JP4882039B2 - Replacing existing guard fences for bridges - Google Patents

Replacing existing guard fences for bridges Download PDF

Info

Publication number
JP4882039B2
JP4882039B2 JP2007054976A JP2007054976A JP4882039B2 JP 4882039 B2 JP4882039 B2 JP 4882039B2 JP 2007054976 A JP2007054976 A JP 2007054976A JP 2007054976 A JP2007054976 A JP 2007054976A JP 4882039 B2 JP4882039 B2 JP 4882039B2
Authority
JP
Japan
Prior art keywords
anchor bolt
concrete
ground
fence
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007054976A
Other languages
Japanese (ja)
Other versions
JP2008063931A (en
Inventor
勝彦 高木
英明 城戸
敏弘 岡村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIKO KENZAI LTD.
SHOWA MANUFACTURING CO., LTD.
Sekisui Jushi Corp
Nippon Engineering Co Ltd
Original Assignee
SHIKO KENZAI LTD.
SHOWA MANUFACTURING CO., LTD.
Sekisui Jushi Corp
Sumikei Nikkei Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIKO KENZAI LTD., SHOWA MANUFACTURING CO., LTD., Sekisui Jushi Corp, Sumikei Nikkei Engineering Co Ltd filed Critical SHIKO KENZAI LTD.
Priority to JP2007054976A priority Critical patent/JP4882039B2/en
Publication of JP2008063931A publication Critical patent/JP2008063931A/en
Application granted granted Critical
Publication of JP4882039B2 publication Critical patent/JP4882039B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、既設の橋梁用防護柵の取替え工法に関する。詳しくは既設橋における防護柵を取り替える際に、既設の橋梁用防護柵に根元を残置した状態で新たな防護柵を地覆コンクリート上に立て替える工法に係るものである。   The present invention relates to a method for replacing an existing bridge protective fence. Specifically, when replacing the protective fence on the existing bridge, it relates to a construction method in which a new protective fence is replaced on the ground-covered concrete with the root remaining in the existing protective fence for the bridge.

橋梁用防護柵は、図11に示すように、車道の路肩における地覆コンクリート101内に抜け防止板102が設けられた防護柵支柱103が埋設される構成や図12に示すように車道に沿った地覆コンクリート101にアンカーボルト104により固定されるベース105と、このベース105上に防護柵支柱103が締結固定される構成のものがある(特許文献1参照。)。 As shown in FIG. 11 , the bridge guard fence is constructed along the roadway as shown in FIG. 12 , in which a guard fence post 103 provided with a slip-off prevention plate 102 is embedded in the ground concrete 101 on the shoulder of the roadway . There is a base 105 fixed to the ground-covered concrete 101 with anchor bolts 104, and a structure in which a guard fence post 103 is fastened and fixed on the base 105 (see Patent Document 1).

特開2001−234515号公報JP 2001-234515 A

しかしながら橋梁用防護柵は風雨に晒されることによる老朽化や事故などによる破損によって取り替える必要が生じてくる。この取り替え時期に相当する防護柵としては前記図11に示すように支柱が地覆コンクリート内に埋め込まれた構成のものが多く、その取り替え工事は、地覆コンクリートを掘削機などによって取り崩して、旧の防護柵を取り外し、その後に新たに地覆コンクリートを施工して防護柵を取り付けているのが現状である。 However, it is necessary to replace the protective fence for bridges due to aging due to exposure to wind and rain or damage due to accidents. As shown in FIG. 11 , there are many protective fences corresponding to this replacement time, in which a support post is embedded in the underground concrete. The replacement work is performed by removing the underground concrete with an excavator or the like. The present situation is that the protective fence is removed and then the concrete is newly constructed and the protective fence is attached.

この防護柵の取替え作業は、地覆コンクリートを取り壊し、新たに地覆コンクリートの型枠を組立てて、前記図12に示すようなアンカーボルトや図11に示すように支柱を型枠内に配置してコンクリートを打設し、コンクリートが固まった後に型枠を外して防護柵を取り付ける作業工程を行わなければならず、その工事期間中には片側通行などによる長期の交通規制を行わなければならない問題が生ずる。 This protective fence replacement work involves demolishing the ground cover concrete, newly assembling the ground concrete formwork, and placing anchor bolts as shown in FIG. 12 and struts in the formwork as shown in FIG. The problem is that the concrete has to be placed, the concrete is solidified, the work frame is removed and the protective fence is attached, and long-term traffic restrictions such as one-way traffic are required during the construction period. Will occur.

また、防護柵の取替えのために地覆コンクリートを取り壊し、新たに地覆コンクリートを施工するのは工事費の負担がかかるとともに、老朽化した防護柵の取替えが思うように進まないなどの問題がある。   In addition, demolishing underground concrete for replacement of protective fences and constructing new underground concrete incurs construction costs and problems such as the replacement of an old protective fence does not proceed as expected. is there.

本発明は、以上の点に鑑みて創案されたものであって、既設の地覆コンクリートを取り壊さずに防護柵の取替え作業を行うことができる既設の橋梁用防護柵の取替え工法を提供することを目的とするものである。   The present invention was devised in view of the above points, and provides an existing method for replacing a guard fence for a bridge that can be used to replace the guard fence without demolishing existing ground-covered concrete. It is intended.

上記の目的を達成するために、本発明に係る既設の橋梁用防護柵の取替え工法は、地覆コンクリートに橋梁用防護柵の支柱の下端が埋設された状態で設置される既設の橋梁用防護柵の取替え工法において、前記地覆コンクリートより露出する支柱の地覆コンクリートとの境界線上を切断して既設の橋梁用防護柵を取り外す工程と、前記地覆コンクリート内に残置する支柱による残置穴を充填材によって埋設する工程と、前記残置穴の周囲にアンカーボルト設置穴を穿孔する工程と、前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、前記地覆コンクリート上に突設するアンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を締結固定して橋梁用防護柵を取り付ける工程を備える。   In order to achieve the above object, the method for replacing an existing bridge guard fence according to the present invention is the existing bridge guard installed with the bottom end of the bridge guard fence embedded in the concrete. In the replacement method of the fence, a step of removing the existing bridge protection fence by cutting the boundary line of the pillar exposed from the ground concrete with the ground concrete, and a remaining hole by the pillar left in the ground concrete A step of burying with a filler, a step of drilling anchor bolt installation holes around the remaining holes, a step of inserting and fixing anchor bolts in the anchor bolt installation holes with a hardener, and projecting on the ground concrete A step of attaching a guard fence for a bridge by fastening and fixing a new support column having an anchor bolt insertion elongated hole that can be inserted into the anchor bolt.

ここで、既設の防護柵を解体して支柱を切断して錆び止め並びにプライマー処理を行った後に地覆コンクリート内に残置した支柱の根元内にモルタルなどの充填材を注入することにより既設の地覆コンクリートを取り壊すことなく、新設の橋梁用防護柵の取替えを行うことができる。   Here, by disassembling the existing protective fence, cutting the struts to prevent rusting and primer treatment, and then injecting a filler such as mortar into the base of the struts left in the ground concrete, the existing ground It is possible to replace the newly constructed protective fence for bridges without destroying the covering concrete.

また、上記の目的を達成するために、本発明に係る既設の橋梁用防護柵の取替え工法は、地覆コンクリートに橋梁用防護柵の支柱の下端が埋設された状態で設置される既設の橋梁用防護柵の取替え工法において、前記地覆コンクリートより露出する支柱の地覆コンクリートとの境界線上を切断して既設の橋梁用防護柵を取り外す工程と、前記地覆コンクリート内に残置する支柱による残置穴を充填材によって埋設する工程と、前記残置穴の両側にアンカーボルト設置穴を穿孔する工程と、前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、前記アンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を、前記地覆コンクリート上に突設するアンカーボルトに挿通されるとともに、前記地覆コンクリートの橋梁外側へ張り出した状態で固定される支柱接合プレート上に締結固定して橋梁用防護柵を取り付ける工程を備える。   In order to achieve the above object, the method for replacing an existing bridge guard fence according to the present invention is an existing bridge installed in a state in which the lower end of the bridge guard fence post is buried in the underground concrete. In the replacement method of the protective fence for the building, the step of removing the existing protective fence for the bridge by cutting the boundary line of the supporting column exposed from the covering concrete with the covering concrete, and the leaving by the supporting pillar to be left in the covering concrete A process of embedding holes with a filler, a process of drilling anchor bolt installation holes on both sides of the remaining holes, a process of inserting and fixing anchor bolts in the anchor bolt installation holes with a hardener, and insertion into the anchor bolts are possible. A new strut having a long hole for inserting an anchor bolt is inserted into an anchor bolt projecting on the ground concrete, and the ground And fastened to the strut junction plates is fixed in a state of projecting to the bridge outside the concrete comprising the step of attaching the bridge for safety barrier.

ここで、既設の地覆コンクリート幅が狭い場合には、地覆コンクリート上に橋梁の外側へ張り出すような支柱接合プレートを取り付けることにより、新設の橋梁用防護柵の取替え施工が可能となる。   Here, when the existing cover concrete width is narrow, the work of replacing the newly installed guard fence for the bridge can be performed by attaching a column joining plate that projects to the outside of the bridge on the cover concrete.

また、上記の目的を達成するために、本発明に係る既設の橋梁用防護柵の取替え工法は、地覆コンクリートに橋梁用防護柵の支柱の下端が埋設された状態で設置される既設の橋梁用防護柵の取替え工法において、前記地覆コンクリートより露出する支柱の地覆コンクリートとの境界線上を切断して既設の橋梁用防護柵を取り外す工程と、前記地覆コンクリート内に残置する支柱による残置穴を充填材によって埋設する工程と、前記地覆コンクリートの橋梁外側壁面に対してアンカーボルト設置穴を穿孔する工程と、前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、前記アンカーボルトに前記地覆コンクリートの橋梁外側へ併設される支柱接合プレートに開設されるアンカーボルト挿通用長穴を挿通し締結固定し、該柱接合プレート上に新設の防護柵を取り付ける工程を備える。 In order to achieve the above object, the method for replacing an existing bridge guard fence according to the present invention is an existing bridge installed in a state in which the lower end of the bridge guard fence post is buried in the underground concrete. In the replacement method of the protective fence for the building, the step of removing the existing protective fence for the bridge by cutting the boundary line of the supporting column exposed from the covering concrete with the covering concrete, and the leaving by the supporting pillar to be left in the covering concrete A step of burying a hole with a filler, a step of drilling an anchor bolt installation hole with respect to a bridge outer wall surface of the ground concrete, a step of inserting and fixing an anchor bolt into the anchor bolt installation hole with a hardening material, Insert the anchor bolts into the anchor bolt insertion long holes that are installed in the column connection plates that are installed outside the concrete concrete bridge. Constant, and comprising the step of attaching a safety barrier of the newly established columnar junction plate.

ここで、該地覆コンクリート上面に防護柵を設置できない場合には、地覆コンクリートの橋梁外側の壁面に、支柱接合プレートを取り付けることにより、新設の橋梁用防護柵の取替え施工が可能となる。   Here, when a protective fence cannot be installed on the top surface of the ground-covered concrete, it is possible to replace the newly installed protective fence for a bridge by attaching a column connection plate to the wall surface outside the bridge of the ground-covered concrete.

本発明の既設の橋梁用防護柵の取替え工法は、既設の地覆コンクリートを取り壊さずに橋梁用防護柵の取替えを可能とするために、工期が短縮され、かつ新設の防護柵のみの資材となることから大幅なコスト低減が可能となる。   The replacement method of the existing protective fence for the bridge according to the present invention has a shortened construction period and enables the replacement of the protective fence for the bridge without destroying the existing underground concrete. Therefore, a significant cost reduction is possible.

また、既設の橋梁用防護柵の支柱跡を新設の防護柵によって隠すことにより美観を損なうことなく、かつ幅の狭い地覆コンクリートでは、支柱接合プレートを地覆コンクリートより道路外側へ張り出すように取り付けることで新設の橋梁用防護柵の取替え施工が可能となる。   In addition, by concealing the struts of the existing guard fences for bridges with the new guard fences, in the case of narrow terrain concrete, the strut joint plate should be extended to the outside of the road from the terrain concrete. By installing it, it is possible to replace the newly constructed guard fence for bridges.

以下、本発明の実施の形態を図面を参酌しながら説明し、本発明の理解に供する。
実施例1
図1は、本発明を適用した既設の橋梁用防護柵の取替え工法における既設の防護柵の取り付け状態を示す説明図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings to provide an understanding of the present invention.
Example 1
FIG. 1 is an explanatory view showing an installed state of an existing protective fence in a method for replacing an existing bridge protective fence to which the present invention is applied.

既設の防護柵1は、道路の路肩に設けられる地覆コンクリート2上に立設された支柱3間にボルト・ナットなどの締結部材によって取り付けられる。
ここで、前記支柱3は平板状の抜け防止板4が基部に一体的に取り付けられた状態で前記地覆コンクリート2内に埋設されている。
The existing protective fence 1 is attached by fastening members such as bolts and nuts between columns 3 erected on the ground concrete 2 provided on the shoulder of the road.
Here, the column 3 is embedded in the ground-covered concrete 2 in a state where a flat plate-like prevention plate 4 is integrally attached to the base.

そこで図2(イ)(ロ)(ハ)にそれぞれ示すように、支柱3間に渡設される各種レール5を取り外して支柱3のみとする。次に、前記地覆コンクリート2より露出する支柱3の地覆コンクリート2との境界線上をガスバーナーによって溶断する。この場合には、ガスバーナーによって溶断した後に残置される支柱3の上端が地覆コンクリート2より露出しないように更に切り下げるなどの作業を行う。   Therefore, as shown in FIGS. 2A, 2B and 2C, the various rails 5 provided between the support columns 3 are removed so that only the support columns 3 are provided. Next, a gas burner melts the boundary line between the support 3 exposed from the ground concrete 2 and the ground concrete 2. In this case, an operation such as further cutting down is performed so that the upper end of the column 3 left after being melted by the gas burner is not exposed from the cover concrete 2.

したがって、地覆コンクリート2上には既設の防護柵に支柱による残置穴6が一定間隔ごとに開口されることになる。そこで前記残置穴6上に新設の防護柵を取り付けるために、図2(ハ)で示すように、前記残置穴6の周囲に4個のアンカーボルト設置穴7をコンクリート穿孔ドリルによって穿孔する。   Therefore, the remaining holes 6 by the support pillars are opened at regular intervals on the existing protective fence on the ground concrete 2. Therefore, in order to attach a new protective fence on the remaining hole 6, four anchor bolt installation holes 7 are drilled around the remaining hole 6 with a concrete drill as shown in FIG.

ここで、前記アンカーボルト設置穴7は図3に示すように、地覆コンクリート2内に埋設された抜け防止板4に当接しない位置、すなわち抜け防止板4の周囲に前記アンカーボルト設置穴7を設ける構成とする。   Here, as shown in FIG. 3, the anchor bolt installation hole 7 is located at a position where the anchor bolt installation hole 7 does not come into contact with the escape prevention plate 4 embedded in the ground concrete 2, that is, around the escape prevention plate 4. It is set as the structure which provides.

そして図4(イ)(ロ)(ハ)にそれぞれ示すように、前記アンカーボルト設置穴7内の清掃後、このアンカーボルト設置穴7内に攪拌により硬化するカプセル内に収納された樹脂製硬化剤9を挿入し、アンカーボルト10を電動ハンマードリル11等に装着し回転・打撃させ、硬化剤9を攪拌・混合しながら前記アンカーボルト設置穴7底面に到達するまで埋め込むものである。   Then, as shown in FIGS. 4 (a), (b), and (c), after the inside of the anchor bolt installation hole 7, the resin-cured resin contained in the capsule that is cured by stirring in the anchor bolt installation hole 7 is used. The agent 9 is inserted, the anchor bolt 10 is mounted on the electric hammer drill 11 and the like, rotated and blown, and the curing agent 9 is agitated and mixed until it reaches the bottom surface of the anchor bolt installation hole 7.

さらに、図5に示すように、前記残置穴6内をプライマー塗布並びに錆び止めを行い、その残置穴6内をモルタル12によって埋設して地覆コンクリート2の上面と同一面とする。このようにして新設の防護柵を取り付けるための前工程を行うものである。   Further, as shown in FIG. 5, primer application and rust prevention are performed in the remaining hole 6, and the remaining hole 6 is buried with a mortar 12 so as to be flush with the upper surface of the ground concrete 2. In this way, a pre-process for attaching a new protective fence is performed.

次に図6に示すように、新設の支柱3Aは断面H型のダクタイル鋳鉄あるいは、鋼製、アルミニウム製、ステンレス製などにより作成され、その下端両側にはプレート板13が延設される。このプレート板13は通常の場合より長く形成される。   Next, as shown in FIG. 6, the new support column 3A is made of ductile cast iron having an H-shaped section, or made of steel, aluminum, stainless steel, etc., and plate plates 13 are extended on both sides of the lower end thereof. This plate 13 is formed longer than usual.

更に前記プレート板13には、前記アンカーボルト10の配置状態に対応したアンカーボルト挿通用長穴14が4個貫設されている。そこで前記地覆コンクリート2に埋め込み設置したアンカーボルト10に支柱3Aのプレート板13のアンカーボルト挿通用長穴14を挿通する。この挿通用長穴14は、コンクリート穿孔ドリルがコンクリート内の鉄筋に当った場合に鉄筋を切断又は損傷させないために、再度その位置を左右側にずらすことができるように地覆コンクリート2の長手方向に沿って長穴形状とされ、かつこの長穴の寸法をアンカーボルトの口径の3倍以上の長さにすることが望ましい。   Further, the plate plate 13 is provided with four anchor bolt insertion slots 14 corresponding to the arrangement state of the anchor bolts 10. Therefore, the anchor bolt insertion long hole 14 of the plate plate 13 of the column 3A is inserted into the anchor bolt 10 embedded and installed in the ground concrete 2. This insertion long hole 14 is provided in the longitudinal direction of the concrete 2 so that the position can be shifted to the left and right again in order not to cut or damage the reinforcing bar when the concrete drill drill hits the reinforcing bar in the concrete. It is desirable that the shape of the elongated hole is formed along the length of the anchor bolt and the dimension of the elongated hole is at least three times the diameter of the anchor bolt.

このようにして図7に示すように、残置穴6上に新設の支柱3Aを立設し、この支柱3A間に上部レール5Aおよび下部レール5Bなどを渡設することにより防護柵1Aへの取替えが完了する。   In this way, as shown in FIG. 7, the newly installed support column 3A is erected on the remaining hole 6, and the upper rail 5A, the lower rail 5B, and the like are installed between the support columns 3A to replace the protective fence 1A. Is completed.

実施例2
次に、地覆コンクリート幅が狭い場合の設置例を図8(イ)(ロ)(ハ)にそれぞれ示す。
前記図2(イ)(ロ)(ハ)で示したように、既設の防護柵1の支柱3の根元部分を溶断して取り外し、図5に示すように残置穴6内にモルタル12によって埋設して地覆コンクリート2の上面と同一面とする。
Example 2
Next, examples of installation in the case where the ground concrete width is narrow are shown in FIGS. 8 (a), (b) and (c), respectively.
As shown in FIGS. 2 (a), (b) and (c), the base portion of the support column 3 of the existing protective fence 1 is melted and removed, and embedded in the remaining hole 6 with a mortar 12 as shown in FIG. And the same surface as the upper surface of the ground-covering concrete 2.

そこで、図8(ハ)で示すように、地覆コンクリート2の残置穴6の両側位置に設けたアンカーボルト設置穴7に2個のアンカーボルト10を、前記図4(イ)(ロ)(ハ)で示す施工手順によって配置する。   Therefore, as shown in FIG. 8C, two anchor bolts 10 are attached to the anchor bolt installation holes 7 provided on both sides of the remaining hole 6 of the ground covering concrete 2 as shown in FIGS. Arranged according to the construction procedure shown in c).

次に、図8(イ)で示すように、前記アンカーボルト10に対して前記地覆コンクリート2の後方へ張り出した状態で支柱接合プレート15を設置するものであり、この支柱接合プレート15の底面には、前記地覆コンクリート2の壁面に当接される支持板16が直角状に突設され、さらに該支持板16と支柱接合プレート15の後端に渡って補強リブ17が設けられるものである。そして前記支柱接合プレート15前部側にはアンカーボルト10が挿通可能としたアンカーボルト挿通用長穴14Aが貫設され、前記支柱接合プレート15後部側には、支柱との接合を行うための締結用長穴18が貫設される。   Next, as shown in FIG. 8 (a), a column joining plate 15 is installed with the anchor bolt 10 protruding to the rear of the ground concrete 2 and the bottom surface of this column joining plate 15 is shown. The support plate 16 that abuts against the wall surface of the ground-covering concrete 2 protrudes at a right angle, and a reinforcing rib 17 is provided across the rear end of the support plate 16 and the column joining plate 15. is there. An anchor bolt insertion elongated hole 14A through which the anchor bolt 10 can be inserted is penetrated in the front side of the column joining plate 15, and fastening for joining the column to the rear side of the column joining plate 15 is performed. An oblong hole 18 is provided.

ここで、支柱接合プレート15を前記アンカーボルト10に支柱接合プレート15前部側に貫設されるアンカーボルト挿通用長穴14Aを挿通した状態で地覆コンクリート2上に設置する。これにより前記支柱接合プレート15は、地覆コンクリート2後方に張り出した状態で設置されることになり、この支柱接合プレート15上に支柱3Aのプレート板13を積重し、ボルト・ナットなどの締結部材19によって接合することにより防護柵1Aの取替えが可能となる。   Here, the column joining plate 15 is installed on the ground concrete 2 in a state where the anchor bolt insertion elongated hole 14A penetrating the anchor bolt 10 at the front side of the column joining plate 15 is inserted. As a result, the column joining plate 15 is installed in a state of projecting behind the ground covering concrete 2, and the plate plate 13 of the column 3 A is stacked on the column joining plate 15 and tightened with bolts and nuts. By joining with the member 19, the protection fence 1A can be replaced.

実施例3
次に、地覆コンクリート幅が狭く、該地覆コンクリート上面に防護柵を設置できない場合の設置例を図9(イ)(ロ)にそれぞれ示す。
この場合には、地覆コンクリート上に設置された既設の防護柵は、図2において前述した手順によって取り外し、図5に示すように残置穴6内にモルタル12によって埋設して地覆コンクリート2の上面と同一面とする。
Example 3
Next, FIG. 9 (A) and FIG. 9 (B) show examples of installation in the case where the ground concrete width is narrow and the protective fence cannot be installed on the top surface of the ground concrete.
In this case, the existing protective fence installed on the ground-covering concrete is removed by the procedure described above in FIG. 2 and buried in the remaining hole 6 with the mortar 12 as shown in FIG. The same surface as the upper surface.

そして図9(イ)で示すように、地覆コンクリート2の橋梁の外側の壁面に対して図4(イ)(ロ)(ハ)において詳述したように、前記壁面に対してアンカーボルト設置穴7を穿孔し、4個のアンカーボルト10を埋め込むものである。   Then, as shown in FIG. 9 (a), anchor bolts are installed on the wall surface on the outer wall surface of the concrete cover 2 bridge as described in detail in FIGS. 4 (a), (b) and (c). A hole 7 is drilled and four anchor bolts 10 are embedded.

ここで、前記アンカーボルト10に対して締結固定される支柱接合プレート15Aを地覆コンクリート2の橋梁の外側の壁面に取り付けるものであり、この支柱接合プレート15Aは90度に折り曲げ形成される壁面接合板20との間に補強リブ17が設けられ、この壁面接合板20にはアンカーボルト挿通用長穴14Aが貫設されるとともに、支柱接合プレート15Aには支柱との接合を行うための締結用長穴18が貫設される。   Here, the column joining plate 15A fastened and fixed to the anchor bolt 10 is attached to the outer wall surface of the bridge of the underground concrete 2, and this column joining plate 15A is bent and formed at 90 degrees. Reinforcing ribs 17 are provided between the plate 20, anchor wall insertion holes 14 </ b> A are penetrated through the wall surface bonding plate 20, and the column bonding plate 15 </ b> A is used for fastening for bonding with the column. A long hole 18 is provided.

したがって、前記支柱接合プレート15Aを地覆コンクリート2の橋梁の外側の壁面に取り付けられるアンカーボルト10とボルト・ナットなどの締結部材19によって取付けることによって、支柱接合プレート15Aが地覆コンクリート2の外側へ張り出した状態となる。   Therefore, the column joining plate 15A is moved to the outside of the ground concrete 2 by attaching the column joining plate 15A by the anchor bolts 10 and the fastening members 19 such as bolts and nuts attached to the outer wall surface of the bridge of the ground concrete 2. It will be overhanging.

そして前記支柱接合プレート15A上に、支柱3Aのプレート板13を積重し、ボルト・ナットなどの締結部材19によって接合することにより防護柵1Aの取替えが可能となる。   The protective fence 1A can be replaced by stacking the plate plates 13 of the columns 3A on the column bonding plates 15A and bonding them with the fastening members 19 such as bolts and nuts.

なお、本実施例ではアンカーボルトの取付けを4個、あるいは2個とするものであるが、必ずしも4個、あるいは2個とする必要性はなく、既設の地覆コンクリート内の鉄筋の位置やコンクリートの強度の状況に応じて本数を決定することが望ましい。   In this embodiment, four or two anchor bolts are attached. However, it is not always necessary to use four or two, and the position of the reinforcing bar in the existing ground-covered concrete or the concrete is not necessarily required. It is desirable to determine the number according to the strength situation.

また、本実施例では残置穴内にモルタルを充填するものであるが、必ずしもモルタルを充填する必要性はなく、合成樹脂材など作業性および強耐性に優れた充填材であればいかなる素材であっても構わない。   Further, in this embodiment, the mortar is filled in the remaining hole, but it is not always necessary to fill the mortar, and any material can be used as long as it is a filler excellent in workability and strong resistance such as a synthetic resin material. It doesn't matter.

実施例4
次に、防護柵がアルミニウム合金などの軽金属製の場合の設置例を図10(イ)(ロ)(ハ)でそれぞれ示す。
Example 4
Next, examples of installation when the protective fence is made of a light metal such as an aluminum alloy are shown in FIGS.

ここで、防護柵1Aがアルミニウム合金などの軽金属製の場合にはプレート板13と、このプレート板13に突設される支柱補助部21はアルミ合金の溶接強度に問題があるために鋼製とされることが多い。この支柱補助部21にアルミニウム合金製の防護柵1Aの支柱3Aが嵌め入れられて、結合用ボルト22によって強固に連結される構成とされる。   Here, when the protective fence 1A is made of a light metal such as an aluminum alloy, the plate plate 13 and the column auxiliary portion 21 protruding from the plate plate 13 have a problem in the welding strength of the aluminum alloy. Often done. A support 3 </ b> A of a protective fence 1 </ b> A made of aluminum alloy is fitted into the support auxiliary part 21 and is firmly connected by a coupling bolt 22.

まず、図10(イ)(ロ)で示すように、地覆コンクリート2に埋設されるアンカーボルト10に対して前記地覆コンクリート2の後方へ張り出した状態で支柱接合プレート15を設置するものであり、この支柱接合プレート15の底面には、前記地覆コンクリート2の壁面に当接される支持板16が直角状に突設され、さらに該支持板16と支柱接合プレート15の後端に渡って補強リブ17が設けられるものである。そして前記支柱接合プレート15前部側にはアンカーボルト10が挿通可能としたアンカーボルト挿通用長穴14Aが貫設される。   First, as shown in FIGS. 10 (a) and 10 (b), the column joining plate 15 is installed in a state where the anchor bolt 10 embedded in the ground concrete 2 is projected rearward from the ground concrete 2. A support plate 16 that abuts against the wall surface of the cover concrete 2 is provided on the bottom surface of the column joining plate 15 so as to project at a right angle, and further across the rear end of the support plate 16 and the column joining plate 15. The reinforcing rib 17 is provided. An anchor bolt insertion long hole 14A through which the anchor bolt 10 can be inserted is provided through the front side of the column joining plate 15.

そこで図10(イ)で示すように、支柱接合プレート15前部側に貫設されるアンカーボルト挿通用長穴14Aを前記アンカーボルト10に挿通した状態で地覆コンクリート2上に設置する。これにより前記支柱接合プレート15は、地覆コンクリート2後方に張り出した状態で設置されることになる。   Therefore, as shown in FIG. 10A, the anchor bolt insertion elongated hole 14 </ b> A penetrating the front side of the column joining plate 15 is installed on the ground concrete 2 in a state of being inserted into the anchor bolt 10. Thereby, the said support | pillar joining plate 15 will be installed in the state projected over the ground-covering concrete 2 back.

この支柱接合プレート15上に、支柱3Aのプレート板13を積重し、ボルト・ナットなどの締結部材19によって接合する。そして該プレート板13に突設される支柱補助部21にアルミニウム合金製の防護柵1Aの支柱3Aが嵌め入れられて、結合用ボルト22によって連結されることにより防護柵1Aの取替えが可能となる。   The plate plate 13 of the column 3A is stacked on the column bonding plate 15 and bonded by a fastening member 19 such as a bolt and a nut. Then, the support fence 3A of the aluminum alloy guard fence 1A is fitted into the support pillar auxiliary portion 21 projecting from the plate plate 13 and is connected by the coupling bolt 22 so that the guard fence 1A can be replaced. .

なお、前記実施例4における防護柵1Aは、鋼製の支柱補助部21にアルミニウム合金製の支柱3Aとの組合せについて詳述したが、必ずしもアルミニウム合金製の支柱3Aとの組合せである必要性はなく、例えば鋼製の支柱3A、あるいは他の金属製による支柱3Aとの組合せであっても構わない。   In addition, although the protective fence 1A in the said Example 4 explained in full detail about the combination with the support | pillar part 3A made from an aluminum alloy in the support | pillar auxiliary | assistance part 21 made from steel, it is not necessarily required to be a combination with the support | pillar 3A made from aluminum alloy. For example, it may be a combination with a steel support 3A or another metal support 3A.

以上の構成よりなる本発明の既設の橋梁用防護柵の取替え工法では、既設の防護柵を解体して支柱を切断して錆び止め、プライマー処理を行った後に地覆コンクリート内に残置した支柱の根元内にモルタルを注入することにより既設の地覆コンクリートを取り壊すことなく使用することができる。   In the construction method of the existing bridge guard fence of the present invention having the above configuration, the existing guard fence is disassembled, the pillar is cut and rust-prevented, and after the primer treatment, the pillars left in the ground concrete are removed. By injecting mortar into the root, it can be used without demolishing the existing underground concrete.

また、前記地覆コンクリート内に残置した支柱の周囲に地覆コンクリート内の鉄筋を避けるようにアンカーボルトを埋め込むことにより前記地覆コンクリート上に通常の防護柵と何ら変わらない防護柵の取替え施工が可能となる。   In addition, by embedding anchor bolts so as to avoid the reinforcing bars in the ground-covered concrete around the pillars left in the ground-covered concrete, replacement work of the protective fence that is no different from the normal guard fence on the ground-covered concrete is possible. It becomes possible.

また、実施例2において詳述したように既設の地覆コンクリート幅が狭い場合には、地覆コンクリート上に橋梁の外側へ張り出すような支柱接合プレートを取り付けることにより、防護柵の取替え施工が可能となる。   In addition, as described in detail in Example 2, when the existing underground concrete width is narrow, the protective fence can be replaced by attaching a column joining plate that projects to the outside of the bridge on the underground concrete. It becomes possible.

また、実施例3において詳述したように地覆コンクリート幅が狭く、該地覆コンクリート上面に防護柵を設置できない場合には、地覆コンクリートの橋梁外側の壁面に、地覆コンクリート内の鉄筋を避けるようにアンカーボルトを埋め込み、該アンカーボルトによる締結固定によって地覆コンクリートの背面側へ張り出すように支柱接合プレートを取り付けることにより、防護柵の取替え施工が可能となる。   Further, as described in detail in Example 3, when the width of the cover concrete is narrow and a protective fence cannot be installed on the top surface of the cover concrete, the reinforcing bars in the cover concrete are attached to the wall surface outside the bridge of the cover concrete. It is possible to replace the protective fence by embedding the anchor bolt so as to avoid it and attaching the column joining plate so as to project to the back side of the ground concrete by fastening and fixing with the anchor bolt.

また、実施例4において詳述したように、防護柵がアルミニウム合金などの軽金属製の場合であっても鋼製よりなるプレート板を、地覆コンクリート2上に設置された支柱接合プレート上に積重した状態で取り付け、プレート板上に突設される支柱補助部にアルミニウム合金製の防護柵の支柱が嵌め入れて結合用ボルトによって結合することによりアルミニウム合金などの軽金属製の防護柵の取替えが容易に行うことが可能となる。   Further, as described in detail in Example 4, even when the protective fence is made of a light metal such as an aluminum alloy, a plate plate made of steel is stacked on the column joining plate installed on the ground concrete 2. The protective fence made of aluminum alloy or the like can be replaced by attaching the pillar of the aluminum alloy protective fence to the support auxiliary part projecting on the plate plate and connecting it with the connecting bolt. It can be easily performed.

本発明を適用した既設の橋梁用防護柵の取替え工法における既設の防護柵の取り付け状態を示す説明図である。It is explanatory drawing which shows the attachment state of the existing protection fence in the replacement construction method of the existing protection fence for bridges to which this invention is applied. 本発明を適用した既設の橋梁用防護柵の取替え工法における既設の防護柵の支柱を切断し、アンカーボルト設置穴を穿孔するまでの説明図である。It is explanatory drawing until it cut | disconnects the pillar of the existing protection fence in the replacement construction method of the existing protection fence for bridges to which this invention is applied, and drills an anchor bolt installation hole. 図2におけるアンカーボルト設置穴の穿孔位置を示す平面説明図である。FIG. 3 is an explanatory plan view showing a drilling position of an anchor bolt installation hole in FIG. 2. 本発明を適用した既設の橋梁用防護柵の取替え工法におけるアンカーボルト設置穴にアンカーボルトを埋設する工程を示す説明図である。It is explanatory drawing which shows the process of embedding an anchor bolt in the anchor bolt installation hole in the replacement construction method of the existing guard fence for bridges to which this invention is applied. 図2における既設の防護柵の支柱を切断した後の残置穴にモルタルを注入した状態を示す説明図である。It is explanatory drawing which shows the state which inject | poured the mortar into the remaining hole after cut | disconnecting the support | pillar of the existing protection fence in FIG. 既設の地覆コンクリート上面に新設の防護柵の支柱を取り付ける状態を示す説明図である。It is explanatory drawing which shows the state which attaches the support | pillar of a new guard fence to the existing upper surface concrete. 図6における新設の防護柵の支柱に各レール等を取り付けて取替えが完了した状態を示す説明図である。It is explanatory drawing which shows the state which attached each rail etc. to the support | pillar of the new protection fence in FIG. 6, and completed replacement | exchange. 本発明を適用した既設の橋梁用防護柵の取替え工法において、地覆コンクリート幅が狭い場合の設置例を示す説明図である。It is explanatory drawing which shows the example of installation in the case where the width of a concrete cover is narrow in the replacement method of the existing guard fence for bridges to which this invention is applied. 本発明を適用した既設の橋梁用防護柵の取替え工法において、地覆コンクリート幅が狭く、該地覆コンクリート上面に防護柵を設置できない場合の設置例を示す説明図である。It is explanatory drawing which shows the example of installation in the case of the replacement method of the existing protection fence for bridges to which this invention is applied, when a concrete cover width is narrow and a protection fence cannot be installed on this ground concrete surface. 本発明を適用した既設の橋梁用防護柵の取替え工法において、防護柵がアルミニウム合金などの軽金属製の場合の設置例を示す説明図である。It is explanatory drawing which shows the example of installation in case the protection fence is light metal, such as an aluminum alloy, in the replacement construction method of the existing protection fence for bridges to which this invention is applied. 既設の防護柵の設置例を示す説明図である。It is explanatory drawing which shows the example of installation of the existing protection fence. 従来の橋梁用防護柵の一例を示す説明図である。It is explanatory drawing which shows an example of the conventional guard fence for bridges.

符号の説明Explanation of symbols

1、1A 防護柵
2 地覆コンクリート
3、3A 支柱
4 抜け防止板
5 レール
6 残置穴
7 アンカーボルト設置穴
9 硬化剤
10 アンカーボルト
11 電動ハンマードリル
12 モルタル
13 プレート板
14、14A アンカーボルト挿通用長穴
15、15A 支柱接合プレート
16 支持板
17 補強リブ
18 締結用長穴
19 締結部材
20 壁面接合板
21 支柱補助部
22 結合用ボルト
DESCRIPTION OF SYMBOLS 1, 1A Guard fence 2 Overlay concrete 3, 3A support | pillar 4 Fall-out prevention board 5 Rail 6 Retained hole 7 Anchor bolt installation hole 9 Hardener 10 Anchor bolt 11 Electric hammer drill 12 Mortar 13 Plate board 14, 14A Anchor bolt insertion length Hole 15, 15A Supporting plate 16 Support plate 17 Reinforcement rib 18 Fastening hole 19 Fastening member 20 Wall surface joining plate 21 Supporting column 22 Connecting bolt

Claims (5)

地覆コンクリートに橋梁用防護柵の支柱の下端が埋設された状態で設置される既設の橋梁用防護柵の取替え工法において、
前記地覆コンクリートより露出する支柱の地覆コンクリートとの境界線上を切断して既設の橋梁用防護柵を取り外す工程と、
前記地覆コンクリート内に残置する支柱による残置穴を充填材によって埋設する工程と、
前記残置穴の周囲にアンカーボルト設置穴を穿孔する工程と、
前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、
前記地覆コンクリート上に突設するアンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を締結固定して橋梁用防護柵を取り付ける工程を備える
ことを特徴とする既設の橋梁用防護柵の取替え工法。
In the method of replacing the existing bridge protection fence, which is installed with the bottom end of the bridge protection fence post buried in the ground concrete,
Cutting off the existing bridge protection fence by cutting the boundary line with the ground concrete of the pillar exposed from the ground concrete;
A step of burying a remaining hole by a pillar to be left in the ground concrete with a filler;
Drilling anchor bolt installation holes around the remaining holes;
Inserting and fixing an anchor bolt with a hardener in the anchor bolt installation hole;
An existing bridge protection comprising a step of fastening and fixing a new support column having an anchor bolt insertion elongated hole that can be inserted into an anchor bolt projecting on the ground covering concrete, and attaching a bridge protection fence. Fence replacement method.
地覆コンクリートに橋梁用防護柵の支柱の下端が埋設された状態で設置される既設の橋梁用防護柵の取替え工法において、
前記地覆コンクリートより露出する支柱の地覆コンクリートとの境界線上を切断して既設の橋梁用防護柵を取り外す工程と、
前記地覆コンクリート内に残置する支柱による残置穴を充填材によって埋設する工程と、
前記残置穴の両側にアンカーボルト設置穴を穿孔する工程と、
前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、
前記アンカーボルトに挿通可能なアンカーボルト挿通用長穴を有する新設の支柱を、前記地覆コンクリート上に突設するアンカーボルトに挿通されるとともに、前記地覆コンクリートの橋梁外側へ張り出した状態で固定される支柱接合プレート上に締結固定して橋梁用防護柵を取り付ける工程を備える
ことを特徴とする既設の橋梁用防護柵の取替え工法。
In the method of replacing the existing bridge protection fence, which is installed with the bottom end of the bridge protection fence post buried in the ground concrete,
Cutting off the existing bridge protection fence by cutting the boundary line with the ground concrete of the pillar exposed from the ground concrete;
A step of burying a remaining hole by a pillar to be left in the ground concrete with a filler;
Drilling anchor bolt installation holes on both sides of the remaining hole;
Inserting and fixing an anchor bolt with a hardener in the anchor bolt installation hole;
A new support column having an anchor bolt insertion elongated hole that can be inserted into the anchor bolt is inserted into an anchor bolt projecting on the ground concrete and fixed in a state of projecting to the outside of the bridge of the ground concrete. A method for replacing an existing bridge protection fence, comprising the step of attaching and securing a bridge protection fence on a pillar connection plate to be fixed.
地覆コンクリートに橋梁用防護柵の支柱の下端が埋設された状態で設置される既設の橋梁用防護柵の取替え工法において、
前記地覆コンクリートより露出する支柱の地覆コンクリートとの境界線上を切断して既設の橋梁用防護柵を取り外す工程と、
前記地覆コンクリート内に残置する支柱による残置穴を充填材によって埋設する工程と、
前記地覆コンクリートの橋梁外側壁面に対してアンカーボルト設置穴を穿孔する工程と、
前記アンカーボルト設置穴内にアンカーボルトを硬化材によって挿入固着する工程と、
前記アンカーボルトに前記地覆コンクリートの橋梁外側へ併設される支柱接合プレートに開設されるアンカーボルト挿通用長穴を挿通し締結固定し、該柱接合プレート上に新設の防護柵を取り付ける工程を備える
ことを特徴とする既設の橋梁用防護柵の取替え工法。
In the method of replacing the existing bridge protection fence, which is installed with the bottom end of the bridge protection fence post buried in the ground concrete,
Cutting off the existing bridge protection fence by cutting the boundary line with the ground concrete of the pillar exposed from the ground concrete;
A step of burying a remaining hole by a pillar to be left in the ground concrete with a filler;
Drilling an anchor bolt installation hole on the bridge outer wall surface of the ground concrete; and
Inserting and fixing an anchor bolt with a hardener in the anchor bolt installation hole;
The anchor bolt is inserted and fastened through an anchor bolt insertion long hole provided in a column joining plate provided outside the bridge of the ground-concrete concrete, and a new guard fence is attached on the column joining plate. Replacement method for existing guard fences for bridges.
前記充填材がモルタルである
ことを特徴とする請求項1、請求項2または請求項3記載の既設の橋梁用防護柵の取替え工法。
The said filler is mortar. The replacement method of the existing guard fence for bridges of Claim 1, Claim 2 or Claim 3 characterized by the above-mentioned.
前記アンカーボルト挿通用長穴は、橋梁の長さ方向とし、かつ地覆コンクリート内の鉄筋にアンカーボルトが当接した際に、該アンカーボルトの位置をずらすことができる長さとする
ことを特徴とする請求項1、請求項2請求項3または請求項4記載の既設の橋梁用防護柵の取替え工法。
The elongated hole for inserting the anchor bolt has a length that allows the position of the anchor bolt to be shifted when the anchor bolt is in contact with a reinforcing bar in the ground-covered concrete in the length direction of the bridge. 5. A method for replacing an existing bridge guard fence according to claim 1, claim 2, claim 3 or claim 4.
JP2007054976A 2006-08-07 2007-03-06 Replacing existing guard fences for bridges Active JP4882039B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007054976A JP4882039B2 (en) 2006-08-07 2007-03-06 Replacing existing guard fences for bridges

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2006214297 2006-08-07
JP2006214297 2006-08-07
JP2007054976A JP4882039B2 (en) 2006-08-07 2007-03-06 Replacing existing guard fences for bridges

Publications (2)

Publication Number Publication Date
JP2008063931A JP2008063931A (en) 2008-03-21
JP4882039B2 true JP4882039B2 (en) 2012-02-22

Family

ID=39286875

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007054976A Active JP4882039B2 (en) 2006-08-07 2007-03-06 Replacing existing guard fences for bridges

Country Status (1)

Country Link
JP (1) JP4882039B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5663142B2 (en) * 2008-05-23 2015-02-04 エフエムレーリング株式会社 Guard fence post for replacement bridge in existing ground-covered concrete
JP5334880B2 (en) * 2010-01-26 2013-11-06 積水樹脂株式会社 Protective fence
JP5831983B2 (en) * 2012-01-17 2015-12-16 株式会社住軽日軽エンジニアリング Protective fence
CN108166388A (en) * 2018-01-15 2018-06-15 湖南省交通规划勘察设计院有限公司 A kind of steel anticollision barrier connecting structure for being easy to construction suitable for STC bridge decks

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54132334A (en) * 1978-04-04 1979-10-15 Nippon Light Metal Co Method of repair construction of shelfflike body
JPS58559A (en) * 1981-06-22 1983-01-05 ワイケイケイ株式会社 Remodeling of established handrail
JPS58113460A (en) * 1981-12-28 1983-07-06 ワイケイケイ株式会社 Remodeling of handrail
JPS6041426A (en) * 1983-08-12 1985-03-05 三菱電機株式会社 Control of water sprinkler
JPH02308004A (en) * 1989-02-25 1990-12-21 Norimasa Ozaki Protection fence for road
JP2002146721A (en) * 2000-11-14 2002-05-22 Chiyoda Engineering Consultants Co Ltd Precast wall balustrade installation method
JP2005076349A (en) * 2003-09-02 2005-03-24 Sumikei-Nikkei Engineering Co Ltd Protective fence for vehicle

Also Published As

Publication number Publication date
JP2008063931A (en) 2008-03-21

Similar Documents

Publication Publication Date Title
JP5190599B2 (en) Replacing existing guard fences for bridges
US9598827B1 (en) Barrier rail retrofit device assembly
KR102181972B1 (en) Bridge inspection facility construction method and bridge inspection facility constructed thereby
JP5694598B2 (en) Guard fence post for replacement bridge in existing ground-covered concrete
JP6097965B2 (en) Construction method of concrete precast slab for bridge
JP4310444B1 (en) Width expansion material for road bridges
JP4882039B2 (en) Replacing existing guard fences for bridges
JP6393350B2 (en) Repair method for existing waterways
JP5064245B2 (en) Joining method of PC beam and steel beam
JP5386379B2 (en) Precast slab joints in bridges
JP5043879B2 (en) How to install width expansion materials for road bridges
JP4420697B2 (en) Standing structure of steel pipe columns
JP2012219610A (en) Method for reinforcing corroded part of steel pipe support
JP5422344B2 (en) Supporting equipment for guard fence posts for bridges in existing underground concrete
KR100473477B1 (en) Bridge guirail reinforcement method of non-dismantle for bridge curbstone
JP6652755B2 (en) Joint structure and joining method between road deck and PCa wall railing
JP2018135678A (en) Support column installation structure and guard fence
JP5130137B2 (en) Renovation method for existing foundation of wooden construction
JP2001146756A (en) Earth-retaining wall and rc synthetic structure
KR100811732B1 (en) Support fixing structure of guard cable
JPH0978544A (en) Work execution method for concrete guard fence and concrete guard fence
JP5829901B2 (en) Guard fence support and support for bridge
KR101316719B1 (en) Structure for reinforcing sloping ground of roadside having guardrail
JP2006028820A (en) Repair method of cylindrical strut for guard-rail
JP4198560B2 (en) Foundation block for protective fence and construction method of protective fence

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110726

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110830

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110913

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20110926

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20110927

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111102

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141216

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4882039

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141216

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20271216

Year of fee payment: 16

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20271216

Year of fee payment: 16

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20271216

Year of fee payment: 16

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350