JP2006169915A - Vertical load testing method for existing pile - Google Patents

Vertical load testing method for existing pile Download PDF

Info

Publication number
JP2006169915A
JP2006169915A JP2004367545A JP2004367545A JP2006169915A JP 2006169915 A JP2006169915 A JP 2006169915A JP 2004367545 A JP2004367545 A JP 2004367545A JP 2004367545 A JP2004367545 A JP 2004367545A JP 2006169915 A JP2006169915 A JP 2006169915A
Authority
JP
Japan
Prior art keywords
existing
existing pile
wall
loading test
reaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004367545A
Other languages
Japanese (ja)
Other versions
JP4502797B2 (en
Inventor
Takashi Shibata
崇史 柴田
Tomio Tsuchiya
富男 土屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2004367545A priority Critical patent/JP4502797B2/en
Publication of JP2006169915A publication Critical patent/JP2006169915A/en
Application granted granted Critical
Publication of JP4502797B2 publication Critical patent/JP4502797B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a vertical load testing method for an existing pile performed for confirming support performance of a pile whether or not the existing pile used for an existing building can be reused as the pile for a new building when reconstructing the building. <P>SOLUTION: The edge of the existing pile of a test object and a foundation building frame of the existing building is cut. The edge of the foundation building frame right above the existing pile of the test object and a column of the existing building is cut and then a jack is placed in the excision part formed between the both. A concrete reaction body is prepared so as to obtain a reaction force of the testing load from the existing building. The reaction force is taken into the concrete reaction body, and a vertical load is applied to the existing pile by the jack, so that the support performance is measured. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

この発明は、既存建物の建て替えに際し、既存建物の柱の直下に位置する既存杭を、新築建物の杭として再利用できるかどうか、同杭の支持性能を確認するために実施する既存杭の鉛直載荷試験方法(以下、単に載荷試験方法という場合がある。)の技術分野に属し、更に云うと、既存建物に反力を得て載荷試験を実施する方法に関する。   In this invention, when rebuilding an existing building, whether or not the existing pile located immediately below the pillar of the existing building can be reused as a pile of a new building, and confirming the support performance of the existing pile, The present invention belongs to the technical field of a loading test method (hereinafter sometimes simply referred to as a loading test method), and more specifically, relates to a method for performing a loading test by obtaining a reaction force on an existing building.

既存建物の建て替えに際し、既存建物に使用された既存杭を新築建物の杭として再利用して、工期の短縮やコストの削減等が図られている。この際、既存杭に載荷試験を実施し、同既存杭の支持性能を確認して、利用価値のある既存杭を再利用するが、解体前の既存建物を有効的に活用して、すなわち既存建物に反力を得て載荷試験を実施する技術が開発されている。   When rebuilding an existing building, the existing pile used in the existing building is reused as a pile in a new building to shorten the construction period and reduce costs. At this time, a loading test is carried out on the existing pile, the supporting performance of the existing pile is confirmed, and the existing pile with utility value is reused. Technology has been developed to obtain a reaction force on the building and perform a loading test.

例えば、特許文献1の載荷試験方法は、既存建物における試験対象の既存杭の頭部を所定の高さで切断して基礎スラブと縁を切り、該縁を切った基礎スラブと上記既存杭の間にジャッキを設置し、前記基礎スラブに反力を得て載荷試験を実施している。
特開平11−264247号公報
For example, in the loading test method of Patent Document 1, the head of an existing pile to be tested in an existing building is cut at a predetermined height to cut the foundation slab and the edge, and the foundation slab and the existing pile that have been cut are cut off. A jack is installed between them, and a loading test is carried out by obtaining a reaction force on the foundation slab.
Japanese Patent Laid-Open No. 11-264247

特許文献1の載荷試験方法は、既存建物の基礎スラブに反力を得て載荷試験を実施しているので、既存杭に大きな試験荷重を加えることができない。   Since the loading test method of Patent Document 1 obtains a reaction force on the foundation slab of an existing building and performs a loading test, a large test load cannot be applied to the existing pile.

また、既存杭と基礎スラブとの間にジャッキを設置するスペースを確保するために、前記基礎スラブの下方の地盤を掘削するが、作業スペースの周囲に山留め壁等を構築する必要がある。また、掘削時に発生する掘削土の搬出や、載荷試験に用いるジャッキ等の試験装置を地下の作業スペースに搬入するのが大変で施工性が悪く、コストが嵩むなどの問題点を有する。   Further, in order to secure a space for installing the jack between the existing pile and the foundation slab, the ground below the foundation slab is excavated, but it is necessary to construct a retaining wall around the work space. In addition, it is difficult to carry out excavated soil generated during excavation and a test device such as a jack used for a loading test into an underground work space, which has poor workability and high costs.

しかも、地下水位が高いと、試験装置が地下水に浸かってしまい、実施が困難になる問題点を有する。   Moreover, if the groundwater level is high, the test apparatus is immersed in the groundwater, which makes it difficult to implement.

本発明の目的は、既存建物に剛強なコンクリート反力体を用意し、同コンクリート反力体に反力を得て、基礎躯体と縁を切った既存杭に載荷試験を実施することで、前記既存建物に反力を得て既存杭に大きな試験荷重を加えることができる、既存杭の鉛直載荷試験方法を提供することである。   The purpose of the present invention is to prepare a strong concrete reaction body in an existing building, obtain a reaction force from the concrete reaction body, and carry out a loading test on an existing pile cut off from the foundation frame. It is to provide a vertical loading test method for existing piles that can apply reaction force to existing buildings and apply a large test load to existing piles.

本発明の目的は、既存建物の基礎躯体の上方空間で載荷試験を実施でき、施工性が良く、コストの削減にも寄与し、しかも地下水位に影響を受けない、既存杭の鉛直載荷試験方法を提供することである。   The purpose of the present invention is to carry out a loading test in the upper space of the foundation frame of an existing building, have good workability, contribute to cost reduction, and are not affected by the groundwater level. Is to provide.

上記従来技術の課題を解決するための手段として、請求項1に記載した発明に係る既存杭の鉛直載荷試験方法は、
既存建物の建て替えに際し、既存建物の柱の直下に位置する既存杭を再利用するための鉛直載荷試験方法であって、
試験対象の既存杭と既存建物の基礎躯体との縁を切る工程と、
前記試験対象の既存杭直上の基礎躯体と既存建物の柱との縁を切り、両者の間に形成した切除部分にジャッキを設置する工程と、
試験荷重の反力を既存建物から得ることが可能にコンクリート反力体を用意する工程と、
コンクリート反力体に反力を得て、前記ジャッキにより既存杭に試験荷重を加えて支持性能を測定する工程と、
から成ることを特徴とする。
As a means for solving the problems of the prior art, a vertical loading test method for an existing pile according to the invention described in claim 1 is:
A vertical loading test method for reusing an existing pile located directly under a pillar of an existing building when rebuilding an existing building,
Cutting the edge between the existing pile to be tested and the foundation frame of the existing building;
Cutting the edge of the foundation frame just above the existing pile to be tested and the pillar of the existing building, and installing a jack in the excised part formed between the two;
A step of preparing a concrete reaction body so that a reaction force of a test load can be obtained from an existing building;
Obtaining a reaction force on the concrete reaction force body, applying a test load to the existing pile with the jack and measuring the supporting performance;
It is characterized by comprising.

請求項2記載の発明は、請求項1に記載した既存杭の鉛直載荷試験方法において、
試験対象である既存杭直上の基礎躯体を、前記既存杭の平面形状とほぼ同形にくり貫いて、既存杭と基礎躯体の縁を切ることを特徴とする。
The invention according to claim 2 is the vertical loading test method for existing piles according to claim 1,
The foundation frame just above the existing pile to be tested is cut into the same shape as the planar shape of the existing pile, and the edges of the existing pile and the foundation frame are cut.

請求項3記載の発明は、請求項1に記載した既存杭の鉛直載荷試験方法において、
コンクリート反力体は鉄筋コンクリート造又は鉄骨鉄筋コンクリート造若しくは鉄骨コンクリート造として用意することを特徴とする。
The invention according to claim 3 is the vertical loading test method for existing piles according to claim 1,
The concrete reaction body is prepared as a reinforced concrete structure, a steel reinforced concrete structure, or a steel concrete structure.

請求項4記載の発明は、請求項1又は3に記載した既存杭の鉛直載荷試験方法において、
コンクリート反力体は、試験対象である既存杭の直上に位置する柱を中心とした柱・梁架構の面内に、反力壁を上下方向に単層又は複数層連続するように形成して用意することを特徴とする。
Invention of Claim 4 is the vertical load test method of the existing pile described in Claim 1 or 3,
The concrete reaction force body is formed so that the reaction force wall is continuous in a single layer or multiple layers in the vertical direction in the plane of the column / beam frame centered on the column located directly above the existing pile to be tested. It is characterized by preparing.

請求項5記載の発明は、請求項4に記載した既存杭の鉛直載荷試験方法において、
反力壁は、平面方向から見て試験対象である既存杭の直上に位置する柱を中心として両側の柱・梁架構、又は前記柱を中心として交差する複数方向に隣接する柱・梁架構に形成することを特徴とする。
The invention according to claim 5 is the vertical loading test method for existing piles according to claim 4,
The reaction wall is a column / beam frame on both sides centered on a column located directly above the existing pile to be tested as viewed from the plane direction, or a column / beam frame adjacent in multiple directions that intersects the column. It is characterized by forming.

請求項6記載の発明は、請求項4又は5に記載した既存杭の鉛直載荷試験方法において、
反力壁は柱・梁架構の左右の柱間を繋ぐように形成することを特徴とする。
Invention of Claim 6 is the vertical load test method of the existing pile described in Claim 4 or 5,
The reaction wall is formed so as to connect the left and right columns of the column / beam frame.

請求項7記載の発明は、請求項4〜6のいずれか一に記載した既存杭の鉛直載荷試験方法において、
反力壁は既存壁を用いて形成することを特徴とする。
Invention of Claim 7 is the vertical loading test method of the existing pile described in any one of Claims 4-6,
The reaction wall is formed using an existing wall.

請求項8記載の発明は、請求項1又は請求項4〜7のいずれか一に記載した既存杭の鉛直載荷試験方法において、
基礎躯体と縁を切られる柱を中心とした柱・梁架構に形成した反力壁を支保工として用いて、試験対象の既存杭直上の基礎躯体と前記柱との縁を切ることを特徴とする。
Invention of Claim 8 is the vertical loading test method of the existing pile described in any one of Claim 1 or Claims 4-7,
It is characterized by cutting the edge of the foundation frame just above the existing pile to be tested using the reaction wall formed on the column / beam frame centered on the column that can be cut off the edge of the foundation frame and the column. To do.

請求項9記載の発明は、請求項4〜8のいずれか一に記載した既存杭の鉛直載荷試験方法において、
基礎躯体と縁を切られる柱を中心とした柱・梁架構に形成する反力壁と前記柱との間には、少なくともジャッキを設置する高さ領域に作業スペースを形成することを特徴とする。
Invention of Claim 9 is the vertical load test method of the existing pile described in any one of Claims 4-8,
A working space is formed at least in a height region where a jack is installed between the pillar and the reaction force wall formed on a pillar / beam frame centered on a pillar whose edge is cut off from the foundation frame. .

請求項10記載の発明は、請求項9に記載した既存杭の鉛直載荷試験方法において、
反力壁は、基礎躯体と縁を切られる柱との間に作業スペースの幅寸法と略等しい間隔を開けて形成し、切除部分より上位の柱と反力壁との間を埋めるように後打ち壁を構築し、ジャッキを設置する高さ領域に作業スペースを形成することを特徴とする。
The invention according to claim 10 is the vertical loading test method for existing piles according to claim 9,
The reaction wall is formed with a space approximately equal to the width of the work space between the foundation frame and the pillar to be cut, and the reaction wall is placed so that it fills the space between the pillar and the reaction wall above the cut part. A striking wall is constructed, and a working space is formed in a height region where a jack is installed.

請求項11記載の発明は、請求項10に記載した既存杭の鉛直載荷試験方法において、
後打ち壁は、試験対象の既存杭と既存建物の柱との縁を切った後に、同既存杭直上の基礎躯体を掘り下げてその上端部に設置されたジャッキと連結できるように、下方まで延長して構築することを特徴とする。
The invention according to claim 11 is the vertical loading test method for an existing pile according to claim 10,
After the edge of the existing pile to be tested and the pillar of the existing building is cut, the trailing wall is extended downward so that the foundation frame just above the existing pile can be dug down and connected to the jack installed at the upper end. It is characterized by building.

請求項12記載の発明は、請求項9に記載した既存杭の鉛直載荷試験方法において、
作業スペースが広い場合は、切除部分より上位の柱の周辺に補強用の反力壁又は反力柱を構築することを特徴とする。
Invention of Claim 12 is the vertical load test method of the existing pile described in Claim 9,
When the work space is wide, a reinforcing reaction force wall or reaction force column is constructed around the column above the cut portion.

請求項13記載の発明は、請求項1又は3に記載した既存杭の鉛直載荷試験方法において、
コンクリート反力体は、基礎躯体の直上の上階床下面又は上面若しくは双方の面において、試験対象の既存杭の直上に位置する柱周辺の複数本の柱で囲まれた領域に反力スラブを構築して用意することを特徴とする。
The invention according to claim 13 is the vertical loading test method for existing piles according to claim 1 or 3,
The concrete reaction force body has a reaction force slab in the area surrounded by multiple columns around the column located directly above the existing pile to be tested on the lower or upper surface of the upper floor or both surfaces directly above the foundation frame. It is constructed and prepared.

請求項14記載の発明は、請求項13に記載した既存杭の鉛直載荷試験方法において、
反力スラブに加えて、試験対象である杭の直上に位置する柱を中心とした柱・梁架構の面内に、反力壁を上下方向に単層又は複数層連続するように形成し、コンクリート反力体を用意することを特徴とする。
The invention according to claim 14 is the vertical loading test method for existing piles according to claim 13,
In addition to the reaction slab, in the plane of the column / beam frame centering on the column located directly above the pile to be tested, the reaction force wall is formed to be continuous in a single layer or multiple layers in the vertical direction, A concrete reaction body is prepared.

請求項15記載の発明は、請求項4〜10又は請求項14のいずれか一に記載した既存杭の鉛直載荷試験方法において、
反力壁は既存建物から試験荷重の反力を得ることが可能な高さまで、上下方向に連続するように単層又は複数層に亘って形成することを特徴とする。
Invention of Claim 15 is the vertical load test method of the existing pile described in any one of Claims 4-10 or Claim 14,
The reaction force wall is formed over a single layer or a plurality of layers so as to be continuous in the vertical direction up to a height at which the reaction force of the test load can be obtained from the existing building.

請求項16記載の発明は、請求項1又は請求項3、4又は請求項13、14のいずれか一に記載した既存杭の鉛直載荷試験方法において、
コンクリート反力体は新築建物の本設躯体として利用することを特徴とする。
Invention of Claim 16 is the vertical load test method of the existing pile described in any one of Claim 1 or Claim 3, 4 or Claims 13 and 14,
The concrete reaction body is used as the main frame of the new building.

本発明に係る既存杭の鉛直載荷試験方法は、既存建物に剛強なコンクリート反力体を用意し、同コンクリート反力体に反力を得て、基礎躯体と縁を切った既存杭に載荷試験を実施するので、前記既存建物に反力を得て既存杭に大きな試験荷重を加えることができる。   The vertical loading test method for an existing pile according to the present invention is to prepare a strong concrete reaction body in an existing building, obtain a reaction force from the concrete reaction body, and load test the existing pile with the foundation frame cut off. Therefore, a large test load can be applied to the existing pile by obtaining a reaction force on the existing building.

既存建物の基礎躯体の上方空間で載荷試験を実施できるので、地盤を掘削する必要が無く、山留め壁等の構築やその他の付随作業を一切省略できる。また、掘削土が発生し搬出する必要がないし、載荷試験に用いるジャッキ等の試験装置の搬入、搬出が容易なので、施工性が良く、コストの削減にも寄与できる。しかも、地下水位に影響を受けない。   Since the loading test can be carried out in the space above the foundation frame of the existing building, it is not necessary to excavate the ground, and construction of retaining walls and other incidental work can be omitted at all. In addition, excavated soil does not need to be generated and carried out, and it is easy to carry in and out a testing device such as a jack used for the loading test, so that the workability is good and the cost can be reduced. Moreover, it is not affected by the groundwater level.

特に、請求項7に記載した発明に係る既存杭の鉛直載荷試験方法は、既存壁でコンクリート反力体の反力壁を形成するので、反力壁の構築を省略でき、施工性が更によくなり、コストの削減と工期の短縮に寄与できる。   In particular, the vertical loading test method of the existing pile according to the invention described in claim 7 forms the reaction wall of the concrete reaction body with the existing wall, so that the construction of the reaction wall can be omitted and the workability is further improved. Therefore, it can contribute to cost reduction and shortening of construction period.

更に、請求項8に記載した発明に係る既存杭の鉛直載荷試験方法は、反力壁を支保工として用いて、試験対象の既存杭直上の基礎躯体と柱との縁を切るので、通例の支保工を既存建物内に搬入し組み立てる必要がなく、やはり施工性が更によくなり、コストの削減と工期の短縮に寄与できる。   Furthermore, since the vertical loading test method of the existing pile according to the invention described in claim 8 uses the reaction wall as a supporting work and cuts the edge of the foundation frame and the column just above the existing pile to be tested, There is no need to carry the support work into the existing building and assemble it, and the workability is improved further, contributing to cost reduction and shortening of the construction period.

試験対象の既存杭と既存建物の基礎躯体との縁を切る。前記試験対象の既存杭直上の基礎躯体と既存建物の柱との縁を切り、両者の間に形成した切除部分にジャッキを設置する。試験荷重の反力を既存建物から得ることが可能にコンクリート反力体を用意し、同コンクリート反力体に反力を得て、前記ジャッキにより既存杭に試験荷重を加えて支持性能を測定する。   Cut the edge between the existing pile to be tested and the foundation frame of the existing building. The edge of the foundation frame just above the existing pile to be tested and the pillar of the existing building is cut, and a jack is installed at the cut portion formed between the two. Prepare a concrete reaction body that can obtain the reaction force of the test load from the existing building, obtain the reaction force from the concrete reaction body, apply the test load to the existing pile with the jack and measure the support performance .

請求項1〜9及び請求項15、16に記載した発明に係る既存杭の鉛直載荷試験方法の実施例を、図1〜図4に基づいて説明する。本実施例の載荷試験方法は、既存建物1の柱2(以下、既存柱2と省略する。)と梁3(以下、既存梁3と省略する。)とで形成された架構4の面内に構築されている既存壁5を有効利用して、既存柱2の直下に位置する既存杭6に載荷試験を実施する。   The Example of the vertical loading test method of the existing pile which concerns on the invention described in Claims 1-9 and Claims 15 and 16 is described based on FIGS. The loading test method of the present embodiment is based on the in-plane structure 4 formed by the pillar 2 of the existing building 1 (hereinafter abbreviated as “existing pillar 2”) and the beam 3 (hereinafter abbreviated as “existing beam 3”). The loading test is carried out on the existing pile 6 located immediately below the existing pillar 2 by effectively using the existing wall 5 constructed in the above.

先ず、既存建物1の複数本の既存杭6…の中から試験対象の既存杭(以下、試験杭と省略する。)6aを選択する(図1(A)、(B)を参照)。この試験杭6aの直上に位置する最下層の既存柱2aの周辺に、後に試験杭6aと基礎躯体7との縁を切ったり、ジャッキ(図4を参照)8を設置したりする際の作業スペースSを、少なくとも前記ジャッキ8を設置する高さ領域に形成するべく、既存壁5の一部を取り壊す(請求項9記載の発明)。ちなみに、基礎躯体7は、既存杭6直上のフーチング7aが基礎梁7bで連結された構成であり、図中の符号7a’は試験杭6a直上のフーチングを示す。   First, an existing pile (hereinafter abbreviated as “test pile”) 6a to be tested is selected from a plurality of existing piles 6 of the existing building 1 (see FIGS. 1A and 1B). Work when cutting the edge of the test pile 6a and the foundation frame 7 or installing a jack (see FIG. 4) 8 around the existing pillar 2a in the lowermost layer located immediately above the test pile 6a A part of the existing wall 5 is demolished in order to form the space S at least in a height region where the jack 8 is installed (the invention according to claim 9). Incidentally, the foundation frame 7 has a structure in which the footing 7a directly above the existing pile 6 is connected by the foundation beam 7b, and the reference numeral 7a 'in the figure indicates the footing directly above the test pile 6a.

試験杭6a直上のフーチング7a’を、上方からコアリング等の手段で前記試験杭6aの平面形状とほぼ同形にくり貫いて、試験杭6aと基礎梁7bとの縁を切る(図2を参照、請求項2記載の発明)。   The footing 7a 'directly above the test pile 6a is cut from the upper side by means of coring or the like in substantially the same shape as the planar shape of the test pile 6a, and the edges of the test pile 6a and the foundation beam 7b are cut (see FIG. 2). The invention of claim 2).

試験杭6aの上方空間に試験荷重の反力を既存建物1から得ることが可能にコンクリート反力体9を用意する。その手段として、図1(B)に示すように試験杭6aの直上に位置する既存柱2aを中心にして直交方向に隣接する各架構4…の面内に、左右の既存柱2aと2を繋ぎ、且つ既存梁3を挟んで構築されている鉄筋コンクリート造の既存壁5を反力壁10として用いる。反力壁10は、試験荷重の反力を得ることが可能な高さまで上下方向に連続するように複数層に亘って形成され、結果として剛強なコンクリート反力体9が構成されるので、既存建物1に反力を得て試験杭6aに大きな試験荷重を加えることができる(請求項3〜7及び請求項15記載の発明)。しかも、既存壁5で反力壁10を形成するので、反力壁10の構築を省略でき、施工性が良く、コストの削減と工期の短縮に寄与できる。もちろん、コンクリート反力体9を用意する際に、既存建物の什器、設備機器などによるスペースの制約を受けることがないので適用範囲が広い。   A concrete reaction body 9 is prepared in a space above the test pile 6a so that a reaction force of the test load can be obtained from the existing building 1. As the means, as shown in FIG. 1 (B), the left and right existing columns 2a and 2 are placed in the plane of each frame 4 adjacent in the orthogonal direction with the existing column 2a positioned directly above the test pile 6a as the center. The existing wall 5 made of reinforced concrete that is connected and sandwiched between the existing beams 3 is used as the reaction wall 10. The reaction wall 10 is formed over a plurality of layers so as to be continuous in the vertical direction up to a height at which a reaction force of the test load can be obtained, and as a result, a strong concrete reaction body 9 is formed. A reaction force can be obtained on the building 1 and a large test load can be applied to the test pile 6a (inventions according to claims 3 to 7 and claim 15). Moreover, since the reaction wall 10 is formed by the existing wall 5, the construction of the reaction wall 10 can be omitted, the workability is good, and the cost can be reduced and the construction period can be shortened. Of course, when the concrete reaction body 9 is prepared, the application range is wide because there is no space restriction due to fixtures or equipment of existing buildings.

最下層の反力壁10…を支保工として用い、同反力壁10…で囲まれた既存柱2aの下端部を所定の高さ(後にジャッキ8を設置できる高さ)切除し、試験杭6a直上のフーチング7a’と既存柱2aとの縁を切る(図3を参照)。反力壁10を支保工として用いるので、通例の支保工を既存建物内に搬入し組み立てる必要がなく、やはり施工性が良く、コストの削減と工期の短縮に寄与できる。   The lowermost reaction wall 10 is used as a support, the lower end of the existing pillar 2a surrounded by the reaction wall 10 is cut to a predetermined height (the height at which the jack 8 can be installed later), and the test pile Cut the edge between the footing 7a 'immediately above 6a and the existing pillar 2a (see FIG. 3). Since the reaction wall 10 is used as a support work, it is not necessary to carry a regular support work into an existing building and assemble it, and the workability is also good, which can contribute to cost reduction and construction time reduction.

切除部分Hにジャッキ8を設置し、同ジャッキ8の上端部と既存柱2aの下端部とを繋ぎ、ジャッキ8により試験荷重を加えて支持性能を測定する(図4を参照、請求項8記載の発明)。既存建物1の基礎躯体7の上方空間で載荷試験を実施できるので、地盤を掘削する必要が無く、山留め壁等の構築やその他の付随作業を一切省略できる。また、掘削土が発生し搬出する必要がないし、載荷試験に用いるジャッキ等の試験装置の搬入、搬出が容易なので、施工性が良く、コストの削減にも寄与できる。しかも、地下水位に影響を殆ど受けない。   The jack 8 is installed in the cut portion H, the upper end portion of the jack 8 is connected to the lower end portion of the existing pillar 2a, and the support performance is measured by applying a test load with the jack 8 (see FIG. 4, claim 8). Invention). Since the loading test can be carried out in the space above the foundation frame 7 of the existing building 1, there is no need to excavate the ground, and construction of a retaining wall and other incidental work can be omitted. In addition, excavated soil does not need to be generated and carried out, and it is easy to carry in and out a testing device such as a jack used for the loading test, so that the workability is good and the cost can be reduced. Moreover, it is hardly affected by the groundwater level.

その後、既存建物1を解体し、上記のように載荷試験を実施し支持性能を確認した既存杭6を、新築建物の杭として再利用するが、このとき、コンクリート反力体9を解体することなく、新築建物の本設躯体として利用すると経済的である(請求項16記載の発明)。   After that, the existing building 1 is dismantled and the existing pile 6 that has been subjected to the loading test and confirmed the supporting performance as described above is reused as the pile of the new building. At this time, the concrete reaction body 9 is dismantled. However, it is economical to use it as a main structure of a new building (invention of claim 16).

上記実施例1は既存壁5を用いて反力壁10を形成しているが、既存壁5がない場合は、図5に示すように反力壁11及び後打ち壁12を構築してコンクリート反力体9を用意する。   In the first embodiment, the reaction wall 10 is formed by using the existing wall 5. However, when there is no existing wall 5, the reaction wall 11 and the trailing wall 12 are constructed as shown in FIG. A reaction body 9 is prepared.

具体的には、試験杭6aの直上に位置する既存柱2aを中心として直交方向に隣接する各架構4…の面内に、反力壁11を試験荷重の反力を得ることが可能な高さまで上下方向に複数層(本実施例では2層であるが、単層でも良い。)連続するように構築する。このとき、上記実施例1と同様に、最下層の既存柱2aの周辺においてジャッキ8を設置する高さ領域に作業スペースSを形成するべく、先ず反力壁11を前記既存柱2aと作業スペースSの幅寸法と略等しい間隔を開けて構築する。そして、切除部分Hより上位の既存柱2aと反力壁11との間に後打ち壁12を構築して、左右の既存柱2aと2を前記後打ち壁12を介して反力壁11で繋ぐ(請求項10記載の発明)。   Specifically, the reaction force wall 11 can obtain the reaction force of the test load in the plane of each of the frames 4 adjacent to each other in the orthogonal direction with the existing column 2a positioned immediately above the test pile 6a as the center. It is constructed so that a plurality of layers are continuous in the vertical direction (two layers in this embodiment, but may be a single layer). At this time, in the same manner as in the first embodiment, in order to form the work space S in the height region where the jack 8 is installed around the existing pillar 2a in the lowermost layer, first, the reaction wall 11 is placed between the existing pillar 2a and the work space. It is constructed with an interval substantially equal to the width dimension of S. Then, the rear striking wall 12 is constructed between the existing pillar 2 a higher than the cut portion H and the reaction wall 11, and the left and right existing pillars 2 a and 2 are connected to the reaction wall 11 via the rear striking wall 12. Connect (Invention of Claim 10).

その後、反力壁11…で囲まれた既存柱2aの下端部を所定の高さ切除し、試験杭6a直上のフーチング7a’と既存柱2aとの縁を切るが、上記実施例1と同様に、反力壁11を支保工として用いることができる。   Thereafter, the lower end portion of the existing column 2a surrounded by the reaction wall 11 is cut to a predetermined height, and the edge between the footing 7a 'immediately above the test pile 6a and the existing column 2a is cut. Further, the reaction wall 11 can be used as a support work.

なお、本実施例では切除部分Hより上位の既存柱2aと反力壁11とを繋ぐように後打ち壁12を構築したが、図6に示すように反力壁11で一体的に構築しても良い。   In this embodiment, the rear striking wall 12 is constructed so as to connect the existing pillar 2a higher than the cut portion H and the reaction force wall 11, but it is constructed integrally with the reaction force wall 11 as shown in FIG. May be.

また、後打ち壁12の高さを稼いで大きな反力を得るべく、図7及び図8に示すようにフーチング7a’を掘り下げた場合は、この掘り下げたフーチング7a’又は基礎梁7bの上端部に設置されたジャッキ8と連結できるように、下方まで延長して構築する(請求項11記載の発明)。   Further, when the footing 7a 'is dug down as shown in FIGS. 7 and 8 in order to increase the height of the trailing wall 12 and obtain a large reaction force, the upper end of the dug footing 7a' or the foundation beam 7b. It is constructed to extend downward so that it can be connected to the jack 8 installed in the invention (the invention according to claim 11).

上記実施例1及び2は、反力壁10(11)を試験杭6aの直上に位置する既存柱2aを中心として直交方向に隣接する各架構4…に形成(構築)しているが、図9に示すように前記既存柱2aを中心として両側の架構4、4に形成(構築)しても良い。その場合は、図10に示すように隣接する既存柱2を取り込むように反力壁10(11)を形成(構築)すると、大きな反力を得ることができる。もちろん、前記既存柱2と2の間の既存柱2aも取り込むように形成(構築)すると更に良い。   In the first and second embodiments, the reaction wall 10 (11) is formed (constructed) on each of the frames 4 adjacent to each other in the orthogonal direction with the existing column 2a positioned directly above the test pile 6a as a center. As shown in FIG. 9, it may be formed (constructed) on the frames 4 and 4 on both sides around the existing pillar 2a. In that case, a large reaction force can be obtained by forming (constructing) the reaction force wall 10 (11) so as to take in the adjacent existing pillar 2 as shown in FIG. Of course, it is better to form (construct) the existing pillar 2a between the existing pillars 2 and 2 so as to be taken in.

ちなみに、既存柱2(2a)を取り込むように反力壁10(11)を形成(構築)することは、既存柱2aを中心として直交方向に隣接する各架構4…に形成(構築)する場合でも同様に云えることである。   Incidentally, forming (constructing) the reaction force wall 10 (11) so as to take in the existing pillar 2 (2a) is when forming (constructing) each frame 4 adjacent in the orthogonal direction around the existing pillar 2a. But the same is true.

上記実施例1〜3は、大きな反力を得るために、架構4の面内のほぼ全域に反力壁10(11)を形成したが、大きな反力を得る必要がない場合は、架構4の面内の一部分に反力壁10(11)を形成すれば良い。その場合は、図11に示すように作業スペースSを広く確保して反力壁10(11)を形成したり、図12に示すように既存梁3の支点間距離を考慮して反力壁10(11)を形成するが、切除部分Hより上位の既存柱2aの周辺に補強用の反力壁13(又は反力柱でも良い。)を構築すると、反力壁10(11)を小型化すると共に比較的大きな反力を得ることができる(請求項12記載の発明)。   In the first to third embodiments, the reaction wall 10 (11) is formed almost in the entire area of the frame 4 in order to obtain a large reaction force. However, when it is not necessary to obtain a large reaction force, the frame 4 The reaction wall 10 (11) may be formed in a part of the surface of the surface. In that case, the reaction wall 10 (11) is formed by securing a wide working space S as shown in FIG. 11, or the reaction wall is considered in consideration of the distance between fulcrums of the existing beam 3 as shown in FIG. 10 (11) is formed, but if a reinforcing reaction wall 13 (or a reaction force column may be used) is constructed around the existing pillar 2a above the cut portion H, the reaction wall 10 (11) is reduced in size. And a relatively large reaction force can be obtained (the invention according to claim 12).

上記実施例1〜4は反力壁10(11)などを用いてコンクリート反力体9を用意しているが、図13(A)、(B)に示すように反力スラブ14、15を用いて用意しても良い。   Although the said Example 1-4 has prepared the concrete reaction force body 9 using reaction force wall 10 (11) etc., as shown to FIG. 13 (A) and (B), reaction force slabs 14 and 15 are provided. You may prepare it.

具体的には、基礎躯体7の直上に位置する上階床16下面において、試験杭6aの直上に位置する既存柱2a周辺の複数本(本実施例では8本)の既存柱2…で囲まれた領域に下側の反力スラブ14を構築する。更に前記上階床16上面にも同じく複数本の既存柱2…で囲まれた領域に上側の反力スラブ15を構築して、コンクリート反力体9を用意する(請求項13記載の発明)。このとき、図示例のように反力スラブ14、15で複数本の既存柱2…を取り込むように構築すると、大きな反力を得ることができる。   Specifically, on the lower surface of the upper floor 16 located just above the foundation frame 7, the surroundings are surrounded by a plurality (eight in this embodiment) of existing pillars 2 around the existing pillar 2a located immediately above the test pile 6a. A lower reaction force slab 14 is constructed in the region. Further, an upper reaction force slab 15 is constructed on an upper surface of the upper floor 16 in a region surrounded by a plurality of existing pillars 2 to prepare a concrete reaction force body 9 (invention according to claim 13). . At this time, if the reaction force slabs 14 and 15 are constructed to take in a plurality of existing pillars 2 as shown in the illustrated example, a large reaction force can be obtained.

なお、試験荷重の大きさを考慮して、下側の反力スラブ14又は上側の反力スラブ15のみを構築して反力を得ても良い。この場合は、図14に示すように試験杭6aの直上に位置する既存柱2a近傍を厚く構築し、同既存柱2aから遠方に向かって徐々に薄く構築すると、合理的に大きな反力を得ることができる構成となる。   In consideration of the magnitude of the test load, the reaction force may be obtained by constructing only the lower reaction force slab 14 or the upper reaction force slab 15. In this case, as shown in FIG. 14, when the vicinity of the existing column 2a located immediately above the test pile 6a is built thick, and gradually built thin from the existing column 2a toward the far side, a reasonably large reaction force is obtained. It becomes the structure which can do.

また、上下方向に単層又は複数層連続するように反力スラブ(結果としてブロック状の反力壁となる。)を構築しても良い。   Further, a reaction force slab (resulting in a block-like reaction force wall) may be constructed so that a single layer or a plurality of layers are continuous in the vertical direction.

要するに、コンクリート反力体9は所定の大きさの反力を既存建物1から得ることが可能な構成とされていれば良く、図15に示すように反力壁10と反力スラブ15とを組み合わせて用意したり、図示は省略するが反力壁を形成した架構の周辺架構にブレースを構築して用意しても良い(請求項14記載の発明)。   In short, it is sufficient that the concrete reaction body 9 has a structure capable of obtaining a reaction force of a predetermined size from the existing building 1, and the reaction wall 10 and the reaction force slab 15 are provided as shown in FIG. They may be prepared in combination, or although not shown, braces may be constructed and prepared on the frame around the frame formed with the reaction force wall (the invention according to claim 14).

また、コンクリート反力体9の反力壁10(11)を、立面視が図13に示すような形状(結果として、梁の如く形状となる。)に形成したり、図14に示すような形状に形成しても良い。   Further, the reaction force wall 10 (11) of the concrete reaction body 9 is formed into a shape as shown in FIG. 13 (resulting in a shape like a beam) or as shown in FIG. It may be formed in any shape.

図1(A)等に示す既存建物1の基礎躯体7は、既存杭6直上のフーチング7aが基礎梁7bで連結された構成であるが、図16に示すように基礎スラブ17で構成されていても、略同様に実施できる。   The foundation frame 7 of the existing building 1 shown in FIG. 1 (A) or the like has a configuration in which a footing 7a directly above the existing pile 6 is connected by a foundation beam 7b, but is configured by a foundation slab 17 as shown in FIG. However, it can be implemented in substantially the same manner.

以上に本発明の実施例を説明したが、本発明はこうした実施例に何ら限定されるものではなく、本発明の要旨を逸脱しない範囲において、種々の形態で実施し得る。   Although the embodiments of the present invention have been described above, the present invention is not limited to these embodiments and can be implemented in various forms without departing from the gist of the present invention.

(A)は実施例1の既存杭の鉛直載荷試験方法の手順を概念的に示した立面図である。(B)は水平断面図である。(A) is the elevation which conceptually showed the procedure of the vertical loading test method of the existing pile of Example 1. FIG. (B) is a horizontal sectional view. 実施例1の既存杭の鉛直載荷試験方法の手順を概念的に示した立面図である。It is the elevation which showed the procedure of the vertical loading test method of the existing pile of Example 1 notionally. 実施例1の既存杭の鉛直載荷試験方法の手順を概念的に示した立面図である。It is the elevation which showed the procedure of the vertical loading test method of the existing pile of Example 1 notionally. 実施例1の既存杭の鉛直載荷試験方法の手順を概念的に示した立面図である。It is the elevation which showed the procedure of the vertical loading test method of the existing pile of Example 1 notionally. 実施例2の既存杭の鉛直載荷試験方法で載荷試験を実施する直前の状態を概念的に示した立面図である。It is the elevation which showed notionally the state just before implementing a loading test with the vertical loading test method of the existing pile of Example 2. FIG. 実施例2の異なる形態を概念的に示した立面図である。It is the elevation which conceptually showed the different form of Example 2. 実施例2の更に異なる形態を概念的に示した立面図である。It is the elevation which showed still another form of Example 2 notionally. 実施例2の更に異なる形態を概念的に示した立面図である。It is the elevation which showed still another form of Example 2 notionally. 反力壁の異なる配置関係を示した水平断面図である。It is the horizontal sectional view which showed the different arrangement | positioning relationship of a reaction force wall. 図9の異なる形態を示した水平断面図である。It is the horizontal sectional view which showed the different form of FIG. 実施例4の既存杭の鉛直載荷試験方法で載荷試験を実施する直前の状態を概念的に示した立面図である。It is the elevation which showed notionally the state just before implementing a loading test with the vertical loading test method of the existing pile of Example 4. FIG. 実施例4の異なる形態を概念的に示した立面図である。It is the elevation which showed notionally different forms of Example 4. (A)は実施例5の既存杭の鉛直載荷試験方法で載荷試験を実施する直前の状態を概念的に示した立面図である。(B)は水平断面図である。(A) is the elevation which showed notionally the state just before implementing a loading test with the vertical loading test method of the existing pile of Example 5. FIG. (B) is a horizontal sectional view. 実施例5の異なる形態を概念的に示した立面図である。It is the elevation which conceptually showed the different form of Example 5. 実施例6の既存杭の鉛直載荷試験方法で載荷試験を実施する直前の状態を概念的に示した立面図である。It is the elevation which showed notionally the state just before implementing a loading test with the vertical loading test method of the existing pile of Example 6. FIG. 実施例7の既存杭の鉛直載荷試験方法で載荷試験を実施する直前の状態を概念的に示した立面図である。It is the elevation which showed notionally the state just before implementing a loading test with the vertical loading test method of the existing pile of Example 7. FIG.

符号の説明Explanation of symbols

1 既存建物
2 既存建物の柱
2a 試験対象である既存杭の直上に位置する柱
4 柱・梁架構
5 既存壁
6 既存杭
6a 試験対象の既存杭(試験杭)
7 基礎躯体
8 ジャッキ
9 コンクリート反力体
10 反力壁
11 反力壁
12 後打ち壁
13 補強用の反力壁
14、15 反力スラブ
16 基礎躯体の直上に位置する上階床
17 基礎スラブ
H 切除部分
S 作業スペース
1 Existing building 2 Column of existing building 2a Column located immediately above existing pile to be tested 4 Column / beam frame 5 Existing wall 6 Existing pile 6a Existing pile to be tested (test pile)
7 foundation frame 8 jack 9 concrete reaction force body 10 reaction force wall 11 reaction force wall 12 trailing wall 13 reinforcement reaction wall 14, 15 reaction force slab 16 upper floor located directly above foundation frame 17 foundation slab H Cut section S Work space

Claims (16)

既存建物の建て替えに際し、既存建物の柱の直下に位置する既存杭を再利用するための鉛直載荷試験方法であって、
試験対象の既存杭と既存建物の基礎躯体との縁を切る工程と、
前記試験対象の既存杭直上の基礎躯体と既存建物の柱との縁を切り、両者の間に形成した切除部分にジャッキを設置する工程と、
試験荷重の反力を既存建物から得ることが可能にコンクリート反力体を用意する工程と、
コンクリート反力体に反力を得て、前記ジャッキにより既存杭に試験荷重を加えて支持性能を測定する工程と、
から成ることを特徴とする、既存杭の鉛直載荷試験方法。
A vertical loading test method for reusing an existing pile located directly under a pillar of an existing building when rebuilding an existing building,
Cutting the edge between the existing pile to be tested and the foundation frame of the existing building;
Cutting the edge of the foundation frame just above the existing pile to be tested and the pillar of the existing building, and installing a jack in the excised part formed between the two;
A step of preparing a concrete reaction body so that a reaction force of a test load can be obtained from an existing building;
Obtaining a reaction force on the concrete reaction force body, applying a test load to the existing pile with the jack and measuring the supporting performance;
A vertical loading test method for existing piles, comprising:
試験対象である既存杭直上の基礎躯体を、前記既存杭の平面形状とほぼ同形にくり貫いて、既存杭と基礎躯体の縁を切ることを特徴とする、請求項1に記載した既存杭の鉛直載荷試験方法。   2. The existing pile according to claim 1, wherein the foundation pile directly above the existing pile to be tested is cut into substantially the same shape as the planar shape of the existing pile, and the edges of the existing pile and the foundation pile are cut. Vertical loading test method. コンクリート反力体は鉄筋コンクリート造又は鉄骨鉄筋コンクリート造若しくは鉄骨コンクリート造として用意することを特徴とする、請求項1に記載した既存杭の鉛直載荷試験方法。   The method for vertical loading test of an existing pile according to claim 1, wherein the concrete reaction body is prepared as a reinforced concrete structure, a steel reinforced concrete structure or a steel concrete structure. コンクリート反力体は、試験対象である既存杭の直上に位置する柱を中心とした柱・梁架構の面内に、反力壁を上下方向に単層又は複数層連続するように形成して用意することを特徴とする、請求項1又は3に記載した既存杭の鉛直載荷試験方法。   The concrete reaction force body is formed so that the reaction force wall is continuous in a single layer or multiple layers in the vertical direction in the plane of the column / beam frame centered on the column located directly above the existing pile to be tested. The vertical loading test method for an existing pile according to claim 1, wherein the method is prepared. 反力壁は、平面方向から見て試験対象である既存杭の直上に位置する柱を中心として両側の柱・梁架構、又は前記柱を中心として交差する複数方向に隣接する柱・梁架構に形成することを特徴とする、請求項4に記載した既存杭の鉛直載荷試験方法。   The reaction wall is a column / beam frame on both sides centered on a column located immediately above the existing pile to be tested as seen from the plane direction, or a column / beam frame adjacent in multiple directions that intersects the column. The vertical loading test method of the existing pile according to claim 4, wherein the pile is formed. 反力壁は柱・梁架構の左右の柱間を繋ぐように形成することを特徴とする、請求項4又は5に記載した既存杭の鉛直載荷試験方法。   The vertical loading test method for an existing pile according to claim 4 or 5, wherein the reaction wall is formed so as to connect the left and right columns of the column / beam frame. 反力壁は既存壁を用いて形成することを特徴とする、請求項4〜6のいずれか一に記載した既存杭の鉛直載荷試験方法。   The vertical loading test method for an existing pile according to any one of claims 4 to 6, wherein the reaction wall is formed using the existing wall. 基礎躯体と縁を切られる柱を中心とした柱・梁架構に形成した反力壁を支保工として用いて、試験対象の既存杭直上の基礎躯体と前記柱との縁を切ることを特徴とする、請求項1又は請求項4〜7のいずれか一に記載した既存杭の鉛直載荷試験方法。   It is characterized by cutting the edge of the foundation frame just above the existing pile to be tested and the column using the reaction wall formed on the pillar / beam frame centered on the column that can be cut off the edge of the foundation frame. The vertical loading test method of the existing pile described in any one of claims 1 or 4 to 7. 基礎躯体と縁を切られる柱を中心とした柱・梁架構に形成する反力壁と前記柱との間には、少なくともジャッキを設置する高さ領域に作業スペースを形成することを特徴とする、請求項4〜8のいずれか一に記載した既存杭の鉛直載荷試験方法。   A working space is formed at least in a height region where a jack is installed between the reaction force wall formed on a pillar / beam frame centered on a pillar whose edge is cut off from the foundation frame and the pillar. The vertical loading test method of the existing pile described in any one of Claims 4-8. 反力壁は、基礎躯体と縁を切られる柱との間に作業スペースの幅寸法と略等しい間隔を開けて形成し、切除部分より上位の柱と反力壁との間を埋めるように後打ち壁を構築し、ジャッキを設置する高さ領域に作業スペースを形成することを特徴とする、請求項9に記載した既存杭の鉛直載荷試験方法。   The reaction wall is formed with a space approximately equal to the width of the work space between the foundation frame and the pillar to be cut, and the reaction wall is placed so as to fill the space between the pillar and the reaction wall above the cut part. The vertical loading test method for an existing pile according to claim 9, wherein a working space is formed in a height region where a striking wall is constructed and a jack is installed. 後打ち壁は、試験対象の既存杭と既存建物の柱との縁を切った後に、同既存杭直上の基礎躯体を掘り下げてその上端部に設置されたジャッキと連結できるように、下方まで延長して構築することを特徴とする、請求項10に記載した既存杭の鉛直載荷試験方法。   After the edge of the existing pile to be tested and the pillar of the existing building is cut, the trailing wall is extended downward so that the foundation frame just above the existing pile can be dug down and connected to the jack installed at the upper end of the foundation The vertical loading test method for an existing pile according to claim 10, wherein the vertical loading test method is performed. 作業スペースが広い場合は、切除部分より上位の柱の周辺に補強用の反力壁又は反力柱を構築することを特徴とする、請求項9に記載した既存杭の鉛直載荷試験方法。   The vertical loading test method for an existing pile according to claim 9, wherein when the work space is wide, a reinforcing reaction force wall or reaction force column is constructed around a column above the cut portion. コンクリート反力体は、基礎躯体の直上の上階床下面又は上面若しくは双方の面において、試験対象の既存杭の直上に位置する柱周辺の複数本の柱で囲まれた領域に反力スラブを構築して用意することを特徴とする、請求項1又は3に記載した既存杭の鉛直載荷試験方法。   Concrete reaction force body is a reaction force slab in the area surrounded by multiple pillars around the pillar located directly above the existing pile to be tested on the lower floor or upper surface of the upper floor or both surfaces directly above the foundation frame. The method for vertical loading test of an existing pile according to claim 1 or 3, characterized in that it is constructed and prepared. 反力スラブに加えて、試験対象である杭の直上に位置する柱を中心とした柱・梁架構の面内に、反力壁を上下方向に単層又は複数層連続するように形成し、コンクリート反力体を用意することを特徴とする、請求項13に記載した既存杭の鉛直載荷試験方法。   In addition to the reaction slab, in the plane of the column / beam frame centering on the column located directly above the pile to be tested, the reaction force wall is formed to be continuous in a single layer or multiple layers in the vertical direction, A method for vertical loading test of an existing pile according to claim 13, wherein a concrete reaction body is prepared. 反力壁は既存建物から試験荷重の反力を得ることが可能な高さまで、上下方向に連続するように単層又は複数層に亘って形成することを特徴とする、請求項4〜10又は請求項14のいずれか一に記載した既存杭の鉛直載荷試験方法。   The reaction wall is formed in a single layer or a plurality of layers so as to be continuous in a vertical direction up to a height at which a reaction force of a test load can be obtained from an existing building. The vertical loading test method of the existing pile described in any one of Claim 14. コンクリート反力体は新築建物の本設躯体として利用することを特徴とする、請求項1又は請求項3、4又は請求項13、14のいずれか一に記載した既存杭の鉛直載荷試験方法。
15. A method for vertical loading test of an existing pile according to claim 1, wherein the concrete reaction body is used as a main frame of a new building.
JP2004367545A 2004-12-20 2004-12-20 Vertical loading test method for existing piles Active JP4502797B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004367545A JP4502797B2 (en) 2004-12-20 2004-12-20 Vertical loading test method for existing piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004367545A JP4502797B2 (en) 2004-12-20 2004-12-20 Vertical loading test method for existing piles

Publications (2)

Publication Number Publication Date
JP2006169915A true JP2006169915A (en) 2006-06-29
JP4502797B2 JP4502797B2 (en) 2010-07-14

Family

ID=36670957

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004367545A Active JP4502797B2 (en) 2004-12-20 2004-12-20 Vertical loading test method for existing piles

Country Status (1)

Country Link
JP (1) JP4502797B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ302521B6 (en) * 2008-07-07 2011-06-29 Ceské vysoké ucení technické v Praze Fakulta stavební Method of trigonometric measurement of vertical shifts during static loading tests of building objects
JP2014080768A (en) * 2012-10-16 2014-05-08 Takenaka Komuten Co Ltd Vertical loading testing method of existing pile, and construction method of concrete reaction body
JP2014201948A (en) * 2013-04-04 2014-10-27 株式会社竹中工務店 Building design method
CN110004996A (en) * 2019-05-10 2019-07-12 四川中亿创新重型装备有限公司 A kind of integral steel structure frame ballast heap carrier and its Static Load Test Method
CN110057611A (en) * 2019-04-25 2019-07-26 宝业集团浙江建设产业研究院有限公司 A kind of adjustable structure mechanical test platform and its processing method, test method
CN111501862A (en) * 2020-04-24 2020-08-07 安徽省建筑科学研究设计院 Method for simulating bearing capacity test of vertical support column in reverse construction method construction environment
KR102309104B1 (en) * 2021-05-13 2021-10-06 주식회사 동양지반 A method of using loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102309145B1 (en) * 2021-05-13 2021-10-06 김창훈 loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102309143B1 (en) * 2021-05-13 2021-10-06 김창훈 loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102310572B1 (en) * 2021-05-13 2021-10-08 주식회사 동양지반 A method of using loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102355940B1 (en) * 2021-12-23 2022-02-08 김준성 Method of static load test of existing pile

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821186B (en) * 2014-02-11 2016-05-18 河南科技大学 Frozen soil environment pile foundation model test apparatus
CN104594395B (en) * 2015-01-15 2016-06-29 中铁第四勘察设计院集团有限公司 A kind of method utilizing railway in operation roadbed side Bored Pile Foundation detection structure to carry out pile measurement
CN109680730B (en) * 2018-11-19 2020-11-10 中国能源建设集团江苏省电力设计院有限公司 Pile top vertical force calculation method considering foundation pile compression and pulling resistance rigidity difference
CN109797785B (en) * 2019-02-14 2020-10-16 南通建威建设工程质量检测有限公司 Vertical resistance to plucking static test anchor clamps of foundation pile

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11264247A (en) * 1998-03-19 1999-09-28 Toda Constr Co Ltd Construction method of building using existing pile
JP2004244814A (en) * 2003-02-10 2004-09-02 Takenaka Komuten Co Ltd Vertical load test method for existing pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11264247A (en) * 1998-03-19 1999-09-28 Toda Constr Co Ltd Construction method of building using existing pile
JP2004244814A (en) * 2003-02-10 2004-09-02 Takenaka Komuten Co Ltd Vertical load test method for existing pile

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ302521B6 (en) * 2008-07-07 2011-06-29 Ceské vysoké ucení technické v Praze Fakulta stavební Method of trigonometric measurement of vertical shifts during static loading tests of building objects
JP2014080768A (en) * 2012-10-16 2014-05-08 Takenaka Komuten Co Ltd Vertical loading testing method of existing pile, and construction method of concrete reaction body
JP2014201948A (en) * 2013-04-04 2014-10-27 株式会社竹中工務店 Building design method
CN110057611A (en) * 2019-04-25 2019-07-26 宝业集团浙江建设产业研究院有限公司 A kind of adjustable structure mechanical test platform and its processing method, test method
CN110004996A (en) * 2019-05-10 2019-07-12 四川中亿创新重型装备有限公司 A kind of integral steel structure frame ballast heap carrier and its Static Load Test Method
CN111501862A (en) * 2020-04-24 2020-08-07 安徽省建筑科学研究设计院 Method for simulating bearing capacity test of vertical support column in reverse construction method construction environment
CN111501862B (en) * 2020-04-24 2021-08-03 安徽省建筑科学研究设计院 Method for simulating bearing capacity test of vertical support column in reverse construction method construction environment
KR102309104B1 (en) * 2021-05-13 2021-10-06 주식회사 동양지반 A method of using loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102309145B1 (en) * 2021-05-13 2021-10-06 김창훈 loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102309143B1 (en) * 2021-05-13 2021-10-06 김창훈 loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102310572B1 (en) * 2021-05-13 2021-10-08 주식회사 동양지반 A method of using loading devices and existing structures to verify the support of existing foundation piles when remodeling existing apartments
KR102355940B1 (en) * 2021-12-23 2022-02-08 김준성 Method of static load test of existing pile

Also Published As

Publication number Publication date
JP4502797B2 (en) 2010-07-14

Similar Documents

Publication Publication Date Title
JP4502797B2 (en) Vertical loading test method for existing piles
JP5446774B2 (en) Temporary pile construction method
JP2016528406A (en) Beam connection structure of temporary retaining works for earth retaining
JP3908752B2 (en) Strain and settlement measurement method for pile vertical loading test
JP5728300B2 (en) Ground improvement body and piled raft foundation equipped with the same
JP5457276B2 (en) Underground pillar construction
JP4226954B2 (en) Underpinning method and viaduct
JPH09184144A (en) Construction method for base isolation pit for existing building
JP2016089481A (en) Extension method for underground facility
JP4378241B2 (en) Vertical loading test method for existing piles
JP5270255B2 (en) Foundation reinforcement method for existing wooden houses
JPH08269968A (en) Sheathing method
KR20190084633A (en) Top-down construction method for concrete building structure using steel pile underground wall and shear support plate
JP4466418B2 (en) Soil cement wall pile, soil cement structure
JP4329068B2 (en) Yamauchi composite wall and method for constructing Yamauchi composite wall
JPH09144049A (en) Temporary holding method of construction
KR101257905B1 (en) Method for constructing foundation work
JP2017119953A (en) Building method using reverse out method
JP2006177097A (en) Vertical loading test method of prefabricated pile in place deeper than groundwater level
JP6710999B2 (en) Temporary receiving method for existing structures
JP2004244814A (en) Vertical load test method for existing pile
JP4749858B2 (en) Method for enhancing bearing capacity in extension or reconstruction of superstructures of existing buildings
KR101762207B1 (en) The speed up construction method using hemispherical joint
JP2004027775A (en) Wide-flange shape steel pile for temporary work
JP4657759B2 (en) Building pile foundation structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090820

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090901

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091030

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100330

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100420

R150 Certificate of patent or registration of utility model

Ref document number: 4502797

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140430

Year of fee payment: 4