tunnel
wellhead
ground
boring machine
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11986298A
Other languages
Japanese (ja)
Inventor
Toshinori Toyoda
敏則 豊田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP11986298A priority Critical patent/JPH11280373A/en
Publication of JPH11280373A publication Critical patent/JPH11280373A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily open a portal in a ground tunnel by providing a guide way at the front face of a mountain slope and assembling a lining frame body and pressing the lining frame body on the ground through anchor steel wires to excavate the inside. SOLUTION: A base ground is formed at the front face of a mountain slope 1 and a guide way 6 is laid and boring holes 4 are bored along the outer periphery of a planned line 2 for excavating a tunnel and further, anchor steel wires 5 are arranged to anchor them in the ground with mortar or the like. Then, a lining frame body 9 is assembled on the guide way 6 and a cutting edge 10 is attached to the tip thereof and the anchor steel wires 5 are connected to a center hole jack 7 through a pressing frame 8 and the lining frame body 9 is pressed on the ground to excavate the inside. A tunnel boring machine may be assembled on the guide way 6 to start excavating the ground by thrusting jacks of the machine by making use of reaction force from the pressing frame 8. Accordingly, a portal for a ground tunnel can be easily opened and a tunnel boring machine can be started.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、山トンネルの建設工事
において、坑口を開設して、トンネル内部への掘進を開
始する場合に適用するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is applied to the construction of a mountain tunnel, in which a pit is opened and excavation into the tunnel is started.

【0002】[0002]

【従来の技術】従来、山トンネルの坑口を開設するにあ
たっては、斜面の地滑りや、崖地の崩壊を押さえるため
に、パイプルーフなどの山留めをしたり、また前面を深
く切り取ったりしていた。また、トンネル・ボーリング
・マシーンを発進する場合には、坑口に反力体が無いの
で、わざわざ準備トンネルを手掘りして、そこから発進
していた。
2. Description of the Related Art Conventionally, in opening a tunnel entrance of a mountain tunnel, a mountain roof such as a pipe roof or a front surface is cut deep in order to suppress a landslide on a slope or a collapse of a cliff. Also, when starting the tunnel boring machine, there was no reaction body at the wellhead, so we dug the preparation tunnel by hand and started from there.

【0003】[0003]

【発明が解決しようとする課題】従来の方法では、前面
を深く切り取り、切土量が多くなる場合には、その分だ
け側面が露出することになり、この側面の切り取りまた
は山留め工事が増えることにより、経済的とは言えない
ものであった。また、トンネル・ボーリング・マシーン
を発進するにあたっても、手掘りで発進用の基地トンネ
ルを掘るなどの必要があり、不合理な施工の方法であっ
た。
In the conventional method, the front surface is cut deeply, and when the amount of cut is increased, the side surface is exposed to that extent, and the cutting or staking work of this side surface is increased. As a result, it was not economical. Also, when starting a tunnel boring machine, it was necessary to dig a base tunnel for starting by hand, which was an irrational construction method.

【0004】[0004]

【課題を解決するための手段】本発明は、坑口防護用の
パイプルーフの一部をアンカー鋼線の定着孔に兼用して
反力となし、覆工躯体および坑門躯体を坑口の前で組み
立てて、これを押し込んで前面および側壁の崩壊を押さ
えながら、坑口部分を開設する方法を提案するものであ
る。その手順は以下の通りに行われる。 (イ)坑口の前面に基地を設けてガイドウエーを敷設す
る。 (ロ)トンネルの予定断面の外周に沿って複数のボーリ
ング孔を堀り、そこに鋼線または鋼棒を配置し、モルタ
ルなどで地山に定着して、アンカーをつくる。 (ハ)前記のガイドウエー上に覆工躯体を組み立てて、
その後方に加圧枠を置き、センターホールジャッキを設
置してアンカー鋼線を通して固定する。 (ニ)覆工躯体の先端部には、ムーバブル・フードを有
する刃口を付ける。 (ホ)坑口部の前面に躯体を押し付けて、坑口部を掘削
する。 (ヘ)躯体の外面には、骨材を塗布して摩擦を逓減する
ことで、上面および側面の山留め機能を発揮させる。 (ト)なお、請求項3に記載の方法では、トンネル・ボ
ーリング・マシーンをガイドウエー上で組み立てて、同
様の操作で当該マシーンを地山面に押し付け、加圧枠を
反力として、以後は当該マシーンが持っている推進ジャ
ッキで、発進し掘進を開始する。
According to the present invention, a part of a pipe roof for wellhead protection is also used as an anchor steel wire anchoring hole to form a reaction force, and a lining frame and a gate structure are provided in front of a wellhead. The present invention proposes a method of assembling and opening a wellhead portion while pushing in the collapse of the front surface and the side wall to suppress collapse. The procedure is performed as follows. (B) A guideway will be laid with a base in front of the wellhead. (B) A plurality of boreholes are dug along the perimeter of the planned section of the tunnel, steel wires or steel rods are placed there, and they are anchored to the ground with mortar or the like to make anchors. (C) assembling the lining frame on the guideway,
A pressure frame is placed on the rear side, a center hole jack is installed, and fixed through an anchor steel wire. (D) At the end of the lining body, a cutting edge having a removable hood is provided. (E) Excavate the wellhead by pressing the frame against the front of the wellhead. (F) An aggregate is applied to the outer surface of the skeleton to gradually reduce friction, thereby exerting the function of retaining the upper surface and side surfaces. (G) In the method according to the third aspect, the tunnel boring machine is assembled on the guideway, the machine is pressed against the ground surface by the same operation, and the pressing frame is used as a reaction force. The propulsion jack of the machine starts and starts excavation.

【0005】[0005]

【作用】本発明による坑口の発進方法によれば、坑門を
プレキャスト化することにより、突出型、直立壁、斜面
壁などの各種の形状に対応することが容易に出来る。ま
た、これらを坑口で組み立てて押し込むことにより、坑
口斜面の安定が図れるとともに、トンネル・ボーリング
・マシーンの発進のための反力が得られることで、無駄
の無い坑口開設が出来る。
According to the method for starting a wellhead according to the present invention, by precasting the wellhead, it is possible to easily cope with various shapes such as a projecting type, an upright wall, and a slope wall. In addition, by assembling and pushing these at the wellhead, the slope of the wellhead can be stabilized, and a reaction force for starting the tunnel boring machine can be obtained, so that the wellhead can be opened without waste.

【0005】[0005]

【実施例】以下に、本発明を図面により説明する。図1
は、本発明の実施例を示した全体の側面図である。1は
これからトンネルを掘ろうとしている山の斜面を表す。
2はトンネル掘進の予定線である。3はトンネル掘進に
よる崩壊を防護するパイプルーフである。4はボーリン
グ孔にアンカー鋼線を定着した状況を示している。5は
アンカー鋼線で、加圧枠8を通して、センターホールジ
ャッキ7に挿通している。9は覆工躯体および坑門躯体
またはトンネル・ボーリング・マシーンで、ガイドウエ
ー6の上に組み立てられている。10は押し込み用の刃
口であり、躯体の先頭部に取り付けてある。ジャッキ7
を操作して刃口10を地山に押し付けて、刃口の内部で
掘削し、さらにジャッキを操作して圧入しながら、掘進
する工法である。図2は従来の坑口開設方法の一例を示
すもので、トンネル覆工躯体12と壁面13および側壁
14を示した図である。トンネル坑口11の開設にあた
っては、大規模な切土が必要であることを示している。
図3は、本発明により施工した場合の、出来上がりの状
態を示す斜視図である。地山を殆ど切土することなく、
坑口の開設が出来る。15はプレキャスト化した覆工躯
体および坑門躯体を示している。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings. FIG.
1 is an overall side view showing an embodiment of the present invention. 1 represents the slope of the mountain about to tunnel.
Reference numeral 2 denotes a planned line for tunnel excavation. Reference numeral 3 denotes a pipe roof that protects against collapse due to tunnel excavation. Reference numeral 4 indicates a situation where an anchor steel wire is fixed in a borehole. Reference numeral 5 denotes an anchor steel wire, which is inserted into the center hole jack 7 through the pressurizing frame 8. Reference numeral 9 denotes a lining frame and a gate frame or a tunnel boring machine, which is assembled on a guideway 6. Reference numeral 10 denotes a blade for pushing, which is attached to the head of the skeleton. Jack 7
Is operated to press the cutting edge 10 against the ground, excavate inside the cutting edge, and further excavate while operating the jack to press-fit. FIG. 2 shows an example of a conventional wellhead opening method, and is a diagram showing a tunnel lining frame 12, a wall surface 13, and a side wall 14. FIG. This indicates that a large-scale cut is required to open the tunnel entrance 11.
FIG. 3 is a perspective view showing a completed state when constructed according to the present invention. With almost no cutting of the ground,
A wellhead can be opened. Reference numeral 15 denotes a precast lining frame and a gate frame.

【0006】[0006]

【発明の効果】本発明によれば、地滑りの恐れのある斜
面や、急峻な崖地などでのトンネル坑口の開設が、安全
かつ経済的に実施で出来る。坑門部の覆工にプレキャス
ト製品を組み立てて盛土する方法は、すでに実施されて
いるが、本発明では、積極的に覆工躯体を坑口の奥深く
まで押し付け、押し込むことが出来る。また、最後に坑
門躯体を組み立てて押し付け、坑口を開設出来る。本発
明の方法により、土留めの作業を省くことが出来るこ
と、景観をそこなわずに坑口の開設が出来ること、採光
の面において追加設備を必要としないこと、また坑口で
の視野も広くなっていることなどの効果を備えた坑門
を、狭い作業基地内で、経済的な工期の中で、また経済
的な工費で造ることが出来る。
According to the present invention, it is possible to safely and economically open a tunnel entrance on a slope or a steep cliff where a landslide may occur. Although a method of assembling a precast product into the lining of the pit and embankment has already been implemented, in the present invention, the lining skeleton can be positively pushed deep into the wellhead and pushed in. Finally, a gate can be opened by assembling and pressing the gate structure. According to the method of the present invention, earth retaining work can be omitted, a tunnel can be opened without deteriorating the scenery, no additional equipment is required in terms of lighting, and the field of view at the tunnel is widened. It is possible to build a gate with such an effect in a narrow work base, within an economical construction period, and at an economical cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例を示す全体の側面図である。FIG. 1 is an overall side view showing an embodiment of the present invention.

【図2】従来の坑口開設方法の一例を示す図である。FIG. 2 is a diagram showing an example of a conventional wellhead opening method.

【図3】本発明の実施例を示す突出型坑門の斜視図であ
る。
FIG. 3 is a perspective view of a projecting type portal showing an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 坑口を開設する山の斜面 2 トンネル掘進予定線 3 パイプルーフ 4 アンカー鋼線の定着部 5 アンカー鋼線 6 ガイドウエー 7 センターホールジャッキ 8 加圧枠 9 覆工躯体、坑門躯体、トンネル・ボーリング
・マシーン 10 刃口 11 坑口 12 坑門 13 面壁 14 側壁 15 プレキャスト坑門(突出型)
1 Slope of the mountain where a pit is to be opened 2 Planned tunnel excavation line 3 Pipe roof 4 Anchoring section of anchor steel wire 5 Anchor steel wire 6 Guideway 7 Center hole jack 8 Pressurizing frame 9 Lining frame, mine gate frame, tunnel boring・ Machine 10 Cutting port 11 Well port 12 Gate 13 Face wall 14 Side wall 15 Precast gate (projection type)

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成10年4月9日[Submission date] April 9, 1998

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】発明の名称[Correction target item name] Name of invention

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【発明の名称】トンネル坑口の発進装置および発進方法Title: Starting device and starting method for tunnel entrance

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】請求項1[Correction target item name] Claim 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0004[Correction target item name] 0004

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0004】躯体の外面には、滑剤を塗布して摩擦を逓
減することで、上面および側面の山留め機能を発揮させ
[0004] A lubricant is applied to the outer surface of the skeleton to gradually reduce the friction so that the upper surface and the side surfaces can perform the function of retaining the mountain.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 山トンネルの坑口開設において、トンネ
ルの予定断面の外周の地山に、複数のアンカー鋼線また
は鋼棒を定着して反力となし、坑口基地にガイドウエー
を敷設し、加圧枠とセンターホールジャッキとアンカー
鋼線を接続してなることを特徴とする、トンネル間の坑
口の発進装置。
At the opening of a tunnel entrance of a mountain tunnel, a plurality of anchor steel wires or steel rods are fixed to the ground around the planned cross section of the tunnel to generate a reaction force, and a guideway is laid at a wellhead base. A starting device for a wellhead between tunnels, comprising connecting a pressure frame, a center hole jack and an anchor steel wire.
【請求項2】 請求項1に記した坑口の発進装置を使用
して、ガイドウエー上の加圧枠と坑口地山面の間に、ト
ンネルのプレキャスト覆工躯体および坑門躯体を組み立
てて、センターホールジャッキを操作して躯体を坑口面
に押付けて、掘削と圧入によって坑口を開設することを
特徴とする坑口の開設方法。
2. A precast lining structure and a portal structure of a tunnel are assembled between the pressurizing frame on the guideway and the ground surface of the wellhead using the wellhead starting device described in claim 1, A method of opening a wellhead, which comprises operating a center hole jack to press the frame against the wellhead surface, and then opening the wellhead by excavation and press-fitting.
【請求項3】 請求項1に記した坑口の発進装置を使用
して、ガイドウエー上の加圧枠と坑口地山面の間に、ト
ンネル・ボーリング・マシーンを設置し、センターホー
ルジャッキを操作してトンネル・ボーリング・マシーン
を坑口面に押付け、以後はトンネル・ボーリング・マシ
ーン自体で掘進を開始することを特徴とする坑口の発進
方法。
3. A tunnel boring machine is installed between the pressurizing frame on the guideway and the ground surface of the wellhead using the wellhead starting device described in claim 1, and the center hole jack is operated. The tunnel boring machine is pressed against the wellbore, and then the tunnel boring machine itself starts excavating itself.
JP11986298A 1998-03-26 1998-03-26 Starting device and method for portal Pending JPH11280373A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11986298A JPH11280373A (en) 1998-03-26 1998-03-26 Starting device and method for portal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11986298A JPH11280373A (en) 1998-03-26 1998-03-26 Starting device and method for portal

Publications (1)

Publication Number Publication Date
JPH11280373A true JPH11280373A (en) 1999-10-12

Family

ID=14772120

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11986298A Pending JPH11280373A (en) 1998-03-26 1998-03-26 Starting device and method for portal

Country Status (1)

Country Link
JP (1) JPH11280373A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100711576B1 (en) * 2005-11-08 2007-04-27 삼성물산 주식회사 Reinforcement structure for entrance of tunnel and construction method thereof
KR101440987B1 (en) * 2013-01-21 2014-09-18 주식회사고려이엔시 System constructing underground structure by the pulling force of tension member and method constructing underground structure thereby
CN106223989A (en) * 2016-08-10 2016-12-14 兰州理工大学 Unsymmetrial loading tunnel hole excavation safeguard structure and construction method
CN107044293A (en) * 2015-12-21 2017-08-15 又炅技术株式会社 A kind of construction method in tunnel
CN111594218A (en) * 2020-05-22 2020-08-28 招商局重庆交通科研设计院有限公司 Steep terrain tunnel diagonal hole-entering structure and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100711576B1 (en) * 2005-11-08 2007-04-27 삼성물산 주식회사 Reinforcement structure for entrance of tunnel and construction method thereof
KR101440987B1 (en) * 2013-01-21 2014-09-18 주식회사고려이엔시 System constructing underground structure by the pulling force of tension member and method constructing underground structure thereby
CN107044293A (en) * 2015-12-21 2017-08-15 又炅技术株式会社 A kind of construction method in tunnel
CN106223989A (en) * 2016-08-10 2016-12-14 兰州理工大学 Unsymmetrial loading tunnel hole excavation safeguard structure and construction method
CN111594218A (en) * 2020-05-22 2020-08-28 招商局重庆交通科研设计院有限公司 Steep terrain tunnel diagonal hole-entering structure and construction method

Similar Documents

Publication Publication Date Title
JPH11280373A (en) Starting device and method for portal
JP2874561B2 (en) Fore piling method with stiffening of the leading leg using a shaft
JPH10205272A (en) Construction method of tunnel and widening method thereof
JP3378615B2 (en) Construction method of tunnel
JP2617267B2 (en) Rock anchoring method for steel pipe piles
JP2001073674A (en) Joining method for shield tunnel
JPH08296252A (en) Pushing device and pushing method for boring machine
JP2002167759A (en) Execution method of foundation pile
JPS6229597B2 (en)
JPH06316927A (en) Installation of open section pile in large diameter
JPS6145036B2 (en)
JPH073766A (en) Method for constructing tunnel
JP2650539B2 (en) Construction method of underground diaphragm wall
JP2002167757A (en) Execution method of foundation pile
JPH0791170A (en) Method of shielding construction
JPS58110796A (en) Method of excavating construction of tunnel
JPS58110797A (en) Method of excavation construction of tunnel making primary covering precede
JP2000226982A (en) Grouting reinforcing method in tunnel excavation
JP2675858B2 (en) Vertical shaft excavation method
JP2000337077A (en) Method for constructing tunnel
JP2932957B2 (en) Underground joint structure of shield machine
JPH0525995A (en) Method for execution of previously placed reinforcing structure and underground space
JPS584021A (en) Underground wall construction work
JPS6088795A (en) Enlarging shield construction method
JPS62228523A (en) Inner drilling work for ready made pile