JP5432320B2 - Foundation pile structure - Google Patents

Foundation pile structure Download PDF

Info

Publication number
JP5432320B2
JP5432320B2 JP2012102162A JP2012102162A JP5432320B2 JP 5432320 B2 JP5432320 B2 JP 5432320B2 JP 2012102162 A JP2012102162 A JP 2012102162A JP 2012102162 A JP2012102162 A JP 2012102162A JP 5432320 B2 JP5432320 B2 JP 5432320B2
Authority
JP
Japan
Prior art keywords
steel pipe
pile
outer peripheral
concrete
ready
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012102162A
Other languages
Japanese (ja)
Other versions
JP2012162983A (en
Inventor
宏征 田中
真 池田
裕貴 日下
和義 津田
充 窪田
亮太 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Nippon Hume Corp
Original Assignee
Nippon Steel Corp
Nippon Hume Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp, Nippon Hume Corp filed Critical Nippon Steel Corp
Priority to JP2012102162A priority Critical patent/JP5432320B2/en
Publication of JP2012162983A publication Critical patent/JP2012162983A/en
Application granted granted Critical
Publication of JP5432320B2 publication Critical patent/JP5432320B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、既製コンクリート杭(PHC杭、RC杭、PRC杭などを含む)と鋼管杭を用いた基礎杭構造に関するものである。 The present invention relates to a basic Kui構granulated using prefabricated concrete pile (PHC pile, RC piles, including PRC piles) and steel pipe piles.

近年の基礎杭の高支持力化や設計地震力の大規模化に伴って、設計時に想定される建物からの地震時水平力や地中部での地盤変位が大きくなり、これによって杭体に生じる大きな断面力に耐え得るように耐力の大きな杭体を使用するケースが増えている。   With the recent increase in bearing capacity of foundation piles and the increase in design seismic force, the horizontal force during earthquakes and the ground displacement in the ground that are assumed at the time of design increase, resulting in pile bodies. An increasing number of cases use pile bodies with high yield strength so that they can withstand large cross-sectional forces.

建物の基礎杭には安価であるなどの理由からPHC杭(遠心力プレストレストコンクリート杭)などの既製コンクリート杭が広く使用されている。PHC杭にはプレストレス力が異なるA種、B種、C種が設定されており、これらが発生する断面力の大きさに応じて使い分けられている。   Ready-made concrete piles such as PHC piles (centrifugal prestressed concrete piles) are widely used for the foundation piles of buildings because they are inexpensive. Different types of prestressing force A type, B type, and C type are set for the PHC piles, and they are properly used according to the cross-sectional force generated.

上述のような環境のもと、特に発生曲げモーメントが大きくなることが多い上杭については、最も耐力の大きなC種のPHC杭でも発生断面力に耐え切れない場合が増加しており、そのような場合には鋼管内部に遠心力コンクリートを打設した高い水平耐力と曲げ耐力を有するSC杭(外殻鋼管付き既製コンクリート杭)が使用されることが多い。   In the above environment, especially for upper piles where the generated bending moment is often increased, even the type C PHC pile with the greatest proof stress has increased the number of cases where it cannot withstand the generated sectional force. In many cases, SC piles (prepared concrete piles with shell steel pipes) having high horizontal strength and bending strength in which centrifugal concrete is placed inside the steel pipe are often used.

SC杭は鋼管と高強度コンクリートからなる鋼−コンクリート複合構造であり、用いる鋼管の板厚にもよるが、通常のPHC杭に比べて十分に大きな曲げ耐力やせん断耐力を有している。また、当然のことながら、同じ鋼管板厚であれば鋼管杭と比較しても大きな曲げ耐力を保有している。   The SC pile is a steel-concrete composite structure composed of a steel pipe and high-strength concrete, and has a sufficiently large bending strength and shear strength compared to a normal PHC pile, although it depends on the thickness of the steel pipe used. Moreover, naturally, if it is the same steel pipe plate thickness, it has big bending strength compared with a steel pipe pile.

また、SC杭はPHC杭と同様に端部に端板が設けられているため、従来のPHC杭同士の接合と同様に端板同士をつき合せて溶接することなどにより、容易にPHC杭と接合することができる。   In addition, since SC piles are provided with end plates at the end portions in the same manner as PHC piles, they can be easily attached to the PHC piles by joining the end plates together and welding them in the same manner as joining conventional PHC piles. Can be joined.

しかし、SC杭は端板を取り付けた鋼管を予め準備した後に、コンクリートを注入して遠心締固めを行い、養生を行う工程を経て製造されるため、製造に必要な期間が長く、鋼管を用いることから高価なものとなっている。   However, since SC pile is manufactured through a process of injecting concrete, centrifugal compacting and curing after preparing a steel pipe with an end plate attached in advance, the period required for manufacturing is long, and the steel pipe is used. Therefore, it is expensive.

そのため、鋼管の製造とコンクリートの打設・養生のための時間がとれず製造が間に合わない場合が生じたり、SC杭を適用することによって基礎杭としてのコストが増加してしまうなどの課題がある。   Therefore, there is a problem that the time for manufacturing the steel pipe and placing and curing the concrete cannot be kept, and the manufacturing may not be in time, or the cost of the foundation pile increases by applying the SC pile. .

以上のような問題を解決するために、例えば特許文献1には、大きな耐力を必要とする箇所にSC杭の代わりに鋼管杭を適用し、既製コンクリート杭と鋼管杭の異種杭の接合構造を用いる方法が開示されている。   In order to solve the above problems, for example, in Patent Document 1, a steel pipe pile is applied instead of an SC pile to a place where a large proof stress is required, and a joint structure between a prefabricated concrete pile and a steel pipe pile is provided. The method used is disclosed.

特開2003−232033号公報JP 2003-232033 A 実公昭39−018126号公報Japanese Utility Model Publication No. 39-018126

図5(特許文献2参照)および図6は、従来のPHC杭(既製コンクリート杭11)の継手部構造の例を示したもので、上述のように端板14同士をつき合せて面接触を確保し縁端部を溶接することなどにより接合が行われている。図5および図6において、符合6は溶接部、符号13は補強バンド、15はプレストレス導入のためのPC鋼材を示す。   FIG. 5 (refer to Patent Document 2) and FIG. 6 show an example of a joint part structure of a conventional PHC pile (ready-made concrete pile 11). As described above, the end plates 14 are brought into contact with each other for surface contact. Joining is performed by securing and welding the edge. 5 and 6, reference numeral 6 denotes a welded portion, reference numeral 13 denotes a reinforcing band, and 15 denotes a PC steel material for introducing prestress.

図7に示すように、この従来のPHC杭の端部構造に対して、そのまま鋼管杭2を接続すると以下のような問題が発生する。   As shown in FIG. 7, when the steel pipe pile 2 is connected to the end structure of this conventional PHC pile as it is, the following problems occur.

(1) PHC杭どうしやPHC杭とSC杭の接合のように端板14の面接触とはならず、接合部において断面が急激に変化するため、杭基礎に作用する鉛直荷重や水平荷重の円滑、かつ健全な伝達の観点から課題が残る。すなわち、PHC杭部分では厚肉のコンクリートによって分担されている軸力が接合部において肉厚の小さな鋼管に集約されることになるが、このとき、鋼管杭2の接合部付近には単純な軸方向力だけでなく、PHC杭(既製コンクリート杭11)の端板14からの曲げ応力Mが作用するため構造的な弱所となる。   (1) Since the cross section of the end plate 14 does not change like the connection between PHC piles, PHC piles and SC piles, and the cross section changes rapidly at the joints, the vertical load and horizontal load acting on the pile foundation Issues remain in terms of smooth and sound communication. That is, in the PHC pile portion, the axial force shared by the thick concrete is concentrated on the steel pipe having a small thickness at the joint portion. At this time, a simple shaft is provided near the joint portion of the steel pipe pile 2. Not only the directional force but also the bending stress M from the end plate 14 of the PHC pile (the ready-made concrete pile 11) acts, so that it becomes a structural weak point.

(2) 鋼管端面と端板の間に隙間ができると溶接金属の漏れなどによって溶接不良を引き起こす恐れがあるため、鋼管杭2の端面精度や杭継ぎ時の鉛直精度を厳格に確保する必要があり、現場での溶接の品質確保の観点からの課題が残る。   (2) If there is a gap between the steel pipe end face and the end plate, it may cause welding failure due to leakage of weld metal, etc., so it is necessary to strictly ensure the end face accuracy of the steel pipe pile 2 and the vertical accuracy at the time of pile connection, Problems remain from the viewpoint of ensuring the quality of welding in the field.

このような課題に対応するため、前述の特許文献1には以下のような構造が開示されている。すなわち、従来のPHC杭どうしの接合と同様に現場溶接が行えるように、鋼管杭のPHC杭と接合する側の端部にも予め同様の端板を設置しておく構造である。   In order to cope with such a problem, the following structure is disclosed in Patent Document 1 described above. That is, it is a structure in which a similar end plate is installed in advance at the end of the steel pipe pile on the side to be joined with the PHC pile so that the field welding can be performed in the same manner as the joining of the conventional PHC piles.

しかし、この構造では上記(2)の課題の解決が図られているが、(1)の課題が解決されない。すなわち、端板14を介して鋼管杭2端部に作用する図7の曲げモーメントMを解消することができない(端板が2重となることで剛性が向上し、鋼管杭端部に作用する曲げモーメントを若干緩和する効果を期待できる可能性はあるが、応力伝達が接合部で急激に変化する構造であることに変わりはない)。   However, in this structure, the problem (2) is solved, but the problem (1) is not solved. That is, the bending moment M of FIG. 7 acting on the end of the steel pipe pile 2 through the end plate 14 cannot be eliminated (the rigidity is improved by the double end plates, and the end of the steel pipe pile is acted on). Although it may be possible to expect an effect of slightly reducing the bending moment, it is still a structure in which the stress transmission changes abruptly at the joint).

この他、鋼管杭のPHC杭と接合する側の端部に予め補剛材を設置して補強しておく構造などが考えられるが、加工に費用がかかり高価なものとなってしまうこと、さらには上記(2)の課題が解決されないことなどの問題がある。   In addition, a structure in which a stiffener is installed and reinforced in advance at the end of the steel pipe pile that is to be joined with the PHC pile can be considered, but the processing is expensive and expensive. However, there is a problem that the problem (2) is not solved.

上記(2)の課題も解決するために、特許文献1の構造にさらに補剛材(鋼管杭と端板の隅角部を補剛材で補強するなど)を設けることも考えられるが、加工が複雑になり、使用材料も増加して非常に高価な構造となってしまう。   In order to solve the above problem (2), it may be possible to further provide a stiffener (such as reinforcing the steel pipe pile and the corners of the end plate with a stiffener) in the structure of Patent Document 1. Becomes complicated and the material used increases, resulting in a very expensive structure.

本発明は、上記のような課題を解決するためになされたもので、既製コンクリート杭からなる基礎杭のうち大きな耐力が要求される箇所に鋼管杭を適用した異種杭からなる継杭構造に関し、押込み・引抜き・曲げによる各応力を円滑、かつ健全に伝達して継手部の耐力が確保でき、かつ現場での溶接作業も従来と同様の方法で実施できる施工性にも優れた基礎杭構造を提供することを目的としている。 The present invention was made to solve the above problems, and relates to a joint pile structure composed of different types of piles in which a steel pipe pile is applied to a place where a large proof stress is required among foundation piles made of ready-made concrete piles. each stress due indentation, pulling, bending smoothly, and sound transmitted to strength of the joint portion can be secured, and welding is also similar to the conventional foundation Kui構Concrete with excellent workability that can be practiced in the field The purpose is to provide.

本願の請求項1に係る基礎杭構造は、既製コンクリート杭と、該既製コンクリート杭よりも曲げ耐力が大きい鋼管杭を接合してなり、前記既製コンクリート杭の鋼管杭と接合する側の端部には、内周面に複数段の突起が設けられた軸力伝達用の外周鋼管が設けられ、前記既製コンクリート杭の端板を前記外周鋼管の内周面に設け、前記外周鋼管の端部を前記端板位置より突出させてあり、前記外周鋼管の板厚が前記鋼管杭の板厚以上であり、かつ前記外周鋼管の長さが前記既製コンクリート杭の外径の0.5〜1.5倍であり、接続される前記既製コンクリート杭と前記鋼管杭との間の断面急変に対し、前記既製コンクリート杭のコンクリート部分で分担されて伝達される荷重が、前記外周鋼管の内周面に設けられた複数段の突起を介して、次第に外周鋼管側へ移行し、鉛直荷重を鋼管杭へ安定的に伝達するようにしたことを特徴とするものである。 The foundation pile structure according to claim 1 of the present application is formed by joining a ready-made concrete pile and a steel pipe pile having a bending strength larger than that of the ready-made concrete pile, and the end of the ready-made concrete pile on the side to be joined to the steel pipe pile. the outer peripheral steel pipes for axial force transmission, which is provided with projections several stages double is provided on the inner circumferential surface, provided the end plate of the pre-cast concrete pile with the inner peripheral surface of the outer peripheral steel pipe, the end portion of the outer peripheral steel pipe the Ri Oh is protruded from the end plate position, the plate thickness of the outer peripheral steel pipe is not less than the thickness of the steel pipe pile, and 0.5 of the outer diameter of the length of the outer peripheral steel pipe the prefabricated concrete pile .5 times, the load transmitted by being shared by the concrete portion of the ready-made concrete pile is transmitted to the inner peripheral surface of the outer peripheral steel pipe with respect to the sudden change in cross section between the ready-made concrete pile and the steel pipe pile to be connected. Through the multi-step projections provided on the Moves to the second outer peripheral steel pipe side, is characterized in that so as to transmit the vertical load stably to the steel pipe pile.

ここでいう既製コンクリート杭には、コンクリートが主体となるPHC杭、RC杭、PRC杭などを含むが、杭全体が鋼−コンクリート複合構造となるSC杭は含まない。   The ready-made concrete piles here include PHC piles, RC piles, PRC piles and the like mainly composed of concrete, but do not include SC piles in which the entire pile has a steel-concrete composite structure.

また、基本的には、既製コンクリート杭の上部に鋼管杭を用いる構成が一般的であるが、特にこれに限定するものではなく、地中部に既製コンクリート杭に挟まれる形でもよい。   Moreover, although the structure which uses a steel pipe pile for the upper part of a ready-made concrete pile is fundamentally, it is not limited to this in particular, The shape pinched | interposed into a ready-made concrete pile may be sufficient.

本発明によれば、接続される既製コンクリート杭と鋼管杭との間の断面急変に対し、既製コンクリート杭の端部に設けられた外周鋼管の内周面に突起を設けたことで、既製コンクリート杭のコンクリート部分で分担されて伝達される荷重が、外周鋼管の内周面に位置する突起を介して次第に外周鋼管側へ移行し、鉛直荷重を鋼管杭へ安定的に伝達することができる。   According to the present invention, for the sudden change in cross section between the ready-made concrete pile and the steel pipe pile to be connected, the protrusion is provided on the inner peripheral surface of the outer peripheral steel pipe provided at the end of the ready-made concrete pile, so that the ready-made concrete is provided. The load that is shared and transmitted by the concrete portion of the pile gradually shifts to the outer steel pipe side through the protrusions located on the inner peripheral surface of the outer steel pipe, and the vertical load can be stably transmitted to the steel pipe pile.

外周鋼管内周面の突起は、支圧力によって接合部位置での軸力を伝達するのに必要な段数を配置するものとする(請求項2)The protrusions on the inner peripheral surface of the outer peripheral steel pipe are arranged with the number of steps necessary for transmitting the axial force at the joint position by the support pressure (Claim 2) .

本発明は、本来的に既製コンクリート杭と鋼管杭との接合部における断面急変に対処するものであり、外周鋼管の板厚が鋼管杭の板厚より小さいと鉛直荷重の安定的な伝達には不利であることから、コンクリート杭の外周鋼管の板厚を鋼管杭の板厚以上(通常、9mm以上)に限定している。 The present invention inherently addresses a sudden change in the cross section at the joint between a ready-made concrete pile and a steel pipe pile, and if the plate thickness of the outer peripheral steel pipe is smaller than the plate thickness of the steel pipe pile, it either et disadvantageous, and limiting the thickness of the peripheral steel pipe concrete piles than the thickness of the steel pipe pile (usually more than 9 mm).

なお、従来、既製コンクリート杭の端部には、主として継手部の曲げに対してコンクリート端部を保護し、杭体一般部と同等の継手耐力を確保する目的で、補強バンドが取り付けられている。   In addition, conventionally, a reinforcing band is attached to the end portion of the ready-made concrete pile mainly for the purpose of protecting the end portion of the concrete against the bending of the joint portion and securing the joint strength equivalent to the general portion of the pile body. .

しかし、コンクリート杭どうしの接合の場合、端板どうしが面接触するため、この補強バンドは軸力を伝達する機能は必要なく、曲げに対して鉄筋の役割を果たせばよく、板厚1.2〜3.2mm程度の鋼板、または縞鋼板(チェッカープレート)が用いられ、突起高さも縞鋼板程度の小さいものである。   However, in the case of joining concrete piles, the end plates are in surface contact with each other, so this reinforcing band does not need a function of transmitting axial force. A steel plate of about 3.2 mm or a striped steel plate (checker plate) is used, and the projection height is as small as that of the striped steel plate.

本発明は、断面の急変に対し、応力状態としてはある程度の長さで徐々に軸力伝達するようにしたものであり、既製コンクリート杭の外径Dに対し、外周鋼管の長さは0.3D以上、好ましくは0.5D以上必要である。また、長過ぎてもコストが嵩むだけであるので、0.5〜1.5Dとした。 In the present invention, the axial force is gradually transmitted with a certain length as a stress state in response to a sudden change in the cross section. The outer peripheral steel pipe has a length of 0. 3D or more, preferably 0.5D or more is required. In addition, the only costly even if too long, 0. It was set to 5-1.5D.

なお、従来の補強バンドの場合、請求項2に関して述べた理由から、その長さも既製コンクリート杭の外径の0.25〜0.5倍程度と短い。   In addition, in the case of the conventional reinforcement band, the length is also as short as about 0.25-0.5 times the outer diameter of a ready-made concrete pile from the reason described regarding Claim 2.

上述のように、本発明の基礎杭構造においては、前記既製コンクリート杭の端板を前記外周鋼管の内周面に設け、前記外周鋼管の端部を前記端板位置より突出させてある。   As mentioned above, in the foundation pile structure of this invention, the end plate of the said ready-made concrete pile is provided in the internal peripheral surface of the said outer periphery steel pipe, and the edge part of the said outer periphery steel pipe is made to protrude from the said end plate position.

本発明における端板は遠心成型による製造上、あるいはPC鋼棒などを固定するために必要な最小限の板厚のものでよい。   The end plate in the present invention may have a minimum plate thickness required for manufacturing by centrifugal molding or for fixing a PC steel bar or the like.

端板を軸力伝達用の突起付き外周鋼管の内周面に取り付け、外周鋼管端部を所定長突出させておくことで、従来の鋼管杭と同じ方法で現場周継ぎ溶接を行うことができる。   By attaching the end plate to the inner peripheral surface of the outer peripheral steel pipe with projections for axial force transmission and projecting the end of the outer peripheral steel pipe for a predetermined length, it is possible to perform field splice welding in the same way as conventional steel pipe piles .

なお、外周鋼管と端板は、溶接等により一体化されていてもよい。   The outer peripheral steel pipe and the end plate may be integrated by welding or the like.

請求項は、請求項1または2に係る基礎杭構造において、前記突起が溶接ビードにより形成されていることを限定したものである。 A third aspect of the present invention is the foundation pile structure according to the first or second aspect , wherein the protrusion is formed by a weld bead.

本発明において、既製コンクリート杭のコンクリートの厚さ、確実な軸力伝達機能の確保を考慮すると、外周鋼管の内面には、8〜15mm程度の高さの突起を、100〜200mm程度のピッチで設置するのがよい。その場合、突起を溶接ビードで作るのが経済的である。   In the present invention, considering the concrete thickness of the ready-made concrete pile and ensuring the reliable axial force transmission function, protrusions with a height of about 8 to 15 mm are formed on the inner surface of the outer peripheral steel pipe at a pitch of about 100 to 200 mm. It is good to install. In that case, it is economical to make the protrusion with a weld bead.

なお、必要以上に突起が高いとコンクリートの割れなどを誘発する恐れがある。また、ピッチが短いと突起による軸力伝達が一つの突起の支圧耐力が低下し非効率的となり、ピッチが長すぎると外周鋼管が長くなって不経済となる。   In addition, if the protrusions are higher than necessary, there is a risk of inducing cracks in the concrete. Further, if the pitch is short, the axial force transmission by the protrusions becomes inefficient because the bearing strength of one protrusion is lowered, and if the pitch is too long, the outer peripheral steel pipe becomes long and uneconomical.

本発明によれば、既製コンクリート杭と鋼管杭とが接合される断面急変部について、既製コンクリート杭の端部に設けた外周鋼管内周面の突起を介して応力が伝達され、それにより基礎杭に作用する押込み・引抜き・曲げによる各応力を円滑、かつ健全に伝達して継手部の耐力が確保できる。   According to the present invention, the stress is transmitted through the protrusion on the inner peripheral surface of the outer peripheral steel pipe provided at the end of the ready-made concrete pile for the sudden change section where the ready-made concrete pile and the steel pipe pile are joined. The stress due to pushing, pulling and bending acting on the steel can be transmitted smoothly and soundly to ensure the strength of the joint.

また、既製コンクリート杭と鋼管杭の接合における現場での溶接作業も従来と同様の方法で実施でき、施工性にも優れる。   Moreover, the welding work in the field in the joining of a ready-made concrete pile and a steel pipe pile can be implemented by the same method as before, and it is excellent in workability.

また、断面急変部における応力伝達を円滑にするための突起を溶接ビードで形成すれば、効率的であり、製作コストも安価となる。   In addition, if the protrusion for facilitating the stress transmission in the suddenly changing section is formed with a weld bead, it is efficient and the manufacturing cost is low.

図1は、本発明の基礎杭構造の全体形状を概略的に示したものであり、先端杭としての従来の一般的な既製コンクリート杭11の上に、本発明における軸力伝達用の外周鋼管3を設けた既製コンクリート杭1をつなぎ、その上に上杭としての曲げ耐力の大きい鋼管杭2をつなぎ、鋼管杭2の頭部がフーチングなどの基礎に埋め込まれる場合を想定している。 FIG. 1 schematically shows the overall shape of a foundation pile structure according to the present invention. On the conventional general ready-made concrete pile 11 as a tip pile, an outer peripheral steel pipe for axial force transmission according to the present invention. It is assumed that a ready-made concrete pile 1 provided with 3 is connected, a steel pipe pile 2 having a large bending strength is connected as an upper pile, and the head of the steel pipe pile 2 is embedded in a foundation such as a footing.

先端杭としての既製コンクリート杭11は、両端に従来の薄肉の鋼板などからなる補強バンド13と、端板14を取り付けたものである。   A ready-made concrete pile 11 as a tip pile has a reinforcing band 13 made of a conventional thin steel plate and an end plate 14 attached to both ends.

本発明の既製コンクリート1については、図1に示した例では、下端には従来の既製コンクリート杭11と同様の補強バンド13と、端板14を取り付け、上端には内周面に複数段の突起3aが設けられた軸力伝達用の外周鋼管3と端板4を取り付けてある。   For the ready-made concrete 1 of the present invention, in the example shown in FIG. 1, a reinforcing band 13 and an end plate 14 similar to those of a conventional ready-made concrete pile 11 are attached to the lower end, and a plurality of steps are provided on the inner peripheral surface at the upper end. An outer peripheral steel pipe 3 and an end plate 4 for axial force transmission provided with protrusions 3a are attached.

先端杭としての既製コンクリート杭11と本発明の既製コンクリート1の接合は、従来の既製コンクリート杭11同士の接合と同様に、端板14と端板4同士を突き合わせて溶接接合している。   The joining of the ready-made concrete pile 11 as the tip pile and the ready-made concrete 1 of the present invention is performed by abutting the end plate 14 and the end plate 4 together by welding similarly to the joining of the conventional ready-made concrete piles 11.

本発明の既製コンクリート1と鋼管杭1との接合は、この例では端板4より上方に突出させた外周鋼管3の上端と鋼管杭2の下端を突合せ、鋼管同士の溶接として接合している。   In this example, the ready-made concrete 1 of the present invention and the steel pipe pile 1 are joined together by welding the upper ends of the outer peripheral steel pipes 3 and the lower ends of the steel pipe piles 2 that protrude upward from the end plates 4. .

図2および図3は、図1の一点鎖線で囲んだA部について、それぞれ異なる形態を示したものである。   FIG. 2 and FIG. 3 show different forms for the portion A surrounded by the one-dot chain line in FIG.

図2は、本発明に含まれない基礎杭構造の一形態を示したもので、荷重伝達用の外周鋼管3の端部が端板4の下面に当接し、上側の鋼管杭1の下端を端板4の上面に溶接している。   FIG. 2 shows an embodiment of a foundation pile structure not included in the present invention. The end of the outer peripheral steel pipe 3 for load transmission is in contact with the lower surface of the end plate 4 and the lower end of the upper steel pipe pile 1 is shown. Welded to the upper surface of the end plate 4.

荷重伝達用の外周鋼管3の内周面には、複数段の突起3aが設けられている。また、端板4には、PC鋼材5の端部が定着されている。   A plurality of projections 3 a are provided on the inner peripheral surface of the outer peripheral steel pipe 3 for load transmission. Further, the end portion of the PC steel material 5 is fixed to the end plate 4.

図3は、本発明に係る発明の一実施形態を示したもので、荷重伝達用の外周鋼管3の内周面に端板4を設け、外周鋼管3の端部を端板4位置より突出させて突出部3bを形成している。   FIG. 3 shows an embodiment of the invention according to the present invention. An end plate 4 is provided on the inner peripheral surface of the outer peripheral steel pipe 3 for load transmission, and the end of the outer peripheral steel pipe 3 protrudes from the position of the end plate 4. Thus, the protruding portion 3b is formed.

このように、外周鋼管3の端部を所定長突出させて突出部3bを形成しておくことで、鋼管杭2との接合に関しては、従来の鋼管杭と同じ方法で現場周継ぎ溶接を行うことができる。   As described above, by projecting the end portion of the outer peripheral steel pipe 3 by a predetermined length to form the protruding portion 3b, on-site circumferential welding is performed in the same manner as the conventional steel pipe pile with respect to the connection with the steel pipe pile 2. be able to.

図2の実施形態にも共通するが、軸力伝達は図4に示すように、外周鋼管3の内周面の突起3aと外周鋼管3で行うため、端板4には構造部材としての機能を期待しなくてよい。従って、端板4は遠心成型による製造上、あるいはPC鋼棒5などを固定するために必要な最小限の板厚のものでよい。   Although common to the embodiment of FIG. 2, since the axial force transmission is performed by the protrusion 3 a on the inner peripheral surface of the outer peripheral steel pipe 3 and the outer peripheral steel pipe 3 as shown in FIG. 4, the end plate 4 functions as a structural member. You don't have to expect Therefore, the end plate 4 may have a minimum plate thickness necessary for manufacturing by centrifugal molding or for fixing the PC steel bar 5 or the like.

円滑な軸力伝達のための剛性・耐力確保、突起3a付近の局所応力に対する耐力確保、鋼管杭2との現場周継溶接という観点からは、外周鋼管3の板厚は、鋼管杭2と同板厚(通常、9mm以上)、あるいはそれ以上とする。   From the standpoints of ensuring rigidity and proof strength for smooth axial force transmission, ensuring proof strength against local stress in the vicinity of the protrusion 3a, and in-situ weld welding with the steel pipe pile 2, the thickness of the outer peripheral steel pipe 3 is the same as that of the steel pipe pile 2. The plate thickness (usually 9 mm or more) or more.

また、応力状態の急変を避け、ある程度の長さで徐々に軸力伝達すという観点から、外周鋼管3の長さは0.5〜1.5Dとする。 Further, from the viewpoint of avoiding sudden changes in the stress state and transmitting the axial force gradually over a certain length, the length of the outer peripheral steel pipe 3 is 0 . 5 to 1.5 D.

突起3aに関しては、既製コンクリート杭1のコンクリートの厚さ、確実な軸力伝達機能の確保を考慮すると、8〜15mm程度の突起3aを100〜200mm程度のピッチで設置するのがよく、その場合、溶接ビードで突起3aを形成するのが経済的である。   As for the protrusions 3a, considering the concrete thickness of the ready-made concrete pile 1 and ensuring the reliable axial force transmission function, it is preferable to install the protrusions 3a of about 8 to 15 mm at a pitch of about 100 to 200 mm. It is economical to form the protrusion 3a with a weld bead.

必要以上に突起3aが高いとコンクリートの割れなどを誘発する恐れがある。突起3a間のピッチが短いと突起3aによる軸力伝達が非効率的(一つの突起の支圧耐力が低下する)であり、長過ぎると外周鋼管3が長くなって不経済である。   If the protrusion 3a is higher than necessary, there is a risk of inducing cracks in the concrete. If the pitch between the protrusions 3a is short, the axial force transmission by the protrusions 3a is inefficient (the bearing load resistance of one protrusion decreases), and if it is too long, the outer peripheral steel pipe 3 becomes long and uneconomical.

突起3aは、支圧力によって接合部位置での軸力を伝達するのに必要な段数を配置する。   The protrusion 3a arranges the number of steps necessary for transmitting the axial force at the joint position by the support pressure.

本発明の基礎杭構造の全体形状を示す断面図である。It is sectional drawing which shows the whole shape of the foundation pile structure of this invention. 基礎杭構造の一形態を示す要部の断面図である。It is sectional drawing of the principal part which shows one form of a foundation pile structure. 本発明の基礎杭構造の一実施形態を示す要部の断面図である。It is sectional drawing of the principal part which shows one Embodiment of the foundation pile structure of this invention. 本発明における異種杭接合部の応力伝達を示す説明図である。It is explanatory drawing which shows the stress transmission of the dissimilar pile joint part in this invention. 従来のPHC杭の接合部を示す立面図(左半分は断面図)である。It is an elevation view (left half is sectional drawing) which shows the junction part of the conventional PHC pile. 従来のPHC杭の接合部の詳細断面図である。It is detail sectional drawing of the junction part of the conventional PHC pile. 従来の異種杭接合部の応力伝達を示す説明図である。It is explanatory drawing which shows the stress transmission of the conventional dissimilar pile joint part.

1…既製コンクリート杭、2…鋼管杭、3…外周鋼管、3a…突起、3b…突出部、4…端板、5…PC鋼材、6…溶接部、
11…従来の既製コンクリート杭、13…補強バンド、14…端板、15…PC鋼材
DESCRIPTION OF SYMBOLS 1 ... Ready-made concrete pile, 2 ... Steel pipe pile, 3 ... Outer peripheral steel pipe, 3a ... Protrusion, 3b ... Projection part, 4 ... End plate, 5 ... PC steel material, 6 ... Welding part,
DESCRIPTION OF SYMBOLS 11 ... Conventional ready-made concrete pile, 13 ... Reinforcement band, 14 ... End plate, 15 ... PC steel

Claims (3)

既製コンクリート杭と、該既製コンクリート杭よりも曲げ耐力が大きい鋼管杭を接合してなり、前記既製コンクリート杭の鋼管杭と接合する側の端部には、内周面に複数段の突起が設けられた軸力伝達用の外周鋼管が設けられ、前記既製コンクリート杭の端板を前記外周鋼管の内周面に設け、前記外周鋼管の端部を前記端板位置より突出させてあり、前記外周鋼管の板厚が前記鋼管杭の板厚以上であり、かつ前記外周鋼管の長さが前記既製コンクリート杭の外径の0.5〜1.5倍であり、接続される前記既製コンクリート杭と前記鋼管杭との間の断面急変に対し、前記既製コンクリート杭のコンクリート部分で分担されて伝達される荷重が、前記外周鋼管の内周面に設けられた複数段の突起を介して、次第に外周鋼管側へ移行し、鉛直荷重を鋼管杭へ安定的に伝達するようにしたことを特徴とする基礎杭構造。 A pre-cast concrete pile, made by joining a large steel pipe pile bending strength than該既a concrete pile, wherein the end on the side to be bonded to the steel pipe pile of pre-cast concrete pile, the projections of several stages double on the inner peripheral surface axial force periphery steel pipe for transfer provided is provided, wherein the end plate of the pre-cast concrete piles provided on the inner peripheral surface of the outer peripheral steel pipe, some unusual information which must be specially ends of the outer peripheral steel pipe is projected from the end plate position, The thickness of the outer peripheral steel pipe is equal to or greater than the thickness of the steel pipe pile, and the length of the outer peripheral steel pipe is 0.5 to 1.5 times the outer diameter of the ready-made concrete pile, and the ready-made concrete to be connected For the sudden change in cross section between the pile and the steel pipe pile, the load that is shared and transmitted by the concrete portion of the ready-made concrete pile is transmitted through a plurality of protrusions provided on the inner peripheral surface of the outer peripheral steel pipe. Gradually moved to the outer steel pipe side, vertical load Foundation pile structure characterized in that so as to stably transfer the steel pipe pile. 前記外周鋼管内周面の突起は、支圧力によって接合部位置での軸力を伝達するのに必要な段数を配置してあることを特徴とする請求項1記載の基礎杭構造。The foundation pile structure according to claim 1, wherein the protrusions on the inner peripheral surface of the outer peripheral steel pipe are arranged with a number of steps necessary to transmit the axial force at the joint position by the support pressure. 前記突起が溶接ビードにより形成されている請求項1または2記載の基礎杭構造。The foundation pile structure according to claim 1 or 2, wherein the projection is formed by a weld bead.
JP2012102162A 2012-04-27 2012-04-27 Foundation pile structure Active JP5432320B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012102162A JP5432320B2 (en) 2012-04-27 2012-04-27 Foundation pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012102162A JP5432320B2 (en) 2012-04-27 2012-04-27 Foundation pile structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2007270842A Division JP4989409B2 (en) 2007-10-18 2007-10-18 Foundation pile structure, ready-made concrete pile, and joint hardware of ready-made concrete pile and steel pipe pile

Publications (2)

Publication Number Publication Date
JP2012162983A JP2012162983A (en) 2012-08-30
JP5432320B2 true JP5432320B2 (en) 2014-03-05

Family

ID=46842615

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012102162A Active JP5432320B2 (en) 2012-04-27 2012-04-27 Foundation pile structure

Country Status (1)

Country Link
JP (1) JP5432320B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6430271B2 (en) * 2015-01-27 2018-11-28 三谷セキサン株式会社 Footing-integrated foundation pile structure and construction method of footing-integrated foundation pile
JP2017197984A (en) * 2016-04-28 2017-11-02 清水建設株式会社 Joining structure of phc pile and steel column

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5478810A (en) * 1977-12-06 1979-06-23 Ujigawa Shiyouten Kk Pc pile* to which head portion steel pipe is connected* and its preparation
JPS60162132U (en) * 1984-04-03 1985-10-28 近畿コンクリ−ト工業株式会社 composite pile
JPS62197516A (en) * 1986-02-24 1987-09-01 Nippon Kokan Kk <Nkk> Soil cement composite pile
JPH05230841A (en) * 1992-02-25 1993-09-07 Nkk Corp Pile head connecting method using cage reinforcement

Also Published As

Publication number Publication date
JP2012162983A (en) 2012-08-30

Similar Documents

Publication Publication Date Title
JP5056911B2 (en) Foundation pile structure and SC pile
JP4230533B1 (en) Bonding structure of structure and fixing member for shear force transmission used therefor
JP4989409B2 (en) Foundation pile structure, ready-made concrete pile, and joint hardware of ready-made concrete pile and steel pipe pile
JP2009293349A (en) Joint structure between pile and foundation, construction method thereof, and joint method of pile to foundation
JP5432320B2 (en) Foundation pile structure
KR102276624B1 (en) the CFT column structure with diagonal line type internal diaphragm
JP5150474B2 (en) Connection structure between pile head of precast pile and footing binder and its connection method
JP3759665B2 (en) Corner joints between reinforcing bars or steel reinforced concrete structures and various columnar structures and joining methods thereof
JP6541255B2 (en) Pile design method and structure support structure
JP4432597B2 (en) Joint structure of foundation pile head and upper foundation
JP5391941B2 (en) Steel pipe concrete composite pile and joint structure of the steel pipe concrete composite pile
JP6274552B2 (en) Foundation pile structure
KR20110026206A (en) Joint for concrete pile
JP4351323B2 (en) Pile head steel pipe concrete pile and its pile head structure
JP4716121B2 (en) Steel column connection structure and steel column connection method
JP6590571B2 (en) Precast concrete beam end joint structure and precast concrete beam column frame
JP2005139731A (en) Connection structure of pipe pile head, and method of constructing pipe pile head
KR102017822B1 (en) Earthquake-registant column and beam constructing method using concrete filled tube and pre-assembled rebar cage
JP2010242325A (en) Column structure and method for constructing the same
JP4626562B2 (en) Foundation pile structure and SC pile
JP4751207B2 (en) Connection structure of circular steel pipe column and H-section steel beam and pier using the connection structure
JP4674721B2 (en) Method for joining concrete members
JP5327615B2 (en) Joint structure of column and flat slab
KR20140143013A (en) Complex pile with PHC pile and steel pipe pile
JP4803438B2 (en) Existing foundation renovation structure and method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121011

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20121011

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130806

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131002

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131205

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5432320

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250