CN101964087A CN2010102998103A CN201010299810A CN101964087A CN 101964087 A CN101964087 A CN 101964087A CN 2010102998103 A CN2010102998103 A CN 2010102998103A CN 201010299810 A CN201010299810 A CN 201010299810A CN 101964087 A CN101964087 A CN 101964087A
Authority
CN
China
Prior art keywords
task
progress
per pass
production
pass operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102998103A
Other languages
Chinese (zh)
Inventor
罗涛
刘鲁江
贺唤平
陈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yonyou Software Co Ltd
Original Assignee
Yonyou Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yonyou Software Co Ltd filed Critical Yonyou Software Co Ltd
Priority to CN2010102998103A priority Critical patent/CN101964087A/en
Publication of CN101964087A publication Critical patent/CN101964087A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention provides a task progress computing method. The method comprises the following steps of: 102, determining the finishing amount of each progress in a corresponding production activity of a task; and 104, obtaining the progress of the task according to the finishing amount of each progress. The invention also provides a task progress computing device. According to the technical scheme of the invention, the practical completion ratio of the corresponding task is computed according to the progress output of each progress practically carried out by a user, so that the practical progress of the task reflects the practical condition of the practical production activity and the project risk is well controlled.

Description

Task Progress computing method and device
Technical field
The present invention relates to production task progress monitoring technology, in particular to a kind of Task Progress computing method and device.
Background technology
In the single production of pressing of single and mini-batch production, the general more complicated of the technology of its activity in production, cycle is longer, but the finished product quantity of final output is generally less, the method according to activity in production completion quantity calculation task progress that exists at present for this class activity in production, can cause in time reflecting the actual progress of this task, the deviation that causes the actual information planned is unfavorable for the problem of project control risk.
Therefore, need a kind of Task Progress account form, calculate the actual completion ratio of corresponding task according to the operation output of the per pass operation of user's actual execution, the actual conditions with the actual progress reflection actual production activity that guarantees task are beneficial to the control project risk.
Summary of the invention
Technical matters to be solved by this invention is, a kind of Task Progress account form is provided, calculate the actual completion ratio of corresponding task according to the operation output of the per pass operation of user's actual execution, actual conditions with the actual progress reflection actual production activity that guarantees task are beneficial to the control project risk.
In view of this, the invention provides a kind of Task Progress computing method, comprising: step 102, the quantity performed of the per pass operation in the corresponding activity in production of affirmation task; Step 104 according to the quantity performed of described per pass operation, obtains the progress of described task.By this technical scheme, come the calculation task progress by operation, help guaranteeing planning consistance in actual production.
In technique scheme, preferably, also comprise: step 101, create described task, described corresponding activity in production and described per pass operation.
In technique scheme, preferably, in described step 102, when particular cases took place, that confirms described per pass operation finished data.
In technique scheme, preferably, described particular cases comprises: to the operation in the described corresponding activity in production change, deletion action; The new operation of finishing appears in the described corresponding activity in production; Planned quantity to the corresponding product of described task carries out alter operation.
In technique scheme, preferably, in described step 104, obtain the quantity performed of described per pass operation and described per pass operation planned quantity ratio and gather, will gather the progress of the ratio of operation quantity in value and the described corresponding task as described task.
The present invention also provides a kind of Task Progress calculation element, comprising: completion procedures is confirmed module, the quantity performed of the per pass operation in the corresponding activity in production of affirmation task; The Task Progress computing module according to the quantity performed of described per pass operation, obtains the progress of described task.By this technical scheme, come the calculation task progress by operation, help guaranteeing planning consistance in actual production.
In technique scheme, preferably, also comprise: task is provided with module, creates described task, described corresponding activity in production and described per pass operation.
In technique scheme, preferably, described completion procedures is confirmed module when particular cases takes place, and that confirms described per pass operation finishes data.
In technique scheme, preferably, described particular cases comprises: to the operation in the described corresponding activity in production change, deletion action; The new operation of finishing appears in the described corresponding activity in production; Planned quantity to the corresponding product of described task carries out alter operation.
In technique scheme, preferably, described Task Progress computing module obtain the quantity performed of described per pass operation and described per pass operation planned quantity ratio and gather, will gather the progress of the ratio of operation quantity in value and the described corresponding task as described task.
Pass through technique scheme, can realize a kind of Task Progress computing method and device, calculate the actual completion ratio of corresponding task according to the operation output of the per pass operation of user's actual execution, actual conditions with the actual progress reflection actual production activity that guarantees task are beneficial to the control project risk.
Description of drawings
Fig. 1 is the process flow diagram of Task Progress computing method according to an embodiment of the invention;
Fig. 2 is the block diagram of Task Progress calculation element according to an embodiment of the invention;
Fig. 3 is the synoptic diagram of Task Progress computing method according to an embodiment of the invention.
Embodiment
Fig. 1 is the process flow diagram of Task Progress computing method according to an embodiment of the invention.
As shown in Figure 1, the invention provides a kind of Task Progress computing method, comprising: step 102, the quantity performed of the per pass operation in the corresponding activity in production of affirmation task; Step 104 according to the quantity performed of described per pass operation, obtains the progress of described task.By this technical scheme, come the calculation task progress by operation, help guaranteeing planning consistance in actual production.
In technique scheme, also comprise: step 101, create described task, described corresponding activity in production and described per pass operation.
In technique scheme, in described step 102, when particular cases took place, that confirms described per pass operation finished data.
In technique scheme, described particular cases comprises: to the operation in the described corresponding activity in production change, deletion action; The new operation of finishing appears in the described corresponding activity in production; Planned quantity to the corresponding product of described task carries out alter operation.
In technique scheme, in described step 104, obtain the quantity performed of described per pass operation and described per pass operation planned quantity ratio and gather, will gather the progress of the ratio of operation quantity in value and the described corresponding task as described task.
Fig. 2 is the block diagram of Task Progress calculation element according to an embodiment of the invention.
As shown in Figure 2, the present invention also provides a kind of Task Progress calculation element 200, comprising: completion procedures is confirmed module 202, the quantity performed of the per pass operation in the corresponding activity in production of affirmation task; Task Progress computing module 204 according to the quantity performed of described per pass operation, obtains the progress of described task.By this technical scheme, come the calculation task progress by operation, help guaranteeing planning consistance in actual production.
In technique scheme, also comprise: task is provided with module, creates described task, described corresponding activity in production and described per pass operation.
In technique scheme, described completion procedures is confirmed module 202 when particular cases takes place, and that confirms described per pass operation finishes data.
In technique scheme, described particular cases comprises: to the operation in the described corresponding activity in production change, deletion action; The new operation of finishing appears in the described corresponding activity in production; Planned quantity to the corresponding product of described task carries out alter operation.
In technique scheme, described Task Progress computing module 204 obtain the quantity performed of described per pass operation and described per pass operation planned quantity ratio and gather, will gather the progress of the ratio of operation quantity in value and the described corresponding task as described task.
Fig. 3 is the synoptic diagram of Task Progress computing method according to an embodiment of the invention.
At first, the Task Progress computing method in the present embodiment are described:
When the user when certain operation of the activity in production of task correspondence has been filled in the actual qualified completion quantity of this operation, find corresponding task, planned quantity according to task, if the user has selected by working hour meter degree of adding, then the man-hour of task as flexible strategy, otherwise, be 1 to handle according to per pass preface flexible strategy, according to the completion ratio of per pass operation, the completion ratio of weighted calculation task; When revising the operation of the actual production activity that (comprise and revising man-hour, planned quantity or deletion operation, newly-increased operation) is used for satisfying these mission requirements, can notify the operation of task activity in production to change; Be used for satisfying the operation of actual production activity of these mission requirements in user's modification after, when activity in production is preserved, recomputate the actual progress of task according to the value after the user's modification.
The Task Progress computing method of present embodiment according to the mode of calculation task progress are:
The formula that calculates according to operation road number is: Task Progress=∑ (the actual completion of each road preface quantity/each road preface planned quantity)/total operation road number; According to the formula that calculates man-hour be: Task Progress=∑ (the actual completion of each road preface quantity/each road preface planned quantity)/∑ (during each road preface beam worker+each each road preface machining period of road preface planned quantity *); If the actual completion quantity of operation>=operationpiston quantity wherein, the actual completion of operation quantity participates in calculating according to operationpiston quantity when then calculating.If after the calculating progress, if the actual start time of Task Progress=100% and task do not have numerical value yet, then with the actual completion date of this change time as task; If Task Progress before the calculating progress=100% is after the calculating progress, if Task Progress<100% then empties the actual completion date of task; If Task Progress before the calculating progress=100%, after the calculating progress, if Task Progress=100%, then the actual completion date of task is constant;
In the Task Progress computing method of present embodiment, when particular cases takes place, the progress of task is calculated, wherein:
(1) operation change: when creating operation or revising operation for the activity in production of satisfying task, change the man-hour of the operation of notice task correspondence, so that task is according to the progress of calculation task in up-to-date man-hour;
After receiving the operation Notification of Changes,,, then do not influence progress if calculate progress according to the road number if there has been progress in task, otherwise, need calculate progress according to operation;
(2) operation deletion: when deleting operation for the activity in production of satisfying task, the operation of notice task correspondence has been deleted, so that task is according to the progress of up-to-date operation calculation task;
After receiving operation deletion notice,, need calculate progress according to operation if there has been progress in task;
(3) operation completion: when certain operation completion quantity for the activity in production of satisfying task changed, the completion quantity that the operation of notice task correspondence is up-to-date was so that task is according to the progress of up-to-date operation completion quantity calculation task;
After receiving operation completion notice, need calculate progress according to operation, if before the calculating progress completion quantity of all process steps be 0 and actual start time of task do not have numerical value yet, then with market price start time of the actual start time write-back task of activity in production; If after the calculating progress, if the actual start time of Task Progress=100% and task does not have numerical value yet, the actual completion date of the notice that then will complete is as the actual completion date of task; If Task Progress before the calculating progress=100% is after the calculating progress, if Task Progress<100% then empties the actual completion date of task; If Task Progress before the calculating progress=100%, after the calculating progress, if Task Progress=100%, then the actual completion date of task is constant;
(4) planned quantity of task change: after task change of plan quantity, need calculate progress according to operation, if the completion quantity of all process steps is 0 then do not calculate before the calculating progress, otherwise the calculating progress; If after the calculating progress, if the actual start time of Task Progress=100% and task do not have numerical value yet, then with the actual completion date of this change time as task; If Task Progress before the calculating progress=100% is after the calculating progress, if Task Progress<100% then empties the actual completion date of task; If Task Progress before the calculating progress=100%, after the calculating progress, if Task Progress=100%, then the actual completion date of task is constant.
According to Fig. 3, provide the example that carries out Task Progress calculating below according to the Task Progress computing method of present embodiment.
As shown in Figure 3, step 302, user's creation task T10.
Step 304, user's appointed task T10 calculates progress according to operation.
Step 306 is preserved task T10.
The WBS chart of task T10 is as follows:
Figure BSA00000293257800061
Step 308, the user creates the activity in production MO10 that satisfies this task.
Activity in production MO10 (not appointed task) is as follows:
Step 310 provides all tasks to check to the user.
Step 312, it is T10 that the user specifies the task of this activity in production.
Activity in production MO10 (appointed task) is as follows:
Figure BSA00000293257800071
Step 314, the user creates the concrete operation of carrying out this activity in production MO10.
Concrete operation is as follows:
Figure BSA00000293257800072
Step 316 is preserved activity in production MO10.
After activity in production was preserved, task data was as follows:
Figure BSA00000293257800073
Step 320, the user increases newly and revises the operation of MO10.
Step 322, during preservation, the change of notice task T10 operation.
Revise operation 20, preserve.
The activity in production data of this assembling are as follows:
Figure BSA00000293257800081
Concrete operation is as follows:
Figure BSA00000293257800082
Step 324, the disposal route that changes at operation in the calling task progress computing method.
Step 326 is carried out Task Progress and is calculated.
Task data is as follows:
Figure BSA00000293257800083
Step 328, the user deletes the operation of M010.
Step 330, during preservation, the deletion of notice task T10 operation.
Deletion operation 30 is preserved.
The activity in production data of this assembling are as follows:
Figure BSA00000293257800091
Concrete operation is as follows:
Figure BSA00000293257800092
Step 332, the disposal route of deleting at operation in the calling task progress computing method.
Step 334 is carried out Task Progress and is calculated.
Task data is as follows:
Figure BSA00000293257800093
Step 336, the user carries out complete report to certain procedure of M010.
Step 338, during preservation, the completion of notice task T10 operation.
Step 340, the disposal route that completes at operation in the calling task progress computing method.
Step 342 is carried out Task Progress and is calculated.
When operation 10 is finished 1, preserve.
The activity in production data of this assembling are as follows:
Concrete operation is as follows:
Figure BSA00000293257800102
Task data is as follows:
Figure BSA00000293257800103
Finish man-hour at all process steps, preserve.
The activity in production data of this assembling are as follows:
Figure BSA00000293257800111
Concrete operation is as follows:
Task data is as follows:
Figure BSA00000293257800113
Step 344, the planned quantity of user's modification task T10.
Step 346, the disposal route that changes at planned quantity in the calling task progress computing method, calculation task progress.
In sum, pass through technique scheme, can realize a kind of Task Progress computing method and device, calculate the actual completion ratio of corresponding task according to the operation output of the per pass operation of user's actual execution, actual conditions with the actual progress reflection actual production activity that guarantees task are beneficial to the control project risk.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. Task Progress computing method is characterized in that, comprising:
Step 102, the quantity performed of the per pass operation in the corresponding activity in production of affirmation task;
Step 104 according to the quantity performed of described per pass operation, obtains the progress of described task.
2. Task Progress computing method according to claim 1 is characterized in that, also comprise:
Step 101 is created described task, described corresponding activity in production and described per pass operation.
3. Task Progress computing method according to claim 2 is characterized in that, in described step 102, when particular cases took place, that confirms described per pass operation finished data.
4. Task Progress computing method according to claim 3 is characterized in that, described particular cases comprises:
To the operation in the described corresponding activity in production change, deletion action;
The new operation of finishing appears in the described corresponding activity in production;
Planned quantity to the corresponding product of described task carries out alter operation.
5. according to each described Task Progress computing method in the claim 1 to 4, it is characterized in that, in described step 104, obtain the quantity performed of described per pass operation and described per pass operation planned quantity ratio and gather, will gather the progress of the ratio of operation quantity in value and the described corresponding task as described task.
6. a Task Progress calculation element is characterized in that, comprising:
Completion procedures is confirmed module, the quantity performed of the per pass operation in the corresponding activity in production of affirmation task;
The Task Progress computing module according to the quantity performed of described per pass operation, obtains the progress of described task.
7. Task Progress calculation element according to claim 6 is characterized in that, also comprises:
Task is provided with module, creates described task, described corresponding activity in production and described per pass operation.
8. Task Progress calculation element according to claim 7 is characterized in that, described completion procedures is confirmed module when particular cases takes place, and that confirms described per pass operation finishes data.
9. Task Progress calculation element according to claim 8 is characterized in that, described particular cases comprises:
To the operation in the described corresponding activity in production change, deletion action;
The new operation of finishing appears in the described corresponding activity in production;
Planned quantity to the corresponding product of described task carries out alter operation.
10. according to each described Task Progress calculation element in the claim 6 to 9, it is characterized in that, described Task Progress computing module obtain the quantity performed of described per pass operation and described per pass operation planned quantity ratio and gather, will gather the progress of the ratio of operation quantity in value and the described corresponding task as described task.
CN2010102998103A 2010-09-29 2010-09-29 Task progress computing method and device Pending CN101964087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102998103A CN101964087A (en) 2010-09-29 2010-09-29 Task progress computing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102998103A CN101964087A (en) 2010-09-29 2010-09-29 Task progress computing method and device

Publications (1)

Publication Number Publication Date
CN101964087A true CN101964087A (en) 2011-02-02

Family

ID=43516951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102998103A Pending CN101964087A (en) 2010-09-29 2010-09-29 Task progress computing method and device

Country Status (1)

Country Link
CN (1) CN101964087A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104285231A (en) * 2013-03-29 2015-01-14 京瓷经营咨询有限公司 Kccs management consulting, inc
CN105512293A (en) * 2015-12-10 2016-04-20 天津海量信息技术有限公司 HBase based Map task progress computation method
CN106780080A (en) * 2016-11-29 2017-05-31 深圳前海弘稼科技有限公司 The computational methods of planting progress, computing device and server
CN106774393A (en) * 2016-09-22 2017-05-31 重庆零度智控智能科技有限公司 A kind of task progress computing method, device and unmanned plane
CN109388116A (en) * 2018-10-31 2019-02-26 金蝶软件(中国)有限公司 A kind of production management method, management system for internet of things and relevant device
CN111768080A (en) * 2020-06-01 2020-10-13 浙江大学 Method and system for evaluating finished progress of manufactured product
CN113704763A (en) * 2021-09-02 2021-11-26 北京珞安科技有限责任公司 Pipelined device scanning detection method
CN114418418A (en) * 2022-01-25 2022-04-29 重庆允丰科技有限公司 Work order information transfer method, system, equipment and medium based on process conversion ratio

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104285231A (en) * 2013-03-29 2015-01-14 京瓷经营咨询有限公司 Kccs management consulting, inc
CN105512293A (en) * 2015-12-10 2016-04-20 天津海量信息技术有限公司 HBase based Map task progress computation method
CN106774393A (en) * 2016-09-22 2017-05-31 重庆零度智控智能科技有限公司 A kind of task progress computing method, device and unmanned plane
CN106780080A (en) * 2016-11-29 2017-05-31 深圳前海弘稼科技有限公司 The computational methods of planting progress, computing device and server
CN109388116A (en) * 2018-10-31 2019-02-26 金蝶软件(中国)有限公司 A kind of production management method, management system for internet of things and relevant device
CN109388116B (en) * 2018-10-31 2021-08-20 金蝶软件(中国)有限公司 Production management method, Internet of things management system and related equipment
CN111768080A (en) * 2020-06-01 2020-10-13 浙江大学 Method and system for evaluating finished progress of manufactured product
CN111768080B (en) * 2020-06-01 2024-05-24 浙江大学 Method and system for evaluating finished progress of manufactured product
CN113704763A (en) * 2021-09-02 2021-11-26 北京珞安科技有限责任公司 Pipelined device scanning detection method
CN113704763B (en) * 2021-09-02 2022-03-25 北京珞安科技有限责任公司 Pipelined device scanning detection method
CN114418418A (en) * 2022-01-25 2022-04-29 重庆允丰科技有限公司 Work order information transfer method, system, equipment and medium based on process conversion ratio

Similar Documents

Publication Publication Date Title
CN101964087A (en) Task progress computing method and device
US20160048785A1 (en) A computer implemented system and method for project controls
WO2008095060A2 (en) Method and apparatus for integrated inventory and planning
US20130054439A1 (en) Curve engine
CN107705029A (en) A kind of computational methods and system of engineering construction progress
CN112541749A (en) Construction progress management system based on BIM technology
WO2018144687A1 (en) Physical resource optimization system and associated method of use
Macek et al. Buildings renovation and maintenance in the public sector
KR101070119B1 (en) Management system of budget
CN101510277A (en) Method for rolling computation of material requirement in production management process
CN104112174A (en) Project regulating and controlling method and system of nuclear power plant
CN102696027A (en) Method and system for performing analysis on documents related to various technology fields
CN115169658B (en) Inventory consumption prediction method, system and storage medium based on NPL and knowledge graph
Project Management Institute Practice standard for scheduling
CN116151894A (en) Real-time bidding global optimization method and system for multi-channel search advertisement
Mundra et al. System Dynamics for Simulation Model of Material Cost in Water Recources Project
CA2832806C (en) Method for optimizing schedule compression in projects using accelerating and overlapping of activities
CN111598729A (en) Method for conveniently compiling settlement change list
Vishnuraj et al. Optimization of resources in highway construction
JP2001318714A (en) Object development type production management system
Ahmed et al. Critical Review of the Evolution of Project Delivery Methods in the Construction Industry. Buildings 2021, 11, 11
CN102938773A (en) Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal
Jaafari Construction management know-how for transnational projects
Kostelyk Project controls for engineering work in practice
Abma et al. Cash flow simulation planning based on building information modeling for construction projects

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110202