JP2007285019A - Foundation pile structure and sc pile - Google Patents

Foundation pile structure and sc pile Download PDF

Info

Publication number
JP2007285019A
JP2007285019A JP2006114035A JP2006114035A JP2007285019A JP 2007285019 A JP2007285019 A JP 2007285019A JP 2006114035 A JP2006114035 A JP 2006114035A JP 2006114035 A JP2006114035 A JP 2006114035A JP 2007285019 A JP2007285019 A JP 2007285019A
Authority
JP
Japan
Prior art keywords
pile
steel pipe
concrete
peripheral surface
surface side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006114035A
Other languages
Japanese (ja)
Other versions
JP4626562B2 (en
Inventor
Hiromasa Tanaka
宏征 田中
Makoto Ikeda
真 池田
Hirotaka Kusaka
裕貴 日下
Masaaki Suzuki
正明 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP2006114035A priority Critical patent/JP4626562B2/en
Publication of JP2007285019A publication Critical patent/JP2007285019A/en
Application granted granted Critical
Publication of JP4626562B2 publication Critical patent/JP4626562B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a foundation pile structure capable of soundly and smoothly transmitting a load, when connecting a steel pipe pile and an SC pile. <P>SOLUTION: This SC pile 2 having bending yield strength larger than the steel pipe pile 1, is joined as an upper pile to an upper part of the steel pipe pile 1 as a lower pile. One stage or a plurality of stages of projections 2c are arranged in an inner peripheral surface lower part of a steel pipe 2a constituting the SC pile 2. A vertical load transmitted by being shared by a concrete 2b part of the SC pile 2, is gradually transferred to the steel pipe 2a side via the projections 2c in the vicinity of a joining part of the steel pipe pile 1 and the SC pile 2 suddenly changing in a cross section, and is stably transmitted to the steel pipe pile 1 as the lower pile. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、鋼管杭とSC杭(鋼管と該鋼管の内面側に一体化されたコンクリートとからなる鋼コンクリート複合パイル)を用いた基礎杭構造、および該基礎杭構造に利用可能なSC杭に関するものである。   The present invention relates to a foundation pile structure using a steel pipe pile and an SC pile (a steel-concrete composite pile made of steel pipe and concrete integrated on the inner surface side of the steel pipe), and an SC pile usable for the foundation pile structure. Is.

近年の基礎杭の高支持力化や設計地震力の大規模化に伴って、従来は曲げ性能に優れると考えられてきた鋼管杭においても、地震時の建物からの水平力や地中部での地盤変位により発生する大きな荷重に対しては耐力が不足したり、必要耐力を得るためには相当に肉厚の大きい高価な鋼管杭が必要になったりする場合が生じている。   With the recent increase in bearing capacity of foundation piles and the increase in design seismic force, steel pipe piles, which have been considered to have excellent bending performance in the past, can be applied to horizontal forces from buildings during earthquakes and in underground areas. In some cases, the proof strength is insufficient for a large load generated by ground displacement, and an expensive steel pipe pile having a considerably large thickness is required to obtain the required proof strength.

このような場合には鋼管杭打設後に該鋼管杭の中空部にコンクリートを打設し、鋼管−コンクリート構造とすることによって曲げ耐力の向上を図るなどの方法が採られたりしているが、この方法には以下に示す課題がある。   In such a case, after placing the steel pipe pile, concrete is placed in the hollow portion of the steel pipe pile, and a method such as improving the bending strength by adopting a steel pipe-concrete structure has been adopted. This method has the following problems.

(1) 鋼管内に中空部が確保されており、かつ鋼管内周面は付着物のないきれいな状態であることが求められるため、鋼管内に土砂やセメントミルクが残置されている場合には、その除去や鋼管表面の清掃などが必要になり、実施が容易でない、あるいは困難になる。そのため、杭の施工法などに依存する適用の制約が大きい。   (1) Since a hollow part is secured in the steel pipe and the inner peripheral surface of the steel pipe is required to be in a clean state without deposits, when earth and sand or cement milk is left in the steel pipe, The removal and cleaning of the surface of the steel pipe are required, which makes it difficult or difficult to implement. For this reason, there are large application restrictions depending on the construction method of the pile.

(2) 杭の施工が終了した後に、所定深度に落し蓋を設置し、コンクリートを打設する工程が増加するため、現場作業や工期が増加する。   (2) After the construction of piles is completed, the process of dropping to a predetermined depth, installing a lid, and placing concrete increases, so the field work and construction period increase.

(3) 現場でのコンクリート打設のため、また場合によっては水中、泥水中でコンクリートを打設する必要も生じることから、得られる強度や品質に限界がある。   (3) There is a limit to the strength and quality that can be obtained due to the concrete placement on site and, in some cases, the need to cast concrete in water and mud.

そこで、本発明では、主として鋼管杭により構成される基礎杭のうち、地震時に大きな水平力が作用する地表面付近などの所要の部位に、鋼管杭よりも曲げ耐力の大きなSC杭を適用して、鋼管杭とSC杭をつなぎ合わせた基礎杭構造を提案することとした。   Therefore, in the present invention, among foundation piles mainly composed of steel pipe piles, SC piles having a greater bending strength than steel pipe piles are applied to required parts such as the ground surface where a large horizontal force acts during an earthquake. It was decided to propose a foundation pile structure in which steel pipe piles and SC piles were joined together.

SC杭はあらかじめ工場で鋼管内周面に高強度コンクリートを一体化することにより製作される既製杭であるため、杭施工後に別工程でコンクリートを打設する必要はなく、上記の現場打ちコンクリートの場合の課題が解決される。   SC piles are prefabricated piles that are manufactured in advance by integrating high-strength concrete on the inner peripheral surface of the steel pipe at the factory. Therefore, it is not necessary to place concrete in a separate process after pile construction. The case problem is solved.

また、SC杭は工場製作であるため現場打設に比べてはるかに大きな強度のコンクリートを適用可能であるとともに、安定した品質が得られ、適切な強度・板厚の鋼管とコンクリート強度の組合せを選定することにより所要の曲げ耐力を有するものを製作可能である。   In addition, SC piles are manufactured at the factory, so it is possible to apply concrete with much higher strength than on-site casting, as well as to obtain stable quality and to combine steel pipes with appropriate strength and thickness and concrete strength. By selecting, it is possible to produce a product having a required bending strength.

従来からも異種の既製杭、すなわち、既製コンクリート杭(PC杭、PHC杭)や鋼コンクリート複合パイル(SC杭)、あるいは鋼管杭などをつなぎ合わせて用いる構造は知られている。   Conventionally, a structure in which different kinds of pre-made piles, that is, pre-made concrete piles (PC piles, PHC piles), steel-concrete composite piles (SC piles), steel pipe piles, or the like are connected together is known.

しかし、これらは例えば 特許文献1、特許文献2にあるように、主として既製コンクリート杭からなる基礎杭の所要の箇所に鋼管杭をつなぎ合わせるもの、すなわち、地震時に大きな水平力が作用する地表面付近などの部位に対して既製コンクリート杭に代わって、それより曲げ耐力の大きな鋼管杭を適用しようとするものである。   However, as described in, for example, Patent Document 1 and Patent Document 2, these steel pipe piles are connected to a required portion of a foundation pile mainly made of ready-made concrete piles, that is, near the ground surface where a large horizontal force acts during an earthquake. Instead of ready-made concrete piles, steel pipe piles with higher bending strength are to be applied to such parts.

この他に、既製コンクリート杭の上杭に同様の理由から同径のSC杭をつなぎ合わせる構造も実用化されているが、主として鋼管杭からなる基礎杭の所要の箇所にさらに曲げ耐力の大きな既製杭を適用することを考えたものではなかった。   In addition, for the same reason, a structure in which SC piles of the same diameter are connected to the upper piles of ready-made concrete piles has also been put into practical use. It was not intended to apply piles.

他方、既製杭をつなぎ合わせる場合の接合にも課題があり、既製コンクリート杭の場合には端板を利用して、現場での突き合せ溶接が行われることが多く、これまでも品質や強度面における課題が指摘されてきた。さらに鋼管杭とSC杭をつなぎ合わせる場合には、既製コンクリート杭どうしの接合のように端板での面接触とはならず、接合部において断面が急激に変化するため、杭基礎に作用する鉛直荷重や水平荷重の円滑、かつ健全な伝達の観点からも配慮が必要となる。   On the other hand, there is also a problem in joining when connecting ready-made piles, and in the case of ready-made concrete piles, butt welding is often performed on the site using end plates, so far the quality and strength aspects The issues in have been pointed out. Furthermore, when steel pipe piles and SC piles are joined together, the vertical contact acting on the pile foundation does not result in surface contact at the end plates as in the case of joining pre-made concrete piles, but the cross section changes rapidly at the joint. Consideration is necessary from the viewpoint of smooth and sound transmission of load and horizontal load.

そのような異種の既製杭の接合における課題を解決する手段としては、特許文献3に示す方法が開示されている。これは、SC杭とその他の既製杭を接合する手段を提供するものであり、SC杭の鋼管の端部をそのままコンクリートの端部より所定長さ突出させることによって、該鋼管の突出部の内側に凹部を形成し、この凹部に他方の杭の端部を嵌入する方法である。   As a means for solving such a problem in joining different kinds of ready-made piles, a method disclosed in Patent Document 3 is disclosed. This provides a means for joining SC piles and other ready-made piles, and by projecting the end of the steel pipe of SC pile as it is from the end of the concrete as it is, the inside of the protruding part of the steel pipe In this method, a recess is formed in the recess, and the end of the other pile is inserted into the recess.

しかし、この方法では鋼管杭とSC杭の接合の観点からは以下の課題がある。   However, this method has the following problems from the viewpoint of joining the steel pipe pile and the SC pile.

(1) 鉛直荷重の伝達は鋼管杭端面とSC杭の端板の接触によって行わなければならず、構造物からの押し込み荷重を円滑、かつ健全に伝達することが難しい。安定的に押し込み荷重を伝達するためには、少なくとも鋼管端面と端板の点接触を避けるため両者の端面精度、杭継ぎ時の鉛直精度などが必要になる他、断面変化点となる鋼管杭端面にリブ補強を施すなどの処置が必要である。さらに引き抜き方向の荷重の伝達に関しては、鋼管杭端面とSC杭の端板が離反し得る構造となるためさらに不安定になる。   (1) The vertical load must be transmitted by the contact between the steel pipe pile end face and the SC pile end plate, and it is difficult to transmit the indentation load from the structure smoothly and soundly. In order to transmit the indentation load stably, at least the end surface accuracy of both ends and vertical accuracy at the time of pile connection are required to avoid point contact between the steel tube end surface and the end plate. It is necessary to take measures such as rib reinforcement. Furthermore, regarding the transmission of the load in the drawing direction, the steel pipe pile end face and the SC pile end plate can be separated from each other, so that the load becomes further unstable.

(2) 突出したSC杭の鋼管の内側に形成した凹部に鋼管杭を嵌入することになるため、SC杭の鋼管の内径と、これに接合する鋼管杭の外径をほぼ等しくしておく必要があるが、鋼管の寸法精度や現場施工の精度や環境を考えると本手法による鋼管杭とSC杭の接合は容易ではない。   (2) Since the steel pipe pile is inserted into the recessed part formed inside the protruding steel pipe of the SC pile, the inner diameter of the steel pipe of the SC pile and the outer diameter of the steel pipe pile to be joined to this need to be substantially equal. However, considering the dimensional accuracy of steel pipes, the accuracy of construction on site, and the environment, joining steel pipe piles and SC piles by this method is not easy.

特公平05−047685号公報Japanese Patent Publication No. 05-047685 特開2003-232033号公報JP 2003-232033 A 特許第3724933号公報Japanese Patent No. 3724933

本発明は、鋼管杭の高支持力化や設計地震動の大規模化などに伴う水平耐力不足の問題を解消するためになされたものであって、鋼管杭とそれよりも曲げ耐力の大きなSC杭をつなぎ合わせ、押し込み・引き抜き・曲げ(水平)の各荷重を健全、かつ円滑に伝達できるようにした基礎杭構造、および該基礎杭構造に利用可能なSC杭を提供するものである。   The present invention has been made in order to solve the problems of insufficient horizontal strength due to high bearing capacity of steel pipe piles and large scale of design earthquake motion, and is a steel pipe pile and an SC pile having a larger bending strength than that. The foundation pile structure which can transmit each load of pushing, pulling out, and bending (horizontal) in a healthy and smooth manner, and the SC pile usable for the foundation pile structure are provided.

本願の請求項1に係る基礎杭構造は、鋼管杭の上部に上杭として、または上杭の一部として、前記鋼管杭よりも曲げ耐力が大きいSC杭を接合してなり、前記SC杭を構成する鋼管の内周面下部に一段または複数段の突起が設けられていることを特徴とするものである。   The foundation pile structure according to claim 1 of the present application is formed by joining an SC pile having a higher bending strength than the steel pipe pile as an upper pile or a part of the upper pile on the upper portion of the steel pipe pile. One or a plurality of projections are provided at the lower part of the inner peripheral surface of the steel pipe to be formed.

上杭にSC杭を用いるのは、地震時に大きな水平力が作用する地表面付近などの部位に対し、鋼管杭より曲げ耐力の大きな杭を適用しようとするものであるが、その場合、接合部における断面急変による応力伝達の問題がある。   The SC pile is used for the upper pile, and it is intended to apply a pile with a greater bending strength than the steel pipe pile to the vicinity of the ground surface where a large horizontal force acts during an earthquake. There is a problem of stress transmission due to sudden change in cross section.

本発明によれば、SC杭を構成する鋼管の内周面下部に突起を設けたことで、SC杭のコンクリート部分で分担されて伝達される荷重が、SC杭の鋼管の内周面下部に位置する突起を介して次第に鋼管側へ移行し、鉛直荷重を下杭としての鋼管杭へ安定的に伝達することができる。   According to the present invention, by providing a protrusion on the lower part of the inner peripheral surface of the steel pipe constituting the SC pile, the load shared and transmitted by the concrete part of the SC pile is transferred to the lower part of the inner peripheral surface of the steel pipe of the SC pile. It moves to the steel pipe side gradually through the protrusion which is located, and a vertical load can be stably transmitted to the steel pipe pile as a lower pile.

本願の請求項2に係る基礎杭構造は、鋼管杭の上部に上杭として、または上杭の一部として、前記鋼管杭よりも曲げ耐力が大きいSC杭を接合してなり、前記鋼管杭の外径が、前記SC杭の外径より小さく、該SC杭の中空部の径より大きく、該鋼管杭の上端部と前記SC杭のコンクリート端部に設けられる端板とを溶接により接合してあることを特徴とするものである。   The foundation pile structure according to claim 2 of the present application is formed by joining an SC pile having a higher bending strength than the steel pipe pile as an upper pile or a part of the upper pile on the upper part of the steel pipe pile. The outer diameter is smaller than the outer diameter of the SC pile, larger than the diameter of the hollow portion of the SC pile, and the upper end of the steel pipe pile and the end plate provided at the concrete end of the SC pile are joined by welding. It is characterized by being.

基本的な考え方は請求項1に係る発明と同様であり、上杭にSC杭を用いる場合の接合部における断面急変による応力伝達の問題を解決するものであるが、請求項2に係る発明では、SC杭の端板の外縁と内縁の間に鋼管杭が接合されることになるため、端板から鋼管杭の端部付近に伝達される曲げが両方向から打ち消しあう形となり、鋼管杭に鉛直荷重を安定的に伝達し、円滑な鉛直荷重の伝達が実現できる。   The basic idea is the same as that of the invention according to claim 1 and solves the problem of stress transmission due to a sudden change in the cross section at the joint when the SC pile is used as the upper pile, but the invention according to claim 2 Since the steel pipe pile is joined between the outer edge and the inner edge of the end plate of the SC pile, the bending transmitted from the end plate to the vicinity of the end of the steel pipe pile cancels out from both directions, and the steel pipe pile is perpendicular to the steel pipe pile. The load can be transmitted stably and a smooth vertical load can be transmitted.

本願の請求項3に係る基礎杭構造は、鋼管杭の上部に上杭として、または上杭の一部として、前記鋼管杭よりも曲げ耐力が大きいSC杭を接合してなり、前記SC杭のコンクリート内面側に内面側鋼管が一体化されており、該内面側鋼管の下部がコンクリートの端部より所要長突出し、前記鋼管杭の上端部に前記内面側鋼管の下端部が接合されていることを特徴とするものである。   The foundation pile structure according to claim 3 of the present application is formed by joining an SC pile having a bending strength larger than that of the steel pipe pile as an upper pile or a part of the upper pile at the upper portion of the steel pipe pile. The inner surface side steel pipe is integrated with the inner surface side of the concrete, the lower part of the inner surface side steel pipe protrudes the required length from the end portion of the concrete, and the lower end portion of the inner surface side steel pipe is joined to the upper end portion of the steel pipe pile. It is characterized by.

請求項3に係る基礎杭構造も、上杭にSC杭を用いる場合の接合部における断面急変による応力伝達の問題を解決するという点において、請求項1,2と共通するものであり、SC杭上部では鋼管とコンクリートで分担されて伝達される荷重が次第に内面側鋼管へ伝達され、鉛直荷重を下杭としての鋼管杭に安定的に伝達することができる。   The foundation pile structure according to claim 3 is the same as that of claims 1 and 2 in that it solves the problem of stress transmission due to a sudden change in the cross section at the joint when SC pile is used for the upper pile. In the upper part, the load shared and transmitted by the steel pipe and concrete is gradually transmitted to the inner surface side steel pipe, and the vertical load can be stably transmitted to the steel pipe pile as the lower pile.

なお、以上の請求項1〜3に係る発明は、実施形態によっては1つの基礎杭構造において併用可能な関係にあるものである。   In addition, the invention which concerns on the above Claims 1-3 exists in the relationship which can be used together in one foundation pile structure depending on embodiment.

請求項4に係るSC杭は、鋼管の内周面にコンクリートが一体化されたSC杭において、前記鋼管の端部内周面に一段または複数段の連続するまたは不連続な突起が設けられていることを特徴とするものである。   The SC pile according to claim 4 is an SC pile in which concrete is integrated with the inner peripheral surface of the steel pipe, and one or more continuous or discontinuous protrusions are provided on the inner peripheral surface of the end portion of the steel pipe. It is characterized by this.

この請求項4に係るSC杭はそのまま請求項1に係る基礎杭構造に適用することができるものである。   The SC pile according to claim 4 can be applied to the foundation pile structure according to claim 1 as it is.

請求項5は、請求項4に係るSC杭において、前記突起が溶接ビードにより形成されている場合を限定したものである。   A fifth aspect of the present invention is the SC pile according to the fourth aspect, wherein the projection is formed by a weld bead.

本願の発明においてSC杭を構成する鋼管の内周面に設けられる突起は、基礎杭構造に適用する場合、その下部、製品としてのSC杭についてはその端部に形成されていればよく、また断面急変部近傍における応力伝達に必要とする突起の高さ(5mm〜15mm程度)との関係から、溶接ビードにより形成するのが効率的であり、製作コストも安価となる。   In the invention of the present application, when the projection provided on the inner peripheral surface of the steel pipe constituting the SC pile is applied to the foundation pile structure, the lower part, the SC pile as a product, may be formed at the end thereof, and Due to the relationship with the height of the protrusion (about 5 mm to 15 mm) necessary for stress transmission in the vicinity of the suddenly changing section, it is efficient to form with a weld bead and the manufacturing cost is also low.

請求項6に係るSC杭は、鋼管の内周面にコンクリートが一体化された中空のSC杭において、前記SC杭のコンクリート内面側に内面側鋼管が一体化されており、該内面側鋼管の少なくとも一端がコンクリートの端部より所要長突出していることを特徴とするものである。   The SC pile according to claim 6 is a hollow SC pile in which concrete is integrated on the inner peripheral surface of the steel pipe, and an inner surface side steel pipe is integrated on the concrete inner surface side of the SC pile, At least one end protrudes from the end of the concrete for a required length.

この請求項6に係るSC杭はそのまま請求項3に係る基礎杭構造に適用することができるものである。   The SC pile according to claim 6 can be applied to the foundation pile structure according to claim 3 as it is.

請求項7は、請求項6に係るSC杭において、前記鋼管の端部内周面および/または前記内面側鋼管の外周面に一段または複数段の連続するまたは不連続な突起が設けられている場合を限定したものである。   In the SC pile according to claim 6, when one or more continuous or discontinuous protrusions are provided on the inner peripheral surface of the end of the steel pipe and / or the outer peripheral surface of the inner steel pipe. Is limited.

突起により、鋼管とコンクリートとの間の付着力が増すが、本発明ではそのような突起をSC杭の外側の鋼管については端部内周面に設けることで、鋼管杭など他の杭と接合した場合の断面急変部における円滑な応力伝達が図れる。   The protrusion increases the adhesion between the steel pipe and the concrete. In the present invention, such a protrusion is provided on the inner peripheral surface of the end of the steel pipe on the outer side of the SC pile, thereby joining to another pile such as a steel pipe pile. In this case, smooth stress transmission can be achieved at the sudden change section.

一方、内面側鋼管については、それ自体が断面急変部における円滑な応力伝達を図っているものであり、突起の位置は特に限定されない。   On the other hand, as for the inner surface side steel pipe itself, it is intended to smoothly transmit stress at the section where the cross section is suddenly changed, and the position of the protrusion is not particularly limited.

請求項8は、請求項6または7に係るSC杭において、前記突起の一部または全部が溶接ビードにより形成されている場合を限定したものである。   In the SC pile according to claim 6 or 7, the case where a part or all of the protrusion is formed by a weld bead is limited.

SC杭の外側の鋼管の端部内周面に形成される突起を溶接ビードにより形成する理由は、請求項5と同様の理由である。内面側鋼管の外周面についてもコンクリートとの応力伝達や加工性を考慮した場合、溶接ビードにより形成するのが比較的効率的であり、製作コストも安価となる。   The reason why the projection formed on the inner peripheral surface of the end of the steel pipe outside the SC pile is formed by the weld bead is the same reason as in the fifth aspect. In consideration of stress transmission with concrete and workability, the outer peripheral surface of the inner surface side steel pipe is also relatively efficient to be formed by a weld bead, and the manufacturing cost is also low.

ただし、一方のみ溶接ビードで形成し、他方は例えば縞付鋼板の突起を利用するなど他の種類の突起と併用してもかまわない。   However, only one of them may be formed with a weld bead, and the other may be used in combination with other types of protrusions, for example, using a protrusion of a striped steel plate.

本願の請求項1に係る基礎杭構造によれば、下杭としての鋼管杭の上部に上杭としてその鋼管杭よりも曲げ耐力が大きいSC杭を接合することで、地震時に大きな水平力が作用する部分についての耐力が確保でき、かつSC杭を構成する鋼管の内周面下部に突起を設けたことで、SC杭のコンクリート部分で分担されて伝達される荷重が、SC杭の鋼管の内周面下部に位置する突起を介して次第に鋼管側へ移行し、鉛直荷重を下杭としての鋼管杭へ安定的に伝達することができる。   According to the foundation pile structure according to claim 1 of the present application, a large horizontal force acts during an earthquake by joining an SC pile having a bending strength larger than that of the steel pipe pile as the upper pile to the upper part of the steel pipe pile as the lower pile. By providing a protrusion on the lower part of the inner peripheral surface of the steel pipe that constitutes the SC pile, the load that is shared and transmitted by the concrete part of the SC pile can be transferred to the inside of the steel pipe of the SC pile. It moves to the steel pipe side gradually through the protrusion located in the lower peripheral surface, and the vertical load can be stably transmitted to the steel pipe pile as the lower pile.

本願の請求項2に係る基礎杭構造によれば、下杭としての鋼管杭の上部に上杭としてその鋼管杭よりも曲げ耐力が大きいSC杭を接合することで、地震時に大きな水平力が作用する部分についての耐力が確保でき、かつSC杭の端板の外縁と内縁の間に鋼管杭が接合されることになるため、端板から鋼管杭の端部付近に伝達される曲げが両方向から打ち消しあう形となり、鋼管杭に鉛直荷重を安定的に伝達し、円滑な鉛直荷重の伝達が実現できる。   According to the foundation pile structure according to claim 2 of the present application, a large horizontal force acts at the time of an earthquake by joining an SC pile having a bending strength larger than that of the steel pipe pile as the upper pile to the upper part of the steel pipe pile as the lower pile. Since the steel pipe pile is joined between the outer edge and the inner edge of the end plate of the SC pile, the bending transmitted from the end plate to the vicinity of the end of the steel pipe pile from both directions can be secured. It becomes a form that cancels out, and the vertical load is stably transmitted to the steel pipe pile, and smooth transmission of the vertical load can be realized.

本願の請求項3に係る基礎杭構造によれば、下杭としての鋼管杭の上部に上杭としてその鋼管杭よりも曲げ耐力が大きいSC杭を接合することで、地震時に大きな水平力が作用する部分についての耐力が確保でき、かつSC杭上部では鋼管とコンクリートで分担されて伝達される荷重が次第に内面側鋼管へ伝達され、鉛直荷重を下杭としての鋼管杭に安定的に伝達することができる。   According to the foundation pile structure according to claim 3 of the present application, a large horizontal force acts during an earthquake by joining an SC pile having a bending strength larger than that of the steel pipe pile as the upper pile to the upper part of the steel pipe pile as the lower pile. The load that is shared and transmitted by the steel pipe and concrete at the upper part of the SC pile is gradually transmitted to the inner steel pipe, and the vertical load is stably transmitted to the steel pipe pile as the lower pile. Can do.

請求項4〜8に係るSC杭は、上記請求項1、2、または3に係る基礎杭構造に適用することで、上述の効果を発揮することができる。また、断面急変部における応力伝達を円滑にするための突起を溶接ビードで形成すれば、効率的であり、製作コストも安価となる。   The SC pile according to claims 4 to 8 can exert the above-described effects by being applied to the foundation pile structure according to claim 1, 2, or 3. In addition, if the protrusion for facilitating the stress transmission in the suddenly changing section is formed with a weld bead, it is efficient and the manufacturing cost is low.

図1は請求項4または5に係るSC杭を用いて、請求項1に係る基礎杭構造を構成した場合の一実施形態を示したものであり、下杭としての鋼管杭1の上部に、上杭としてのSC杭2を接合してなる。   FIG. 1 shows one embodiment when the foundation pile structure according to claim 1 is configured using the SC pile according to claim 4 or 5, and in the upper part of the steel pipe pile 1 as a lower pile, The SC pile 2 as an upper pile is joined.

SC杭2を構成する鋼管2aの内周面下部には複数段の突起2cが設けられており、SC杭2の両端には接合用の端板2dが設けられている。   A plurality of projections 2 c are provided at the lower part of the inner peripheral surface of the steel pipe 2 a constituting the SC pile 2, and end plates 2 d for joining are provided at both ends of the SC pile 2.

この基礎杭構造において、鋼管杭1とSC杭2の接合は、通常の既製杭どうしの縦継ぎと同様に現場での溶接などにより行うこともできる。あるいは事前に所定長さの鋼管杭1とSC杭2を工場溶接などで接合した後に現場に搬入し、現場での縦継ぎは一般的な鋼管杭どうしを接合する形とすることもできる。   In this foundation pile structure, the steel pipe pile 1 and the SC pile 2 can be joined together by welding at the site in the same manner as a longitudinal connection between ordinary pre-made piles. Alternatively, the steel pipe pile 1 and SC pile 2 having a predetermined length may be joined in advance by factory welding or the like, and then carried into the site, and the longitudinal joint on the site may be formed by joining common steel pipe piles.

本発明では、SC杭2として作用軸力下における曲げ耐力が接合される鋼管杭1の曲げ耐力よりも大きいものを用いる。SC杭2の耐力は、SC杭2の外周に用いる鋼管2aの材質、板厚や、内周側のコンクリート2bの強度によって変わることから、所要の耐力が得られるように、これらの組合せを選定すればよい。   In the present invention, the SC pile 2 having a larger bending strength under the acting axial force than the bending strength of the steel pipe pile 1 to be joined is used. Since the strength of the SC pile 2 varies depending on the material and thickness of the steel pipe 2a used on the outer periphery of the SC pile 2, and the strength of the concrete 2b on the inner circumference side, these combinations are selected so that the required strength can be obtained. do it.

例えば、SC杭2を構成する鋼管2aの板厚を、それに接続される鋼管杭1の板厚と同等、あるいはそれ以上としておくことが考えられる。また、鋼管杭1に比べて径の大きなSC杭2を用いる場合、鋼管杭1よりも曲げ耐力の大きなSC杭2を構成しやすく、鋼管2aの材質・板厚、コンクリート2bの強度の組合せも考慮すれば、鋼管杭1に比べて曲げ耐力を大幅に増すことも可能である。   For example, it is conceivable that the thickness of the steel pipe 2a constituting the SC pile 2 is equal to or greater than the thickness of the steel pipe pile 1 connected thereto. Moreover, when using SC pile 2 having a diameter larger than that of steel pipe pile 1, it is easy to configure SC pile 2 having a bending strength greater than that of steel pipe pile 1, and the combination of the material and thickness of steel pipe 2a and the strength of concrete 2b is also possible. Considering it, it is possible to significantly increase the bending strength compared to the steel pipe pile 1.

図2(a)、(b)は請求項4または5に係るSC杭を用いた請求項1に係る発明の他の実施形態における下杭と上杭の接合部を示したもので、図2(c)はそれに対する比較例を示したものである。   2 (a) and 2 (b) show a joint portion of a lower pile and an upper pile in another embodiment of the invention according to claim 1 using the SC pile according to claim 4 or 5, and FIG. (c) shows a comparative example.

鋼管杭1とSC杭2の接合は、前述した図1のように、SC杭2の端板2dと鋼管杭1を溶接にて接合する方法や、SC杭2の鋼管2aと鋼管杭1とを溶接にて接合する方法(比較例としての図2(c)と同様の形態)、さらにはこの図2(a)のようにSC杭2の鋼管2aをコンクリート2bより所定長だけ突出させておき、この部分を利用して鋼管杭1と溶接にて接合する方法などを採用することができる。   The steel pipe pile 1 and the SC pile 2 are joined together by welding the end plate 2d of the SC pile 2 and the steel pipe pile 1 as shown in FIG. (Fig. 2 (c) as a comparative example), and the steel pipe 2a of the SC pile 2 is projected from the concrete 2b by a predetermined length as shown in Fig. 2 (a). In addition, a method of joining the steel pipe pile 1 by welding using this portion can be employed.

また、SC杭2の鋼管2aを突出させておく場合には、図2(b)のように鋼管杭1との接合に機械式の継手4を用いることもできる。   Moreover, when making the steel pipe 2a of SC pile 2 project, the mechanical coupling 4 can also be used for joining with the steel pipe pile 1 like FIG.2 (b).

SC杭2の鋼管2aと鋼管杭1を接合する方式の場合には、SC杭2下部の端板を省略することができ、あるいは製造上必要な最小限の簡易な端板とするなどの合理化も可能である。   In the case of the method of joining the steel pipe 2a of the SC pile 2 and the steel pipe pile 1, the end plate at the bottom of the SC pile 2 can be omitted, or rationalization such as making the minimum simple end plate necessary for manufacturing. Is also possible.

一方、図1のようにSC杭2の端板2aを利用して鋼管杭1と接合する方式の場合には、鋼管杭1との接合が容易であり、また鋼管杭1への荷重伝達がより安定的なものとなるように形状などを工夫した専用の板を利用する方式とすることもできる。   On the other hand, in the case of the method of joining with the steel pipe pile 1 using the end plate 2a of the SC pile 2 as shown in FIG. 1, the joining with the steel pipe pile 1 is easy, and the load transmission to the steel pipe pile 1 is possible. It is also possible to use a dedicated plate that is devised in shape so as to be more stable.

本発明では、SC杭2に必要な耐力、杭の施工法、SC杭2と鋼管杭1の接合方法、SC杭2の製造・運搬の制約など様々な条件を勘案して最適な構成を選択することができる。   In the present invention, the optimum structure is selected in consideration of various conditions such as the proof stress necessary for the SC pile 2, the construction method of the pile, the joining method of the SC pile 2 and the steel pipe pile 1, and the restrictions on the manufacture and transportation of the SC pile 2. can do.

図3(a)、(b)は請求項1に係る発明における荷重伝達機構の説明図、図3(c)は比較例における荷重伝達機構の説明図である。   3 (a) and 3 (b) are explanatory views of the load transmission mechanism in the invention according to claim 1, and FIG. 3 (c) is an explanatory view of the load transmission mechanism in the comparative example.

図1や図2(a)、(b)のように、内周面に所定段数の突起2cを有する鋼管を用いたSC杭2を用い、これと鋼管杭1をつなぎ合わせた構成とすることにより、図3(a)、(b)に示すように円滑に鉛直荷重を伝達することが可能となる。   As shown in Fig. 1 and Fig. 2 (a) and (b), the SC pile 2 using a steel pipe having a predetermined number of protrusions 2c on the inner peripheral surface is used, and this is connected to the steel pipe pile 1. As a result, the vertical load can be smoothly transmitted as shown in FIGS.

すなわち、SC杭2上部で鋼管2aとコンクリート2bで分担されて伝達される荷重のうち、コンクリート2bで分担されている荷重が突起2cを介して次第にSC杭2の鋼管2aへ移行し、鋼管杭1との接合部においてはコンクリート2bの分担荷重がゼロに近い非常に小さい状態となることによって、鋼管杭1へ安定的に鉛直荷重を伝達できるようになる。   That is, among the loads transferred and shared by the steel pipe 2a and the concrete 2b at the upper part of the SC pile 2, the load shared by the concrete 2b gradually moves to the steel pipe 2a of the SC pile 2 through the protrusion 2c, and the steel pipe pile In the joint portion with 1, the shared load of the concrete 2 b becomes a very small state close to zero, so that the vertical load can be stably transmitted to the steel pipe pile 1.

なお、コンクリート2bの分担荷重をSC杭2の鋼管2aへ移行させるための十分な突起段数が確保されていれば、構造的な観点からは必ずしもSC杭2の下端の端板2dは必要ではなく、図2(a)、(b)およびこれらに対応する図3(b)のような端板2dのない構成とすることもできる。あるいは、製造上の理由などから端板2dの省略ができない場合でも、最低限必要な簡易な端板を使用するなど形状、材料の合理化を図ることもできる。   Note that the end plate 2d at the lower end of the SC pile 2 is not necessarily required from a structural point of view if a sufficient number of protrusions for transferring the shared load of the concrete 2b to the steel pipe 2a of the SC pile 2 is secured. 2 (a) and 2 (b) and the corresponding configuration shown in FIG. 3 (b) may be configured without the end plate 2d. Alternatively, even if the end plate 2d cannot be omitted due to manufacturing reasons or the like, the shape and material can be rationalized by using a minimum required simple end plate.

図2(c)は比較例として、突起2cをSC杭2を構成する鋼管2aの内周面全体に設けた場合を示したものである。この場合、鋼管2aの材料として縞付鋼板などを用いることも考えられるが、SC杭2と鋼管杭1との接合部における断面急変に対しコンクリート2bの分担荷重を徐々にSC杭2の鋼管2aへ移行させるという点では効果的ではなく無駄が多い。   FIG. 2 (c) shows a case where the protrusion 2 c is provided on the entire inner peripheral surface of the steel pipe 2 a constituting the SC pile 2 as a comparative example. In this case, it is conceivable to use a striped steel plate or the like as the material of the steel pipe 2a. However, the steel pipe 2a of the SC pile 2 is gradually subjected to the shared load of the concrete 2b with respect to the sudden change in the cross section at the joint between the SC pile 2 and the steel pipe pile 1. It is not effective in terms of migrating to and is wasteful.

事前に突起2cを設けた鋼管2aを用いてコンクリート2bを打設、養生することにより、図2および図3のようなSC杭2が製造可能であり、鋼管2a内周面の突起2cは少なくとも一方の端部に、SC杭2のコンクリート2bと鋼管2aとの間で荷重を伝達するために必要な段数を設置しておけばよい。なお、この場合の突起2cの連続、不連続は問わず、また突起2cが段ごと厳密に分かれている必要はなく、適度に分散した状態でもよい。   The SC pile 2 as shown in FIGS. 2 and 3 can be manufactured by placing and curing the concrete 2b using the steel pipe 2a provided with the protrusion 2c in advance, and the protrusion 2c on the inner peripheral surface of the steel pipe 2a is at least What is necessary is just to install the number of steps required in order to transmit a load between the concrete 2b of the SC pile 2, and the steel pipe 2a in one edge part. In this case, the protrusions 2c may be continuous or discontinuous, and the protrusions 2c do not have to be strictly separated for each step, and may be in a moderately dispersed state.

また、図2(a)、(b)に示すように、SC杭のコンクリート部よりも鋼管をそのまま延長して突出させた構成とし、前述のようにこの突出部を利用して下杭としての鋼管杭1と接合する構成とすることもできる。   In addition, as shown in Fig. 2 (a) and (b), the steel pipe is extended and protruded from the concrete part of the SC pile, and as described above, this projecting part is used as the lower pile. It can also be set as the structure joined to the steel pipe pile 1. FIG.

図2(a)、(b)は下側の端板2dがない場合を示しているが、下側の端板2dがある場合でも比較例としての図2(c)と同様に端板2dの外周部が鋼管2aの内周面に接する構造とすれば、同様に鋼管2aをコンクリート2bより所定長突出させた構造とすることもできる。   2 (a) and 2 (b) show the case where there is no lower end plate 2d, but even if there is a lower end plate 2d, the end plate 2d is similar to FIG. 2 (c) as a comparative example. If the outer peripheral portion of the steel tube 2a is in contact with the inner peripheral surface of the steel pipe 2a, the steel pipe 2a can be similarly protruded from the concrete 2b by a predetermined length.

鋼管杭1とSC杭2の接合は、前述のように現場においてそれらを順次打設した後に縦継ぎする方式、工場にてあらかじめSC杭2の下部に所定長の鋼管杭1を接合した状態で1本ものとして現場に搬入して通常の鋼管杭1の縦継ぎと同様に鋼管どうしを周継ぎ溶接する方式、さらに、図2(b)に示したように機械式継手4を利用する方式など多様な方法が可能であり、杭の施工法やSC杭2の長さなどに応じて適切な方法を選択すればよい。   The steel pipe pile 1 and the SC pile 2 are joined in such a manner that the pipe piles 1 are sequentially cast in the field as described above, and the steel pipe pile 1 having a predetermined length is joined to the lower portion of the SC pile 2 in advance at the factory. A method of bringing the steel pipes into the field as a single piece, and welding the steel pipes together in the same manner as a normal longitudinal connection of the steel pipe pile 1, and a method of using a mechanical joint 4 as shown in FIG. 2 (b) Various methods are possible, and an appropriate method may be selected according to the construction method of the pile, the length of the SC pile 2, and the like.

比較例としての図3(c)は、内周面に突起がない通常のSC杭2と鋼管杭1をつなぎ合わせた構成を示しているが、この場合にはSC杭2と鋼管杭1の接合部で断面が急激に変化し、接合部直下の鋼管杭1断面が構造上の弱点となりやすい。   FIG. 3 (c) as a comparative example shows a configuration in which a normal SC pile 2 and a steel pipe pile 1 having no protrusion on the inner peripheral surface are connected. In this case, the SC pile 2 and the steel pipe pile 1 are The cross section suddenly changes at the joint, and the cross section of the steel pipe pile 1 immediately below the joint tends to be a structural weak point.

すなわち、SC杭2部分では鋼管2aとコンクリート2bで分担されて伝達される荷重が接合部において鋼管杭1断面に集約されるが、このとき鋼管杭1端部付近には単純な軸方向力だけでなく、SC杭2の端板2dからの曲げが作用するため構造的な弱所となる場合がある。   That is, in the SC pile 2 part, the load shared and transmitted by the steel pipe 2a and the concrete 2b is concentrated on the cross section of the steel pipe pile 1 at the joint, but at this time, only a simple axial force is present near the end of the steel pipe pile 1 In addition, the bending from the end plate 2d of the SC pile 2 may be a structural weak point.

したがって、このことを考慮して鋼管杭1の板厚は、軸力の伝達に必要な板厚よりも大きめのものを用いるか、あるいは補剛材の配置など構造的な対処などが必要となる。   Therefore, in consideration of this, the steel pipe pile 1 has a plate thickness larger than the plate thickness necessary for transmitting the axial force, or requires structural measures such as arrangement of stiffeners. .

なお、図3(a)、(b)の構成とする場合には、SC杭2の下部ではSC杭2の鋼管2aで鉛直方向荷重の全て、あるいは大部分を分担すること、特に図3(b)の構成では鋼管どうしを溶接することも考え合わせると、SC杭2の鋼管2aの板厚は、これと接合する鋼管杭1の板厚と同等、あるいはそれ以上であることが望ましい。   3 (a) and 3 (b), in the lower part of the SC pile 2, the steel pipe 2a of the SC pile 2 shares all or most of the vertical load, in particular FIG. In consideration of the fact that the steel pipes 2a of the SC pile 2 are welded together in the configuration of b), it is desirable that the steel pipe 2a of the SC pile 2 is equal to or greater than the thickness of the steel pipe pile 1 to be joined thereto.

突起2cは平鋼や棒鋼を溶接して形成したものなどを用いることができ、コンクリート2b−鋼管2a間の荷重の伝達が可能なものであれば特に材料は限定されないが、図4に示すような、溶接ビードによる突起2cを直接形成した溶接成型突起を適用することもできる(請求項8に対応)。   The protrusion 2c can be formed by welding flat steel or steel bar, and the material is not particularly limited as long as it can transmit the load between the concrete 2b and the steel pipe 2a, but as shown in FIG. It is also possible to apply a weld molding projection in which the projection 2c is formed directly by a weld bead (corresponding to claim 8).

図4における好ましい寸法例を挙げると、SC杭2の鋼管2aの板厚tが9mm以上として、突起幅B0が6〜10mm、突起高さt0が8〜12mmである。 Preferred and dimensions example in FIG. 4, as the thickness t of the SC piles 2 of the steel pipe 2a at least 9 mm, projection width B 0 is 6 to 10 mm, the projection height t 0 is 8 to 12 mm.

SC杭2のコンクリート被り厚さや製造時のコンクリート充填性などを考慮すると、あまり高さの大きな突起2cは好ましくなく、突起高さt0は15mm程度までとするのが望ましい。そのことを勘案すると、溶接ビードによる突起成型が好適であり、突起材料の省略、製造工程の短縮、コストダウンが図れる。 Considering the concrete covering thickness of the SC pile 2 and the concrete filling property at the time of manufacture, the projection 2c having a very high height is not preferable, and the projection height t 0 is desirably about 15 mm. Considering this fact, projection molding using a weld bead is suitable, and the projection material can be omitted, the manufacturing process can be shortened, and the cost can be reduced.

その他、圧延により突起を設けた鋼板を製管した内面突起付き鋼管を適用することも可能で、これにより突起溶接の手間を省略することができる。   In addition, it is also possible to apply a steel pipe with an internal protrusion, which is made of a steel plate provided with protrusions by rolling, thereby eliminating the need for protrusion welding.

図5は請求項2に係る発明の一実施形態を示したもので、下杭としての鋼管杭1の上に上杭として、外径が鋼管杭1の外径よりも大きく、中空部の径が鋼管杭1の外径よりも小さいSC杭2をつなぎ合わせている。   FIG. 5 shows an embodiment of the invention according to claim 2, wherein the outer diameter is larger than the outer diameter of the steel pipe pile 1 as the upper pile on the steel pipe pile 1 as the lower pile, and the diameter of the hollow portion. However, the SC pile 2 smaller than the outer diameter of the steel pipe pile 1 is connected.

SC杭2として作用軸力下における曲げ耐力が接合される鋼管杭1の曲げ耐力よりも大きいものを用いる点は、請求項1に対応する図1の場合と同様である。SC杭2部分に必要な耐力、杭の施工法、SC杭2と鋼管杭1の接合方法、SC杭2の製造・運搬の制約など様々の条件を勘案して最適な構成を選択することができる。   The point which uses the thing larger than the bending yield strength of the steel pipe pile 1 to which the bending yield strength under action axial force is joined as SC pile 2 is the same as that of the case of FIG. It is possible to select the optimum structure in consideration of various conditions such as the proof stress necessary for the SC pile 2 part, the pile construction method, the joining method of the SC pile 2 and the steel pipe pile 1, and the restrictions on the manufacture and transportation of the SC pile 2 it can.

この場合も、鋼管杭1とSC杭2の接合は、通常の既製杭どうしの縦継ぎと同様に現場での溶接などにより行うこともできる。あるいは、事前にSC杭2と所定長さの鋼管杭1を工場溶接などで接合した後に現場に搬入し、現場での縦継ぎは一般的な鋼管杭どうしを接合する形とすることもできる。   In this case as well, the steel pipe pile 1 and the SC pile 2 can be joined by welding in the same manner as in the case of a normal joint between normal piles. Alternatively, the SC pile 2 and the steel pipe pile 1 having a predetermined length may be joined in advance by factory welding or the like, and then carried into the site, and the longitudinal joint on the site may be formed by joining common steel pipe piles.

SC杭2の耐力は、用いる鋼管2aの材質、板厚、コンクリート2bの強度によって変化することから、所要の耐力が得られるように、これらの組合せを選定すればよい。   Since the proof stress of the SC pile 2 varies depending on the material of the steel pipe 2a to be used, the plate thickness, and the strength of the concrete 2b, these combinations may be selected so that the required proof strength can be obtained.

また、請求項2では鋼管杭1に比べて外径の大きなSC杭2を用いるため、鋼管杭1よりも曲げ耐力の大きなSC杭2を構成しやすく、鋼管2aの材質・板厚、コンクリート2b強度の組合せも考慮すれば、鋼管杭1に比べて曲げ耐力を大幅に増すことができる。   Further, in claim 2, since the SC pile 2 having a larger outer diameter than that of the steel pipe pile 1 is used, the SC pile 2 having a bending strength larger than that of the steel pipe pile 1 can be easily formed, and the material / sheet thickness of the steel pipe 2a, concrete 2b If the combination of strength is also taken into consideration, the bending strength can be greatly increased as compared with the steel pipe pile 1.

また、図6は請求項2に係る発明において、鋼管2aの下部内周面に突起2cを設けたSC杭2を適用した場合であり、請求項1に係る発明の実施形態にも相当する。また、SC杭2自体は請求項4または5に係るSC杭に相当する。   Moreover, FIG. 6 is a case where the SC pile 2 in which the protrusion 2c is provided on the lower inner peripheral surface of the steel pipe 2a is applied in the invention according to claim 2, and corresponds to the embodiment of the invention according to claim 1. The SC pile 2 itself corresponds to the SC pile according to claim 4 or 5.

図7は請求項2に係る発明における荷重伝達機構の説明図である。   FIG. 7 is an explanatory view of a load transmission mechanism in the invention according to claim 2.

図5にように外径が鋼管杭1の径よりも大きく、中空部の径が鋼管杭1の外径よりも小さいSC杭2を用いた場合には、接合部で断面が急激に変化するものの、図7に示すようにSC杭2の端板2dの外縁と内縁の間に鋼管杭1が接合されているため、端板2dから鋼管杭1の端部付近に伝達される曲げが両方向から打ち消しあう形となり、鋼管杭1に鉛直荷重を安定的に伝達することが可能になる。すなわち、端板2dの板厚や形状、鋼管杭1の接合位置を調整することにより、円滑な鉛直荷重の伝達が実現できる。   As shown in FIG. 5, when the SC pile 2 having an outer diameter larger than the diameter of the steel pipe pile 1 and a hollow portion smaller than the outer diameter of the steel pipe pile 1 is used, the cross section rapidly changes at the joint. However, since the steel pipe pile 1 is joined between the outer edge and the inner edge of the end plate 2d of the SC pile 2 as shown in FIG. 7, the bending transmitted from the end plate 2d to the vicinity of the end of the steel pipe pile 1 is bi-directional. Therefore, the vertical load can be stably transmitted to the steel pipe pile 1. That is, by adjusting the thickness and shape of the end plate 2d and the joining position of the steel pipe pile 1, smooth transmission of the vertical load can be realized.

図8は請求項2に係る発明における下杭としての鋼管杭1と上杭としてのSC杭2の溶接に関し、端板2dの断面形状の例(片側のみ)を示したもので、鋼管杭1を接合する場所にもガイド兼裏あてのための突出部5を設けたものである。   FIG. 8 shows an example (one side only) of the cross-sectional shape of the end plate 2d regarding the welding of the steel pipe pile 1 as the lower pile and the SC pile 2 as the upper pile in the invention according to claim 2. A projection 5 for guiding and backing is also provided at the place where the joints are joined.

さらに、この突出部5は鉛直方向の荷重伝達においては端板2dの剛性を高め変形を防止するための補剛材の役割を果たし、鋼管杭1への円滑な荷重伝達にも寄与する構造となっている。   Further, the projecting portion 5 serves as a stiffener for increasing the rigidity of the end plate 2d and preventing deformation in vertical load transmission, and contributes to smooth load transmission to the steel pipe pile 1. It has become.

図9は、請求項3に係る基礎杭構造(全体構造は、図1あるいは図5の場合と同様であるので省略する)の一実施形態における下杭としての鋼管杭1と上杭としてのSC杭2(請求項6または7に対応)の接合部を示したものである。   FIG. 9 shows a steel pipe pile 1 as a lower pile and an SC as an upper pile in an embodiment of a foundation pile structure according to claim 3 (the whole structure is the same as in FIG. 1 or FIG. 5 and is omitted). The joint part of the pile 2 (corresponding to claim 6 or 7) is shown.

この例では、SC杭2のコンクリート2b内面側にも鋼管2eが一体化され、さらに内面側鋼管2eの外周面のコンクリート2bと接する部分に突起2fが設けられ、一端がコンクリート2bの端部より所定長突出する構成となっている。この突出した内面側鋼管2eと同径の鋼管杭1を溶接3などによりつなぎ合わせることで、頭部を拡頭した基礎杭が築造されることになる。   In this example, the steel pipe 2e is integrated also on the inner surface side of the concrete 2b of the SC pile 2, and further, a protrusion 2f is provided on a portion of the outer peripheral surface of the inner surface side steel pipe 2e in contact with the concrete 2b, and one end is from the end of the concrete 2b. It has a configuration that protrudes a predetermined length. By connecting the steel pipe piles 1 having the same diameter as the protruding inner steel pipe 2e by welding 3 or the like, a foundation pile having an enlarged head is built.

内面側鋼管2eの突起2fには、例えば図1に示したSC杭2の鋼管2aの内周面の突起2cと同様に、平鋼や棒鋼を溶接して形成したものなどを用いることもでき、コンクリート2b−内面側鋼管2e間の荷重の伝達が可能なものであれば特に材料は限定されない。また、図4に示した溶接ビードによる突起(溶接成型突起)を適用することもできる。   As the projection 2f of the inner surface side steel pipe 2e, for example, a projection formed by welding a flat bar or a steel bar, like the projection 2c on the inner peripheral surface of the steel pipe 2a of the SC pile 2 shown in FIG. 1, can be used. The material is not particularly limited as long as the load can be transmitted between the concrete 2b and the inner surface side steel pipe 2e. Moreover, the protrusion (welding molding protrusion) by the weld bead shown in FIG. 4 can also be applied.

図10(a)〜(c)は請求項3に係る基礎杭構造で用いられるSC杭2(請求項6または7に対応)の他の実施形態を示したものである。   10 (a) to 10 (c) show another embodiment of the SC pile 2 (corresponding to claim 6 or 7) used in the foundation pile structure according to claim 3. FIG.

図10(a)は内面側鋼管2eに、外周面に突起2fを設けた鋼管を使用した場合の例を示したものであり、SC杭2の外周面側の鋼管2aには突起がない。この図10(a)では内面側鋼管2eの外周面突起2fによってSC杭2から内面側鋼管2eに鉛直方向の押込み荷重が伝達できる構成となっており、SC杭2下端の端板2dは省略されている。   FIG. 10 (a) shows an example in which a steel pipe provided with protrusions 2f on the outer peripheral surface is used for the inner steel pipe 2e. The steel pipe 2a on the outer peripheral surface side of the SC pile 2 has no protrusions. In FIG. 10 (a), a vertical pushing load can be transmitted from the SC pile 2 to the inner surface side steel pipe 2e by the outer peripheral surface projection 2f of the inner surface side steel pipe 2e, and the end plate 2d at the lower end of the SC pile 2 is omitted. Has been.

引抜き方向の荷重がない場合などでは、本例のように端板2dを省略したり、製造時のコンクリート2b打設のための型枠の役割のみを果たす簡易なものとすることなどができる。   In the case where there is no load in the drawing direction, the end plate 2d can be omitted as in this example, or the end plate 2d can be simplified as it only serves as a formwork for placing the concrete 2b during production.

図10(b)は、図9のSC杭2における突起2fを設けた内面側鋼管2eに代わり、縞付鋼板から成形される外面縞付鋼管を内面側鋼管2eとして用いた場合である。   FIG.10 (b) is a case where the outer surface striped steel pipe shape | molded from a striped steel plate is used as the inner surface side steel pipe 2e instead of the inner surface side steel pipe 2e which provided the protrusion 2f in the SC pile 2 of FIG.

両側の鋼管2a、2eに突起2c、2fを設けることにより、より安定的に鉛直方向の押込み荷重の伝達を図ることができ、かつ、引抜き方向の荷重に対しても円滑な伝達が可能となる。本構造においても図9の場合と同様に突出した内面側鋼管2eと同径の鋼管杭をつなぎ合わせることにより、頭部を拡頭した基礎杭を築造することができる。   By providing the protrusions 2c and 2f on the steel pipes 2a and 2e on both sides, it is possible to more stably transmit the push-in load in the vertical direction, and to smoothly transmit the load in the pull-out direction. . In this structure as well, the foundation pile with the head expanded can be constructed by connecting the steel pipe piles having the same diameter as the protruding inner steel pipe 2e as in the case of FIG.

図10(c)の例は、SC杭2下端の端板2dと内面側鋼管2eとを溶接3などで固定したり、あるいは固定していなくても十分な剛性を有する端板を用いることで引抜き方向の荷重に対しても安定的に荷重伝達が可能な構造とするものである。   In the example of FIG. 10 (c), the end plate 2d at the lower end of the SC pile 2 and the inner surface side steel pipe 2e are fixed by welding 3 or the like, or an end plate having sufficient rigidity is used even if not fixed. The structure is such that the load can be stably transmitted even with respect to the load in the drawing direction.

なお、図10(c)では内面側鋼管2eの頭部に端板2gを設けた構造の例を示しているが、これは杭頭処理の際に中空部頭部に充填するコンクリート12を活用してコンクリー内面側鋼管2eに鉛直方向荷重を伝達する役割を期待したものである。   In addition, although the example of the structure which provided the end plate 2g in the head of the inner surface side steel pipe 2e is shown in FIG.10 (c), this utilizes the concrete 12 with which a hollow part head is filled at the time of a pile head process. Thus, the role of transmitting the vertical load to the concrete inner side steel pipe 2e is expected.

図11(a)、(b)は、図10(a)、(b)のSC杭2を用いた場合の荷重伝達の機構を示したものである。   11 (a) and 11 (b) show a load transmission mechanism when the SC pile 2 shown in FIGS. 10 (a) and 10 (b) is used.

図11(a)に示す図10(a)のSC杭2を用いた構造では、SC杭2上部では鋼管2aとコンクリート2bで分担されて伝達される荷重が2fを介して次第に内面側鋼管2eへ伝達され、コンクリート2b下面においてはコンクリートの分担荷重がゼロとなり、全てが内面側鋼管2eへ伝達され、さらには鋼管杭1へと伝達される。   In the structure using the SC pile 2 of FIG. 10 (a) shown in FIG. 11 (a), the load transferred by the steel pipe 2a and the concrete 2b, which is shared by the steel pipe 2a and the concrete 2b, is gradually passed through 2f on the SC pile 2e. On the lower surface of the concrete 2b, the shared load of the concrete becomes zero, and everything is transmitted to the inner surface side steel pipe 2e and further to the steel pipe pile 1.

図11(b)に示す図10(b)のSC杭2を用いた構造では、荷重の伝達がより明解で安定的となる。すなわち、SC杭2上部では鋼管2aとコンクリート2bで分担されて伝達される荷重のうち、鋼管2aでの分担荷重がSC杭2の鋼管2aの内周面突起2cによってコンクリート2bへ伝達され、これとコンクリート2b部分の分担荷重が外周面の突起2fを介して内面側鋼管2eへ伝達され、さらに、鋼管杭1へと伝達されることになる。   In the structure using the SC pile 2 of FIG. 10 (b) shown in FIG. 11 (b), the transmission of the load becomes clearer and more stable. That is, among the loads transmitted and shared by the steel pipe 2a and the concrete 2b at the upper part of the SC pile 2, the shared load on the steel pipe 2a is transmitted to the concrete 2b by the inner peripheral surface projection 2c of the steel pipe 2a of the SC pile 2, And the shared load of the concrete 2b portion is transmitted to the inner surface side steel pipe 2e via the protrusion 2f on the outer peripheral surface, and further transmitted to the steel pipe pile 1.

また、図11(b)の構造では引抜き方向の荷重に対しても安定的に荷重伝達を行うことができる。この場合、両側の鋼管2a、2eに十分な突起段数が確保されていれば、構造的な観点からは必ずしもSC杭2の下端の端板2dは必要ではなく、図11(a)と同様に端板を省略したり、簡易な端板を使用するなど合理化を図ることもできる。   Further, in the structure of FIG. 11 (b), load transmission can be stably performed even with respect to the load in the drawing direction. In this case, the end plate 2d at the lower end of the SC pile 2 is not necessarily required from a structural point of view if a sufficient number of protrusions are secured on the steel pipes 2a, 2e on both sides, as in FIG. 11 (a). It is possible to rationalize such as omitting the end plate or using a simple end plate.

請求項1に係る発明の一実施形態を示す断面図である。It is sectional drawing which shows one Embodiment of the invention which concerns on Claim 1. (a)、(b)は請求項1に係る発明の他の実施形態における下杭と上杭の接合部を示す断面図、(c)は比較例における下杭と上杭の接合部を示す断面図である。(a), (b) is sectional drawing which shows the junction part of the lower pile and upper pile in other embodiment of the invention which concerns on Claim 1, (c) shows the junction part of the lower pile and upper pile in a comparative example It is sectional drawing. (a)、(b)は請求項1に係る発明における荷重伝達機構の説明図、(c)は比較例における荷重伝達機構の説明図である。(a), (b) is explanatory drawing of the load transmission mechanism in the invention which concerns on Claim 1, (c) is explanatory drawing of the load transmission mechanism in a comparative example. 溶接ビードによる突起の説明図である。It is explanatory drawing of the processus | protrusion by a weld bead. 請求項2に係る発明の一実施形態を示す断面図である。It is sectional drawing which shows one Embodiment of the invention which concerns on Claim 2. 請求項2に係る発明の他の実施形態における下杭と上杭の接合部を示す断面図である。It is sectional drawing which shows the junction part of the lower pile and upper pile in other embodiment of the invention which concerns on Claim 2. 請求項2に係る発明における荷重伝達機構の説明図である。It is explanatory drawing of the load transmission mechanism in the invention which concerns on Claim 2. 請求項2に係る発明における下杭と上杭の溶接による接合部の説明図である。It is explanatory drawing of the junction part by welding of the lower pile and the upper pile in the invention which concerns on Claim 2. 請求項3に係る発明の一実施形態における下杭と上杭の接合部を示す断面図である。It is sectional drawing which shows the junction part of the lower pile and upper pile in one Embodiment of the invention which concerns on Claim 3. (a)〜(c)は請求項3に係る発明で用いるSC杭の他の実施形態を示す断面図である。(a)-(c) is sectional drawing which shows other embodiment of the SC pile used by the invention which concerns on Claim 3. FIG. (a)、(b)は請求項3に係る発明における荷重伝達機構の説明図である。(a), (b) is explanatory drawing of the load transmission mechanism in the invention which concerns on Claim 3. FIG.

符号の説明Explanation of symbols

1…鋼管杭、2…SC杭、2a…鋼管、2b…コンクリート、2c…突起、2d…端板、2e…内面側鋼管、2f…突起、2g…端板、3…溶接、4…機械式継手、
11…フーチング、12…コンクリート、
21…地盤上部、22…支持地盤
DESCRIPTION OF SYMBOLS 1 ... Steel pipe pile, 2 ... SC pile, 2a ... Steel pipe, 2b ... Concrete, 2c ... Protrusion, 2d ... End plate, 2e ... Inner surface side steel pipe, 2f ... Protrusion, 2g ... End plate, 3 ... Welding, 4 ... Mechanical type Fittings,
11 ... Footing, 12 ... Concrete,
21 ... Upper part of the ground, 22 ... Supporting ground

Claims (8)

鋼管杭の上部に上杭として、または上杭の一部として、前記鋼管杭よりも曲げ耐力が大きいSC杭を接合してなり、前記SC杭を構成する鋼管の内周面下部に一段または複数段の突起が設けられていることを特徴とする基礎杭構造。   As an upper pile or a part of the upper pile, an SC pile having a bending strength greater than that of the steel pipe pile is joined to the upper portion of the steel pipe pile, and one or more steps are provided at the lower part of the inner peripheral surface of the steel pipe constituting the SC pile. A foundation pile structure characterized by a step projection. 鋼管杭の上部に上杭として、または上杭の一部として、前記鋼管杭よりも曲げ耐力が大きいSC杭を接合してなり、前記鋼管杭の外径が、前記SC杭の外径より小さく、該SC杭の中空部の径より大きく、該鋼管杭の上端部と前記SC杭のコンクリート端部に設けられる端板とを溶接により接合してあることを特徴とする基礎杭構造。   As an upper pile or as a part of the upper pile, an SC pile having a bending strength greater than that of the steel pipe pile is joined to the upper portion of the steel pipe pile, and the outer diameter of the steel pipe pile is smaller than the outer diameter of the SC pile. The foundation pile structure characterized by being larger than the diameter of the hollow part of this SC pile, and joining the upper end part of this steel pipe pile, and the end plate provided in the concrete edge part of the said SC pile by welding. 鋼管杭の上部に上杭として、または上杭の一部として、前記鋼管杭よりも曲げ耐力が大きいSC杭を接合してなり、前記SC杭のコンクリート内面側に内面側鋼管が一体化されており、該内面側鋼管の下部がコンクリートの端部より所要長突出し、前記鋼管杭の上端部に前記内面側鋼管の下端部が接合されていることを特徴とする基礎杭構造。   As an upper pile or as a part of the upper pile, an SC pile having a bending strength greater than that of the steel pipe pile is joined to the upper portion of the steel pipe pile, and the inner surface side steel pipe is integrated on the concrete inner surface side of the SC pile. And a lower portion of the inner surface side steel pipe projects a required length from an end portion of the concrete, and a lower end portion of the inner surface side steel pipe is joined to an upper end portion of the steel pipe pile. 鋼管の内周面にコンクリートが一体化されたSC杭において、前記鋼管の端部内周面に一段または複数段の連続するまたは不連続な突起が設けられていることを特徴とするSC杭。   An SC pile in which concrete is integrated with an inner peripheral surface of a steel pipe, wherein one or more continuous or discontinuous protrusions are provided on an inner peripheral surface of the end portion of the steel pipe. 前記突起が溶接ビードにより形成されていることを特徴とする請求項4記載のSC杭。   The SC pile according to claim 4, wherein the protrusion is formed by a weld bead. 鋼管の内周面にコンクリートが一体化された中空のSC杭において、前記SC杭のコンクリート内面側に内面側鋼管が一体化されており、該内面側鋼管の少なくとも一端がコンクリートの端部より所要長突出していることを特徴とするSC杭。   In a hollow SC pile in which concrete is integrated on the inner peripheral surface of the steel pipe, an inner surface side steel pipe is integrated on the concrete inner surface side of the SC pile, and at least one end of the inner surface side steel pipe is required from the end of the concrete. SC pile characterized by long protrusion. 前記鋼管の端部内周面および/または前記内面側鋼管の外周面に一段または複数段の連続するまたは不連続な突起が設けられていることを特徴とする請求項6記載のSC杭。   The SC pile according to claim 6, wherein one or a plurality of steps of continuous or discontinuous protrusions are provided on the inner peripheral surface of the end of the steel pipe and / or the outer peripheral surface of the inner surface side steel pipe. 前記突起の一部または全部が溶接ビードにより形成されていることを特徴とする請求項6または7記載のSC杭。   The SC pile according to claim 6 or 7, wherein a part or all of the protrusion is formed by a weld bead.
JP2006114035A 2006-04-18 2006-04-18 Foundation pile structure and SC pile Active JP4626562B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006114035A JP4626562B2 (en) 2006-04-18 2006-04-18 Foundation pile structure and SC pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006114035A JP4626562B2 (en) 2006-04-18 2006-04-18 Foundation pile structure and SC pile

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP2010146152A Division JP5056911B2 (en) 2010-06-28 2010-06-28 Foundation pile structure and SC pile
JP2010146151A Division JP5056910B2 (en) 2010-06-28 2010-06-28 Foundation pile structure

Publications (2)

Publication Number Publication Date
JP2007285019A true JP2007285019A (en) 2007-11-01
JP4626562B2 JP4626562B2 (en) 2011-02-09

Family

ID=38757053

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006114035A Active JP4626562B2 (en) 2006-04-18 2006-04-18 Foundation pile structure and SC pile

Country Status (1)

Country Link
JP (1) JP4626562B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017190571A (en) * 2016-04-11 2017-10-19 Jfeエンジニアリング株式会社 Joining structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374092B (en) * 2019-07-10 2021-08-13 江苏镇江路桥工程有限公司 Pile end post-grouting device and process for cast-in-place pile

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4912709U (en) * 1972-04-28 1974-02-02
JPS61207716A (en) * 1985-03-09 1986-09-16 Yukio Matsumoto Highly resilient sc pile
JPS6223715A (en) * 1985-07-24 1987-01-31 南日本高圧コンクリ−ト株式会社 Manufacture of false prestressed sc pile
JPH07331650A (en) * 1994-06-10 1995-12-19 Hiraoka Kinzoku Kogyo Kk Joint for pile
JPH11152743A (en) * 1997-11-21 1999-06-08 Geotop Corp Joint of pile by using sc pile and sc pile
JP2002061173A (en) * 2000-06-05 2002-02-28 Asahi Kasei Corp Precast pile with enlarged head
JP2002332634A (en) * 2001-05-10 2002-11-22 Nkk Corp Cast-in-place steel pipe concrete pile and its execution method
JP2005264666A (en) * 2004-03-22 2005-09-29 Jfe Steel Kk Pile head joining structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4912709U (en) * 1972-04-28 1974-02-02
JPS61207716A (en) * 1985-03-09 1986-09-16 Yukio Matsumoto Highly resilient sc pile
JPS6223715A (en) * 1985-07-24 1987-01-31 南日本高圧コンクリ−ト株式会社 Manufacture of false prestressed sc pile
JPH07331650A (en) * 1994-06-10 1995-12-19 Hiraoka Kinzoku Kogyo Kk Joint for pile
JPH11152743A (en) * 1997-11-21 1999-06-08 Geotop Corp Joint of pile by using sc pile and sc pile
JP2002061173A (en) * 2000-06-05 2002-02-28 Asahi Kasei Corp Precast pile with enlarged head
JP2002332634A (en) * 2001-05-10 2002-11-22 Nkk Corp Cast-in-place steel pipe concrete pile and its execution method
JP2005264666A (en) * 2004-03-22 2005-09-29 Jfe Steel Kk Pile head joining structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017190571A (en) * 2016-04-11 2017-10-19 Jfeエンジニアリング株式会社 Joining structure

Also Published As

Publication number Publication date
JP4626562B2 (en) 2011-02-09

Similar Documents

Publication Publication Date Title
JP5056911B2 (en) Foundation pile structure and SC pile
JP2008231799A (en) Base isolation structure
JP2009007745A (en) Axial-force transmission structure for permanent sub-substructural column and foundation pile, and construction method for permanent sub-substructural column
JP2008223339A (en) Pile head strengthening method for hollow pile and pile head strengthening reinforcement material
JP4626562B2 (en) Foundation pile structure and SC pile
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
JP4989409B2 (en) Foundation pile structure, ready-made concrete pile, and joint hardware of ready-made concrete pile and steel pipe pile
JP5215030B2 (en) Structure
JP6327660B2 (en) Construction method of shaft
JP5056910B2 (en) Foundation pile structure
JP3787109B2 (en) Pile foundation and its construction method
JP4954226B2 (en) Prestressed concrete structure
JP5432320B2 (en) Foundation pile structure
JP2017025680A (en) Connection structure of precast concrete beam end and precast concrete beam column frame
JP2015063889A (en) Column jointed structure
JP4209314B2 (en) Pile head joint structure and pile body construction method
JP4449595B2 (en) Column-beam joint structure, method for constructing column-beam joint structure, method for constructing underground structure, and building
JP6461752B2 (en) Bonded concrete structure
JP2007051500A (en) Joint structure of column and pile
JP6217102B2 (en) Joint structure and method of head and foundation of cast-in-place concrete pile
JP2005023573A (en) Joining structure of reinforced concrete member and steel pipe concrete
JP2007303196A (en) Aseismatic reinforcing structure and aseismatic reinforcing method for existing pile
JP2005105812A (en) Pile head reinforcing member, and pile head reinforcing structure using the same
JP6545557B2 (en) segment
JP2006336217A (en) Existing concrete pile and axial shear reinforcing structure inside pile head

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080423

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100422

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100427

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100628

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101012

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101025

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131119

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4626562

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131119

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131119

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350