JP2008075287A - 循環式掘削装置とスイベルジョイント - Google Patents
循環式掘削装置とスイベルジョイント Download PDFInfo
- Publication number
- JP2008075287A JP2008075287A JP2006253576A JP2006253576A JP2008075287A JP 2008075287 A JP2008075287 A JP 2008075287A JP 2006253576 A JP2006253576 A JP 2006253576A JP 2006253576 A JP2006253576 A JP 2006253576A JP 2008075287 A JP2008075287 A JP 2008075287A
- Authority
- JP
- Japan
- Prior art keywords
- hole
- housing
- bearing
- pipe
- swivel joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 55
- 239000004519 grease Substances 0.000 claims abstract description 44
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 42
- 238000012856 packing Methods 0.000 claims abstract description 28
- 210000002445 nipple Anatomy 0.000 claims abstract description 18
- 238000009412 basement excavation Methods 0.000 claims description 64
- 239000007788 liquid Substances 0.000 claims description 38
- 239000004576 sand Substances 0.000 claims description 21
- 230000000087 stabilizing effect Effects 0.000 claims description 17
- 239000011148 porous material Substances 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 47
- 230000008602 contraction Effects 0.000 description 6
- 239000000428 dust Substances 0.000 description 6
- 230000005484 gravity Effects 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000002411 adverse Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 208000002173 dizziness Diseases 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
【解決手段】供給ポンプ9の吐出ポート9aをスイベルジョイント5の導水管12と縦穴3に設置された配管13との間で切換え接続すると共に、吸上ポンプ10の吸込ポート10aを前記配管13と前記導水管12との間で切換え接続する切換弁11を設ける。スイベルジョイントのハウジングと駆動筒との間に、軸受への漏水を防止するパッキングを設ける。ハウジングの外部から軸受に連通させる貫通孔にグリスニップルを設ける。この貫通孔の反対側にハウジングの外部から軸受に連通させる貫通孔に細孔を有する孔付目めくらを設ける。
【選択図】図1
Description
このドリリングパイプを下部に接続し回転させる駆動装置を有しかつ上部に安定液を通す導水管を有するスイベルジョイントと、
前記安定液を溜めかつ安定液中の土砂を分離するプラントと、
前記掘削具により掘削された縦穴に前記プラントより安定液を供給する供給ポンプと、
前記掘削具による掘削部を経た安定液を前記プラントに吸い上げる吸上ポンプとを備えた循環式掘削装置において、
前記供給ポンプの吐出ポートを前記導水管と前記縦穴に設置された配管との間で切換え接続すると共に、前記吸上ポンプの吸込ポートを前記縦穴に設置された前記配管と前記導水管との間で切換え接続する切換弁を設けたことを特徴とする。
前記導水管が上部に設けられ、かつ前記駆動装置が設けられるハウジングと、
前記導水管に連通すると共に、前記ハウジング内に軸受を介して回転可能に取付けられ、下部に前記ドリリングパイプが接続されるチャック装置を設けた駆動筒と、
前記ハウジングと前記駆動筒との間に設けられ、前記軸受への漏水を防止するパッキングと、
前記ハウジングに設けられ、前記ハウジングの外部から前記軸受に連通させる第1の貫通孔と、
前記第1の貫通孔に取付けられたグリスニップルと、
前記ハウジングにおける前記第1の貫通孔の反対側に設けられ、前記ハウジングの外部から前記軸受に連通させる第2の貫通孔と、
前記第2の貫通孔に取付けられ、軸受とハウジングの外部とを連通させる細孔を有する孔付目めくらとを備えたことを特徴とする。
前記パッキングを上下に間隔を有して2段に設け、
これらのパッキングの間と前記ハウジングの外部とを連通させる第3の貫通孔を設け、
前記第3の貫通孔における前記第3の貫通孔を設けた箇所の反対側に、前記2段のパッキングの間と前記ハウジングの外部とを連通させる第4の貫通孔を設け、
前記第3の貫通孔にグリスニップルを取付け、前記第4の貫通孔に孔付目めくらを取付けたことを特徴とする。
Claims (3)
- 先端に掘削具を取付けたドリリングパイプと、
このドリリングパイプを下部に接続し回転させる駆動装置を有しかつ上部に安定液を通す導水管を有するスイベルジョイントと、
前記安定液を溜めかつ安定液中の土砂を分離するプラントと、
前記掘削具により掘削された縦穴に前記プラントより安定液を供給する供給ポンプと、
前記掘削具による掘削部を経た安定液を前記プラントに吸い上げる吸上ポンプとを備えた循環式掘削装置において、
前記供給ポンプの吐出ポートを前記導水管と前記縦穴に設置された配管との間で切換え接続すると共に、前記吸上ポンプの吸込ポートを前記縦穴に設置された前記配管と前記導水管との間で切換え接続する切換弁を設けたことを特徴とする循環式掘削装置。 - 請求項1に記載の循環式掘削装置に設けられる前記スイベルジョイントにおいて、
前記導水管が上部に設けられ、かつ前記駆動装置が設けられるハウジングと、
前記導水管に連通すると共に、前記ハウジング内に軸受を介して回転可能に取付けられ、下部に前記ドリリングパイプが接続されるチャック装置を設けた駆動筒と、
前記ハウジングと前記駆動筒との間に設けられ、前記軸受への漏水を防止するパッキングと、
前記ハウジングに設けられ、前記ハウジングの外部から前記軸受に連通させる第1の貫通孔と、
前記第1の貫通孔に取付けられたグリスニップルと、
前記ハウジングにおける前記第1の貫通孔の反対側に設けられ、前記ハウジングの外部から前記軸受に連通させる第2の貫通孔と、
前記第2の貫通孔に取付けられ、軸受とハウジングの外部とを連通させる細孔を有する孔付目めくらとを備えたことを特徴とするスイベルジョイント。 - 請求項2に記載のスイベルジョイントにおいて、
前記パッキングを上下に間隔を有して2段に設け、
これらのパッキングの間と前記ハウジングの外部とを連通させる第3の貫通孔を設け、
前記第3の貫通孔における前記第3の貫通孔を設けた箇所の反対側に、前記2段のパッキングの間と前記ハウジングの外部とを連通させる第4の貫通孔を設け、
前記第3の貫通孔にグリスニップルを取付け、前記第4の貫通孔に孔付目めくらを取付けたことを特徴とするスイベルジョイント。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006253576A JP4693730B2 (ja) | 2006-09-19 | 2006-09-19 | 循環式掘削装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006253576A JP4693730B2 (ja) | 2006-09-19 | 2006-09-19 | 循環式掘削装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2008075287A true JP2008075287A (ja) | 2008-04-03 |
JP4693730B2 JP4693730B2 (ja) | 2011-06-01 |
Family
ID=39347634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2006253576A Active JP4693730B2 (ja) | 2006-09-19 | 2006-09-19 | 循環式掘削装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4693730B2 (ja) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010203171A (ja) * | 2009-03-04 | 2010-09-16 | Ohbayashi Corp | 気体の除去方法、掘削システム |
CN102979454A (zh) * | 2012-12-05 | 2013-03-20 | 张家口市宣化正远钻采机械有限公司 | 一种地质勘探用的反循环钻机及其动力头 |
CN107701123A (zh) * | 2017-11-29 | 2018-02-16 | 河北天理环保科技有限公司 | 一种空气钻进双壁钻杆正反循环转换接头 |
CN112576210A (zh) * | 2020-12-15 | 2021-03-30 | 中铁北京工程局集团有限公司 | 一种钻孔灌注桩清孔装置 |
US10995563B2 (en) | 2017-01-18 | 2021-05-04 | Minex Crc Ltd | Rotary drill head for coiled tubing drilling apparatus |
CN113585992A (zh) * | 2021-07-22 | 2021-11-02 | 深圳市工勘岩土集团有限公司 | 超厚覆盖层大直径嵌岩灌注桩的泵吸反循环钻进结构 |
KR102404517B1 (ko) * | 2021-08-10 | 2022-06-02 | 김명원 | 암반 천공 장치 및 이를 이용한 암반 파쇄 방법 |
CN117248823A (zh) * | 2023-11-15 | 2023-12-19 | 新乡市市政工程处有限公司 | 一种自走式多功能钻机 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104631439B (zh) * | 2014-12-31 | 2016-08-17 | 上海市机械施工集团有限公司 | 一种泵吸反循环桩基施工装置及方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002047648A (ja) * | 2000-08-02 | 2002-02-15 | East Japan Railway Co | 場所打ちコンクリート杭工法 |
JP2005126922A (ja) * | 2003-10-21 | 2005-05-19 | Kajima Corp | 現場打ち工法及び掘削装置 |
-
2006
- 2006-09-19 JP JP2006253576A patent/JP4693730B2/ja active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002047648A (ja) * | 2000-08-02 | 2002-02-15 | East Japan Railway Co | 場所打ちコンクリート杭工法 |
JP2005126922A (ja) * | 2003-10-21 | 2005-05-19 | Kajima Corp | 現場打ち工法及び掘削装置 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010203171A (ja) * | 2009-03-04 | 2010-09-16 | Ohbayashi Corp | 気体の除去方法、掘削システム |
CN102979454A (zh) * | 2012-12-05 | 2013-03-20 | 张家口市宣化正远钻采机械有限公司 | 一种地质勘探用的反循环钻机及其动力头 |
US10995563B2 (en) | 2017-01-18 | 2021-05-04 | Minex Crc Ltd | Rotary drill head for coiled tubing drilling apparatus |
US11136837B2 (en) | 2017-01-18 | 2021-10-05 | Minex Crc Ltd | Mobile coiled tubing drilling apparatus |
CN107701123A (zh) * | 2017-11-29 | 2018-02-16 | 河北天理环保科技有限公司 | 一种空气钻进双壁钻杆正反循环转换接头 |
CN112576210A (zh) * | 2020-12-15 | 2021-03-30 | 中铁北京工程局集团有限公司 | 一种钻孔灌注桩清孔装置 |
CN113585992A (zh) * | 2021-07-22 | 2021-11-02 | 深圳市工勘岩土集团有限公司 | 超厚覆盖层大直径嵌岩灌注桩的泵吸反循环钻进结构 |
KR102404517B1 (ko) * | 2021-08-10 | 2022-06-02 | 김명원 | 암반 천공 장치 및 이를 이용한 암반 파쇄 방법 |
CN117248823A (zh) * | 2023-11-15 | 2023-12-19 | 新乡市市政工程处有限公司 | 一种自走式多功能钻机 |
CN117248823B (zh) * | 2023-11-15 | 2024-01-26 | 新乡市市政工程处有限公司 | 一种自走式多功能钻机 |
Also Published As
Publication number | Publication date |
---|---|
JP4693730B2 (ja) | 2011-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4693730B2 (ja) | 循環式掘削装置 | |
US3645343A (en) | Rotary drilling machine | |
US9850637B2 (en) | Digging equipment with relative improved hydraulic system | |
JP2019105272A (ja) | 水中サンドポンプ | |
JP2007009576A (ja) | 掘削土砂排出装置及びシールド装置 | |
JP4732287B2 (ja) | 井戸掘削装置 | |
JP2019019482A (ja) | 場所打ち杭工法におけるスライム処理装置及びその方法 | |
JP4901634B2 (ja) | マンホール管埋設工法 | |
JP4365695B2 (ja) | 掘削装置 | |
JP2004339819A (ja) | 正逆循環方式併用形ウォータースイベル | |
JP4091526B2 (ja) | 基礎地盤の乾式柱状体製造方法 | |
JP2005281972A (ja) | リバースサーキュレーションドリル | |
CN216342122U (zh) | 一种深井掘进高压水冲洗系统 | |
KR102230972B1 (ko) | 친환경 세미실드 굴착장치 | |
JP2003239687A (ja) | 推進工法における立坑の排水構造 | |
KR101023565B1 (ko) | 이수흐름의 제어가 가능한 굴진기 | |
JP5526893B2 (ja) | 懸垂式掘削機の姿勢制御装置 | |
JP2000192787A (ja) | 泥土圧式シ―ルド掘進機とその掘削方法 | |
JP5340012B2 (ja) | マンホール管埋設工法 | |
SE542233C2 (sv) | Förfarande och borranordning för montering av markrör i jord | |
JP2009144366A (ja) | 杭圧入装置に用いられるジョイント装置 | |
JP2002088758A (ja) | スライム処理工法と、その装置 | |
JP5340011B2 (ja) | マンホール管埋設工法及びそのマンホール管埋設工法で使用するマンホール管 | |
JP5047721B2 (ja) | マンホール管埋設装置 | |
JP2003041879A (ja) | 立坑シールド機による水中掘削方法及び装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080916 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100903 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100914 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101018 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110222 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110222 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140304 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4693730 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |