JP5073081B2 - Steel rail - Google Patents

Steel rail Download PDF

Info

Publication number
JP5073081B2
JP5073081B2 JP2011102747A JP2011102747A JP5073081B2 JP 5073081 B2 JP5073081 B2 JP 5073081B2 JP 2011102747 A JP2011102747 A JP 2011102747A JP 2011102747 A JP2011102747 A JP 2011102747A JP 5073081 B2 JP5073081 B2 JP 5073081B2
Authority
JP
Japan
Prior art keywords
column
fixed
floor slab
steel
outer panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011102747A
Other languages
Japanese (ja)
Other versions
JP2011174372A (en
Inventor
修一 村田
信彦 ▲浜▼田
清 山村
晶子 田畑
Original Assignee
阪神高速道路株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 阪神高速道路株式会社 filed Critical 阪神高速道路株式会社
Priority to JP2011102747A priority Critical patent/JP5073081B2/en
Publication of JP2011174372A publication Critical patent/JP2011174372A/en
Application granted granted Critical
Publication of JP5073081B2 publication Critical patent/JP5073081B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、例えば高速道路の高架橋に用いられる鋼製高欄に関する。   The present invention relates to a steel rail used for a highway viaduct, for example.

高速道路の高架橋では、床版の両端部に高欄を設け、この高欄の頂部に照明柱や遮音壁等を固定している。従来の高欄は、多くが鉄筋コンクリート製であり、床版に鉄筋が定着されて床版と一体に形成されている。   In the viaduct of the expressway, railings are provided at both ends of the floor slab, and lighting columns, sound insulation walls, etc. are fixed to the tops of the railings. Many of the conventional railings are made of reinforced concrete, and the reinforcing bars are fixed on the floor slab and are formed integrally with the floor slab.

高欄が老朽化すると、剥離コンクリートの落下等の危険が生じる可能性があるため、高欄の取り替えが行われる。高欄の取り替え方法は、既存の高欄の基部をコンクリートカッター等で切断し、高欄を床版から分離して撤去した後、撤去位置に新たな高欄を構築する。新たな高欄として鉄筋コンクリート製の高欄を構築する場合、現場打ちコンクリートによる方法や、プレキャスト製品を用いる方法がある。   When the railing is aged, there is a possibility that the peeled concrete will fall, so the railing is replaced. The handrail replacement method is to cut the existing handrail base with a concrete cutter, etc., separate the handrail from the floor slab and remove it, and then construct a new handrail at the removal position. When constructing a railing made of reinforced concrete as a new railing, there are a method using on-site concrete and a method using a precast product.

しかしながら、現場打ちコンクリートの施工には型枠工程が必要であり、手間の増大と工期の長期化を招くという問題がある。また、プレキャスト製品は重量が比較的大きいため、製造工場から現場までの運搬や、現場における取り扱いに手間とコストがかかるという問題がある。さらに、現場打ち及びプレキャスト製品のいずれの鉄筋コンクリートも、重量が大きいので、既存の床版に十分に結合させるのが難しいという問題がある。   However, there is a problem in that the formwork process is necessary for the construction of cast-in-place concrete, which increases labor and prolongs the construction period. In addition, since the precast product has a relatively large weight, there is a problem that it takes time and labor to transport the product from the manufacturing factory to the site and to handle it on the site. Furthermore, since both reinforced concrete in-situ and precast products are heavy, there is a problem that it is difficult to sufficiently bond to existing floor slabs.

これらの問題を解決するには、新たな高欄として、重量が比較的小さい鋼製高欄を設置するのが効果的である。従来、鋼製高欄としては、床版上に箱状のユニットを連ねて形成されるものがある(例えば、特開平09‐177029号公報参照)。この種の鋼製高欄は、床版上にアンカーボルトを介して固定されるベース部と、このベース部にボルトで固定されるフェース部とで構成される。ベース部は上端が開口した箱体からなり、箱体の底面にアンカーボルトの挿通孔が設けられている。フェース部は下端が開口した箱体からなり、ベース部の外側面に嵌まり合うように形成されている。   In order to solve these problems, it is effective to install a steel rail having a relatively small weight as a new rail. Conventionally, steel rails are formed by connecting box-shaped units on a floor slab (see, for example, JP-A-09-177029). This type of steel rail is composed of a base portion fixed on a floor slab via an anchor bolt and a face portion fixed to the base portion with a bolt. The base part consists of a box with an open top, and an anchor bolt insertion hole is provided on the bottom of the box. The face portion is formed of a box having an open lower end, and is formed so as to be fitted to the outer surface of the base portion.

上記鋼製高欄を用いた高欄の取り替え方法は、既存の高欄を撤去した後、床版の表面に、高欄の設置延長に亘ってハツリを行う。このハツリ面に、高欄の設置延長に亘って略等間隔にアンカーボルトを埋設する。このアンカーボルトに、底面の貫通孔を挿通させてベース部を設置し、ベース部の内側からナット締めを行ってベース部をアンカーボルトに固定する。この後、ベース部の上方からフェース部を嵌め合わせ、ベース部とフェース部とをボルトで固定して、箱状のユニットを構築する。このユニットを高欄の延長方向に順次構築し、ユニットを互いに連結して鋼製高欄が完成する。このように、新たな高欄として、鋼製の箱体からなる軽量な高欄を構築することにより、床版の過重負担を少なくし、しかも、少ない手間で容易に高欄の取り替えを行うようにしている。
特開平09‐177029号公報
In the method of replacing the rail using the steel rail, the existing rail is removed, and then the surface of the floor slab is chopped over the installation of the rail. Anchor bolts are buried in this chipping surface at substantially equal intervals over the railing installation extension. A base portion is installed by inserting a through hole on the bottom surface of the anchor bolt, and a nut is tightened from the inside of the base portion to fix the base portion to the anchor bolt. Thereafter, the face portion is fitted from above the base portion, and the base portion and the face portion are fixed with bolts to construct a box-shaped unit. The units are sequentially constructed in the direction of the rails, and the units are connected to each other to complete the steel rails. In this way, as a new handrail, by constructing a light handrail made of a steel box, the burden on the floor slab is reduced, and the handrail can be easily replaced with less effort. .
Japanese Patent Application Laid-Open No. 09-177029

しかしながら、上記従来の鋼製高欄は、床版上にベース部を固定するために、高欄の設置延長に亘って連続してハツ面を施工する必要がある。このハツリ面は、ベース部の設置高さに影響を与えないように、不陸を抑える必要がある。したがって、ハツリ面積が大きい上に高度な作業が必要となるので、施工の手間とコストが嵩むという問題がある。さらに、高欄の設置延長に形成したハツリ面に、略等間隔にアンカーボルトを埋設する必要があるので、アンカーボルトの埋設本数が多く、施工の手間とコストが嵩むという問題がある。   However, in order to fix the base part on the floor slab, it is necessary to construct the face surface continuously over the installation extension of the rail. This chipped surface needs to suppress unevenness so as not to affect the installation height of the base portion. Therefore, there is a problem that the work area and cost are increased because the chip area is large and advanced work is required. Furthermore, since it is necessary to embed anchor bolts at substantially equal intervals on the chipped surface formed in the rail installation extension, there is a problem that the number of anchor bolts to be embedded is large and the labor and cost of construction increase.

また、上記従来の鋼製高欄の設置後、床版上を走行する車両が鋼製高欄に衝突した場合、フェース部は内外の両壁面が天面及び側面と共に一体に形成されているので、外壁面は破損してなくても、フェース部全体を交換する必要がある。したがって、補修に手間とコストがかかる問題がある。さらに、鋼製高欄のユニットは、ベース部とフェース部とが互いに固定された一体の箱体であるので、車両のフェース部への衝突に伴ってベース部も破損しやすい。ベース部が破損した場合、ベース部の底面に略等間隔に固定された複数のアンカーボルトについて、ベース部との取り外し又は取り付け作業や補修作業を行う必要があり、補修の手間とコストが更に増大するという問題がある。   In addition, when a vehicle traveling on a floor slab collides with a steel rail after installation of the conventional steel rail, the face part is formed integrally with the top and side surfaces of the inner and outer walls. Even if the wall surface is not damaged, it is necessary to replace the entire face portion. Therefore, there is a problem that repair takes time and cost. Furthermore, since the steel rail unit is an integral box body in which the base portion and the face portion are fixed to each other, the base portion is likely to be damaged when the vehicle collides with the face portion. When the base part is damaged, it is necessary to remove or attach to the base part or repair work for multiple anchor bolts fixed to the bottom surface of the base part at approximately equal intervals, further increasing the labor and cost of repair. There is a problem of doing.

また、上記従来の鋼製高欄は、鋼板の箱体で形成されているので強度が比較的小さく、大型の照明柱や遮音壁等を設置するには強度不足になり易いという問題がある。   Further, the conventional steel rails are formed of a steel plate box, so that the strength is relatively small, and there is a problem that the strength tends to be insufficient to install a large illumination column, a sound insulation wall, or the like.

そこで、本発明の課題は、施工の手間とコストを低減でき、補修の手間とコストが少なく、さらに、十分な強度が得られる鋼製高欄を提供することにある。   Accordingly, an object of the present invention is to provide a steel rail that can reduce the labor and cost of construction, reduce the labor and cost of repair, and can obtain sufficient strength.

上記課題を解決するため、本発明の鋼製高欄は、床版の端部に延長方向に所定間隔をおいて配置され、アンカーボルトを介して上記床版に固定されるベースプレートと、上記ベースプレート上に固定された支柱と、隣り合う上記支柱間に掛け渡され、上記支柱の上記床版の幅方向中央を臨む側に固定される内パネルと、隣り合う上記支柱間に掛け渡され、上記支柱の上記内パネルが固定された側と反対側の面に固定される外パネルとを備え、上記外パネルは、この外パネルを上記支柱に固定するためのボルトが予め固定されていることを特徴としている。   In order to solve the above-mentioned problems, a steel rail of the present invention includes a base plate disposed at an end portion of a floor slab at a predetermined interval in an extending direction and fixed to the floor slab via an anchor bolt, and the base plate The struts fixed to the adjacent struts and spanned between the adjacent struts and the inner panels fixed to the side of the struts facing the center in the width direction of the floor slab. The outer panel is fixed to a surface opposite to the side on which the inner panel is fixed, and the outer panel is preliminarily fixed with bolts for fixing the outer panel to the column. It is said.

上記構成によれば、鋼製高欄は、床版上に固定されるベースプレートと、このベースプレート上に固定された支柱と、この支柱間に掛け渡される内パネル及び外パネルで形成される。この鋼製高欄の設置工事においては、床版のベースプレートを配置する位置にハツリを行い、ハツリ面にアンカーボルトを埋設し、アンカーボルトにベースプレートを固定する。ハツリ面は、ベースプレート及び支柱の配置位置であって、床版の延長方向に所定間隔をおいた位置に形成すればよい。したがって、従来の鋼製高欄のように、ベース部を配置するために高欄の設置延長に連続してハツリ面を形成するよりも、ハツリ面の施工面積を大幅に縮小できる。また、アンカーボルトは、所定間隔おきに配置されるベースプレートを固定する本数であればよい。したがって、従来の鋼製高欄のように、高欄の設置延長に亘ってアンカーボルトを略等間隔に固定するよりも、アンカーボルトの埋設本数を削減できる。このように、ハツリ面の施工面積を縮小でき、しかも、アンカーボルトの埋設本数を削減できるので、施工の手間を効果的に削減でき、工期を短縮でき、また、施工費を削減できる。   According to the above configuration, the steel rail is formed by the base plate fixed on the floor slab, the columns fixed on the base plate, and the inner panel and the outer panel spanned between the columns. In the installation work of this steel railing, it crushes in the position which arrange | positions the base plate of a floor slab, embeds an anchor bolt in the claw surface, and fixes a base plate to an anchor bolt. The chipping surface may be formed at a position where the base plate and the support column are arranged and at a predetermined interval in the extending direction of the floor slab. Therefore, it is possible to greatly reduce the construction area of the chipping surface compared to the case where the chipping surface is formed continuously with the installation extension of the railing to arrange the base portion as in the conventional steel railing. Moreover, the anchor bolt should just be the number which fixes the base plate arrange | positioned at predetermined intervals. Therefore, the number of anchor bolts embedded can be reduced as compared with the case where the anchor bolts are fixed at substantially equal intervals over the rail installation extension as in the conventional steel rails. Thus, since the construction area of the chipped surface can be reduced, and the number of anchor bolts embedded can be reduced, the construction effort can be effectively reduced, the construction period can be shortened, and the construction cost can be reduced.

また、上記アンカーボルト及びベースプレートを介して床版に固定された支柱は、床版の延長方向に所定間隔をおいて配置されるので、床版上を走行する車両が鋼製高欄に衝突しても、アンカーボルトの補修が必要となる可能性が従来よりも低い。したがって、鋼製高欄の補修の手間とコストを従来よりも削減することができる。   In addition, the columns fixed to the floor slab via the anchor bolt and the base plate are arranged at a predetermined interval in the extending direction of the floor slab, so that a vehicle traveling on the floor slab collides with the steel rail. However, the possibility that the anchor bolt needs to be repaired is lower than in the past. Therefore, the labor and cost of repairing the steel rail can be reduced as compared with the conventional case.

また、上記支柱を型鋼を用いて形成することにより、この支柱によって大型の照明柱や遮音壁等を支持することができる。   In addition, by forming the column using mold steel, it is possible to support a large illumination column, a sound insulation wall, or the like by this column.

また、上記ベースプレート及び支柱と、内パネルと、外パネルは、互いに分離できるので、箱体のベース部及びフェース部で構成された従来の鋼製高欄よりも搬入や積み下ろしを容易にでき、従来よりも小型の重機によって設置作業を行うことができる。   In addition, since the base plate and the support column, the inner panel, and the outer panel can be separated from each other, it is easier to carry in and unload than the conventional steel rail made up of the base portion and the face portion of the box. However, installation work can be performed with small heavy machinery.

また、上記外パネルは、この外パネルを上記支柱に固定するためのボルトが予め固定されているので、予め固定されたボルトに内パネル側からナットを螺合することにより、容易に外パネルを支柱に固定することができる。また、外パネルからのボルトの脱落を確実に防止でき、例えば鋼製高欄を高架橋の床版に取り付ける場合、高架橋の下方にボルトが落下する不都合を確実に防止できる。   Moreover, since the bolt for fixing this outer panel to the said support | pillar is previously fixed to the said outer panel, an outer panel can be easily attached by screwing a nut from the inner panel side to the bolt fixed beforehand. Can be fixed to the column. Moreover, the drop-off of the bolt from the outer panel can be reliably prevented. For example, when the steel rail is attached to the viaduct floor slab, the inconvenience of the bolt falling below the viaduct can be reliably prevented.

一実施形態の鋼製高欄は、上記外パネルは、縁部が上記支柱に固定される壁面部と、この壁面部の上端に連なると共に、上記内パネル側に略直角に屈曲した天面部とを有し、上記内パネルは、縁部が上記支柱に固定される壁面部と、この壁面部の上端に連なると共に、上記外パネル側に略直角に屈曲した天面部とを有し、上記外パネル及び内パネルのうちの一方の天面部の端縁に支持プレートが固定され、この支持プレート上に配置された弾性部材を介して、上記外パネル及び内パネルのうちの他方の天面部の端縁が支持されている。   In one embodiment of the steel rail, the outer panel includes a wall surface portion whose edge is fixed to the support column, and a top surface portion that is connected to the upper end of the wall surface portion and is bent at a substantially right angle to the inner panel side. The inner panel has a wall surface portion whose edge is fixed to the support column, and a top surface portion that is continuous with the upper end of the wall surface portion and is bent substantially at right angles to the outer panel side. A support plate is fixed to an edge of one top surface portion of the inner panel and the inner panel, and an edge of the other top surface portion of the outer panel and the inner panel is interposed via an elastic member disposed on the support plate. Is supported.

上記実施形態によれば、外パネルの壁面部の縁部と、内パネルの壁面部の縁部とが支柱に固定されることにより、中空の壁体が形成される。この壁体の天面は、内パネルの天面部と外パネルの天面部とで形成される。壁体の天面では、内外パネルの一方の天面部に固定された支持プレートにより、弾性部材を介して他方の天面部が支持されている。このように、内パネルと外パネルとが互いに直接固定されない状態で接続されるので、内パネルの壁面部に床版上の車両が衝突しても、破損を内パネルのみに止めて、外パネルの損傷を防止できる。したがって、内パネルを交換するのみによって補修を行うことができるので、従来の鋼製高欄のように箱体のフェース部を交換するよりも、補修の手間とコストを大幅に削減できる。   According to the said embodiment, a hollow wall body is formed by fixing the edge part of the wall surface part of an outer panel, and the edge part of the wall surface part of an inner panel to a support | pillar. The top surface of the wall body is formed by the top surface portion of the inner panel and the top surface portion of the outer panel. On the top surface of the wall body, the other top surface portion is supported via an elastic member by a support plate fixed to one top surface portion of the inner and outer panels. Thus, since the inner panel and the outer panel are connected in a state where they are not directly fixed to each other, even if a vehicle on the floor slab collides with the wall surface of the inner panel, the damage is stopped only on the inner panel, and the outer panel Can prevent damage. Therefore, since the repair can be performed only by exchanging the inner panel, the labor and cost of the repair can be greatly reduced as compared with the case where the face portion of the box is replaced like a conventional steel rail.

また、内パネルの天面部と外パネルの天面部との間に、支持プレート上の弾性部材が介在されているので、この弾性部材によって内外パネルの天面部の間が密閉され、これにより、壁体内への雨水の浸入を防止して、鋼製高欄の劣化を防止できる。なお、壁体内への雨水の浸入を効果的に防止する点で、内パネルの天面部と外パネルの天面部との間に、コーキング剤を配置するのが好ましい。   In addition, since the elastic member on the support plate is interposed between the top surface portion of the inner panel and the top surface portion of the outer panel, the elastic member seals the space between the top surface portion of the inner and outer panels. Prevents rainwater from entering the body and prevents deterioration of steel rails. In addition, it is preferable to arrange a caulking agent between the top surface portion of the inner panel and the top surface portion of the outer panel from the viewpoint of effectively preventing rainwater from entering the wall.

一実施形態の鋼製高欄は、順次隣り合う複数の支柱に係合されると共に、上記複数の支柱のうちの両端の支柱に接続され、上記複数の支柱の落下を防止する支柱落下防止部材を備える。   The steel rail of one embodiment is connected to a plurality of struts that are sequentially adjacent to each other, and is connected to struts at both ends of the plurality of struts, and includes a strut fall prevention member that prevents the plurality of struts from falling. Prepare.

上記実施形態によれば、鋼製高欄への車両の衝突等に起因して、所定の支柱が床版から離脱しても、この支柱が支柱落下防止部材を介して係合される支柱で支持されることにより、離脱した支柱の落下を防止できる。この支柱落下防止部材は、例えばワイヤー等のような線状部材と、線状部材の両端に連なる接続部材とで形成し、支柱に設けられた例えば貫通孔に上記線状部材を挿通させて複数の支柱に係合すると共に、複数の支柱のうちの両端の支柱に上記接続部材を接続するように構成することができる。なお、上記線状部材は、支柱の貫通孔に挿通させる以外に、例えば支柱に固定された金具に係合させてもよい。   According to the above embodiment, even if a predetermined column is detached from the floor slab due to the collision of the vehicle with the steel rail, etc., the column is supported by the column engaged through the column drop prevention member. By doing so, it is possible to prevent the detached column from falling. This support | pillar fall prevention member is formed with a linear member, such as a wire, for example, and a connecting member connected to both ends of the linear member, and the plurality of linear members are inserted through, for example, through holes provided in the support column. The connecting member can be connected to the struts at both ends of the plurality of struts. In addition, the linear member may be engaged with, for example, a metal fitting fixed to the support column in addition to being inserted through the through hole of the support column.

一実施形態の鋼製高欄は、上記支柱に係合されると共に、この支柱の両側の2つの外パネルに接続され、上記2つの外パネルの落下を防止する外パネル落下防止部材を備える。   The steel rail of one embodiment is provided with an outer panel fall prevention member that is engaged with the column and connected to the two outer panels on both sides of the column to prevent the two outer panels from falling.

上記実施形態によれば、鋼製高欄への車両の衝突等に起因して、外パネルが支柱から離脱しても、この外パネルが外パネル落下防止部材を介して係合される支柱で支持されることにより、離脱した外パネルの落下を防止できる。この外パネル落下防止部材は、例えばワイヤー等のような線状部材と、線状部材の両端に連なる接続部材とで形成し、支柱に設けられた例えば貫通孔に上記線状部材を挿通させて上記支柱に係合すると共に、この支柱の両側の外パネルに上記接続部材を接続するように構成することができる。なお、上記線状部材は、支柱の貫通孔に挿通させる以外に、例えば支柱に固定された金具に係合させてもよい。   According to the above embodiment, even if the outer panel is detached from the column due to the collision of the vehicle with the steel rail, etc., the outer panel is supported by the column engaged through the outer panel fall prevention member. As a result, the detached outer panel can be prevented from falling. The outer panel fall prevention member is formed by a linear member such as a wire and a connecting member connected to both ends of the linear member, and the linear member is inserted into, for example, a through-hole provided in the support column. While engaging with the said support | pillar, it can comprise so that the said connection member may be connected to the outer panel of the both sides of this support | pillar. In addition, the linear member may be engaged with, for example, a metal fitting fixed to the support column in addition to being inserted through the through hole of the support column.

参考例の高欄の取り替え方法は、既存の鉄筋コンクリート製高欄を鋼製高欄に取り替える高欄の取り替え方法であって、床版と一体の鉄筋コンクリート製高欄を、上記床版から切り離して撤去する工程と、上記床版上の鋼製高欄の設置位置に沿って、所定間隔おきにハツリ面を形成する工程と、上記ハツリ面にアンカーボルトを設置する工程と、上記アンカーボルトの突出端部に、支柱のベースプレートを連結する工程と、隣り合う上記支柱の間に外パネルを固定する工程と、隣り合う上記支柱の間に内パネルを固定する工程とを備えることを特徴としている。   The replacement method of the handrail of the reference example is a method of replacing the handrail of the existing reinforced concrete handrail with a steel handrail, in which the reinforced concrete handrail integrated with the floor slab is separated from the floor slab and removed, and A step of forming a chamfer surface at predetermined intervals along the installation position of the steel rail on the floor slab, a step of installing anchor bolts on the chamfer surface, and a base plate of a column on the protruding end of the anchor bolt , A step of fixing the outer panel between the adjacent struts, and a step of fixing the inner panel between the adjacent struts.

上記構成によれば、床版上に形成するハツリ面は、ベースプレート及び支柱の配置位置であって、床版の延長方向に所定間隔をおいた位置に形成すればよいので、従来の鋼製高欄に取り替える場合よりも、ハツリ面の施工面積を大幅に縮小できる。また、アンカーボルトは、所定間隔おきに配置されるベースプレートを固定する本数であればよいので、従来の鋼製高欄に取り替える場合よりも、アンカーボルトの埋設本数を削減できる。このように、本発明の高欄の取り替え方法によれば、ハツリ面の施工面積を縮小し、しかも、少アンカーボルトの埋設本数を削減することにより、少ない施工の手間により、短い工期で、また、低廉な施工費で、高欄を取り替えることができる。   According to the above configuration, the chipped surface formed on the floor slab is an arrangement position of the base plate and the column and may be formed at a predetermined interval in the extending direction of the floor slab. Compared to the case of replacing with, it is possible to greatly reduce the construction area of the chipped surface. Moreover, since the anchor bolt should just be the number which fixes the base plate arrange | positioned at predetermined intervals, the number of embedding | removing anchor bolts can be reduced rather than the case where it replaces with the conventional steel railing. Thus, according to the railing replacement method of the present invention, by reducing the construction area of the chipped surface, and by reducing the number of embedded small anchor bolts, with less work, in a short construction period, and The railing can be replaced at a low construction cost.

以上のように、本発明の鋼製高欄によれば、高欄を設置する床版上のハツリ面積を縮小でき、しかも、アンカーボルトの埋設本数を削減できるので、施工の手間を効果的に削減でき、工期を短縮でき、また、施工費を削減できる。また、床版上を走行する車両が衝突した場合、補修の手間とコストを削減できる。また、大型の照明柱や遮音壁を設置するための十分な強度が得られる。また、容易に外パネルを支柱に固定することができ、高架橋の下方にボルトが落下する不都合を確実に防止できる。また、参考例の高欄の取り替え方法によれば、少ない施工の手間により、短い工期で、また、低廉な施工費で、高欄を取り替えることができる。   As described above, according to the steel rail of the present invention, the chip area on the floor slab in which the rail is installed can be reduced, and the number of anchor bolts embedded can be reduced, so that the labor of construction can be effectively reduced. The construction period can be shortened and the construction cost can be reduced. Further, when a vehicle traveling on the floor slab collides, the labor and cost of repair can be reduced. Moreover, sufficient intensity for installing a large illuminating column and a sound insulation wall can be obtained. In addition, the outer panel can be easily fixed to the support column, and the inconvenience that the bolt falls below the viaduct can be reliably prevented. Further, according to the handrail replacement method of the reference example, the handrail can be replaced with a short construction period, a short construction period, and a low construction cost.

本発明の実施形態の鋼製高欄を床版の端部に設置した様子を示す斜視図である。It is a perspective view which shows a mode that the steel rail of embodiment of this invention was installed in the edge part of a floor slab. 鋼製高欄を支柱位置で床版の幅方向に切断した様子を示す横断面図である。It is a cross-sectional view which shows a mode that the steel rail was cut | disconnected in the width direction of the floor slab in the support | pillar position. 鋼製高欄を支柱位置で床版の延長方向に切断した様子を示す縦断面図である。It is a longitudinal cross-sectional view which shows a mode that the steel rail was cut | disconnected in the extending direction of the floor slab in the support | pillar position. 鋼製高欄の天面を示す図である。It is a figure which shows the top | upper surface of steel railings. 支柱間に形成される壁体を示す横断面図である。It is a cross-sectional view which shows the wall body formed between support | pillars. 外パネル落下防止部材の近傍部分を示す平断面図である。It is a plane sectional view showing the neighborhood part of an outer panel fall prevention member. 壁体の天面の近傍部分を示す横断面図である。It is a cross-sectional view which shows the vicinity part of the top | upper surface of a wall body. 支柱を内壁面側から見た様子を示す正面図である。It is a front view which shows a mode that the support | pillar was seen from the inner wall surface side. 支柱を外壁面側から見た様子を示す背面図である。It is a rear view which shows a mode that the support | pillar was seen from the outer wall surface side. 支柱を鋼製高欄の延長方向から見た左側面図である。It is the left view which looked at the support | pillar from the extension direction of steel railings. 支柱を上方から見た様子を示す平面図である。It is a top view which shows a mode that the support | pillar was seen from upper direction. 支柱を下方から見た様子を示す底面図である。It is a bottom view which shows a mode that the support | pillar was seen from the downward direction.

以下、本発明の実施形態を、図面を参照しながら詳細に説明する。
図1は、本発明の実施形態の鋼製高欄を床版の端部に設置した様子を示す斜視図である。図2は床版上の鋼製高欄を支柱位置で床版の幅方向に切断した様子を示す横断面図であり、図3は床版上の鋼製高欄を支柱位置で床版の延長方向に切断した様子を示す縦断面図であり、図4は鋼製高欄の天面を示す図であり、図5は支柱間に形成される壁体を示す横断面図である。図6は外パネル落下防止部材の近傍部分を示す平断面図であり、図7は壁体の天面の近傍部分を示す横断面図である。図8は支柱を内壁面側から見た様子を示す正面図であり、図9は支柱を外壁面側から見た様子を示す背面図であり、図10は支柱を鋼製高欄の延長方向から見た左側面図である。右側面図は、図10と左右対称の形状を有する。図11は支柱を上方から見た様子を示す平面図であり、図12は支柱を下方から見た様子を示す底面図である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a perspective view showing a state in which a steel rail of an embodiment of the present invention is installed at an end portion of a floor slab. FIG. 2 is a cross-sectional view showing a state where a steel rail on the floor slab is cut in the width direction of the floor slab at the column position, and FIG. 3 is an extension direction of the floor slab at the column position on the steel rail FIG. 4 is a view showing a top surface of a steel rail, and FIG. 5 is a cross-sectional view showing a wall formed between columns. FIG. 6 is a plan sectional view showing the vicinity of the outer panel drop prevention member, and FIG. 7 is a transverse sectional view showing the vicinity of the top surface of the wall. FIG. 8 is a front view showing a state in which the column is viewed from the inner wall surface side, FIG. 9 is a rear view showing the state in which the column is viewed from the outer wall surface side, and FIG. It is the left view seen. The right side view has a shape symmetrical to that of FIG. FIG. 11 is a plan view showing a state in which the column is viewed from above, and FIG. 12 is a bottom view showing the state in which the column is viewed from below.

この鋼製高欄は、図1及び2に示すように、床版10上にアンカーボルト11によって固定されたベースプレート1と、このベースプレート1上に溶接により固定された支柱2と、この支柱2に高欄の延長方向の両側にボルトで固定された内パネル3及び外パネル4とで大略構成されている。この鋼製高欄は、高速道路の高架橋に設置され、床版10の幅方向の両端部に、この床版10の縁に沿って延設されている。この鋼製高欄は、床版10に一体に形成されていた鉄筋コンクリート製の高欄が撤去された後、その撤去位置に新たに設置されたものである。床版10はPC(プレキャスト)梁15によって支持されており、また、床版10上には車両用のアスファルト舗装16が敷設されている。   As shown in FIGS. 1 and 2, the steel rail is composed of a base plate 1 fixed on the floor slab 10 with anchor bolts 11, a column 2 fixed on the base plate 1 by welding, and a column on the column 2. The inner panel 3 and the outer panel 4 are fixed roughly with bolts on both sides in the extending direction. The steel rails are installed on the viaduct of the expressway, and extend along the edges of the floor slab 10 at both ends in the width direction of the floor slab 10. This steel rail is newly installed at the removal position after the rail made of reinforced concrete formed integrally with the floor slab 10 is removed. The floor slab 10 is supported by a PC (precast) beam 15, and a vehicle asphalt pavement 16 is laid on the floor slab 10.

上記ベースプレート1は、鋼製の板状材料で形成されており、床版10内に埋設されたアンカーボルト11の上端部に、このアンカーボルト11に螺合するナット12,13で表裏両面から挟まれて固定されている。   The base plate 1 is made of a steel plate-like material, and is sandwiched from both front and back surfaces by nuts 12 and 13 which are screwed into the anchor bolt 11 at the upper end portion of the anchor bolt 11 embedded in the floor slab 10. Is fixed.

上記支柱2は、ベースプレート1上に溶接により下端が固定されたH型鋼(以下、H鋼という)21を有する。このH鋼21の上端には、鋼製の板状材料からなる天板22が溶接で固定されており、この天板22には、照明柱等を連結するための貫通孔221,221,・・・が設けられている。本実施形態の鋼製高欄は、強度が比較的高いH鋼21により、従来の箱体の鋼製高欄では支持が不可能であった大型の照明柱や遮音壁等を支持することができる。上記ベースプレート1上には、H鋼21の高欄延長方向における両側に、このベースプレート1に対して直角に延びる2つの五角形の保護プレート23,23が固定されている。各保護プレート23は、L型鋼によって形成された固定部材25でH鋼21の内側のフランジ21aに固定されている。この保護プレート23は、床版10幅方向における内側と外側の縁が、内パネル3と外パネル4の内側面に沿った形状を有している。さらに、上記ベースプレート1上に、H鋼21のフランジ21aの幅方向中央に位置する台形の補強部材24が固定されている。この補強部材24の床版10側の縁は、内パネル3の内側面に沿った形状に形成されている。上記保護プレート23,23によって、ベースプレート1と支柱2との溶接部が、車両の接触等で衝撃を直接受けることを防止している。また、上記補強部材24によって曲げ補強をしている。支柱のH鋼21のウェブ21cには、後述する落下防止部材8,9のワイヤー81,91が挿通される円形の貫通孔214と、照明用等の電力線や通信電線等が挿通される配線管27が内嵌された配線用貫通孔215と、支柱落下防止部材8の固定金具82が係止される止め孔216が設けられている。   The support column 2 has an H-shaped steel (hereinafter referred to as H steel) 21 having a lower end fixed on the base plate 1 by welding. A top plate 22 made of a steel plate material is fixed to the upper end of the H steel 21 by welding, and the top plate 22 has through holes 221, 221,.・ ・ Is provided. The steel rail of the present embodiment can support a large lighting column, a sound insulation wall, and the like that cannot be supported by the steel box of a conventional box body by the H steel 21 having relatively high strength. On the base plate 1, two pentagonal protection plates 23, 23 extending at right angles to the base plate 1 are fixed on both sides of the H steel 21 in the rail extension direction. Each protection plate 23 is fixed to a flange 21a inside the H steel 21 with a fixing member 25 formed of L-shaped steel. The protective plate 23 has a shape in which the inner and outer edges in the width direction of the floor slab 10 are along the inner surfaces of the inner panel 3 and the outer panel 4. Further, a trapezoidal reinforcing member 24 located at the center in the width direction of the flange 21 a of the H steel 21 is fixed on the base plate 1. The edge of the reinforcing member 24 on the floor slab 10 side is formed in a shape along the inner side surface of the inner panel 3. The protective plates 23 and 23 prevent the welded portion between the base plate 1 and the column 2 from receiving an impact directly due to vehicle contact or the like. Further, the reinforcing member 24 is used for bending reinforcement. A circular through hole 214 into which wires 81 and 91 of the fall prevention members 8 and 9 to be described later are inserted, and a wiring pipe through which a power line, a communication wire, etc. for illumination are inserted into the web 21c of the H steel 21 of the support column. 27 is provided, and a through hole 215 for wiring in which 27 is fitted, and a stop hole 216 in which the fixing bracket 82 of the column drop prevention member 8 is locked are provided.

上記内パネル3は、略鉛直方向に延びる壁面部31と、この壁面部31の下端に連なり、下側が床版10の幅方向内側に向かって傾斜する傾斜面部32と、この傾斜面部32の下端に連なり、略鉛直方向に延びて床版10表面に達する裾部33を有する。この壁面部31と、傾斜面部32と、裾部33とで高欄1の内側壁面を形成している。内パネル3の壁面部31の上端には、この壁面部31に対して直角に屈曲して床版10の幅方向外側に延びる天面部35が連なっている。内パネル3の壁面部31の内側面には、L型鋼で形成され、高欄1の延長方向に延びると共に鉛直方向に互いに平行に配置された複数の補強部材36,36,・・・が固定されている。内パネル3の裾部33の外側面には、床版10上のアスファルト舗装16が接している。   The inner panel 3 includes a wall portion 31 extending in a substantially vertical direction, a lower end of the wall portion 31, an inclined surface portion 32 whose lower side is inclined inward in the width direction of the floor slab 10, and a lower end of the inclined surface portion 32. And has a skirt 33 extending substantially vertically and reaching the surface of the floor slab 10. The wall surface portion 31, the inclined surface portion 32, and the skirt portion 33 form an inner wall surface of the rail 1. A top surface portion 35 that is bent at a right angle to the wall surface portion 31 and extends outward in the width direction of the floor slab 10 is connected to the upper end of the wall surface portion 31 of the inner panel 3. A plurality of reinforcing members 36, 36,..., Which are formed of L-shaped steel and extend in the extending direction of the rail 1 and are arranged parallel to each other in the vertical direction, are fixed to the inner side surface of the wall portion 31 of the inner panel 3. ing. The asphalt pavement 16 on the floor slab 10 is in contact with the outer surface of the skirt 33 of the inner panel 3.

上記外パネル4は、略鉛直方向に延びる壁面部41と、この壁面部41の上端に直角に屈曲して連なり、床版の幅方向内側に延びる天面部42とを有する。外パネル4の壁面部41によって高欄1の外側壁面を形成している。外パネル4の壁面部41の内側面には、L型鋼で形成され、高欄1の延長方向に延びると共に鉛直方向に互いに平行に配置された複数の補強部材44,44,・・・が固定されている。外パネル4の壁面部41は、床版10の縁よりも幅方向外側に位置していると共に、下端縁が床版10の表面よりも下方に位置している。床版10の外側面の上端近傍にL型鋼18が固定されており、このL型鋼18により、床版10の側面と外パネル4の壁面部41の内側面との間の隙間を埋めている。   The outer panel 4 includes a wall surface portion 41 extending in a substantially vertical direction, and a top surface portion 42 that is bent at a right angle to the upper end of the wall surface portion 41 and extends inward in the width direction of the floor slab. The outer wall surface of the rail 1 is formed by the wall surface portion 41 of the outer panel 4. A plurality of reinforcing members 44, 44,..., Which are formed of L-shaped steel and extend in the extending direction of the rail 1 and are arranged in parallel with each other in the vertical direction, are fixed to the inner side surface of the wall surface portion 41 of the outer panel 4. ing. The wall surface portion 41 of the outer panel 4 is positioned on the outer side in the width direction than the edge of the floor slab 10, and the lower end edge is positioned below the surface of the floor slab 10. An L-shaped steel 18 is fixed in the vicinity of the upper end of the outer side surface of the floor slab 10, and the L-shaped steel 18 fills a gap between the side surface of the floor slab 10 and the inner side surface of the wall portion 41 of the outer panel 4. .

上記内パネル3は、延長方向の両側の縁部が、ボルト38によってH鋼21の内側のフランジ21aの表面に固定されている。このボルト38は、H鋼21のフランジ21aに設けられたボルト孔211に挿通され、このフランジ21aの裏面に予め固定されたナットに螺合している。このように、フランジ21aの裏面にナットを予め固定することにより、内パネル3の取り付けの際に、高欄1の内壁面側からボルト38を容易に締結可能にしている。   The inner panel 3 is fixed to the surface of the flange 21 a on the inner side of the H steel 21 by bolts 38 at both ends in the extending direction. The bolt 38 is inserted into a bolt hole 211 provided in the flange 21a of the H steel 21 and screwed into a nut fixed in advance on the back surface of the flange 21a. As described above, by fixing the nut to the back surface of the flange 21a in advance, the bolt 38 can be easily fastened from the inner wall surface side of the rail 1 when the inner panel 3 is attached.

上記外パネル4は、延長方向の両側の縁部が、ボルト48によってH鋼21の外側のフランジ21bの表面に固定されている。このボルト48は、外パネル4に予め固定されており、H鋼21のフランジ21bに設けられた長孔状のボルト孔212に挿通され、このフランジ21bの裏面のナットに締結されている。このように、外パネル4にボルト48を予め固定することにより、外パネル4の取り付けの際に、ボルト48が外パネル4から離脱して落下する不都合を防止しつつ支柱2に設置でき、また、高欄1の内壁面側からナットを容易に締結可能にしている。   The outer panel 4 is fixed to the surface of the outer flange 21b of the H steel 21 by bolts 48 at both edges in the extending direction. The bolt 48 is fixed to the outer panel 4 in advance, is inserted into a long hole-shaped bolt hole 212 provided in the flange 21b of the H steel 21, and is fastened to a nut on the back surface of the flange 21b. Thus, by fixing the bolts 48 to the outer panel 4 in advance, the bolts 48 can be installed on the support column 2 while preventing the bolts 48 from being detached from the outer panel 4 and falling when the outer panel 4 is attached. The nut can be easily fastened from the inner wall surface side of the rail 1.

上記内パネル3と外パネル4とが夫々支柱2に固定されることにより、中空の壁体を形成している。この壁体の天面は、図4及び5に示すように、内パネル3の天面部35と外パネル4の天面部42とで形成され、各パネル3,4の天面部35,42は、互いに直接固定されない状態で接続されている。すなわち、上記外パネル4の天面部42の端縁の内側面に、支持プレート6がボルト61で固定されている。この支持プレート6は、天面部42の端縁に沿って高欄1の延長方向に延びている。この支持プレート6の上側面に、弾性部材としてのゴム製シート62が貼り付けられており、このゴム製シート62の表面に、内パネル3の天面部35の端縁部の内側面が密着している。各天面部35,42の端縁の間は、コーキング剤で目止めされている。このように、内パネル3と外パネル4とが互いに直接固定されない状態で接続されているので、内パネル3の壁面部に車両が衝突しても、破損を内パネル3のみに止めて、外パネル4の損傷を防止できる。したがって、内パネル3を交換するのみによって補修を行うことができるので、従来の鋼製高欄のように箱体のフェース部を交換するよりも、補修の手間とコストを大幅に削減できる。また、内パネル3の天面部35の端縁の内側面がゴム製シート62に密着し、また、各天面部35,42の端縁の間にコーキング剤が配置されているので、雨水の壁体内への浸入を効果的に防止できる。   The inner panel 3 and the outer panel 4 are each fixed to the support column 2 to form a hollow wall body. 4 and 5, the top surface of the wall is formed by the top surface portion 35 of the inner panel 3 and the top surface portion 42 of the outer panel 4, and the top surface portions 35, 42 of the panels 3, 4 are They are connected without being directly fixed to each other. That is, the support plate 6 is fixed to the inner surface of the edge of the top surface portion 42 of the outer panel 4 with the bolts 61. The support plate 6 extends in the extending direction of the rail 1 along the edge of the top surface portion 42. A rubber sheet 62 as an elastic member is affixed to the upper surface of the support plate 6, and the inner surface of the edge of the top surface portion 35 of the inner panel 3 is in close contact with the surface of the rubber sheet 62. ing. Between the edge of each top surface part 35 and 42, it is stopped by the caulking agent. Thus, since the inner panel 3 and the outer panel 4 are connected in a state where they are not directly fixed to each other, even if a vehicle collides with the wall surface of the inner panel 3, the damage is stopped only on the inner panel 3, Damage to the panel 4 can be prevented. Therefore, since the repair can be performed only by replacing the inner panel 3, it is possible to greatly reduce the labor and cost of the repair compared to replacing the face part of the box as in the conventional steel rail. Further, since the inner side surface of the edge of the top surface portion 35 of the inner panel 3 is in close contact with the rubber sheet 62 and the caulking agent is disposed between the edges of the top surface portions 35 and 42, the wall of rainwater Effectively prevent entry into the body.

この鋼製高欄には、車両の衝突等に起因する支柱2と外パネル4の落下を防止するために、支柱落下防止部材8及び外パネル落下防止部材9が設けられている。   This steel rail is provided with a column fall prevention member 8 and an outer panel fall prevention member 9 in order to prevent the column 2 and the outer panel 4 from falling due to a vehicle collision or the like.

支柱落下防止部材8は、図3に一部を示すように、線状部材としてのワイヤー81と、このワイヤー81の両端に固定された接続部材としての円筒形状の固定金具82とで形成されている。この支柱落下防止部材8のワイヤー81が、互いに隣り合う複数の支柱2の貫通孔214に挿通されている。ワイヤー81の両端の固定金具82は、複数の支柱2によって互いに隔てられた2つの支柱2のH鋼21に接続されている。固定金具82が接続されるH鋼21には、ウェブ21cに止め孔216が設けられている。この止め孔216は、図10に示すように、上端に形成された大径部216aと、この大径部216aの下部に連なる小幅の長孔部216bとで形成されている。支柱落下防止部材8の取り付けの際、止め孔216の大径部216aに固定金具82を挿通させた後、ワイヤー81を長孔部216bの下端に移動させて、長孔部216bの縁部に固定金具82を係止させる。こうして、支柱落下防止部材8の固定金具82を支柱2に接続している。   As shown in part in FIG. 3, the support post falling prevention member 8 is formed by a wire 81 as a linear member and a cylindrical fixing fitting 82 as a connecting member fixed to both ends of the wire 81. Yes. The wire 81 of this support | pillar fall prevention member 8 is penetrated by the through-hole 214 of the some support | pillar 2 adjacent to each other. Fixing brackets 82 at both ends of the wire 81 are connected to the H steel 21 of the two struts 2 separated from each other by the plurality of struts 2. The H steel 21 to which the fixing bracket 82 is connected is provided with a stop hole 216 in the web 21c. As shown in FIG. 10, the stop hole 216 is formed by a large-diameter portion 216a formed at the upper end and a small-width long-hole portion 216b connected to the lower portion of the large-diameter portion 216a. When attaching the column drop prevention member 8, after the fixing bracket 82 is inserted into the large diameter portion 216 a of the stop hole 216, the wire 81 is moved to the lower end of the long hole portion 216 b, and the edge of the long hole portion 216 b is moved. The fixing bracket 82 is locked. In this way, the fixing bracket 82 of the column drop prevention member 8 is connected to the column 2.

この支柱落下防止部材8により、支柱2が高架橋から落下する危険を効果的に防止できる。例えば、アスファルト舗装16上を走行する車両が鋼製高欄に衝突すること等により、支柱2が床版10から離脱しても、この離脱した支柱2がワイヤー81を介して隣り合う支柱2に支持される。これにより、離脱した支柱2が高架橋から落下する危険を防止できる。なお、落下防止部材8は、鋼製高欄の延長方向に互いに重複するように複数本設置するのが好ましい。例えば、1つの支柱落下防止部材8のワイヤー81を10本の支柱2の貫通孔214に挿通させる場合、両端の2本の支柱2に、隣接して配置する支柱落下防止部材8のワイヤー81を重複して挿通させる。これにより、固定金具82が接続された支柱2が脱落した場合、重複した2本のワイヤー81で脱落した支柱2を両側から支持できるので、ワイヤー81に作用する負担を緩和できる。   By this support | pillar fall prevention member 8, the danger that the support | pillar 2 falls from a viaduct can be prevented effectively. For example, even if the column 2 is detached from the floor slab 10 due to a vehicle traveling on the asphalt pavement 16 colliding with a steel rail, the separated column 2 is supported by the adjacent column 2 via the wire 81. Is done. Thereby, the danger that the detached support | pillar 2 falls from a viaduct can be prevented. In addition, it is preferable to install a plurality of fall prevention members 8 so as to overlap each other in the extending direction of the steel rail. For example, when inserting the wire 81 of one support | pillar fall prevention member 8 in the through-hole 214 of ten support | pillars 2, the wire 81 of the support | pillar fall prevention member 8 arrange | positioned adjacent to the two support | pillars 2 of both ends is used. Duplicate insertion. Thereby, when the support | pillar 2 to which the fixing metal fitting 82 was connected dropped, the support | pillar 2 dropped | disconnected by the two overlapping wires 81 can be supported from both sides, Therefore The burden which acts on the wire 81 can be eased.

外パネル落下防止部材9は、図6に示すように、線状部材としてのワイヤー91と、このワイヤー91の両端に固定された接続部材としての円筒形状の固定金具92とで形成されている。H鋼21の両側の外パネル4には、最上段の補強部材44の端部に止め孔441が設けられている。この止め孔441は、L型鋼からなる補強部材44の水平部に設けられており、大径部441aと、この大径部441aに連なって支柱2に近づく方向に延びる小幅の長孔部441bとで形成されている。外パネル落下防止部材9の取り付けの際、止め孔441の大径部441aに固定金具92を挿通させた後、ワイヤー91を長孔部441bの支柱2側の端に移動させて、長孔部441bの縁部に固定金具92を係止させる。こうして、外パネル落下防止部材9の固定金具92を外パネル4に接続している。   As shown in FIG. 6, the outer panel drop prevention member 9 is formed of a wire 91 as a linear member and a cylindrical fixing fitting 92 as a connecting member fixed to both ends of the wire 91. The outer panel 4 on both sides of the H steel 21 is provided with a stop hole 441 at the end of the uppermost reinforcing member 44. The stop hole 441 is provided in the horizontal portion of the reinforcing member 44 made of L-shaped steel, and includes a large diameter portion 441a, and a long hole portion 441b having a small width extending in a direction approaching the support column 2 connected to the large diameter portion 441a. It is formed with. When attaching the outer panel drop prevention member 9, after the fixing bracket 92 is inserted into the large diameter portion 441 a of the stop hole 441, the wire 91 is moved to the end of the long hole portion 441 b on the column 2 side, and the long hole portion The fixing bracket 92 is locked to the edge of 441b. Thus, the fixing bracket 92 of the outer panel drop prevention member 9 is connected to the outer panel 4.

この外パネル落下防止部材9により、外パネル4が高架橋から落下する危険を効果的に防止できる。例えば、アスファルト舗装16上を走行する車両が鋼製高欄に衝突すること等により、外パネル4が支柱2から離脱しても、この離脱した外パネル4がワイヤー91を介して支柱2に支持される。これにより、離脱した外パネル4が高架橋から落下する危険を防止できる。   The outer panel fall prevention member 9 can effectively prevent the danger of the outer panel 4 falling from the viaduct. For example, even if the outer panel 4 is detached from the column 2 due to a vehicle traveling on the asphalt pavement 16 colliding with a steel rail, the detached outer panel 4 is supported by the column 2 via the wire 91. The Thereby, the danger that the detached outer panel 4 falls from the viaduct can be prevented.

上記支柱落下防止部材8と外パネル落下防止部材9は、内パネル3と外パネル4で形成される壁体の内部に配置しているので、ワイヤー81,91や固定金具82,92が外部に露出して美観を損なうこと無く、支柱2と外パネル4の落下防止効果を発揮することができる。   The column drop prevention member 8 and the outer panel fall prevention member 9 are disposed inside the wall formed by the inner panel 3 and the outer panel 4, so that the wires 81 and 91 and the fixing brackets 82 and 92 are exposed to the outside. The fall prevention effect of the column 2 and the outer panel 4 can be exhibited without exposing and deteriorating the aesthetic appearance.

次に、この鋼製高欄を、鉄筋コンクリート製の高欄と取り替える方法について説明する。   Next, a method for replacing the steel rail with a rail made of reinforced concrete will be described.

まず、床版10と一体に構築された鉄筋コンクリート製高欄を、延長方向に所定間隔おきに垂直に切断して、所定長さに分割する。次いで、分割された鉄筋コンクリート製高欄の基部を水平に切断して床版10から分離する。床版10から分離された高欄片を、重機で吊り下げて撤去し、トラックで搬出する。   First, the reinforced concrete rails constructed integrally with the floor slab 10 are vertically cut at predetermined intervals in the extending direction and divided into predetermined lengths. Next, the base of the divided reinforced concrete rail is cut horizontally and separated from the floor slab 10. The balustrade pieces separated from the floor slab 10 are removed by hanging with heavy machinery and carried out with a truck.

次に、床版10表面の支柱2を設置する部分と、床版10の側面とにブレーカ等でハツリを行う。ハツリ面に露出した鉄筋は、ガス切断機等で切断して撤去する。続いて、床版10表面のハツリ面に、ドリルによってアンカー設置孔を形成し、アンカー設置孔内にアンカーボルト11を挿入して接着剤によって固定する。アンカーボルト11が床版10に定着した後、高さ調整用のナット12をアンカーボルト11に螺合し、このナット12を所定の高さに設定する。この後、重機を用いてベースプレート1及び支柱2を設置する。このとき、ベースプレート1の長孔19にアンカーボルト11を挿通させて、ナット12によりベースプレート1を支持する。ベースプレート1の長孔19から突出するアンカーボルト11にナット13を螺着し、締結することにより、ベースプレート1をアンカーボルト11に固定する。アンカーボルト11に固定されたベースプレート1の底面側には、ハツリ面との間に空間が存在するので、ベースプレート1と床版10側面との間にL型鋼18を固定した後、上記空間を無収縮モルタルで埋める。   Next, chipping is performed with a breaker or the like on the portion of the floor slab 10 where the column 2 is installed and the side surface of the floor slab 10. The rebar exposed on the chipped surface is cut and removed with a gas cutter or the like. Subsequently, an anchor installation hole is formed by a drill on the chipped surface of the floor slab 10, and the anchor bolt 11 is inserted into the anchor installation hole and fixed with an adhesive. After the anchor bolt 11 is fixed to the floor slab 10, a height adjusting nut 12 is screwed into the anchor bolt 11, and the nut 12 is set to a predetermined height. Then, the base plate 1 and the support | pillar 2 are installed using a heavy machine. At this time, the anchor bolt 11 is inserted into the long hole 19 of the base plate 1 and the base plate 1 is supported by the nut 12. The base plate 1 is fixed to the anchor bolt 11 by screwing and fastening the nut 13 to the anchor bolt 11 protruding from the long hole 19 of the base plate 1. Since a space exists between the bottom surface side of the base plate 1 fixed to the anchor bolt 11 and the chipping surface, the L-shaped steel 18 is fixed between the base plate 1 and the side surface of the floor slab 10, and then the space is not formed. Fill with shrink mortar.

こうして床版10の端部に、延長方向に所定間隔おきに支柱2を立設した後、この支柱2の間に外パネル4を固定する。詳しくは、外パネル4の壁面部41の縁部に予め固定されたボルト48が支柱2のH鋼21のフランジ21bのボルト孔212に挿通するように、外パネル4を支柱2に設置する。この後、フランジ21bの裏面に突出したボルト48の軸に、高欄の内壁面側からナットを螺合させて、外パネル4を支柱2に固定する。引き続いて、隣り合う複数の支柱2の貫通穴214に支柱落下防止部材8のワイヤー81を挿通させて、このワイヤー81の両端の固定金具82を所定の支柱2に夫々接続する。また、各支柱2の貫通孔214に外パネル落下防止部材9のワイヤー91を挿通させて、このワイヤー91の両端の固定金具92を支柱2の両側の外パネル4に夫々接続する。また、照明用等の電力線や通信電線を、各支柱2の配線管27内を通して配線する。外パネル4の天面部42の端縁に支持プレート6をボルト61で固定した後、支柱2の間に内パネル3を固定する。詳しくは、内パネル3の壁面部31の縁部を、支柱2のH鋼21のフランジ21aに位置合わせすると共に、内パネル3の天面部35の端縁を支持プレート6表面のゴム製シート62上に配置する。この後、内パネル3の縁部のボルト孔とH鋼21のフランジ21aのボルト孔211にボルト38を挿通し、このボルト38をフランジ21aの裏面に予め固定されたナットに螺合させて、内パネル3を支柱2に固定する。最後に、内パネル3の天面部35の端縁と外パネル4の天面部42の端縁との間に、コーキング剤を塗布して目止めを行う。   Thus, after the support columns 2 are erected on the end portion of the floor slab 10 at predetermined intervals in the extending direction, the outer panel 4 is fixed between the support columns 2. Specifically, the outer panel 4 is installed in the support column 2 so that the bolt 48 fixed in advance to the edge of the wall surface portion 41 of the outer panel 4 is inserted into the bolt hole 212 of the flange 21b of the H steel 21 of the support column 2. Thereafter, a nut is screwed onto the shaft of the bolt 48 protruding from the back surface of the flange 21 b from the inner wall surface side of the rail, and the outer panel 4 is fixed to the column 2. Subsequently, the wires 81 of the column drop prevention member 8 are inserted into the through holes 214 of the plurality of adjacent columns 2, and the fixtures 82 at both ends of the wires 81 are connected to the predetermined columns 2, respectively. Further, the wire 91 of the outer panel drop prevention member 9 is inserted into the through hole 214 of each column 2, and the fixing brackets 92 at both ends of the wire 91 are connected to the outer panel 4 on both sides of the column 2, respectively. Further, a power line or a communication wire for illumination is wired through the wiring tube 27 of each support column 2. After the support plate 6 is fixed to the edge of the top surface portion 42 of the outer panel 4 with bolts 61, the inner panel 3 is fixed between the columns 2. Specifically, the edge portion of the wall surface portion 31 of the inner panel 3 is aligned with the flange 21a of the H steel 21 of the support column 2, and the edge of the top surface portion 35 of the inner panel 3 is aligned with the rubber sheet 62 on the surface of the support plate 6. Place on top. Thereafter, the bolt 38 is inserted into the bolt hole at the edge of the inner panel 3 and the bolt hole 211 of the flange 21a of the H steel 21, and this bolt 38 is screwed into a nut fixed in advance on the back surface of the flange 21a. The inner panel 3 is fixed to the column 2. Finally, a caulking agent is applied between the edge of the top surface portion 35 of the inner panel 3 and the edge of the top surface portion 42 of the outer panel 4 to perform sealing.

このようにして鉄筋コンクリート製高欄と取り替えられた鋼製高欄は、鉄筋コンクリート製高欄よりも重量が大幅に小さいので、短いアンカーボルト11によって十分な強度を発揮して床版10と結合することができる。   Since the steel rails replaced with the reinforced concrete rails in this way are significantly smaller in weight than the reinforced concrete rails, they can be combined with the floor slab 10 with sufficient strength by the short anchor bolts 11.

また、床版10表面のハツリ作業において、床版10の延長方向に所定間隔をおいたベースプレート1の配置位置にハツリ面を形成すればよいので、従来の鋼製高欄のように、ベース部を配置するために高欄の設置延長に連続してハツリ面を形成するよりも、ハツリ面の施工面積を大幅に縮小できる。また、アンカーボルト11は、所定間隔おきに配置されるベースプレート1を固定する本数であればよい。したがって、従来の鋼製高欄のように、高欄の設置延長に亘ってアンカーボルトを略等間隔に固定するよりも、アンカーボルト11の埋設本数を削減できる。このように、ハツリ面の施工面積を縮小でき、しかも、アンカーボルト11の埋設本数を削減できるので、少ない手間により、短い工期で、また、低廉な施工費で、鉄筋コンクリート製高欄を鋼製高欄1に取り替えることができる。   Further, in the chipping work on the surface of the floor slab 10, it is only necessary to form a chipping surface at the arrangement position of the base plate 1 with a predetermined interval in the extending direction of the floor slab 10, so that the base portion is formed like a conventional steel rail. Compared to forming a chamfer surface in succession to the railing installation extension, the chamfer surface construction area can be greatly reduced. Moreover, the anchor bolt 11 should just be the number which fixes the base plate 1 arrange | positioned at predetermined intervals. Therefore, the number of embedded anchor bolts 11 can be reduced rather than fixing the anchor bolts at substantially equal intervals over the installation extension of the rail as in the conventional steel rail. In this way, the construction area of the chipped surface can be reduced, and the number of anchor bolts 11 embedded can be reduced, so that the reinforced concrete rails can be replaced with steel rails 1 with a short work period and a low construction cost with less labor. Can be replaced.

また、ベースプレート1及び支柱2と、内パネル3と、外パネル4は、互いに分離した状態で搬入できるので、比較的大型のベース部及びフェース部で構成された従来の鋼製高欄よりも、搬入や積み下ろし作業を容易に行うことができる。したがって、従来よりも小型の重機を用いて、簡単かつ安価に鋼製高欄の設置作業を行うことができる。   Moreover, since the base plate 1 and the support column 2, the inner panel 3, and the outer panel 4 can be carried in a state of being separated from each other, it is carried more than a conventional steel rail having a relatively large base part and face part. And can be easily loaded and unloaded. Therefore, the installation work of the steel rail can be performed easily and inexpensively using a heavy machine smaller than conventional ones.

以上、本発明の一実施形態について説明したが、本発明は上述の実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲で、種々の変更を加え得ることは勿論である。例えば、落下防止部材8,9のワイヤー81,91は、支柱2の貫通孔214に挿通させる以外に、例えば、支柱2に固定した環状の金具等に挿通させてもよい。また、本発明の鋼製高欄は、高速道路に限らず、一般道に用いることもできる。また、本発明の鋼製高欄は、既存の高架橋の鉄筋コンクリート製高欄に対する取り替えに用いるのみでなく、新設の高架橋に用いることもできる。また、本発明の鋼製高欄は、コンクリート床版に限られず、鋼製床版に設置することもできる。また、本発明の鋼製高欄は、高架橋に限られず、河川や海峡等の橋梁に用いることもできる。   As mentioned above, although one Embodiment of this invention was described, this invention is not limited to the above-mentioned embodiment, Of course, a various change can be added in the range which does not deviate from the summary of this invention. For example, the wires 81 and 91 of the fall prevention members 8 and 9 may be inserted into, for example, an annular fitting fixed to the column 2 in addition to being inserted through the through hole 214 of the column 2. Moreover, the steel rails of the present invention can be used not only for expressways but also for ordinary roads. In addition, the steel rail of the present invention can be used not only for replacement of the existing viaduct reinforced concrete rail, but also for a newly installed viaduct. Moreover, the steel rail of the present invention is not limited to a concrete slab, and can be installed on a steel slab. Moreover, the steel rail of the present invention is not limited to a viaduct, and can also be used for bridges such as rivers and straits.

1 ベースプレート
2 支柱
3 内パネル
4 外パネル
10 床版
16 アスファルト舗装
31 内パネルの壁面部
35 内パネルの天面部
41 外パネルの壁面部
42 外パネルの天面部
DESCRIPTION OF SYMBOLS 1 Base plate 2 Support | pillar 3 Inner panel 4 Outer panel 10 Floor slab 16 Asphalt pavement 31 Inner panel wall part 35 Inner panel top part 41 Outer panel wall part 42 Outer panel top part

Claims (3)

床版の端部に延長方向に所定間隔をおいて配置され、アンカーボルトを介して上記床版に固定されるベースプレートと、
上記ベースプレート上に固定された支柱と、
隣り合う上記支柱間に掛け渡され、上記支柱の上記床版の幅方向中央を臨む面に固定される内パネルと、
隣り合う上記支柱間に掛け渡され、上記支柱の上記内パネルが固定される側と反対側の面に固定される外パネルと
を備え、上記外パネルは、この外パネルを上記支柱に固定するためのボルトが予め固定されていることを特徴とする鋼製高欄。
A base plate arranged at a predetermined interval in the extending direction at the end of the floor slab, and fixed to the floor slab via an anchor bolt;
A support post fixed on the base plate;
An inner panel that is spanned between the adjacent struts and is fixed to the surface of the strut facing the center in the width direction of the floor slab;
An outer panel that is spanned between the adjacent columns and is fixed to a surface opposite to the side on which the inner panel of the column is fixed, and the outer panel fixes the outer panel to the column. Steel railings, characterized in that bolts for fixing are fixed beforehand.
請求項1に記載の鋼製高欄において、
順次隣り合う複数の支柱に係合されると共に、上記複数の支柱のうちの両端の支柱に接続され、上記複数の支柱の落下を防止する支柱落下防止部材を備えることを特徴とする鋼製高欄。
In the steel rails according to claim 1 ,
A steel rail that is provided with strut fall prevention members that are engaged with a plurality of struts adjacent to each other and connected to struts at both ends of the plurality of struts to prevent the plurality of struts from falling. .
請求項1又は2に記載の鋼製高欄において、
上記支柱に係合されると共に、この支柱の両側の2つの外パネルに接続され、上記2つの外パネルの落下を防止する外パネル落下防止部材を備えることを特徴とする鋼製高欄。
In the steel table of claim 1 or 2 ,
A steel rail having an outer panel fall prevention member which is engaged with the column and connected to two outer panels on both sides of the column to prevent the two outer panels from falling.
JP2011102747A 2011-05-02 2011-05-02 Steel rail Expired - Fee Related JP5073081B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011102747A JP5073081B2 (en) 2011-05-02 2011-05-02 Steel rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011102747A JP5073081B2 (en) 2011-05-02 2011-05-02 Steel rail

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2007148677A Division JP4740900B2 (en) 2007-06-04 2007-06-04 Steel rails and how to replace rails

Publications (2)

Publication Number Publication Date
JP2011174372A JP2011174372A (en) 2011-09-08
JP5073081B2 true JP5073081B2 (en) 2012-11-14

Family

ID=44687457

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011102747A Expired - Fee Related JP5073081B2 (en) 2011-05-02 2011-05-02 Steel rail

Country Status (1)

Country Link
JP (1) JP5073081B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6376021B2 (en) * 2015-03-30 2018-08-22 Jfeエンジニアリング株式会社 Attaching structure of exterior plate to rigid protective fence
JP6413890B2 (en) * 2015-03-30 2018-10-31 Jfeエンジニアリング株式会社 Reinforced structure of rigid protective fence
JP6375022B1 (en) * 2017-06-27 2018-08-15 株式会社シラヤマ Road bridge cover widening unit

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5237131Y2 (en) * 1972-07-14 1977-08-24
JPS5811557U (en) * 1981-07-15 1983-01-25 積水樹脂株式会社 Supports for soundproof walls, fall prevention fences, etc., wires to prevent fall of face materials - Fixtures
JPH0327334U (en) * 1989-07-27 1991-03-19
JP3376344B2 (en) * 2000-07-21 2003-02-10 株式会社サンケンスチール Installation method of steel wall railing and steel wall railing
JP2002371518A (en) * 2001-06-15 2002-12-26 Daito Giken Kk Protection block for steel structure
JP2003096718A (en) * 2001-09-25 2003-04-03 Sanken Steel:Kk Steel wall balustrade
JP2004190308A (en) * 2002-12-10 2004-07-08 Asahi Kasei Construction Materials Co Ltd Mounting structure and mounting metal fitting of wall panel
JP2005090060A (en) * 2003-09-17 2005-04-07 Daito Giken Kk Connecting structure of steel structure protective block
JP4519683B2 (en) * 2005-03-01 2010-08-04 東日本高速道路株式会社 Sound insulation wall support structure

Also Published As

Publication number Publication date
JP2011174372A (en) 2011-09-08

Similar Documents

Publication Publication Date Title
JP5847483B2 (en) Bridge wall railing method
JP5968846B2 (en) Concrete wall railing mounting structure
US9598827B1 (en) Barrier rail retrofit device assembly
JP4740900B2 (en) Steel rails and how to replace rails
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
JP6673131B2 (en) Floor slab replacement method
JP2013036206A (en) Structure for joining precast barrier curbs to each other
JP5073081B2 (en) Steel rail
JP2015038307A (en) Bridge guard fence strut for replacement in existing wheel guard concrete
JP5273556B2 (en) Widening structure of road bridge and widening method of road bridge
JP5386379B2 (en) Precast slab joints in bridges
JP2004176400A (en) Width expansion member for road and its installation method
JP5043879B2 (en) How to install width expansion materials for road bridges
JP6810472B2 (en) Repair method for drainage lids for bridges
JP6178269B2 (en) Wall railing
JP4477467B2 (en) Bridge structure and its replacement method
JP2001207421A (en) Temporary guard rail part
JP2015117515A (en) Inner tunnel watchman passage structure, and construction method for the same
KR200432268Y1 (en) Cover Plate integrated with the Frame
KR101519373B1 (en) Smart solar way for separation from the damage as a collision of car
JP5829901B2 (en) Guard fence support and support for bridge
KR101486954B1 (en) Extension footpath structure for reinforcement strength of pillar and it's construction method
KR102098432B1 (en) Mounting type haunch module
KR200414665Y1 (en) Bridge inspection appratus is constructed together with bridge
KR20090115637A (en) Bridge reinforcement block

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20110707

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20110708

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120514

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A132

Effective date: 20120522

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120720

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120821

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120821

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150831

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees