concrete width is narrow, the work of replacing the newly installed guard fence for the bridge can be performed by attaching a column joining plate that projects to the outside of the bridge on the cover concrete.

また、上記の目的を達成するために、本発明に係る既設の橋梁用防護柵の取替え工法は、地覆コンクリートに埋設されたアンカーボルトに橋梁用防護柵の支柱の下端が締結固定される既設の橋梁用防護柵の取替え工法において、地覆コンクリートより露出するアンカーボルトと地覆コンクリートとの境界線上を切断して地覆コンクリート内に残置されるアンカーボルト上端面をモルタルにより覆設する工程と、、前記地覆コンクリートの橋梁外側壁面に対してアンカーボルト設置穴を穿孔する工程と、前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、前記アンカーボルトに前記地覆コンクリートの橋梁外側へ併設される支柱接合プレートに開設されるアンカーボルト挿通用長穴を挿通し締結固定し、該柱接合プレート上に新設の防護柵を取り付ける工程を備える。   In addition, in order to achieve the above object, the method for replacing an existing bridge guard fence according to the present invention includes an anchor bolt embedded in the underground concrete and the lower end of the bridge guard fence post fastened and fixed. In the replacement method of the protective fence for bridges, the process of cutting the boundary line between the anchor bolt exposed from the ground concrete and the ground concrete and covering the upper end surface of the anchor bolt left in the ground concrete with mortar A step of drilling an anchor bolt installation hole in the outer wall surface of the bridge of the ground concrete, a step of inserting and fixing the anchor bolt into the anchor bolt installation hole with a hardening material, and a step of inserting the anchor concrete into the anchor bolt. Insert and fasten the anchor bolt insertion oblong hole established in the column connection plate provided outside the bridge. Comprising the step of attaching a safety barrier of the newly established case plate.

ここで、地覆コンクリート上面に防護柵を設置できない場合には、地覆コンクリートの橋梁外側の壁面に、支柱接合プレートを取り付けることにより、新設の橋梁用防護柵の取替え施工が可能となる。   Here, when a protective fence cannot be installed on the top surface of the ground-covered concrete, a new bridge-shaped protective fence can be replaced by attaching a column connection plate to the wall surface outside the bridge of the ground-covered concrete.

本発明の既設の橋梁用防護柵の取替え工法は、既設の地覆コンクリートを取り壊さずに橋梁用防護柵の取替えを可能とするために、工期が短縮され、かつ新設の防護柵のみの資材となることから大幅なコスト削減が可能となる。   The replacement method of the existing protective fence for the bridge according to the present invention has a shortened construction period and enables the replacement of the protective fence for the bridge without destroying the existing underground concrete. Therefore, significant cost reduction is possible.

また、残置アンカーボルトを新設の防護柵によって隠すことにより美観を損なうことなく、かつ幅の狭い地覆コンクリートでは、支柱接合プレートを地覆コンクリートより張り出すように取り付けることで新設の橋梁用防護柵の取替え施工が可能となる。   In addition, by hiding the remaining anchor bolts with a new protective fence, in the case of narrow underground concrete, a new bridge protective fence is installed by attaching the column connection plate so as to protrude from the underground concrete. Can be replaced.

以下、本発明の実施の形態を図面を参酌しながら説明し、本発明の理解に供する。
実施例1
図1は、本発明を適用した既設の橋梁用防護柵の取替え工法における既設の防護柵の取り付け状態を示す説明図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings to provide an understanding of the present invention.
Example 1
FIG. 1 is an explanatory view showing an installed state of an existing protective fence in a method for replacing an existing bridge protective fence to which the present invention is applied.

既設の防護柵1は、道路の路肩に設けられる地覆コンクリート2上に立設された支柱3間にボルト・ナットなどの締結部材によって取り付けられる。
ここで、前記支柱3の下端にはベース板4が固着される。いっぽう、前記地覆コンクリート2には、そのネジ部が露出されたアンカーボルト10が埋設される。そしてアンカーボルト10が前記ベース板4の開設される貫通穴(図示せず。)に挿通されてナットなどの締結部材19によって連結固定される。
The existing protective fence 1 is attached by fastening members such as bolts and nuts between columns 3 erected on the ground concrete 2 provided on the shoulder of the road.
Here, the base plate 4 is fixed to the lower end of the column 3. On the other hand, an anchor bolt 10 having an exposed screw portion is embedded in the ground covering concrete 2. The anchor bolt 10 is inserted into a through hole (not shown) in which the base plate 4 is opened, and is connected and fixed by a fastening member 19 such as a nut.

そこで図2(イ)(ロ)(ハ)にそれぞれ示すように、アンカーボルト10と支柱3の下端のベース板4との連結を解除して地覆コンクリート2上から防護柵1を取外すものである。   Therefore, as shown in FIGS. 2 (a), (b), and (c), the connection between the anchor bolt 10 and the base plate 4 at the lower end of the column 3 is released, and the protective fence 1 is removed from the cover concrete 2. is there.

したがって、地覆コンクリート2上からアンカーボルト10の上端部分が突出した状態となっている。この前記地覆コンクリート2より露出するアンカーボルトの地覆コンクリート2との境界線上をガスバーナーによって溶断する。この場合には、ガスバーナーによって溶断した後に、錆び止め、プライマー処理を行った後に残置されるアンカーボルト10の上端が地覆コンクリート2上面より下部となるように切り下げるなどの作業を行い、それぞれのアンカーボルト10上に窪み部23を設ける。   Therefore, the upper end portion of the anchor bolt 10 protrudes from the ground concrete 2. The boundary between the anchor bolt exposed from the ground concrete 2 and the ground concrete 2 is melted by a gas burner. In this case, after fusing with a gas burner, the work is performed such as cutting down so that the upper end of the anchor bolt 10 left after rust prevention and primer treatment is below the upper surface of the ground concrete 2. A recess 23 is provided on the anchor bolt 10.

次に、前記溶断されたアンカーボルト10の上端面が露出しないように、それぞれのアンカーボルト10の上端面に形成される窪み部23内にモルタル12を充填してアンカーボルト10の上端面が露出しないように覆設する。   Next, the mortar 12 is filled in the recess 23 formed on the upper end surface of each anchor bolt 10 so that the upper end surface of the fused anchor bolt 10 is not exposed, and the upper end surface of the anchor bolt 10 is exposed. Do not cover.

そして図3(イ)(ロ)でそれぞれ示すように、前記地覆コンクリート2内に残置されたアンカーボルト10上に新設の防護柵を取り付けるために、前記アンカーボルト10の周囲に新たに4個のアンカーボルト設置穴7をコンクリート穿孔ドリルによって穿孔する。   Then, as shown in FIGS. 3 (a) and 3 (b), in order to attach a new protective fence on the anchor bolt 10 left in the ground covering concrete 2, four pieces are newly provided around the anchor bolt 10. The anchor bolt installation hole 7 is drilled with a concrete drill.

ここで、図4(イ)(ロ)(ハ)にそれぞれ示すように、前記アンカーボルト設置穴7内の清掃後、このアンカーボルト設置穴7内に攪拌により硬化するカプセル内に収納された樹脂製硬化剤9を挿入し、新たなアンカーボルト10Aを電動ハンマードリル11等に装着し回転・打撃させ、硬化剤9を攪拌・混合しながら前記アンカーボルト設置穴7底面に到達するまで埋め込むものである。   Here, as shown in FIGS. 4 (a), (b), and (c), after the inside of the anchor bolt installation hole 7 is cleaned, the resin contained in the capsule that is hardened by stirring in the anchor bolt installation hole 7 Insert the hardener 9 and attach a new anchor bolt 10A to the electric hammer drill 11 or the like, rotate and blow it, and embed the hardener 9 until it reaches the bottom surface of the anchor bolt installation hole 7 while stirring and mixing. is there.

次に図5および図6に示すように、新設の支柱3Aは断面H型のダクタイル鋳鉄、あるいは鋼製、アルミニウム製、ステンレス製などにより作成され、その下端両側にはプレート板13が延設される。このプレート板13は通常の場合より長く形成される。   Next, as shown in FIGS. 5 and 6, the new support 3 </ b> A is made of ductile cast iron having an H-shaped section, or made of steel, aluminum, stainless steel, and the like, and plate plates 13 are extended on both sides of the lower end thereof. The This plate 13 is formed longer than usual.

更に、前記プレート板13には、前記新たなアンカーボルト10Aの配置状態に対応したアンカーボルト挿通用長穴14が4個開設されている。そこで前記地覆コンクリート2に埋め込み設置した新たなアンカーボルト10Aに支柱3Aのプレート板13のアンカーボルト挿通用長穴14を挿通する。この挿通用長穴14は、コンクリート穿孔ドリルがコンクリート内の鉄筋に当った場合に鉄筋を切断又は損傷させないために、再度その位置を左右側にずらすことができるように地覆コンクリート2の長手方向に沿って長穴形状とされ、かつこの長穴の寸法をアンカーボルトの口径の3倍以上の長さにすることが望ましい。   Further, the plate plate 13 is provided with four anchor bolt insertion long holes 14 corresponding to the arrangement state of the new anchor bolt 10A. Therefore, the anchor bolt insertion slot 14 of the plate plate 13 of the column 3A is inserted into a new anchor bolt 10A embedded and installed in the ground concrete 2. This insertion long hole 14 is provided in the longitudinal direction of the concrete 2 so that the position can be shifted to the left and right again in order not to cut or damage the reinforcing bar when the concrete drill drill hits the reinforcing bar in the concrete. It is desirable that the shape of the elongated hole is formed along the length of the anchor bolt and the dimension of the elongated hole is at least three times the diameter of the anchor bolt.

このようにして図7に示すように、残置したアンカーボルト10上に新設の支柱3Aを立設し、この支柱3A間に上部レール5Aおよび下部レール5Bなどを渡設することにより防護柵1Aへの取替えが完了する。   In this way, as shown in FIG. 7, a new support column 3A is erected on the remaining anchor bolt 10, and the upper rail 5A, the lower rail 5B, and the like are provided between the support columns 3A so as to reach the protective fence 1A. Replacement of is completed.

実施例2
次に、地覆コンクリート幅が狭い場合の設置例を図8(イ)(ロ)(ハ)にそれぞれ示す。
前記図2(イ)(ロ)(ハ)で示したように、地覆コンクリート2上に突出する既設のアンカーボルト10を溶断し、窪み部23内にモルタル12を充填して地覆コンクリート2の上面と同一面となるように覆設する。
Example 2
Next, examples of installation in the case where the ground concrete width is narrow are shown in FIGS. 8 (a), (b) and (c), respectively.
As shown in FIGS. 2 (a), (b) and (c), the existing anchor bolt 10 protruding on the ground concrete 2 is melted, and the mortar 12 is filled in the recess 23 to cover the ground concrete 2 It covers so that it may become the same surface as the upper surface.

そこで図8(ハ)で示すように、地覆コンクリート2の残置されたアンカーボルト10の両側位置に設けたアンカーボルト設置穴7に2個のアンカーボルト10Aを前記図4(イ)(ロ)(ハ)で示す施行手順によって配置する。   Therefore, as shown in FIG. 8 (c), the two anchor bolts 10A are installed in the anchor bolt installation holes 7 provided on both sides of the anchor bolts 10 on which the underground concrete 2 is left, as shown in FIG. Place according to the enforcement procedure shown in (c).

次に、図8(イ)で示すように、前記アンカーボルト10Aに対して前記地覆コンクリート2の後方へ張り出した状態で支柱接合プレート15を設置するものであり、この支柱接合プレート15の底面には、前記地覆コンクリート2の壁面に当接される支持板16が直角状に突設され、更に該支持板16と支柱接合プレート15の後端に渡って補強リブ17が設けられるものである。そして前記支柱接合プレート15前部側にはアンカーボルト10Aが挿通可能としたアンカーボルト挿通用長穴14Aが貫設され、前記支柱接合プレート15後部側には、支柱との接合を行うための締結用長穴18が貫設される。   Next, as shown in FIG. 8 (a), a column joining plate 15 is installed in a state of protruding to the rear of the ground concrete 2 with respect to the anchor bolt 10A. The support plate 16 that abuts against the wall surface of the ground-covering concrete 2 protrudes at a right angle, and a reinforcing rib 17 is provided across the rear end of the support plate 16 and the column joining plate 15. is there. An anchor bolt insertion elongated hole 14A through which the anchor bolt 10A can be inserted is penetrated in the front side of the column joining plate 15, and fastening for joining to the column is performed on the rear side of the column joining plate 15 An oblong hole 18 is provided.

ここで、支柱接合プレート15を前記アンカーボルト10Aに支柱接合プレート15前部側に貫設されるアンカーボルト挿通用長穴14Aを挿通した状態で地覆コンクリート2上に設置する。これにより前記支柱接合プレート15は、地覆コンクリート2後方に張り出した状態で設置されることになり、この支柱接合プレート15上に支柱3Aのプレート板13を積重し、ボルト・ナットなどの締結部材19によって接合することにより防護柵1Aの取替えが可能となる。   Here, the column joining plate 15 is installed on the ground concrete 2 in a state where the anchor bolt insertion elongated hole 14A penetrating the anchor bolt 10A on the front side of the column joining plate 15 is inserted. As a result, the column joining plate 15 is installed in a state of projecting behind the ground covering concrete 2, and the plate plate 13 of the column 3 A is stacked on the column joining plate 15 and tightened with bolts and nuts. By joining with the member 19, the protection fence 1A can be replaced.

実施例3
次に、地覆コンクリート幅が狭く、該地覆コンクリート上面に防護柵を設置できない場合の設置例を図9(イ)(ロ)にそれぞれ示す。
この場合には、地覆コンクリート上に設置された既設の防護柵は、図2において前述した手順によって取外し、地覆コンクリート2上に突出する既設のアンカーボルト10の溶断し、窪み部23内にモルタル12を充填して地覆コンクリート2の上面と同一面となるように覆設する。
Example 3
Next, FIG. 9 (A) and FIG. 9 (B) show examples of installation in the case where the ground concrete width is narrow and the protective fence cannot be installed on the top surface of the ground concrete.
In this case, the existing protective fence installed on the ground-covering concrete is removed by the procedure described above in FIG. 2, the existing anchor bolt 10 protruding on the ground-covering concrete 2 is melted, and the recessed portion 23 is inserted. The mortar 12 is filled and laid so as to be flush with the upper surface of the ground concrete 2.

そして図9(イ)で示すように、地覆コンクリート2の橋梁の外側の壁面に対して図4(イ)(ロ)(ハ)において詳述したように、アンカーボルト設置穴7を穿孔し、4個のアンカーボルト10Aを埋め込むものである。
なお、前記アンカーボルト設置穴7を穿孔する場合には、地覆コンクリート2内に残置されたアンカーボルト10に当接しないように、該アンカーボルト10の周囲に穿孔し、新たなアンカーボルト10Aを取り付けるものとする。
Then, as shown in FIG. 9 (a), as described in detail in FIGS. 4 (a), (b), and (c), an anchor bolt installation hole 7 is drilled on the outer wall surface of the bridge of the underground concrete 2. Four anchor bolts 10A are embedded.
When the anchor bolt installation hole 7 is drilled, the anchor bolt 10A is drilled around the anchor bolt 10 so as not to contact the anchor bolt 10 left in the ground concrete 2, and a new anchor bolt 10A is installed. It shall be attached.

ここで、前記アンカーボルト10Aに対して締結固定される支柱接合プレート15Aを地覆コンクリート2の橋梁の外側の壁面に取り付けるものであり、この支柱接合プレート15Aは90度に折り曲げ形成される壁面接合板20との間に補強リブ17が設けられ、この壁面接合板20にはアンカーボルト挿通用長穴14Aが貫設されるとともに、支柱接合プレート15Aには支柱との接合を行うための締結用長穴18が貫設される。   Here, the column joining plate 15A fastened and fixed to the anchor bolt 10A is attached to the outer wall surface of the bridge of the underground concrete 2, and this column joining plate 15A is bent and formed at 90 degrees. Reinforcing ribs 17 are provided between the plate 20, anchor wall insertion holes 14 </ b> A are penetrated through the wall surface bonding plate 20, and the column bonding plate 15 </ b> A is used for fastening for bonding with the column. A long hole 18 is provided.

したがって、前記支柱接合プレート15Aを地覆コンクリート2の橋梁の外側の壁面に取り付けられるアンカーボルト10Aとボルト・ナットなどの締結部材19によって取付けることによって、支柱接合プレート15Aが地覆コンクリート2の外側へ張り出した状態となる。   Therefore, by attaching the column joining plate 15A by the anchor bolt 10A attached to the outer wall surface of the bridge of the ground concrete 2 and the fastening members 19 such as bolts and nuts, the column joining plate 15A is moved to the outside of the ground concrete 2. It will be overhanging.

そして前記支柱接合プレート15A上に、支柱3Aのプレート板13を積重し、ボルト・ナットなどの締結部材19によって接合することにより防護柵1Aの取替えが可能となる。   The protective fence 1A can be replaced by stacking the plate plates 13 of the columns 3A on the column bonding plates 15A and bonding them with the fastening members 19 such as bolts and nuts.

実施例4
次に、防護柵がアルミニウム合金などの軽金属製の場合の設置例を図10(イ)(ロ)(ハ)でそれぞれ示す。
Example 4
Next, examples of installation when the protective fence is made of a light metal such as an aluminum alloy are shown in FIGS.

ここで、防護柵1Aがアルミニウム合金などの軽金属製の場合にはプレート板13と、このプレート板13に突設される支柱補助部21はアルミ合金の溶接強度に問題があるために鋼製とされることが多い。この支柱補助部21にアルミニウム合金製の防護柵1Aの支柱3Aが嵌め入れられて、結合用ボルト22によって強固に連結される構成とされる。   Here, when the protective fence 1A is made of a light metal such as an aluminum alloy, the plate plate 13 and the column auxiliary portion 21 protruding from the plate plate 13 have a problem in the welding strength of the aluminum alloy. Often done. A support 3 </ b> A of a protective fence 1 </ b> A made of aluminum alloy is fitted into the support auxiliary part 21 and is firmly connected by a coupling bolt 22.

地覆コンクリート上に設置された既設の防護柵は、図2において前述した手順によって取外し、地覆コンクリート2上に突出する既設のアンカーボルト10を溶断し、窪み部23内にモルタル12を充填して地覆コンクリート2の上面と同一面となるように覆設する。   The existing protective fence installed on the ground concrete is removed by the procedure described above with reference to FIG. 2, the existing anchor bolt 10 protruding on the ground concrete 2 is melted, and the mortar 12 is filled in the recess 23. And laying so that it is flush with the upper surface of the ground concrete 2.

そして図10(ロ)で示すように、地覆コンクリート2の残置アンカーボルト10の周囲の上面に対して図4(イ)(ロ)(ハ)において詳述したように、アンカーボルト設置穴7を穿孔し、2個の新たなアンカーボルト10Aを埋め込むものである。   Then, as shown in FIG. 10 (B), the anchor bolt installation hole 7 as described in detail in FIGS. And two new anchor bolts 10A are embedded.

まず、図10(イ)(ロ)で示すように、地覆コンクリート2に埋設されるアンカーボルト10Aに対して前記地覆コンクリート2の後方へ張り出した状態で支柱接合プレート15を設置するものであり、この支柱接合プレート15の底面には、前記地覆コンクリート2の壁面に当接される支持板16が直角状に突設され、さらに該支持板16と支柱接合プレート15の後端に渡って補強リブ17が設けられるものである。そして前記支柱接合プレート15前部側にはアンカーボルト10Aが挿通可能としたアンカーボルト挿通用長穴14Aが貫設される。   First, as shown in FIGS. 10 (a) and 10 (b), the column joining plate 15 is installed in a state where the anchor bolt 10A embedded in the ground concrete 2 is projected rearward from the ground concrete 2. A support plate 16 that abuts against the wall surface of the cover concrete 2 is provided on the bottom surface of the column joining plate 15 so as to project at a right angle, and further across the rear end of the support plate 16 and the column joining plate 15. The reinforcing rib 17 is provided. An anchor bolt insertion long hole 14A through which the anchor bolt 10A can be inserted is provided through the front side of the column joining plate 15.

そこで図10(イ)で示すように、に支柱接合プレート15前部側に貫設されるアンカーボルト挿通用長穴14Aを前記アンカーボルト10Aに挿通した状態で地覆コンクリート2上に設置する。これにより前記支柱接合プレート15は、地覆コンクリート2後方に張り出した状態で設置されることになる。   Therefore, as shown in FIG. 10 (a), the anchor bolt insertion long hole 14A penetrating the front side of the column joining plate 15 is installed on the ground concrete 2 in a state of being inserted into the anchor bolt 10A. Thereby, the said support | pillar joining plate 15 will be installed in the state projected over the ground-covering concrete 2 back.

この支柱接合プレート15上に、支柱3Aのプレート板13を積重し、ボルト・ナットなどの締結部材19によって接合する。そして該プレート板13に突設される支柱補助部21にアルミニウム合金製の防護柵1Aの支柱3Aが嵌め入れられて、結合用ボルト22によって連結されることにより防護柵1Aの取替えが可能となる。   The plate plate 13 of the column 3A is stacked on the column bonding plate 15 and bonded by a fastening member 19 such as a bolt and a nut. Then, the support fence 3A of the aluminum alloy guard fence 1A is fitted into the support pillar auxiliary portion 21 projecting from the plate plate 13 and is connected by the coupling bolt 22 so that the guard fence 1A can be replaced. .

なお、本実施例ではアンカーボルトの取付けを4個、あるいは2個とするものであるが、必ずしも4個、あるいは2個とする必要性はなく、既設の地覆コンクリート内の鉄筋の位置やコンクリートの強度の状況に応じて本数を決定することが望ましい。   In this embodiment, four or two anchor bolts are attached. However, it is not always necessary to use four or two, and the position of the reinforcing bar in the existing ground-covered concrete or the concrete is not necessarily required. It is desirable to determine the number according to the strength situation.

以上の構成よりなる本発明の既設の橋梁用防護柵の取替え工法では、既設の防護柵を取外し、既設のアンカーボルトを切断して錆び止め、プライマー処理を行った後に、モルタル12を充填して地覆コンクリート2の上面と同一面となるように覆設し、その周囲に新たなアンカーボルトを埋め込むことにより残置したアンカーボルト上に通常の防護柵と何ら変わらない防護柵の取替え施行が可能となる。   In the method of replacing the existing bridge protection fence of the present invention having the above configuration, the existing protection fence is removed, the existing anchor bolts are cut to prevent rusting, the primer treatment is performed, and then the mortar 12 is filled. It is possible to replace the protective fence that is the same as a normal protective fence on the remaining anchor bolt by laying it so that it is flush with the upper surface of the concrete 2 and embedding a new anchor bolt around it. Become.

また、実施例2において詳述したように既設の地覆コンクリート幅が狭い場合には、地覆コンクリート上に橋梁の外側へ張り出すような支持接合プレートを取り付けることにより、防護柵の取替え施工が可能となる。   In addition, as described in detail in Example 2, when the existing cover concrete width is narrow, the protective fence replacement work can be performed by attaching a support joint plate that projects to the outside of the bridge on the cover concrete. It becomes possible.

また、実施例3において詳述したように地覆コンクリート幅が狭く、該地覆コンクリート上面に防護柵を設置できない場合には、地覆コンクリートの橋梁外側の壁面に、地覆コンクリート内の鉄筋を避けるようにアンカーボルトを埋め込み、該アンカーボルトによる締結固定によって地覆コンクリートの背面側へ張り出すように支柱接合プレートを取り付けることにより、防護柵の取替え施工が可能となる。   Further, as described in detail in Example 3, when the width of the cover concrete is narrow and a protective fence cannot be installed on the top surface of the cover concrete, the reinforcing bars in the cover concrete are attached to the wall surface outside the bridge of the cover concrete. It is possible to replace the protective fence by embedding the anchor bolt so as to avoid it and attaching the column joining plate so as to project to the back side of the ground concrete by fastening and fixing with the anchor bolt.

本発明を適用した既設の橋梁用防護柵の取替え工法における既設の防護柵の取り付け状態を示す説明図である。It is explanatory drawing which shows the attachment state of the existing protection fence in the replacement construction method of the existing protection fence for bridges to which this invention is applied. 本発明を適用した既設の橋梁用防護柵の取替え工法における既設の防護柵を取外し、アンカーボルトを切断するまでの説明図である。It is explanatory drawing until it removes the existing protection fence in the replacement construction method of the existing bridge protection fence to which this invention is applied, and cut | disconnects an anchor bolt. 図2におけるアンカーボルト設置穴の穿孔位置を示す説明図である。It is explanatory drawing which shows the drilling position of the anchor bolt installation hole in FIG. 本発明を適用した既設の橋梁用防護柵の取替え工法におけるアンカーボルト設置穴にアンカーボルトを埋設する工程を示す説明図である。It is explanatory drawing which shows the process of embedding an anchor bolt in the anchor bolt installation hole in the replacement construction method of the existing guard fence for bridges to which this invention is applied. 図2におけるアンカーボルト設置穴に新たなアンカーボルトを設置した状態を示す説明図である。It is explanatory drawing which shows the state which installed the new anchor bolt in the anchor bolt installation hole in FIG. 既設の地覆コンクリート上面に新設の防護柵の支柱を取り付ける状態を示す説明図である。It is explanatory drawing which shows the state which attaches the support | pillar of a new guard fence to the existing upper surface concrete. 図5における新設の防護柵の支柱に各レール等を取り付けて取替えが完了した状態を示す説明図である。It is explanatory drawing which shows the state which attached each rail etc. to the support | pillar of the new protection fence in FIG. 5, and completed replacement | exchange. 本発明を適用した既設の橋梁用防護柵の取替え工法において、地覆コンクリート幅が狭い場合の設置例を示す説明図である。It is explanatory drawing which shows the example of installation in the case where the width of a concrete cover is narrow in the replacement method of the existing guard fence for bridges which applied this invention. 本発明を適用した既設の橋梁用防護柵の取替え工法において、地覆コンクリート幅が狭く、該地覆コンクリート上面に防護柵を設置できない場合の設置例を示す説明図である。It is explanatory drawing which shows the example of installation in the case of the replacement method of the existing protection fence for bridges to which this invention is applied, when a concrete cover width is narrow and a protection fence cannot be installed on this ground concrete surface. 本発明を適用した既設の橋梁用防護柵の取替え工法において、防護柵がアルミニウム合金などの軽金属製の場合の設置例を示す説明図である。It is explanatory drawing which shows the example of installation in case the protection fence is light metal, such as an aluminum alloy, in the replacement construction method of the existing protection fence for bridges to which this invention is applied. 従来の防護柵の設置例を示す説明図である。It is explanatory drawing which shows the example of installation of the conventional protective fence. 既設の橋梁用防護柵の取替えの工法の一例を示す説明図である。It is explanatory drawing which shows an example of the construction method of replacement | exchange of the existing guard fence for bridges.

符号の説明Explanation of symbols

1、1A 防護柵
2 地覆コンクリート
3、3A 支柱
4 ベース板
5 レール
6 残置穴
7 アンカーボルト設置穴
9 硬化剤
10 既設のアンカーボルト
10A 新設のアンカーボルト
11 電動ハンマードリル
12 モルタル
13 プレート板
14 支柱のアンカーボルト挿通用長穴
14A 支柱接合プレートのアンカーボルト挿通用長穴
15、15A 支柱接合プレート
16 支持板
17 補強リブ
18 締結用長穴
19 締結部材
20 壁面接合板
21 支柱補助部
22 結合用ボルト
23 窪み部
DESCRIPTION OF SYMBOLS 1, 1A Guard fence 2 Overlay concrete 3, 3A support | pillar 4 Base board 5 Rail 6 Remaining hole 7 Anchor bolt installation hole 9 Hardener 10 Existing anchor bolt 10A New anchor bolt 11 Electric hammer drill 12 Mortar 13 Plate board 14 Post Anchor bolt insertion oblong hole 14A Anchor bolt insertion oblong hole 15, 15A Prop joint plate 16 Support plate 17 Reinforcement rib 18 Fastening hole 19 Fastening member 20 Wall joint plate 21 Prop auxiliary part 22 Coupling bolt 23 depression

Claims (3)

地覆コンクリートに埋設されたアンカーボルトに橋梁用防護柵の支柱の下端が締結固定される既設の橋梁用防護柵の取替え工法において、
地覆コンクリートより露出したアンカーボルト地覆コンクリートとの境界線上を切断して地覆コンクリート内に残置されたアンカーボルト上端面をモルタルにより覆設する工程と、
前記残置されたアンカーボルトの両側にアンカーボルト設置穴を穿孔する工程と、
前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、
前記アンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を、前記地覆コンクリート上に突設するアンカーボルトに挿通されるとともに、前記地覆コンクリートの橋梁外側へ張り出した状態で固定される支柱接合プレート上に締結固定して橋梁用防護柵を取り付ける工程を備える
ことを特徴とする既設の橋梁用防護柵の取替え工法。
In the replacement method of the existing bridge protection fence, where the lower end of the bridge protection fence post is fastened and fixed to the anchor bolts embedded in the underground concrete,
Cutting the boundary line between the anchor bolt exposed from the ground concrete and the ground concrete and covering the upper end surface of the anchor bolt left in the ground concrete with mortar;
Drilling anchor bolt installation holes on both sides of the left anchor bolt;
Inserting and fixing an anchor bolt with a hardener in the anchor bolt installation hole;
A new support column having an anchor bolt insertion elongated hole that can be inserted into the anchor bolt is inserted into an anchor bolt projecting on the ground concrete and fixed in a state of projecting to the outside of the bridge of the ground concrete. A method for replacing an existing bridge protection fence, comprising the step of attaching and securing a bridge protection fence on a pillar connection plate to be fixed.
地覆コンクリートに埋設されたアンカーボルトに橋梁用防護柵の支柱の下端が締結固定される既設の橋梁用防護柵の取替え工法において、
地覆コンクリートより露出したアンカーボルト地覆コンクリートとの境界線上を切断して地覆コンクリート内に残置されたアンカーボルト上端面をモルタルにより覆設する工程と、
前記地覆コンクリートの橋梁外側壁面に対してアンカーボルト設置穴を穿孔する工程と、
前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、
前記アンカーボルトに前記地覆コンクリートの橋梁外側へ併設される支柱接合プレートに開設されるアンカーボルト挿通用長穴を挿通し締結固定し、該支柱接合プレート上に新設の防護柵を取り付ける工程を備える
ことを特徴とする既設の橋梁用防護柵の取替え工法。
In the replacement method of the existing bridge protection fence, where the lower end of the bridge protection fence post is fastened and fixed to the anchor bolts embedded in the underground concrete,
Cutting the boundary line between the anchor bolt exposed from the ground concrete and the ground concrete and covering the upper end surface of the anchor bolt left in the ground concrete with mortar;
Drilling an anchor bolt installation hole on the bridge outer wall surface of the ground concrete; and
Inserting and fixing an anchor bolt with a hardener in the anchor bolt installation hole;
The anchor bolt is inserted and fastened through an anchor bolt insertion oblong hole established in a column joint plate provided outside the bridge of the ground concrete, and a new guard fence is attached on the column joint plate. Replacement method for existing guard fences for bridges.
前記アンカーボルト挿通用長穴は、同アンカーボルト挿通用長穴の長径が橋梁の長さ方向とし、かつ地覆コンクリート内の鉄筋にアンカーボルトが当接した際に、該アンカーボルトの位置をずらすことができる長さとする
ことを特徴とする請求項1または請求項2に記載の既設の橋梁用防護柵の取替え工法。
The elongated hole for inserting the anchor bolt shifts the position of the anchor bolt when the long diameter of the elongated hole for inserting the anchor bolt is the length direction of the bridge and the anchor bolt abuts on the reinforcing bar in the ground concrete. 3. A method for replacing an existing bridge protection fence according to claim 1 or 2 , wherein the length is such that the length can be adjusted.
JP2007063077A 2007-03-13 2007-03-13 Replacing existing guard fences for bridges Active JP5190599B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007063077A JP5190599B2 (en) 2007-03-13 2007-03-13 Replacing existing guard fences for bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007063077A JP5190599B2 (en) 2007-03-13 2007-03-13 Replacing existing guard fences for bridges

Publications (2)

Publication Number Publication Date
JP2008223332A JP2008223332A (en) 2008-09-25
JP5190599B2 true JP5190599B2 (en) 2013-04-24

Family

ID=39842261

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007063077A Active JP5190599B2 (en) 2007-03-13 2007-03-13 Replacing existing guard fences for bridges

Country Status (1)

Country Link
JP (1) JP5190599B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4820890B2 (en) * 2009-06-18 2011-11-24 日本車輌製造株式会社 Guard fence fixing structure
JP5422344B2 (en) * 2009-11-16 2014-02-19 エフエムレーリング株式会社 Supporting equipment for guard fence posts for bridges in existing underground concrete
JP5334880B2 (en) * 2010-01-26 2013-11-06 積水樹脂株式会社 Protective fence
JP2011252362A (en) * 2010-06-04 2011-12-15 Showa Manufactruing Co Ltd Method of replacing balustrade column, spacer for balustrade column replacement and balustrade column
JP5436358B2 (en) * 2010-07-20 2014-03-05 公益財団法人鉄道総合技術研究所 Vehicle track support method using vertical sleepers and track position support tool used therefor
JP5829901B2 (en) * 2011-01-07 2015-12-09 勝彦 高木 Guard fence support and support for bridge
JP5973796B2 (en) * 2012-06-12 2016-08-23 株式会社ダイクレ Floor slab widening unit
JP6389771B2 (en) * 2015-02-02 2018-09-12 株式会社住軽日軽エンジニアリング Protective fence

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2717126B2 (en) * 1988-08-23 1998-02-18 石川島建材工業株式会社 Repair method of median strip and protective wall block used for it
JPH09228321A (en) * 1996-02-28 1997-09-02 Satougumi:Kk Construction method for repairing bridge
JP2000045433A (en) * 1998-07-30 2000-02-15 Ozawa Concrete Ind Co Ltd Form fitting method and work execution method of concrete structure
JP4414111B2 (en) * 2001-03-29 2010-02-10 株式会社興和工業所 Support fence post

Also Published As

Publication number Publication date
JP2008223332A (en) 2008-09-25

Similar Documents

Publication Publication Date Title
JP5190599B2 (en) Replacing existing guard fences for bridges
JP5694598B2 (en) Guard fence post for replacement bridge in existing ground-covered concrete
US9598827B1 (en) Barrier rail retrofit device assembly
JP6370729B2 (en) Road bridge protective fence installation method
KR102181972B1 (en) Bridge inspection facility construction method and bridge inspection facility constructed thereby
JP2010121281A (en) Width expanding material for road bridge
JP4882039B2 (en) Replacing existing guard fences for bridges
JP5431877B2 (en) Repair method and repair tool for slope stabilization anchor
JP2008196162A (en) Bridge fall prevention structure
JP2012219610A (en) Method for reinforcing corroded part of steel pipe support
JP4420697B2 (en) Standing structure of steel pipe columns
JP5043879B2 (en) How to install width expansion materials for road bridges
JP5422344B2 (en) Supporting equipment for guard fence posts for bridges in existing underground concrete
JP5773755B2 (en) Pile foundation structure of exterior structure and construction method of pile foundation structure of exterior structure
JP2005307452A (en) Method of regenerating concrete open channel
KR100865991B1 (en) Clamp for a scaffold pipe
KR100473477B1 (en) Bridge guirail reinforcement method of non-dismantle for bridge curbstone
JP4820975B2 (en) Reinforcement member and column / beam joint structure
JP5130137B2 (en) Renovation method for existing foundation of wooden construction
KR101333843B1 (en) Constructing device of install mount for street facility
JPH0978544A (en) Work execution method for concrete guard fence and concrete guard fence
JP5771448B2 (en) Tunnel interior panel mounting structure and tunnel interior panel mounting method
KR200275042Y1 (en) superannuat concrete with add concrete of joint equipment
JP5505979B2 (en) How to repair gutter
JP5554662B2 (en) How to repair gutter

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110630

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20110926

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20110927

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111102

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120306

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121219

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121227

R150 Certificate of patent or registration of utility model

Ref document number: 5190599

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160208

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350