KR200414665Y1 - Bridge inspection appratus is constructed together with bridge - Google Patents

Bridge inspection appratus is constructed together with bridge Download PDF

Info

Publication number
KR200414665Y1
KR200414665Y1 KR2020060003738U KR20060003738U KR200414665Y1 KR 200414665 Y1 KR200414665 Y1 KR 200414665Y1 KR 2020060003738 U KR2020060003738 U KR 2020060003738U KR 20060003738 U KR20060003738 U KR 20060003738U KR 200414665 Y1 KR200414665 Y1 KR 200414665Y1
Authority
KR
South Korea
Prior art keywords
bridge
bottom plate
bridge inspection
pier
inspection path
Prior art date
Application number
KR2020060003738U
Other languages
Korean (ko)
Inventor
박찬혁
Original Assignee
주식회사 다린이앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 다린이앤씨 filed Critical 주식회사 다린이앤씨
Priority to KR2020060003738U priority Critical patent/KR200414665Y1/en
Application granted granted Critical
Publication of KR200414665Y1 publication Critical patent/KR200414665Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Abstract

본 고안은 교각점검로에 관한 것으로써, 상기 교량점검로는 교각 또는 교대의 두부 둘레로 소정의 길이, 작업자가 통행하기 용이할 정도의 폭으로 뻗어 나온 바닥판과 바닥판의 선단부에서 수직방향으로 길이연장되어 있는 난간을 포함하되, 상기 바닥판과 난간을 교각 또는 교대 두부를 형성시킬 때 함께 설치되도록 하여 교량점검로 설치가 매우 용이할 수 있도록 하는 것을 특징으로 한다.The present invention relates to a pier inspection path, the bridge inspection path in the vertical direction from the tip of the bottom plate and the bottom plate extending a predetermined length around the head of the pier or alternating, the width of the operator easy to pass Including the extended railing, the bottom plate and the railing is characterized in that it is very easy to install by the bridge inspection to be installed together when forming the bridge or alternating head.

교량점검로 Bridge inspection

Description

교량과 일체로 형성된 교량점검로{BRIDGE INSPECTION APPRATUS IS CONSTRUCTED TOGETHER WITH BRIDGE} Bridge inspection road integrally formed with bridges {BRIDGE INSPECTION APPRATUS IS CONSTRUCTED TOGETHER WITH BRIDGE}

도 1은 교각두부에 설치된 본 고안에 따른 교량점검로의 정면도이다.1 is a front view of the bridge inspection path according to the present invention installed in the head of the pier.

도 2는 도 1에 Ⅱ-Ⅱ선에 따른 단면도이다.2 is a cross-sectional view taken along the line II-II in FIG. 1.

도 3은 본 고안에 따른 교량점검로의 설치상세도이다.Figure 3 is a detailed view of the installation of the bridge inspection road according to the present invention.

도 4는 본 고안에 따른 교량점검로의 개략적인 설치순서도이다.4 is a schematic installation flowchart of the bridge inspection path according to the present invention.

도 5는 종래기술에 따른 교량점검로의 정면도이다.5 is a front view of a bridge inspection road according to the prior art.

<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>

1,101 ----- 교량점검로, 2,102 ----- 교량,1,101 ----- bridge inspection, 2,102 ----- bridge,

3,103 ----- 교각, 3',103' ----- 교각두부,3,103 ----- pier, 3 ', 103' ----- pier tofu,

4,104 ----- 상부슬래브, 5,105 ----- 교좌,4,104 ----- upper slab, 5,105 ----- conduit,

11,111 ----- 난간, 12,112 ----- 바닥판,11,111 ----- handrail, 12,112 ----- sole plate,

13,113 ----- 출입시설, 16 ----- 삽입공,13,113 ----- access facilities, 16 ----- insertion holes,

114,115 ----- H-형강, H ---- 바닥판 높이.114115 ----- H-shaped steel, H ---- bottom plate height.

본 고안은 교각두부에 일체로 형성된 교량점검로에 관한 것으로, 더욱 구체적으로 교량의 보수, 보강 또는 하자점검 등을 위하여 교각 또는 교대 둘레를 따라 작업자가 이동할 수 있는 작업발판, 안전사고 방지를 위하여 작업발판 둘레를 따라 설치되는 난간 및 원형사다리와 같은 출입시설을 포함하는 교량점검로에 관한 것이다. The present invention relates to a bridge inspection path integrally formed in the head of the pier, more specifically to the work scaffold that can move the worker along the pier or the circumference for the repair, reinforcement or defect inspection of the bridge, work to prevent accidents A bridge inspection path including access facilities such as railings and circular ladders installed along the circumference of the scaffold.

신설된 교량 또는 기존의 교량의 주기적인 점검과 유지관리를 위해 통상적으로 교량은 도 5에 도시된 바와 같이 교각두부(103') 또는 교대두부 둘레를 따라 교량점검로(101)를 설치한다.In order to periodically check and maintain the new bridge or the existing bridge, the bridge typically installs the bridge inspection path 101 along the pier head 103 'or the circumferential head as shown in FIG.

이 교량점검로(101)는 교각(103) 상단에 형성된 교각두부(103') 둘레로 형성되되, 특히 교통제한 없이 상시적으로 점검이 가능토록 출입시설(113)과 작업자의 통행을 돕는 바닥판(112) 및 이 바닥판(112)에서 수직으로 길이연장되어 있는 난간(111)으로 구성되어 있으며, The bridge inspection road 101 is formed around the pier head 103 'formed on the top of the pier 103, in particular, the floor plate to help the passage of the access facility 113 and the worker so that it can be checked at all times without traffic restrictions. And a handrail 111 extending lengthwise from the bottom plate 112 vertically,

통상적으로, 상기 교량점검로는 교각두부(103') 콘크리트 구조물 주위를 따라 철재 또는 알루미늄재질의 채널, 형강 또는 바닥판을 조립하여 부착시키는 방법으로 설치하고 있다. Typically, the bridge inspection is installed by assembling and attaching a channel, a section steel or a bottom plate of steel or aluminum material along the pier head 103 'concrete structure.

즉, 교각두부(103') 둘레를 따라 교량을 점검할 점검자 또는 이를 보수할 작업자의 안전보장을 위해 구비된 교량점검로(101)는 통상적으로 교각두부(103') 선단부 주위를 따라 앵커볼트(Anchor Bolt;도시되지 않음)를 매개로 H-형강(114)을 수직되게 고정장착한 후에, 다른 H-형강(115)은 수직하게 위치된 H-형강(114)에서 윗방향으로 적당한 각도로 경사지게 기울어지게 배치하여 브라켓을 설치하고, 양 H-형강(114,115)으로 구성된 브라켓 위로 일반적으로 알루미늄재질로 제작된 바닥 판(112)을 고정시켜 교량점검로를 설치하게 된다. 또한 난간(111)도 마찬가지로 바닥판(112)에서 수직되게 브래킷과 볼트 또는 용접 등과 같은 다양한 체결수단을 통해 위치 고정되는 것이 일반적이다. That is, the bridge inspection path 101 provided for the safety of the inspector to inspect the bridge along the pier head (103 ') or the worker to repair it is typically anchor bolt (around the tip of the pier head 103') After anchoring the H-beams 114 vertically via an Anchor Bolt (not shown), the other H-beams 115 are inclined at an appropriate angle upwards in the vertically positioned H-beams 114. Brackets are installed by tilting, and the bridge inspection path is installed by fixing the bottom plate 112, which is generally made of aluminum, over the bracket composed of both H-beams 114 and 115. In addition, handrail 111 is also generally fixed to the position through a variety of fastening means such as brackets and bolts or welding perpendicular to the bottom plate (112).

나아가 교량점검로(101)에는 점검자가 교량(102)을 점검하고 할 때 안전하게 바닥판으로 접근할 수 있도록 슬래브(104) 측면에서 아래방향으로 바닥판(112)까지 뻗어 있는 사다리 형상의 출입시설(113)을 설치하게 된다.Furthermore, the bridge inspection path 101 has a ladder-shaped access facility extending from the side of the slab 104 to the bottom plate 112 so that the inspector can safely access the bottom plate when inspecting the bridge 102. 113) will be installed.

이에 교각두부(103') 주위를 따라 고정된 바닥판(112)에 의하여 제공된 작업통로를 따라 점검자 혹은 작업자가 이동할 수 있으며 교량의 주요 구성구조물의 상태를 확인할 수 있게 된다.This allows the inspector or worker to move along the work path provided by the bottom plate 112 fixed around the pier head 103 'and check the state of the main components of the bridge.

이와 같이 교량점검로를 설치하는 종래의 방법은 교대, 교각 및 슬래브를 모두 완성시킨 후에 설치하는 방식을 따르기 때문에 결국 교량점검로를 설치하기 위한 별도의 작업수단이 필요하게 된다. 하지만 이러한 작업수단으로써 별도의 비계를 이용하기도 하며 차량에 설치된 작업대를 교대 또는 교각 주위에 배치하여 교량점검로를 설치하는 방법을 이용하게 되는데 양자 모두 공종이 복잡하고, 설치비용이 증가되며, 고소작업에 따른 안전상의 문제점이 있었다. 나아가 교량점검로를 구성하는 브라켓, 바닥판 및 난간을 용이하게 설치하기 위해서 운반 및 설치작업의 편이성을 위하여 경량이면서 내구성 및 외적미관을 고려한 알루미늄 제품을 이용하는 것이 일반적이다. 즉, 만약 철재로 형성시키는 경우에는 대기중의 오염물질과 공기와의 오랜 산화로 인해 부식현상이 유발되어 녹물이 교각을 따라 흘러내려 미적반감을 일으킬 뿐만 아니라 주기적으로 교량의 유지에 따른 부담 이외에 교량점 검로(101)의 유지보수를 위한 추가비용을 확보해야 하기 때문이다.In this way, the conventional method of installing the bridge inspection path follows the installation method after completing all the shifts, bridges, and slabs, so that a separate working means for installing the bridge inspection path is required. However, as a means of work, a separate scaffold is used, and a work bench installed in a vehicle is installed around a shift or a pier to install a bridge inspection path, which is complicated in both types of work, increases installation costs, and works at heights. There was a safety problem. Furthermore, in order to easily install the bracket, the bottom plate, and the railing constituting the bridge inspection path, it is common to use an aluminum product in consideration of light weight, durability, and external appearance for ease of transportation and installation work. In other words, if it is made of steel, corrosion is caused by long-term oxidation of air pollutants and air, and the melt flows along the bridge, causing aesthetic sensation, and in addition to the burden of maintaining the bridge periodically. This is because additional costs for maintenance of the inspection furnace 101 must be secured.

또한 일단 교량점검로(101) 자체에 하자가 발생하게 되면 재설치작업을 수행해야만 한다. 일반적으로 교각(103)으로 지지되는 상부슬래브(114)는 지상으로부터 높이 떠받쳐져 있기 때문에 시설물의 유지관리 및 보수를 위해 고공작업이 필수적이다. 결국 이에 따른 안전사고의 우려와 고공작업에 따른 가시설, 예컨대 작업비계의 설치로 추가적인 비용이 요구 된다는 문제점이 있었다. In addition, once the failure occurs in the bridge inspection road 101 itself must be reinstalled. In general, since the upper slab 114 supported by the pier 103 is held high from the ground, high work is essential for the maintenance and repair of the facility. As a result, there was a problem of safety accidents and additional costs required for the installation of temporary facilities, for example, work scaffolding, due to high-working.

또한, 브라켓 및 바닥작판 설치 및 해체작업 및 바닥판(112)을 교각 둘레로 배열하기 위한 작업은 이미 형성시킨 구조물의 일부 훼손을 피할 수 없어 구조적인 문제점 및 시공성의 저하는 피할 수 없다는 문제점이 있었다. In addition, the installation and dismantling of the bracket and the floor board and the work for arranging the bottom plate 112 around the piers are not able to avoid some damage to the already formed structure, and thus there is a problem in that structural problems and deterioration in construction are inevitable. .

이러한 문제점들의 대부분은 결국 교량점검로를 교량의 완성 시점 이후에 추가로 설치하는 방식을 따르기 때문인데, 이에 본 고안은 이러한 문제점을 근본적으로 해결하기 위한 교량점검로 설치방식을 개발하게 되었다.Most of these problems are due to the following method of installing the bridge inspection road after the completion of the bridge, the present invention has developed a bridge inspection road installation method to solve these problems fundamentally.

본 고안의 목적은 교량점검로를 보다 경제적으로 용이하게 교량에 설치하기 위한 교량점검로를 제공하기 위한 것이다.An object of the present invention is to provide a bridge inspection path for installing the bridge inspection path on the bridge more economically and easily.

본 고안의 다른 목적은 재설치작업 및 유지관리보수가 용이한 교량점검로를 제공하기 위한 것이다.Another object of the present invention is to provide a bridge inspection path that is easy to reinstall work and maintenance.

상기 기술적과제를 달성하기 위하여 본 고안에 따른 교량점검로는 교각 또는 교대를 형성시킬때 함께 교량점검로가 설치될 수 있도록 함으로써 추가적인 교각점검로 를 추후 설치하는 공정이 생략될 수 있는 것을 특징으로 한다.In order to achieve the technical problem, the bridge inspection road according to the present invention is characterized in that the bridge inspection path may be installed together when the bridge or the bridge is formed, so that the additional installation of the bridge inspection path may be omitted later. .

또한 교각점검로를 구성하는 바닥판을 교대 또는 교각용 콘크리트 타설할 때 함께 콘크리트로 일체화되어 형성되도록 하여 시공성을 대폭 향상될 수 있도록 하고, 난간의 경우에도 콘크리트 바닥판에 간단하게 삽입하여 설치될 수 있도록 함으로써 교량점검로 설치 공기를 대폭 감축할 수 있음을 기술적 특징으로 한다.In addition, when the bottom plate constituting the pier inspection path is to be formed integrally together with concrete when placing alternating or pier concrete, the workability can be greatly improved, and in the case of handrails, it can be installed simply by inserting it into the concrete floor plate. The technical feature is that bridge inspection can significantly reduce installation air.

본 고안을 보다 명확하고 용이하게 설명하기 위해서 이하 본 고안의 최선의 실시예를 첨부도면에 의하여 상세하게 설명하며, 본 고안에 따른 실시예는 여러 가지 다른 형태로 변형될 수 있으므로, 본 고안의 범위가 아래에서 설명되는 실시예에 한정되지 않는다.In order to explain the present invention more clearly and easily described in detail by the accompanying drawings the best embodiment of the present invention, the embodiment according to the present invention can be modified in various other forms, the scope of the present invention Is not limited to the embodiment described below.

도 1은 교각두부에 설치된 본 고안에 따른 교량점검로를 교량방향으로 바라본 정면도이다.1 is a front view of the bridge inspection path according to the present invention installed in the head of the bridge in a bridge direction.

도시된 바와 같이, 교량(2)은 크게 상부구조와 하부구조로 나눌 수 있는데, 상부구조라 함은 교대 또는 교각(3) 위로 안착되어 있는 구조물을 지칭하는 것으로, 일반적으로 거더(Girder)와 슬래브(Slab,4) 등으로 이루어져 있다. 또한, 상부구조로 가해지는 하중을 지반까지 안전하게 전달하는 역할을 수행하는 상부슬래브(4)와 하부구조는 교대와 교각(3) 사이에 교좌장치(5)를 구비하게 된다.As shown, the bridge 2 can be broadly divided into a superstructure and a substructure, which refers to a structure seated on an alternating or pier 3, and generally refers to girders and slabs ( Slab, 4) and so on. In addition, the upper slab 4 and the lower structure which serves to safely transmit the load applied to the superstructure to the ground is provided with a bridge device 5 between the alternating and the piers (3).

교량(2)의 상부슬래브(4)는 교각(3) 및 교대로 이루어진 하부구조 위로 안착되어 있는데, 이와 구조로 설치되어 있는 교량(2)을 지속적으로 점검하기 위해서 교각(3)의 상부(여기서는 두부(頭部)로 칭함) 둘레로 작업자의 통행로를 제공하기 위해 교량점검로(1)가 설치된다. 상기 교량점검로(1)로 인해 교량(2) 위로 통행하 는 차량 또는 사람들의 통행을 제한하지 않고서 교량의 안전유무를 확인할 수 있는 작업공간이 확보된다.The upper slab 4 of the bridge 2 is seated above the bridge 3 and the alternating substructure, in which the upper part of the bridge 3 (here A bridge inspection path 1 is provided to provide a worker's passage around the head. Due to the bridge inspection path (1) is secured a work space that can confirm the safety of the bridge without restricting the traffic of vehicles or people passing over the bridge (2).

종래기술과는 달리 본 고안에 따른 교량점검로(1)는 교각(3)의 시공시 동시에 교각(3)의 두부와 일체로 형성되는 것을 특징으로 한다.Unlike the prior art, the bridge inspection furnace 1 according to the present invention is characterized in that it is integrally formed with the head of the bridge 3 at the time of construction of the bridge 3.

상기 교량점검로(1)는 통행자의 통행로를 확보하는 바닥판(12)과 이 바닥판(12)으로부터 수직되게 위로 길이연장되어 있는 난간(11)으로 구성되어 있다. 이와 더불어 상부슬래브(4)로부터 점검자가 바닥판(12)으로 위치이동하기 위해 출입시설(13)을 구비한다.The bridge inspection path 1 is composed of a bottom plate 12 that secures a passage of a pedestrian and a handrail 11 that extends vertically upward from the bottom plate 12. In addition, an access facility 13 is provided to move the inspector from the upper slab 4 to the bottom plate 12.

도 2는 도 1에 Ⅱ-Ⅱ선에 따른 단면도로서, 교량(2)의 구조물 중 상부슬래브(4)를 제거한 상태한 상태에서 아래방향으로 바라본 평면도이다.FIG. 2 is a cross-sectional view taken along the line II-II in FIG. 1 and is a plan view of the structure of the bridge 2 viewed downward while the upper slab 4 is removed.

사각형상으로 되어 있는 교각두부(3') 상으로 상부슬래브(2;도 1참조)를 떠받치는 4개의 교좌장치(5)가 도시되어 있으며, 상기 교각두부(3') 둘레에서 일체로 방사상으로 바깥방향을 향해 뻗어 철근콘크리트로 형성된 바닥판(12)을 포함한 교량점검로(1)로 이루어져 있다. 또한, 도 1로 기술되었듯이, 교량점검로(1) 외곽 둘레로 작업자의 안전을 위한 난간(11)을 설치한다. Four scaffolding devices 5 are shown which support the upper slab 2 (see FIG. 1) onto the pier head 3 'which is rectangular in shape and are integrally radially circumferentially around the pier head 3'. It consists of a bridge inspection path 1 including a bottom plate 12 extending outward and formed of reinforced concrete. In addition, as described in FIG. 1, a railing 11 for worker safety is installed around the periphery of the bridge inspection path 1.

도 3은 본 고안에 따른 교량점검로(1)의 설치상태도이다. 교각두부(3') 둘레로 뻗어 일체로 형성된 교량점검로(1)는 콘크리트재로 이루어진 바닥판(12)과 철재, 바람직하기로 내식성을 갖춘 알루미늄 소재로 제작된 난간(11)으로 구성되어 있다. 3 is an installation state diagram of the bridge inspection path (1) according to the present invention. Bridge inspection path 1 formed integrally extending around the pier head 3 'is composed of a bottom plate 12 made of concrete and a handrail 11 made of steel, preferably aluminum having corrosion resistance. .

도 4는 본 고안에 따른 교량점검로의 설치순서를 개략적으로 도시한 것이다.Figure 4 schematically shows the installation procedure of the bridge inspection path according to the present invention.

도면으로 도시되지 않지만, 교각두부(3')의 내부에 배근되는 주철근과 보조철근에서 상부슬래브(4)와 거의 평행하게 철근을 추가로 장착하고 거푸집을 설치한 후 바닥판용 콘크리트를 교각용 콘크리트 타설과 함께 동시에 타설한다. 콘크리트가 양생과정을 거친 다음에, 바닥판(12)의 외곽 선단끝을 따라 난간(11)을 입설시켜 고정한다. 바람직하기로는, 난간(11)은 바닥판(12)의 외곽 끝을 따라 소정의 간격으로 이격되어 형성된 삽입공(16)에 삽입시키고 삽입공에 몰탈을 채워 확실하게 난간이 바닥판에 고정될 수 있도록 할 수 있다.. Although not shown in the drawing, in the main reinforcement and secondary reinforcing bars in the interior of the pier head (3 '), additional reinforcement is installed almost parallel to the upper slab (4) and the formwork is installed, the concrete for the bottom plate pour concrete And pour together simultaneously. After the concrete undergoes curing, railings 11 are placed along the outer edge of the bottom plate 12 and fixed. Preferably, the handrail 11 is inserted into the insertion hole 16 formed spaced apart at predetermined intervals along the outer end of the bottom plate 12 and the mortar is filled in the insertion hole to ensure that the handrail is fixed to the bottom plate. You can do that.

구체적으로는 교각두부(3')에는 교각두부를 형성시키기 위한 지보공(도면 미도시)이 설치되는데, 본 고안의 바닥판(12)을 설치하기 위하여 상기 지보공을 이용하되 바닥판 형성작업을 위하여 통상적인 지보공보다 외곽쪽으로 더 연장되어 설치될 수 있도록 한다. 결국 교각두부를 형성시키기 위한 종래의 지보공을 이용하기 때문에 별도의 지보공 설치가 필요없게 된다.Specifically, the pier head (3 ') is provided with a support (not shown) for forming the pier head, using the support for installing the bottom plate 12 of the present invention, but the bottom plate forming operation It can be installed to extend more outward than the intelligence. As a result, since the conventional support for forming the pier head is used, there is no need to install a separate support for the support.

다음에는, 바닥판용 콘크리트 내부에 배근되는 철근을 더 추가하여 설치한 후에 거푸집을 설치하고, 추가로, 교량점검로 외측선단부에 위치될 난간을 입설시키도록 블록아웃(block-out)용 구멍을 형성하기 위해 소정의 직경과 단면형상을 갖는 파이프 등을 설치하여 난간의 용이한 입설을 돕는 삽입공(16)이 형성되도록 한다.Next, after adding and installing additional reinforcing bars inside the concrete for the bottom plate, formwork is installed, and additionally, holes for block-out are formed to insert a railing to be positioned at the outer end by bridge inspection. In order to install a pipe and the like having a predetermined diameter and cross-sectional shape so as to form an insertion hole 16 to facilitate the entry of handrails.

다음에는 바닥판의 높이(H)까지 교각두부와 함께 일체로 콘크리트를 타설하는 제 1 타설단계(A)를 거치게 되는데 이 제 1타설을 한 후 시간의 경과를 두고 경화되기 전에 완전하게 교각두부 콘크리트로 타설하는 제 2타설단계(B)를 거치게 된 다.Next, a first pouring step (A) is performed in which the concrete is integrally poured together with the pier head to the height (H) of the bottom plate, and then the pier head concrete is completely cured after the first pouring. The second casting step (B) is to be poured.

타설을 마치고 가시설(예컨대, 거푸집 및 비계)을 해체하고 나서는, 최종적으로 교량점검대의 외측에 매설된 파이프로 형성된 삽입공(16)으로 난간을 삽입하여 설치하게 된다. 상기 A단계와 B단계로 교각(3)을 분리타설하는 이유는 교각(3)을 타설할 때에 교각두부(3')의 상단부까지 연속타설하게 되면 점검로의 바닥면(12)의 높이(H) 보다 높게 타설된 콘크리트가 솟구쳐 올라오는 현상을 방지하기 위함이다. 이때 추후에 발생될수 있는 난간(11)의 보수작업을 위해서 노후되고 파괴된 난간(11)을 삽입공으로부터 해체하고 다시 삽입공(16)에 새로운 난간(11)을 삽입시킬 수 있어 유지관리에 매우 유리하게 된다.After disassembly of the temporary facility (for example, formwork and scaffolding) after placing, the railing is inserted into the insertion hole 16 formed of a pipe embedded in the outside of the bridge inspection table. The reason for separating and placing the piers 3 in the steps A and B is that the height H of the bottom surface 12 of the inspection road when the piers 3 are continuously placed to the upper end of the piers 3 'when placing the piers 3 is placed. This is to prevent the concrete from rising higher than the poured concrete. At this time, the old and broken handrail 11 can be dismantled from the insertion hole and the new handrail 11 can be inserted into the insertion hole 16 for maintenance of the handrail 11, which may be generated later. Is advantageous.

이상과 같이 본 고안에 의하면, 교각두부를 형성시킬 때 콘크리트에 의하여 교각과 일체로 형성된 교량점검로는 추후 따로 설치할 필요가 없어져 교량점검로 설치작업 시공성이 매우 뛰어나고, 추후 유지관리도 용이할 뿐만 아니라, 교량점검로를 별도로 설치하는 것보다 공사비를 훨씬 절약할 수 있으며, 교각두부와 함께 설치할 수 있으므로 작업공수를 줄일 수 있으며, 교각두부와 일체 시공으로 구조물의 미려함을 제공할 뿐더러, 반영구적으로 사용할 수 있어서 유지관리비를 절감할 수 있다.As described above, according to the present invention, when the bridge head is formed, the bridge inspection path formed integrally with the bridge by concrete does not need to be installed separately later, so the installation work is very excellent as bridge inspection, and the maintenance is easy as well. In addition, the construction cost can be saved much more than installing the bridge inspection path separately, and it can be installed together with the pier head to reduce the labor, and provide the beautifulness of the structure by integral construction with the pier head. Therefore, maintenance costs can be reduced.

Claims (3)

교량의 교대 또는 교각둘레로 형성되어 작업자의 통행로를 제공할 수 있는 교량점검로에 있어서, 상기 교량점검로는 교각두부를 형성시킴과 더불어 일체로 교각두부 둘레를 따라 방사상으로 형성시킨 바닥판; 및 상기 바닥판 외측선단부에 설치된 난간;을 포함하도록 구성되어, 추후 별도로 교량점검로 설치작업 없이도 교대 또는 교각 형성시 교량점검로를 설치할 수 있는 것을 특징으로 하는 교량과 일체로 형성된 교량점검로.A bridge inspection path formed by alternating bridges or bridge circumferences to provide a passage for a worker, wherein the bridge inspection path forms a bridge head and integrally forms a bottom plate radially along the pier head; And a railing installed at the bottom end of the bottom plate; and the bridge inspection path integrally formed with the bridge, wherein the bridge inspection path may be installed when the bridge or the bridge is formed without additional bridge inspection installation work. 제 1항에 있어서, 상기 바닥판은 교각두부용 콘크리트 타설 시 함께 콘크리트를 타설하여 형성시킨 콘크리트 바닥판인 것을 특징으로 하는 교량과 일체로 형성된 교량점검로.The bridge inspection furnace integrally with the bridge according to claim 1, wherein the bottom plate is a concrete bottom plate formed by pouring concrete together when placing concrete for pier heads. 제 1항 또는 제 2항에 있어서, 상기 난간은 바닥판의 외측선단부에 입설시키기 위하여 바닥판 형성시 미리 형성바닥판 외곽끝 쪽으로 형성된 삽입공에 입설시켜 설치되는 것을 특징으로 하는 교량과 일체로 형성된 교량점검로.According to claim 1 or 2, wherein the handrail is formed integrally with the bridge, characterized in that installed in the insertion hole formed toward the outer edge of the preformed bottom plate when the bottom plate is formed in order to enter the outer end portion of the bottom plate Bridge inspection.
KR2020060003738U 2006-02-10 2006-02-10 Bridge inspection appratus is constructed together with bridge KR200414665Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060003738U KR200414665Y1 (en) 2006-02-10 2006-02-10 Bridge inspection appratus is constructed together with bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060003738U KR200414665Y1 (en) 2006-02-10 2006-02-10 Bridge inspection appratus is constructed together with bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060012570 Division 2006-02-09

Publications (1)

Publication Number Publication Date
KR200414665Y1 true KR200414665Y1 (en) 2006-04-21

Family

ID=44481776

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060003738U KR200414665Y1 (en) 2006-02-10 2006-02-10 Bridge inspection appratus is constructed together with bridge

Country Status (1)

Country Link
KR (1) KR200414665Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101449654B1 (en) * 2014-04-10 2014-10-13 주식회사 삼우기업 Angle and height adjustable apparatus for inspecting bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101449654B1 (en) * 2014-04-10 2014-10-13 주식회사 삼우기업 Angle and height adjustable apparatus for inspecting bridge

Similar Documents

Publication Publication Date Title
JP5773814B2 (en) Construction method of wall rail of overhanging PC bridge
KR101129698B1 (en) Hanger type temporary resources for cantilever and method for construction of cantilever part of bridge using the temporary resources
JP4310444B1 (en) Width expansion material for road bridges
KR101406035B1 (en) Pier for Bridge and Construction Method thereof
JP3128947U (en) Bridge inspection road structure
JPH08269911A (en) Structure of attaching part of concrete wall transom
KR100688149B1 (en) Supporting structure of parapet for steel bridge
KR200414665Y1 (en) Bridge inspection appratus is constructed together with bridge
JP2017040113A (en) Overhanging passage of steel structure
JP6360769B2 (en) Widening method of existing road bridge
JP5043879B2 (en) How to install width expansion materials for road bridges
JP6652755B2 (en) Joint structure and joining method between road deck and PCa wall railing
KR100403988B1 (en) Method for forming continuous p.s.c beams with steel plate girder splice and apparatus thereof
JP4044893B2 (en) Suspended scaffolding
JP2000017618A (en) Replacement method of concrete bridge to steel bridge
KR102332145B1 (en) Ramp construction structure of warehouse using precast concrete construction method
JP5807883B1 (en) Suspended scaffolding
JP7134133B2 (en) Bridge railing construction method
KR100729842B1 (en) Repair work of railroad bridge and that structure
KR102120857B1 (en) System for constructing bridge deck
KR100469638B1 (en) Support construction for slab of prestressed concrete beam of bridge
KR20010097315A (en) Pier scaffolding and the pier construction method for using pier scaffolding
JP2003056186A5 (en)
JP2010101072A (en) Structure of composite beam, and construction method for composite beam
KR20060128805A (en) Pc structure for a falling of a bridge and manufacturing method thereof

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment