JP2006348592A - Pile core control tool, and pile core control method using pile core control tool - Google Patents

Pile core control tool, and pile core control method using pile core control tool Download PDF

Info

Publication number
JP2006348592A
JP2006348592A JP2005176298A JP2005176298A JP2006348592A JP 2006348592 A JP2006348592 A JP 2006348592A JP 2005176298 A JP2005176298 A JP 2005176298A JP 2005176298 A JP2005176298 A JP 2005176298A JP 2006348592 A JP2006348592 A JP 2006348592A
Authority
JP
Japan
Prior art keywords
pile core
pile
core
hole
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2005176298A
Other languages
Japanese (ja)
Inventor
Koji Sumi
光二 須見
Masao Hanaoka
正雄 花岡
Kouji Kawahara
広時 川原
Hiroto Kon
広人 今
Yoshiharu Hayashi
義治 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotop Corp
Original Assignee
Geotop Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geotop Corp filed Critical Geotop Corp
Priority to JP2005176298A priority Critical patent/JP2006348592A/en
Publication of JP2006348592A publication Critical patent/JP2006348592A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a pile core control tool which allows easy alignment of pile cores. <P>SOLUTION: A pair of bars 1a, 1b, which are pivoted to open/close freely, are arranged to be fixed together at almost right angles to each other. A pile core bar hole 11, into which a pile core bar 2 is inserted, is formed on the corner of the bars 1a, 1b fixed at almost right angles. A clearance core bar hole 12, into which a clearance core bar 3 is inserted, is formed on the bar 1a and on the bar 1b, where each clearance core bar hole 12 is located at the same distance from the pile core bar hole 11. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、杭芯管理治具及び杭芯管理治具を用いた杭芯管理方法に関し、特に、杭芯の位置合わせを容易に行うことができる杭芯管理治具及び杭芯管理治具を用いた杭芯管理方法に関するものである。   The present invention relates to a pile core management jig and a pile core management method using the pile core management jig, and in particular, a pile core management jig and a pile core management jig that can easily align the pile core. It relates to the used pile core management method.

従来、既製杭の建て込みに際しては、地盤の杭芯位置にオーガースクリューの掘削ヘッドをセットし、鉛直性を確認しつつ掘削を行い、オーガースクリューを引き抜いた後、既製杭を建て込むようにしている。   Conventionally, when building ready-made piles, an auger screw excavation head is set at the pile core position of the ground, excavation is performed while checking the verticality, and after pulling out the auger screw, the ready-made piles are built.

ところで、上記従来の方法では、オーガースクリューの掘削ヘッドのセット時に、すでに杭芯ずれを発生している場合が少なくなく、また、掘削を始めて最初の2〜3mは障害物等の影響を受けて掘削芯がずれるおそれがある。   By the way, in the above-mentioned conventional method, there are many cases where pile core misalignment has already occurred at the time of setting the auger screw excavation head, and the first 2 to 3 m from the beginning of excavation are affected by obstacles etc. There is a risk of misalignment of the drill core.

本発明は、上記従来の杭芯管理治具が有する問題点に鑑み、杭芯の位置合わせを容易に行うことができる杭芯管理治具及び杭芯管理治具を用いた杭芯管理方法を提供することを目的とする。   In view of the problems of the conventional pile core management jig, the present invention provides a pile core management jig capable of easily aligning the pile core and a pile core management method using the pile core management jig. The purpose is to provide.

上記目的を達成するため、本第1発明の杭芯管理治具は、開閉可能に枢着した1対の棒状体を略直角位置で固定可能に設け、略直角にした棒状体の角部に杭芯棒を挿入する杭芯棒穴を形成するとともに、前記1対の棒状体に、該杭芯棒穴から同じ距離をおいた位置に逃げ芯棒を挿入する逃げ芯棒穴をそれぞれ形成したことを特徴とする。   In order to achieve the above object, the pile core management jig according to the first aspect of the present invention is provided with a pair of rod-like bodies pivotably attached so as to be openable and closable so as to be fixed at substantially right-angle positions. A pile core rod hole for inserting the pile core rod was formed, and an escape core rod hole for inserting the escape core rod was formed in the pair of rod-like bodies at the same distance from the pile core rod hole. It is characterized by that.

また、本第2発明の杭芯管理治具は、掘削径に合わせた径を有し、中心に杭芯棒を挿入する杭芯棒穴を形成した円形の杭芯位置確認板と、該杭芯位置確認板が嵌合する掘削用穴部を形成した敷き板とを備えたことを特徴とする。   Moreover, the pile core management jig of this 2nd invention has the diameter match | combined with the excavation diameter, the circular pile core position confirmation board which formed the pile core rod hole which inserts a pile core rod in the center, and this pile And a laying board having a hole for excavation into which the core position confirmation board is fitted.

また、本発明の杭芯管理治具を用いた杭芯管理方法は、地面の杭芯位置に杭芯棒を打ち込み、該杭芯棒が杭芯棒穴に挿入されるように、本第1発明の杭芯管理治具を設置し、杭芯管理治具の逃げ芯棒穴を介して、逃げ芯棒を地面に打ち込み、その後、本第1発明の杭芯管理治具を取り除く工程と、
本第2発明の杭芯管理治具の杭芯位置確認板を杭芯棒穴に杭芯棒を挿入するように地面に設置し、この杭芯位置確認板が掘削用穴部に嵌合するように敷き板を地面に設置し、その後、杭芯位置確認板を取り除くことにより掘削芯を確保する工程と、
敷き板の掘削用穴部の穴芯に掘削ヘッド芯を合わせて掘削を開始する工程と、
からなることを特徴とする。
Moreover, the pile core management method using the pile core management jig of the present invention is driven by a pile core rod at the pile core position on the ground, and the first pile core rod is inserted into the pile core rod hole. Installing the pile core management jig of the invention, driving the relief core rod into the ground via the relief core hole of the pile core management jig, and then removing the pile core management jig of the first invention;
The pile core position confirmation plate of the pile core management jig of the second invention is installed on the ground so that the pile core rod is inserted into the pile core rod hole, and this pile core position confirmation plate is fitted into the excavation hole. To secure the excavation core by removing the pile core position confirmation plate,
A step of starting excavation by aligning the excavation head core with the hole core of the excavation hole of the floor plate,
It is characterized by comprising.

本第1発明の杭芯管理治具によれば、開閉可能に枢着した1対の棒状体を略直角位置で固定可能に設け、略直角にした棒状体の角部に杭芯棒を挿入する杭芯棒穴を形成するとともに、前記1対の棒状体に、該杭芯棒穴から同じ距離をおいた位置に逃げ芯棒を挿入する逃げ芯棒穴をそれぞれ形成することから、逃げ芯棒を容易かつ精度良く打ち込むことができ、この逃げ芯棒を棒状体の逃げ芯棒穴に挿入することにより、あとから杭芯を容易に確認することができる。
また、使用しないときは棒状体を折り畳み、コンパクトにした状態で持ち運んだり収納したりすることができる。
According to the pile core management jig of the first aspect of the invention, a pair of rod-like bodies pivotably attached so as to be openable and closable are provided so as to be fixed at a substantially right angle position, and the pile core rods are inserted into the corners of the rod-like bodies that are substantially perpendicular. And a relief core rod hole for inserting the relief core rod into the pair of rod-like bodies at the same distance from the pile core rod hole. The rod can be driven easily and accurately, and the pile core can be easily confirmed later by inserting the relief core rod into the relief core hole of the rod-shaped body.
When not in use, the rod-like body can be folded and carried in a compact state or stored.

また、本第2発明の杭芯管理治具によれば、掘削径に合わせた径を有し、中心に杭芯棒を挿入する杭芯棒穴を形成した円形の杭芯位置確認板と、該杭芯位置確認板が嵌合する掘削用穴部を形成した敷き板とを備えることから、杭芯位置確認板をその杭芯棒穴に杭芯棒を挿入するように設置するとともに、該杭芯位置確認板が掘削用穴部に嵌合するように敷き板を設置し、その後、杭芯位置確認板を取り除くことにより掘削芯を確保することができ、この敷き板の掘削用穴部の穴芯に掘削ヘッド芯を合わせて削孔することにより、正確な杭芯の杭孔を掘削することができる。   Moreover, according to the pile core management jig of the second invention, a circular pile core position confirmation plate having a diameter matched to the excavation diameter and formed with a pile core rod hole into which the pile core rod is inserted at the center, Since the pile core position confirmation plate is provided with a laying plate formed with a hole for excavation into which the pile core position confirmation plate is fitted, the pile core position confirmation plate is installed so as to insert the pile core rod into the pile core rod hole, The laying plate is installed so that the pile core position confirmation plate fits into the excavation hole, and then the excavation core can be secured by removing the pile core position confirmation plate. By drilling with the drill head aligned with the hole core, an accurate pile core hole can be excavated.

また、本発明の杭芯管理治具を用いた杭芯管理方法によれば、施工中の杭芯の位置合わせを容易に行うことができる。   Moreover, according to the pile core management method using the pile core management jig of the present invention, it is possible to easily align the pile core during construction.

以下、本発明の杭芯管理治具及び杭芯管理治具を用いた杭芯管理方法の実施の形態を、図面に基づいて説明する。   Hereinafter, an embodiment of a pile core management jig and a pile core management method using the pile core management jig of the present invention will be described based on the drawings.

図1に、本発明の杭芯管理治具の第1実施例を示す。
この杭芯管理治具Aは、開閉可能に枢着した1対の棒状体1a、1bを略直角位置で固定可能に設け、略直角にした棒状体1a、1bの角部に杭芯棒2を挿入する杭芯棒穴11を形成するとともに、前記1対の棒状体1a、1bに、該杭芯棒穴11から同じ距離をおいた位置に逃げ芯棒3を挿入する逃げ芯棒穴12をそれぞれ形成している。
In FIG. 1, the 1st Example of the pile core management jig | tool of this invention is shown.
This pile core management jig A is provided with a pair of rod-like bodies 1a, 1b pivotably attached so as to be openable and closable so that they can be fixed at substantially right-angle positions. And the escape core rod hole 12 into which the escape core rod 3 is inserted into the pair of rod-like bodies 1a and 1b at the same distance from the pile core hole 11. Respectively.

棒状体1a、1bは3m程度の長尺のアルミニウム製の中空角材からなり、先端部にL字状に突片13が形成された棒状体1aと、該棒状体1aの突片13に枢着された直線状の棒状体1bとで構成されている。
杭芯棒穴11は、この突片13の枢着軸13aに隣接するように、略直角にした棒状体1a、1bの角部に形成されており、また、逃げ芯棒穴12は、各棒状体1a、1bにこの杭芯棒穴11から2m離れた位置でそれぞれ形成されている。
The rod-shaped bodies 1a and 1b are made of a long aluminum hollow square member having a length of about 3 m, and are pivotally attached to the rod-shaped body 1a having a L-shaped protruding piece 13 formed at the tip and a protruding piece 13 of the rod-shaped body 1a. It is comprised with the linear rod-shaped body 1b made.
The pile core rod hole 11 is formed at the corners of the rod-shaped bodies 1a and 1b that are substantially perpendicular so as to be adjacent to the pivot shaft 13a of the projecting piece 13. The rod-shaped bodies 1a and 1b are formed at positions 2 m away from the pile core hole 11 respectively.

また、各棒状体1a、1bの中間部には、リンクアーム14の両端部が枢着されている。
このリンクアーム14は、中間部が蝶番15aを介して折曲可能に枢着されており、真っ直ぐ伸ばした状態でストッパ15bによって固定することにより、棒状体1a、1bを直角の位置で固定することができ、また、ストッパ15bを解除して折り曲げることにより、棒状体1a、1bを折り畳むことができるようにされている。
なお、各棒状体1a、1bの適宜位置には、杭芯管理治具Aを折り畳んだ状態で保持するための止め穴16を形成するようにする。
Moreover, the both ends of the link arm 14 are pivotally attached to the intermediate part of each rod-shaped body 1a, 1b.
The link arm 14 is pivotally attached to the middle portion via a hinge 15a so that the link arm 14 can be bent, and is fixed by a stopper 15b in a straightened state, thereby fixing the rod-like bodies 1a and 1b at right angles. In addition, the rod-like bodies 1a and 1b can be folded by releasing the stopper 15b and bending it.
In addition, the stop hole 16 for hold | maintaining the pile core management jig | tool A in the folded state is formed in the appropriate position of each rod-shaped body 1a, 1b.

図2〜図3に、本発明の杭芯管理治具の第2実施例を示す。
この杭芯管理治具Bは、掘削径に合わせた径を有し、中心に杭芯棒2を挿入する杭芯棒穴41を形成した円形の杭芯位置確認板4と、該杭芯位置確認板4が嵌合する掘削用穴部51を形成した敷き板5とを備えている。
2 to 3 show a second embodiment of the pile core management jig of the present invention.
This pile core management jig B has a diameter matching the excavation diameter, and has a circular pile core position confirmation plate 4 in which a pile core bar hole 41 for inserting the pile core bar 2 is formed at the center, and the pile core position. And a laying plate 5 having an excavation hole 51 into which the confirmation plate 4 is fitted.

杭芯位置確認板4は、本実施例では、円形の鉄筋の内側に十文字状の鉄筋を配設するとともに、この十文字状の鉄筋をプレートにより固定して、円の中心に杭芯棒穴41を形成している。
なお、この杭芯位置確認板4の外径は、掘削径とほぼ同じにすることが好ましい。
In this embodiment, the pile core position confirmation plate 4 is arranged with a cross-shaped rebar inside a circular rebar, and the cross-shaped rebar is fixed by a plate, and a pile core hole 41 is formed at the center of the circle. Is forming.
The outer diameter of the pile core position confirmation plate 4 is preferably substantially the same as the excavation diameter.

また、敷き板5は、本実施例では、長方形の鉄板に幅方向に偏心して掘削用穴部51を形成しており、該鉄板には、ワイヤを掛けて吊り上げる吊りワイヤ孔52や、玉掛ワイヤを掛止する引掛け金具53が形成されている。
掘削用穴部51は、穴の縁部にリング状の角材54を溶接することにより補強されるとともに、口元管6を止める役割をし、杭芯位置確認板4がほぼ隙間なく嵌合するように形成されている。
Further, in the present embodiment, the laying plate 5 is formed in a rectangular iron plate in the width direction so as to be excavated hole 51, and the iron plate is hung by a suspension wire hole 52 that is hung by a wire, or a slinging wire. A hook fitting 53 for hooking is formed.
The excavation hole 51 is reinforced by welding a ring-shaped square member 54 to the edge of the hole, and serves to stop the lip 6 so that the pile core position confirmation plate 4 can be fitted with almost no gap. Is formed.

次に、第1実施例の杭芯管理治具Aと第2実施例の杭芯管理治具Bを用いた杭芯管理方法(杭の施工例)を説明する。
まず、地面の杭芯位置に杭芯棒2を打ち込み、該杭芯棒2が杭芯棒穴11に挿入されるように、第1実施例の杭芯管理治具Aを設置する。
そして、杭芯管理治具Aの逃げ芯棒穴12を介して、逃げ芯棒3を地面に打ち込み、その後、杭芯管理治具Aを取り除く。
これにより、逃げ芯棒3を容易かつ精度良く打ち込むことができ、この逃げ芯棒3を杭芯管理治具Aの逃げ芯棒穴12に挿入することにより、杭芯棒穴11を介して、あとから杭芯を容易に確認することができる。
Next, a pile core management method (pile construction example) using the pile core management jig A of the first embodiment and the pile core management jig B of the second embodiment will be described.
First, the pile core rod 2 is driven into the pile core position on the ground, and the pile core management jig A of the first embodiment is installed so that the pile core rod 2 is inserted into the pile core rod hole 11.
Then, the escape core rod 3 is driven into the ground via the relief core hole 12 of the pile core management jig A, and then the pile core management jig A is removed.
Thereby, the escape core 3 can be driven easily and accurately. By inserting the escape core 3 into the escape core hole 12 of the pile core management jig A, the pile core hole 11 is inserted. You can easily check the pile core later.

次に、杭芯管理治具Bの杭芯位置確認板4をその杭芯棒穴41に杭芯棒2を挿入するように地面に設置し、この杭芯位置確認板4が掘削用穴部51に嵌合するように敷き板5を地面に設置する。
この場合、敷き板5が設置される地面は、予め水平に均しておく。
そして、図4に示すように、杭芯位置確認板4を取り除くことにより掘削芯を確保し、この敷き板5の掘削用穴部51の穴芯に杭打ち重機の掘削ヘッド芯を合わせて掘削を開始する。
この場合、敷き板5が横にずれないように、杭打ち重機本体のキャタピラで踏むなどして敷き板5を固定することができる。
Next, the pile core position confirmation plate 4 of the pile core management jig B is installed on the ground so that the pile core rod 2 is inserted into the pile core rod hole 41, and this pile core position confirmation plate 4 is a hole for excavation. The laying plate 5 is installed on the ground so as to be fitted to 51.
In this case, the ground on which the floor plate 5 is installed is leveled in advance.
Then, as shown in FIG. 4, the excavation core is secured by removing the pile core position confirmation plate 4, and the excavation head core of the pile driving heavy machine is aligned with the hole core of the excavation hole 51 of the laying plate 5. To start.
In this case, the laying plate 5 can be fixed by stepping on the caterpillar of the pile driving heavy machine main body so that the laying plate 5 does not shift laterally.

次に、図5に示すように、削孔を開始する。
この場合、図5(a)に示すように、最初の2〜3mは障害物等の影響を受けて掘削芯がずれやすいため、必要に応じて、逃げ芯棒3から検尺棒で杭芯位置を確認しながら、正回転掘削にて所定の位置まで掘削した後、図5(b)に示すように、逆回転で拡大掘削する。
また、正回転と逆回転を2〜3回繰り返し、削孔内の地盤を攪拌する。
このとき、スクリューSの鉛直精度を常に計測すること、削孔時に敷き板5を移動させないこと、ユンボ等にて排土するときに敷き板5を移動させないことなどに注意する。
そして、削孔完了後に、前記した要領で逃げ芯棒3から削孔芯を確認する。
Next, as shown in FIG. 5, drilling is started.
In this case, as shown in FIG. 5 (a), since the excavation core is easily displaced due to the influence of obstacles and the like in the first 2 to 3m, if necessary, the pile core can be removed from the escape core 3 with a measuring rod. While confirming the position, after excavating to a predetermined position by forward rotation excavation, as shown in FIG.
Moreover, normal rotation and reverse rotation are repeated 2-3 times, and the ground in the drilling hole is agitated.
At this time, attention should be paid to the fact that the vertical accuracy of the screw S is always measured, the laying plate 5 is not moved at the time of drilling, and the laying plate 5 is not moved at the time of discharging with a jumbo or the like.
Then, after completion of the drilling, the drilling core is confirmed from the escape core 3 in the manner described above.

次に、図6に示すように、口元管6を挿入する。
口元管6は回転キャップ7にて圧入又は回転圧入し、圧入力は減速機の自重を基本とする。
回転圧入が力不足の場合、口元管6の下部にビットを取り付け、圧入力不足を助ける処置が必要となる。
口元管6は、例えば、直径が1219.2mm、厚みが12.7mm、長さが3000mmの一般構造用鋼管を使用することができる。
Next, as shown in FIG. 6, the mouth tube 6 is inserted.
The mouth tube 6 is press-fitted or rotationally press-fitted with a rotary cap 7, and the pressure input is based on the weight of the speed reducer.
If the rotational press-fit is insufficient, a bit is attached to the lower portion of the mouth tube 6 to treat the press input.
As the mouth tube 6, for example, a general structural steel pipe having a diameter of 1219.2 mm, a thickness of 12.7 mm, and a length of 3000 mm can be used.

次に、図7に示すように、口元管6をセットする。
口元管6の廻りに取り付けてある角材61と、最初にセットしている敷き板5にも取り付けてある角材54とを、合わせるようにセットする。
この場合、口元管6の挿入時には、鉛直精度を常に計測し挿入する。
また、口元管6の上部に排土口62を設けてあるので、セット時に方向を誤らないようにする。
Next, as shown in FIG. 7, the mouth tube 6 is set.
The square member 61 attached around the mouth tube 6 and the square member 54 attached also to the first laying plate 5 are set so as to match.
In this case, when the mouth tube 6 is inserted, the vertical accuracy is always measured and inserted.
Moreover, since the earth discharge port 62 is provided in the upper part of the mouth pipe | tube 6, it does not make a mistake in a direction at the time of setting.

次に、図8に示すように、本杭削孔を行う。
この場合、口元管位置を逃げ芯棒3からの寄りを確認し、スクリューSのヘッド芯を合わせて削孔を開始する。
また、口元管6からスクリューSのヘッドが下がったときに、再度ロッド芯が杭芯であることを口元管6を基準として確認し、削孔を継続する。この確認を必要に応じ繰り返す。
Next, as shown in FIG. 8, this pile drilling is performed.
In this case, the position of the mouth tube is confirmed from the escape core 3 and the head core of the screw S is aligned to start drilling.
Further, when the head of the screw S is lowered from the mouth tube 6, it is confirmed again that the rod core is a pile core with reference to the mouth tube 6, and the drilling is continued. This confirmation is repeated as necessary.

次に、図9に示すように、杭を挿入する。
図9(a)では下杭と中杭の継ぎを示しているが、下杭が節杭の場合は、口元管6の上に杭受台81を乗せて杭をセットし、下杭と中杭を無溶接継手82にて杭接合を実施する。
また、図9(b)では中杭と上杭の継ぎを示しているが、中杭が節拡頭又はPHC杭の場合は、敷き板5に取り付けてある引掛け金具53に玉掛けワイヤ83を引っ掛けてセットした後、上杭を無溶接継手82にて杭接合を実施する。
Next, as shown in FIG. 9, a pile is inserted.
FIG. 9 (a) shows a joint between the lower pile and the middle pile. When the lower pile is a joint pile, the pile is placed on the mouth pipe 6 and the pile is set. The pile is joined with a non-welded joint 82.
9B shows a joint between the middle pile and the upper pile. When the middle pile is a joint expansion head or a PHC pile, the sling wire 83 is hooked on the hanging metal fitting 53 attached to the laying plate 5. Then, the upper pile is joined to the upper pile by the non-welded joint 82.

その後、図10(a)に示すように、例えば、外径φ1000mm、長さ3500mmのヤットコ84と回転キャップ7を使用し、水平位置及び鉛直精度を確認しながら、所定杭頭レベルまで杭をセットする。
次に、図10(b)に示すように、口元管6の下端より杭頭が下方に位置する場合は、ヤットコ84を杭頭にセットしたまま、約1.5〜2時間静止させた後、ヤットコ84を引き抜く。
そして、図10(c)に示すように、口元管6を撤去し、図10(d)に示すように、敷き板5を撤去して作業が完了する。
Thereafter, as shown in FIG. 10 (a), for example, using a Yatsuko 84 and a rotating cap 7 having an outer diameter of 1000 mm and a length of 3500 mm, the pile is set to a predetermined pile head level while checking the horizontal position and vertical accuracy. To do.
Next, as shown in FIG. 10 (b), when the pile head is positioned below the lower end of the mouth tube 6, after the Yatco 84 is set on the pile head, it is allowed to stand for about 1.5 to 2 hours. Pull out the Yatco 84.
Then, as shown in FIG. 10 (c), the mouth tube 6 is removed, and as shown in FIG. 10 (d), the laying plate 5 is removed and the operation is completed.

かくして、本第1実施例の杭芯管理治具Aによれば、開閉可能に枢着した1対の棒状体1a、1bを略直角位置で固定可能に設け、略直角にした棒状体1a、1bの角部に杭芯棒2を挿入する杭芯棒穴11を形成するとともに、前記1対の棒状体1a、1bに、該杭芯棒穴11から同じ距離をおいた位置に逃げ芯棒3を挿入する逃げ芯棒穴12をそれぞれ形成することから、逃げ芯棒3を容易かつ精度良く打ち込むことができ、この逃げ芯棒3を棒状体1a、1bの逃げ芯棒穴12に挿入することにより、あとから杭芯を容易に確認することができる。
また、使用しないときは棒状体1a、1bを折り畳み、コンパクトにした状態で持ち運んだり収納したりすることができる。
Thus, according to the pile core management jig A of the first embodiment, a pair of rod-like bodies 1a and 1b pivotably attached so as to be openable and closable are provided so as to be fixed at substantially right-angle positions, and the rod-like bodies 1a having substantially right angles are provided. A pile core rod hole 11 into which the pile core rod 2 is inserted is formed at the corner of 1b, and a clearance core rod is formed in the pair of rod-like bodies 1a and 1b at the same distance from the pile core rod hole 11. Since the escape core rod holes 12 for inserting the cores 3 are respectively formed, the escape core rod 3 can be driven easily and accurately, and the escape core rod 3 is inserted into the escape core rod holes 12 of the rod-like bodies 1a and 1b. Thus, the pile core can be easily confirmed later.
Further, when not in use, the rod-like bodies 1a and 1b can be folded and carried and stored in a compact state.

また、本第2実施例の杭芯管理治具Bによれば、掘削径に合わせた径を有し、中心に杭芯棒2を挿入する杭芯棒穴41を形成した円形の杭芯位置確認板4と、該杭芯位置確認板4が嵌合する掘削用穴部51を形成した敷き板5とを備えることから、杭芯位置確認板4をその杭芯棒穴41に杭芯棒2を挿入するように設置するとともに、該杭芯位置確認板4が掘削用穴部51に嵌合するように敷き板5を設置し、その後、杭芯位置確認板4を取り除くことにより掘削芯を確保することができ、この敷き板5の掘削用穴部51の穴芯に掘削ヘッド芯を合わせて削孔することにより、正確な杭芯の杭孔を掘削することができる。   Moreover, according to the pile core management jig B of the second embodiment, a circular pile core position having a diameter matched to the excavation diameter and formed with a pile core rod hole 41 into which the pile core rod 2 is inserted at the center. Since the check plate 4 and the laying plate 5 in which the excavation hole 51 to which the pile core position check plate 4 is fitted are provided, the pile core position check plate 4 is put into the pile core hole 41 of the pile core bar. 2 is inserted, and the laying plate 5 is installed so that the pile core position confirmation plate 4 is fitted in the excavation hole 51, and then the pile core position confirmation plate 4 is removed to remove the pile core. By excavating the excavation head core with the excavation head core in the excavation hole 51 of the laying plate 5, an accurate pile core excavation can be excavated.

以上、本発明の杭芯管理治具及び杭芯管理治具を用いた杭芯管理方法について、その実施例に基づいて説明したが、本発明は上記実施例に記載した構成に限定されるものではなく、その趣旨を逸脱しない範囲において適宜その構成を変更することができる。   As mentioned above, although the pile core management method of the present invention and the pile core management method using the pile core management jig have been described based on the embodiments thereof, the present invention is limited to the configurations described in the above embodiments. Instead, the configuration can be changed as appropriate without departing from the spirit of the invention.

以上、本発明の杭芯管理治具及び杭芯管理治具を用いた杭芯管理方法は、杭芯の位置合わせを容易に行うことができることから、杭の施工の用途に好適に用いることができる。   As mentioned above, since the pile core management method of the present invention and the pile core management method using the pile core management jig can easily perform the alignment of the pile core, the pile core management method can be preferably used for the application of pile construction. it can.

本発明の杭芯管理治具の第1実施例を示し、(a)は平面図、(b)は杭芯棒穴付近の拡大斜視図、(c)はリンクアームとストッパを示す拡大図である。The 1st Example of the pile core management jig | tool of this invention is shown, (a) is a top view, (b) is an enlarged perspective view near a pile core rod hole, (c) is an enlarged view which shows a link arm and a stopper. is there. 本発明の杭芯管理治具の第2実施例を示し、(a)は芯位置確認板の平面図、(b)は同断面図である。The 2nd Example of the pile core management jig | tool of this invention is shown, (a) is a top view of a core position confirmation board, (b) is the same sectional drawing. 本発明の杭芯管理治具の第2実施例を示し、(a)は敷き板の平面図、(b)は同断面図である。The 2nd Example of the pile core management jig | tool of this invention is shown, (a) is a top view of a laying board, (b) is the same sectional drawing. 本発明の杭芯管理治具を用いた杭の施工例を示す第1工程図である。It is a 1st process drawing which shows the construction example of the pile using the pile core management jig | tool of this invention. 同第2工程図である。It is the 2nd process drawing. 同第3工程図である。It is the 3rd process drawing. 同第4工程図である。It is the 4th process drawing. 同第5工程図である。It is the same 5th process drawing. 同第6工程図である。It is the 6th process drawing. 同第7工程図である。It is the 7th process drawing.

符号の説明Explanation of symbols

A 杭芯管理治具
B 杭芯管理治具
S スクリュー
1 棒状体
11 杭芯棒穴
12 逃げ芯棒穴
13 突片
13a 枢着軸
14 リンクアーム
15a 蝶番
15b ストッパ
16 止め穴
2 杭芯棒
3 逃げ芯棒
4 杭芯位置確認板
41 杭芯棒穴
5 敷き板
51 掘削用穴部
52 吊りワイヤ孔
53 引掛け金具
54 角材
6 口元管
61 角材
62 排土口
7 回転キャップ
81 杭受台
82 無溶接継手
83 玉掛けワイヤ
84 ヤットコ
A Pile core management jig B Pile core management jig S Screw 1 Rod 11 Pile core hole 12 Escape core hole 13 Protruding piece 13a Pivoting shaft 14 Link arm 15a Hinge 15b Stopper 16 Stop hole 2 Pile core 3 Escape Core rod 4 Pile core position confirmation plate 41 Pile core rod hole 5 Laying plate 51 Excavation hole 52 Suspension wire hole 53 Hook metal fittings 54 Square material 6 Mouth pipe 61 Square material 62 Drainage port 7 Rotating cap 81 Pile rest 82 Unwelded Fitting 83 sling wire 84 Yatco

Claims (3)

開閉可能に枢着した1対の棒状体を略直角位置で固定可能に設け、略直角にした棒状体の角部に杭芯棒を挿入する杭芯棒穴を形成するとともに、前記1対の棒状体に、該杭芯棒穴から同じ距離をおいた位置に逃げ芯棒を挿入する逃げ芯棒穴をそれぞれ形成したことを特徴とする杭芯管理治具。   A pair of rods pivoted so as to be openable and closable are provided so as to be fixed at a substantially right angle position, and a pile core rod hole for inserting a pile core rod is formed at a corner of the substantially rectangular rod, and the pair of rods is formed. A pile core management jig, wherein a relief core hole for inserting the relief core rod is formed in the rod-like body at a position at the same distance from the pile core hole. 掘削径に合わせた径を有し、中心に杭芯棒を挿入する杭芯棒穴を形成した円形の杭芯位置確認板と、該杭芯位置確認板が嵌合する掘削用穴部を形成した敷き板とを備えたことを特徴とする杭芯管理治具。   A circular pile core position confirmation plate that has a diameter matched to the excavation diameter and has a pile core rod hole that inserts the pile core rod in the center, and a drilling hole that fits the pile core position confirmation plate is formed A pile core management jig characterized by comprising a laid board. 地面の杭芯位置に杭芯棒を打ち込み、該杭芯棒が杭芯棒穴に挿入されるように、請求項1記載の杭芯管理治具を設置し、杭芯管理治具の逃げ芯棒穴を介して、逃げ芯棒を地面に打ち込み、その後、請求項1記載の杭芯管理治具を取り除く工程と、
請求項2記載の杭芯管理治具の杭芯位置確認板を杭芯棒穴に杭芯棒を挿入するように地面に設置し、この杭芯位置確認板が掘削用穴部に嵌合するように敷き板を地面に設置し、その後、杭芯位置確認板を取り除くことにより掘削芯を確保する工程と、
敷き板の掘削用穴部の穴芯に掘削ヘッド芯を合わせて掘削を開始する工程と、
からなることを特徴とする杭芯管理治具を用いた杭芯管理方法。
The pile core management jig according to claim 1 is installed so that the pile core rod is driven into the pile core position on the ground, and the pile core rod is inserted into the pile core rod hole. A step of driving the escape core rod into the ground through the rod hole, and then removing the pile core management jig according to claim 1;
The pile core position confirmation plate of the pile core management jig according to claim 2 is installed on the ground so that the pile core rod is inserted into the pile core rod hole, and the pile core position confirmation plate is fitted into the excavation hole. To secure the excavation core by removing the pile core position confirmation plate,
A step of starting excavation by aligning the excavation head core with the hole core of the excavation hole of the floor plate,
A pile core management method using a pile core management jig characterized by comprising:
JP2005176298A 2005-06-16 2005-06-16 Pile core control tool, and pile core control method using pile core control tool Withdrawn JP2006348592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005176298A JP2006348592A (en) 2005-06-16 2005-06-16 Pile core control tool, and pile core control method using pile core control tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005176298A JP2006348592A (en) 2005-06-16 2005-06-16 Pile core control tool, and pile core control method using pile core control tool

Publications (1)

Publication Number Publication Date
JP2006348592A true JP2006348592A (en) 2006-12-28

Family

ID=37644719

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005176298A Withdrawn JP2006348592A (en) 2005-06-16 2005-06-16 Pile core control tool, and pile core control method using pile core control tool

Country Status (1)

Country Link
JP (1) JP2006348592A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174124A (en) * 2008-01-22 2009-08-06 Asahi Kasei Construction Materials Co Ltd Pile core position confirmation method
JP2009281010A (en) * 2008-05-20 2009-12-03 Yamazaki Hume Kan Kk Tool for measuring pile position
JP2012026124A (en) * 2010-07-21 2012-02-09 Mitani Sekisan Co Ltd Pile core position setting device
CN111254932A (en) * 2020-03-19 2020-06-09 华质建设集团有限公司 Tubular pile core cleaning tool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174124A (en) * 2008-01-22 2009-08-06 Asahi Kasei Construction Materials Co Ltd Pile core position confirmation method
JP2009281010A (en) * 2008-05-20 2009-12-03 Yamazaki Hume Kan Kk Tool for measuring pile position
JP2012026124A (en) * 2010-07-21 2012-02-09 Mitani Sekisan Co Ltd Pile core position setting device
CN111254932A (en) * 2020-03-19 2020-06-09 华质建设集团有限公司 Tubular pile core cleaning tool
CN111254932B (en) * 2020-03-19 2021-04-30 华质建设集团有限公司 Tubular pile core cleaning tool

Similar Documents

Publication Publication Date Title
JP2008069577A (en) Pile cage building method and pile cage building apparatus
JP6310198B2 (en) Pier construction method
JP2006348592A (en) Pile core control tool, and pile core control method using pile core control tool
CN109898669B (en) Construction method for underground first-layer beam column joint by reverse construction method
JP2009263966A (en) Removal method of existing pile
JP4536615B2 (en) Construction method of steel pillars to steel pipe piles, buried pipe body and pile construction method
JP2010150810A (en) Implement and method for measuring inclination
JP4373824B2 (en) Joining method of cast-in-place pile and steel pipe column
JP5426424B2 (en) Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor
KR20190027402A (en) Low part cast in place pile construction method
JP5016521B2 (en) Earth anchor and its removal method
JP2007107276A (en) Repair reinforcement method of existing quaywall and its repair reinforcement structure
JP2005220573A (en) Pile driving method
JP3827309B2 (en) Auxiliary pile method and embedded pile method
JP2001207452A (en) Method for burying pipe
JP2006336239A (en) Method for controlling degree of verticality of pc hollow pile
JP2004278250A (en) Method for positioning concrete pile
JP3403674B2 (en) Method of maintaining the suspension support posture of the tube
JP4137172B1 (en) Reinforcing bar construction in cast-in-place pile
JP2015183374A (en) Pile construction method
JP6208397B1 (en) Auxiliary tool for press-fitting parent pile and method for press-fitting parent pile using the same
JP2011220009A (en) Erection method of permanent sub-substructural column
JPH0224419A (en) Simultaneous backfilling with pile drawing, and pile drawer
JP3265491B2 (en) Positioning method of vertical columns
JP4478615B2 (en) Steel pipe sheet pile wall construction method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20070423

A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20080902