JP2002167757A - Execution method of foundation pile - Google Patents

Execution method of foundation pile

Info

Publication number
JP2002167757A
JP2002167757A JP2000369559A JP2000369559A JP2002167757A JP 2002167757 A JP2002167757 A JP 2002167757A JP 2000369559 A JP2000369559 A JP 2000369559A JP 2000369559 A JP2000369559 A JP 2000369559A JP 2002167757 A JP2002167757 A JP 2002167757A
Authority
JP
Japan
Prior art keywords
foundation pile
head
enlarged
ground
excavating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000369559A
Other languages
Japanese (ja)
Other versions
JP4523716B2 (en
Inventor
Taisuke Uematsu
泰右 植松
Yasuhiko Sugiyama
康彦 杉山
Takahiro Hayashi
隆浩 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyo Asano Foundation Co Ltd
Original Assignee
Toyo Asano Foundation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Asano Foundation Co Ltd filed Critical Toyo Asano Foundation Co Ltd
Priority to JP2000369559A priority Critical patent/JP4523716B2/en
Publication of JP2002167757A publication Critical patent/JP2002167757A/en
Application granted granted Critical
Publication of JP4523716B2 publication Critical patent/JP4523716B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an execution method of a foundation pile for wholly eliminating surplus soil discharged on the ground, and remarkably enhancing bearing power of the foundation pile. SOLUTION: In this execution method of the foundation pile, a screw blade 3 is projected on an outer peripheral surface, an expanding excavating head 2 having a pair of opening windows 4 bored in an outer peripheral wall is arranged on the lower end of the foundation pile 1, an agitating rod 5 having a pair of span expanding claws 7 expandably installed in a lower part is inserted into the foundation pile 1 and the expanding excavating head 2, span expanding claws 6 are inserted into the opening windows 4 of the expanding excavating head 2, the expanding excavating head 2 is connected to the agitating rod 5, boring is advanced in the ground while rotating the agitating rod 5 and the expanding excavating head 2, most of excavating earth excavated by the screw blade 3 is compacted to the inner periphery of an excavating hole 13, a small quantity of residual surplus soil is housed in a hollow part between the expanding excavating head 2 and the foundation pipe 1, and the foundation pile 1 and the expanding excavating head 2 are buried in the ground.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する利用分野】本発明は、基礎杭を地中に埋
設する施工方法に係り、特に、地中を掘削すると共に掘
削土の大半を掘削穴の周りに圧密することが出来、かつ
基礎杭に大きな支持力を付与し得る拡大掘削ヘッドと共
に基礎杭を地中に埋設することが出来る基礎杭の施工方
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for burying a foundation pile in the ground, and more particularly to a method for excavating the ground and consolidating most of the excavated soil around a drilled hole. The present invention relates to a method for constructing a foundation pile capable of burying a foundation pile in the ground together with an enlarged excavation head capable of providing a large bearing capacity to the pile.

【0002】[0002]

【従来の技術】従来のこの種の基礎杭の施工方法として
は、一般的に無振動と無騒音に優れた中堀工法或は外堀
工法が実施されていた。
2. Description of the Related Art As a conventional method of constructing a foundation pile of this kind, a middle moat method or an outer moat method, which is excellent in no vibration and no noise, has been generally carried out.

【0003】これ等の中堀工法及び外堀工法は共に、地
中を掘削して掘削土を地上に排土しながら基礎杭を地中
に埋設する施工法であるために、施工に伴って地上に排
出される土の量が多く、これ等の排土は産業廃棄物とな
るので、その処理が大変であると共に、捨場の確保が難
しく大きな社会問題になっていた。
[0003] Since both the middle and outer excavation methods are construction methods in which the foundation pile is buried in the ground while excavating the ground and excavating the excavated soil on the ground, Since a large amount of soil is discharged, and such soil is turned into industrial waste, it is difficult to dispose of it, and it is difficult to secure a dump site, which has become a major social problem.

【0004】さらに、これ等の中堀工法及び外堀工法で
は、基礎杭の先端にヘッド等を取付けることが出来ない
ので、基礎杭に大きな支持力を得ることが困難である問
題もあった。
[0004] Furthermore, in these middle and outer moat methods, there is a problem that it is difficult to obtain a large supporting force on the basic pile because a head or the like cannot be attached to the tip of the basic pile.

【0005】前述の従来の中堀工法及び外堀工法の欠点
を改善するために、最近になって鋼管杭を使用し、この
鋼管杭を回転させながら地中に埋設する鋼管杭の回転埋
設施工法が実用化されるようになって来た。
[0005] In order to improve the drawbacks of the above-mentioned conventional middle and outer excavation methods, recently a method of rotating and burying steel pipe piles using a steel pipe pile and burying the steel pipe pile in the ground while rotating the steel pipe pile has been proposed. It has come to practical use.

【0006】[0006]

【発明が解決しようとする課題】然るに、この鋼管杭の
回転埋設施工法は、鋼管杭の頭部をチャックして鋼管杭
を回転させながら鋼管杭自体を地中に掘進して埋設する
施工法であるため、地上に排出される掘削土はなく、従
って前述の中堀工法及び外堀工法の問題を全て解決する
ことが出来る得点はあるが、一方で次のような問題点が
生じていた。
However, this method of rotating and burying steel pipe piles is a method of digging and embedding steel pipe piles in the ground while chucking the head of the steel pipe piles and rotating the steel pipe piles. Therefore, there is no excavated soil discharged to the ground. Therefore, there is a score that can solve all the problems of the above-mentioned middle moat method and outer moat method, but on the other hand, the following problems have occurred.

【0007】即ち、前述の鋼管杭の回転埋設施工法は、
鋼管杭の頭部をチャックして大きな力を掛けて鋼管杭を
強制的に回転させるために、鋼管杭にネジレが生じ、最
終的には鋼管杭が破損したり或は損傷が発生する問題が
あった。また、鋼管杭の施工に際しては、鋼管杭を掘進
させる時に排土がないため、地盤抵抗が極めて大きく、
従って鋼管杭の回転埋設による反力が大きくなり、必要
以上に大型の施工機械を使用しなければ施工が出来なく
なる問題もあった。
[0007] That is, the above-mentioned method of rotating and burying steel pipe piles is as follows.
Since the head of the steel pipe pile is chucked and a large force is applied to forcibly rotate the steel pipe pile, the steel pipe pile may be twisted, and eventually the steel pipe pile may be damaged or damaged. there were. In addition, when constructing steel pipe piles, there is no earth removal when excavating the steel pipe piles, so the ground resistance is extremely large,
Therefore, the reaction force due to the rotary burial of the steel pipe pile is increased, and there is also a problem that the construction cannot be performed unless an unnecessarily large construction machine is used.

【0008】本発明に係る基礎杭の施工方法は、前述の
従来の多くの問題点に鑑み開発された全く新しい技術で
あって、特に外周面にスクリュー刃を突設した基礎杭の
外径より大きな外径を有する拡大掘削ヘッド上に基礎杭
を乗せ、撹拌ロッドで拡大掘削ヘッドを回転させて地中
を掘削しながら掘削土の大半を穴の周面に圧密すると共
に、その圧密した後の残土を該拡大掘削ヘッドと基礎杭
の中空部内に収納して、拡大掘削ヘッドと共に基礎杭を
地中に埋設することが出来る全く新しい基礎杭の施工方
法の技術を提供するものである。
The method for constructing a foundation pile according to the present invention is a completely new technique developed in view of the above-mentioned many problems in the prior art. Place the foundation pile on the enlarged excavation head with a large outer diameter, rotate the enlarged excavation head with a stirring rod, excavate the ground and consolidate most of the excavated soil to the peripheral surface of the hole, and after the consolidation It is an object of the present invention to provide a completely new foundation pile construction method capable of storing the remaining soil in the hollow portion of the enlarged excavation head and the foundation pile and burying the foundation pile together with the enlarged excavation head.

【0009】[0009]

【課題を解決するための手段】本発明の係る基礎杭の施
工方法は、前述の従来の基礎杭の施工方法の問題点を根
本的に改善した発明であって、その第1発明の要旨は、
基礎杭の外径の1.5〜2.5倍の外径を有し、かつ外
周面にスクリュー刃を突設した拡大掘削ヘッド上に該基
礎杭を戴置し、かつ該基礎杭の中空部に挿入した撹拌ロ
ッドを前記拡大掘削ヘッドに接続した後で、該撹拌ロッ
ドを介して前記拡大掘削ヘッドを回転させて地中を掘削
しながら前記スクリュー刃で掘削土を掘削穴の周面に圧
密し、かつ残った少量の残土を該拡大掘削ヘッドと基礎
杭との中空部に収納し、拡大掘削ヘッドと共に基礎杭を
地中に埋設することを特徴とした基礎杭の施工方法であ
る。
SUMMARY OF THE INVENTION The method for constructing a foundation pile according to the present invention is an invention which fundamentally improves on the problems of the conventional method for constructing a foundation pile described above, and the gist of the first invention is as follows. ,
Placing the foundation pile on an enlarged excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile and projecting a screw blade on the outer peripheral surface, and hollowing the foundation pile After connecting the stirring rod inserted into the section to the enlarged excavation head, the excavated soil is drilled on the peripheral surface of the excavation hole with the screw blade while excavating underground by rotating the enlarged excavation head via the stirring rod. A method for constructing a foundation pile, comprising compacting and storing a small amount of remaining soil in a hollow portion between the enlarged excavation head and the foundation pile, and burying the foundation pile together with the enlarged excavation head in the ground.

【0010】前述の第1発明に係る基礎杭の施工方法
は、基礎杭の下方にこの基礎杭の外径の1.5〜2.5
倍の外径を有する拡大掘削ヘッドを接続した状態で地中
に埋設するので、前記基礎杭に大きな支持力を付与する
ことが出来る。
The method for constructing a foundation pile according to the first aspect of the present invention is characterized in that the foundation pile has an outer diameter of 1.5 to 2.5 mm below the foundation pile.
Since it is buried in the ground in a state where the enlarged excavating head having a double outer diameter is connected, a large supporting force can be given to the foundation pile.

【0011】また、前記拡大掘削ヘッドの外周面にはス
クリュー刃が突設されており、かつこの拡大掘削ヘッド
は撹拌ロッドで回転させながら地中を掘進するので、前
記スクリュー刃で地中を掘削する際に生ずる掘削土の大
半を該スクリュー刃で掘削穴の周面に圧密することが出
来る。かつ、掘削穴の周面に圧密されなかった少量の残
土のみを前記拡大掘削ヘッドと基礎杭との中空部内に収
納することが出来る。従って、地上に掘削土が排出され
ることを完全に防止出来る。
Further, a screw blade is protruded from the outer peripheral surface of the enlarged excavation head, and the enlarged excavation head excavates in the ground while rotating with a stirring rod. Most of the excavated soil generated during the drilling can be compacted to the peripheral surface of the excavated hole by the screw blade. In addition, only a small amount of soil remaining unconsolidated on the peripheral surface of the excavation hole can be stored in the hollow portion between the enlarged excavation head and the foundation pile. Therefore, it is possible to completely prevent the excavated soil from being discharged to the ground.

【0012】本発明に係る基礎杭の施工方法の第2発明
の要旨は、基礎杭の外径の1.5〜2.5倍の外径を有
し、かつ外周面にスクリュー刃が突設された拡大掘削ヘ
ッドの上に該基礎杭を戴置し、撹拌ロッドの下部に回転
しながら地盤を掘削すると共に掘削土を打固めることが
出来るダウンホールハンマーを取付け、前記基礎杭内に
挿通されたダウンホールハンマーを拡大掘削ヘッドに接
続した後で、撹拌ロッドを介してダウンホールハンマー
と拡大掘削ヘッドとを回転させて地中を掘削しながら、
前記スクリュー刃で掘削土を掘削穴の周面に圧密し、か
つ残った少量の残土をダウンホールハンマーで拡大掘削
ヘッド内及びその下方地盤に打固め、拡大掘削ヘッドと
基礎杭とを地中に埋設することを特徴とした基礎杭の施
工方法である。
The gist of the second invention of the method for constructing a foundation pile according to the present invention is that the foundation pile has an outer diameter 1.5 to 2.5 times the outer diameter of the foundation pile, and a screw blade protrudes from the outer peripheral surface. The foundation pile is placed on the enlarged drilling head, and a downhole hammer is attached to the lower part of the stirring rod, which can excavate the ground while rotating and compact the excavated soil, and is inserted into the foundation pile. After connecting the downhole hammer to the enlarged digging head, while rotating the downhole hammer and the enlarged digging head via a stirring rod, excavating underground,
The excavated soil is compacted to the peripheral surface of the excavated hole with the screw blade, and a small amount of remaining soil is compacted in the enlarged excavation head and the ground below it with a downhole hammer, and the enlarged excavated head and the foundation pile are placed underground. This is a method of constructing a foundation pile characterized by being buried.

【0013】前記第2実施例に於ては、撹拌ロッドの下
部にダウンホールハンマーを取付けると共に、このダウ
ンホールハンマーを拡大掘削ヘッドに接続するようにし
たので、撹拌ロッド及びダウンホールハンマーを介して
拡大掘削ヘッドを回転させて、拡大掘削ヘッドのスクリ
ュー刃とダウンホールハンマーとによって地中を掘削し
ながら掘進させることが出来る。
In the second embodiment, the downhole hammer is attached to the lower portion of the stirring rod, and the downhole hammer is connected to the enlarged excavating head. Therefore, the downhole hammer is connected via the stirring rod and the downhole hammer. By rotating the enlarged excavating head, it is possible to excavate while excavating underground by the screw blade of the enlarged excavating head and the downhole hammer.

【0014】前述のようにスクリュー刃とダウンホール
ハンマーとによって掘削した掘削土の大半は、該スクリ
ュー刃によって掘削穴の内周面に圧密することが出来
る。また掘削穴の内周面に圧密されなかった少量の残土
は最終的に該ダウンホールハンマーによって拡大掘削ヘ
ッド内及びその下方地盤に打固めすることが出来る。
As described above, most of the excavated soil excavated by the screw blade and the downhole hammer can be compacted on the inner peripheral surface of the excavation hole by the screw blade. In addition, a small amount of soil remaining unconsolidated on the inner peripheral surface of the excavation hole can be finally compacted by the downhole hammer in the enlarged excavation head and on the ground below.

【0015】従って、前述の第2発明の施工方法を実施
した場合には、第1発明の施工方法と同様に、掘削土が
地上に排出されることを完全に防止出来ると共に、地中
に埋設された拡大掘削ヘッドの周りの地盤をより強固に
打固めることが出来るので、基礎杭の支持力をより強化
することが出来る。
Therefore, when the construction method of the second invention is carried out, similarly to the construction method of the first invention, the excavated soil can be completely prevented from being discharged to the ground and buried in the ground. The ground around the enlarged excavation head can be compacted more firmly, and the bearing capacity of the foundation pile can be further strengthened.

【0016】本発明に係る基礎杭の施工方法の第3発明
の要旨は、前記基礎杭の周りに鋼管ケーシングを被覆す
ると共に該鋼管ケーシングの下部を前記拡大掘削ヘッド
に接続し、該鋼管ケーシングと拡大掘削ヘッドとを回転
させて地中を掘削しながら拡大掘削ヘッドと基礎杭を地
中に埋設することを特徴とした第1発明或は第2発明の
基礎杭の施工方法である。
The gist of the third invention of the method for constructing a foundation pile according to the present invention is to cover a steel pipe casing around the foundation pile and to connect a lower part of the steel pipe casing to the enlarged excavation head. A method for constructing a foundation pile according to the first invention or the second invention, characterized in that an enlarged excavation head and a foundation pile are buried in the ground while excavating underground by rotating an enlarged excavation head.

【0017】前述の第3発明の基礎杭の施工方法に於て
は、基礎杭の周りに鋼管ケーシングを被覆すると共に、
この鋼管ケーシングを前記拡大掘削ヘッドに接続し、鋼
管ケーシングを拡大掘削ヘッドと共に回転させながら地
中を掘進させるので、鋼管ケーシングによって掘削穴の
周りの土砂の抵抗を切断することが出来、これによって
掘進をスムーズにすることが出来る。
In the method for constructing a foundation pile according to the third aspect of the present invention, a steel pipe casing is coated around the foundation pile,
The steel pipe casing is connected to the enlarged drilling head, and the steel pipe casing is excavated in the ground while rotating together with the enlarged drilling head. Can be smoothed.

【0018】[0018]

【発明の実施の形態】図により本発明に係る基礎杭の施
工方法について、その一実施例を具体的に説明すると、
図1(a)、(b)は夫々本発明の基礎杭の施工方法の
実施に当って用いられる装置の要部の簡略説明図、図2
(a)、(b)、(c)は夫々撹拌ロッドの下部にダウ
ンホールハンマーを取付けて使用する場合の説明図、図
3(a)、(b)は夫々本発明の基礎杭の施工方法の実
施に当って鋼管ケーシングを用いた場合の要部の簡略説
明図、図4(a)乃至(e)は夫々本発明の基礎杭の施
工方法の工程を示す簡略説明図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing a construction method of a foundation pile according to the present invention.
FIGS. 1 (a) and 1 (b) are simplified explanatory diagrams of a main part of an apparatus used for carrying out the method for constructing a foundation pile according to the present invention, respectively.
FIGS. 3 (a), 3 (b) and 3 (c) are explanatory views of a case where a downhole hammer is attached to a lower portion of a stirring rod and used, and FIGS. 4 (a) to 4 (e) are simplified explanatory diagrams showing steps of a method for constructing a foundation pile according to the present invention, respectively.

【0019】図1(a)、(b)乃至図4(a)〜
(e)に於て、1はコンクリート製の基礎杭(パイル)
であって、中空状に形成されている。2は中空状の拡大
掘削ヘッドであって、この拡大掘削ヘッド2の外周面に
はスクリュー刃3が突設されている。
1 (a), 1 (b) to 4 (a) to
In (e), 1 is a concrete foundation pile (pile)
And is formed in a hollow shape. Reference numeral 2 denotes a hollow enlarged excavating head, and a screw blade 3 is provided on an outer peripheral surface of the enlarged excavating head 2.

【0020】この拡大掘削ヘッド2の外径(スクリュー
刃3を含めた外径)は、例えば、600mmに対して1
200mmとなるような、基礎杭1の1.5〜2.5倍
の外径を有している。前記拡大掘削ヘッド2の外壁には
対応する位置に後述の拡翌爪を挿通することが出来る一
対の開口窓4が穿設されている。
The outer diameter of the enlarged excavating head 2 (the outer diameter including the screw blade 3) is, for example, 1 mm for 600 mm.
It has an outer diameter of 1.5 to 2.5 times that of the foundation pile 1 so as to be 200 mm. A pair of opening windows 4 through which an enlarging nail, which will be described later, can be inserted is formed at an outer wall of the enlarged excavation head 2 at a corresponding position.

【0021】図中5は撹拌ロッドであって、前記基礎杭
1及び拡大掘削ヘッド2内に挿通し得る径を有し、か
つ、その内部にはエアー或は油等を流通させるために中
空状に形成されている。
In the figure, reference numeral 5 denotes a stirring rod having a diameter capable of being inserted into the foundation pile 1 and the enlarged excavation head 2 and having a hollow inside for allowing air or oil to flow therethrough. Is formed.

【0022】さらに、撹拌ロッド5の下部には、図示せ
ざる空圧装置或は油圧装置等によって自在に伸縮するこ
とが出来る拡翌爪6が両側に突設されている。また、撹
拌ロッド5の最下端には先端スクリュー刃7が取付けら
れている。
Further, at the lower part of the stirring rod 5, expansion pawls 6 which can be freely expanded and contracted by a pneumatic device or a hydraulic device (not shown) are provided on both sides so as to protrude. Further, a tip screw blade 7 is attached to the lowermost end of the stirring rod 5.

【0023】前記撹拌ロッド5の下部と拡大掘削ヘッド
2とを相互に連結するに当っては、特に図1(b)に示
す如く、一対の拡翌爪6を収縮させた状態で拡大掘削ヘ
ッド2内に挿入し、次に前述の空圧装置等を作動させる
ことによって、拡翌爪6を外方に伸ばして拡大掘削ヘッ
ド2に設けられた開口窓4内に挿通することによって、
拡大掘削ヘッド2を撹拌ロッド5に結合させることが出
来る。
In connecting the lower portion of the stirring rod 5 and the enlarged excavation head 2 to each other, particularly, as shown in FIG. 2 and then by operating the above-described pneumatic device or the like, the extension pawl 6 is extended outward and inserted into the opening window 4 provided in the enlarged excavation head 2.
The enlarged excavating head 2 can be connected to the stirring rod 5.

【0024】本発明に係る基礎杭の施工方法の基本的方
法に於ては、図1(b)の状態に構成された装置を用い
て、撹拌ロッド5を回転させることによって、拡大掘削
ヘッド2で地中を掘進させ、掘削穴を形成すると共に、
拡大掘削ヘッド2のスクリュー刃3で掘削した大半の掘
削土を掘削穴13の内周面に圧密させ、かつ圧密の際に
残った少量の残土を撹拌ロッド5を介して地上に排出す
る。
In the basic method of constructing a foundation pile according to the present invention, an enlarged excavating head 2 is rotated by rotating a stirring rod 5 using an apparatus configured as shown in FIG. To excavate underground to form excavation holes,
Most of the excavated soil excavated by the screw blade 3 of the enlarged excavation head 2 is compacted on the inner peripheral surface of the excavation hole 13, and a small amount of residual soil remaining during the consolidation is discharged to the ground via the stirring rod 5.

【0025】前述のような作業を続けることによって、
基礎杭1と拡大掘削ヘッド2を地中内の一定の深さまで
掘進させた状態で、前記撹拌ロッド5の下部に設けられ
た拡翌爪6を収縮させて開口窓4より抜き取って、撹拌
ロッド5と拡大掘削ヘッド2との結合を解除する。
By continuing the work described above,
With the foundation pile 1 and the enlarged excavation head 2 dug to a certain depth in the ground, the expansion nail 6 provided at the lower part of the stirring rod 5 is contracted and pulled out from the opening window 4 to remove the stirring rod. 5 and the enlarged excavation head 2 are released.

【0026】前記実施例に於ては撹拌ロッド5に一対の
拡翌爪6と先端スクリュー刃7とを取付けて構成した例
について説明したが、図2(a)乃至(c)に示す如
く、撹拌ロッド5の下端にダウンホールハンマー8を取
付け、かつこのダウンホールハンマー8に前述のような
一対の拡翌爪6を設けて構成したものを使用した場合に
も本発明の施工方法を実施することが出来る。
In the above embodiment, an example was described in which a pair of expanding nails 6 and a tip screw blade 7 were attached to the stirring rod 5, but as shown in FIGS. 2 (a) to 2 (c), The construction method of the present invention is also carried out when a downhole hammer 8 is attached to the lower end of the stirring rod 5 and the downhole hammer 8 is provided with a pair of expanding claws 6 as described above. I can do it.

【0027】このダウンホールハンマー8は、広和産業
株式会社(愛知県西春日井)で製造販売されているもの
であって、ハンマーを撹拌ロッド或はモーターで回転さ
せて、圧縮空気により先端ピットで穴底を叩きながら掘
進することが出来る機具である。本発明の実施に当って
は、このダウンホールハンマー8の所定位置に前述の一
対の拡翌爪6を組込み、この拡翌爪6が伸縮出来るよう
に構成した。
This downhole hammer 8 is manufactured and sold by Kowa Sangyo Co., Ltd. (Nishi-Kasugai, Aichi Prefecture). The downhole hammer 8 is rotated by a stirring rod or a motor, and the bottom of the hole is formed at the tip pit by compressed air. It is a tool that can excavate while hitting. In the embodiment of the present invention, the pair of expanding nails 6 are assembled at predetermined positions of the downhole hammer 8 so that the expanding nails 6 can expand and contract.

【0028】このように撹拌ロッド5の下部に前述のダ
ウンホールハンマー8を取付け、かつダウンホールハン
マー8を前記拡大掘削ヘッド2に接続した場合には、撹
拌ロッド5を回転させながら拡大掘削ヘッド2のスクリ
ュー刃3とダウンホールハンマー8の先端部とで地中を
掘削し、かつこれ等のスクリュー刃3とダウンホールハ
ンマー8で掘削した掘削土を掘削穴の内周面に強制的に
圧密しながら掘進することが出来る。
When the downhole hammer 8 is attached to the lower portion of the stirring rod 5 and the downhole hammer 8 is connected to the enlarged excavating head 2, the enlarged excavating head 2 is rotated while the stirring rod 5 is rotated. The underground is excavated with the screw blade 3 and the tip of the downhole hammer 8, and the excavated soil excavated with the screw blade 3 and the downhole hammer 8 is forcibly compacted into the inner peripheral surface of the excavation hole. You can excavate while digging.

【0029】従って、前述のように掘削された掘削土の
大半を掘削穴の内周面に圧密することが出来、かつ圧密
されなかった少量の残土は最終的に該ダウンホールハン
マー8によって拡大掘削ヘッド2内及びその下方地盤に
打固めることが出来る。
Therefore, most of the excavated soil excavated as described above can be compacted on the inner peripheral surface of the excavation hole, and a small amount of unreacted soil is finally excavated by the downhole hammer 8. It can be compacted in the head 2 and the ground below it.

【0030】前記実施例に於ては、鋼管ケーシングを用
いずに本発明の施工方法を実施したが、次に鋼管ケーシ
ングを使用して本発明の施工方法を実施する実施例につ
いて詳述する。
In the above embodiment, the construction method of the present invention was implemented without using a steel pipe casing. Next, an embodiment in which the construction method of the present invention is implemented using a steel pipe casing will be described in detail.

【0031】図3(a)、(b)及び図4(a)〜
(e)に於て、9は前記基礎杭1の周りに被覆し得る鋼
管ケーシングであって、この鋼管ケーシング9の下端縁
には対応する位置に一対のカギ溝10が穿設されてい
る。また、前述の拡大掘削ヘッド2の外周面所定位置に
は、前記カギ溝10内に挿入し得る一対の突起11が夫
々所定位置に突設されている。
FIGS. 3A and 3B and FIGS.
In (e), reference numeral 9 denotes a steel pipe casing capable of covering around the foundation pile 1, and a pair of key grooves 10 are formed at corresponding positions on the lower end edge of the steel pipe casing 9. At a predetermined position on the outer peripheral surface of the enlarged excavation head 2, a pair of protrusions 11 that can be inserted into the key groove 10 are respectively provided at predetermined positions.

【0032】前述の鋼管ケーシング9を用いて本発明の
基礎杭の施工方法を施工する場合には、図に示すよう
に、基礎杭1の周りに被覆された鋼管ケーシング9を下
降させてこの鋼管ケーシング9の下端部を拡大掘削ヘッ
ド2の上端部の周りに被覆させながら、鋼管ケーシング
9のカギ溝10と拡大掘削ヘッド2の突起11とを相互
に位置合わせし、この状態で突起11をカギ溝10に挿
入し、さらに鋼管ケーシング9或は拡大掘削ヘッド2を
所定方向に回転させることによって、突起11をカギ溝
10の折曲最奥部に挿入して、鋼管ケーシング9と拡大
掘削ヘッド2とを相互に結合させることが出来る。
When the method for constructing a foundation pile according to the present invention is carried out by using the above-mentioned steel pipe casing 9, as shown in the figure, the steel pipe casing 9 covered around the foundation pile 1 is lowered and the steel pipe casing 9 is lowered. While covering the lower end portion of the casing 9 around the upper end portion of the enlarged excavation head 2, the key groove 10 of the steel pipe casing 9 and the projection 11 of the enlarged excavation head 2 are aligned with each other. By inserting the projection 11 into the bent innermost part of the key groove 10 by rotating the steel pipe casing 9 or the enlarged excavation head 2 in a predetermined direction, the steel pipe casing 9 and the enlarged excavation head 2 are rotated. Can be combined with each other.

【0033】続いて、図4(a)乃至(c)に示す如
く、拡大掘削ヘッド2を回転させながら地中を掘進させ
て、該拡大掘削ヘッド2と鋼管ケーシング9及び基礎杭
1とを所定の位置、即ち基礎杭1の下部及び拡大掘削ヘ
ッド2が支持層地盤12内に挿入される位置迄に埋設す
ることが出来る。このように鋼管ケーシング9を使用し
た場合には、鋼管ケーシング9を拡大掘削ヘッド2と共
に回転させながら掘進させることが出来るので、掘削穴
13の周面の土砂との関係を断ち切ることが出来、従っ
て拡大掘削ヘッド2と基礎杭1との掘進をよりスムーズ
に行うことが出来る。
Subsequently, as shown in FIGS. 4A to 4C, the enlarged excavation head 2 is excavated in the ground while rotating, so that the enlarged excavation head 2, the steel pipe casing 9 and the foundation pile 1 are fixed to each other. , That is, the lower part of the foundation pile 1 and the position where the enlarged excavation head 2 is inserted into the support layer ground 12. When the steel pipe casing 9 is used as described above, the steel pipe casing 9 can be excavated while being rotated together with the enlarged excavation head 2, so that the relationship between the steel pipe casing 9 and the soil on the peripheral surface of the excavation hole 13 can be cut off. Excavation between the enlarged excavation head 2 and the foundation pile 1 can be performed more smoothly.

【0034】前述のように、本発明の施工方法を実施し
た場合には、拡大掘削ヘッド2の外周にスクリュー刃3
を設けると共に、この拡大掘削ヘッド2を撹拌ロッド5
で回転させながら地中を掘削するので、スクリュー刃3
で掘削した掘削土の大半を掘削穴13の内周部に圧密さ
せることが出来る。
As described above, when the construction method of the present invention is carried out, the screw blade 3
And the enlarged drilling head 2 is
Drilling underground while rotating with a screw blade 3
Most of the excavated soil excavated in the above can be compacted in the inner peripheral portion of the excavation hole 13.

【0035】掘削穴13に圧密されなかった掘削土の残
りの少量の残土は、拡大掘削ヘッド2の中空部及び基礎
杭1の中空部に収納することが出来る。また、前述の第
2実施例のように、ダウンホールハンマー8を撹拌ロッ
ド5の下部に取付けて使用した場合には、掘削穴の内周
面に圧密することが出来なかった少量の残土を拡大掘削
ヘッド2の中空部及びその下方地盤に打固めることが出
来る。
The remaining small amount of excavated soil not compacted in the excavation hole 13 can be stored in the hollow portion of the enlarged excavation head 2 and the hollow portion of the foundation pile 1. Further, when the downhole hammer 8 is attached to the lower part of the stirring rod 5 as in the second embodiment, a small amount of soil that could not be compacted on the inner peripheral surface of the excavation hole is enlarged. It can be compacted in the hollow portion of the excavation head 2 and the ground below it.

【0036】従って、本発明を実施した場合には拡大掘
削ヘッド2のスクリュー刃3、先端スクリュー刃7或は
ダウンホールハンマー8によって掘削した掘削土を全く
地上に排出することなく、これ等全ての掘削土を掘削穴
13の内周面に圧密し、或は拡大掘削ヘッド2、基礎杭
1の内部に収納することが出来る。
Therefore, when the present invention is implemented, the excavated soil excavated by the screw blade 3, the tip screw blade 7 or the downhole hammer 8 of the enlarged excavating head 2 is not discharged to the ground at all, and The excavated soil can be compacted on the inner peripheral surface of the excavation hole 13 or can be stored inside the enlarged excavation head 2 and the foundation pile 1.

【0037】[0037]

【発明の効果】本発明に係る基礎杭の施工方法は、基礎
杭の下方にこの基礎杭の外径の1.5〜2.5倍の外径
を有する拡大掘削ヘッドを接続した状態で地中に埋設す
るので、前記基礎杭に大きな支持力を付与することが出
来る効果を有している。
According to the method for constructing a foundation pile according to the present invention, a ground excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile is connected below the foundation pile. Since it is buried inside, there is an effect that a large supporting force can be given to the foundation pile.

【0038】また、前記拡大掘削ヘッドの外周面にはス
クリュー刃が突設されており、かつこの拡大掘削ヘッド
は撹拌ロッドで回転させながら地中を掘進するので、前
記スクリュー刃で地中を掘削する際に生ずる掘削土の大
半を該スクリュー刃で掘削穴の周面に圧密することが出
来る。かつ、掘削穴の周面に圧密されなかった少量の残
土のみを前記拡大掘削ヘッドと基礎杭との中空部内に収
納することが出来る。従って、地上に掘削土が排出され
ることを完全に防止出来る効果も有している。
Further, a screw blade is projected from the outer peripheral surface of the enlarged excavating head, and the enlarged excavating head excavates underground while rotating with a stirring rod. Most of the excavated soil generated during the drilling can be compacted to the peripheral surface of the excavated hole by the screw blade. In addition, only a small amount of soil remaining unconsolidated on the peripheral surface of the excavation hole can be stored in the hollow portion between the enlarged excavation head and the foundation pile. Therefore, there is also an effect that the excavated soil can be completely prevented from being discharged to the ground.

【0039】本発明の施工方法に於て、撹拌ロッドの下
部にダウンホールハンマーを取付けると共に、このダウ
ンホールハンマーを拡大掘削ヘッドに接続するようにし
た場合には、撹拌ロッド及びダウンホールハンマーを介
して拡大掘削ヘッドを回転させて、拡大掘削ヘッドのス
クリュー刃とダウンホールハンマーとによって地中を掘
削しながら掘進させることが出来る効果を有している。
In the construction method of the present invention, when the downhole hammer is attached to the lower part of the stirring rod and this downhole hammer is connected to the enlarged excavating head, the downhole hammer is connected via the stirring rod and the downhole hammer. By rotating the enlarged excavating head, it is possible to excavate while excavating underground by the screw blade of the enlarged excavating head and the downhole hammer.

【0040】前述のようにスクリュー刃とダウンホール
ハンマーとによって掘削した掘削土の大半は、該スクリ
ュー刃によって掘削穴の内周面に圧密することが出来
る。また掘削穴の内周面に圧密されなかった少量の残土
は最終的に該ダウンホールハンマーによって拡大掘削ヘ
ッド内及びその下方地盤に打固めすることが出来る効果
を有している。
As described above, most of the excavated soil excavated by the screw blade and the downhole hammer can be compacted on the inner peripheral surface of the excavation hole by the screw blade. In addition, a small amount of the remaining soil not compacted on the inner peripheral surface of the excavation hole has an effect that the downhole hammer can finally be compacted in the enlarged excavation head and the ground below the enlarged excavation head.

【0041】従って、このようにダウンホールハンマー
を使用した場合には、前述の基本的な施工方法と同様
に、掘削土が地上に排出されることを完全に防止出来る
と共に、地中に埋設された拡大掘削ヘッドの周りの地盤
をより強固に打固めることが出来るので、基礎杭の支持
力をより強化することが出来る等の効果を有している。
Therefore, when the downhole hammer is used in this manner, the excavated soil can be completely prevented from being discharged to the ground and buried in the ground, similarly to the above-mentioned basic construction method. Since the ground around the enlarged excavation head can be compacted more firmly, there is an effect that the supporting force of the foundation pile can be further strengthened.

【0042】基礎杭の周りに鋼管ケーシングを被覆する
と共に、この鋼管ケーシングを前記拡大掘削ヘッドに接
続し、鋼管ケーシングを拡大掘削ヘッドと共に回転させ
ながら地中を掘進させる場合には、鋼管ケーシングによ
って掘削穴の周りの土砂の抵抗を切断することが出来、
これによって掘進をスムーズにすることが出来る効果を
有している。
When the steel pipe casing is covered around the foundation pile and the steel pipe casing is connected to the enlarged drilling head, and the steel pipe casing is excavated in the ground while rotating with the enlarged drilling head, the excavation is performed by the steel pipe casing. It can cut the resistance of the earth and sand around the hole,
This has the effect of making excavation smooth.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1(a)、(b)は夫々本発明の基礎杭の施
工方法の実施に当って用いられる装置の要部の簡略説明
図である。
FIGS. 1 (a) and 1 (b) are simplified explanatory views of the main parts of an apparatus used for carrying out a method for constructing a foundation pile according to the present invention.

【図2】図2(a)、(b)、(c)は夫々撹拌ロッド
の下部にダウンホールハンマーを取付けて使用する場合
の説明図である。
FIGS. 2 (a), (b) and (c) are explanatory views in the case where a downhole hammer is attached to a lower portion of a stirring rod and used.

【図3】図3(a)、(b)は夫々本発明の基礎杭の施
工方法の実施に当って鋼管ケーシングを用いた場合の要
部の簡略説明図である。
FIGS. 3 (a) and 3 (b) are simplified explanatory views of main parts when a steel pipe casing is used in carrying out the method for constructing a foundation pile according to the present invention, respectively.

【図4】図4(a)乃至(e)は夫々本発明の基礎杭の
施工方法の工程を示す簡略説明図である。
FIGS. 4A to 4E are simplified explanatory views showing steps of a method for constructing a foundation pile according to the present invention.

【符号の説明】[Explanation of symbols]

1 …基礎杭 2 …拡大掘削ヘッド 3 …スクリュー刃 4 …開口窓 5 …撹拌ロッド 6 …拡翌爪 7 …先端スクリュー刃 8 …ダウンホールハンマー 9 …鋼管ケーシング 10 …カギ溝 11 …突起 12 …支持層地盤 13 …掘削穴 DESCRIPTION OF SYMBOLS 1 ... Foundation pile 2 ... Enlarged excavation head 3 ... Screw blade 4 ... Opening window 5 ... Stirring rod 6 ... Expansion jaw 7 ... Tip screw blade 8 ... Downhole hammer 9 ... Steel pipe casing 10 ... Key groove 11 ... Protrusion 12 ... Support Layer ground 13… Drilled hole

フロントページの続き (72)発明者 林 隆浩 東京都渋谷区千駄ヶ谷5−27−9 株式会 社トーヨーアサノ内 Fターム(参考) 2D041 AA02 BA12 BA13 CA05 DB02 DB03 FA03 FA14 2D050 AA03 AA07 BB05 CA02 CB05 CB06 CB10 CB34 EE03 Continued on the front page (72) Inventor Takahiro Hayashi 5-27-9 Sendagaya, Shibuya-ku, Tokyo F-term in Toyo Asano Corporation (reference) 2D041 AA02 BA12 BA13 CA05 DB02 DB03 FA03 FA14 2D050 AA03 AA07 BB05 CA02 CB05 CB06 CB10 CB34 EE03

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 基礎杭の外径の1.5〜2.5倍の外径
を有し、かつ外周面にスクリュー刃を突設した拡大掘削
ヘッド上に該基礎杭を戴置し、かつ該基礎杭の中空部に
挿入した撹拌ロッドを前記拡大掘削ヘッドに接続した後
で、該撹拌ロッドを介して前記拡大掘削ヘッドを回転さ
せて地中を掘削しながら前記スクリュー刃で掘削土を掘
削穴の周面に圧密し、かつ残った少量の残土を該拡大掘
削ヘッドと基礎杭との中空部に収納し、拡大掘削ヘッド
と共に基礎杭を地中に埋設することを特徴とした基礎杭
の施工方法。
1. The foundation pile is placed on an enlarged excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile and having a screw blade protruding on the outer peripheral surface, and After connecting the stirring rod inserted into the hollow part of the foundation pile to the enlarged excavation head, excavating excavated soil with the screw blade while excavating underground by rotating the enlarged excavation head via the stirring rod. The foundation pile is characterized in that it is compacted on the peripheral surface of the hole, and a small amount of remaining soil is stored in the hollow portion between the enlarged drilling head and the foundation pile, and the foundation pile is buried in the ground together with the enlarged drilling head. Construction method.
【請求項2】 基礎杭の外径の1.5〜2.5倍の外径
を有し、かつ外周面にスクリュー刃が突設された拡大掘
削ヘッドの上に該基礎杭を戴置し、撹拌ロッドの下部に
回転しながら地盤を掘削すると共に掘削土を打固めるこ
とが出来るダウンホールハンマーを取付け、前記基礎杭
内に挿通されたダウンホールハンマーを拡大掘削ヘッド
に接続した後で、撹拌ロッドを介してダウンホールハン
マーと拡大掘削ヘッドとを回転させて地中を掘削しなが
ら、前記スクリュー刃で掘削土を掘削穴の周面に圧密
し、かつ残った少量の残土をダウンホールハンマーで拡
大掘削ヘッド内及びその下方地盤に打固め、拡大掘削ヘ
ッドと基礎杭とを地中に埋設することを特徴とした基礎
杭の施工方法。
2. The foundation pile is mounted on an enlarged excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile and having a screw blade protruding on the outer peripheral surface. At the bottom of the stirring rod, a downhole hammer that can excavate the ground while rotating and compact the excavated soil is installed, and after connecting the downhole hammer inserted into the foundation pile to the enlarged excavation head, stirring is performed. While drilling in the ground by rotating the downhole hammer and the enlarged drilling head via a rod, the excavated soil is compacted to the peripheral surface of the drilled hole with the screw blade, and a small amount of remaining soil is left downhammer. A method for constructing a foundation pile, wherein the foundation pile is buried underground with the expanded drilling head compacted in the ground below the expanded drilling head.
【請求項3】 前記基礎杭の周りに鋼管ケーシングを被
覆すると共に該鋼管ケーシングの下部を前記拡大掘削ヘ
ッドに接続し、該鋼管ケーシングと拡大掘削ヘッドとを
回転させて地中を掘削しながら拡大掘削ヘッドと基礎杭
を地中に埋設することを特徴とした請求項1或は請求項
2の基礎杭の施工方法。
3. A steel pipe casing is covered around the foundation pile and a lower portion of the steel pipe casing is connected to the enlarged drilling head, and the steel pipe casing and the enlarged drilling head are rotated to excavate while excavating in the ground. 3. The method according to claim 1, wherein the excavating head and the foundation pile are buried underground.
JP2000369559A 2000-12-05 2000-12-05 Foundation pile construction method Expired - Lifetime JP4523716B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000369559A JP4523716B2 (en) 2000-12-05 2000-12-05 Foundation pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000369559A JP4523716B2 (en) 2000-12-05 2000-12-05 Foundation pile construction method

Publications (2)

Publication Number Publication Date
JP2002167757A true JP2002167757A (en) 2002-06-11
JP4523716B2 JP4523716B2 (en) 2010-08-11

Family

ID=18839574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000369559A Expired - Lifetime JP4523716B2 (en) 2000-12-05 2000-12-05 Foundation pile construction method

Country Status (1)

Country Link
JP (1) JP4523716B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1034016C2 (en) * 2007-06-22 2008-12-23 Johannes Maria Veenman Method for introducing into the ground an elongate foundation element, a device therefor, as well as a foundation element.
JP2016130418A (en) * 2015-01-14 2016-07-21 株式会社サムシング Method for embedding low-strength pipe, and excavation head used therewith
CN105887876A (en) * 2016-03-28 2016-08-24 陶明安 Construction method for cast-in-situ large-diameter combined thin-wall threaded pipe pile and pile forming device of cast-in-situ large-diameter combined thin-wall threaded pipe pile
JP2018071134A (en) * 2016-10-27 2018-05-10 新日鉄住金エンジニアリング株式会社 Method for constructing lateral rotary pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4813406B1 (en) * 1968-06-14 1973-04-27
JPS6183718A (en) * 1984-09-28 1986-04-28 Totsuki Kogyo Kk Excavating method
JPS6466312A (en) * 1987-05-26 1989-03-13 Hokukon Kk Method and apparatus for concrete pile foundation work
JPH0813486A (en) * 1994-06-29 1996-01-16 Kencho Kobe:Kk Driving method for steel sheet pile
JPH11303069A (en) * 1998-04-17 1999-11-02 Nkk Corp Screwed type steel pipe pile with blade and execution method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4813406B1 (en) * 1968-06-14 1973-04-27
JPS6183718A (en) * 1984-09-28 1986-04-28 Totsuki Kogyo Kk Excavating method
JPS6466312A (en) * 1987-05-26 1989-03-13 Hokukon Kk Method and apparatus for concrete pile foundation work
JPH0813486A (en) * 1994-06-29 1996-01-16 Kencho Kobe:Kk Driving method for steel sheet pile
JPH11303069A (en) * 1998-04-17 1999-11-02 Nkk Corp Screwed type steel pipe pile with blade and execution method therefor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1034016C2 (en) * 2007-06-22 2008-12-23 Johannes Maria Veenman Method for introducing into the ground an elongate foundation element, a device therefor, as well as a foundation element.
JP2016130418A (en) * 2015-01-14 2016-07-21 株式会社サムシング Method for embedding low-strength pipe, and excavation head used therewith
CN105887876A (en) * 2016-03-28 2016-08-24 陶明安 Construction method for cast-in-situ large-diameter combined thin-wall threaded pipe pile and pile forming device of cast-in-situ large-diameter combined thin-wall threaded pipe pile
JP2018071134A (en) * 2016-10-27 2018-05-10 新日鉄住金エンジニアリング株式会社 Method for constructing lateral rotary pile

Also Published As

Publication number Publication date
JP4523716B2 (en) 2010-08-11

Similar Documents

Publication Publication Date Title
JP3468724B2 (en) Method and device for placing concrete pile and enlarged head
JP2002167757A (en) Execution method of foundation pile
JP2005273293A (en) Excavating method
JP2001336149A (en) Taper pile for civil engineering and building work foundation construction, foundation construction equipment therefor, and embedding method therefor
JP2724548B2 (en) 2-stage enlarged head
JP2002167759A (en) Execution method of foundation pile
JP2006083573A (en) All casing method and its apparatus
JP3165997B2 (en) Casting method and equipment for sheet piles
KR101363625B1 (en) Under ground drilling machine
JPH02296989A (en) Bit device for excavation and method thereof
JPS60119816A (en) Formation of continuous pile
JP4029966B2 (en) Pile embedding method and excavation equipment used therefor
JPH11280373A (en) Starting device and method for portal
JPH10147931A (en) Inner excavation drilling machine of boring machine
JP2004278250A (en) Method for positioning concrete pile
JP2003096772A (en) Screw type steel pipe pile and its work method
JP2006265888A (en) Sand pile creating method and sand pile creating machine
KR0134073B1 (en) Earth auger apparatus and concrete pile making method in the underground
JP2524654B2 (en) Kason deposition method
JP2575088B2 (en) Improvement method and equipment of foundation ground
JP3007755U (en) Magnifying head
JP2005240395A (en) Rotary embedding method for pile
JP2785541B2 (en) Burial method for pillars
JP3817285B2 (en) Building foundation pile driving method and steel pipe pile connection pin used for it
JP2004218341A (en) Steel pipe pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070515

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091208

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100122

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100525

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100528

R150 Certificate of patent or registration of utility model

Ref document number: 4523716

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term