JP5426424B2 - Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor - Google Patents

Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor Download PDF

Info

Publication number
JP5426424B2
JP5426424B2 JP2010029624A JP2010029624A JP5426424B2 JP 5426424 B2 JP5426424 B2 JP 5426424B2 JP 2010029624 A JP2010029624 A JP 2010029624A JP 2010029624 A JP2010029624 A JP 2010029624A JP 5426424 B2 JP5426424 B2 JP 5426424B2
Authority
JP
Japan
Prior art keywords
pile
ground
rod
ground reinforcement
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010029624A
Other languages
Japanese (ja)
Other versions
JP2011163064A (en
Inventor
将憲 菅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2010029624A priority Critical patent/JP5426424B2/en
Publication of JP2011163064A publication Critical patent/JP2011163064A/en
Application granted granted Critical
Publication of JP5426424B2 publication Critical patent/JP5426424B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、地盤補強杭及び先行掘用ロッドの打設方法とそれに用いられる打設装置に関する。   The present invention relates to a method for placing a ground reinforcing pile and a rod for preceding excavation and a placing apparatus used therefor.

軟弱な地盤に建物を建設する場合、地盤を補強するために地盤補強杭を打設するが、地中に転石などの障害物があると、地盤補強杭がその障害物に当たってしまってその深さ以上に打設できなかったり、地盤補強杭の芯ズレが生じてしまう。   When building a building on soft ground, a ground reinforcement pile is placed to reinforce the ground, but if there is an obstacle such as a boulder in the ground, the ground reinforcement pile hits the obstacle and its depth. It can not be placed more than the above, or the core displacement of the ground reinforcement pile will occur.

そこで、地盤補強杭打設前に、地盤補強材よりも硬い材料からなる先行掘用ロッドを用いて、先行掘孔を掘り、その先行掘孔に地盤補強杭を打設するといった方法がとられている。   Therefore, before the ground reinforcement pile is placed, a method is used in which a preliminary excavation hole is dug using a harder rod made of a material harder than the ground reinforcement, and the ground reinforcement pile is placed in the advance excavation hole. ing.

特開平9−13375号公報Japanese Patent Laid-Open No. 9-13375

しかし、地盤補強杭の打設に先立って、先行掘用ロッドにより先行孔を掘るため、施工が先行掘用ロッドの打設と地盤補強杭の打設の2工程からなり、施工に手間がかかるといった問題があった。また、先行掘用ロッド1本だけを杭打設機械を用いて施工する場合、杭打設機械からの荷重が偏ることにより杭先掘用ロッドが傾斜してしまい、そのため先行掘孔が傾き、ひいては地盤補強杭が傾斜して打設されてしまうという問題があった。   However, prior to the placement of the ground reinforcement piles, the construction of the preceding hole is dug with the prior excavation rod, so the construction consists of two steps, the placement of the advance excavation rod and the placement of the ground reinforcement pile. There was a problem. In addition, when constructing only one leading digging rod using a pile driving machine, the pile digging rod is inclined due to the biased load from the pile driving machine, so that the preceding digging hole is inclined, As a result, there was a problem that the ground reinforcement pile was inclined and driven.

本発明は、以上のような問題点に鑑み、施工工程を短縮することができ、また、地盤補強杭を傾斜させることなく打設することができる、地盤補強杭及び先行掘用ロッドの打設方法とそれに用いられる打設装置を提供することを課題とする。   In view of the problems as described above, the present invention can shorten the construction process and can be driven without inclining the ground reinforcing pile. It is an object of the present invention to provide a method and a driving device used therefor.

上記の課題は、載荷梁に地盤補強杭と地盤補強杭打設前の先行掘用ロッドが取り付けられた地盤補強杭及び先行掘用ロッド打設装置を用い、地盤補強杭打設前の先行掘用ロッドにより先掘りされた先行掘孔に、地盤補強杭を打設すると同時に、次工程で地盤補強杭を打設する位置に、先行掘り用ロッドで先行掘孔を先掘りすることを特徴とする地盤補強杭及び先行掘用ロッドの打設方法、また、載荷梁に地盤補強杭と地盤補強杭打設前の先行掘用ロッドが取り付けられ、地盤補強杭と先行掘用ロッドを同時に打設できる地盤補強杭及び先行掘用ロッド打設装置により解決される。   The above-mentioned problem is that the ground excavation pile before the ground reinforcement pile is placed using the ground reinforcement pile and the ground excavation rod placement device in which the ground reinforcement pile and the prior excavation rod are attached to the loading beam. It is characterized in that the ground excavation hole is pre-drilled with the prior excavation rod at the position where the ground reinforcement pile is placed in the next process at the same time as the ground excavation hole is cast in the prior excavation hole that has been excavated with the rod for construction. The method of placing the ground reinforcement pile and the pre-excavation rod to be installed, and the ground reinforcement pile and the pre-excavation rod prior to the construction of the ground reinforcement pile are attached to the loading beam, and the ground reinforcement pile and the pre-excavation rod are simultaneously installed. It can be solved by a ground reinforcing pile and a rod driving device for preceding excavation.

本打設方法及び打設装置では、載荷梁に地盤補強杭と先行掘用ロッドが取り付けられた地盤補強杭及び先行掘用ロッド打設装置を用いて、載荷梁と連結した杭打設用機械により、地盤補強杭と先行掘用ロッドを同時に地盤に打設することができるので、地盤補強杭の打設と先行掘用ロッドにより先行掘孔の掘削を杭打設機械を2工程繰り返すことなく、一度の工程でできるため、施工工程を短縮し、施工時間を短縮することができる。   In this placing method and placing device, a pile placing machine connected to the loading beam using a ground reinforcing pile and a leading excavation rod placing device in which a ground reinforcing pile and a leading excavation rod are attached to the loading beam. Therefore, the ground reinforcement pile and the preceding digging rod can be simultaneously placed on the ground, so that the pile piercing machine does not repeat the two steps of the pile placement machine for the placement of the ground reinforcement pile and the digging of the preceding digging hole by the preceding digging rod. Because it can be done in a single process, the construction process can be shortened and the construction time can be shortened.

そして、地盤補強杭と先行掘用ロッドを同時に地盤に打設する施工を順次繰り返していくことにより、地盤補強杭どうしの間隔を一定に保ちながら、効率的に敷地に地盤補強材を打設していくことができる。   Then, by repeating the construction in which the ground reinforcement pile and the pre-excavation rod are simultaneously placed on the ground, the ground reinforcement material is efficiently placed on the site while keeping the distance between the ground reinforcement piles constant. Can continue.

また、地盤補強杭と先行掘用ロッドが取り付けられた載荷梁を用いて、先行掘用ロッドの施工を地盤補強杭の打設と同時に行うため、載荷梁を介しての杭打設機械からの荷重が偏ることなく均等にかかるため、先行掘用ロッドを地盤に対して真っ直ぐに施工することができ、先行掘孔を傾斜させることなく真っ直ぐ設けることができる。   In addition, using the loading beam to which the ground reinforcement pile and the pre-excavation rod are attached, the construction of the pre-excavation rod is performed simultaneously with the placement of the ground reinforcement pile. Since the load is applied evenly without being biased, the preceding digging rod can be applied straight to the ground, and the preceding digging hole can be provided straight without inclining.

また、上記の地盤補強杭及び先行掘用ロッド打設装置において、載荷梁は、2以上の地盤補強杭取付部と、2以上の先行掘用ロッド取付部と、2以上の杭打設機械連結ロッド取付部を有し、地盤補強杭と先行掘用ロッドと杭打設機械連結ロッドは、それぞれ任意の位置に取り付けることができるとよい。   Moreover, in the ground reinforcing pile and the preceding excavation rod placing device, the loading beam includes two or more ground reinforcing pile attaching portions, two or more preceding excavating rod attaching portions, and two or more pile placing machine connections. It has a rod attachment part, and it is good that a ground reinforcement pile, a rod for preliminary excavation, and a pile driving machine connection rod can be attached to arbitrary positions, respectively.

載荷梁に、地盤補強杭と、先行掘用ロッドと、載荷梁と杭打設機械とを連結する杭打設機械連結ロッドをそれぞれ任意の位置に取り付けることができるので、地盤補強杭と先行掘用ロッドの形態や重量に合わせて、地盤補強杭と先行掘用ロッドと杭打設機械連結ロッドの取付け位置を調整することにより、地盤補強杭、先行掘用ロッドを含めた載荷梁の重量バランスが調整され、載荷梁を水平に維持することができ、載荷梁を水平に維持して杭打設機械で載荷梁に荷重をかけることで、地盤補強材と先行掘用ロッドを地盤に真っ直ぐに打設することができる。また、地盤補強杭と先行掘用ロッドの間隔を変えることで、地盤補強杭どうしの間隔を調整することができる。   A ground reinforcement pile, a pre-excavation rod, and a pile driving machine connecting rod that connects the loading beam and the pile driving machine can be attached to the loading beam at any position. The weight balance of the load beam including the ground reinforcement pile and the pre-excavation rod is adjusted by adjusting the mounting position of the ground reinforcement pile, the pre-excavation rod and the pile driving machine connecting rod according to the form and weight of the construction rod. The load beam can be kept horizontal, and the ground beam can be kept horizontal and the load beam can be loaded with a pile driving machine. Can be cast. Moreover, the space | interval of ground reinforcement piles can be adjusted by changing the space | interval of a ground reinforcement pile and a rod for preceding excavation.

本発明は以上のとおりであるから、施工工程を短縮することができ、また、地盤補強杭を傾斜させることなく打設することができる、地盤補強杭及び先行掘用ロッドの打設方法とそれに用いられる打設装置を提供することができる。   Since the present invention is as described above, the construction process can be shortened, and the ground reinforcement pile and the method for placing the pre-excavation rod can be placed without tilting the ground reinforcement pile, and to it. A driving device to be used can be provided.

図(イ)は、本発明の実施形態である地盤補強杭及び先行掘用ロッド打設装置を示す一部断面正面図、図(ロ)は、要部拡大一部断面図である。FIG. 1 (a) is a partial cross-sectional front view showing a ground reinforcing pile and a pre-digging rod placing device according to an embodiment of the present invention, and FIG. 図(イ)(ロ)は、それぞれ地盤補強杭、先行掘用ロッド、杭打設機械連結ロッドの載荷梁への取付け状況を示す一部断面正面図である。FIGS. 1A and 1B are partial cross-sectional front views showing the state of attachment of the ground reinforcing pile, the preceding excavation rod, and the pile driving machine connecting rod to the loading beam. 図(イ)乃至(ハ)は、地盤補強杭及び先行掘用ロッドの打設装置を用いた地盤補強杭及び先行掘用ロッドの打設方法を順次示す正面図である。Drawing (a) thru / or (c) is a front view which shows sequentially a placement method of a ground reinforcement pile and a prior excavation rod using a ground reinforcement pile and a prior excavation rod placement device. 図(イ)乃至(ハ)は、それぞれ、本発明の他実施例に用いられる載荷梁を示す一部断面斜視図である。FIGS. 1A to 1C are partially sectional perspective views showing a loading beam used in another embodiment of the present invention.

次に、本発明の実施形態を図面に基づいて説明する。   Next, embodiments of the present invention will be described with reference to the drawings.

図1に示す地盤補強杭と先行掘用ロッドを同時に打設できる地盤補強杭及び先行掘用ロッド打設装置1において、2は地盤補強杭、4は先行掘用ロッド、6は載荷梁である。   In the ground reinforcing pile and the leading excavation rod placing apparatus 1 capable of simultaneously placing the ground reinforcing pile and the leading excavation rod shown in FIG. 1, 2 is the ground reinforcing pile, 4 is the preceding excavation rod, and 6 is the loading beam. .

地盤補強杭2は建物及び地盤の状況に応じて設計された長さ・径を有するプラスチック杭からなり、地盤補強杭2が任意に脱着可能な地盤補強杭固定チャック3を介して載荷梁6に固定されている。地盤補強杭2は、後述する先行掘用ロッドによって掘削された先行掘孔10に打設される。   The ground reinforcement pile 2 is made of a plastic pile having a length and a diameter designed according to the situation of the building and the ground, and the ground reinforcement pile 2 is attached to the loading beam 6 via a ground reinforcement pile fixing chuck 3 to which the ground reinforcement pile 2 can be arbitrarily attached and detached. It is fixed. The ground reinforcement pile 2 is driven into a preceding digging hole 10 excavated by a later-described digging rod.

先行掘用ロッド4は、地盤補強杭2の地盤への打設に先立って、地中に転石などの障害物があると、地盤補強杭がその障害物に当たってしまってその深さ以上に打設できなかったり、地盤補強杭の芯ズレが生じてしまうのを防ぐために、地盤に先行掘孔10を掘削するためのものであり、地盤補強杭2よりも小径で剛性の高い鋼管からなり、載荷梁6に固定されている。なお、5は先行掘用ロッドを打設する地盤上の位置をあわせるための位置決め用突起である。   Prior to placing the ground reinforcement pile 2 on the ground, if there is an obstacle such as a boulder in the ground, the ground excavation rod 4 will hit the obstacle and be placed more than its depth. It is for excavating the pre-drilling hole 10 in the ground in order to prevent it from occurring or the core displacement of the ground reinforcing pile, and it is made of a steel pipe having a smaller diameter and higher rigidity than the ground reinforcing pile 2, It is fixed to the beam 6. Reference numeral 5 denotes a positioning projection for aligning the position on the ground where the leading excavation rod is to be placed.

杭打設機械連結ロッド8は、一方の端部を載荷梁6に固定され、もう一方の端部を図示しない杭打設機械に接続され、杭打設機械による載荷重を載荷梁6に伝達するものである。   The pile driving machine connecting rod 8 has one end fixed to the loading beam 6 and the other end connected to a pile driving machine (not shown) to transmit the loading load by the pile driving machine to the loading beam 6. To do.

載荷梁6は、水平方向に延びる断面方形の棒状部材で、上部には杭打設機械連結ロッド8の端部に設けられた雄ネジと螺合する雌ネジを有する杭打設機械連結ロッド取付部9が間隔をあけて複数設けられている。一方、載荷梁6の下部には、地盤補強杭固定チャック3の端部に設けられた雄ネジ及び先行掘用ロッド4の端部に設けられた雄ネジと螺合する雌ネジを有する地盤補強杭取付部7と先行掘用ロッド取付部7が間隔をあけて複数設けられている。なお、本実施形態では、地盤補強杭固定チャック3の端部に設けられた雄ネジと先行掘用ロッド4の端部に設けられた雄ネジは同じ形状になっており、その雄ネジにあわせて、地盤補強杭取付部7と先行掘用ロッド取付部7も区別なく同じ形状の雌ネジが設けられている。   The loading beam 6 is a bar-shaped member having a rectangular cross section extending in the horizontal direction, and a pile driving machine connecting rod mounting having a female screw threadedly engaged with a male screw provided at an end of the pile driving machine connecting rod 8 at the upper part. A plurality of portions 9 are provided at intervals. On the other hand, in the lower part of the loading beam 6, the ground reinforcement having a male screw provided at the end of the ground reinforcing pile fixing chuck 3 and a female screw engaged with the male screw provided at the end of the preceding excavation rod 4. A plurality of pile attachment portions 7 and a preceding excavation rod attachment portion 7 are provided at intervals. In the present embodiment, the male screw provided at the end of the ground reinforcing pile fixing chuck 3 and the male screw provided at the end of the preceding excavation rod 4 have the same shape and are matched to the male screw. The ground reinforcement pile mounting portion 7 and the preceding excavation rod mounting portion 7 are also provided with female screws of the same shape without distinction.

図1(ロ)、図2(イ)、(ロ)に示すように、地盤補強杭固定チャック3、先行掘用ロッド4、杭打設機械連結ロッド8は、それぞれ、地盤補強杭取付部7、先行掘用ロッド取付部7、杭打設機械連結ロッド取付部9の任意の位置に脱着可能に取り付け可能であり、地盤補強杭2の打設ピッチにあわせて、地盤補強杭固定チャック3と先行掘用ロッド4の間隔を調整して、それぞれ、地盤補強杭取付部7と先行掘用ロッド取付部7に固定する。また、地盤補強杭固定チャック3と先行掘用ロッド4が地盤に対して傾斜させることなく垂直に打設するために、地盤補強杭固定チャック3と先行掘用ロッド4の間隔及び重量等を考慮して、載荷梁6を水平状態に維持して、杭打設機械連結ロッド8を杭打設機械連結ロッド取付部9に固定する。   As shown in FIG. 1 (B), FIG. 2 (B), and (B), the ground reinforcement pile fixing chuck 3, the pre-excavation rod 4, and the pile driving machine connecting rod 8 are respectively connected to the ground reinforcement pile mounting portion 7. It can be detachably attached to any position of the leading excavation rod mounting portion 7 and the pile driving machine connecting rod mounting portion 9, and according to the pitch of the ground reinforcing pile 2, the ground reinforcing pile fixing chuck 3 and The distance between the leading excavation rods 4 is adjusted and fixed to the ground reinforcement pile mounting portion 7 and the leading excavation rod mounting portion 7, respectively. Further, in order to drive the ground reinforcing pile fixing chuck 3 and the preceding excavation rod 4 vertically without being inclined with respect to the ground, the distance and weight of the ground reinforcing pile fixing chuck 3 and the preceding excavation rod 4 are considered. Then, the loading beam 6 is maintained in a horizontal state, and the pile driving machine connecting rod 8 is fixed to the pile driving machine connecting rod attaching portion 9.

地盤補強杭及び先行掘用ロッド打設装置1を用いた地盤補強杭及び先行掘用ロッドの打設は次のようにして行われる。   The placement of the ground reinforcement pile and the preceding excavation rod using the ground reinforcement pile and the advance excavation rod placing apparatus 1 is performed as follows.

図3(イ)に示すように、まず、載荷梁6の下部に先行掘用ロッド4だけを取り付け、地盤に先行掘孔10を掘削する。次に、図3(ロ)に示すように、載荷梁6に、地盤補強杭固定チャック3を介して地盤補強杭2と先行掘用ロッド4をそれぞれ所定の間隔をあけて取り付け、載荷梁6を水平状態に維持したまま、前工程で先行掘用ロッド4により掘削した先行掘孔10に地盤補強杭2をあわせて、地盤補強杭2と先行掘用ロッド4を同時に打設する。打設後、図3(ハ)に示すように、地盤補強杭2を地盤補強杭固定チャック3から取り外し、地盤補強杭2を地盤に打設したまま、先行掘用ロッド4を地盤から引き抜く。そして、地盤補強杭2を取り外した地盤補強杭固定チャック3に別に用意した地盤補強杭2を取りつけ、前工程で先行掘用ロッド4により掘削した先行掘孔10に地盤補強杭2をあわせて、地盤補強杭2と先行掘用ロッド4を同時に打設する。以上の工程を順次繰り返すことで地盤補強杭を地盤に打設する。   As shown in FIG. 3A, first, only the preceding excavation rod 4 is attached to the lower portion of the loading beam 6, and the preceding excavation hole 10 is excavated in the ground. Next, as shown in FIG. 3 (b), the ground reinforcing pile 2 and the pre-excavation rod 4 are attached to the loading beam 6 via the ground reinforcing pile fixing chuck 3 at predetermined intervals, respectively. The ground reinforcing pile 2 and the preceding digging rod 4 are driven simultaneously by aligning the ground reinforcing pile 2 with the preceding digging hole 10 excavated by the preceding digging rod 4 in the previous step. After the placement, as shown in FIG. 3 (c), the ground reinforcing pile 2 is removed from the ground reinforcing pile fixing chuck 3, and the preceding excavation rod 4 is pulled out from the ground while the ground reinforcing pile 2 is placed on the ground. Then, the ground reinforcement pile 2 separately attached to the ground reinforcement pile fixing chuck 3 from which the ground reinforcement pile 2 has been removed is attached, and the ground reinforcement pile 2 is aligned with the preceding borehole 10 excavated by the preceding excavation rod 4 in the previous process, The ground reinforcing pile 2 and the preceding excavation rod 4 are driven simultaneously. The ground reinforcement pile is placed on the ground by sequentially repeating the above steps.

本打設方法及び打設装置では、地盤補強杭の打設と先行掘用ロッドにより先行掘孔の掘削を、杭打設機械を工程を2回繰り返すことなく、一度の工程でできるため、施工工程を短縮し、施工時間を短縮することができ、地盤補強杭と先行掘用ロッドを同時に地盤に打設する施工を順次繰り返していくことにより、効率的に地盤に地盤補強杭を打設していくことができる。   In this placement method and placement device, the construction of the ground reinforcement piles and the excavation of the pre-drilling holes by the pre-excavation rod can be performed in one step without repeating the process twice. The process can be shortened and the construction time can be shortened. By repeating the construction in which the ground reinforcement pile and the pre-excavation rod are simultaneously placed on the ground, the ground reinforcement pile can be efficiently placed on the ground. Can continue.

また、地盤補強杭と先行掘用ロッドが取り付けられた載荷梁を用いて、先行掘用ロッドの施工を地盤補強杭の打設と同時に行うため、載荷梁を介しての杭打設機械からの荷重が偏ることなく均等にかかるため、先行掘用ロッドを地盤に対して真っ直ぐに施工することができ、先行掘孔を傾斜させることなく真っ直ぐ掘削することができ、ひいては地盤補強杭を地盤に対して真っ直ぐに打設することができる。特に、地盤補強杭がプラスッチク杭からなっていても、剛性の高い鋼管からなる先行掘用ロッドにより、先行掘孔が掘削されているため、地盤補強材を地盤に真っ直ぐに打設することができる。   In addition, using the loading beam to which the ground reinforcement pile and the pre-excavation rod are attached, the construction of the pre-excavation rod is performed simultaneously with the placement of the ground reinforcement pile. Since the load is evenly distributed without bias, the pre-excavation rod can be installed straight to the ground, and the pre-excavation hole can be excavated straight without tilting, and the ground reinforcement pile is Can be placed straight. In particular, even if the ground reinforcement piles are plastic piles, the ground excavation holes are excavated by the rods for leading excavation made of high-rigidity steel pipes, so the ground reinforcement can be placed straight on the ground. .

特に、載荷梁に、地盤補強杭と、先行掘用ロッドと、載荷梁と杭打設機械とを連結する杭打設機械連結ロッドをそれぞれ任意の位置に取り付けることができるので、地盤補強杭と先行掘用ロッドの形態や重量に合わせて、地盤補強杭と先行掘用ロッドと杭打設機械連結ロッドの取付け位置をそれぞれ調整することにより、地盤補強杭、先行掘用ロッドを含めた載荷梁の重量バランスが調整され、載荷梁を水平に維持することができ、載荷梁を水平に維持して杭打設機械で載荷梁に荷重をかけることで、地盤補強材と先行掘用ロッドを地盤に真っ直ぐに打設することができる。   In particular, it is possible to attach a ground reinforcement pile, a pre-excavation rod, and a pile driving machine connecting rod for connecting the loading beam and the pile driving machine to the loading beam, respectively. By adjusting the mounting position of the ground reinforcing pile, the leading excavation rod and the pile driving machine connecting rod according to the form and weight of the leading excavation rod, the loading beam including the ground reinforcing pile and the leading excavation rod The weight balance is adjusted so that the loading beam can be kept horizontal, and the loading beam is kept horizontal and a load is applied to the loading beam by a pile driving machine, so that the ground reinforcement material and the pre-excavation rod are grounded. Can be placed straight on.

以上に、本発明の実施形態を示したが、本発明はこれに限られるものではなく、発明思想を逸脱しない範囲で各種の変更が可能である。上記の実施形態では、地盤補強杭がプラスチック杭である場合について示したが、地盤補強杭の材質に限定はなく、プラスチック杭以外の材質であってもよく、例えば、鋼管杭であってもよいし、木杭であってもよい。   Although the embodiment of the present invention has been described above, the present invention is not limited to this, and various modifications can be made without departing from the spirit of the invention. In the above embodiment, the case where the ground reinforcing pile is a plastic pile has been shown, but the material of the ground reinforcing pile is not limited, and may be a material other than the plastic pile, for example, a steel pipe pile. However, it may be a wooden pile.

また、上記の実施形態では、地盤補強杭と次に地盤補強杭を打設する先行掘孔を掘削する先行掘用ロッドの2本を同時に打設する場合について示したが、例えば、1本の地盤補強杭に対して、2本若しくはそれ以上の先行掘用ロッドを載荷梁に取り付け、1本の地盤補強杭の打設で2本若しくはそれ以上の先行掘用ロッドによる先行掘孔の掘削をしてもよい。この場合、複数掘削された先行掘孔に対して、載荷梁に1本若しくはそれ以上の地盤補強杭を取り付け、1本ずつ若しくは複数本同時に地盤補強杭を打設すればよい。   Moreover, in the above embodiment, the case where two of the ground excavation rods for excavating the ground excavation hole for excavating the ground excavation hole and the next excavation hole for the excavation of the ground excavation pile are shown. Attach two or more pre-excavation rods to the loading beam to the ground reinforcement pile, and drill a pre-drilling hole with two or more pre-excavation rods by placing one ground reinforcement pile. May be. In this case, it suffices to attach one or more ground reinforcing piles to the loading beam for a plurality of preceding excavated holes, and place one or more ground reinforcing piles simultaneously.

また、載荷梁の形態についても制限はなく、上述のように密実な棒状部材に雌ネジが設けられているだけでなく、例えば図4(イ)に示すように、H型鋼のフランジ部に地盤補強杭取付部、先行掘用ロッド取付部などの取付部としての雌ネジが設けられていてもよいし、図4(ロ)に示すように、平面視十型をしていてもよいし、図4(ハ)に示すように、平面視方形型であってもよい。   Moreover, there is no restriction | limiting also about the form of a loading beam, As shown in FIG. 4 (A), for example, as shown in FIG. Female screws as attachment parts such as ground reinforcement pile attachment parts and preceding excavation rod attachment parts may be provided, or as shown in FIG. As shown in FIG. 4C, it may be a planar view square shape.

さらに、載荷梁と、地盤補強杭、地盤補強杭固定チャック、杭打設機械連結ロッドとの取り付けも螺子式に限定されることはなく、脱着可能に取り付けられれば、その取り付け方法に制限はない。   Furthermore, the mounting of the loading beam, the ground reinforcing pile, the ground reinforcing pile fixing chuck, and the pile driving machine connecting rod is not limited to the screw type, and there is no limitation on the mounting method as long as it can be attached and detached. .

1・・・ 地盤補強杭及び先行掘用ロッド打設装置
2・・・地盤補強杭
3・・・地盤補強杭固定チャック
4・・・先行掘用ロッド
6・・・載荷梁
7・・・地盤補強杭取付部、先行掘用ロッド取付部
8・・・杭打設機械連結ロッド
9・・・杭打設機械連結ロッド取付部
10・・・先行掘孔
DESCRIPTION OF SYMBOLS 1 ... Ground reinforcement pile and rod driving device for preceding excavation 2 ... Ground reinforcement pile 3 ... Ground reinforcement pile fixing chuck 4 ... Rod for preceding excavation 6 ... Loading beam 7 ... Ground Reinforcement pile mounting part, pre-drilling rod mounting part 8 ... pile driving machine connecting rod 9 ... pile driving machine connecting rod mounting part 10 ... pre-drilling hole

Claims (3)

載荷梁に地盤補強杭と地盤補強杭打設前の先行掘用ロッドが取り付けられた地盤補強杭及び先行掘用ロッド打設装置を用い、
地盤補強杭打設前の先行掘用ロッドにより先掘りされた先行掘孔に、地盤補強杭を打設すると同時に、次工程で地盤補強杭を打設する位置に、先行掘り用ロッドで先行掘孔を先掘りすることを特徴とする地盤補強杭及び先行掘用ロッドの打設方法。
Using the ground reinforcement pile and the pre-excavation rod driving device in which the ground reinforcement pile and the pre-excavation rod before installation of the ground reinforcement pile are attached to the loading beam,
Pre-drilling with a pre-digging rod at the position where the ground reinforcement pile is to be placed in the next process at the same time as placing the ground reinforcement pile into the pre-drilled hole drilled by the pre-digging rod before placing the ground reinforcement pile A method for placing a ground reinforcing pile and a rod for preceding excavation, characterized by digging a hole.
載荷梁に地盤補強杭と地盤補強杭打設前の先行掘用ロッドが取り付けられ、地盤補強杭と先行掘用ロッドを同時に打設できる地盤補強杭及び先行掘用ロッド打設装置。   A ground reinforcement pile and a prior excavation rod driving device, in which a ground reinforcement pile and a prior excavation rod before placement of the ground reinforcement pile are attached to the loading beam, and the ground reinforcement pile and the advance excavation rod can be placed simultaneously. 前記載荷梁は、2以上の地盤補強杭取付部と、2以上の先行掘用ロッド取付部と、2以上の杭打設機械連結ロッド取付部を有し、地盤補強杭と先行掘用ロッドと杭打設機械連結ロッドは、それぞれ任意の位置に取り付けることができる請求項2に記載の地盤補強杭と先行掘用ロッドを同時に打設できる地盤補強杭及び先行掘用ロッド打設装置。   The above-mentioned cargo beam has two or more ground reinforcing pile mounting portions, two or more preceding digging rod mounting portions, and two or more pile driving machine connecting rod mounting portions, and the ground reinforcing pile and the leading digging rod, The ground reinforcement pile and the preceding excavation rod placing device capable of simultaneously placing the ground reinforcement pile and the preceding excavation rod according to claim 2, wherein the pile placing machine connecting rods can be respectively attached at arbitrary positions.
JP2010029624A 2010-02-15 2010-02-15 Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor Expired - Fee Related JP5426424B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010029624A JP5426424B2 (en) 2010-02-15 2010-02-15 Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010029624A JP5426424B2 (en) 2010-02-15 2010-02-15 Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor

Publications (2)

Publication Number Publication Date
JP2011163064A JP2011163064A (en) 2011-08-25
JP5426424B2 true JP5426424B2 (en) 2014-02-26

Family

ID=44594079

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010029624A Expired - Fee Related JP5426424B2 (en) 2010-02-15 2010-02-15 Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor

Country Status (1)

Country Link
JP (1) JP5426424B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5951398B2 (en) * 2012-08-06 2016-07-13 株式会社タイボー Underground plastic cylinders
JP2020165115A (en) * 2019-03-28 2020-10-08 旭化成ホームズ株式会社 Method of burying pile body and pile body connection jig
JP2020165119A (en) * 2019-03-28 2020-10-08 旭化成ホームズ株式会社 Method of burying pile body

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3662470B2 (en) * 2000-03-03 2005-06-22 株式会社モリセン Suspended mobile pile embedding device and pile embedding method using the same
JP4107586B2 (en) * 2003-07-30 2008-06-25 株式会社小松製作所 Pile driver pressure input detection device

Also Published As

Publication number Publication date
JP2011163064A (en) 2011-08-25

Similar Documents

Publication Publication Date Title
JP6634219B2 (en) Ground anchor installation method
JP2012097458A (en) Foundation construction method for structure on ground, and component of foundation construction
JP6936613B2 (en) Masonry reinforcement structure and reinforcement method
JP2009097176A (en) Banking structure and its construction method
JP2010229627A (en) Earth retaining wall structure and method for constructing the same
JP5426424B2 (en) Method for placing ground reinforcing pile and rod for preceding excavation and casting apparatus used therefor
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
JP2020037808A (en) Method of constructing vertical shaft
KR100897397B1 (en) Construction method of earth retaining wall
JP7280602B2 (en) Concrete wall forming method for earth retaining
KR100898969B1 (en) Tunnel Boring Method Using Sheet Pile and Tunnel Structure therof
JP6777408B2 (en) Building horizontal restoration method and building horizontal restoration structure
JP2010031568A (en) Aseismatic reinforcing construction method for existing foundation and aseismatic reinforcing structure of existing foundation
JP2007308951A (en) Method of constructing outer peripheral column by inverted construction method
KR20190027402A (en) Low part cast in place pile construction method
JP5016521B2 (en) Earth anchor and its removal method
JP2007107276A (en) Repair reinforcement method of existing quaywall and its repair reinforcement structure
JP6353775B2 (en) Construction method of leading element of underground continuous wall, construction method of underground continuous wall, and construction device of leading element of underground continuous wall
JP4407716B2 (en) Construction method of earth retaining wall
JP5584373B1 (en) Sheet pile placing method
KR100793510B1 (en) Tension soil nail and construction method of underground wall using the same
KR100665594B1 (en) Wire draw gear of casket anchor
JP2009162029A (en) Retaining wall
JP4993132B2 (en) Foundation reinforcement method for existing structures
JP3805342B2 (en) Yamadome wall structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130124

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131018

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131128

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5426424

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees