JP2009174124A JP2008011040A JP2008011040A JP2009174124A JP 2009174124 A JP2009174124 A JP 2009174124A JP 2008011040 A JP2008011040 A JP 2008011040A JP 2008011040 A JP2008011040 A JP 2008011040A JP 2009174124 A JP2009174124 A JP 2009174124A
Authority
JP
Japan
Prior art keywords
pile
core
measuring rod
relief
pile core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008011040A
Other languages
Japanese (ja)
Other versions
JP5114223B2 (en
Inventor
O Hasegawa
央 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Construction Materials Corp
Original Assignee
Asahi Kasei Construction Materials Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Construction Materials Corp filed Critical Asahi Kasei Construction Materials Corp
Priority to JP2008011040A priority Critical patent/JP5114223B2/en
Publication of JP2009174124A publication Critical patent/JP2009174124A/en
Application granted granted Critical
Publication of JP5114223B2 publication Critical patent/JP5114223B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a pile core position confirmation method capable of accurately and easily confirming the core position of a pile before and after installing the pile by using an existing tool. <P>SOLUTION: Length inspection bars 4 are attached to the pile core 1 at two positions in the directions at right angle to each other, respectively. A relief core 2 is formed at the end of each length inspection bar 4. To secure the direction of the length inspection bar 4, one or relief cores 3 are formed between the relief core 2 and the pile core 1 at positions where the relief core 3 is brought into contact with the length inspection bar 4. A pile 5 is set to the pile core 1, and the length inspection bars 4 are set horizontal and brought into contact with the pile core 5 while aligning with the relief core 2 for confirming a pile core first position. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、既存の冶具を用いた、建て込み前と建て込み中の杭の杭芯位置の確認を、正確且つ容易に行う杭芯位置の確認方法に関するものである。   The present invention relates to a method for confirming a pile core position that uses an existing jig to accurately and easily confirm a pile core position of a pile before and during the building.

従来から図5に示す様に杭5または掘削ロッド6やヤットコ8を埋設する際に杭芯1に対してそれらが正しく設置されているか、または、掘削終了後に杭5または掘削ロッド6やヤットコ8が正確に杭芯1位置にあるかどうかを確認するために、直角2方向に逃げ芯2を設置している方法が知られている。   Conventionally, as shown in FIG. 5, when the pile 5 or the excavation rod 6 or the yatco 8 is embedded, they are correctly installed on the pile core 1 or after the excavation is finished, the pile 5 or the excavation rod 6 or the yatco 8 In order to confirm whether or not is exactly at the position of the pile core 1, there is known a method in which the relief core 2 is installed in two perpendicular directions.

しかしながら、この様な管理方法では杭5の建て込み中、杭芯1位置の確認時に、以前と同位置に検尺棒4を当てるのが困難であり、且つ検尺棒4の水平方向の精度が悪いという問題があった。   However, in such a management method, it is difficult to apply the measuring rod 4 to the same position as before when the pile core 1 is confirmed during the installation of the pile 5, and the horizontal accuracy of the measuring rod 4 is difficult. There was a problem of being bad.

前述の図5に示す従来の問題を解決するために、最近になって例えば、特開2006−348592号公報(特許文献1)に示す如く、開閉可能に枢着した1対の棒状体を略直角位置で固定可能に設け、略直角にした棒状体の角部に杭芯棒を挿入する杭芯棒穴を形成するとともに、一対の棒状体に杭芯棒穴から同じ距離をおいた位置に逃げ芯棒を挿入する逃げ芯棒穴をそれぞれ形成する杭芯管理冶具が開発されている。   In order to solve the conventional problem shown in FIG. 5, recently, a pair of rod-like bodies pivotably attached to each other as shown in, for example, Japanese Patent Application Laid-Open No. 2006-348593 (Patent Document 1) are substantially omitted. A pile core rod hole is formed at the corner of the rod-shaped body that is fixed at a right-angled position and is inserted at a substantially right angle, and at the same distance from the pile core rod hole in a pair of rod-shaped bodies. Pile core management jigs have been developed that each form a clearance core hole for inserting the clearance core.

特開2006−348592号公報JP 2006-348592 A

しかしながら、前記特許文献1の発明に於いては、1対の棒状体を略直角位置で固定可能に設けている杭芯管理冶具を用いる事によって、建て込み前の杭芯位置の確認は容易に行うことはできるが、この杭芯管理冶具杭の建て込み中の杭あるいは掘削時のロッドの正確な杭芯位置が確認できず、また、掘削中のロッドは地中障害物によって正しい杭芯位置からずれる場合があり、芯ずれの発生原因になる。   However, in the invention of Patent Document 1, it is easy to confirm the pile core position before erection by using a pile core management jig that is provided so that a pair of rod-shaped bodies can be fixed at substantially right angle positions. Although it can be done, the exact pile core position of the pile during construction of this pile core management jig pile or the rod during excavation cannot be confirmed. This may cause misalignment and cause misalignment.

また、前記特許文献1の発明では杭芯管理を行うのに新たな冶具が必要となり、冶具の製作、管理に手間を要するという問題があった。   Further, the invention of Patent Document 1 requires a new jig to perform pile core management, and there is a problem that it takes time to manufacture and manage the jig.

本発明は前記課題を解決するものであり、その目的とするところは、既存の冶具を用いた、建て込み前と建て込み中の杭芯位置の確認を正確且つ容易に行う方法を提供することにある。   This invention solves the said subject, The place made into the objective provides the method of performing the confirmation of the pile core position before and during construction accurately and easily using the existing jig. It is in.

前記目的を達成するための本発明に係る杭芯位置の確認方法の第1の構成は、検尺棒を杭芯の所定の複数の角度方向で且つそれぞれの方向において少なくとも2箇所に設けた逃げ芯に合わせ、杭或いは掘削ロッドを前記杭芯にセットし、前記検尺棒を水平になるように前記各逃げ芯に合わせながら該検尺棒の端部を杭或いは掘削ロッドに当てて杭芯位置の確認を行うことを特徴とする。   The first configuration of the pile core position confirmation method according to the present invention for achieving the above object is that the measuring rods are provided at a predetermined plurality of angular directions of the pile core in at least two places in each direction. Set the pile or excavation rod to the pile core in alignment with the core, and put the end of the measuring rod against the pile or excavating rod while aligning the measuring rod with each relief core so that it is horizontal. The position is confirmed.

また、本発明に係る杭芯位置の確認方法の第2の構成は、前記第1の構成において、前記逃げ芯に前記検尺棒を遊動可能に支持する支持部材を設けたことを特徴とする。   Moreover, the 2nd structure of the confirmation method of the pile core position which concerns on this invention provided the supporting member which supports the said measuring rod in the said escape core so that free movement was possible in the said 1st structure. .

また、本発明に係る杭芯位置の確認方法の第3の構成は、前記第1、第2の構成において、前記検尺棒に水平器を設けたことを特徴とする。   Moreover, the 3rd structure of the confirmation method of the pile core position which concerns on this invention has provided the leveling device in the said measuring rod in the said 1st, 2nd structure, It is characterized by the above-mentioned.

また、本発明に係る杭芯位置の確認方法の第4の構成は、前記第1〜第3の構成において、前記検尺棒に前記逃げ芯位置に対応する指示手段を設けたことを特徴とする。   Moreover, the 4th structure of the confirmation method of the pile core position which concerns on this invention has provided the instruction | indication means corresponding to the said relief core position in the said measuring rod in the said 1st-3rd structure, It is characterized by the above-mentioned. To do.

また、本発明に係る杭芯位置の確認方法の第5の構成は、前記第1〜第4の構成において、杭の建て込み中に前記逃げ芯を用いて杭芯位置の確認を行うことを特徴とする。   Moreover, the 5th structure of the confirmation method of the pile core position which concerns on this invention performs confirmation of a pile core position using the said relief core in the said 1st-4th structure during the construction of a pile. Features.

本発明に係る杭芯位置の確認方法の第1の構成によれば、杭の埋設前、埋設中に関わらず、検尺棒がずれることなく同位置に当てることが出来、正確な杭芯位置とのずれを確認することが可能である。また、構成が簡単で安価に芯ずれの発生を防止できる。   According to the first configuration of the method for confirming the pile core position according to the present invention, the pile rod can be applied to the same position without being displaced, regardless of whether the pile is buried or not. It is possible to confirm the deviation. In addition, the configuration is simple and can prevent the misalignment from occurring at low cost.

また、本発明に係る杭芯位置の確認方法の第2の構成によれば、逃げ芯に設けた支持部材により検尺棒を遊動可能に支持することができ、人が検尺棒を持たなくとも該検尺棒の端部を杭に当てて杭芯位置の確認ができる。   Moreover, according to the 2nd structure of the confirmation method of the pile core position which concerns on this invention, a measuring rod can be supported so that it can move freely with the support member provided in the relief core, and a person does not have a measuring rod. In both cases, the end of the measuring rod can be applied to the pile to check the pile core position.

また、本発明に係る杭芯位置の確認方法の第3の構成によれば、検尺棒に設けた水平器を視認することにより該検尺棒の水平度を確認することが出来る。   Moreover, according to the 3rd structure of the confirmation method of the pile core position which concerns on this invention, the levelness of this measuring rod can be confirmed by visually recognizing the level provided in the measuring rod.

また、本発明に係る杭芯位置の確認方法の第4の構成によれば、検尺棒に設けた指示手段を逃げ芯位置に合わせることで、逃げ心から杭までの検尺棒の長さを確認することができ、芯ずれの距離を正確に把握することができる。   Moreover, according to the 4th structure of the confirmation method of the pile core position which concerns on this invention, the length of the measuring rod from a relief center to a pile is made by matching the instruction | indication means provided in the measuring rod to the relief core position. The distance of misalignment can be accurately grasped.

また、本発明に係る杭芯位置の確認方法の第5の構成によれば、前述の逃げ芯を用いて杭の建て込み中に杭芯位置の確認を行うことが出来る。   Moreover, according to the 5th structure of the confirmation method of the pile core position which concerns on this invention, a pile core position can be confirmed during construction of a pile using the above-mentioned relief core.

図により本発明に係る杭芯位置の確認方法の一実施形態を具体的に説明する。図1(a),(b)は本発明に係る杭芯位置の確認方法を説明する平面図及び側面図、図2及び図3は逃げ芯に設けられた検尺棒を遊動可能に支持する各種の支持部材の構成を示す図、図4(a)は既製杭を埋設するための掘削ロッドの杭芯位置の確認方法を説明する側面図、図4(b)は本杭の上部に接続されるヤットコ(雇杭)の杭芯位置の確認方法を説明する側面図である。   An embodiment of a method for confirming a pile core position according to the present invention will be specifically described with reference to the drawings. 1 (a) and 1 (b) are a plan view and a side view for explaining a method for confirming a pile core position according to the present invention, and FIGS. 2 and 3 support a measuring rod provided on the relief core in a freely movable manner. The figure which shows the structure of various support members, Fig.4 (a) is a side view explaining the confirmation method of the pile core position of the excavation rod for burying a ready-made pile, FIG.4 (b) is connected to the upper part of this pile It is a side view explaining the confirmation method of the pile core position of the Yatco (employment pile).

図1〜図5において、杭芯1位置を確認するに際して、一端部4aが杭5、ヤットコ(雇杭)8或いは掘削ロッド6の回転軸表面に当接する検尺棒4を杭芯1の所定の複数の角度方向で且つそれぞれの方向において少なくとも2箇所に設けた逃げ芯2,3に合わせ、杭5、ヤットコ8或いは掘削ロッド6を杭芯1にセットし、検尺棒4を水平になるように各逃げ芯2,3に合わせながら該検尺棒4の一端部4aを杭5、ヤットコ8或いは掘削ロッド6に当てて杭芯1位置の確認を行うことが出来る。   In FIG. 1 to FIG. 5, when checking the position of the pile core 1, the measuring rod 4 whose one end 4 a is in contact with the surface of the rotary shaft of the pile 5, the Yatco (employed pile) 8 or the excavating rod 6 is fixed to the pile core 1. The pile 5, Yatco 8 or excavation rod 6 is set on the pile core 1 in accordance with the relief cores 2 and 3 provided in at least two locations in each of the angular directions, and the measuring rod 4 is leveled. As described above, the position of the pile core 1 can be confirmed by applying the one end 4a of the measuring rod 4 to the pile 5, Yatco 8 or the excavating rod 6 while adjusting to the respective escape cores 2 and 3.

本実施形態では、検尺棒4を杭芯1の直角方向の2箇所に合わせた一例を示すが、他の種々の角度に設定された他の複数の数の検尺棒4を用いる構成とすることが出来、各方向において、2箇所以上の他の複数の逃げ芯を設けることでも良い。   In this embodiment, although the example which match | combined the measuring rod 4 with two places of the orthogonal | vertical direction of the pile core 1 is shown, the structure which uses the other several number measuring rod 4 set to other various angles, It is also possible to provide two or more other relief cores in each direction.

逃げ芯2,3は予め設定された杭芯1位置に対応して地盤Gに立設されており、該逃げ芯2,3には検尺棒4を遊動可能に支持する支持部材7a,7bが設けられている。なお、逃げ芯2,3には丸型水準器(図示せず)が取り付けられており、これにより逃げ芯2,3の鉛直度を確認することが出来る。   The escape cores 2 and 3 are erected on the ground G corresponding to the position of the pile core 1 set in advance, and the escape cores 2 and 3 support members 7a and 7b that support the measuring rod 4 so as to be freely movable. Is provided. A round level (not shown) is attached to the escape cores 2 and 3 so that the verticality of the escape cores 2 and 3 can be confirmed.

図2に示す支持部材7a,7bは、断面コ字形状の板材で構成され、逃げ芯2側に設けられる支持部材7aは、該逃げ芯2が挿通される貫通孔7a6が設けられた水平片7a3の一方の端部から垂直片7a2が垂下し、該垂直片7a2を貫通して設けられた雌ネジ部7a4に留めネジ7a5が螺合され、水平片7a3の貫通孔7a6に逃げ芯2を挿通して支持部材7aを所望の高さに設定すると共に、雌ネジ部7a4に留めネジ7a5を螺合締結することにより逃げ芯2の表面に該留めネジ7a5の先端が当接して逃げ芯2に支持部材7aが固定される。水平片7a3の他方の端部からガイド片7a1が垂下し、該ガイド片7a1と逃げ芯2との間に検尺棒4が遊動可能に拘束される。   The support members 7a and 7b shown in FIG. 2 are made of a plate material having a U-shaped cross section, and the support member 7a provided on the escape core 2 side is a horizontal piece provided with a through hole 7a6 through which the escape core 2 is inserted. A vertical piece 7a2 hangs down from one end of 7a3, a retaining screw 7a5 is screwed into a female screw 7a4 provided through the vertical piece 7a2, and the escape core 2 is inserted into the through hole 7a6 of the horizontal piece 7a3. The support member 7a is inserted and set to a desired height, and the retaining screw 7a5 is screwed and fastened to the female screw portion 7a4 so that the tip of the retaining screw 7a5 comes into contact with the surface of the escapement core 2 to escape. The support member 7a is fixed to the surface. The guide piece 7a1 hangs down from the other end of the horizontal piece 7a3, and the measuring rod 4 is freely restrained between the guide piece 7a1 and the escape core 2.

一方、逃げ芯3側に設けられる支持部材7bは、該逃げ芯3が挿通される貫通孔7b6が設けられた水平片7b3の一方の端部から垂直片7b2が起立し、該垂直片7b2を貫通して設けられた雌ネジ部7b4に留めネジ7b5が螺合され、水平片7b3の貫通孔7b6に逃げ芯3を挿通して支持部材7bを所望の高さに設定すると共に、雌ネジ部7b4に留めネジ7b5を螺合締結することにより逃げ芯3の表面に該留めネジ7b5の先端が当接して逃げ芯3に支持部材7bが固定される。水平片7b3の他方の端部からガイド片7b1が起立し、該ガイド片7b1と逃げ芯3との間に検尺棒4が遊動可能に拘束される。   On the other hand, the support member 7b provided on the escape core 3 side has a vertical piece 7b2 standing up from one end of a horizontal piece 7b3 provided with a through hole 7b6 through which the escape core 3 is inserted. The retaining screw 7b5 is screwed into the female screw portion 7b4 provided through, the escape core 3 is inserted into the through hole 7b6 of the horizontal piece 7b3, and the support member 7b is set to a desired height, and the female screw portion By screwing and fastening the retaining screw 7b5 to 7b4, the tip of the retaining screw 7b5 comes into contact with the surface of the escape core 3, and the support member 7b is fixed to the escape core 3. A guide piece 7b1 rises from the other end of the horizontal piece 7b3, and the measuring rod 4 is freely restrained between the guide piece 7b1 and the escape core 3.

そして、逃げ芯3の位置よりも重心が杭芯1側にある検尺棒4を支持部材7a,7bの各水平片7a3の下面及び水平片7b3の上面に当接させて該水平片7b3上に載置することで、支持部材7a,7bにより検尺棒4が安定して遊動可能に支持される。   Then, the measuring rod 4 whose center of gravity is on the pile core 1 side with respect to the position of the escape core 3 is brought into contact with the lower surface of each horizontal piece 7a3 and the upper surface of the horizontal piece 7b3 of the support members 7a and 7b. , The measuring rod 4 is stably and freely supported by the support members 7a and 7b.

図3では、図2の逃げ芯3側に設けられた支持部材7bを逃げ芯2側にも前述と同様に設けて構成したものであり、逃げ芯3の位置よりも重心が逃げ芯2側にある検尺棒4を一対の支持部材7bの各水平片7b3の上面に載置することで、該一対の支持部材7bにより検尺棒4が安定して遊動可能に支持される。尚、支持部材7a,7bは上下反転することにより図2及び図3に示すように、共通に使用することが出来る。   3, the support member 7b provided on the relief core 3 side in FIG. 2 is provided on the relief core 2 side in the same manner as described above, and the center of gravity is located closer to the relief core 2 side than the position of the relief core 3. The measuring rod 4 is placed on the upper surface of each horizontal piece 7b3 of the pair of supporting members 7b, so that the measuring rod 4 is stably and freely supported by the pair of supporting members 7b. The support members 7a and 7b can be used in common as shown in FIGS. 2 and 3 by turning upside down.

なお、図2及び図3に示される支持部材7a,7bは、開放された形状であるため、開放端から検尺棒4を容易に遊動可能に支持することが出来る。また、図2及び図3に示される支持部材7a,7bをより閉じた形状とすると、検尺棒4をより安定して遊動可能に支持することが出来る。   The support members 7a and 7b shown in FIGS. 2 and 3 have an open shape, so that the measuring rod 4 can be easily and freely supported from the open end. Further, when the supporting members 7a and 7b shown in FIGS. 2 and 3 are more closed, the measuring rod 4 can be supported more stably and freely movable.

検尺棒4には水平器9が設けられており、該水平器9を目視することにより検尺棒4の水平度を確認することが出来る。   The measuring bar 4 is provided with a leveling device 9, and the leveling of the measuring bar 4 can be confirmed by viewing the leveling device 9.

また、検尺棒4の逃げ芯2,3位置に対応する部位には、図1(a)に示すように、ライン、指標、マーク、テープ等の指示手段10a,10bが設けられている。   Further, as shown in FIG. 1 (a), indication means 10a, 10b such as lines, indicators, marks, tapes, etc. are provided at portions corresponding to the clearance cores 2, 3 position of the measuring rod 4.

また、杭5の立て込み前だけでなく、該杭5の建て込み中にも逃げ芯2,3を用いて杭芯1位置の確認を行うことが出来る。   Further, the position of the pile core 1 can be confirmed using the escape cores 2 and 3 not only before the pile 5 is set up but also during the construction of the pile 5.

図1に示す杭5は既製コンクリート杭または鋼管杭を示しており、杭5本体の先端部外周に少なくとも1周以上の螺旋状羽根5aを設けている。また、図1に示す杭5以外にも杭5本体の先端部外周に螺旋状羽根5aを設けないストレート杭や図4(a)に示す様に地盤Gの掘削時に用いる掘削ロッド6や図4(b)に示す様に杭を埋設するときに用いる本杭の上部に接続されるヤットコ8も含まれる。   The pile 5 shown in FIG. 1 has shown the ready-made concrete pile or the steel pipe pile, and the spiral blade | wing 5a of at least 1 round is provided in the front-end | tip part outer periphery of the pile 5 main body. In addition to the pile 5 shown in FIG. 1, a straight pile without a spiral blade 5a on the outer periphery of the tip of the pile 5 main body, a drill rod 6 used when excavating the ground G as shown in FIG. As shown in (b), Yatco 8 connected to the upper part of the main pile used when burying the pile is also included.

支持部材7a,7bを有さない構成においては、検尺棒4を水平に持ち、一端部4aを杭芯1に当て、図1に示す様にもう一つの検尺棒4を前述の検尺棒4と直角方向になるように一端部4aを杭芯1に当て、それぞれの他端部に逃げ芯2を取る。逃げ芯3は杭芯1と逃げ芯2との間に検尺棒4に接して1つ以上取る。   In the configuration without the supporting members 7a and 7b, the measuring rod 4 is held horizontally, the one end 4a is applied to the pile core 1, and the other measuring rod 4 is connected to the above-mentioned measuring rod as shown in FIG. One end 4a is applied to the pile core 1 so as to be perpendicular to the rod 4, and the escape core 2 is taken at each other end. One or more relief cores 3 are in contact with the measuring rod 4 between the pile core 1 and the relief core 2.

逃げ芯2,3および検尺棒4は一般的な冶具を使用するので安価且つ容易に管理できる。   Since the escape cores 2 and 3 and the measuring rod 4 use general jigs, they can be managed inexpensively and easily.

杭5の埋設中または掘削ロッド6を用いて地盤Gの掘削中やヤットコ8を用いた杭5の埋設中に杭芯1位置を確認する場合は、埋設や掘削を中止し、静止状態の杭5または掘削ロッド6やヤットコ8に検尺棒4を前述と同様の手順で当てる。これより、正確な杭芯1位置とのずれを確認できる。   When checking the position of the pile core 1 during the laying of the pile 5 or during the excavation of the ground G using the excavating rod 6 or the laying of the pile 5 using the Yatco 8, the laying or excavation is stopped and the pile in a stationary state 5 or the excavation rod 6 or Yatco 8 is touched with the measuring rod 4 in the same procedure as described above. Thereby, the deviation | shift from the exact pile core 1 position can be confirmed.

検尺棒4を2本以上の逃げ芯2,3に沿わせる事によって、検尺棒4を同位置に当てることができる。   By placing the measuring rod 4 along two or more relief cores 2 and 3, the measuring rod 4 can be applied to the same position.

従来例に於いては新たな杭芯管理冶具が必要であるが、本発明は、既存の冶具のみで正確な杭芯1位置を確認できる。   In the conventional example, a new pile core management jig is required, but the present invention can confirm the exact pile core 1 position only with the existing jig.

本発明の活用例として、既存の冶具を用いた、建て込み前と建て込み中の杭の杭芯位置の確認を、正確且つ容易に行う杭芯位置の確認方法に適用出来る。   As an application example of the present invention, it can be applied to a method for confirming a pile core position that uses an existing jig to accurately and easily confirm the pile core position of the pile before and during the building.

(a),(b)は本発明に係る杭芯位置の確認方法を説明する平面図及び側面図である。(A), (b) is the top view and side view explaining the confirmation method of the pile core position which concerns on this invention. 逃げ芯に設けられた検尺棒を遊動可能に支持する各種の支持部材の構成を示す図である。It is a figure which shows the structure of the various support members which support the measuring rod provided in the relief core so that it can move freely. 逃げ芯に設けられた検尺棒を遊動可能に支持する各種の支持部材の構成を示す図である。It is a figure which shows the structure of the various support members which support the measuring rod provided in the relief core so that it can move freely. (a)は既製杭を埋設するための掘削ロッドの杭芯位置の確認方法を説明する側面図、(b)は本杭の上部に接続されるヤットコ(雇杭)の杭芯位置の確認方法を説明する側面図である。(A) is a side view for explaining a method for confirming a pile core position of an excavating rod for burying a ready-made pile, and (b) is a method for confirming a pile core position of a yatco (employed pile) connected to the upper part of the main pile. FIG. 従来例を説明する図である。It is a figure explaining a prior art example.

符号の説明Explanation of symbols

1…杭芯
2,3…逃げ芯
4…検尺棒
4a…一端部
5…杭
5a…螺旋状羽根
6…掘削ロッド
7a,7b…支持部材
7a1…ガイド片
7a2…垂直片
7a3…水平片
7a4…雌ネジ部
7a5…留めネジ
7a6…貫通孔
7b1…ガイド片
7b2…垂直片
7b3…水平片
7b4…雌ネジ部
7b5…留めネジ
7b6…貫通孔
8…ヤットコ
9…水平器
10a,10b…指示手段
G…地盤
DESCRIPTION OF SYMBOLS 1 ... Pile core 2, 3 ... Relief core 4 ... Measuring rod 4a ... One end part 5 ... Pile 5a ... Spiral blade 6 ... Excavation rod 7a, 7b ... Support member
7a1… Guide piece
7a2… Vertical piece
7a3 ... Horizontal piece
7a4 ... Female thread
7a5 ... Fastening screw
7a6… through hole
7b1… Guide piece
7b2… Vertical piece
7b3… Horizontal piece
7b4 ... Female thread
7b5 ... Fastening screw
7b6 ... Through hole 8 ... Yatco 9 ... Level
10a, 10b ... Instruction means G ... Ground

Claims (5)

検尺棒を杭芯の所定の複数の角度方向で且つそれぞれの方向において少なくとも2箇所に設けた逃げ芯に合わせ、杭或いは掘削ロッドを前記杭芯にセットし、前記検尺棒を水平になるように前記各逃げ芯に合わせながら該検尺棒の端部を杭或いは掘削ロッドに当てて杭芯位置の確認を行うことを特徴とする杭芯位置の確認方法。 The measuring rod is aligned with the relief cores provided at a predetermined plurality of angular directions of the pile core in at least two locations in each direction, the pile or the excavating rod is set on the pile core, and the measuring rod is leveled In this way, the pile core position is confirmed by applying the end of the measuring rod to the pile or excavating rod while adjusting to each of the relief cores. 前記逃げ芯に前記検尺棒を遊動可能に支持する支持部材を設けたことを特徴とする請求項1に記載の杭芯位置の確認方法。 The pile core position confirmation method according to claim 1, wherein a support member is provided on the relief core so as to support the measuring rod so as to be freely movable. 前記検尺棒に水平器を設けたことを特徴とする請求項1または請求項2に記載の杭芯位置の確認方法。 The pile core position confirmation method according to claim 1 or 2, wherein a level is provided on the measuring rod. 前記検尺棒に前記逃げ芯位置に対応する指示手段を設けたことを特徴とする請求項1〜3の何れか1項に記載の杭芯位置の確認方法。 The method for confirming a pile core position according to any one of claims 1 to 3, wherein the measuring rod is provided with instruction means corresponding to the escape core position. 杭の建て込み中に前記逃げ芯を用いて杭芯位置の確認を行うことを特徴とする請求項1〜4の何れか1項に記載の杭芯位置の確認方法。 The pile core position confirmation method according to any one of claims 1 to 4, wherein the pile core position is confirmed using the relief core during pile erection.
JP2008011040A 2008-01-22 2008-01-22 How to check pile core position Expired - Fee Related JP5114223B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008011040A JP5114223B2 (en) 2008-01-22 2008-01-22 How to check pile core position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008011040A JP5114223B2 (en) 2008-01-22 2008-01-22 How to check pile core position

Publications (2)

Publication Number Publication Date
JP2009174124A true JP2009174124A (en) 2009-08-06
JP5114223B2 JP5114223B2 (en) 2013-01-09

Family

ID=41029494

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008011040A Expired - Fee Related JP5114223B2 (en) 2008-01-22 2008-01-22 How to check pile core position

Country Status (1)

Country Link
JP (1) JP5114223B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011069074A (en) * 2009-09-24 2011-04-07 Japan Pile Corp Support implement for relief core rod, and device for checking pile core
JP2012026124A (en) * 2010-07-21 2012-02-09 Mitani Sekisan Co Ltd Pile core position setting device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002206237A (en) * 2001-01-09 2002-07-26 Toshihiko Fujii Execution method for pile
JP2003147772A (en) * 2001-11-08 2003-05-21 Asahi Kasei Corp Pile core setting tool
JP2006274634A (en) * 2005-03-29 2006-10-12 Daiwa House Ind Co Ltd Pile driving posture monitoring device and pile driving posture monitoring method
JP2006348592A (en) * 2005-06-16 2006-12-28 Geotop Corp Pile core control tool, and pile core control method using pile core control tool

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002206237A (en) * 2001-01-09 2002-07-26 Toshihiko Fujii Execution method for pile
JP2003147772A (en) * 2001-11-08 2003-05-21 Asahi Kasei Corp Pile core setting tool
JP2006274634A (en) * 2005-03-29 2006-10-12 Daiwa House Ind Co Ltd Pile driving posture monitoring device and pile driving posture monitoring method
JP2006348592A (en) * 2005-06-16 2006-12-28 Geotop Corp Pile core control tool, and pile core control method using pile core control tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011069074A (en) * 2009-09-24 2011-04-07 Japan Pile Corp Support implement for relief core rod, and device for checking pile core
JP2012026124A (en) * 2010-07-21 2012-02-09 Mitani Sekisan Co Ltd Pile core position setting device

Also Published As

Publication number Publication date
JP5114223B2 (en) 2013-01-09

Similar Documents

Publication Publication Date Title
CN203684398U (en) Device for positioning embedded parts in reinforced concrete structure
JP5585059B2 (en) Measuring method of steel pipe installation error
US8833036B2 (en) Aligning shaft doors of an elevator
JP2008069577A (en) Pile cage building method and pile cage building apparatus
CN105421476B (en) The construction method and mounting structure of tower crane built-in fitting are installed on raft foundation
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
US9909329B2 (en) Anchor device positioning and plumbing tool and methods related thereto
JP5114223B2 (en) How to check pile core position
KR102047997B1 (en) Construction method and slab brackets for underground cable tunnel
US7484913B2 (en) Placing elements in piles
CN204085524U (en) A kind of high-rise building Core Walls Structure axis Vertical device adopting mould crawling process
JP3112409U (en) Guide ruler for drilling into tile joints
CN111980024A (en) Positioning and guiding equipment for foundation construction of steel trestle
CN108914997A (en) A kind of reinforced soil retaining wall lateral deformation test device and working method
CN102995899A (en) Measurement control method for sizes of building construction vertical members
US11795649B2 (en) Apparatus and method for subsea wall insertion
CN208792386U (en) A kind of reinforced soil retaining wall lateral deformation test device
JP4723920B2 (en) Anchor bolt positioning device
TW201005154A (en) Measuring and positioning method of top-down construction steel column and structure thereof
JP2012163498A (en) Separation distance measuring apparatus
CN106638664A (en) Foundation bolt fixing apparatus and positioning method
JP5863635B2 (en) Surveying orbital ruler
CN104596488B (en) For the holder device of building construction measurement and control the vertical method of body of wall
CN203375984U (en) Portable measurement instrument bracket
JP6826510B2 (en) Temporary support member for joining steel beams and joining method of steel beams

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20090724

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20090810

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20090729

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121002

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121015

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151019

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5114223

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees