JP2002346626A - 引き抜きリングによるチューブ延伸方法及び延伸装置 - Google Patents
引き抜きリングによるチューブ延伸方法及び延伸装置Info
- Publication number
- JP2002346626A JP2002346626A JP2002065495A JP2002065495A JP2002346626A JP 2002346626 A JP2002346626 A JP 2002346626A JP 2002065495 A JP2002065495 A JP 2002065495A JP 2002065495 A JP2002065495 A JP 2002065495A JP 2002346626 A JP2002346626 A JP 2002346626A
- Authority
- JP
- Japan
- Prior art keywords
- tube
- mandrel
- stretching
- ring
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 238000000605 extraction Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000007704 transition Effects 0.000 description 2
- 101100321669 Fagopyrum esculentum FA02 gene Proteins 0.000 description 1
- 230000004323 axial length Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004898 kneading Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K21/00—Making hollow articles not covered by a single preceding sub-group
- B21K21/08—Shaping hollow articles with different cross-section in longitudinal direction, e.g. nozzles, spark-plugs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K1/00—Making machine elements
- B21K1/06—Making machine elements axles or shafts
- B21K1/12—Making machine elements axles or shafts of specially-shaped cross-section
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C1/00—Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
- B21C1/16—Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
- B21C1/18—Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes from stock of limited length
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C1/00—Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
- B21C1/16—Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
- B21C1/22—Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles
- B21C1/24—Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles by means of mandrels
- B21C1/26—Push-bench drawing
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Extraction Processes (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Abstract
サイクル時間を達成するためのより有効な方法を提供す
ることにある。 【解決手段】 チューブ(10)を引き延ばすとき、引
っ張り力が有効引き抜きリング断面をすでに通過して引
き延ばされたチューブ部分(22)に加えられ、そして
圧力が前記有効引き抜きリング断面をまだ通過してない
チューブブランク部分(11)に加えられ、前記引っ張
り力が前記チューブに位置決めされかつ形状嵌合または
力錠止方法において前方チューブ端に接続されるマンド
レル(16)によって加えられている、引き抜きリング
(13)によってチューブ(10)を引き延ばす方法。
Description
るチューブを引き延ばすためのチューブ延伸方法および
チューブ延伸装置に関する。
方向減少において異なる1部片(組み立てられない)管
状部材が必要である場合に使用される。かかる用途は、
より薄い壁厚を備えたより長い中央部分およびより厚い
壁厚かつ同時により小さい外径を備えた2つの端部分を
含んでいる、例えば、いわゆる単一ブロック中間軸であ
る。かかる軸を製造するために、真っ直ぐな筒状ブラン
クにより開始し、すなわち、その簡単な管状部分は、ま
ず、前方端が第1のチューブ端を形成するために減少さ
れ、次いで、より薄い壁厚を備えた中央部分を製造する
ためにマンドレル上でチューブ長さの大部分を引き延ば
しかつ最後に第2のチューブ端を製造するために後方
の、引き延ばされないチューブ端を減少することが慣例
である。(ドイツ連邦共和国特許第3506220A1
号)。
の後方端から挿入され、このマンドレルが管状部材を内
側から支持し、かつマンドレルの前方端が、内側で、管
状部材の減少された端部分に対して載置するような方法
において行われる。
にマンドレルは、その場合に、引き抜きリングを通って
押される。管状部材の内径は支持される一方、外径は減
少され、チューブは同時に引き抜きリングの有効断面を
通過するとき引き延ばされる。前記過程の開始から、減
少されたチューブ部分は引っ張り力を受け、前記引っ張
り力は変形の程度が大きければ大きいほど、すなわち、
一方で直径の変化が大きければ大きいほどかつ他方で送
給速度が大きければ大きいほど高い。
は変形の間中のより短いサイクル時間を達成するため
に、上述した方法をより有効にもたらすことにある。
ューブを引き延ばすとき、引っ張り力が有効引き抜きリ
ング断面をすでに通過して引き延ばされたチューブ部分
に加えられ、圧力が前記有効引き抜きリング断面をまだ
通過してないチューブブランク部分に加えられ、 そし
て、前記引っ張り力が前記チューブに位置決めされかつ
形状嵌合または力錠止方法においてチューブ前方端に接
続されるマンドレルによって加えられることによって達
成される。
が首部の両側に同時に作用するため引き抜きリング首部
においてチューブに作用している力を減少することがで
きる。一定の変形量により、したがって、引き延ばされ
たチューブがマンドレルによって加えられた引っ張り力
の結果として裂けるのは不可能である。これに反して、
臨界の引っ張り力が達成される前に変形量をかなり増加
することができる。最大引っ張り力は、幾つかの安全策
を観察しながら、引き延ばされた部分の引き裂き力の値
以下である値に制限されるべきである。
ために、チューブ端用の特別な締め付け装置を設けるこ
とができるか、または引っ張りロッドがチューブ端に一
時的に溶接され得る。
に、好ましくは、その断面がチューブの断面に対応しか
つチューブに同軸に取着されるスリーブが使用される。
送給速度はチューブの後方端の送給速度より大きいよう
に設定されるべきである。とくに、一定の速度比を観察
することが重要である。所定の速度比はマンドレルおよ
びスリーブ用の送給シリンダを適宜に制御することによ
って達成される。
さらに他の好適な方法によれば、チューブの前方部分が
引き延ばされる前に減少され;前記前方部分が力のない
方法において引き抜きリングに通されることができる。
めのさらに他の援助を必要とすることなくチューブの減
少された前方部分に対して内側で載置するようになるこ
とができる。
再び、中間軸の製造に関連して、チューブの前方部分
は、まず、それが引き抜きリングを通って案内されない
ことによって引き延ばされないままであり、チューブの
後方部分はこのチューブが引き抜きリングから撤退され
た後かつ取り外された後減少される。前方部分および後
方部分はより小さい断面を有する種々の工具を使用する
引き抜き方法によって減少される。
丸い打ち出し(ラウンドハンマリング)/丸い練り上げ
(ラウンドニーディング)を使用することによって軸歯
を直接備えることができる。
ブの内径にほぼ対応するマンドレル、および内径が前記
チューブの外径より小さくかつ前記マンドレルの外径よ
り大きい引き抜きリング、ならびに前記マンドレル上に
同軸に案内されるスリーブを含んでおり、そのさい前記
マンドレルが前記スリーブより速い速度で前方に向かっ
て動かされることによって達成される。スリーブは第1
の送給シリンダにかつマンドレルは前記第1の送給シリ
ンダに案内される第2の送給シリンダに接続され得る。
この装置の運転モードはすでに上述されている。
よび本方法を実施するための装置を以下で同封の図面に
基づいて説明する。
方に減少された端部分12を備えたチューブ10を示し
ており、その端部分12は首部14を含んでいる引き抜
きリング13に導入されている。チューブ10の外方円
錐肩部分15はブランク部分11から減少された端部分
12への遷移領域において前記首部14に対して当接し
ている。チューブ10にはマンドレル16が挿入され、
このマンドレルの円錐点17は、ブランク部分11が前
方で減少された端部分12に変化する領域においてチュ
ーブ10の内方円錐肩部分18に対して載置している。
面20が後方チューブ端に対して載置するスリーブ19
がマンドレル16で摺動する。第1の力F1 9 がスリー
ブ19に加えられかつ同一方向に作用している力F1 6
がマンドレル16に加えられ、前記両方の力は引き抜き
リング13に向かって作用している。力F1 9 は圧力の
形でブランク部分11に作用しかつ力F1 6 はブランク
部分11と減少された端部分12との間の遷移の領域に
作用し、引き抜きリング13によって加えられる首部1
4での対抗力が前記圧力に対して作用している。
を備えたチューブ10はすでに引き抜きリング13を通
って首部14を部分的に通って押され、かつ引き延ばさ
れた部分22がチューブ10に形成されている。スリー
ブ19に作用している力F19が減少されないブランク部
分11に圧力の形で作用し続け、その力は首部14にお
いて引き抜きリング13によって加えられた対抗力によ
って半体に作用され、力F1 6 は、引っ張り力の形にお
いて、マンドレル点17および内方円錐肩部18を介し
て、チューブ10の既に減少された、引き延ばされた部
分22に作用している。マンドレル16およびスリーブ
19の変化された相対的な位置から見ることができるよ
うに、前方チューブ端は減少されないブランク部分11
より速い送給速度を含んでいる。
れた部分22’は所定の長さが付与されかつ軸方向長さ
が以前に減少された第1のチューブ部分12の長さにほ
ぼ対応する短い、減少されないブランク部分11’が残
っている。マンドレルはすでにチューブ10から撤退さ
れかつ減少された、引き延ばされた部分22’が引き抜
きリングから後方に放出される。
が第1の端部分12と同一の形状の第2の減少された端
部分23に形成されていることを示しており、これに反
して減少された、引き延ばされた部分22’はその以前
の長さを維持している。仕上げられた製品は中間軸であ
り、かつ適宜な減少工具が使用されるならば、軸の歯が
この段階においてすでに端部分12および23に設けら
れ得る。両チューブ端において、端部分の減少は引き出
しによって達成され得る。しかしながら、減少された、
引き延ばされた部分12が減少された曲げ強さを含むと
いう事実に鑑みて、半径方向の丸い打ち延ばしが、少な
くとも第2の端部分23を製造するのにより好都合であ
る。
よって受容される上方パンチ32(図5a)および下方
パンチ31(図5b)からなっている装置を示してい
る。ダイ保持装置33およびこれにボルト止めされた工
具案内手段34が下方パンチ31に固定されている。ダ
イ保持装置33と工具案内手段34との間には、引き抜
きリング13が位置決めされている。図1の形状と同じ
形状の減少された端部分を備えたチューブ10が工具案
内手段34および引き抜きリング13に挿入されてい
る。スリーブ19は油圧シリンダの形において設けられ
得る上方パンチ32に工具保持装置35を介してボルト
止めされている。上方パンチ32には、スリーブ19を
貫通するマンドレル16が固定されるシリンダ36が設
けられる。工具32および36が配置される方法はシリ
ンダ内シリンダ構体に対応している。上方パンチ32
は、その工具、すなわち、マンドレル16およびスリー
ブ19とともに、下方パンチ31上に降下されることが
できかつマンドレル16はスリーブ19の速度に対して
増加された速度においてチューブ内で前方に向かって動
かされ得る。
の通りである。 1. 引き抜きリング(13)によってチューブ(1
0)を引き延ばすためのチューブ延伸方法において、前
記チューブを引き延ばすとき、引っ張り力が有効引き抜
きリング断面をすでに通過して引き延ばされたチューブ
部分(22)に加えられ、圧力が前記有効引き抜きリン
グ断面をまだ通過してないチューブブランク部分(1
1)に加えられ、そして、前記引っ張り力が前記チュー
ブに位置決めされかつ形状嵌合または力錠止方法におい
てチューブ前方端に接続されるマンドレル(16)によ
って加えられることを特徴とするチューブ延伸方法。 2. 前記圧力が後方チューブ端に接続されるスリーブ
(19)によって加えられることを特徴とする前記第1
項に記載のチューブ延伸方法。 3. 前記チューブ(10)の前方部分(12)の送給
速度が前記チューブ(10)の後方部分(21)の送給
速度より速いことを特徴とする上記第1項または第2項
に記載のチューブ延伸方法。 4. 前記チューブ(10)の前方部分(12)が、前
記チューブが引き延ばされる前に減少されることを特徴
とする上記第1〜3項の何れか1項に記載のチューブ延
伸方法。 5. 前記マンドレル(16)の前方端(17)が、内
側で、前記チューブ(10)の減少された前方部分(1
2)に対して載置されることを特徴とする上記第4項に
記載のチューブ延伸方法。 6. 前記チューブ(10)の後方部分(21)が前記
引き抜きリング(13)を通って案内されずかつ前記後
方部分(21)が前記マンドレル(16)が取り除かれ
た後減少されることによって引き延ばされないまま残る
ことを特徴とする上記第1〜5項の何れか1項に記載の
チューブ延伸方法。 7. 前記前方部分(12)および/または前記後方部
分(23)が引き出されていることによって減少される
ことを特徴とする上記第4〜6項の何れか1項に記載の
チューブ延伸方法。 8. 前記前方部分(12)および/または前記後方部
分(23)が丸く打ち延ばすことによって減少されるこ
とを特徴とする上記第4〜6項の何れか1項に記載のチ
ューブ延伸方法。 9. 減少されながら、前記前方部分(512)および
/または前記後方部分(23)がスプラインを備えるこ
とを特徴とする上記第7項または第8項に記載の引き抜
きリングによるチューブ延伸方法。 10.引き抜きリング(13)によってチューブ(1
0)を引き延ばすためのチューブ延伸装置において、外
径が前記チューブの内径にほぼ対応するマンドレル(1
6)、および内径が前記チューブの外径より小さくかつ
前記マンドレルの外径より大きい引き抜きリング(1
3)、ならびに前記マンドレル上に同軸に案内されるス
リーブ(19)を含んでおり、そのさい前記マンドレル
が前記スリーブより速い速度で前方に向かって動かされ
ることを特徴とするチューブ延伸装置。 11.前記スリーブ(19)が第1の送給シリンダ(3
2)に接続されかつ前記マンドレル(16)が前記第1
の送給シリンダ(32)に案内される第2の送給シリン
ダ(36)に接続されることを特徴とする上記第10項
に記載されたチューブ延伸装置。
グによってチューブを引き延ばすための、引き抜きリン
グによるチューブ引き延ばし方法において、前記チュー
ブを引き延ばすとき、引っ張り力が有効引き抜きリング
断面をすでに通過して引き延ばされたチューブ部分に加
えられ、そして圧力が前記有効引き抜きリング断面をま
だ通過してないチューブブランク部分に加えられ、前記
引っ張り力が前記チューブに位置決めされかつ形状嵌合
または力錠止方法において前方チューブ端に接続される
マンドレルによって加えられている構成としたので、工
具のより長い寿命または変形中のより短いサイクル時間
を達成するためのより有効な方法をもたらす引き抜きリ
ングによるチューブ引き延ばし方法を提供することがで
きる。
でに減少されているブランクを示す断面図である。
を示す断面図である。
を示す断面図である。
によるチューブを示す断面図である。
スリーブ)を示す概略断面図である。
よる挿入の下方工具(引き抜きリング)を示す概略断面
図である。
Claims (2)
- 【請求項1】 引き抜きリング(13)によってチュー
ブ(10)を引き延ばすためのチューブ延伸方法におい
て、 前記チューブを引き延ばすとき、引っ張り力が有効引き
抜きリング断面をすでに通過して引き延ばされたチュー
ブ部分(22)に加えられ、 圧力が前記有効引き抜きリング断面をまだ通過してない
チューブブランク部分(11)に加えられ、 そして、前記引っ張り力が前記チューブに位置決めされ
かつ形状嵌合または力錠止方法においてチューブ前方端
に接続されるマンドレル(16)によって加えられるこ
とを特徴とするチューブ延伸方法。 - 【請求項2】 引き抜きリング(13)によってチュー
ブ(10)を引き延ばすためのチューブ延伸装置におい
て、 外径が前記チューブの内径にほぼ対応するマンドレル
(16)、および内径が前記チューブの外径より小さく
かつ前記マンドレルの外径より大きい引き抜きリング
(13)、ならびに前記マンドレル上に同軸に案内され
るスリーブ(19)を含んでおり、そのさい前記マンド
レルが前記スリーブより速い速度で前方に向かって動か
されることを特徴とするチューブ延伸装置。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10118032.2 | 2001-04-11 | ||
DE10118032A DE10118032B4 (de) | 2001-04-11 | 2001-04-11 | Verfahren zum Abstrecken eines Rohres mittels eines Ziehringes |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2002346626A true JP2002346626A (ja) | 2002-12-03 |
JP3893297B2 JP3893297B2 (ja) | 2007-03-14 |
Family
ID=7681193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002065495A Expired - Fee Related JP3893297B2 (ja) | 2001-04-11 | 2002-03-11 | 引き抜きリングによるチューブ延伸方法及び延伸装置 |
Country Status (4)
Country | Link |
---|---|
US (1) | US6837091B2 (ja) |
JP (1) | JP3893297B2 (ja) |
KR (1) | KR100495597B1 (ja) |
DE (2) | DE10118032B4 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010504213A (ja) * | 2006-09-22 | 2010-02-12 | ジーケイエヌ ドライヴライン インターナショナル ゲゼルシャフト ミット ベシュレンクテル ハフツング | 中空部材の成形方法 |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7025686B1 (en) * | 2003-06-04 | 2006-04-11 | Torque-Traction Technologies, Inc. | Axially collapsible driveshaft assembly |
DE102004001141B4 (de) * | 2004-01-07 | 2006-07-13 | Gkn Driveline International Gmbh | Verfahren zur Herstellung von Wellenzapfen und zur Herstellung einer gebauten Welle |
DE102004039967B4 (de) * | 2004-08-18 | 2006-10-12 | Gkn Driveline International Gmbh | Verfahren zum Rückwärtsfließpressen von Innenprofilen |
DE102004056147B3 (de) * | 2004-11-20 | 2006-08-03 | Gkn Driveline International Gmbh | Reduzieren von Rohren über einem abgesetzten Dorn zur Herstellung von Hohlwellen mit Hinterschnitt in einer Operation |
US20060112558A1 (en) * | 2004-11-29 | 2006-06-01 | Crs Holdings, Inc. | Process of making variable wall thickness tubing |
CN101754820B (zh) * | 2007-06-29 | 2012-12-12 | Gkn动力传动系统国际有限责任公司 | 用于细长的空心件的轴向成形的装置和方法 |
KR100964882B1 (ko) * | 2008-01-31 | 2010-06-23 | 주식회사 코우 | 조향장치용 어퍼샤프트 가공방법 |
AT507273B1 (de) * | 2008-09-14 | 2014-03-15 | Sms Meer Gmbh | Gradausziehmaschine und verfahren zum gradausziehen eines werkstückes |
KR101040411B1 (ko) | 2009-04-03 | 2011-06-09 | 현대하이스코 주식회사 | 카울크로스바용 일체형 파이프 및 그 제조방법 |
KR100949449B1 (ko) | 2009-07-07 | 2010-03-29 | 삼원산업 주식회사 | 자동차용 가변직경형 카울크로스바 제조장치 및 그 방법 |
WO2014067581A1 (de) * | 2012-11-02 | 2014-05-08 | Schmittergroup Ag | Verfahren zur herstellung unterschiedlicher wanddicken eines behälterrohres |
DE102013206577A1 (de) * | 2013-04-12 | 2014-10-16 | Peri Gmbh | Verfahren zur Festigung und Kalibrierung eines Rohrabschnittes |
KR102062076B1 (ko) * | 2016-03-11 | 2020-01-03 | 닛폰세이테츠 가부시키가이샤 | 두께가 상이한 강관의 제조 방법 및 두께가 상이한 강관 |
US10850584B2 (en) | 2016-06-07 | 2020-12-01 | Beijingwest Industries Co., Ltd. | Damper housing and a method for manufacturing the damper housing |
DE102017114509A1 (de) * | 2017-06-29 | 2019-01-03 | Federal-Mogul Valvetrain Gmbh | Hohlraumventil mit optimierter Schaftinnengeometrie und Verfahren zu dessen Herstellung |
DE102017114524A1 (de) | 2017-06-29 | 2019-01-03 | Federal-Mogul Valvetrain Gmbh | Verfahren zur Herstellung von Hohlraumventilen |
CN112570488B (zh) * | 2020-12-21 | 2022-06-10 | 燕山大学 | 中小型胀压成形汽车桥壳用阶梯形管坯的旋压-缩径成形方法 |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA573431A (en) * | 1959-04-07 | H. Appel Gerhard | Mandrel | |
US441927A (en) * | 1890-12-02 | Machine foe cold dba wing metallic pipe | ||
US2270398A (en) * | 1939-04-06 | 1942-01-20 | Westin Sven | Method of reducing metal tubing |
US2886170A (en) * | 1943-06-08 | 1959-05-12 | Wallace E Kerr | Method of drawing tubes |
US2597500A (en) * | 1948-04-28 | 1952-05-20 | Wallace E Kerr | Apparatus for drawing elongated metal objects |
AT305734B (de) * | 1971-05-06 | 1973-03-12 | Gfm Gesselschaft Fuer Fertigun | Schmiedemaschine zum Innenprofilieren rohrförmiger Werkstücke |
SU835555A1 (ru) * | 1979-08-08 | 1981-06-07 | Denisov Petr S | Устройство дл проталкивани по-лОй зАгОТОВКи B пРОфильНую ВОлОКу |
JPS58151915A (ja) * | 1982-03-05 | 1983-09-09 | Sumitomo Metal Ind Ltd | 両管端アプセツト管の製造方法 |
DE3437123A1 (de) * | 1984-10-10 | 1986-04-10 | Edmund Dipl.-Ing. 6100 Darmstadt Böhm | Verfahren und umformwerkzeug zum gleichlauf-weiterziehen von napffoermigen werkstuecken |
DE3506220A1 (de) * | 1985-02-22 | 1986-08-28 | Laeis GmbH, 5500 Trier | Verfahren zum herstellen von rohren mit dickwandigen enden durch kaltumformen eines rohrfoermigen rohlings |
US4616500A (en) * | 1985-02-25 | 1986-10-14 | George A. Mitchell Company | Method for producing tubing of varying wall thickness |
JPS63235015A (ja) * | 1987-03-20 | 1988-09-30 | Sumitomo Metal Ind Ltd | 段付材の製造方法及びその実施に使用するダイス |
US5327756A (en) * | 1991-12-31 | 1994-07-12 | Fox Francis J | Method and apparatus for forming spiral grooves internally in metal tubing |
US5522246A (en) * | 1995-04-19 | 1996-06-04 | U.S. Manufacturing Corporation | Process for forming light-weight tublar axles |
DE19723795A1 (de) * | 1997-06-06 | 1998-12-10 | Manfred Dr Ing Jansen | Einteilige Stoßdämpferrohre mit und ohne Boden sowie Verfahren zu ihrer Herstellung |
-
2001
- 2001-04-11 DE DE10118032A patent/DE10118032B4/de not_active Expired - Fee Related
- 2001-04-11 DE DE20122516U patent/DE20122516U1/de not_active Expired - Lifetime
-
2002
- 2002-03-11 JP JP2002065495A patent/JP3893297B2/ja not_active Expired - Fee Related
- 2002-04-08 KR KR10-2002-0018850A patent/KR100495597B1/ko not_active IP Right Cessation
- 2002-04-09 US US10/118,781 patent/US6837091B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010504213A (ja) * | 2006-09-22 | 2010-02-12 | ジーケイエヌ ドライヴライン インターナショナル ゲゼルシャフト ミット ベシュレンクテル ハフツング | 中空部材の成形方法 |
Also Published As
Publication number | Publication date |
---|---|
KR100495597B1 (ko) | 2005-06-16 |
US20020170331A1 (en) | 2002-11-21 |
US6837091B2 (en) | 2005-01-04 |
JP3893297B2 (ja) | 2007-03-14 |
DE10118032A1 (de) | 2002-10-24 |
DE20122516U1 (de) | 2005-12-29 |
KR20020080253A (ko) | 2002-10-23 |
DE10118032B4 (de) | 2006-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2002346626A (ja) | 引き抜きリングによるチューブ延伸方法及び延伸装置 | |
US5460026A (en) | Method of and apparatus for the cutting of an opening in a hollow body | |
US4928507A (en) | Methods and apparatus for manufacturing seamless tube | |
WO2008022715A1 (de) | Vorrichtung und verfahren zum herstellen eines hohlkörpers aus einem rondenförmigen werkstück | |
US4577481A (en) | Process for production of seamless tube and apparatus for processing seamless tube | |
EP1500443A1 (en) | Hollow stepped shaft and method of forming the same | |
US5490408A (en) | Method of and apparatus for extruding a billet of a light metal alloy | |
CZ286337B6 (cs) | Způsob výroby kovového pouzdra | |
EP3713690B1 (en) | Manufacturing method for hollow rack bar | |
JP5430159B2 (ja) | 異径鋼管の製造方法 | |
JPH07148516A (ja) | 後続のカスケード引抜のために厚肉の管ブランクを前処理する方法 | |
JP4914356B2 (ja) | 内側異形部を後方押出し加工するための方法 | |
JP2010179319A (ja) | 異径鋼管の製造方法 | |
US2063689A (en) | Manufacture of tubes | |
KR101030262B1 (ko) | 강관의 확관 성형 방법 및 강관의 확관 성형 장치 | |
US6807837B1 (en) | Method and apparatus for producing variable wall thickness tubes and hollow shafts | |
US5467631A (en) | Method for manufacturing a plug-type chamber used in the cascade drawing of tubes, and device for implementing the method | |
JP3633281B2 (ja) | 金属管の押出製造方法 | |
JPH10192965A (ja) | 車体構造用筒状部材の製造方法 | |
KR20180104204A (ko) | 드라이브 샤프트의 제조 방법 | |
RU2113302C1 (ru) | Способ получения толстостенных труб сложного внутреннего профиля волочением и устройство для его осуществления | |
SU1637894A1 (ru) | Способ волочени труб на короткой оправке | |
US1981930A (en) | Manufacture of tubes by the push bench process | |
CN117794657A (zh) | 通过改形空心体来减小管状的空心体的横截面的设备和方法 | |
JPH01266914A (ja) | 膨出円筒体付管材のつば出しと段差とを一工程で成形する方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050506 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050804 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060222 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20060324 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20060522 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20060525 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060822 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061004 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061020 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061122 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061211 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091215 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101215 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111215 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121215 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121215 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131215 Year of fee payment: 7 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |