CN102938773A - Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal - Google Patents

Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal Download PDF

Info

Publication number
CN102938773A
CN102938773A CN 201110341965 CN201110341965A CN102938773A CN 102938773 A CN102938773 A CN 102938773A CN 201110341965 CN201110341965 CN 201110341965 CN 201110341965 A CN201110341965 A CN 201110341965A CN 102938773 A CN102938773 A CN 102938773A
Authority
CN
China
Prior art keywords
internet user
configuration
planning
terminal
individual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110341965
Other languages
Chinese (zh)
Inventor
李宗诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110341965 priority Critical patent/CN102938773A/en
Publication of CN102938773A publication Critical patent/CN102938773A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Disclosed is an ICT technical support design for planning and configuring a function module by an internet user terminal. The design is based on establishment of brand new logic basis, mathematical basis and scientific basis, aims at transforming a 'cloud' calculation system into a universally communicated 'heaven and earth' calculation system, takes internet users as a center and further takes a multi-layer global value chain (GVC) as the center, takes the linking and coordination of a cognitive system and a practice system based on a computer aided system and the internet as a mainline of an evolution process of a higher intelligent integrated system (HIIS), and is a new technology established through constructing network configuration of basic models, paradigms and equation systems for dynamics and holographic organizing synergetics.

Description

The ICT technical support design of Internet user's terminal planning and configuration functional module
Technical field
" GVC network technology support system [DCN/IIL (VCSE)] ", its bulking property target is, centered by the Internet user, and then centered by global value Chain System (GVC), the connection that the Natural Intelligence and Artificial Intelligence of usining carries out based on computer and network thereof and coordinate the main line as general intelligence integrated system (GIIS) Upgrade process, set up brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technical foundation and engineering foundation, for relative closure, relatively static " resource pool "---system for cloud computing injects soul, intelligence and life, build global intelligent integral contract network computer architecture (CS/HSN (GII)), Global Internet is made and become the technique support system that really has life and ecological holographic joint management character.On this basis; using connection that cognitive system and practice system carry out based on computer aided system and the Internet and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process, set up based on the brand-new theoretical integrated science system of intelligence (the IIS &amp of metasystem (MS) science; IIT), by the novel Global Internet of life-giving vigor be dispersed in logistics net, energy net, Network and Finance Network and the knowledge knowledge network of each field all departments all over the world and combine together, carry out energetically the GVC system engineering, set up and really there is the dynamic Correspondent network system of global intelligent integral (DCN/HII (GVC)) of life and ecological holographic joint management character, thereby build intelligent integrated net, life the Internet and ecological operation net.By implementing, GVC system engineering technology Cluster Exploitation total strategy---inventor Li Zong really is referred to as " since the beginning of history " plan, and by flicker, indefinite " cloud " counting system is transformed into " world " counting system of Correspondent all things on earth, perforation longitude and latitude.
The main purpose of this invention, be by brand-new logical foundations, Fundamentals of Mathematics, scientific basic and brand-new technical foundation and engineering foundation, for Internet user's terminal planning and configuration provides the ICT network docking technique of functional module.
Related all Mathematical Modelings in this specification, have original creativity.
This invention belongs to planning and configuration, planning organization and planning management field (PA/UEC) of Internet user's terminal, be resource distribution, the organization and management technical foundation of Internet user terminal and then Internet user terminal planning and configuration system, people, mechanism and tissue guided into to the key of " world " (brand-new counting system) of Correspondent all things on earth from flicker indefinite " cloud " (counting system).
PA/UEC is a kind of solution of Internet user's system engineering, by means of brand-new Information technology and the network technology, Internet user's service strategy and operation mode are imported and wholely take among the inside and outside associated system of Internet user's planning and configuration that information system is trunk, it is not the change on science and technology, but involves comprehensive integration and the configuration of the flow process on Internet user's organization internal cross-region all about personnel, fund, logistics, manufacture and Internet user tissue associated with outside or transnational border.  
PA/UEC is physical resources configuration (logistics), human resources configuration (stream of people), fund resources configuration (wealth stream), information resources configuration (information flow) the integrated Internet user's configuration software for the inside and outside association of Internet user's planning and configuration.The DIM that rule designer by the inside and outside association of Internet user planning and configuration, system integrator, module generate the business analyzes and Li Zongcheng proposes the inside and outside associated ultimate consumer of Internet user planning and configuration, social governor motion, the SHF of relative analyzes both at home and abroad, describes vertical associated department of future generation, horizontal associated department and value resource planning (VRP) software.It will comprise the user of the inside and outside association of Internet user's planning and configuration/service system framework, use graphical user interface, and the application open system is made.Except existing standard feature, it also comprises other characteristic, as the adjustment report of the quality of the inside and outside association of Internet user's planning and configuration, process enactment configuration and the inside and outside association of Internet user's planning and configuration etc.Particularly, thus the basic technology that PA/UEC adopts be more prone to upgrading will to the user software of the inside and outside association of Internet user's planning and configuration and the independence of hardware two aspects simultaneously.The key of PA/UEC be all users of the inside and outside association of Internet user's planning and configuration can cutting its application, thereby there is natural ease for use.
Background technology
PA/UEC can be a kind of instrument that configuration person solves Internet user's organization configurations problem.The department of the inside and outside association of Internet user's planning and configuration does not treat as management itself by PA/UEC, before implementing, PA/UEC must analyze in earnest the allocation problem of the inside and outside association of Internet user's planning and configuration, find solution route, and rely on excessively PA/UEC, do not solve problem.What correctly is familiar with PA/UEC and is and what is not, will be before PA/UEC implements the inside and outside problem existed in configuration that is associated in of serious analysis Internet user planning and configuration, understand the effect of PA/UEC to addressing these problems, plan and the practicable program of utilizing PA/UEC to address these problems fully meticulously, provide basis for PA/UEC gives full play to efficiency.
In recent years, the fusion of ICT industry three macroreticulars and system for cloud computing technology were pushed ahead international and domestic always energetically.Grid attempts to realize the overall sharing of interconnected internet resource, comprises information resources, data resource, computational resource and software resource etc.Therefore, can regard grid as a high performance network computer, it is wider than general network machine bandwidth, computational speed sooner, more intelligent, more can effectively utilize various resources [20]-[24].Grid adopts the international uniform standard, and this can provide unified port service with regard to meaning it for the object of various different hardware types, different operating system, makes people convenient and swift just as water, electricity consumption with grid.The Open Grid Service structure OGSA (Open Grid Services Architecture) proposed by WorldNet's lattice theory altar is the most influential mesh architecture, and it proceeds to commercial field by the application of grid from scientific domain.
But, at present, the fusion of ICT industry three macroreticulars just is being absorbed in the desperate situation of dying young, the novelty wretched insufficiency of cloud computing technology, the application of cloud computing meets with all restrictions, and the exploitation of cloud computing system meets with heat, cold difficult situation out of trade in the industry.Along with the fast development of computer technology and the network technology, along with the increase day by day of financial innovation and financial risks, market competition is further aggravated, and space and the scope of Internet user's competition further enlarge, and the integrated of global economy also constantly pushed ahead.Twentieth century main Internet user nineties internal resource is the thought of configuration comprehensively, progressively develops into the configuration thought of how effectively utilizing and configuring whole resource thereupon.Under this situation, at first Li Zongcheng has proposed the concept report of NA/UEC.
Setting up Correspondent set based on intelligent compositive economy multiattribute measure space, Correspondent operator based on intelligent compositive economy more rules metric matrix, becoming based on intelligent compositive economy multiple-factor on the basis of the comprehensive Correspondent relation of power and the Correspondent function based on intelligent compositive economy multiplicity algebra system, the inventor proposes will to develop and set up take the brand-new network system---" whole world is the Correspondent network dynamically " that information network combines logistics network, knowledge network and banking network together as platform; And then propose to develop and to set up and a kind of cloud computing and grid computing included at interior brand-new counting system---towards " world " computation schema of knowledge resource configuration, physical resources configuration and allocation of financial resource; Again and then propose to develop and to set up and a kind ofly take computer operating system and internet operating system as crucial brand-new operation system---" holographic co-operation system " (OS/HSO) that various cognitive operation and practical operation are combined together.
The inventor proposes the dynamic Correspondent network in the whole world that will develop and set up and the world is calculated and holographic co-operation system (is called for short OS/HSO, Operating System of Holo-synergetic Oganization), be a complete complex system.The world is calculated and is intended to by the logistics under the information network support, knowledge, the full Correspondent network of finance, by a plurality of costs, relatively low computational entity is integrated into a complete Integrated Intelligent System with powerful calculating ability, and, by brand-new business models such as information network inside and outside SaaS/HSO, PaaS/HSO, IaaS/HSO, MSP/HSO, this powerful computing capability is distributed in the terminal use's hand of information network inside and outside.
The whole world dynamically Correspondent network calculations concept can be regarded as and a kind ofly take information network and logistics network, knowledge network and banking network are collected and connect the application model of getting up as platform.The dynamic Correspondent network calculations in the whole world is computer-oriented and information network not only, and Logistics Oriented network, knowledge network and banking network.It attempts to surmount, and information is calculated and information network calculates, and information is calculated and information network calculating collects to connect and move with logistics network, knowledge network and banking network and is closely linked, and realization is intelligent integrated.
Summary of the invention
(1) for Internet user's terminal, the logical foundations that the inventor is brand-new in its independent foundation, Fundamentals of Mathematics, on scientific basic and brand-new technical foundation and engineering foundation, for " cloud " counting system that flicker is indefinite is transformed into the Correspondent all things on earth, connect " world " counting system of longitude and latitude, adhere to take that the global value Chain System is as core, using cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) connection and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process, set up the scientific basic of the holographic collaborative design of planning and configuration.
Some tissues---particularly those have the tissue that enough inside IT technology are carried out integrated a plurality of software products---generally can select only to realize the part of PA/UEC system, then for other PA/UEC assembly or they apply the external interface of other separate payments exploitations needed.Such as, the HRMS of PeopleSoft and financial system may be sensuously much better than the HRMS solution of SAP.Equally, some also may think that the manufacture of SAP and crm system may be more much better than the corresponding product of PeopleSoft.In this case, these tissues may feel to buy a set of PA/UEC system and still be necessary, but it may buy HRMS and the fiscal module of PeopleSoft from Oracle, and all the other are bought from SAP.  
Ideally, PA/UEC only stores all data of each module of software of the inside and outside association of Internet user's planning and configuration with a database, and these modules have:
The vertical associated department of Internet user
Internet user's raw material supply, the task configuration, quality control, the cost configuration, running, system engineering, operation flow, area of activities and scope, commission, service, trade connection and the center of calling are supported, derived product, derivative service
Vertical associated department between the Internet user
Raw material supply between the Internet user, the task configuration, quality control, the cost configuration, running, system engineering, operation flow, area of activities and scope, commission, service, trade connection and the center of calling are supported, derived product, derivative service
The horizontal associated department of Internet user
The Internet user's is auxiliary, corollary equipment, spare and accessory parts, outward appearance
Horizontal associated department between the Internet user
Assisting between the Internet user, corollary equipment, spare and accessory parts, outward appearance
Data warehouse
And the inside and outside rule designer of Internet user's planning and configuration, system integrator, module generate business, ultimate consumer and social governor motion and various from service interface between relative both at home and abroad.
The purpose of Internet user configuration be make the Internet user more effectively, more motor-driven, running more in phase.Weigh the operational paradigm of the inside and outside association of Internet user's planning and configuration, four available judgement instruments are at present:
The Back ground Information of the inside and outside association of Internet user's planning and configuration, as the fund information of the inside and outside association of Internet user's planning and configuration: cash flow and financial ratios etc.;
The configuration information of the inside and outside association of Internet user's planning and configuration, as the cost information of the inside and outside association of Internet user's planning and configuration: resource utilization and overall profit etc.;
The ability information of the inside and outside association of Internet user's planning and configuration, as speciality and the weakness of the Internet user of the inside and outside association of Internet user's planning and configuration tissue with respect to the competitor;
The resource information of the inside and outside association of Internet user's planning and configuration, comprise the resource of the inside and outside association of Internet user's planning and configuration and manpower etc.
Before the PA/UEC that induces one, the interchange major part of Internet user's internal information is the transmission by paper.Although there has been such-and-such network system in some Internet users, people still get used to conveying a message by tangible file.This is because the cause that each system in the Internet user is done things in his own way, isolated mutually.In order to change arise at the historic moment just by this situation for PA/UEC, and it organically integrates Internet user's organization internal with each outside associated functional module, with MA/UEC together with NA/UEC, the common running.
The network integration based on the ICT industry, the inventor further proposes to set up the integrated dynamic Correspondent network of Internet user's terminal intelligent, by the Internet merged based on the ICT industry network, in Internet user's terminal, logistics net, knowledge knowledge network and Network and Finance Network are collected to perforation, in the whole society so the whole world realize the human-machine interaction configuration of whole resource, as shown in Figure 1.
The dynamic Correspondent of whole network mainly refers to the business Correspondent of logistics net, information network and the application of Network and Finance Network three major types Network resource allocation, and does not mean that the physics of logistics net, information network and the application of Network and Finance Network three major types Network resource allocation merges.
In from different perspectives conceptive and step analysis, the dynamic Correspondent of whole network can relate to technology Correspondent, business Correspondent, industry Correspondent, terminal Correspondent and network Correspondent, as shown in Figure 2.At present main, can consider to use mutually unified communication protocol on application level, to form the binding site of the dynamic Correspondent of whole network.  
Released the integrated dynamic Correspondent network system of Internet user's terminal intelligent that will develop and set up by the inventor, formed by Internet user's terminal planning and configuration inside and outside hardware system and software systems.
The hardware system of (1. 1) Internet user's terminal planning and configuration inside and outside
Internet user's terminal planning and configuration inside and outside hardware system is comprised of Internet user's terminal planning and configuration inside and outside input equipment, Internet user's terminal planning and configuration inside and outside output equipment, Internet user's terminal planning and configuration inside and outside memory, Internet user's terminal planning and configuration inside and outside arithmetic unit and Internet user's terminal planning and configuration inside and outside controller.Wherein
Internet user's terminal planning and configuration inside and outside arithmetic unit and controller combine, and can be described as holographic cooperative system central processing unit (CPU/HSO [IU]) (being Internet user's terminal planning and configuration inside and outside arithmetic unit and controller).Holographic cooperative system central processing unit and Internet user's terminal planning and configuration inside and outside memory, can be collectively referred to as holographic cooperative system main frame.
Internet user's terminal planning and configuration inside and outside input equipment.
Internet user's terminal planning and configuration inside and outside output equipment.
Holographic cooperative system central processing unit: CPU/HSO [IU], it comprises Internet user's terminal planning and configuration inside and outside arithmetic unit and controller.It is the core of the integrated dynamic Correspondent network system of Internet user's terminal intelligent.
Internet user's terminal planning and configuration inside and outside arithmetic unit: can carry out arithmetical operation and logical operation;
Internet user's terminal planning and configuration inside and outside controller: be the command system of computer, its operating process is the instruction fetch analysis instruction, and circulation is carried out.
Internet user's terminal planning and configuration inside and outside memory: there is the physical device of memory function, for Internet user's terminal planning and configuration inside and outside storage information.Can be divided into Internet user's terminal inner internal memory, Internet user's exterior of terminal internal memory, Internet user's terminal inner external memory and Internet user's exterior of terminal external memory.
Two important indicators of Internet user's terminal planning and configuration inside and outside memory: access speed and memory capacity.The access speed of internal memory is the fastest, and floppy disk is the slowest.Memory capacity is the canned data amount, and it is by byte (Byte) as base unit, and 1 byte means with 8 bits, 1KB=1024 B, 1MB=1024 KB, 1GB=1024 MB.
The software systems of (1. 2) Internet user's terminal planning and configuration inside and outside
Internet user's terminal planning and configuration inside and outside software systems are divided into Internet user's terminal planning and configuration inside and outside systems soft ware and the large class of application software two.
Internet user's terminal planning and configuration inside and outside systems soft ware: in order to use the software with managing internet user terminal planning and configuration inside and outside; The main operating system software in Internet user's terminal planning and configuration inside and outside has
Windows 95 / 98 / 2000 / NT / xp / vista / HSO [ IU ],
DOS / HSO [ IU ],
UCDOS / HSO [ IU ],
MS-DOS / HSO [ IU ],
Unix / HSO [ IU ],
OS / 2 / HSO [ IU ],
Linux / HSO [ IU ]
Deng.Wherein, WINDOWS/HSO [IU] is Internet user's terminal planning and configuration inside and outside multitask visualized graph interface, and DOS/HSO [IU] is the holographic co-operation system of the single task of character command forms.
Internet user's terminal planning and configuration inside and outside application software: Internet user's terminal planning and configuration inside and outside software of writing for certain application purpose, mainly contain Internet user's terminal planning and configuration inside and outside Assisted Instruction Software, Internet user's terminal planning and configuration inside and outside Autocad, Internet user's terminal planning and configuration inside and outside word processor, Internet user's terminal planning and configuration inside and outside tool software and other Internet user's terminal planning and configuration inside and outside application software.
The main functional modules prospect of (1. 3) future scenarios: PA/UEC
Because product style and the emphasis of each PA/UEC manufacturer is not quite similar, thereby the modular structure of its PA/UEC product also must differ larger.For the reader of first understanding PA/UEC, sometimes may think not make clear which is only real PA/UEC system on earth.So, here, we bypass actual product, from the angle of the inside and outside association of Internet user's planning and configuration, the functional structure of PA/inside and outside association of UEC system interconnect network users planning and configuration is once simply described, be what PA/UEC can do for Internet user's tissue, which content is the inside and outside relating module function of its Internet user's planning and configuration comprise on earth.
PA/UEC with Internet user's effect chain market configuring technical MA/UEC together with Internet user's effect chain network configuring technical NA/UEC, formation makes up mutually, the relation of phase trans-substitution, jointly all resources of the inside and outside association of Internet user's planning and configuration are carried out to the integration configuration, in brief, be that three of the inside and outside association of Internet user's planning and configuration is flowed greatly---the configuration information system that logistics, cash flow, information flow carry out the entirely integrating configuration.The inside and outside correlation function module of its Internet user's planning and configuration is to be different from the module of NA/IVC and ERP, it not only can be used for the configuration of the inside and outside association of Internet user's planning and configuration, and also can import as the Internet user of some unproductive utilities MRP and the configuration that PA/UEC system is carried out the inside and outside association of Internet user's planning and configuration the Internet user of many other types.Here we design the functional module of PA/UEC by Fig. 3.
In the inside and outside association of Internet user's planning and configuration, general configuration mainly comprises the content of three aspects:: (planning and implementation of the inside and outside association of Internet user's planning and configuration), resource distribution (supply and the configuration of the inside and outside association of Internet user's planning and configuration) and funding arrangement (resource distribution accounting, finance configuration) are controlled in operation.This three large system itself is exactly conglomerate, between they are mutual, corresponding interface is arranged, and can be good at combining the Internet user is configured.In addition, want special one carry be, along with the reinforcement of Internet user to stakeholder's resource distribution, will have increasing PA/UEC manufacturer and the resource distribution of benefit community (DIM and SHF) be included in to an important component part of PA/UEC system.
Funding arrangement module (the resource distribution accounting of the inside and outside association of Internet user's planning and configuration, finance configuration)
In the Internet user, clear clearly demarcated funding arrangement is extremely important.So it is an indispensable part in the whole scheme of PA/UEC.PA/inside and outside association of UEC Internet user planning and configuration the monetary items module different from general monetary items software, a part as PA/inside and outside association of UEC system interconnect network users planning and configuration, other module of it and system has corresponding interface, can be mutually integrated, such as: it can be by the economical operation activity by the inside and outside association of Internet user's planning and configuration, the information of logistics arrangement activity input automatically counts the monetary items module and generates total design schedule, the resource distribution design schedule, cancelled the loaded down with trivial details process of input document, almost completely substitute in the past traditional manual operations.The monetary items of general PA/inside and outside association of UEC software interconnection network users planning and configuration partly is divided into resource distribution accounting and the funding arrangement two major parts of the inside and outside association of Internet user's planning and configuration.
The resource distribution of the inside and outside association of Internet user's planning and configuration is adjusted
Change process and result thereof that it is mainly record, accounting, reflection and analysis fund in the inside and outside associated economic activity of Internet user's planning and configuration that the resource distribution of the inside and outside association of Internet user's planning and configuration is adjusted.It partly consists of the ingather calculate table of total design schedule of the inside and outside association of Internet user's planning and configuration, the ingather calculate table that drops into department and expenditure design schedule, output department and expenditure design schedule, cash, fixed assets, multi-currency etc.
Total design schedule module of A1, the inside and outside association of Internet user's planning and configuration
Its function is to process the input of design schedule voucher, the registration of the inside and outside association of Internet user's planning and configuration, output day design schedule, general detailed account and account as recorded in a ledger, establishment Main Resources configuration design schedule.It is the core that whole resource distribution is adjusted, and drops into the ingather calculate table of department and pays the ingather calculate table of design schedule, output department and pay each modules such as design schedule, fixed assets accounting, cash configuration, wage accounting, multi-currency and all centered by it, carry out mutual information transmission.
The ingather calculate table module of A2, the inside and outside association of Internet user's planning and configuration
The ingather calculate table of Design with Rule department, the ingather calculate table of system integration department and module generate the ingather calculate table of department;
The ingather calculate table of the ingather calculate table of forward conjunction department, the ingather calculate table of backward association department and cooperative association department.
The expenditure design schedule module of A3, the inside and outside association of Internet user's planning and configuration
The expenditure design schedule of Design with Rule department, the expenditure design schedule of system integration department and module generate the expenditure design schedule of department;
The expenditure design schedule of the expenditure design schedule of forward conjunction department, the expenditure design schedule of backward association department and cooperative association department.
The cash configuration module of A4, the inside and outside association of Internet user's planning and configuration
It is mainly to the control of the cash inflow outflow of the inside and outside association of Internet user's planning and configuration and the accounting of petty cash and cash in banks.It has comprised the configuration to the coin of the inside and outside association of Internet user's planning and configuration, bank note, check, draft and cash in banks.The functions relevant with cash such as bill maintenance, bill printing, payment maintenance, bank's list print, payment inquiry, bank's inquiry and check lookup of the inside and outside association of Internet user's planning and configuration are provided in PA/UEC.In addition, it is gone back and the module integrations such as the inside and outside associated ingather calculate table of Internet user's planning and configuration, expenditure design schedule, total design schedule, automatically produces voucher, enters total design schedule.
The fixed assets accounting module of A5, the inside and outside association of Internet user's planning and configuration
Complete the increase and decrease change of the fixed assets of the inside and outside association of Internet user's planning and configuration and the calculation work that depreciation related fund meter is carried and distributed.It can help the configuration person of the inside and outside association of Internet user's planning and configuration to have gained some understanding to the present situation of current fixed assets, and the whole bag of tricks that can provide by this module configures assets, and carries out corresponding accounting process.Its concrete function has: fixed assets card and the detailed account of the inside and outside association of login Internet user's planning and configuration, calculate the depreciation of the inside and outside association of Internet user's planning and configuration, prepare statements, and the transfer voucher of automatically working out the inside and outside association of Internet user's planning and configuration, and proceed to total design schedule.It and the inside and outside associated expenditure design schedule of Internet user's planning and configuration, cost, total design schedule module integration.
The multi-currency module of A6, the inside and outside association of Internet user's planning and configuration
This is in order to adapt to current Internet user's internationalization operation, and the requirement of foreign currency settlement process is increased and produces.Multi-currency means the various functions of the whole monetary items system of the inside and outside association of Internet user's planning and configuration and settle accounts with various currency system, and customer order, stock's configuration and logistics arrangement etc. also can be used the multi-currency configuration of concluding the business.The multi-currency of the inside and outside association of Internet user's planning and configuration has interface with each modules such as the inside and outside associated ingather calculate table of Internet user's planning and configuration, expenditure design schedule, total design schedule, customer order, logistics arrangements, can automatically generate desired data.
The personal income of A7, the inside and outside association of Internet user's planning and configuration is adjusted module
Automatically carrying out the meter of Internet user stakeholder's personal income clearing, distribution, accounting and every relevant funds carries.It can login personal income, printing personal income inventory and all kinds of consolidated statement of the inside and outside association of Internet user's planning and configuration, calculate meter and put forward the relevant expense of every and personal income of the inside and outside association of Internet user's planning and configuration, automatically make voucher, import total design schedule of the inside and outside association of Internet user's planning and configuration.This module is with the inside and outside associated total design schedule of Internet user's planning and configuration and cost module integration.
The cost module of A8, the inside and outside association of Internet user's planning and configuration
It will carry out the calculating of the various costs of department according to information such as Internet user's structure of the inside and outside association of Internet user's planning and configuration, the project center, each link of Internet user's effect chain, logistics arrangements, in order to carry out cost analysis and planning.Can also safeguard the cost of the inside and outside association of Internet user's planning and configuration by place with standard costs or average cost method.
The funding arrangement of the inside and outside association of Internet user's planning and configuration
The function of the funding arrangement of the inside and outside association of Internet user's planning and configuration, mainly be based on the data of the resource distribution accounting of the inside and outside association of Internet user's planning and configuration, then analyzed, thereby predict accordingly configuration and control activity.It lays particular emphasis on monetary items planning, control, analysis and prediction:
The monetary items of the inside and outside association of Internet user's planning and configuration planning: make the monetary items planning, budget of next period etc. according to monetary items analysis in early stage.
The monetary items analysis of the inside and outside association of Internet user's planning and configuration: query function is provided and carries out monetary items performance evaluation, account analysis etc. by the figure demonstration of user-defined variance data.
The monetary items decision-making of the inside and outside association of Internet user's planning and configuration of the inside and outside association of Internet user's planning and configuration: the core of funding arrangement, centre point is to make the decision-making of relevant fund, comprises fund procurement, input and fund configuration.
Configuration module (planning and implementation of the inside and outside association of Internet user's planning and configuration) is controlled in the operation of the inside and outside association of Internet user's planning and configuration
This part is the core place of PA/UEC system.Applying under brand-new economic science technology and brand-new management science technology, on the basis of applying modern network information technology the integrated dynamic Correspondent network of Devoting Major Efforts To Developing foundation intelligence, PA/UEC and MA/UEC and NA/UEC interconnect, jointly the inside and outside association process of whole Internet user's planning and configuration of Internet user's effect chain is combined, make the Internet user can effectively reduce system cost, improve system benefit.Simultaneously each department's flow process of originally disperseing forms from being dynamically connected, also make department's flow process can before and after coherent carrying out, and not there will be economical operation to disconnect, affect the economical operation cycle.
It is an Internet user's method for organizing with the advanced person that is planned to guiding that configuration is controlled in the operation of the inside and outside association of Internet user's planning and configuration.At first, the Internet user determines its a total system operation planning, then, after system is segmented layer by layer, is issued to all departments and goes to carry out.The department that is the inside and outside association of Internet user's planning and configuration participates in Internet user's activity with this, and logistics arrangement department arranges various resources etc. by this.
The main system operation planning of A1, the inside and outside association of Internet user's planning and configuration
It is to arrange according to the input of system operation planning, prediction and the customer order of the inside and outside association of Internet user's planning and configuration the product category and the quantity that provide in each cycle in the future, it transfers the system operation planning of the inside and outside association of Internet user's planning and configuration to the product programming of the inside and outside association of Internet user's planning and configuration, in balance after the needs of the resource of the inside and outside association of Internet user's planning and configuration and ability, be accurate to the detailed progress planning of time, quantity.Be the Internet user within one period the inside and outside association of Internet user's planning and configuration the arrangement of total operation, being a stable planning, is with the system operation planning of the inside and outside association of Internet user's planning and configuration, actual order and analysis gets to history run prediction generating.
The material demand planning of A2, the inside and outside association of Internet user's planning and configuration
After the main system operation planning of the inside and outside association of Internet user's planning and configuration determines to produce how many final products, again according to BOM, the quantity of the product that will produce whole Internet user changes the quantity of the parts of required production into, and contrast existing quantity in stock, can obtain also needing processing how many, the final amt that the logistics arrangement is how many.This be only whole department really according to planning.
The ability need planning of B3, the inside and outside association of Internet user's planning and configuration
It is after drawing preliminary material demand planning, total project load by all items center of the inside and outside association of Internet user's planning and configuration, the detail items planning produced after the power balance with the project center, in order to determine whether the material demand planning generated is demand planning feasible on Internet user's production capacity.The ability need planning of the inside and outside association of Internet user's planning and configuration is a kind of short-term, planning current practical application.
The DIM of A4, the inside and outside association of Internet user's planning and configuration controls
This is the inside and outside associated dynamic item planning of time dependent Internet user's planning and configuration, be that the allocation of items of the inside and outside association of Internet user's planning and configuration is arrived to Design with Rule person, system integration person and module generation person, then carry out entry sorting, project configuration, project monitoring.
The manufacturer's standard of A5, the inside and outside association of Internet user's planning and configuration
The many essential informations that need the system operation of the inside and outside association of Internet user's planning and configuration in establishment planning, these essential informations are exactly the operation standard of the inside and outside association of Internet user's planning and configuration, comprise the collaboration items of the inside and outside association of Internet user's planning and configuration, supporting project, Internet user's structure, program and the project center, all use unique code to identify in computer.
a. the collaboration items code of the inside and outside association of Internet user's planning and configuration, to the configuration of collaboration items resource, gives unique code identification to every kind of material.
b. the relevant item inventory of the inside and outside association of Internet user's planning and configuration, the technological document of definition Internet user structure, be used for working out various planning.
c. the program of the inside and outside association of Internet user's planning and configuration, the enforcement order of system operating procedure, stage and the vertical and horizontal associated item of the inside and outside association of description Internet user's planning and configuration.It comprises implementation procedure, indicates enforcement means, technology and needed timetable and the distribution of earnings etc. of each stage, each link.
d. the project center of the inside and outside association of Internet user's planning and configuration, use the means, technology of same or similar program and human resources to form, be engaged in the scheduling, accounting ability of economical operation, the base unit assessed the cost.
Logistics configuration module (supply and the configuration of the inside and outside association of Internet user's planning and configuration)
The distribution configuration of the inside and outside association of Internet user's planning and configuration
The inside and outside associated configuration of selling of Internet user's planning and configuration is from the merchandise planning of the inside and outside related product of Internet user's planning and configuration, configuration and statistics to the sell goods of the inside and outside association of Internet user's planning and configuration, sales territory, the various information of trade debtor, and can make comprehensive analysis to sales volume, the amount of money, profit, performance, customer service, the function of three aspects: is roughly arranged like this in the distribution configuration module.
A1, for configuration and the service of the inside and outside related information of Internet user's planning and configuration
It can set up customer information archives, and it is carried out to classification configurations, and then it is carried out to customer service targetedly, with the reservation frequent customer that reaches peak efficiency, strive for new client.Here, what mention especially is exactly nearest emerging CRM software, i.e. customer relationship configuration, and PA/UEC and its combination will increase Internet user's benefit greatly.
A2, for the configuration of the inside and outside associated sales order of Internet user's planning and configuration
The sales order of the inside and outside association of Internet user's planning and configuration is the entrance of PA/UEC, and all Internet user's system operation plannings are all assigned according to it and arranged.And the configuration of the inside and outside associated sales order of Internet user's planning and configuration is the whole flow process that has run through Internet user's effect catenary system.It comprises:
a. the audit of client's credit and the inquiry (classification of client's credit, examine order transaction) of the inside and outside association of Internet user's planning and configuration.
b. the product inventory of the inside and outside association of Internet user's planning and configuration inquiry (determine whether want back order, split shipment or with the substitute delivery etc.).
c. the products quotation of the inside and outside association of Internet user's planning and configuration (for the client does the quotation of different product).
d. order input, change and the tracking of the inside and outside association of Internet user's planning and configuration (after the order input, the correction of change, and the trace analysis of order).
e. (determining delivery date and the arrangement of delivery things) processed in the confirmation at the delivery date of the inside and outside association of Internet user's planning and configuration and delivery.
B3, statistics and analysis that for Internet user's planning and configuration, inside and outside association is sold
At this moment system is according to the performance of the inside and outside associated sales order of Internet user's planning and configuration, make statistics according to the various indexs of the inside and outside association of Internet user's planning and configuration, such as the client segmentation statistics, sale agent statistic of classification etc., then with regard to these statisticses, Internet user's effective sale effect is estimated:
a. the inside and outside associated sale result of Internet user's planning and configuration (being added up respectively according to sale form, product, agent, area, sales force, the amount of money, quantity).
b. the inside and outside associated marketing analysis of Internet user's planning and configuration (comprise contrast target, the same period relatively and the delivery analysis of ordering goods, make a relevant analysis from aspects such as quantity, the amount of money, profit and performance).
c. the customer service of the inside and outside association of Internet user's planning and configuration (customer complaint record, the analysis of causes).
The stock of the inside and outside association of Internet user's planning and configuration controls
Be used for controlling the quantity of the inside and outside association store material of Internet user's planning and configuration, produce normally to guarantee stable logistics support, but the minimal capital that takies.It is a kind of relevant, dynamic, and real system of inventory control.It can in conjunction with, meet the demand of relevant departments, temporal evolution is dynamically adjusted the stock, reflects accurately stock's present situation.The function of this system relates to again:
a. for all materials of the inside and outside association of Internet user's planning and configuration are set up the stock, determine when to order goods the logistics arrangement, simultaneously as giving logistics to arrange department's logistics arrangement, production division to make the foundation of system operation planning.
b. receive the order material, through the quality inspection warehouse-in, the product of production too will be through the check warehouse-in.
c. the daily flow processing work of transmitting-receiving material.
The logistics arrangement of the inside and outside association of Internet user's planning and configuration
Determine rational order quantity, outstanding supplier and keep best safety stock on the link of the inside and outside association of Internet user's planning and configuration.The information of ordering, checking and accepting can be provided at any time, follow the tracks of and urge the material to outsourcing or external processing, guarantee that goods arrives in time.Set up supplier's archives on the link of the inside and outside association of Internet user's planning and configuration, adjust stock's cost with up-to-date cost information.Specifically have:
a. the supplier information inquiry of the inside and outside association of Internet user's planning and configuration (inquiry supplier's ability, prestige etc.).
b. the inside and outside association of Internet user's planning and configuration urge goods (material of outsourcing or external processing is followed and urged).
c. the logistics arrangement of the inside and outside association of Internet user's planning and configuration and external processing statistics (add up, set up archives, assess the cost).
d. the price analysis of the inside and outside association of Internet user's planning and configuration (to the cost of material analysis, adjusting inventory cost).
Batch tracking configuration of the inside and outside association of Internet user's planning and configuration
For department and the link of the inside and outside association of Internet user's planning and configuration, require goods and materials in the middle of the process of circulation, need to carry out the tracking configuration of product batches, once product, quality problems appear, can review by product batches.Can clearly know like this which raw material or parts or the technique of which procedure goes wrong.At this moment same problematic product is isolated.
The human resources configuration module
From direct aspect, await the PA that exploitation sets up/UEC system, basically be centered by Internet user's running (effect chain) of the inside and outside association of Internet user's planning and configuration, people can the core resource using the resource relevant with manufacturing resource as the Internet user be configured.But in a deeper sense, the human resources of Internet user inside, should especially will receive the concern of Internet user's tissue, can be considered Internet user's resource originally.In this case, human resources configuration, as a module independently, should join PA/UEC system, together with monetary items in PA/UEC, production system, form Internet user's resource system that efficiently, there is the height integration.It has basic different from the configuration of occurrences in human life under traditional approach.
The HRP aid decision of the inside and outside association of A1 Internet user planning and configuration
For Internet user's human resources of the inside and outside association of Internet user's planning and configuration, the kinds of schemes of institutional framework establishment, simulated comparison and operating analysis, and be aided with the assessment directly perceived of figure, auxiliary configuration person makes final decision.
Department and link for the inside and outside association of Internet user's planning and configuration, formulate the post model, comprise job requirement, promotion path and training planning, according to qualification and the condition of serving as this position stakeholder, system can propose a series of training suggestions for these interests relative, once mechanism's reorganization or position change, system can propose a series of position change or the suggestion of being transferred and promoted.
Department and link for the inside and outside association of Internet user's planning and configuration, carry out the cost of human resources analysis, can make and analyzing and prediction past, cost of human resources present, in the future, and by PA/UEC the integration environment, for Internet user's cost analysis provides foundation.
The human resources configuration of the inside and outside association of A2 Internet user planning and configuration
The personal income of the inside and outside association of A3 Internet user planning and configuration is adjusted
a. for department and the link of the inside and outside association of Internet user's planning and configuration, trans-regional, trans-departmental according to company, across the different pay structures of work post and handling process, formulate the wages accounting method adapted with it.
b. for department and the link of the inside and outside association of Internet user's planning and configuration, directly integrated with the time configuration, can upgrade in time, stakeholder's wages are adjusted to mobilism.
c. function is calculated in returning of the inside and outside association of Internet user's planning and configuration.Integrated by with other module, adjust pay structure and data automatically as requested.
The configuration in man-hour of the inside and outside association of A4 Internet user planning and configuration
a. for department and the link of the inside and outside association of Internet user's planning and configuration, according to this country or local calendar, arrange Internet user's running time and labour's daily schedule.
b. for department and the link of the inside and outside association of Internet user's planning and configuration, use the far-end attendance checking system, stakeholder's the actual situation of turning out for work can be recorded in main system, and a time data relevant with stakeholder's wages, bonus imports in wages system and cost accounting.
(2) for Internet user's terminal, the logical foundations that the inventor is brand-new in its independent foundation, Fundamentals of Mathematics, on scientific basic and brand-new technology base and engineering foundation, for " cloud " counting system that flicker is indefinite is transformed into the Correspondent all things on earth, connect " world " counting system of longitude and latitude, adhere to take that the global value Chain System is as core, using cognitive system (RS and computer aided system thereof) and practice system (PS and computer aided system thereof) connection and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process, set up kinetic model and the restriction condition of the collaborative design of user terminal planning and configuration.
For Internet user's terminal, on the one hand, demand and supply that the property right based on interest relations occurs in inner specialization and the inner division of labor, the formation internal motivation factor; On the other hand, the inner specialized and inner system benefit and the system cost that occur in the property transaction based on interest relations of dividing the work, form the internal coordination factor.For the internal motivation factor, basic motive analysis and the basic effect analysis of on the one hand setting up property right insider transaction system, set up Dynamic Analysis of Foundation and the basic effect analysis of property right insider transaction system on the other hand.For the internal coordination factor, basic motive analysis and the basic effect analysis of on the one hand setting up the system evolution system, set up Dynamic Analysis of Foundation and the basic effect analysis of system evolution system on the other hand.As the strengthening power factor, property transaction is likely strengthened the resource distribution effect on the one hand, likely reduces on the other hand the resource distribution load; As the strengthening effect factor, property transaction is likely strengthened configuration-system effect (or benefit) on the one hand, likely reduces on the other hand configuration-system consumption (or cost).Related to this, as the strengthening power factor, systems are likely strengthened the resource distribution effect on the one hand, likely reduce on the other hand the resource distribution load; As the strengthening effect factor, systems are likely strengthened configuration-system effect (or benefit) on the one hand, likely reduce on the other hand configuration-system consumption (or cost).Property transaction is the dynamic effect for resource distribution for the dynamic effect of resource distribution and systems, is closely-related.
The load of Internet user's terminal planning and configuration tissue (or individual) is to consist of Internet user's terminal planning and configuration tissue (or individual) actual whole resources that directly operate under certain operation strength condition.On amount, we can be by the actual whole stock numbers that directly operated by main body Q M With certain operation intensity C MM Amass to calculate Internet user's terminal planning and configuration tissue (or individual) load.The load of Internet user's terminal planning and configuration tissue (or individual), can be regarded as by the configuration load of Internet user's terminal planning and configuration tissue (or individual) ( M M D ), conveying load ( M M C ), processing load ( M M E ) and the innovation load ( M M B ) common formation, that is:
M M M = M M M ( M M D , M M C , M M E , M M B )
= M M M ( C M D Q M D , C M C Q M C , C M E Q M E , C M B Q M B ) ( 2. 187 )
In formula, C M D , C M C , C M E With C M B Be respectively Internet user's terminal planning and configuration tissue (or individual's) configuration intensity, delivery intensity, processing intensity and innovation intensity, Q M D , Q M C , Q M E With Q M B Be respectively configuration amount, carrying capacity, processing capacity and the innovation amount of Internet user's terminal planning and configuration tissue (or individual) for resource.
For Internet user's terminal planning and configuration tissue (or individual), we can set up following load dynamical equation:
Figure DEST_PATH_IMAGE001
( 2. 188 )
In formula
L MM ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) load factor value;
ζ MM ( t) one by one tThe collaborative variable of the integrated all inscapes of Internet user's terminal intelligent in period;
Y MD ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) configuration load key element index set;
Y MC ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) transports load key element index set;
Y ME ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) machine load key element index set;
Y MB ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) innovation load key element index set;
l MM ()---about Y M D ( t), Y M C ( t), Y M E ( t) and Y M B ( t) nonlinear function;
M MN ( t)--- tThe natural resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M MS ( t)--- tThe social resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M ST ( t)--- tThe thinking resource load amount of Internet user's terminal planning and configuration tissue in period (or individual).
Obviously, generally have:
M SM ( M SD , M SC , M SE , M SB ) > M M M ( M M D , M M C , M M E , M M B )
And, M M D < M S D , M M C < M S C , M M E < M S E , M M B < M S B .
This be because, the load of Internet user's terminal planning and configuration tissue (or individual) is only that Internet user's terminal planning and configuration tissue (or individual) is not having intermediary's key element and system thereof, basic factors and system thereof that the load of directly bearing under the isolated condition of booster action is provided, and this load obviously is less than the load of Internet user's terminal planning and configuration system.
As a composition of Internet user's terminal planning and configuration system load, the system configuration load can be described by following dynamical equation:
Figure DEST_PATH_IMAGE003
( 2. 189 )
In formula
L SD ( t)--- tPeriod Internet user's terminal planning and configuration system configuration load factor value;
ζ SD ( t) one by one tThe collaborative variable of all inscapes of Internet user's terminal planning and configuration in period;
M ND ( t)--- tPeriod Internet user's terminal planning and configuration system natural resources configuration load amount;
M SD ( t)--- tPeriod Internet user's terminal planning and configuration system the configuration of social resources load capacity;
M TD ( t)--- tPeriod Internet user's terminal planning and configuration system thinking resource distribution load capacity.
As a composition of Internet user's terminal planning and configuration system load, the system conveying load can be described by following dynamical equation:
Figure 846887DEST_PATH_IMAGE004
( 2. 190 )
In formula
L SC ( t)--- tPeriod Internet user's terminal planning and configuration system conveying load exponential quantity;
ζ SC ( t) one by one tThe integrated collaborative variable that transports all inscapes of Internet user's terminal intelligent in period;
M NC ( t)--- tPeriod Internet user's terminal planning and configuration system natural resources conveying load amount;
M SC ( t)--- tPeriod Internet user's terminal planning and configuration system social resources conveying load amount;
M TC ( t)--- tPeriod Internet user's terminal planning and configuration system thinking resource conveying load amount.
As a composition of Internet user's terminal planning and configuration system load, system processing load can be described by following dynamical equation:
Figure DEST_PATH_IMAGE005
( 2. 191 )
In formula
L SE ( t)--- tInternet user's terminal planning and configuration system processing in period load factor value;
ζ SE ( t) one by one tThe collaborative variable of all inscapes of the integrated processing of Internet user's terminal intelligent in period;
M NE ( t)--- tPeriod, the natural resources of Internet user's terminal planning and configuration system was processed load capacity;
M SE ( t)--- tPeriod, the social resources of Internet user's terminal planning and configuration system were processed load capacity;
M TE ( t)--- tPeriod Internet user's terminal planning and configuration system thinking resources processing load capacity.
As a composition of Internet user's terminal planning and configuration system load, the system innovation load can be described by following dynamical equation:
Figure 801942DEST_PATH_IMAGE006
( 2. 192 )
In formula
L SB ( t)--- tPeriod Internet user's terminal planning and configuration system innovation load factor value;
ζ SB ( t) one by one tThe collaborative variable of all inscapes of Internet user's terminal intelligent integrated innovation in period;
M NB ( t)--- tPeriod, the natural resources of Internet user's terminal planning and configuration system was innovated load capacity;
M SB ( t)--- tPeriod, the social resources of Internet user's terminal planning and configuration system were innovated load capacity;
M TB ( t)--- tPeriod Internet user's terminal planning and configuration system thinking resource innovation load capacity.
As a composition of Internet user's terminal planning and configuration tissue (or individual) load, the main body configuration load can be described by following dynamical equation:
Figure DEST_PATH_IMAGE007
( 2. 193 )
In formula
L MD ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) configuration load exponential quantity;
ζ MD ( t) one by one tThe collaborative variable of all inscapes of Internet user's terminal planning and configuration in period;
M ND ( t)--- tThe natural resources configuration load amount of Internet user's terminal planning and configuration tissue in period (or individual);
M SD ( t)--- tThe configuration of social resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M TD ( t)--- tThe thinking resource distribution load capacity of Internet user's terminal planning and configuration tissue in period (or individual).
As a composition of Internet user's terminal planning and configuration tissue (or individual) load, the main body conveying load can be described by following dynamical equation:
( 2. 194 )
In formula
L MC ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) conveying load exponential quantity;
ζ MC ( t) one by one tThe integrated collaborative variable that transports all inscapes of Internet user's terminal intelligent in period;
M NC ( t)--- tThe natural resources conveying load amount of Internet user's terminal planning and configuration tissue in period (or individual);
M SC ( t)--- tThe social resources conveying load amount of Internet user's terminal planning and configuration tissue in period (or individual);
M TC ( t)--- tThe thinking resource conveying load amount of Internet user's terminal planning and configuration tissue in period (or individual).
As a composition of Internet user's terminal planning and configuration tissue (or individual) load, main body processing load can be described by following dynamical equation:
Figure DEST_PATH_IMAGE009
( 2. 195 )
In formula
L ME ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) processing load factor value;
ζ ME ( t) one by one tThe collaborative variable of all inscapes of the integrated processing of Internet user's terminal intelligent in period;
M NE ( t)--- tThe natural resources processing load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M SE ( t)--- tThe social resources processing load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M TE ( t)--- tThe thinking resources processing load capacity of Internet user's terminal planning and configuration tissue in period (or individual).
As a composition of Internet user's terminal planning and configuration tissue (or individual) load, main body innovation load can be described by following dynamical equation:
( 2. 196 )
In formula
L MB ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) innovation load factor value;
ζ MB ( t) one by one tThe collaborative variable of all inscapes of Internet user's terminal intelligent integrated innovation in period;
M NB ( t)--- tThe natural resources innovation load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M SB ( t)--- tThe social resources innovation load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M TB ( t)--- tThe thinking resource innovation load capacity of Internet user's terminal planning and configuration tissue in period (or individual).
Internet user's terminal planning and configuration system configuration dynamics mainly should be studied the reaction that Internet user's terminal planning and configuration system configuration of any given type produces when bearing any dynamic load.To Internet user's terminal planning and configuration system configuration, the reaction under dynamic load mainly means with the change of agent structure.
The dynamic (dynamical) problem of Internet user's terminal planning and configuration system configuration can be divided into two levels: one is the dynamics problem between the structure of the running load of Internet user's terminal planning and configuration system and Internet user's terminal planning and configuration system; Another is the operation effect of Internet user's terminal planning and configuration system and the dynamics problem between load and subjective basis structure.
The running load of Internet user's terminal planning and configuration system M S M ( t) mainly the whole resources by the actual operation under certain operation intensity of Internet user's terminal planning and configuration system form.The bearing capacity of Internet user's terminal planning and configuration system configuration is mainly by the running power of Internet user's terminal planning and configuration system F S M ( t) form.Obviously,
When M S M ( t)<< F S M ( t) time, there is not dynamics problem in Internet user's terminal planning and configuration system configuration;
When M S M ( t)< F SM ( t) time, Internet user's terminal planning and configuration system configuration slightly responds;
When M S M ( t)= F S M ( t) time, Internet user's terminal planning and configuration system configuration keeps dynamic equilibrium;
When M S M ( t) F S M ( t) time, Internet user's terminal planning and configuration system configuration need suitably be adjusted;
When M SM ( t) F S M ( t) time, great change will occur in Internet user's terminal planning and configuration system configuration, even be damaged.
Therefore, following principle can be proposed:
The running load of Internet user's terminal planning and configuration system must adapt with the bearing capacity of Internet user's terminal planning and configuration system configuration,
| M S M ( t ) – F S M ( t ) | < ε S ( 2. 199 )
This can be used as the dynamic (dynamical) article one principle of Internet user's terminal planning and configuration system configuration; Wherein εFor arbitrary small number.
Further, following several requirement is arranged:
The running load of configuration-system must adapt with the bearing capacity of configuration-system structure,
| M S D ( t ) – F S D ( t ) | < ε SD
The running load of transport system must adapt with the bearing capacity of transport system structure,
| M S C ( t ) – F S C ( t ) | < ε SC
The running load of system of processing must adapt with the bearing capacity of system of processing structure,
| M S E ( t ) – F S E ( t ) | < ε SE
The running load of Innovation System must adapt with the bearing capacity of Innovation System structure,
| M S B ( t ) – F S B ( t ) | < ε SB
Between the foundation structure of the running of Internet user's terminal planning and configuration system and Internet user's terminal planning and configuration system, load mainly consists of jointly running power and the running load of Internet user's terminal planning and configuration system, is denoted as M S ( t), M S ( M S M ( t), F S M ( t)); Bearing capacity is mainly by the surrounding environment bearing capacity E S M ( t) and concentrate and coordinate bearing capacity C SM ( t) common formation, be denoted as B S M ( t), B SM ( E S M ( t), C S M ( t)).
If the maximum load capacity of Internet user's terminal planning and configuration system infrastructure is B * S M ( t).Obviously,
When M S ( t)<< B * S M ( t) time, there is not dynamics problem in Internet user's terminal planning and configuration system infrastructure;
When M S ( t)< B * S M ( t).Internet user's terminal planning and configuration system infrastructure slightly responds;
When M S ( t)= B * S M ( t), Internet user's terminal planning and configuration system infrastructure keeps dynamic equilibrium;
When M S ( t) B * S M ( t) time, Internet user's terminal planning and configuration system infrastructure need suitably be adjusted;
When M S ( t) B * S M ( t) time, great change will occur in Internet user's terminal planning and configuration system infrastructure, even be damaged.
Therefore, following principle can be proposed:
The running power of Internet user's terminal planning and configuration system and running load must adapt with the bearing capacity of Internet user's terminal planning and configuration system infrastructure,
| M S ( t ) – B * S M ( t ) | < ε S ( 2. 200 )
This can be used as the dynamic (dynamical) second principle of Internet user's terminal planning and configuration system configuration.
Further, following several requirement is arranged:
The running power of configuration-system and running load must adapt with the bearing capacity of configuration-system foundation structure,
| M S D ( t ) – B * S D ( t ) | < ε S D
The running power of transport system and running load must adapt with the bearing capacity of transport system foundation structure,
| M S C ( t ) – B * S C ( t ) | < ε S C
The running power of system of processing and running load must adapt with the bearing capacity of system of processing foundation structure,
| M S E ( t ) – B * S E ( t ) | < ε S E
The running power of Innovation System and running load must adapt with the bearing capacity of Innovation System foundation structure,
| M S B ( t ) – B * S B ( t ) | < ε S B
Will be in implementation structure dynamic equilibrium aspect certain resource, Internet user's terminal planning and configuration system should be subject to following essential condition constraint:
(I) to iPlant Internet user's terminal planning and configuration System Operation power of resource F * S M, i ( t) attenuation rate β i ( t) the considered time period [0, T] in must be not more than arbitrarily small number ε i ,
β i ( t ) ≤ ε i t ∈[ 0, T ] ( 2. 201 )
(II) by iPlant the load that resource forms for Internet user's terminal planning and configuration system M S M, i ( t) the considered time period [0, T] in must be not more than Internet user's terminal planning and configuration system for the iPlant the running power of resource F * S M, i ( t),
M S M, i ( t ) ≤ F * S M, i ( t ), β i ( t ) ≤ ε i t ∈[ 0, T ] ( 2. 202 )
Realize comprehensive structural dynamic balance aspect various resources, Internet user's terminal planning and configuration system should be subject to following essential condition constraint:
(I) to Internet user's terminal planning and configuration System Operation power of various resources F * S M ( t) attenuation rate β( t) the considered time period [0, T] in must be not more than arbitrarily small number ε,
β( t ) ≤ εt ∈ [ 0, T ] ( 2. 203 )
(II) load formed for Internet user's terminal planning and configuration system by various resources M S Mi ( t) the considered time period [0, T] in must be not more than the running power of Internet user's terminal planning and configuration system for various resources F * S M ( t),
M S Mi ( t ) ≤ F * S Mi ( t ), β( t ) ≤ εt ∈ [ 0, T ] ( 2. 204 )
We can be the correlation of asking of the integrated running power of Internet user's terminal intelligent and Internet user's terminal intelligent integrated operation load (load) the general characteristic of Internet user's terminal intelligent integrated operation power.First by the integrated running power of Internet user's terminal intelligent F M Divide into two kinds: maximum running power F M, max With actual operation power F M .Following relation is generally arranged:
F M ( t ) ≤ F M, max ( t )
When the integrated running power of Internet user's terminal intelligent and the load of Internet user's terminal intelligent integrated operation M M ( t) when close or identical, the nearly balance of Internet user's terminal intelligent integrated operation power or balance appear.As shown in Fig. 3.
If the integrated running power of Internet user's terminal intelligent is fully known over time, although can be height change indefinite or its character is irregular for it, we can be referred to as nonrandom running power; If running power is not fully known over time, but can be defined from the statistics aspect, this running power can be described as randomly operating power.
Viewpoint from analyzing, be divided into two kinds of fundamental types by the integrated running power of nonrandom Internet user's terminal intelligent: cycle and the integrated running power of aperiodic Internet user's terminal intelligent.Some canonical forms of the integrated running power of nonrandom Internet user's terminal intelligent are shown in Fig. 4.The integrated running power of Internet user's terminal intelligent that the shown integrated running power of cycle Internet user terminal intelligent is repetition, in repeatedly circulating, identical time course all one after the other appears in the integrated running power of these Internet user's terminal intelligents.
The integrated running power of the simplest cycle Internet user terminal intelligent is the sinusoidal variations that is known as the integrated running power of simple harmonic quantity Internet user terminal intelligent.By means of Fourier analysis, the integrated running power of any cycle Internet user terminal intelligent can mean by a series of simple harmonic component sums.
Obviously, with regard to ordinary circumstance, see, within a specific period, Internet user's terminal planning and configuration System Operation power is compared with Internet user's terminal planning and configuration tissue (or individual) running power, and following several characteristics are arranged: the former often is greater than the latter; The former is stable not as the latter; The former size is relevant with the latter, and the latter often first grows steadily and then gradually descends.As shown in Fig. 5.
From the comparison of Internet user's terminal planning and configuration System Operation power and the system load of Internet user's terminal planning and configuration and relatively of Internet user's terminal planning and configuration tissue (or individual) running power and Internet user's terminal planning and configuration tissue (or individual) load, we can find out respectively the ruuning situation of Internet user's terminal planning and configuration system and the function situation of Internet user's terminal planning and configuration tissue (or individual).With regard to overall target, see, in the situation that the load of Internet user's terminal planning and configuration system is basicly stable, the ruuning situation of Internet user's terminal planning and configuration system has four kinds;
In the situation that Internet user's terminal planning and configuration System Operation power is basicly stable, the ruuning situation of Internet user's terminal planning and configuration system has another four kinds; In the situation that the load of Internet user's terminal planning and configuration tissue (or individual) is basicly stable, the ruuning situation of Internet user's terminal planning and configuration tissue (or individual) has four kinds; In the situation that Internet user's terminal planning and configuration tissue (or individual) running power is basicly stable, the ruuning situation of Internet user's terminal planning and configuration tissue (or individual) has other four kinds.
Further, from the comparison of Internet user's terminal planning and configuration system configuration power and the load of Internet user's terminal planning and configuration system configuration and relatively of Internet user's terminal planning and configuration tissue (or individual) configuration power and Internet user's terminal planning and configuration tissue (or individual) configuration load, we can find out respectively the configuring condition of Internet user's terminal planning and configuration system and the configuring condition of Internet user's terminal planning and configuration tissue (or individual).
From the comparison of Internet user's terminal planning and configuration system delivery power and Internet user's terminal planning and configuration system conveying load and relatively of Internet user's terminal planning and configuration tissue (or individual) delivery power and Internet user's terminal planning and configuration tissue (or individual) conveying load, we can find out respectively the delivery situation of Internet user's terminal planning and configuration system and the delivery situation of Internet user's terminal planning and configuration tissue (or individual).
From the comparison of Internet user's terminal planning and configuration system operating force and Internet user's terminal planning and configuration system processing load and relatively of Internet user's terminal planning and configuration tissue (or individual) operating force and Internet user's terminal planning and configuration tissue (or individual) processing load, we can find out respectively the processing situation of Internet user's terminal planning and configuration system and the processing situation of Internet user's terminal planning and configuration tissue (or individual).
From the comparison of Internet user's terminal planning and configuration system innovation power and the load of Internet user's terminal planning and configuration system innovation and relatively of Internet user's terminal planning and configuration tissue (or individual) innovation and Internet user's terminal planning and configuration tissue (or individual) innovation load, we can find out respectively the innovation situation of Internet user's terminal planning and configuration system and the innovation situation of Internet user's terminal planning and configuration tissue (or individual).
(3) for Internet user's terminal, the logical foundations that the inventor is brand-new in its independent foundation, Fundamentals of Mathematics, on scientific basic and brand-new technical foundation and engineering foundation, for " cloud " counting system that flicker is indefinite is transformed into the Correspondent all things on earth, connect " world " counting system of longitude and latitude, adhere to take that the global value Chain System is as core, it is suitable to introduce, for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, basic consumption, the various basic collaborative variable of inner cooperation and competition and outside cooperation and competition, set up technical scheme and the evaluation method of the collaborative design of user terminal planning and configuration.
The configuration theory of (3. 1) PA/UEC
C1, embodiment are carried out the effectively thought of configuration to whole effect chain resource.Applying under brand-new economic science technology and brand-new management science technology, on the basis of applying modern network information technology the integrated dynamic Correspondent network of Devoting Major Efforts To Developing foundation intelligence, PA/UEC and MA/UEC and NA/UEC interconnect, the common configuration realized all resources such as the person property of inside and outside association on whole Internet user's effect chain and flow process thereof;
The thought of C2, the arrangement of embodiment benefit community, Simultaneous Engineering and the operation of camera choice type.In the face of the keen competition (market) of the inside and outside association of Internet user's planning and configuration, stable cooperation (planning) and the inside and outside associated interaction coordination of Internet user's planning and configuration (network) of the inside and outside association of Internet user's planning and configuration, the Internet user need to use Simultaneous Engineering operation and camera choice configuration, keeps high level, variation, flexibility.Applying under brand-new economic science technology and brand-new management science technology, on the basis of applying modern network information technology the integrated dynamic Correspondent network of Devoting Major Efforts To Developing foundation intelligence, PA/UEC and MA/UEC and NA/UEC interconnect, and jointly realize camera choice operation;
The thought of C3, embodiment advance planning and mid-event control.Applying under brand-new economic science technology and brand-new management science technology, on the basis of applying modern network information technology the integrated dynamic Correspondent network of Devoting Major Efforts To Developing foundation intelligence, PA/UEC and MA/UEC and NA/UEC interconnect, jointly set up the planning system of PA/UEC system, and the planning system of PA/inside and outside association of UEC Internet user planning and configuration mainly comprises vertical associated planning, laterally associated planning, cooperative association planning, supporting associated planning, ability need planning etc.;
The thought of C4, the configuration of embodiment delivery flow process, for improving competitive advantage, cooperative advantage and the coordination advantage of the inside and outside association of Internet user's effect chain, must bring the reform of the inside and outside associated delivery flow process of Internet user's planning and configuration, and the use of the inside and outside interconnected system application program of Internet user's planning and configuration also must the corresponding adjustment with the variation of delivery flow process.
(3. 2), for Internet user's terminal, decision process can be regarded the major part of intelligent integrating process as.In comprehensive integrated epoch of science and technology, by IDSS design adult's one machine joint cognitive system (Man-Machine Joint Cognitive System), be necessary.Some new ideas that now new design related to are defined as follows:
Internet user's terminal intelligent integrated support system IGSS.Promote and put into practice quality or path optimizing is selection, people's one machine interactive system based on knowledge by the cognitive ability (Cognition Making Abilities) of expanding Internet user's terminal planning and configuration tissue (or individual).Here, people's one machine is the necessary condition of IGSS alternately, and at first the aim of system support is the cognitive ability (decision-making capability that comprises the policymaker) of expansion Internet user terminal planning and configuration tissue (or individual), rather than replace Internet user's terminal planning and configuration tissue (or individual) to make one's options.Obviously, IGSS is the expansion of IDSS.
Internet user's terminal planning and configuration tissue (or individual) GM.This is the end user (End User) of IGSS, is also the leading factor of Internet user's terminal intelligent integrating process.It need to use the cognitive miscellaneous function of IGSS, and the solution route of problem is had to idea, and Internet user's terminal intelligent support of computer is had to demand.
Internet user's terminal intelligent integrating process IGP.Internet user's terminal intelligent integrating process can be interpreted as to the actual process of dealing with problems under goal orientation.Furthermore, it is IGCP that title GM is used the cognitive process of IGSS, and the GM process of cognition separately is auxiliary cognitive process (Unaided.IGCP), and the independent cognitive process of machine is automatic cognitive process (Automated IGCP).Not auxiliary cognitive process has reflected Internet user's terminal planning and configuration tissue (or individual) cognitive process of Solve problems alone, also claim the integrated cognitive process of nature Internet user terminal intelligent (Natural IGCP), it is the basic foundation of the integrated cognitive design of auxiliary Internet user's terminal intelligent, so also claim the integrated cognitive process of base Internet user terminal intelligent (Baseline IGP).
Put into practice Cognitive task Task.By the actual problem that will solve of IGP, it is not at least the text description of realistic problem usually, but the problem set proposed in IGSS acceptable information representation mode, and the structure that often has levels.
Put into practice cognitive environment Environment.。The residing social environment of IDSS and physical environment, comprise under the IGSS effect, realize whole software and hardware systems of IGP.
Calculate and holographic co-operation system in the Global Internet user terminal integrated dynamic Correspondent net of intelligence and the world.
The IGSS design principle of Internet user's terminal intelligent integration engineering should be: science and the cognitive process (Cognitive Process) of putting into practice Internet user's terminal planning and configuration tissue in cognitive process (Natural/Baseline IGP) (or individual) of reasonably decomposing nature; Adopt suitable computer technology eliminate those obstruction or limit it and successfully make best cognitive intelligence boundary constraint and external environment condition obstacle; Rely on advanced person's in the present age computing capability to realize required systemic-function.
See further, the IGSS design based on cognitive engineering can divide six steps to carry out.4 square frames of left column provide design process and respectively walk required support (data, Word message are main), and 6 square frames of right row indicate due result while respectively having walked, and in the middle of these, achievements the process status of design with the formal denotation of technical notes card.When design process completes, system enters computer realization during the stage, and they form the main frame systems that knowledge base is put into practice the Cognitive task module naturally.
Because the service of IGSS has chronicity, once decision situation changes, readjust design, and will assist cognitive need to gather to be shown in table 1.These need to relate to the aspects such as judgement that the description of putting into practice cognitive process and selection criterion, information processing, intermediate analysis, decision table are sought peace and required, they can provide support to Practice Subject by modern the Internet user terminal intelligence DSS technology respectively, and these six kinds of corresponding technology are:
* process model building (Proeess Modeling).In real world, system evolution process or evolution can solve and carry out scenario analysis and optimize and analyze by mathematical modeling, Computer Simulation, produce the behavior track of system under various conditions;
* select modeling (Value Modeling).Very advanced multi-level, multiple target, many people's evaluation model has been arranged now and has used the balance model of fuzzy logic personification, in order to support decision scheme preferentially and sequence;
The integrated demand of table 1 Internet user terminal intelligent is assisted summary sheet
Figure DEST_PATH_IMAGE011
The integrated situation situation of Internet user's terminal intelligent name hierarchical relationship
Task dynamical state type belongs to: closed loop is iterative, open loop expansion, one-time calculation
Internet user's terminal
The integrated target of intelligence is in order to describe verfolgten Ziele event (Observable and can describe)
Evaluation index is listed each index (attribute) of describing object event
Estimate the integrated quality of Internet user's terminal intelligent by property value
Process delineation statement is containing observable total process of the integrated situation of Internet user's terminal intelligent
Information environment tabular three category informations: input, output and parameter
Middle reasoning/analytical procedure character express nature, Internet user's terminal intelligent integrator adopts inference step
Qualitative or the quantitative description of the dbjective state that the object event statement realizes about expectation
The judgement needed is in Internet user's terminal intelligent integrating process
Which result need be made the judgement of positive or negative
Figure 712597DEST_PATH_IMAGE011
* information management (Information Management).The present information treatment technology, the information processing that can need IGSS (store, take, upgrade, delete, maintain etc.) handle with ease;
* automatic or semi-automated analysis and reasoning (Automated and/or Semi-automated Analysis and Rea-soning).The combination of modern mathematics, computer science, artificial intelligence technology, many automatic, semi-automatic inference mechanisms have been realized, on-line automatic reasoning and executable operations have been linked the user is listed to the overall process of seeking advice from conclusion from puing question to, and with necessary description and interpretation;
* auxiliary expression (Representation aids).Computer graphics technique and Language Processing technology can be described tabular form assisting to the various functional modules of its statement computer to the intelligence of putting into practice cognitive Status with the human cognitive person is peculiar.
* judgement is refined and is strengthened statistics and wait computer science and technology successfully inconsistent for the various systematicness that may occur in putting into practice cognitive process of elimination, inaccurate etc. to artificial deviation generation quantitative expression.
Behavior model to system can divide certainty and the large class Mathematical Modeling of randomness two.The first kind comprises the I/O type---closed form analytic modell analytical model, mechanism type---discrete digital simulation model and continuous system dynamics model; The Markov chain random difference equation model of Equations of The Second Kind comprises the I/O type---probabilistic model, mechanism type---non-regular Monte-Carlo Simulation model and canonical etc.
(3. 3) are according to thinking that document [35]-[40] provide, by the method in Internet user's terminal planning and configuration comparator matrix, each element is taken the logarithm, we can be converted into the distance that can be described as the integrated Correspondent distance of Internet user's terminal intelligent by the integrated AHP comparative result of Internet user's terminal intelligent.Internet user's terminal planning and configuration comparator matrix is converted into the integrated Correspondent distance matrix of Internet user's terminal intelligent, relatively Internet user's terminal intelligent is integrated relatively is converted into the integrated comparison of absolute Internet user's terminal intelligent, makes the calculating order-preserving problem invariably of such problem.
If individual point is arranged on Internet user's terminal intelligent integrated planar, between each point, by line segment, directly or indirectly coupled together, the distance between each point can be meaned by the integrated distance matrix of Internet user's terminal intelligent.On expression plane in Internet user's terminal planning and configuration matrix, from the beeline of the o'clock to the o'clock, Internet user's terminal planning and configuration matrix was a symmetrical matrix.If regard Internet user's terminal intelligent integrated planar as regular planar, each point is regarded the Internet user terminal intelligent integrated metrology of object under this rule as, and each element in Internet user's terminal planning and configuration matrix can be considered the integrated Correspondent distance of Internet user's terminal intelligent between each object under this rule:
Figure 484244DEST_PATH_IMAGE012
( 3. 9. 72 )
In certain rule X GE Lower right mThe integrated object of individual Internet user's terminal intelligent compares in twos, can obtain Internet user's terminal planning and configuration comparator matrix C GE :
Figure DEST_PATH_IMAGE013
( 3. 9. 73 )
If
Figure 310249DEST_PATH_IMAGE014
( 3. 9. 74 )
For Internet user's terminal intelligent integration characteristic vector, have
C GE W = λ GE, max W
Wherein λ GE, max Maximum characteristic root for this Internet user's terminal planning and configuration comparator matrix.
If Internet user's terminal planning and configuration matrix is consistent, λ GE, max = n GE .
At the integrated AHP of Internet user's terminal intelligent to matrix C GE Calculating in the characteristic vector that obtains be:
Figure DEST_PATH_IMAGE015
( 3. 9. 75 )
Wherein,
Figure 255071DEST_PATH_IMAGE016
.
Internet user's terminal planning and configuration comparator matrix by AHP under certain rule C GE In each element take the logarithm, can obtain Internet user's terminal planning and configuration matrix S GE As follows:
Figure DEST_PATH_IMAGE017
( 3. 9. 76 )
Wherein,
Figure DEST_PATH_IMAGE019
Can be considered under this rule iThe integrated object to the of individual Internet user's terminal intelligent jThe Correspondent distance of the integrated object of individual Internet user's terminal intelligent,
Figure 924005DEST_PATH_IMAGE020
( i=1,2,, n) mean that the Correspondent distance of Internet user's terminal intelligent integrated object itself is 0.
Supposing has for the integrated object samples comprehensive measurement of Internet user's terminal intelligent community set PIndividual attribute (index), the integrated photometry system of Internet user's terminal intelligent contains nThe result of individual unit.With Internet user's terminal planning and configuration matrix
Figure DEST_PATH_IMAGE021
Mean, claim
Figure 174989DEST_PATH_IMAGE022
Sample data matrix for intelligent holographic Correspondent system metrics.
In order to eliminate the order of magnitude impact different from dimension between the integrated variable of Internet user's terminal intelligent (index), make between integrated each variable of Internet user's terminal intelligent to have comparativity (the integrated attribute volume cording of Internet user's terminal intelligent has same tendency), the integrated variable of Internet user's terminal intelligent is carried out to standardized transformation, even
Figure DEST_PATH_IMAGE023
Wherein With
Figure DEST_PATH_IMAGE025
Respectively jSample average and the standard deviation of the integrated variable of individual Internet user's terminal intelligent.get
Figure 972437DEST_PATH_IMAGE026
( 3. 9. 77 )
Wherein
Figure DEST_PATH_IMAGE027
Claim the standardization sample data matrix that (3. 9. 77) formula is intelligent holographic Correspondent system metrics.
For the integrated data matrix of standardized interconnections network users terminal intelligent with same tendency (3. 9. 77), our useable linear weighted comprehensive method metering comprehensive measurement value [34]-[40],
Figure 507323DEST_PATH_IMAGE028
( 3. 9. 78 )
Wherein , be pThe weight of the integrated attribute of Internet user's terminal intelligent, claim that (3. 9. 78) formula is intelligent holographic Correspondent system metrics value model.
The mathematical form of the Factor Analysis Model of intelligent holographic Correspondent system metrics attribute system is
Figure 433822DEST_PATH_IMAGE030
Figure DEST_PATH_IMAGE031
( 3. 9. 79 )
Claim X GE There is factor structure, wherein f GE , s GE For random vector, be respectively X GE Main gene and specific factor; AFor constant matrices, be called the factor loading matrix, and A=( a i j ) p* m There is statistical property: a i j Be x GE, i With f GE, j Coefficient correlation; Note
Figure 421370DEST_PATH_IMAGE032
For g 2 j , it means f GE, j Right XTotal impact of integrated each component of Internet user's terminal intelligent, be called f GE, j Variance contribution.
If the integrated object of Internet user's terminal intelligent nIndividual unit metric is arranged as by size: z GE, 1 , z GE, 2 ,, z GE, n .
If the integrated class of a certain Internet user's terminal intelligent G GE, i j For z GE, i , z GE, i+ 1 ,, z GE, j ( j>= i), its average is
Figure DEST_PATH_IMAGE033
Diameter is
Figure 957262DEST_PATH_IMAGE034
( 3. 9. 80 )
If minute kClass.If a certain point-score
Figure DEST_PATH_IMAGE035
Figure 81076DEST_PATH_IMAGE036
The target function that defines this point-score is
Figure DEST_PATH_IMAGE037
( 3. 9. 81 )
When n, kIn the time of fixedly, t[ P GE ( n, k)] all kinds of sums of squares of deviations of less expression are less, classify more reasonable.
By following recurrence formula
( 3. 9. 82 )
( 3. 9. 83 )
4, accompanying drawing explanation
Fig. 1 is the dynamic Correspondent net of Internet user's planning and configuration and three large resource flow networks and three large configuration-system network diagram.
The network integration based on the ICT industry, the inventor further proposes to set up the integrated dynamic Correspondent network of Global Internet user terminal intelligence, by the Internet merged based on the ICT industry network, logistics net, knowledge knowledge network and Network and Finance Network are collected to perforation, in the whole society so the whole world realize the human-machine interaction configuration of whole resource, as shown in Figure 1.
The dynamic Correspondent of whole network mainly refers to the business Correspondent of logistics net, information network and the application of Network and Finance Network three major types Network resource allocation, and does not mean that the physics of logistics net, information network and the application of Network and Finance Network three major types Network resource allocation merges.
Fig. 2 is Internet user's planning and configuration and three large resource flow networks and three large configuration-system network diagram.
In from different perspectives conceptive and step analysis, the dynamic Correspondent of whole network can relate to technology Correspondent, business Correspondent, industry Correspondent, terminal Correspondent and network Correspondent, as shown in Figure 2.At present main, can consider to use mutually unified communication protocol on application level, to form the binding site of the dynamic Correspondent of whole network.  
Released the integrated dynamic Correspondent network system of Internet user's terminal intelligent that will develop and set up by the inventor, formed by Internet user's terminal planning and configuration inside and outside hardware system and software systems.
Fig. 3 is the main composition figure of Internet user's effect chain planning and configuration system PA/UEC software module.
PA/UEC with Internet user's effect chain market configuring technical MA/UEC together with Internet user's effect chain network configuring technical NA/UEC, formation makes up mutually, the relation of phase trans-substitution, jointly all resources of the inside and outside association of Internet user's planning and configuration are carried out to the integration configuration, in brief, be that three of the inside and outside association of Internet user's planning and configuration is flowed greatly---the configuration information system that logistics, cash flow, information flow carry out the entirely integrating configuration.The inside and outside correlation function module of its Internet user's planning and configuration is to be different from the module of NA/IVC and ERP, it not only can be used for the configuration of the inside and outside association of Internet user's planning and configuration, and also can import as the Internet user of some unproductive utilities MRP and the configuration that PA/UEC system is carried out the inside and outside association of Internet user's planning and configuration the Internet user of many other types.Here we design the functional module of PA/UEC by Fig. 3.
Fig. 4 is that calculate and holographic co-operation system diagram in the dynamic Correspondent net of Internet user's planning and configuration and the world.
Calculate and holographic co-operation system in the Global Internet user terminal integrated dynamic Correspondent net of intelligence and the world, as shown in Fig. 4.
The IGSS design principle of Internet user's terminal intelligent integration engineering should be: science and reasonably decompose the cognitive process (Cognitive Process) that nature is put into practice Internet user's terminal planning and configuration tissue in cognitive process (Natural/Baseline IGP) (or individual); Adopt suitable computer technology eliminate those obstruction or limit it and successfully make best cognitive intelligence boundary constraint and external environment condition obstacle; Rely on advanced person's in the present age computing capability to realize required systemic-function.
Fig. 5 is the PCSS designograph of Internet user's planning and configuration intelligence integration engineering.
See further, the IGSS design based on cognitive engineering can divide six steps to carry out, and is shown in Fig. 5.4 square frames of Fig. 5 left column provide design process and respectively walk required support (data, Word message are main), and 6 square frames of right row indicate due result while respectively having walked, and in the middle of these, achievements the process status of design with the formal denotation of technical notes card.When design process completes, system enters computer realization during the stage, and they form the main frame systems that knowledge base is put into practice the Cognitive task module naturally.
5, embodiment
Await the PA that exploitation sets up/UEC system, huge system engineering of the inside and outside association of Internet user's planning and configuration beyond doubt.For PA/UEC, certainly need to drop into a large amount of human and material resources and financial resources, but what is more important, need brand-new economic science technical system and brand-new management science technical system, need to develop and set up the integrated operating system of Internet user's terminal intelligent and dynamic Correspondent network.PA/UEC is a kind of advanced person's economic science technical system, a kind of advanced management science system and a kind of advanced person's the system engineering theory and practice, it involves a wide range of knowledge, throw the National People's Congress, implementation cycle is long, difficulty is large, there is certain risk, the success that need to take the method for science to come Guarantee item to implement.
(5. 1) generally should be noted that following problem in force:
The top policy maker of Internet user's tissue and all stakeholder's participation.The enforcement of PA/UEC is related to the adjustment of the inside and outside associated configuration pattern of Internet user's planning and configuration, the variation of the inside and outside associated delivery flow process of Internet user's planning and configuration and a large amount of personnel's changes, do not have Internet user policymaker's participation will be difficult to be committed to practice.But while PA/UEC is that information Correspondent and the information of Internet user's level is integrated, the participation that there is no all stakeholder is also impossible successful.
The renewal of knowledge of the inside and outside association of Internet user's planning and configuration.PA/UEC is the combination of information technology and advanced configuration technology, no matter be the common stakeholder of policymaker, configuration person or the inside and outside association of Internet user's planning and configuration of the inside and outside association of Internet user's planning and configuration, all GPRS computer technology, the communication technology, and they are applied in the configuration of brand-new Internet user's tissue and go.
The normalized number certificate of the inside and outside association of Internet user's planning and configuration.PA/UEC system has realized that the overall situation of Internet user's data shares, as a configuration information system, its process to as if data.Data normalization is the prerequisite that realizes that information is integrated, just talks on this basis the accurate, complete and timely of information.Must exert to prepare basic data so implement PA/UEC.Such as, product data information, rule designer's information, system integrator's information, module generate business's information, ultimate consumer's information and social governor motion information and domestic and international relative information etc.
The delivery flow process restructuring of the inside and outside association of Internet user's planning and configuration and mechanism's restructuring.PA/UEC is the inside and outside associated item stream of Internet user planning and configuration, and it has realized minimal redundancy and maximum the sharing of the inside and outside related information of Internet user's planning and configuration.The task that tradition needs several steps or several department to complete may only need once just can complete after implementing PA/UEC system.Therefore Internet user's tissue will allow PA/UEC system play a role, and is necessary being recombinated aspect the delivery flow process of the inside and outside association of Internet user's planning and configuration and organization, to make it to meet the enforcement requirement of PA/UEC.
PA/UEC emphasizes the Prior Control ability to Internet user's configuration, the operation of the aspects such as front end link, rear end link, cooperation link, supporting link and human resources, system environments, decision support, but regard the organic whole of a dynamic Prior Control as.PA/UEC system combines above-mentioned links, its core is configuring internet user existing resource, rational allocation and accurately utilize existing resource, for the Internet user provide a set of can to system dynamic, systemic effect, turn of the market, network dynamically, the key issue such as the customer satisfaction DSS of carrying out real-time analysis, judgement.
PA/UEC is advanced modern the Internet user's configuration mode, main objective for implementation is the Internet user of the inside and outside association of Internet user's planning and configuration, purpose be by the inside and outside association of Internet user's planning and configuration resource (comprising physical resources, information resources, human resources and the fund) reasonable disposition of various aspects, to make it to give full play to usefulness, make the Internet user in fierce market competition, stable planning cooperation and the interactive network coordination, bring into play in all directions energy, thereby obtain optimum economic benefit.PA/UEC system has been expanded the configuration scope on the basis of NA/IVC, has proposed the inside and outside associated configuration architecture of new Internet user's planning and configuration, and Internet user's inside and outside resource is organically combined togather.Here fully implement the configuration thought of effect chain, the operation activity of user's demand and Internet user inside and external supplier's operation resource has together been comprised, embodied the thought of moving by customer demand fully.
PA/UEC embodies a concentrated reflection of theory and the method for brand-new Internet user's configuration, also emphasizes the principle of the inside and outside association of Internet user's planning and configuration simultaneously.But PA now/UEC software is imperfection also, be far from reaching the client to requirement, even do not reach the promise that software vendor oneself are made yet.What the user needed is the more careful planning of effect chain, enforcement more flexibly, wish that PA/UEC can not only be applicable to the delivery flow process of the inside and outside association of Internet user's planning and configuration today, and want to improve rapidly, adapt to the new model of the inside and outside association of Internet user's planning and configuration in the future.PA of today/UEC system main weakness is aspect the planning function of the inside and outside association of Internet user's planning and configuration, system convention design module (SRD) and resource distribution planning (RDP) module of being the inside and outside association of Internet user's planning and configuration need to be in time with existing resource response client's demands, and the effect chain with reinforcement to real world provides support.
Internet user's tissue is by implementing PA/UEC, supporting engineering is to help the Internet user to set up the flow process of the inside and outside association of Internet user's planning and configuration, set up the system of the inside and outside association of Internet user's planning and configuration, set up the standard of the inside and outside association of Internet user's planning and configuration, set up the standard of the inside and outside association of Internet user's planning and configuration, the TQC(that guarantees the inside and outside association of Internet user's planning and configuration hands over the phase, quality, cost) control and assurance ability, thereby improve the configuration level of the inside and outside association of Internet user's planning and configuration, promote the composite force of the inside and outside association of Internet user's planning and configuration, competitiveness and coordination power, promote the economic benefit of the inside and outside association of Internet user's planning and configuration, realize the profit maximization of the inside and outside association of Internet user's planning and configuration.
That is to say, if the importing of PA/UEC does not have supportingly the flow process of the inside and outside association of Internet user's planning and configuration, system, standard, normalization, it is just very large that PA/UEC implements failed risk.Otherwise, by implementing PA/UEC, the Internet user organizes flow process, standard, standard, the system of having set up the inside and outside association of rational Internet user's planning and configuration, and constantly solidify constantly and optimize that (improvement of original configuration was endless, the process of constantly improving), thereby reach the composite force, competitiveness and the coordination power that promote the inside and outside association of Internet user's planning and configuration, realize the target of the profit maximization of the inside and outside association of Internet user's planning and configuration.
(5. 2) future scenarios: the enforcement of Internet user's effect chain planning and configuration
C 1 conceptual design
The software company be determined should send the strongest configuration and technical specialist, go deep into Internet user's organization internal and outside associated projects link, demand analysis according to early stage, the all departments of the inside and outside association of research Internet user's planning and configuration and relevant departments' delivery flow process and problem demanding prompt solution, detailed embodiment is proposed, determine and implement planning step by step according to the enforcement logic of the inside and outside association of Internet user's planning and configuration, technical standard and the data encoding standard of the inside and outside association of Internet user's planning and configuration are proposed on this basis, implement step by step, key breakthrough, progressively launch, and manager relevant to the Internet user fully links up, the rear both sides that the reach an agreement confirmation of signing, using this foundation as the project implementation and examination.
C 2 organizations set up
Internet user's effect chain planning and configuration Project Leading Group that the leader of each functional department that rule designer's policymaker is group leader, the inside and outside association of Internet user's planning and configuration is the member is take in establishment, is responsible for project overall plan; Resource allocation, interagency coordination and the decision-making of the inside and outside association of Internet user's planning and configuration; The project recruitment evaluation of the inside and outside association of Internet user's planning and configuration and project configuration examination; Foundation be take Internet user's effect chain planning and configuration that the information-based leader of authorities is director and is advanced office, by the flow process backbone of all departments of computer professional, the inside and outside association of Internet user's planning and configuration and the project manager of software company and implement the group that the engineer forms, the promoting comprehensively of responsible project; Be responsible to define overall plan, and the goal task in clear and definite each stage, director, deadline; Concrete organizing and implementing, the scheduling of the project of being responsible for; Be responsible for arrangement and the typing of organization foundation data, organize configuration consulting, delivery flow definition, system testing, end user's training, the system acceptance of project simultaneously, and submit progress report by the stage to the Project Leading Group.Submit decision recommendation to and, for the risk that may the occur solution of advising, the related work of the inside and outside associated item of Internet user's planning and configuration is fulfilled for significant problem.
C 3 strengthens project organization configuration
Internet user's effect chain planning and configuration is included Internet user's tissue class configuration innovation item in and is configured, and determines phase targets, implementary plan, the rewards and punishments measure of the inside and outside association of Internet user's planning and configuration, formulates effective appraisal standards.
Be organized as main body with the Internet user and determine standard process, formulate the operational procedure of the inside and outside association of Internet user's planning and configuration, and to the stakeholder carry out repeatedly, targetedly the training, Internet user's effect chain planning and configuration operation qualifying examination is carried out in training after finishing, using this as foundation on duty.
Carry out the planning and configuration week work regular meeting of Internet user's effect chain and monthly work briefing system of issue.In regular meeting, each group of the inside and outside association of Internet user's planning and configuration circulates a notice of performance, asks a question, by leading group's Solve on site, and arrange the task of next stage, the system performance of one month is issued on company's internal network with the form of Internet user's effect chain planning and configuration bulletin, and be furnished with suitable praise and criticize content, laggard to urge on.
C 4 Internet user's effect chain planning and configuration project implementation planning
According to overall planning, implement step by step, the principle of profit-driven, key breakthrough, determine stage by stage target, by the target making planning of the inside and outside association of Internet user's planning and configuration.From easy to difficult, application from low to high, focus on actual effects.All the time adhere to being undertaken by planning tissue, training, data preparation, test, perfect, dry run, the step of formally reaching the standard grade.
The Internet user organizes and determines first implementing procedure comparison standard, less the advancing, sell, deposit and the monetary items system of difficulty, implement the production module and reach the modules such as relevant with it equipment, metering, quality after the system stability of the inside and outside association of Internet user's planning and configuration, finally implement again the modules such as occurrences in human life, decision-making.
Organize reality according to the Internet user, determine that whole project divides two stages to carry out:
First stage, the system of mainly implementing the inside and outside association of Internet user's planning and configuration is controlled, sells configuration, receivable configuration, logistics arrangement, is dealt with configuration, stock's configuration, inventory auditing, product data configuration (containing the configuration of Internet user's structure, Process configuration), expense budget configuration (configuring containing expense), monetary items accounting, PDM data preparation and demand analysis, hardware net environmental structure, Internet user's effect chain planning and configuration.Cycle is about 12 months.Mainly complete the integrated of the inside and outside associated logistics of Internet user's planning and configuration and cash flow, standard, transparent configurations.
Second stage is production master program, material demand planning, power balance, workshop project configuration, quality configuration, equipment the configuration of metering, human resources configuration, solution analysis, Internet user's effect chain planning and configuration of the inside and outside association of integrated Internet user's planning and configuration.Cycle is about 16 months.Main market of realizing take the inside and outside association of Internet user's planning and configuration as demand, with the master ga(u)ge that vertically reaches horizontal drive divide core into, the input and output of the inside and outside association of Internet user's planning and configuration of take are main contents holographic concertedness enterprise schema, effectively be controlled at goods, compress to greatest extent stock, improve delivery date, satisfying the market needs rapidly.
The overall goal of C 5 planning and configuration
a. the enforcement Internet user effect chain planning and configuration project of take is opportunity, promote Internet user's transformation to the configuration mode of transparent, collaborative, standard, lean by traditional sealing, poor efficiency, extensive style configuration mode, the realization of support Internet user strategic objective.
b. strengthen Internet user's configurations.Set up the inside and outside associated data standard of Internet user's planning and configuration and the coding scheme of standard, promote the Internet user basis to rectify; Strengthen product design, the technical papers standard configurations of the inside and outside association of Internet user's planning and configuration; The ration allocation when raw materials consumption of the inside and outside association of refinement Internet user planning and configuration, man-hour, the occupation of capital, table of equipment; Internet user's standard campaign of the inside and outside association of standard Internet user's planning and configuration; Strengthen the customer resources information configuration of the inside and outside association of Internet user's planning and configuration; The cost of the inside and outside association of refinement Internet user planning and configuration and price configuration; Strengthen delivery flow process and the role norm configuration of the inside and outside association of Internet user's planning and configuration.
c. improve configuration, decision-making technique.Realize that data integration and the database overall situation of IRP, each subsystem of the inside and outside association of Internet user's planning and configuration share; Set up Internet user's Back ground Information structure of the inside and outside association of Internet user's planning and configuration, comprise integrated information network and comprehensive unified data interaction form; Neat cover stock configuration and the analysis of the inside and outside association of Internet user's planning and configuration; The process consuming cost of the inside and outside association of Internet user's planning and configuration is adjusted; The risk of sale on credit of the inside and outside association of Internet user's planning and configuration is controlled and the customer resources configuration; Vertically reach the integrated application of the horizontal main system operation planning driven, material demand planning, order configuration; The real-time cost accounting of minute product of the inside and outside association of Internet user's planning and configuration; Fast Quotation; Profit budget and the breakeven analysis of the inside and outside association of Internet user's planning and configuration; Online multidimensional data analysis, support the decision-making application.
d. Internet user's effect chain planning and configuration of take is standard, and system improving Internet user configuration is supported the Internet user and carried out phyletic evolution, forms Internet user's culture of transparent, open, collaborative, standard, lean.
The implementation content of C 6 planning and configuration
a. the logistics arrangement of the inside and outside association of Internet user's planning and configuration.Rely on brand-new information system support, transmit in time the demand of the inside and outside associated production system of Internet user's planning and configuration, and integrated by the information with the inside and outside associated logistics system of Internet user's planning and configuration, rapidly the inside and outside associated demand of producing of Internet user's planning and configuration is made to fast reaction, guarantee the Qi Taoxing of the inside and outside associated production material of Internet user's planning and configuration.Internet user's effect chain planning and configuration system, according to the system operation planning, proposes the inside and outside associated demand planning of producing of Internet user's planning and configuration; The inside and outside associated production system of Internet user's planning and configuration can, according to the neat cover situation of material planning inquiry raw material and parts, propose the inside and outside associated logistics arrangement planning of Internet user's planning and configuration; Rely on the inside and outside related information of Internet user's planning and configuration of Internet user's effect chain planning and configuration system integrated, the inside and outside affiliated supplier's configuration scheme of Internet user's planning and configuration of Erecting and improving; Foundation using information such as the inside and outside affiliated supplier's of Internet user's planning and configuration delivery date, article qualities as supplier evaluation; With logistics, arrange the inside and outside affiliated supplier's evaluation result of Internet user's planning and configuration share distribution, Payments Policy to combine; Set up the information bank of the configurations such as the inside and outside associated logistics of Internet user's planning and configuration arranges the cycle, economic lot size, safety inventory, for ensureing in time the material supply, provide foundation.
b. sale, stock and the production system of the inside and outside association of Internet user's planning and configuration.The system operation planning is the programmatic document that instructs the inside and outside associated activity in production of Internet user's planning and configuration.For the enforcement of safeguards system operation planning, material logistics arrangement planning, cooperation part planning, workshop project planning, the equipment that can produce the inside and outside association of Internet user's planning and configuration are used a series of supporting planning such as planning, moulds of industrial equipment planning simultaneously.System operation planning and these planning are guiding principle and purpose relation, and guiding principle is lifted and could be opened by order.
c. the cost configuration of the inside and outside association of Internet user's planning and configuration.Production cost to the inside and outside association of Internet user's planning and configuration is planned, is adjusted, is controlled and configured, set up the departmental cost budget method of the inside and outside association of Internet user's planning and configuration, and with thing in cost analysis compare, make budget progressively department learn, accurately, for Internet user organizational decision making provides the data of use.
d. the inside and outside association of Internet user's planning and configuration deal with configuration.The various contact funds that the main configuring internet user of the account payable subsystem of the inside and outside association of Internet user's planning and configuration occurs with supplier in running, effectively help Internet user configuration person to grasp the flow direction of fund, control the outflow of Internet user's fund by monitoring payment situation, form the good circulation of circulating fund.The account payable subsystem of the inside and outside association of Internet user's planning and configuration is filled in invoice, tax and logistics operational costs use based on logistics arrangement activity, also can directly call the order that logistics arranges subsystem to generate.Invoice amount is shared with the warehouse-in material, can determine warehouse-in material payment situation.The invoice rear generation account payable account of transferring items, payment order and account payable account are settled accounts, and determine the received payment amount of money and the arrearage amount of money, can process advance payment simultaneously.Organize following cash flow artificial situation in order to grasp in real time the Internet user, the system of the inside and outside association of Internet user's planning and configuration also provides abundant query statistic function, and arranges subsystem, the integrated use of account subsystem with the inside and outside associated logistics of Internet user's planning and configuration.
e. the receivable configuration of the inside and outside association of Internet user's planning and configuration.Internet user tissue is by the application to Internet user's effect chain planning and configuration system, realizes sharing of data between the monetary items department of the inside and outside association of Internet user's planning and configuration and sales department, completes the interchange of data message on network; The ingather calculate table money of the monetary items section of the inside and outside association of Internet user's planning and configuration will be take the invoice for sales of sales department as according to being registered; The ingather calculate table money of the inside and outside association of Internet user's planning and configuration is by being collected toward vostro account.Gathering, the invoice for sales of the inside and outside association of Internet user's planning and configuration are evidence-based, clear and definite flow process source.The returned money clearing time can be assigned to each account due, make ingather calculate table age, the reflection of advance aging in time, accurately, not only can carry out ingather calculate table age, advance aging analysis of accounts, can also carry out the returned money aging analysis of accounts.
(5. 3) following sight is summed up
The first, not still brand-new expansion and the innovation of collocation method of the enforcement of Internet user's effect chain planning and configuration system, organizational innovation, innovation of consciousness and a mechanism innovation that all stakeholder participate in, be a synergitic huge system engineering of holography especially.Applying under brand-new economic science technology and brand-new management science technology, on modern information technologies and the integrated operating system of Internet user's terminal intelligent and dynamic Correspondent network foundation, it is guidance that Internet user's effect chain planning and configuration technology PA/UEC be take the holographic coordinated management thought of metasystem science, with Internet user's effect chain market configuring technical MA/UEC, together with Internet user's effect chain network configuring technical NA/UEC, formation makes up mutually, the relation of phase trans-substitution.Therefore, will do one's best on the implementation, directly related with the inside and outside associated demand of Internet user's planning and configuration and configuration level, not all Internet user is applicable to.
The second, the enforcement of Internet user's effect chain planning and configuration system is the inside and outside associated engineering of integrating of Internet user's planning and configuration, and policymaker that must the inside and outside association of Internet user's planning and configuration participates in jointly, could continue to promote down; To strictly follow the principle of " long-term plan, implement step by step, profit-driven, key breakthrough ", carry out the planning of the inside and outside association of Internet user's planning and configuration, have levels, in steps, target arranged, advance in proper order by the stage, can not be anxious for success; Strong organizational structures are arranged, clear and definite objectives, everyone has responsibility, guarantees project success.
The 3rd, the technical risk of Internet user's effect chain planning and configuration project is little, and main concentration of risk is in the configuration aspect of the inside and outside association of Internet user's planning and configuration.The software of the inside and outside association of all Internet user's planning and configuration all is based on role's definition and the standard of flow process.Therefore, be not only the technological change of the inside and outside association of Internet user's planning and configuration, and be configuration innovation, thought innovation and the system innovation of the inside and outside association of Internet user's planning and configuration.Internet user's effect chain planning and configuration system involves a wide range of knowledge, and not only will drop into a large amount of man power and materials, also relates to Internet user's organization, a series of major transformations such as configuration system, method of work and configure base.Say in a sense, informatization be exactly to the inside and outside association of Internet user's planning and configuration human, financial, and material resources power resource and once large innovation and the change carried out at aspects such as information processing, working method, configuration mechanism and people's concept, customs of the production, supply and sales link of the inside and outside association of Internet user's planning and configuration.
The 4th, Internet user's effect chain planning and configuration System Implementation, the data of the inside and outside association of Internet user's planning and configuration are crucial.The software of the inside and outside association of three minutes Internet user's planning and configuration, the data of the inside and outside association of seven minutes Internet user's planning and configuration, accomplish " three-arrive-place ": the data of the inside and outside association of Internet user's planning and configuration put in place, the training of the inside and outside association of Internet user's planning and configuration puts in place, and the examination of the inside and outside association of Internet user's planning and configuration puts in place; " guarantee for one ": the new-old system of guaranteeing the inside and outside association of Internet user's planning and configuration steadily is connected.

Claims (7)

1. independent claims---the ICT technical support design of Internet user's terminal planning and configuration functional module, that the applicant is setting up brand-new logical foundations, Fundamentals of Mathematics, on scientific basic and brand-new technical foundation and engineering foundation, for " cloud " counting system that flicker is indefinite is transformed into the Correspondent all things on earth, connect " world " counting system of longitude and latitude, centered by the Internet user, and then centered by global value Chain System (GVC), the connection that the Natural Intelligence and Artificial Intelligence of usining carries out based on computer and network thereof and coordinate the main line as general intelligence integrated system (IIS) Upgrade process, the new technology put forward by setting up network configuration dynamics basic model and normal form, this right is characterised in that:
A, for the ICT technical support of Internet user's terminal planning and configuration functional module, brand-new logical foundations comprises holographic Correspondent logic, the two poles of the earth Correspondent logic, the holographic Correspondent logic in the two poles of the earth; Brand-new Fundamentals of Mathematics comprise holographic Correspondent mathematics, the two poles of the earth Correspondent mathematics, system Analysis on Vicissitudes mathematics; Brand-new scientific basic comprises resource distribution dynamics, holographic organization synergetics, the system behavio(u)r theory of value, game coordination, the equilibrium economics that liquidates, holographic Correspondent physics, and the perforation science (interdisciplinary science and Cross science)---metasystem science and the intelligent integrated science that by the large comprehensive of a series of brand-new theories, are formed; Brand-new technical foundation is to take value chain system as core, towards the synergitic brand-new systems technology of holography (cluster); Brand-new engineering foundation is to take value chain system as core, towards the synergitic brand-new system engineering of holography (cluster);
B, ICT technical support for Internet user's terminal planning and configuration functional module, " world " calculating itself is an extremely complicated system, there is very complicated holographic joint management structure, here, on the one hand, various computers and infrastructure thereof, auxiliary device and the network equipment (comprise server, browser) (comprise ICC with holographic joint management pattern, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH) couple together and form the computer interconnected network tissue, on the other hand, various users and effect chain thereof couple together and form natural intelligence socialization tissue with holographic joint management pattern (comprising ICC, ICK, ICH, IDC, IDK, IDH, IMC, IMK, IMH, ECC, ECK, ECH, EDC, EDK, EDH, EMC, EMK, EMH), and this natural intelligence socialization tissue and computer interconnected network tissue form jointly according to described " world " counting system CS/HSN (GII) that described the present invention censures according to independent claims 1 of independent claims 1,
C, for the ICT technical support of Internet user's terminal planning and configuration functional module, set up the scientific basic of the holographic collaborative design of planning and configuration, and then set up kinetic model and the restriction condition of the collaborative design of user terminal planning and configuration;
D, for the ICT technical support of Internet user's terminal planning and configuration functional module, introduce suitable, for reflecting respectively general Complex Adaptive Systems basic motive, base load, basic effect, substantially consume, the various basic collaborative variablees of inner cooperation and competition and outside cooperation and competition, set up technical scheme and the evaluation method of the collaborative design of user terminal planning and configuration.
2. dependent claims---regard Internet user's terminal planning and configuration system as set that the chain by a kind of node by some (or variable number) and some (or variable number) is formed, has multiple level and various modes according to the described the present invention of independent claims 1, set up the software and hardware master-plan framework of Internet user effect chain planning operation, this right is characterised in that:
Ideally, PA/UEC only stores all data of each module of software of the inside and outside association of Internet user with a database, and these modules have:
The vertical associated department of Internet user
Internet user's raw material supply, the task configuration, quality control, the cost configuration, running, system engineering, operation flow, area of activities and scope, commission, service, trade connection and the center of calling are supported, derived product, derivative service
Vertical associated department between the Internet user
Raw material supply between the Internet user, the task configuration, quality control, the cost configuration, running, system engineering, operation flow, area of activities and scope, commission, service, trade connection and the center of calling are supported, derived product, derivative service
The horizontal associated department of Internet user
The Internet user's is auxiliary, corollary equipment, spare and accessory parts, outward appearance
Horizontal associated department between the Internet user
Assisting between the Internet user, corollary equipment, spare and accessory parts, outward appearance
Data warehouse
And the inside and outside rule designer of Internet user, system integrator, module generate business, ultimate consumer and social governor motion and various from service interface between relative both at home and abroad.
3. dependent claims---according to the described inventor of independent claims 1 using IU cognitive system (RS and computer aided system thereof) and IU practice system (PS and computer aided system thereof) connection and coordinate the main line as high-grade intelligent integrated system (HIIS) evolution process, set up the main functional modules of PA/UEC, this right is characterised in that:
PA/UEC with Internet user's effect chain market configuring technical MA/UEC together with Internet user's effect chain network configuring technical NA/UEC, formation makes up mutually, the relation of phase trans-substitution, jointly all resources of the inside and outside association of Internet user are carried out to the integration configuration, in brief, be that three of the inside and outside association of Internet user is flowed greatly---the configuration information system that logistics, cash flow, information flow carry out the entirely integrating configuration; The inside and outside correlation function module of its Internet user is to be different from the module of NA/IVC and ERP, it not only can be used for the configuration of the inside and outside association of Internet user, and also can import as the Internet user of some unproductive utilities MRP and the configuration that PA/UEC system is carried out the inside and outside association of Internet user the Internet user of many other types;
In the inside and outside association of Internet user, general configuration mainly comprises the content of three aspects:: (planning and implementation of the inside and outside association of Internet user), resource distribution (supply of the inside and outside association of Internet user and configuration) and funding arrangement (resource distribution accounting, finance configuration) are controlled in operation; This three large system itself is exactly conglomerate, between they are mutual, corresponding interface is arranged, and can be good at combining the Internet user is configured; In addition, want special one carry be, along with the reinforcement of Internet user to stakeholder's resource distribution, will have increasing PA/UEC manufacturer and the resource distribution of benefit community (DIM and SHF) be included in to an important component part of PA/UEC system.
4. dependent claims---for Internet user's terminal, according to independent claims 1, the described inventor sets up the kinetic model of user terminal planning and configuration collaborative design, and this right is characterised in that:
The load of Internet user's terminal planning and configuration tissue (or individual) is to consist of Internet user's terminal planning and configuration tissue (or individual) actual whole resources that directly operate under certain operation strength condition; On amount, we can be by the actual whole stock numbers that directly operated by main body Q M With certain operation intensity C MM Amass to calculate Internet user's terminal planning and configuration tissue (or individual) load; The load of Internet user's terminal planning and configuration tissue (or individual), can be regarded as by the configuration load of Internet user's terminal planning and configuration tissue (or individual) ( M M D ), conveying load ( M M C ), processing load ( M M E ) and the innovation load ( M M B ) common formation, that is:
M M M = M M M ( M M D , M M C , M M E , M M B )
= M M M ( C M D Q M D , C M C Q M C , C M E Q M E , C M B Q M B ) ( 2. 187 )
In formula, C M D , C M C , C M E With C M B Be respectively Internet user's terminal planning and configuration tissue (or individual's) configuration intensity, delivery intensity, processing intensity and innovation intensity, Q M D , Q M C , Q M E With Q M B Be respectively configuration amount, carrying capacity, processing capacity and the innovation amount of Internet user's terminal planning and configuration tissue (or individual) for resource;
For Internet user's terminal planning and configuration tissue (or individual), we can set up following load dynamical equation:
Figure 513882DEST_PATH_IMAGE002
Figure 241142DEST_PATH_IMAGE004
( 2. 188 )
In formula
L MM ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) load factor value;
ζ MM ( t) one by one tThe collaborative variable of the integrated all inscapes of Internet user's terminal intelligent in period;
Y MD ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) configuration load key element index set;
Y MC ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) transports load key element index set;
Y ME ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) machine load key element index set;
Y MB ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) innovation load key element index set;
l MM ()---about Y M D ( t), Y M C ( t), Y M E ( t) and Y M B ( t) nonlinear function;
M MN ( t)--- tThe natural resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M MS ( t)--- tThe social resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M ST ( t)--- tThe thinking resource load amount of Internet user's terminal planning and configuration tissue in period (or individual).
5. dependent claims---for Internet user's terminal, set up the dynamics restriction condition of user terminal planning and configuration collaborative design according to the described inventor of independent claims 1, this right is characterised in that:
The load of Internet user's terminal planning and configuration tissue (or individual) is to consist of Internet user's terminal planning and configuration tissue (or individual) actual whole resources that directly operate under certain operation strength condition; On amount, we can be by the actual whole stock numbers that directly operated by main body Q M With certain operation intensity C MM Amass to calculate Internet user's terminal planning and configuration tissue (or individual) load; The load of Internet user's terminal planning and configuration tissue (or individual), can be regarded as by the configuration load of Internet user's terminal planning and configuration tissue (or individual) ( M M D ), conveying load ( M M C ), processing load ( M M E ) and the innovation load ( M M B ) common formation, that is:
M M M = M M M ( M M D , M M C , M M E , M M B )
= M M M ( C M D Q M D , C M C Q M C , C M E Q M E , C M B Q M B ) ( 2. 187 )
In formula, C M D , C M C , C M E With C M B Be respectively Internet user's terminal planning and configuration tissue (or individual's) configuration intensity, delivery intensity, processing intensity and innovation intensity, Q M D , Q M C , Q M E With Q M B Be respectively configuration amount, carrying capacity, processing capacity and the innovation amount of Internet user's terminal planning and configuration tissue (or individual) for resource;
For Internet user's terminal planning and configuration tissue (or individual), we can set up following load dynamical equation:
Figure 833928DEST_PATH_IMAGE002
Figure 291455DEST_PATH_IMAGE004
( 2. 188 )
In formula
L MM ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) load factor value;
ζ MM ( t) one by one tThe collaborative variable of the integrated all inscapes of Internet user's terminal intelligent in period;
Y MD ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) configuration load key element index set;
Y MC ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) transports load key element index set;
Y ME ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) machine load key element index set;
Y MB ( t)--- tInternet user's terminal planning and configuration tissue in period (or individual) innovation load key element index set;
l MM ()---about Y M D ( t), Y M C ( t), Y M E ( t) and Y M B ( t) nonlinear function;
M MN ( t)--- tThe natural resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M MS ( t)--- tThe social resources load capacity of Internet user's terminal planning and configuration tissue in period (or individual);
M ST ( t)--- tThe thinking resource load amount of Internet user's terminal planning and configuration tissue in period (or individual).
6. dependent claims---for Internet user's terminal, introduce various basic collaborative variable suitable, for reflecting that respectively general Complex Adaptive Systems basic motive, base load, basic effect, consumption substantially, inside cooperation and competition and outside are cooperated and competed according to the described inventor of independent claims 1, set up the technical scheme of user terminal planning and configuration collaborative design, this right is characterised in that:
The configuration theory of PA/UEC
C1, embodiment are carried out the effectively thought of configuration to whole effect chain resource;
The thought of C2, the arrangement of embodiment benefit community, Simultaneous Engineering and the operation of camera choice type;
The thought of C3, embodiment advance planning and mid-event control;
The thought of C4, the configuration of embodiment delivery flow process, for improving competitive advantage, cooperative advantage and the coordination advantage of the inside and outside association of Internet user's effect chain, must bring the reform of the inside and outside associated delivery flow process of Internet user, and the use of the inside and outside interconnected system application program of Internet user also must the corresponding adjustment with the variation of delivery flow process;
Internet user's terminal intelligent integrated support system IGSS; Promote and put into practice quality or path optimizing is selection, people's one machine interactive system based on knowledge by the cognitive ability (Cognition Making Abilities) of expanding Internet user's terminal planning and configuration tissue (or individual); Here, people's one machine is the necessary condition of IGSS alternately, and at first the aim of system support is the cognitive ability (decision-making capability that comprises the policymaker) of expansion Internet user terminal planning and configuration tissue (or individual), rather than replace Internet user's terminal planning and configuration tissue (or individual) to make one's options; Obviously, IGSS is the expansion of IDSS;
Internet user's terminal planning and configuration tissue (or individual) GM; This is the end user (End User) of IGSS, is also the leading factor of Internet user's terminal intelligent integrating process; It need to use the cognitive miscellaneous function of IGSS, and the solution route of problem is had to idea, and Internet user's terminal intelligent support of computer is had to demand.
7. dependent claims---for Internet user's terminal, introduce various basic collaborative variable suitable, for reflecting that respectively general Complex Adaptive Systems basic motive, base load, basic effect, consumption substantially, inside cooperation and competition and outside are cooperated and competed according to the described inventor of independent claims 1, set up the evaluation method of Internet user's terminal planning and configuration collaborative design, this right is characterised in that:
In order to eliminate the order of magnitude impact different from dimension between the integrated variable of Internet user's terminal intelligent (index), make between integrated each variable of Internet user's terminal intelligent to have comparativity (the integrated attribute volume cording of Internet user's terminal intelligent has same tendency), the integrated variable of Internet user's terminal intelligent is carried out to standardized transformation, even
Wherein
Figure 239874DEST_PATH_IMAGE008
With
Figure 569224DEST_PATH_IMAGE010
Respectively jSample average and the standard deviation of the integrated variable of individual Internet user's terminal intelligent;
Figure 768124DEST_PATH_IMAGE012
( 3. 9. 77 )
Wherein
Figure 250052DEST_PATH_IMAGE014
Claim the standardization sample data matrix that (3. 9. 77) formula is intelligent holographic Correspondent system metrics;
For the integrated data matrix of standardized interconnections network users terminal intelligent with same tendency (3. 9. 77), our useable linear weighted comprehensive method metering comprehensive measurement value [34]-[40],
Figure 243416DEST_PATH_IMAGE016
( 3. 9. 78 )
Wherein , be pThe weight of the integrated attribute of Internet user's terminal intelligent, claim that (3. 9. 78) formula is intelligent holographic Correspondent system metrics value model;
The mathematical form of the Factor Analysis Model of intelligent holographic Correspondent system metrics attribute system is
Figure 629114DEST_PATH_IMAGE022
( 3. 9. 79 )
Claim X GE There is factor structure, wherein f GE , s GE For random vector, be respectively X GE Main gene and specific factor; AFor constant matrices, be called the factor loading matrix, and A=( a i j ) p* m There is statistical property: a i j Be x GE, i With f GE, j Coefficient correlation; Note For g 2 j , it means f GE, j Right XTotal impact of integrated each component of Internet user's terminal intelligent, be called f GE, j Variance contribution.
CN 201110341965 2011-11-03 2011-11-03 Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal Pending CN102938773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110341965 CN102938773A (en) 2011-11-03 2011-11-03 Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110341965 CN102938773A (en) 2011-11-03 2011-11-03 Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal

Publications (1)

Publication Number Publication Date
CN102938773A true CN102938773A (en) 2013-02-20

Family

ID=47697641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110341965 Pending CN102938773A (en) 2011-11-03 2011-11-03 Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal

Country Status (1)

Country Link
CN (1) CN102938773A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106662852A (en) * 2014-07-31 2017-05-10 三菱电机株式会社 Execution time estimation program and execution time estimation device
CN111260293A (en) * 2020-01-17 2020-06-09 Oppo(重庆)智能科技有限公司 Remote material matching method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106662852A (en) * 2014-07-31 2017-05-10 三菱电机株式会社 Execution time estimation program and execution time estimation device
CN106662852B (en) * 2014-07-31 2018-09-11 三菱电机株式会社 It executes time presumption method and executes time estimating device
CN111260293A (en) * 2020-01-17 2020-06-09 Oppo(重庆)智能科技有限公司 Remote material matching method and system

Similar Documents

Publication Publication Date Title
CN102938773A (en) Information and communications technology (ICT) technical support design for planning and configuring function module by internet user terminal
CN102938774A (en) Information and communications technology (ICT) technical support design for global value chain network configuration function module
CN102647439A (en) ICT (Integrated Computer Telemetry) network docking technology of enterprise value chain network configuration system
CN102739752A (en) Information communication technology (ICT)/network abutting technology of area value chain network configuration system
CN102624822A (en) ICT (information and communication technology) technical support design for providing functional module for regional value chain network configuration
CN103312742A (en) Information and communication technology (ICT) support design for Internet user terminal market allocation function module
CN102710694A (en) Enterprise value chain network allocation holographic butt balance list technology
CN103179141A (en) Information communication technology (ICT) support design of enterprise value chain network configuration function module
CN102882916A (en) Information and communication technology (ICT) support design of industrial value chain planning allocation function module
CN103188274A (en) ICT network connecting technology for Internet user terminal coordination configuration system
CN102624793A (en) ICT technical support design for providing functional module for global value chain market configuration
CN102710675A (en) Information and communication technology (ICT) support design for national value chain planning configuration function module
CN102651764A (en) Information communication technology (ICT) technical supporting design for functional module for planning and configuring value chain of enterprise
CN102638545A (en) ICT technical support design for national value chain market allocation functional module
CN102710683A (en) Information and communication technology (ICT) support design for regional value chain planning allocation function module
CN103078885A (en) ICT (Information and Communications Technology) network butt-joint technology of user terminal market configuration system of internet
CN102724241A (en) ICT technical support design of industrial value chain market allocation function module
CN102724236A (en) ICT technical support design for advantage comparison of internet user terminal market allocation
CN102638546A (en) Information communication technology (ICT) support design for national value chain network configuration functional module
CN102638520A (en) ICT technical support design for global value chain planning and configuration function module
CN102752347A (en) Information and communication technology (ICT) support design of area value chain market allocation function module
CN102801765A (en) ICT (Information Communication Technology) technology support design of enterprise value chain market configured functional module
CN103118041A (en) National value chain market allocation holographic hedging balance listing technology
CN102932394A (en) Internet user terminal configuration-coordinated holographic docking and balancing tabulation technology
CN102710705A (en) Information and communication technology (ICT) support design for comparing advantages of Internet user terminal planning configuration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130220