JP2005031821A - Hydroelectric power station operation plan preparing device, method, and program - Google Patents
Hydroelectric power station operation plan preparing device, method, and program Download PDFInfo
- Publication number
- JP2005031821A JP2005031821A JP2003193993A JP2003193993A JP2005031821A JP 2005031821 A JP2005031821 A JP 2005031821A JP 2003193993 A JP2003193993 A JP 2003193993A JP 2003193993 A JP2003193993 A JP 2003193993A JP 2005031821 A JP2005031821 A JP 2005031821A
- Authority
- JP
- Japan
- Prior art keywords
- inflow water
- water amount
- predicted
- operation plan
- inflow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、ダムを運用,管理する、給電指令所,ダム管理所,水力発電所等において、計算機上で、水力発電所の運用計画を作成する方法に関する。
【0002】
【従来の技術】
水力発電所の運用計画の従来技術では、特開平5−91799号公報(以下、特許文献1という),特開2002−278603号公報(以下、特許文献2という)がある。これらは、高品質な運用計画を実用的な処理時間で作成する方法について述べている。
【0003】
【特許文献1】
特開平5−91799号公報
【特許文献2】
特開2002−278603号公報
【0004】
【発明が解決しようとする課題】
水力発電所の運用計画の入力データであるダム流入量の予測精度が良くないために、実運用に適用できる計画を作成することが難しい。
【0005】
本発明は、水力発電所の運用を計画作成する対象日の至近日のダムに流入する水量の予測誤差を使用して、水力発電所運用計画の入力データであるダムに流入する水量の予測値に予測誤差分を反映させて計画を作成することで実運用に適した水力発電所の運用計画を作成することができる装置を提供することである。
【0006】
【課題を解決するための手段】
本発明は、ダム流入水量作成装置で、ダムへ流入する水量の予測精度を計算する予測精度計算装置で得られる予測誤差を利用して、予測したダムへ流入する水量から複数のダム流入量予測パターンを作成し、ダムへ流入する水量のパターンごとに最適運用計画作成装置で最適な水力発電所の運用計画を作成することにより、実運用に適した水力発電所運用計画を提供するものである。
【0007】
【発明の実施の形態】
本発明を図1から図7を用いて、詳細に説明する。
【0008】
図1は、水力発電所運用計画作成装置で、運用計画作成日などを入力する入力装置1,処理の全体制御を行う制御装置2,作成日,初期条件格納データベース8,過去実績データベース9,ダム設備データベース10,流入量予測データベース11に格納しているデータを読み込むためのデータ読込装置3,過去実績データベース9,流入量予測データベース11に格納しているデータをある条件のもとで検索するためのデータ検索装置4,流入量の予測精度を計算する予測精度計算装置7,予測精度計算装置7の計算結果である流入量予測精度と水力発電所運用計画の入力データである流入量予測値を利用して予測精度を考慮した流入量を計算する流入量計算装置5,与えられた入力データより最適な水力発電所運用計画を作成する水力発電所運用計画作成装置6,水力発電所運用計画作成装置6で作成された水力発電所運用計画を格納する運用計画データベース12で構成していることを示している。
【0009】
入力装置1は、制御装置2からの制御信号S1により、ユーザーに運用計画作成日,水力発電所運用計画作成対象日の入力を知らせる。ユーザーは、入力装置1より、運用計画作成日,水力発電所運用計画対象日を入力すると、入力装置1から制御装置2へ制御信号S2を送信する。制御装置2では、制御信号S2を受信後、運用計画作成日,水力発電所運用計画対象日のデータであるD1を作成日,初期条件格納データベース8に格納する。
【0010】
制御装置2からの制御信号S3を受信したデータ読込装置3は、運用計画作成日,初期条件格納データベース8に格納しているデータD5,過去実績データベース9に格納しているデータD2,ダム設備データベース10に格納しているデータD3,流入量予測データベース11に格納しているデータD4を読込み、データ読込終了後、データ読込装置3は制御信号S4を制御装置2に送信する。
【0011】
制御装置2から送信された制御信号S5を受信したデータ検索装置4はある条件でデータ読込装置3のデータD6を検索し、検索終了後、制御信号S6を制御装置2へ送信する。
【0012】
制御装置2から送信された制御信号S11を受信した予測精度計算装置7は、ある条件でデータ読込装置3のデータD11を検索し、検索終了後、制御信号
S12を制御装置2へ送信する。
【0013】
制御装置2から送信された制御信号S7を受信した流入量計算装置5は、データ読込装置3からデータD7を受信し、流入量計算装置5での処理結果を流入量予測データベース11に送信する。その後、流入量計算装置5から制御信号S8を制御装置2に送信する。
【0014】
制御装置2から送信された制御信号S9を受信した水力発電所運用計画作成装置6は、データ読込装置3からデータD12を受信し、水力発電所の運用計画を作成し、運用計画データベース12へ送信する。その後、水力発電所運用計画作成装置6から制御信号S10を制御装置2に送信する。
【0015】
図2は、図1で示した運用計画作成日,初期条件格納データベース8のデータベースの構成を示したものである。運用計画作成日データは、作成年月日,作成対象日のデータで構成されている。初期条件格納データベースは、流入量計算装置5の処理の入力データである「対象とする至近日の期間」,「流入量のパターン数」,「流入量パターン数が1の有無」,「流入量パターン数が1の場合使用する予測誤差の値」の項目で構成されている。
【0016】
図3は、図1に示した実績データベース9のデータベースの構成を示したものであり、「データの年月日時」,「ダム放流量」,「流入量」,「予測精度」等のデータ項目から構成されている。複数のダムを対象とした運用計画を作成する場合は、ダム毎に実績データベース9が存在する。
【0017】
図4は、図1に示したダム設備データベース10の構成を示したものであり、「ダム名称」,「発電機台数」,「有効水深」,「運用水位上限値」,「運用水位下限値」,「使用水量上限値」,「使用水量下限値」,「電水比」のデータ項目で構成されている。
【0018】
図5は、図1に示した流入量予測データベース11のデータベースの構成を示したものであり、「データの年月日時」,「流入量予測値」,「流入量補正計算値」で構成されている。
【0019】
図6は、図1に示した運用計画データベース12のデータベースの構成を示したものであり、ダムの「データの年月日時」,「使用水量」,「ゲート放流」,「発電量」のデータ項目で構成されている。
【0020】
図7は、水力発電所運用計画作成の処理フローを示している。以下、水力発電所運用計画作成の処理を図7の処理フローに従って説明する。
【0021】
処理ブロック201:作成日,初期条件の入力
入力装置1は、制御装置2からの制御信号S1により、ユーザーに運用計画作成日,初期条件の入力をうながす。ユーザーは、入力装置1より、水力発電所運用計画の作成日,流入量計算装置5の入力データである「対象とする至近日の期間」などを入力すると、入力装置1から制御装置2へ制御信号S2を送信する。制御装置2では、制御信号S2を受信後、水力発電所運用計画の作成日,流入量計算装置5の入力データである“対象とする至近日の期間”などのデータであるD1を作成日,初期条件格納データベース8に格納し、処理ブロック202へ進む。
【0022】
処理ブロック202:ダム設備データ,運用計画対象日の流入量予測データの読込
制御装置2より制御信号S3をデータ読込装置3に送信する。制御信号S2を受信したデータ読込装置3は、作成日,初期条件格納データベース8,ダム設備データベース10,流入量予測データベース11に格納されているデータD3,D4,D5を受信する。
【0023】
具体的には、作成日,初期条件格納データベース8からは、「運用計画作成日」,「作成対象日」,「対象とする至近日の期間」,「流入量パターン数」が受信される。このとき、流量パターン数のデータの内容が「1」の場合は、「流入パターン数=1のときの流入量値で使用する予測誤差の値」のデータ項目も受信する。
【0024】
ダム設備データベース10からは、「ダム名称」,「発電機台数」,「有効水深」,「運用水位上限値」,「運用水位下限値」,「使用水量上限値」,「使用水量下限値」,「電水比(単位水量あたりの出力)」のデータD3を受信する。
【0025】
流入量予測データベース11からは、初期条件格納データベース8から受信した「作成対象日」と同じ年月日時の“流入量予測値”データD4を受信する。前記処理終了後、制御信号S4を制御装置2へ送信する。
【0026】
制御装置2では、制御信号S4を受信後、次の処理ブロック203へ進む。
【0027】
処理ブロック203:初期条件で設定した運用計画作成日と至近日データから予測誤差データの作成
制御装置2より制御信号S11を予測精度計算装置7に送信する。制御信号S11を受信したデータ読込装置3は、過去実績データベース9と流入量予測データベース11から、処理ブロック201で入力した作成日,初期条件格納データベース8に格納されている「対象とする至近日の期間」のデータ項目より対象となる期間分の流入量データD2と流入量予測値データD4を受信する。
【0028】
たとえば、処理ブロック201において、入力装置1で「作成日」を2002年12月31日、「作成対象日」を2003年1月1日、「対象とする至近日の期間」を3日間とした場合、過去実績データベース9より2002年12月28日から2002年12月30日の「流入量(実績)」データ,流入量予測データベース11より2002年12月28日から2002年12月30日の「流入量予測値」データを受信する。
【0029】
前記受信したデータである「流入量(実績)」データと「流入量予測値」データから、式1を利用して、各日各時刻の予測誤差データを作成し、過去実績データベース9へ送信する。前記処理終了後、制御信号S12を制御装置2へ送信する。
【0030】
制御装置2では、制御信号S12を受信後、次の処理ブロック204へ進む。
【0031】
【数1】
【0032】
処理ブロック204:流入量予測データと予測誤差データを利用した複数の流入量予測データの作成
流入量予測データと予測誤差データを利用して複数の流入量予測データを作成するために、制御装置2から流入量計算装置5へ制御信号S7を送信する。制御信号S7を受信した流入量計算装置5は、過去実績データベース9より「予測精度」、流入量予測データベース11より「流入予測値」,「作成日」,初期条件格納データベース8より「流入量パターン数」のデータD7を受信する。
【0033】
たとえば、処理ブロック201において、入力装置1で「作成日」を2002年12月31日、「作成対象日」を2003年1月1日、「対象とする至近日の期間」を3日間、「流入パターン数」3とした場合、過去実績データベース9より2002年12月28日から2002年12月30日の「予測精度」データ、流入量予測データベース11より2003年1月1日の「流入量予測値」データを受信する。
【0034】
ここで、前記受信したデータを利用して、各時刻で複数の流入量予測データを作成する。複数の流入量予測データは、計画対象日の至近日の中で同一時刻の予測精度データの最小値と最大値の範囲内で、初期条件格納データベース8に格納されている「流入パターン数」の予測精度を作成し、作成した予測精度と流入量予測データベース11から受信した「流入量予測値」を積算して求める。
【0035】
たとえば、2002年12月28日から2002年12月30日の「予測精度」データの中で、1時の予測精度がそれぞれ、10%,30%,15%、初期条件格納データベース8に格納されている「流入パターン数」を3とした場合、予測精度の最小値10%と最大値30%の範囲内で3つの予測精度を等間隔で作成する場合、予測精度は、10%,20%,30%となる。
【0036】
前記処理内容で流入量計算装置5で複数の流入量予測データを作成した後、流入量予測データベース11に複数の流入量予測データD8を送信し、制御信号S8を制御装置2へ送信する。
【0037】
制御装置2では、制御信号S8を受信後、次の処理ブロック205へ進む。
【0038】
処理ブロック205:複数の流入量予測データの水力発電所運用計画の作成
制御装置2から制御信号S9を水力発電所運用計画作成装置6へ送信する。水力発電所運用計画作成装置6では、処理ブロック204で作成した複数の流入量予測データに対して水力発電所運用計画を作成する。具体的な運用計画の作成方法に関しては、例えば特許文献1又は特許文献2に記載の方法を用いる。
【0039】
以上のようにして、計算機で水力発電所の運用計画を作成する装置において、計画対象日の至近日のダム流入量の予測誤差データを利用して、複数の流入量予測データを作成し、その流入量予測データに対して計画を作成することで、ダム流入量の予測誤差を考慮した現実的な計画を提供することができる。
【0040】
本実施例では、1つのダムを対象とした水力発電所運用計画作成について説明したが、1つの河川に複数のダムが存在する連接水系の場合も同様に適用できる。
【0041】
【発明の効果】
本発明によると、計画対象日の至近日の流入量予測誤差データを利用して、流入量予測データを作成し、そのデータに対する水力発電所運用計画を作成することで、実運用に適した計画を提供することができる。
【図面の簡単な説明】
【図1】水力発電所運用計画作成装置の構成。
【図2】作成日,初期条件格納するデータベースの構成図。
【図3】過去実績データベースの構成図。
【図4】ダム設備データベースの構成図。
【図5】流入量予測データベースの構成図。
【図6】運用計画データベースの構成図。
【図7】水力発電所運用計画の作成処理フロー図。
【符号の説明】
1…入力装置、2…制御装置、3…データ読込装置、4…データ検索装置、5…流入量計算装置、6…水力発電所運用計画作成装置、7…予測精度計算装置、8…作成日,初期条件格納データベース、9…過去実績データベース、10…ダム設備データベース、11…流入量予測データベース、12…運用計画データベース、S1…制御装置2から入力装置1を制御する信号、S2…入力装置1での処理終了状態を制御装置2へ通信する信号、S3…制御装置2からデータ読込装置3を制御する信号、S4…データ読込装置3の処理終了状態を制御装置2へ通信する信号、S5…制御装置2からデータ検索装置4を制御する信号、S6…データ検索装置4の処理終了状態を制御装置2へ通信する信号、S7…制御装置2から流入量計算装置5を制御する信号、S8…流入量計算装置5の処理終了状態を制御装置2へ通信する信号、S9…制御装置2から水力発電所運用計画作成装置6を制御する信号、S10…水力発電所運用計画作成装置6の処理終了状態を制御装置2へ通信する信号、D1…入力装置1から作成日,初期条件格納データベース8へ送信する作成日,作成対象日データ、D2…過去実績データベース9からデータ読込装置3へ送信する過去の実績データのダム名称,放流量,流入量(実績)、D3…ダム設備データベース10からデータ読込装置3へ送信するダム設備データ、D4…流入量予測データベース11からデータ読込装置3へ送信する流入量予測データ、D5…作成日,初期条件格納データベース8からデータ読込装置3へ送信する作成日,作成対象日データ,初期条件データ、D6…データ読込装置3からデータ検索装置4へ送信する過去実績データ、D7…データ読込装置3から流入量計算装置5へ送信する流入量(実績)データ、D8…流入量計算装置5から流入量予測データベース11へ送信する複数の流入量予測データ、D9…予測精度計算装置7から過去実績データベース9へ送信する予測精度データ、D10…水力発電所運用計画作成装置6から運用計画データベース12へ送信するデータ。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for creating an operation plan for a hydroelectric power plant on a computer in a power supply command station, a dam management station, a hydroelectric power plant, or the like that operates and manages the dam.
[0002]
[Prior art]
As conventional techniques for the operation plan of a hydroelectric power plant, there are JP-A-5-91799 (hereinafter referred to as Patent Document 1) and JP-A-2002-278603 (hereinafter referred to as Patent Document 2). They describe how to create a high-quality operation plan in a practical processing time.
[0003]
[Patent Document 1]
JP-A-5-91799 [Patent Document 2]
Japanese Patent Laid-Open No. 2002-278603 [0004]
[Problems to be solved by the invention]
It is difficult to create a plan that can be applied to actual operation because the prediction accuracy of the dam inflow, which is the input data for the operation plan of the hydropower plant, is not good.
[0005]
The present invention predicts the amount of water flowing into a dam that is input data of the hydropower plant operation plan using the prediction error of the amount of water flowing into the dam in the nearest day of the target date for planning the operation of the hydropower plant. It is to provide an apparatus that can create an operation plan of a hydroelectric power station suitable for actual operation by creating a plan that reflects a prediction error.
[0006]
[Means for Solving the Problems]
The present invention is a dam inflow water amount creation device that uses a prediction error obtained by a prediction accuracy calculation device that calculates the prediction accuracy of the amount of water flowing into a dam, and predicts a plurality of dam inflow amounts from the predicted amount of water flowing into the dam. A hydropower plant operation plan suitable for actual operation is provided by creating a pattern and creating an optimal hydropower plant operation plan with the optimum operation plan creation device for each pattern of water flow into the dam. .
[0007]
DETAILED DESCRIPTION OF THE INVENTION
The present invention will be described in detail with reference to FIGS.
[0008]
FIG. 1 shows a hydropower plant operation plan creation device, which includes an input device for inputting an operation plan creation date, a
[0009]
The
[0010]
The
[0011]
The data search device 4 that has received the control signal S5 transmitted from the
[0012]
The prediction accuracy calculation device 7 that has received the control signal S11 transmitted from the
[0013]
The inflow
[0014]
The hydropower plant operation
[0015]
FIG. 2 shows the database configuration of the operation plan creation date / initial
[0016]
FIG. 3 shows the structure of the database of the performance database 9 shown in FIG. 1, and data items such as “data date / time”, “dam discharge”, “inflow”, “prediction accuracy”, etc. It is composed of When creating an operation plan for a plurality of dams, a performance database 9 exists for each dam.
[0017]
FIG. 4 shows the configuration of the
[0018]
FIG. 5 shows the structure of the inflow amount prediction database 11 shown in FIG. 1, which is composed of “data date / time”, “inflow amount prediction value”, and “inflow amount correction calculation value”. ing.
[0019]
FIG. 6 shows the database configuration of the
[0020]
FIG. 7 shows a processing flow for creating a hydropower plant operation plan. Hereinafter, the process of creating the hydropower plant operation plan will be described according to the process flow of FIG.
[0021]
Processing block 201: Creation date and initial condition input The
[0022]
Processing block 202: The control signal S3 is transmitted to the
[0023]
Specifically, from the creation date / initial
[0024]
From the
[0025]
From the inflow amount prediction database 11, “inflow amount prediction value” data D 4 having the same date and time as the “date of creation” received from the initial
[0026]
The
[0027]
Processing block 203: The control signal S11 is transmitted to the prediction accuracy calculation device 7 from the prediction error data
[0028]
For example, in the
[0029]
From the received data “flow rate (actual)” data and “flow rate predicted value” data, prediction error data for each time of day is created using
[0030]
The
[0031]
[Expression 1]
[0032]
Processing block 204: Creation of a plurality of inflow prediction data using inflow prediction data and prediction error data In order to create a plurality of inflow prediction data using inflow prediction data and prediction error data, the
[0033]
For example, in the
[0034]
Here, a plurality of inflow prediction data is created at each time using the received data. The plurality of inflow amount prediction data includes “the number of inflow patterns” stored in the initial
[0035]
For example, among the “prediction accuracy” data from December 28, 2002 to December 30, 2002, the prediction accuracy at 1 o'clock is stored in the initial
[0036]
After the inflow
[0037]
The
[0038]
Process block 205: A control signal S9 is transmitted from the hydropower plant operation plan
[0039]
As described above, in a device that creates a hydropower plant operation plan with a computer, a plurality of inflow prediction data is created using the prediction error data of the dam inflow on the day of the planning date. By creating a plan for the inflow prediction data, it is possible to provide a realistic plan that takes into account the prediction error of the dam inflow.
[0040]
In the present embodiment, the hydropower plant operation plan creation for one dam has been described. However, the present invention can be similarly applied to a case of a connected water system in which a plurality of dams exist in one river.
[0041]
【The invention's effect】
According to the present invention, the inflow prediction data is created using the inflow prediction error data of the nearest day of the planning target date, and the hydropower plant operation plan for the data is created, so that the plan suitable for actual operation Can be provided.
[Brief description of the drawings]
FIG. 1 shows the configuration of a hydropower plant operation plan creation device.
FIG. 2 is a configuration diagram of a database for storing creation dates and initial conditions.
FIG. 3 is a configuration diagram of a past performance database.
FIG. 4 is a configuration diagram of a dam facility database.
FIG. 5 is a configuration diagram of an inflow prediction database.
FIG. 6 is a configuration diagram of an operation plan database.
FIG. 7 is a flowchart of a hydropower plant operation plan creation process.
[Explanation of symbols]
DESCRIPTION OF
Claims (5)
過去の所定の期間にダムに流入した水量の計測値を記憶する流入水量記憶手段と、
過去の所定の期間にダムに流入した水量の予測値を記憶する流入水量予測値記憶手段と、
前記流入水量記憶手段が記憶した流入水量計測値及び前記流入水量予測値記憶手段が記憶した流入水量予測値に基づいて過去の所定の期間の流入水量に関する予測誤差を算出する予測誤差算出手段と、
前記予測誤差算出手段が算出した予測誤差に基づいてダムの運用計画作成対象日の予測流入水量パターンを作成する予測流入水量パターン作成手段と、
前記予測流入水量パターン作成手段が作成した予測流入水量パターンを表示する表示手段とを備えることを特徴とする水力発電所運用計画作成装置。Inflow water amount prediction means for predicting the amount of water flowing into the dam,
Inflow water amount storage means for storing a measured value of the amount of water that has flowed into the dam during a predetermined period in the past;
Inflow water amount predicted value storage means for storing a predicted value of the amount of water that has flowed into the dam during a predetermined period in the past;
Prediction error calculation means for calculating a prediction error related to the inflow water amount in a predetermined past period based on the inflow water amount measurement value stored in the inflow water amount storage means and the inflow water amount prediction value stored in the inflow water amount prediction value storage means;
A predicted inflow water amount pattern creating means for creating a predicted inflow water amount pattern for a dam operation plan creation day based on the prediction error calculated by the prediction error calculating means;
A hydropower plant operation plan creation device comprising: display means for displaying the predicted inflow water quantity pattern created by the predicted inflow water quantity pattern creation means.
前記予測流入水量パターン作成手段は前記予測誤差算出手段が算出した過去の所定の期間の予測誤差の最大値と最小値の範囲内で前記流入パターン数受信手段が受信したパターン数の予測流入水量パターンを作成することを特徴とする水力発電所運用計画作成装置。In Claim 1, the inflow water amount pattern number receiving means for inputting the predicted inflow water amount pattern number;
The predicted inflow water amount pattern creating means has a predicted inflow water amount pattern of the number of patterns received by the inflow pattern number receiving means within the range of the maximum and minimum prediction errors of the past predetermined period calculated by the prediction error calculating means. Hydropower plant operation plan creation device characterized by creating
過去の所定の期間にダムに流入した水量の計測値を記憶する流入水量記憶手段、
過去の所定の期間にダムに流入した水量の予測値を記憶する流入水量予測値記憶手段、
前記流入水量記憶手段が記憶した流入水量計測値及び前記流入水量予測値記憶手段が記憶した流入水量予測値に基づいて過去の所定の期間の流入水量に関する予測誤差を算出する予測誤差算出手段、
前記予測誤差算出手段が算出した予測誤差に基づいてダムの運用計画作成日の予測流入水量パターンを作成する予測流入水量パターン作成手段、
前記予測流入水量パターン作成手段が作成した予測流入水量パターンを表示する表示手段として機能させることを特徴とする水力発電所運用計画作成プログラム。Inflow water amount prediction means for predicting the amount of water flowing into the dam with a computer,
Inflow water amount storage means for storing a measured value of the amount of water that has flowed into the dam during a predetermined period in the past,
Inflow water amount predicted value storage means for storing a predicted value of the amount of water that has flowed into the dam during a past predetermined period,
A prediction error calculation means for calculating a prediction error related to the inflow water amount in the past predetermined period based on the inflow water amount measurement value stored in the inflow water amount storage means and the inflow water amount prediction value stored in the inflow water amount prediction value storage means;
Predicted influent water amount pattern creating means for creating a predicted influent water amount pattern on the dam operation plan creation date based on the prediction error calculated by the prediction error calculating means,
A hydropower plant operation plan creation program that functions as display means for displaying a predicted inflow water amount pattern created by the predicted inflow water amount pattern creation means.
過去の所定の期間にダムに流入した水量の計測値を記憶する流入水量記憶ステップと、
過去の所定の期間にダムに流入した水量の予測値を記憶する流入水量予測値記憶ステップと、
前記流入水量記憶手段が記憶した流入水量計測値及び前記流入水量予測値記憶手段が記憶した流入水量予測値に基づいて過去の所定の期間の流入水量に関する予測誤差を算出する予測誤差算出ステップと、
前記予測誤差算出手段が算出した予測誤差に基づいてダムの運用計画作成日の予測流入水量パターンを作成する予測流入水量パターン作成ステップと、
前記予測流入水量パターン作成手段が作成した予測流入水量パターンを表示する表示ステップとを備えることを特徴とする水力発電所運用計画作成方法。An inflow water amount prediction step for predicting the amount of water flowing into the dam;
An inflow water amount storing step for storing a measured value of the amount of water that has flowed into the dam during a predetermined period in the past;
An inflow water amount predicted value storage step for storing a predicted value of the amount of water that has flowed into the dam in a past predetermined period;
A prediction error calculation step of calculating a prediction error related to the inflow water amount in a predetermined past period based on the inflow water amount measurement value stored in the inflow water amount storage unit and the inflow water amount prediction value stored in the inflow water amount prediction value storage unit;
A predicted inflow water amount pattern creating step for creating a predicted inflow water amount pattern of a dam operation plan creation date based on the prediction error calculated by the prediction error calculating means;
A hydropower plant operation plan creation method comprising: a display step for displaying the predicted inflow water amount pattern created by the predicted inflow water amount pattern creation means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003193993A JP2005031821A (en) | 2003-07-09 | 2003-07-09 | Hydroelectric power station operation plan preparing device, method, and program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003193993A JP2005031821A (en) | 2003-07-09 | 2003-07-09 | Hydroelectric power station operation plan preparing device, method, and program |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2005031821A true JP2005031821A (en) | 2005-02-03 |
Family
ID=34205274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003193993A Pending JP2005031821A (en) | 2003-07-09 | 2003-07-09 | Hydroelectric power station operation plan preparing device, method, and program |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2005031821A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009223692A (en) * | 2008-03-17 | 2009-10-01 | Chugoku Electric Power Co Inc:The | Operation support system, operation support method and program for water storage facility, |
JP2010044551A (en) * | 2008-08-12 | 2010-02-25 | Chugoku Electric Power Co Inc:The | Device and program for calculating water type power generation output |
WO2010071158A1 (en) * | 2008-12-19 | 2010-06-24 | 中国電力株式会社 | System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program |
JP2010211527A (en) * | 2009-03-10 | 2010-09-24 | Chugoku Electric Power Co Inc:The | Inflow prediction system, inflow prediction method, and program |
JP2011180899A (en) * | 2010-03-02 | 2011-09-15 | Chugoku Electric Power Co Inc:The | Reservoir management plan creation method and device |
JP2012127073A (en) * | 2010-12-14 | 2012-07-05 | Chugoku Electric Power Co Inc:The | Water intake control method and device |
JP7467315B2 (en) | 2020-11-11 | 2024-04-15 | 株式会社東芝 | Water system operation planning method and water system operation planning system |
-
2003
- 2003-07-09 JP JP2003193993A patent/JP2005031821A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009223692A (en) * | 2008-03-17 | 2009-10-01 | Chugoku Electric Power Co Inc:The | Operation support system, operation support method and program for water storage facility, |
JP2010044551A (en) * | 2008-08-12 | 2010-02-25 | Chugoku Electric Power Co Inc:The | Device and program for calculating water type power generation output |
WO2010071158A1 (en) * | 2008-12-19 | 2010-06-24 | 中国電力株式会社 | System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program |
JP2010165346A (en) * | 2008-12-19 | 2010-07-29 | Chugoku Electric Power Co Inc:The | System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program |
TWI490811B (en) * | 2008-12-19 | 2015-07-01 | Chugoku Electric Power | Support facilities for storage facilities, use of reservoir support facilities and support facilities for storage facilities |
JP2010211527A (en) * | 2009-03-10 | 2010-09-24 | Chugoku Electric Power Co Inc:The | Inflow prediction system, inflow prediction method, and program |
JP2011180899A (en) * | 2010-03-02 | 2011-09-15 | Chugoku Electric Power Co Inc:The | Reservoir management plan creation method and device |
JP2012127073A (en) * | 2010-12-14 | 2012-07-05 | Chugoku Electric Power Co Inc:The | Water intake control method and device |
JP7467315B2 (en) | 2020-11-11 | 2024-04-15 | 株式会社東芝 | Water system operation planning method and water system operation planning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5014213B2 (en) | Water storage facility operation support system, operation support method and program | |
US20030083788A1 (en) | Operation support system and method | |
CN104392274B (en) | The short-term electro-load forecast method in city based on power load and temperature trend | |
WO2013150405A1 (en) | Smoothing power output from a wind farm | |
JP5047260B2 (en) | Precipitation prediction system, precipitation prediction method and program | |
JP5225256B2 (en) | Water storage facility operation support system, water storage facility operation support method and program | |
CN102018498A (en) | Clinical thermometer special for female | |
JP2005031821A (en) | Hydroelectric power station operation plan preparing device, method, and program | |
EP4303785A1 (en) | Reservoir flow rate regulating method and apparatus, electronic device, and storage medium | |
CN106650086A (en) | Indirect air cooling system numerical simulation platform based on FLUENT software | |
CN101964087A (en) | Task progress computing method and device | |
JP2005285032A (en) | Daily power generation planning system for hydroelectric power station group | |
CN109470918A (en) | The electricity data processing method and IR46 electric energy meter of IR46 electric energy meter | |
JP2006039838A (en) | Water type power generation operation plan preparation supporting apparatus | |
CN107423912A (en) | A kind of method and system for becoming dynamic mesh dynamic division based on personnel | |
JP5014522B1 (en) | Inflow amount prediction apparatus, inflow amount prediction method, and program | |
TW201824043A (en) | Operation plan creating apparatus, operation plan creating method, and program | |
JP5191308B2 (en) | Water-based power generation output calculation device and water-based power generation output calculation program | |
JP2009251742A (en) | Demand predicting device, demand predicting method and demand predicting program | |
JP5153805B2 (en) | Water storage facility operation support system, operation support method and program | |
JPH08115369A (en) | Sales amount prediction system | |
JP2003134664A (en) | Operation planning device, operation planning method, operation planning program, and recording medium recording the program | |
Guyaguler et al. | Comparison of genetic algorithm with linear programming for the optimization of an underground gas-storage field | |
CN111124452A (en) | Software upgrading method and device for instrument, instrument and storage medium | |
JP2002054182A (en) | Device for predicting amount of water supply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050616 |
|
RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20060420 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070116 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070123 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20070605 |