JP2005031821A - Hydroelectric power station operation plan preparing device, method, and program - Google Patents

Hydroelectric power station operation plan preparing device, method, and program Download PDF

Info

Publication number
JP2005031821A
JP2005031821A JP2003193993A JP2003193993A JP2005031821A JP 2005031821 A JP2005031821 A JP 2005031821A JP 2003193993 A JP2003193993 A JP 2003193993A JP 2003193993 A JP2003193993 A JP 2003193993A JP 2005031821 A JP2005031821 A JP 2005031821A
Authority
JP
Japan
Prior art keywords
inflow water
water amount
predicted
operation plan
inflow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003193993A
Other languages
Japanese (ja)
Inventor
Toshiyuki Furukawa
俊行 古川
Toshiyuki Sawa
敏之 澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2003193993A priority Critical patent/JP2005031821A/en
Publication of JP2005031821A publication Critical patent/JP2005031821A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Feedback Control In General (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To prepare the operation plan of a hydroelectric power station with the predicted error of a dam inflow water volume taken into consideration. <P>SOLUTION: A predicted error S12 associated with an inflow water volume in the past predetermined period is calculated based on an inflow water volume measured value D2 and an inflow water volume predicted value D4. Then, the predicted inflow water volume pattern at the operation plan preparation target date of a dam is prepared based on the calculated predicted error, and displayed to an operation plan preparator. The operation plan preparator is able to prepare a realistic operation plan with the predicted error taken into consideration by referring to the predicted inflow water volume. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、ダムを運用,管理する、給電指令所,ダム管理所,水力発電所等において、計算機上で、水力発電所の運用計画を作成する方法に関する。
【0002】
【従来の技術】
水力発電所の運用計画の従来技術では、特開平5−91799号公報(以下、特許文献1という),特開2002−278603号公報(以下、特許文献2という)がある。これらは、高品質な運用計画を実用的な処理時間で作成する方法について述べている。
【0003】
【特許文献1】
特開平5−91799号公報
【特許文献2】
特開2002−278603号公報
【0004】
【発明が解決しようとする課題】
水力発電所の運用計画の入力データであるダム流入量の予測精度が良くないために、実運用に適用できる計画を作成することが難しい。
【0005】
本発明は、水力発電所の運用を計画作成する対象日の至近日のダムに流入する水量の予測誤差を使用して、水力発電所運用計画の入力データであるダムに流入する水量の予測値に予測誤差分を反映させて計画を作成することで実運用に適した水力発電所の運用計画を作成することができる装置を提供することである。
【0006】
【課題を解決するための手段】
本発明は、ダム流入水量作成装置で、ダムへ流入する水量の予測精度を計算する予測精度計算装置で得られる予測誤差を利用して、予測したダムへ流入する水量から複数のダム流入量予測パターンを作成し、ダムへ流入する水量のパターンごとに最適運用計画作成装置で最適な水力発電所の運用計画を作成することにより、実運用に適した水力発電所運用計画を提供するものである。
【0007】
【発明の実施の形態】
本発明を図1から図7を用いて、詳細に説明する。
【0008】
図1は、水力発電所運用計画作成装置で、運用計画作成日などを入力する入力装置1,処理の全体制御を行う制御装置2,作成日,初期条件格納データベース8,過去実績データベース9,ダム設備データベース10,流入量予測データベース11に格納しているデータを読み込むためのデータ読込装置3,過去実績データベース9,流入量予測データベース11に格納しているデータをある条件のもとで検索するためのデータ検索装置4,流入量の予測精度を計算する予測精度計算装置7,予測精度計算装置7の計算結果である流入量予測精度と水力発電所運用計画の入力データである流入量予測値を利用して予測精度を考慮した流入量を計算する流入量計算装置5,与えられた入力データより最適な水力発電所運用計画を作成する水力発電所運用計画作成装置6,水力発電所運用計画作成装置6で作成された水力発電所運用計画を格納する運用計画データベース12で構成していることを示している。
【0009】
入力装置1は、制御装置2からの制御信号S1により、ユーザーに運用計画作成日,水力発電所運用計画作成対象日の入力を知らせる。ユーザーは、入力装置1より、運用計画作成日,水力発電所運用計画対象日を入力すると、入力装置1から制御装置2へ制御信号S2を送信する。制御装置2では、制御信号S2を受信後、運用計画作成日,水力発電所運用計画対象日のデータであるD1を作成日,初期条件格納データベース8に格納する。
【0010】
制御装置2からの制御信号S3を受信したデータ読込装置3は、運用計画作成日,初期条件格納データベース8に格納しているデータD5,過去実績データベース9に格納しているデータD2,ダム設備データベース10に格納しているデータD3,流入量予測データベース11に格納しているデータD4を読込み、データ読込終了後、データ読込装置3は制御信号S4を制御装置2に送信する。
【0011】
制御装置2から送信された制御信号S5を受信したデータ検索装置4はある条件でデータ読込装置3のデータD6を検索し、検索終了後、制御信号S6を制御装置2へ送信する。
【0012】
制御装置2から送信された制御信号S11を受信した予測精度計算装置7は、ある条件でデータ読込装置3のデータD11を検索し、検索終了後、制御信号
S12を制御装置2へ送信する。
【0013】
制御装置2から送信された制御信号S7を受信した流入量計算装置5は、データ読込装置3からデータD7を受信し、流入量計算装置5での処理結果を流入量予測データベース11に送信する。その後、流入量計算装置5から制御信号S8を制御装置2に送信する。
【0014】
制御装置2から送信された制御信号S9を受信した水力発電所運用計画作成装置6は、データ読込装置3からデータD12を受信し、水力発電所の運用計画を作成し、運用計画データベース12へ送信する。その後、水力発電所運用計画作成装置6から制御信号S10を制御装置2に送信する。
【0015】
図2は、図1で示した運用計画作成日,初期条件格納データベース8のデータベースの構成を示したものである。運用計画作成日データは、作成年月日,作成対象日のデータで構成されている。初期条件格納データベースは、流入量計算装置5の処理の入力データである「対象とする至近日の期間」,「流入量のパターン数」,「流入量パターン数が1の有無」,「流入量パターン数が1の場合使用する予測誤差の値」の項目で構成されている。
【0016】
図3は、図1に示した実績データベース9のデータベースの構成を示したものであり、「データの年月日時」,「ダム放流量」,「流入量」,「予測精度」等のデータ項目から構成されている。複数のダムを対象とした運用計画を作成する場合は、ダム毎に実績データベース9が存在する。
【0017】
図4は、図1に示したダム設備データベース10の構成を示したものであり、「ダム名称」,「発電機台数」,「有効水深」,「運用水位上限値」,「運用水位下限値」,「使用水量上限値」,「使用水量下限値」,「電水比」のデータ項目で構成されている。
【0018】
図5は、図1に示した流入量予測データベース11のデータベースの構成を示したものであり、「データの年月日時」,「流入量予測値」,「流入量補正計算値」で構成されている。
【0019】
図6は、図1に示した運用計画データベース12のデータベースの構成を示したものであり、ダムの「データの年月日時」,「使用水量」,「ゲート放流」,「発電量」のデータ項目で構成されている。
【0020】
図7は、水力発電所運用計画作成の処理フローを示している。以下、水力発電所運用計画作成の処理を図7の処理フローに従って説明する。
【0021】
処理ブロック201:作成日,初期条件の入力
入力装置1は、制御装置2からの制御信号S1により、ユーザーに運用計画作成日,初期条件の入力をうながす。ユーザーは、入力装置1より、水力発電所運用計画の作成日,流入量計算装置5の入力データである「対象とする至近日の期間」などを入力すると、入力装置1から制御装置2へ制御信号S2を送信する。制御装置2では、制御信号S2を受信後、水力発電所運用計画の作成日,流入量計算装置5の入力データである“対象とする至近日の期間”などのデータであるD1を作成日,初期条件格納データベース8に格納し、処理ブロック202へ進む。
【0022】
処理ブロック202:ダム設備データ,運用計画対象日の流入量予測データの読込
制御装置2より制御信号S3をデータ読込装置3に送信する。制御信号S2を受信したデータ読込装置3は、作成日,初期条件格納データベース8,ダム設備データベース10,流入量予測データベース11に格納されているデータD3,D4,D5を受信する。
【0023】
具体的には、作成日,初期条件格納データベース8からは、「運用計画作成日」,「作成対象日」,「対象とする至近日の期間」,「流入量パターン数」が受信される。このとき、流量パターン数のデータの内容が「1」の場合は、「流入パターン数=1のときの流入量値で使用する予測誤差の値」のデータ項目も受信する。
【0024】
ダム設備データベース10からは、「ダム名称」,「発電機台数」,「有効水深」,「運用水位上限値」,「運用水位下限値」,「使用水量上限値」,「使用水量下限値」,「電水比(単位水量あたりの出力)」のデータD3を受信する。
【0025】
流入量予測データベース11からは、初期条件格納データベース8から受信した「作成対象日」と同じ年月日時の“流入量予測値”データD4を受信する。前記処理終了後、制御信号S4を制御装置2へ送信する。
【0026】
制御装置2では、制御信号S4を受信後、次の処理ブロック203へ進む。
【0027】
処理ブロック203:初期条件で設定した運用計画作成日と至近日データから予測誤差データの作成
制御装置2より制御信号S11を予測精度計算装置7に送信する。制御信号S11を受信したデータ読込装置3は、過去実績データベース9と流入量予測データベース11から、処理ブロック201で入力した作成日,初期条件格納データベース8に格納されている「対象とする至近日の期間」のデータ項目より対象となる期間分の流入量データD2と流入量予測値データD4を受信する。
【0028】
たとえば、処理ブロック201において、入力装置1で「作成日」を2002年12月31日、「作成対象日」を2003年1月1日、「対象とする至近日の期間」を3日間とした場合、過去実績データベース9より2002年12月28日から2002年12月30日の「流入量(実績)」データ,流入量予測データベース11より2002年12月28日から2002年12月30日の「流入量予測値」データを受信する。
【0029】
前記受信したデータである「流入量(実績)」データと「流入量予測値」データから、式1を利用して、各日各時刻の予測誤差データを作成し、過去実績データベース9へ送信する。前記処理終了後、制御信号S12を制御装置2へ送信する。
【0030】
制御装置2では、制御信号S12を受信後、次の処理ブロック204へ進む。
【0031】
【数1】

Figure 2005031821
【0032】
処理ブロック204:流入量予測データと予測誤差データを利用した複数の流入量予測データの作成
流入量予測データと予測誤差データを利用して複数の流入量予測データを作成するために、制御装置2から流入量計算装置5へ制御信号S7を送信する。制御信号S7を受信した流入量計算装置5は、過去実績データベース9より「予測精度」、流入量予測データベース11より「流入予測値」,「作成日」,初期条件格納データベース8より「流入量パターン数」のデータD7を受信する。
【0033】
たとえば、処理ブロック201において、入力装置1で「作成日」を2002年12月31日、「作成対象日」を2003年1月1日、「対象とする至近日の期間」を3日間、「流入パターン数」3とした場合、過去実績データベース9より2002年12月28日から2002年12月30日の「予測精度」データ、流入量予測データベース11より2003年1月1日の「流入量予測値」データを受信する。
【0034】
ここで、前記受信したデータを利用して、各時刻で複数の流入量予測データを作成する。複数の流入量予測データは、計画対象日の至近日の中で同一時刻の予測精度データの最小値と最大値の範囲内で、初期条件格納データベース8に格納されている「流入パターン数」の予測精度を作成し、作成した予測精度と流入量予測データベース11から受信した「流入量予測値」を積算して求める。
【0035】
たとえば、2002年12月28日から2002年12月30日の「予測精度」データの中で、1時の予測精度がそれぞれ、10%,30%,15%、初期条件格納データベース8に格納されている「流入パターン数」を3とした場合、予測精度の最小値10%と最大値30%の範囲内で3つの予測精度を等間隔で作成する場合、予測精度は、10%,20%,30%となる。
【0036】
前記処理内容で流入量計算装置5で複数の流入量予測データを作成した後、流入量予測データベース11に複数の流入量予測データD8を送信し、制御信号S8を制御装置2へ送信する。
【0037】
制御装置2では、制御信号S8を受信後、次の処理ブロック205へ進む。
【0038】
処理ブロック205:複数の流入量予測データの水力発電所運用計画の作成
制御装置2から制御信号S9を水力発電所運用計画作成装置6へ送信する。水力発電所運用計画作成装置6では、処理ブロック204で作成した複数の流入量予測データに対して水力発電所運用計画を作成する。具体的な運用計画の作成方法に関しては、例えば特許文献1又は特許文献2に記載の方法を用いる。
【0039】
以上のようにして、計算機で水力発電所の運用計画を作成する装置において、計画対象日の至近日のダム流入量の予測誤差データを利用して、複数の流入量予測データを作成し、その流入量予測データに対して計画を作成することで、ダム流入量の予測誤差を考慮した現実的な計画を提供することができる。
【0040】
本実施例では、1つのダムを対象とした水力発電所運用計画作成について説明したが、1つの河川に複数のダムが存在する連接水系の場合も同様に適用できる。
【0041】
【発明の効果】
本発明によると、計画対象日の至近日の流入量予測誤差データを利用して、流入量予測データを作成し、そのデータに対する水力発電所運用計画を作成することで、実運用に適した計画を提供することができる。
【図面の簡単な説明】
【図1】水力発電所運用計画作成装置の構成。
【図2】作成日,初期条件格納するデータベースの構成図。
【図3】過去実績データベースの構成図。
【図4】ダム設備データベースの構成図。
【図5】流入量予測データベースの構成図。
【図6】運用計画データベースの構成図。
【図7】水力発電所運用計画の作成処理フロー図。
【符号の説明】
1…入力装置、2…制御装置、3…データ読込装置、4…データ検索装置、5…流入量計算装置、6…水力発電所運用計画作成装置、7…予測精度計算装置、8…作成日,初期条件格納データベース、9…過去実績データベース、10…ダム設備データベース、11…流入量予測データベース、12…運用計画データベース、S1…制御装置2から入力装置1を制御する信号、S2…入力装置1での処理終了状態を制御装置2へ通信する信号、S3…制御装置2からデータ読込装置3を制御する信号、S4…データ読込装置3の処理終了状態を制御装置2へ通信する信号、S5…制御装置2からデータ検索装置4を制御する信号、S6…データ検索装置4の処理終了状態を制御装置2へ通信する信号、S7…制御装置2から流入量計算装置5を制御する信号、S8…流入量計算装置5の処理終了状態を制御装置2へ通信する信号、S9…制御装置2から水力発電所運用計画作成装置6を制御する信号、S10…水力発電所運用計画作成装置6の処理終了状態を制御装置2へ通信する信号、D1…入力装置1から作成日,初期条件格納データベース8へ送信する作成日,作成対象日データ、D2…過去実績データベース9からデータ読込装置3へ送信する過去の実績データのダム名称,放流量,流入量(実績)、D3…ダム設備データベース10からデータ読込装置3へ送信するダム設備データ、D4…流入量予測データベース11からデータ読込装置3へ送信する流入量予測データ、D5…作成日,初期条件格納データベース8からデータ読込装置3へ送信する作成日,作成対象日データ,初期条件データ、D6…データ読込装置3からデータ検索装置4へ送信する過去実績データ、D7…データ読込装置3から流入量計算装置5へ送信する流入量(実績)データ、D8…流入量計算装置5から流入量予測データベース11へ送信する複数の流入量予測データ、D9…予測精度計算装置7から過去実績データベース9へ送信する予測精度データ、D10…水力発電所運用計画作成装置6から運用計画データベース12へ送信するデータ。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for creating an operation plan for a hydroelectric power plant on a computer in a power supply command station, a dam management station, a hydroelectric power plant, or the like that operates and manages the dam.
[0002]
[Prior art]
As conventional techniques for the operation plan of a hydroelectric power plant, there are JP-A-5-91799 (hereinafter referred to as Patent Document 1) and JP-A-2002-278603 (hereinafter referred to as Patent Document 2). They describe how to create a high-quality operation plan in a practical processing time.
[0003]
[Patent Document 1]
JP-A-5-91799 [Patent Document 2]
Japanese Patent Laid-Open No. 2002-278603 [0004]
[Problems to be solved by the invention]
It is difficult to create a plan that can be applied to actual operation because the prediction accuracy of the dam inflow, which is the input data for the operation plan of the hydropower plant, is not good.
[0005]
The present invention predicts the amount of water flowing into a dam that is input data of the hydropower plant operation plan using the prediction error of the amount of water flowing into the dam in the nearest day of the target date for planning the operation of the hydropower plant. It is to provide an apparatus that can create an operation plan of a hydroelectric power station suitable for actual operation by creating a plan that reflects a prediction error.
[0006]
[Means for Solving the Problems]
The present invention is a dam inflow water amount creation device that uses a prediction error obtained by a prediction accuracy calculation device that calculates the prediction accuracy of the amount of water flowing into a dam, and predicts a plurality of dam inflow amounts from the predicted amount of water flowing into the dam. A hydropower plant operation plan suitable for actual operation is provided by creating a pattern and creating an optimal hydropower plant operation plan with the optimum operation plan creation device for each pattern of water flow into the dam. .
[0007]
DETAILED DESCRIPTION OF THE INVENTION
The present invention will be described in detail with reference to FIGS.
[0008]
FIG. 1 shows a hydropower plant operation plan creation device, which includes an input device for inputting an operation plan creation date, a control device 2 for performing overall control of the process, a creation date, an initial condition storage database 8, a past performance database 9, and a dam. A data reading device 3 for reading data stored in the facility database 10 and the inflow prediction database 11, and a search for data stored in the past performance database 9 and the inflow prediction database 11 under certain conditions. Data search device 4, prediction accuracy calculation device 7 for calculating the prediction accuracy of the inflow amount, inflow prediction accuracy as the calculation result of the prediction accuracy calculation device 7 and inflow prediction value as the input data of the hydropower plant operation plan An inflow calculation device that calculates the inflow considering the prediction accuracy by using the hydropower generator that creates the optimal hydropower plant operation plan from the given input data It indicates that constitutes a production plan database 12 for storing the hydroelectric power plant operation plan created planning device 6, in hydroelectric plants operation plan creation device 6 production place.
[0009]
The input device 1 informs the user of the input of the operation plan creation date and the hydropower plant operation plan creation target date by the control signal S1 from the control device 2. When the user inputs the operation plan creation date and the hydropower plant operation plan target date from the input device 1, the user transmits a control signal S 2 from the input device 1 to the control device 2. After receiving the control signal S <b> 2, the control device 2 stores D <b> 1, which is data on the operation plan creation date and the hydropower plant operation plan target date, in the creation date / initial condition storage database 8.
[0010]
The data reading device 3 that has received the control signal S3 from the control device 2 receives the operation plan creation date, the data D5 stored in the initial condition storage database 8, the data D2 stored in the past performance database 9, and the dam equipment database The data D3 stored in 10 and the data D4 stored in the inflow prediction database 11 are read. After the data reading is completed, the data reading device 3 transmits a control signal S4 to the control device 2.
[0011]
The data search device 4 that has received the control signal S5 transmitted from the control device 2 searches the data D6 of the data reading device 3 under a certain condition, and transmits the control signal S6 to the control device 2 after the search is completed.
[0012]
The prediction accuracy calculation device 7 that has received the control signal S11 transmitted from the control device 2 searches the data D11 of the data reading device 3 under a certain condition, and transmits the control signal S12 to the control device 2 after the search is completed.
[0013]
The inflow amount calculation device 5 that has received the control signal S7 transmitted from the control device 2 receives the data D7 from the data reading device 3, and transmits the processing result in the inflow amount calculation device 5 to the inflow amount prediction database 11. Thereafter, a control signal S8 is transmitted from the inflow amount calculation device 5 to the control device 2.
[0014]
The hydropower plant operation plan creation device 6 that has received the control signal S9 transmitted from the control device 2 receives the data D12 from the data reading device 3, creates an operation plan for the hydropower plant, and transmits it to the operation plan database 12. To do. Thereafter, a control signal S10 is transmitted from the hydropower plant operation plan creation device 6 to the control device 2.
[0015]
FIG. 2 shows the database configuration of the operation plan creation date / initial condition storage database 8 shown in FIG. The operation plan creation date data is composed of creation date and creation target date data. The initial condition storage database includes the input data of the processing of the inflow amount calculation device 5 "the period of the nearest target day", "number of inflow amount patterns", "whether the inflow amount pattern number is 1", "inflow amount" The prediction error value used when the number of patterns is 1 item.
[0016]
FIG. 3 shows the structure of the database of the performance database 9 shown in FIG. 1, and data items such as “data date / time”, “dam discharge”, “inflow”, “prediction accuracy”, etc. It is composed of When creating an operation plan for a plurality of dams, a performance database 9 exists for each dam.
[0017]
FIG. 4 shows the configuration of the dam facility database 10 shown in FIG. 1. The “dam name”, “number of generators”, “effective water depth”, “operating water level upper limit value”, “operating water level lower limit value” are shown. ”,“ Usage water amount upper limit value ”,“ Usage water amount lower limit value ”, and“ Electric water ratio ”data items.
[0018]
FIG. 5 shows the structure of the inflow amount prediction database 11 shown in FIG. 1, which is composed of “data date / time”, “inflow amount prediction value”, and “inflow amount correction calculation value”. ing.
[0019]
FIG. 6 shows the database configuration of the operation plan database 12 shown in FIG. 1, and the data of “date and time of data”, “amount of water used”, “gate discharge”, and “power generation” of the dam. It consists of items.
[0020]
FIG. 7 shows a processing flow for creating a hydropower plant operation plan. Hereinafter, the process of creating the hydropower plant operation plan will be described according to the process flow of FIG.
[0021]
Processing block 201: Creation date and initial condition input The input device 1 prompts the user to input an operation plan creation date and initial conditions by a control signal S1 from the control device 2. When the user inputs the creation date of the hydropower plant operation plan and the input data of the inflow amount calculation device 5 from the input device 1, such as “period of the nearest target date”, the control is performed from the input device 1 to the control device 2. Signal S2 is transmitted. In the control device 2, after receiving the control signal S 2, the creation date of the hydropower plant operation plan, the data D 1 such as “the nearest period of interest” that is the input data of the inflow amount calculation device 5, the creation date, Store in the initial condition storage database 8, and proceed to processing block 202.
[0022]
Processing block 202: The control signal S3 is transmitted to the data reading device 3 from the reading control device 2 for the dam equipment data and the inflow prediction data for the operation plan target date. The data reading device 3 that has received the control signal S2 receives the data D3, D4, and D5 stored in the creation date, initial condition storage database 8, dam facility database 10, and inflow prediction database 11.
[0023]
Specifically, from the creation date / initial condition storage database 8, “operation plan creation date”, “creation target date”, “target near-term period”, and “number of inflow patterns” are received. At this time, if the content of the flow rate pattern number data is “1”, the data item “prediction error value used for the inflow amount value when the inflow pattern number = 1” is also received.
[0024]
From the dam facility database 10, “dam name”, “number of generators”, “effective water depth”, “operating water level upper limit value”, “operating water level lower limit value”, “operating water amount upper limit value”, “used water amount lower limit value” , Data D3 of “electric water ratio (output per unit amount of water)” is received.
[0025]
From the inflow amount prediction database 11, “inflow amount prediction value” data D 4 having the same date and time as the “date of creation” received from the initial condition storage database 8 is received. After the process is completed, a control signal S4 is transmitted to the control device 2.
[0026]
The control device 2 proceeds to the next processing block 203 after receiving the control signal S4.
[0027]
Processing block 203: The control signal S11 is transmitted to the prediction accuracy calculation device 7 from the prediction error data creation control device 2 from the operation plan creation date and the latest date data set in the initial conditions. The data reading device 3 that has received the control signal S11 reads from the past record database 9 and the inflow prediction database 11 the creation date input in the processing block 201, stored in the initial condition storage database 8, and Inflow data D2 and predicted inflow data D4 for the target period are received from the data item “period”.
[0028]
For example, in the processing block 201, the “creation date” is set to December 31, 2002, the “creation target date” is set to January 1, 2003, and the “target latest period” is set to three days in the input device 1. In this case, from the past performance database 9 to the “inflow (actual)” data from December 28, 2002 to December 30, 2002, from the inflow prediction database 11 from December 28, 2002 to December 30, 2002. Receives “inflow predicted value” data.
[0029]
From the received data “flow rate (actual)” data and “flow rate predicted value” data, prediction error data for each time of day is created using Equation 1 and transmitted to the past performance database 9. . After the process is completed, a control signal S12 is transmitted to the control device 2.
[0030]
The control device 2 proceeds to the next processing block 204 after receiving the control signal S12.
[0031]
[Expression 1]
Figure 2005031821
[0032]
Processing block 204: Creation of a plurality of inflow prediction data using inflow prediction data and prediction error data In order to create a plurality of inflow prediction data using inflow prediction data and prediction error data, the control device 2 Transmits the control signal S7 to the inflow amount calculation device 5. The inflow amount calculation device 5 that has received the control signal S7 receives “prediction accuracy” from the past performance database 9, “inflow predicted value” from the inflow amount prediction database 11, “creation date”, and “inflow amount pattern from the initial condition storage database 8. Number "data D7 is received.
[0033]
For example, in the processing block 201, the “creation date” is set to December 31, 2002, the “creation target date” is set to January 1, 2003, and the “target immediate period” is set to “three days” When the number of inflow patterns is “3”, “prediction accuracy” data from December 28, 2002 to December 30, 2002 from the past performance database 9, and “inflow amount” from January 1, 2003 from the inflow prediction database 11. "Predicted value" data is received.
[0034]
Here, a plurality of inflow prediction data is created at each time using the received data. The plurality of inflow amount prediction data includes “the number of inflow patterns” stored in the initial condition storage database 8 within the range of the minimum value and the maximum value of the prediction accuracy data at the same time in the nearest day of the planning target date. A prediction accuracy is created, and the created prediction accuracy and the “inflow prediction value” received from the inflow prediction database 11 are integrated to obtain.
[0035]
For example, among the “prediction accuracy” data from December 28, 2002 to December 30, 2002, the prediction accuracy at 1 o'clock is stored in the initial condition storage database 8 respectively 10%, 30%, 15%. Assuming that the number of inflow patterns is 3, the prediction accuracy is 10% and 20% when three prediction accuracy are created at regular intervals within the range of the minimum value 10% and the maximum value 30%. , 30%.
[0036]
After the inflow amount calculation device 5 creates a plurality of inflow amount prediction data with the processing contents, a plurality of inflow amount prediction data D8 is transmitted to the inflow amount prediction database 11, and a control signal S8 is transmitted to the control device 2.
[0037]
The control device 2 proceeds to the next processing block 205 after receiving the control signal S8.
[0038]
Process block 205: A control signal S9 is transmitted from the hydropower plant operation plan creation control device 2 for a plurality of inflow prediction data to the hydropower plant operation plan creation device 6. The hydropower plant operation plan creation device 6 creates a hydropower plant operation plan for the plurality of inflow prediction data created in the processing block 204. For a specific operation plan creation method, for example, the method described in Patent Document 1 or Patent Document 2 is used.
[0039]
As described above, in a device that creates a hydropower plant operation plan with a computer, a plurality of inflow prediction data is created using the prediction error data of the dam inflow on the day of the planning date. By creating a plan for the inflow prediction data, it is possible to provide a realistic plan that takes into account the prediction error of the dam inflow.
[0040]
In the present embodiment, the hydropower plant operation plan creation for one dam has been described. However, the present invention can be similarly applied to a case of a connected water system in which a plurality of dams exist in one river.
[0041]
【The invention's effect】
According to the present invention, the inflow prediction data is created using the inflow prediction error data of the nearest day of the planning target date, and the hydropower plant operation plan for the data is created, so that the plan suitable for actual operation Can be provided.
[Brief description of the drawings]
FIG. 1 shows the configuration of a hydropower plant operation plan creation device.
FIG. 2 is a configuration diagram of a database for storing creation dates and initial conditions.
FIG. 3 is a configuration diagram of a past performance database.
FIG. 4 is a configuration diagram of a dam facility database.
FIG. 5 is a configuration diagram of an inflow prediction database.
FIG. 6 is a configuration diagram of an operation plan database.
FIG. 7 is a flowchart of a hydropower plant operation plan creation process.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Input device, 2 ... Control device, 3 ... Data reading device, 4 ... Data search device, 5 ... Inflow amount calculation device, 6 ... Hydroelectric power plant operation plan creation device, 7 ... Prediction accuracy calculation device, 8 ... Creation date , Initial condition storage database, 9 ... past performance database, 10 ... dam facility database, 11 ... inflow prediction database, 12 ... operation plan database, S1 ... signal for controlling input device 1 from control device 2, S2 ... input device 1 A signal for communicating the processing end state in step S3 to the control device 2, a signal for controlling the data reading device 3 from the control device 2, a signal for communicating the processing end state of the data reading device 3 to the control device 2, S5. A signal for controlling the data search device 4 from the control device 2, S6: a signal for communicating the processing end state of the data search device 4 to the control device 2, S7: an inflow amount calculation device 5 from the control device 2 Signal to control, S8 ... Signal for communicating processing end state of inflow amount calculation device 5 to control device 2, S9 ... Signal for controlling hydropower plant operation plan creation device 6 from control device 2, S10 ... Hydropower plant operation plan Signal for communicating the processing end state of the creation device 6 to the control device 2, D1: creation date from the input device 1, creation date to be sent to the initial condition storage database 8, creation target date data, D2 ... data read from the past result database 9 The past dam name, discharge flow rate, inflow amount (actual result) to be transmitted to the device 3, D3 ... dam facility data to be transmitted from the dam facility database 10 to the data reading device 3, D4 ... data read from the inflow amount prediction database 11 Inflow prediction data to be transmitted to the device 3, D5 ... creation date, creation date to be transmitted from the initial condition storage database 8 to the data reading device 3, and creation target date Data, initial condition data, D6... Past performance data transmitted from the data reading device 3 to the data retrieval device 4, D7... Inflow amount (actual) data transmitted from the data reading device 3 to the inflow amount calculating device 5, D8. A plurality of inflow prediction data to be transmitted from the amount calculation device 5 to the inflow amount prediction database 11, D9... Prediction accuracy data to be transmitted from the prediction accuracy calculation device 7 to the past performance database 9, D10... From the hydropower plant operation plan creation device 6. Data to be transmitted to the operation plan database 12.

Claims (5)

ダムに流入する水量を予測する流入水量予測手段と、
過去の所定の期間にダムに流入した水量の計測値を記憶する流入水量記憶手段と、
過去の所定の期間にダムに流入した水量の予測値を記憶する流入水量予測値記憶手段と、
前記流入水量記憶手段が記憶した流入水量計測値及び前記流入水量予測値記憶手段が記憶した流入水量予測値に基づいて過去の所定の期間の流入水量に関する予測誤差を算出する予測誤差算出手段と、
前記予測誤差算出手段が算出した予測誤差に基づいてダムの運用計画作成対象日の予測流入水量パターンを作成する予測流入水量パターン作成手段と、
前記予測流入水量パターン作成手段が作成した予測流入水量パターンを表示する表示手段とを備えることを特徴とする水力発電所運用計画作成装置。
Inflow water amount prediction means for predicting the amount of water flowing into the dam,
Inflow water amount storage means for storing a measured value of the amount of water that has flowed into the dam during a predetermined period in the past;
Inflow water amount predicted value storage means for storing a predicted value of the amount of water that has flowed into the dam during a predetermined period in the past;
Prediction error calculation means for calculating a prediction error related to the inflow water amount in a predetermined past period based on the inflow water amount measurement value stored in the inflow water amount storage means and the inflow water amount prediction value stored in the inflow water amount prediction value storage means;
A predicted inflow water amount pattern creating means for creating a predicted inflow water amount pattern for a dam operation plan creation day based on the prediction error calculated by the prediction error calculating means;
A hydropower plant operation plan creation device comprising: display means for displaying the predicted inflow water quantity pattern created by the predicted inflow water quantity pattern creation means.
請求項1において、前記予測流入水量パターン作成手段が作成した流入水量パターンに基づいて水力発電所の運用計画を作成することを特徴とする水力発電所運用計画作成装置。2. The hydropower plant operation plan creation device according to claim 1, wherein the hydropower plant operation plan is created based on the inflow water amount pattern created by the predicted inflow water amount pattern creation means. 請求項1において、前記予測流入水量パターン数を入力する流入水量パターン数受信手段と、
前記予測流入水量パターン作成手段は前記予測誤差算出手段が算出した過去の所定の期間の予測誤差の最大値と最小値の範囲内で前記流入パターン数受信手段が受信したパターン数の予測流入水量パターンを作成することを特徴とする水力発電所運用計画作成装置。
In Claim 1, the inflow water amount pattern number receiving means for inputting the predicted inflow water amount pattern number;
The predicted inflow water amount pattern creating means has a predicted inflow water amount pattern of the number of patterns received by the inflow pattern number receiving means within the range of the maximum and minimum prediction errors of the past predetermined period calculated by the prediction error calculating means. Hydropower plant operation plan creation device characterized by creating
コンピュータを、ダムに流入する水量を予測する流入水量予測手段、
過去の所定の期間にダムに流入した水量の計測値を記憶する流入水量記憶手段、
過去の所定の期間にダムに流入した水量の予測値を記憶する流入水量予測値記憶手段、
前記流入水量記憶手段が記憶した流入水量計測値及び前記流入水量予測値記憶手段が記憶した流入水量予測値に基づいて過去の所定の期間の流入水量に関する予測誤差を算出する予測誤差算出手段、
前記予測誤差算出手段が算出した予測誤差に基づいてダムの運用計画作成日の予測流入水量パターンを作成する予測流入水量パターン作成手段、
前記予測流入水量パターン作成手段が作成した予測流入水量パターンを表示する表示手段として機能させることを特徴とする水力発電所運用計画作成プログラム。
Inflow water amount prediction means for predicting the amount of water flowing into the dam with a computer,
Inflow water amount storage means for storing a measured value of the amount of water that has flowed into the dam during a predetermined period in the past,
Inflow water amount predicted value storage means for storing a predicted value of the amount of water that has flowed into the dam during a past predetermined period,
A prediction error calculation means for calculating a prediction error related to the inflow water amount in the past predetermined period based on the inflow water amount measurement value stored in the inflow water amount storage means and the inflow water amount prediction value stored in the inflow water amount prediction value storage means;
Predicted influent water amount pattern creating means for creating a predicted influent water amount pattern on the dam operation plan creation date based on the prediction error calculated by the prediction error calculating means,
A hydropower plant operation plan creation program that functions as display means for displaying a predicted inflow water amount pattern created by the predicted inflow water amount pattern creation means.
ダムに流入する水量を予測する流入水量予測ステップと、
過去の所定の期間にダムに流入した水量の計測値を記憶する流入水量記憶ステップと、
過去の所定の期間にダムに流入した水量の予測値を記憶する流入水量予測値記憶ステップと、
前記流入水量記憶手段が記憶した流入水量計測値及び前記流入水量予測値記憶手段が記憶した流入水量予測値に基づいて過去の所定の期間の流入水量に関する予測誤差を算出する予測誤差算出ステップと、
前記予測誤差算出手段が算出した予測誤差に基づいてダムの運用計画作成日の予測流入水量パターンを作成する予測流入水量パターン作成ステップと、
前記予測流入水量パターン作成手段が作成した予測流入水量パターンを表示する表示ステップとを備えることを特徴とする水力発電所運用計画作成方法。
An inflow water amount prediction step for predicting the amount of water flowing into the dam;
An inflow water amount storing step for storing a measured value of the amount of water that has flowed into the dam during a predetermined period in the past;
An inflow water amount predicted value storage step for storing a predicted value of the amount of water that has flowed into the dam in a past predetermined period;
A prediction error calculation step of calculating a prediction error related to the inflow water amount in a predetermined past period based on the inflow water amount measurement value stored in the inflow water amount storage unit and the inflow water amount prediction value stored in the inflow water amount prediction value storage unit;
A predicted inflow water amount pattern creating step for creating a predicted inflow water amount pattern of a dam operation plan creation date based on the prediction error calculated by the prediction error calculating means;
A hydropower plant operation plan creation method comprising: a display step for displaying the predicted inflow water amount pattern created by the predicted inflow water amount pattern creation means.
JP2003193993A 2003-07-09 2003-07-09 Hydroelectric power station operation plan preparing device, method, and program Pending JP2005031821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003193993A JP2005031821A (en) 2003-07-09 2003-07-09 Hydroelectric power station operation plan preparing device, method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003193993A JP2005031821A (en) 2003-07-09 2003-07-09 Hydroelectric power station operation plan preparing device, method, and program

Publications (1)

Publication Number Publication Date
JP2005031821A true JP2005031821A (en) 2005-02-03

Family

ID=34205274

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003193993A Pending JP2005031821A (en) 2003-07-09 2003-07-09 Hydroelectric power station operation plan preparing device, method, and program

Country Status (1)

Country Link
JP (1) JP2005031821A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009223692A (en) * 2008-03-17 2009-10-01 Chugoku Electric Power Co Inc:The Operation support system, operation support method and program for water storage facility,
JP2010044551A (en) * 2008-08-12 2010-02-25 Chugoku Electric Power Co Inc:The Device and program for calculating water type power generation output
WO2010071158A1 (en) * 2008-12-19 2010-06-24 中国電力株式会社 System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program
JP2010211527A (en) * 2009-03-10 2010-09-24 Chugoku Electric Power Co Inc:The Inflow prediction system, inflow prediction method, and program
JP2011180899A (en) * 2010-03-02 2011-09-15 Chugoku Electric Power Co Inc:The Reservoir management plan creation method and device
JP2012127073A (en) * 2010-12-14 2012-07-05 Chugoku Electric Power Co Inc:The Water intake control method and device
JP7467315B2 (en) 2020-11-11 2024-04-15 株式会社東芝 Water system operation planning method and water system operation planning system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009223692A (en) * 2008-03-17 2009-10-01 Chugoku Electric Power Co Inc:The Operation support system, operation support method and program for water storage facility,
JP2010044551A (en) * 2008-08-12 2010-02-25 Chugoku Electric Power Co Inc:The Device and program for calculating water type power generation output
WO2010071158A1 (en) * 2008-12-19 2010-06-24 中国電力株式会社 System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program
JP2010165346A (en) * 2008-12-19 2010-07-29 Chugoku Electric Power Co Inc:The System for aiding operation of reservoir facility, method for aiding operation of reservoir facility, and program
TWI490811B (en) * 2008-12-19 2015-07-01 Chugoku Electric Power Support facilities for storage facilities, use of reservoir support facilities and support facilities for storage facilities
JP2010211527A (en) * 2009-03-10 2010-09-24 Chugoku Electric Power Co Inc:The Inflow prediction system, inflow prediction method, and program
JP2011180899A (en) * 2010-03-02 2011-09-15 Chugoku Electric Power Co Inc:The Reservoir management plan creation method and device
JP2012127073A (en) * 2010-12-14 2012-07-05 Chugoku Electric Power Co Inc:The Water intake control method and device
JP7467315B2 (en) 2020-11-11 2024-04-15 株式会社東芝 Water system operation planning method and water system operation planning system

Similar Documents

Publication Publication Date Title
JP5014213B2 (en) Water storage facility operation support system, operation support method and program
US20030083788A1 (en) Operation support system and method
CN104392274B (en) The short-term electro-load forecast method in city based on power load and temperature trend
WO2013150405A1 (en) Smoothing power output from a wind farm
JP5047260B2 (en) Precipitation prediction system, precipitation prediction method and program
JP5225256B2 (en) Water storage facility operation support system, water storage facility operation support method and program
CN102018498A (en) Clinical thermometer special for female
JP2005031821A (en) Hydroelectric power station operation plan preparing device, method, and program
EP4303785A1 (en) Reservoir flow rate regulating method and apparatus, electronic device, and storage medium
CN106650086A (en) Indirect air cooling system numerical simulation platform based on FLUENT software
CN101964087A (en) Task progress computing method and device
JP2005285032A (en) Daily power generation planning system for hydroelectric power station group
CN109470918A (en) The electricity data processing method and IR46 electric energy meter of IR46 electric energy meter
JP2006039838A (en) Water type power generation operation plan preparation supporting apparatus
CN107423912A (en) A kind of method and system for becoming dynamic mesh dynamic division based on personnel
JP5014522B1 (en) Inflow amount prediction apparatus, inflow amount prediction method, and program
TW201824043A (en) Operation plan creating apparatus, operation plan creating method, and program
JP5191308B2 (en) Water-based power generation output calculation device and water-based power generation output calculation program
JP2009251742A (en) Demand predicting device, demand predicting method and demand predicting program
JP5153805B2 (en) Water storage facility operation support system, operation support method and program
JPH08115369A (en) Sales amount prediction system
JP2003134664A (en) Operation planning device, operation planning method, operation planning program, and recording medium recording the program
Guyaguler et al. Comparison of genetic algorithm with linear programming for the optimization of an underground gas-storage field
CN111124452A (en) Software upgrading method and device for instrument, instrument and storage medium
JP2002054182A (en) Device for predicting amount of water supply

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050616

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20060420

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070123

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070605