JP2002167759A - Execution method of foundation pile - Google Patents

Execution method of foundation pile

Info

Publication number
JP2002167759A
JP2002167759A JP2000369558A JP2000369558A JP2002167759A JP 2002167759 A JP2002167759 A JP 2002167759A JP 2000369558 A JP2000369558 A JP 2000369558A JP 2000369558 A JP2000369558 A JP 2000369558A JP 2002167759 A JP2002167759 A JP 2002167759A
Authority
JP
Japan
Prior art keywords
foundation pile
head
enlarged
ground
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000369558A
Other languages
Japanese (ja)
Inventor
Taisuke Uematsu
泰右 植松
Yasuhiko Sugiyama
康彦 杉山
Takahiro Hayashi
隆浩 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyo Asano Foundation Co Ltd
Original Assignee
Toyo Asano Foundation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Asano Foundation Co Ltd filed Critical Toyo Asano Foundation Co Ltd
Priority to JP2000369558A priority Critical patent/JP2002167759A/en
Publication of JP2002167759A publication Critical patent/JP2002167759A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an execution method of a foundation pile for remarkably reducing surplus soil discharged on the ground, and remarkably enhancing bearing power of the foundation pile. SOLUTION: In this execution method of the foundation pile, a screw blade 3 is projected on an outer peripheral surface, an expanding excavating head 2 having a pair of opening windows 4 bored in an outer peripheral wall is arranged on the lower end of the foundation pile 1, a screw auger 5 having a pair of span expanding claws 7 expandably installed in a lower part is inserted into the foundation pile 1 and the expanding excavating head 2, the span expanding claws 7 are inserted into the opening windows 4 of the expanding excavating head 2, the expanding excavating head 2 is connected to the screw auger 5, boring is advanced in the ground while rotating the expanding excavating head 2 by the screw auger 5, most of excavating earth excavated by the screw blade 3 is compacted to the inner periphery of an excavating hole 13, a small quantity of residual surplus soil is discharged on the ground via the screw auger 5, cement milk is injected from a lower part of the screw auger 5, and the foundation pile 1 and the expanding excavating head 2 are joined.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する利用分野】本発明は、基礎杭を地中に埋
設する施工方法に係り、特に、地中を掘削すると共に掘
削土の大半を掘削穴の周りに圧密することが出来、かつ
基礎杭に大きな支持力を付与し得る拡大掘削ヘッドと共
に基礎杭を地中に埋設することが出来る基礎杭の施工方
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for burying a foundation pile in the ground, and more particularly to a method for excavating the ground and consolidating most of the excavated soil around a drilled hole. The present invention relates to a method for constructing a foundation pile capable of burying a foundation pile in the ground together with an enlarged excavation head capable of providing a large bearing capacity to the pile.

【0002】[0002]

【従来の技術】従来のこの種の基礎杭の施工方法として
は、一般的に無振動と無騒音に優れた中堀工法或は外堀
工法が実施されていた。
2. Description of the Related Art As a conventional method of constructing a foundation pile of this kind, a middle moat method or an outer moat method, which is excellent in no vibration and no noise, has been generally carried out.

【0003】これ等の中堀工法及び外堀工法は共に、地
中を掘削して掘削土を地上に排土しながら基礎杭を地中
に埋設する施工法であるために、施工に伴って地上に排
出される土の量が多く、これ等の排土は産業廃棄物とな
るので、その処理が大変であると共に、捨場の確保が難
しく大きな社会問題になっていた。
[0003] Since both the middle and outer excavation methods are construction methods in which the foundation pile is buried in the ground while excavating the ground and excavating the excavated soil on the ground, Since a large amount of soil is discharged, and such soil is turned into industrial waste, it is difficult to dispose of it, and it is difficult to secure a dump site, which has become a major social problem.

【0004】さらに、これ等の中堀工法及び外堀工法で
は、基礎杭の先端にヘッド等を取付けることが出来ない
ので、基礎杭に大きな支持力を得ることが困難である問
題もあった。
[0004] Furthermore, in these middle and outer moat methods, there is a problem that it is difficult to obtain a large supporting force on the basic pile because a head or the like cannot be attached to the tip of the basic pile.

【0005】前述の従来の中堀工法及び外堀工法の欠点
を改善するために、最近になって鋼管杭を使用し、この
鋼管杭を回転させながら地中に埋設する鋼管杭の回転埋
設施工法が実用化されるようになって来た。
[0005] In order to improve the drawbacks of the above-mentioned conventional middle and outer excavation methods, recently a method of rotating and burying steel pipe piles using a steel pipe pile and burying the steel pipe pile in the ground while rotating the steel pipe pile has been proposed. It has come to practical use.

【0006】[0006]

【発明が解決しようとする課題】然るに、この鋼管杭の
回転埋設施工法は、鋼管杭の頭部をチャックして鋼管杭
を回転させながら鋼管杭自体を地中に掘進して埋設する
施工法であるため、地上に排出される掘削土はなく、従
って前述の中堀工法及び外堀工法の問題を全て解決する
ことが出来る得点はあるが、一方で次のような問題点が
生じていた。
However, this method of rotating and burying steel pipe piles is a method of digging and embedding steel pipe piles in the ground while chucking the head of the steel pipe piles and rotating the steel pipe piles. Therefore, there is no excavated soil discharged to the ground. Therefore, there is a score that can solve all the problems of the above-mentioned middle moat method and outer moat method, but on the other hand, the following problems have occurred.

【0007】即ち、前述の鋼管杭の回転埋設施工法は、
鋼管杭の頭部をチャックして大きな力を掛けて鋼管杭を
強制的に回転させるために、鋼管杭にネジレが生じ、最
終的には鋼管杭が破損したり或は損傷が発生する問題が
あった。また、鋼管杭の施工に際しては、鋼管杭を掘進
させる時に排土がないため、地盤抵抗が極めて大きく、
従って鋼管杭の回転埋設による反力が大きくなり、必要
以上に大型の施工機械を使用しなければ施工が出来なく
なる問題もあった。
[0007] That is, the above-mentioned method of rotating and burying steel pipe piles is as follows.
Since the head of the steel pipe pile is chucked and a large force is applied to forcibly rotate the steel pipe pile, the steel pipe pile may be twisted, and eventually the steel pipe pile may be damaged or damaged. there were. In addition, when constructing steel pipe piles, there is no earth removal when excavating the steel pipe piles, so the ground resistance is extremely large,
Therefore, the reaction force due to the rotary burial of the steel pipe pile is increased, and there is also a problem that the construction cannot be performed unless an unnecessarily large construction machine is used.

【0008】本発明に係る基礎杭の施工方法は、前述の
従来の多くの問題点に鑑み開発された全く新しい技術で
あって、特に外周面にスクリュー刃を突設した基礎杭の
外径より大きな外径を有する拡大掘削ヘッド上に基礎杭
を乗せ、スクリューオーガーで拡大掘削ヘッドを回転さ
せて地中を掘削しながら掘削土の大半を穴の周面に圧密
すると共に、その圧密した後の残土をスクリューオーガ
ーによって地上に排出して拡大掘削ヘッドと共に基礎杭
を地中に埋設することが出来る全く新しい基礎杭の施工
方法の技術を提供するものである。
The method for constructing a foundation pile according to the present invention is a completely new technique developed in view of the above-mentioned many problems in the prior art. Place the foundation pile on the enlarged excavation head with a large outer diameter, rotate the enlarged excavation head with a screw auger and excavate underground while consolidating most of the excavated soil to the surrounding surface of the hole, and after the consolidation An object of the present invention is to provide a completely new foundation pile construction method capable of discharging residual soil to the ground by a screw auger and burying the foundation pile together with an enlarged drilling head in the ground.

【0009】[0009]

【課題を解決するための手段】本発明の係る基礎杭の施
工方法は、前述の従来の基礎杭の施工方法の問題点を根
本的に改善した発明であって、その第1発明の要旨は、
基礎杭の外径の1.5〜2.5倍の外径を有し、かつ外
周面にスクリュー刃を突設した拡大掘削ヘッド上に該基
礎杭を戴置し、かつ該基礎杭の中空部に挿入したスクリ
ューオーガーを前記拡大掘削ヘッドに接続した後で、該
スクリューオーガーを介して前記拡大掘削ヘッドを回転
させて地中を掘削しながら前記スクリュー刃で掘削土を
掘削穴の周面に圧密し、かつ圧密した後の少量の残土を
スクリューオーガーによって地上に排出し、拡大掘削ヘ
ッドと共に基礎杭を地中に埋設することを特徴とした基
礎杭の施工方法である。
SUMMARY OF THE INVENTION The method for constructing a foundation pile according to the present invention is an invention which fundamentally improves on the problems of the conventional method for constructing a foundation pile described above, and the gist of the first invention is as follows. ,
Placing the foundation pile on an enlarged excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile and projecting a screw blade on the outer peripheral surface, and hollowing the foundation pile After connecting the screw auger inserted in the part to the enlarged excavation head, the excavated soil is excavated on the peripheral surface of the excavation hole with the screw blade while rotating the enlarged excavation head through the screw auger to excavate underground. This is a method for constructing a foundation pile, which comprises compacting and discharging a small amount of residual soil after compaction to the ground by a screw auger, and burying the foundation pile together with an enlarged excavation head in the ground.

【0010】前述の第1発明に係る基礎杭の施工方法
は、基礎杭の下方にこの基礎杭の外径の1.5〜2.5
倍の外径を有する拡大掘削ヘッドを接続した状態で地中
に埋設するので、前記基礎杭に大きな支持力を付与する
ことが出来る。
The method for constructing a foundation pile according to the first aspect of the present invention is characterized in that the foundation pile has an outer diameter of 1.5 to 2.5 mm below the foundation pile.
Since it is buried in the ground in a state where the enlarged excavating head having a double outer diameter is connected, a large supporting force can be given to the foundation pile.

【0011】また、前記拡大掘削ヘッドの外周面にはス
クリュー刃が突設されており、かつこの拡大掘削ヘッド
はスクリューオーガーで回転させながら地中を掘進する
ので、前記スクリュー刃で地中を掘削する際に生ずる掘
削土の大半をスクリュー刃で掘削穴の周面に圧密するこ
とが出来、かつ、掘削穴の周面に圧密されなかった少量
の残土のみをスクリューオーガーによって地上に排出す
ることが出来る。従って、地上に排出される残土量を極
めて少くすることが出来る。
Further, a screw blade protrudes from an outer peripheral surface of the enlarged excavation head, and the enlarged excavation head excavates underground while rotating with a screw auger. Most of the excavated soil generated during the drilling can be compacted to the peripheral surface of the drilled hole with a screw blade, and only a small amount of residual soil not compacted to the peripheral surface of the drilled hole can be discharged to the ground by a screw auger. I can do it. Therefore, the amount of residual soil discharged to the ground can be extremely reduced.

【0012】本発明に係る基礎杭の施工方法の第2発明
の要旨は、前記基礎杭の周りに鋼管ケーシングを被覆す
ると共に該鋼管ケーシングの下部を前記拡大掘削ヘッド
に接続し、該鋼管ケーシングと拡大掘削ヘッドとを回転
させて地中を掘削しながら拡大掘削ヘッドと基礎杭を地
中に埋設することを特徴とした第1発明の基礎杭の施工
方法である。
[0012] The gist of the second invention of a method for constructing a foundation pile according to the present invention is to cover a steel pipe casing around the foundation pile and connect a lower portion of the steel pipe casing to the enlarged excavation head. A method for constructing a foundation pile according to the first invention, characterized in that the enlarged drilling head and the foundation pile are buried in the ground while excavating underground by rotating the enlarged drilling head.

【0013】前述の第2発明の基礎杭の施工方法に於て
は、基礎杭の周りに鋼管ケーシングを被覆すると共に、
この鋼管ケーシングを前記拡大掘削ヘッドに接続し、鋼
管ケーシングを拡大掘削ヘッドと共に回転させながら地
中を掘進させるので、鋼管ケーシングによって掘削穴の
周りの土砂の抵抗を切断することが出来、これによって
掘進をスムーズにすることが出来る。
In the method for constructing a foundation pile according to the second aspect of the present invention, a steel pipe casing is coated around the foundation pile,
The steel pipe casing is connected to the enlarged drilling head, and the steel pipe casing is excavated in the ground while rotating together with the enlarged drilling head. Can be smoothed.

【0014】本発明に係る基礎杭の施工方法の第3明の
要旨は、前記拡大掘削ヘッドと基礎杭とを地中に埋設し
た後でセメントミルクを掘削穴の中に注入して該拡大掘
削ヘッドと基礎杭とを一体的に結合させると共に基礎杭
の下端部の周りを根固めすることを特徴とした第1発明
或は第2発明の基礎杭の施工方法である。
The gist of the third aspect of the method for constructing a foundation pile according to the present invention is that the enlarged drilling head and the foundation pile are buried in the ground, and then cement milk is injected into the drilled hole to perform the enlarged drilling. A method for constructing a foundation pile according to the first invention or the second invention, characterized in that a head and a foundation pile are integrally connected and a root is fixed around a lower end portion of the foundation pile.

【0015】前述の第3発明の基礎杭の施工方法に於て
は、拡大掘削ヘッドと基礎杭とが地中に埋設された後
で、掘削穴の中にセメントミルクを注入して固化させる
ので、このセメントミルクを介して前記基礎杭と拡大掘
削ヘッドとを相互に一体的に結合させることが出来る。
これによって基礎杭の下端部の周りを根固めし、基礎杭
の支持力を著るしく向上せしめることが出来る。
In the method for constructing a foundation pile according to the third aspect of the present invention, cement milk is injected into an excavation hole and solidified after the enlarged excavation head and the foundation pile are buried in the ground. The foundation pile and the enlarged excavation head can be integrally connected to each other via the cement milk.
As a result, the lower end of the foundation pile can be solidified and the bearing capacity of the foundation pile can be significantly improved.

【0016】[0016]

【発明の実施の形態】図により本発明に係る基礎杭の施
工方法について、その一実施例を具体的に説明すると、
図1(a)、(b)は夫々本発明の基礎杭の施工方法の
実施に当って用いられる装置の要部の簡略説明図、図2
(a)、(b)は夫々本発明の基礎杭の施工方法の実施
に当って鋼管ケーシングを用いた場合の要部の簡略説明
図、図3(a)乃至(e)は夫々本発明の基礎杭の施工
方法の工程を示す簡略説明図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing a construction method of a foundation pile according to the present invention.
FIGS. 1 (a) and 1 (b) are simplified explanatory diagrams of a main part of an apparatus used for carrying out the method for constructing a foundation pile according to the present invention, respectively.
(A) and (b) are simplified explanatory views of a main part when a steel pipe casing is used in carrying out the method for constructing a foundation pile according to the present invention, and FIGS. 3 (a) to 3 (e) respectively show the present invention. It is a simplified explanatory view showing a process of a construction method of a foundation pile.

【0017】図1(a)、(b)乃至図3(a)〜
(e)に於て、1はコンクリート製の基礎杭(パイル)
であって、中空状に形成されている。2は中空状の拡大
掘削ヘッドであって、この拡大掘削ヘッド2の外周面に
はスクリュー刃3が突設されている。
1 (a), 1 (b) to 3 (a) to
In (e), 1 is a concrete foundation pile (pile)
And is formed in a hollow shape. Reference numeral 2 denotes a hollow enlarged excavating head, and a screw blade 3 is provided on an outer peripheral surface of the enlarged excavating head 2.

【0018】この拡大掘削ヘッド2の外径(スクリュー
刃3を含めた外径)は、例えば、600mmに対して1
200mmとなるような、基礎杭1の1.5〜2.5倍
の外径を有している。前記拡大掘削ヘッド2の外壁には
対応する位置に後述の拡翌爪を挿通することが出来る一
対の開口窓4が穿設されている。
The outer diameter (outer diameter including the screw blade 3) of the enlarged excavating head 2 is, for example, 1 mm per 600 mm.
It has an outer diameter of 1.5 to 2.5 times that of the foundation pile 1 so as to be 200 mm. A pair of opening windows 4 through which an enlarging nail, which will be described later, can be inserted is formed at an outer wall of the enlarged excavation head 2 at a corresponding position.

【0019】図中5はスクリューオーガーであって、前
記基礎杭1及び拡大掘削ヘッド2内に挿通し得る径を有
し、かつ、その内部には油、エアー或はセメントミルク
等を流通させるために中空状に形成されており、その外
周面にはスクリュー刃6が突設されている。
In the figure, reference numeral 5 denotes a screw auger, which has a diameter capable of being inserted into the foundation pile 1 and the enlarged excavation head 2 and through which oil, air or cement milk flows. And a screw blade 6 protrudes from the outer peripheral surface thereof.

【0020】さらに、スクリューオーガー5の下部に
は、図示せざる油圧装置等によって自在に伸縮すること
が出来る拡翌爪7が両側に突設されている。また、スク
リューオーガー5の最下端には先端スクリュー刃8が取
付けられている。
Further, at the lower portion of the screw auger 5, expansion pawls 7 which can be freely expanded and contracted by a hydraulic device or the like (not shown) are provided on both sides to protrude. Further, a tip screw blade 8 is attached to the lowermost end of the screw auger 5.

【0021】前記スクリューオーガー5の下部と拡大掘
削ヘッド2とを相互に連結するに当っては、特に図1
(b)に示す如く、一対の拡翌爪7を収縮させた状態で
拡大掘削ヘッド2内に挿入し、次に前述の油圧装置等を
作動させることによって、拡翌爪7を外方に伸ばして拡
大掘削ヘッド2に設けられた開口窓4内に挿通する。こ
れによって、拡大掘削ヘッド2をスクリューオーガー5
に結合させることが出来る。
In connecting the lower portion of the screw auger 5 and the enlarged excavating head 2 to each other, particularly, FIG.
As shown in (b), the pair of expansion pawls 7 are inserted into the enlarged excavation head 2 in a contracted state, and then the above-described hydraulic device or the like is operated to extend the expansion pawls 7 outward. Through the opening window 4 provided in the enlarged excavation head 2. As a result, the enlarged excavating head 2 is connected to the screw auger 5
Can be combined with

【0022】本発明に係る基礎杭の施工方法の基本的方
法に於ては、図1(b)の状態に構成された装置を用い
て、スクリューオーガー5を回転させることによって、
拡大掘削ヘッド2及び先端スクリュー刃8で地中を掘進
させ、掘削穴を形成すると共に、拡大掘削ヘッド2のス
クリュー刃3で掘削した大半の掘削土を掘削穴13の内
周面に圧密させ、かつ圧密の際に残った少量の残土をス
クリューオーガー5を介して地上に排出する。
In the basic method for constructing a foundation pile according to the present invention, the screw auger 5 is rotated by using an apparatus configured as shown in FIG.
The excavation head 2 and the tip screw blade 8 excavate underground to form a drill hole, and most of the excavated soil excavated with the screw blade 3 of the enlarge drill head 2 is compacted on the inner peripheral surface of the drill hole 13. In addition, a small amount of soil remaining during the consolidation is discharged to the ground via the screw auger 5.

【0023】前述のような作業を続けることによって、
基礎杭1と拡大掘削ヘッド2を地中内の一定の深さまで
掘進させた状態で、前記スクリューオーガー5の下部に
設けられた拡翌爪7を収縮させて開口窓4より抜き取っ
て、スクリューオーガー5と拡大掘削ヘッド2との結合
を解除する。
By continuing the work described above,
With the foundation pile 1 and the enlarged excavation head 2 excavated to a certain depth in the ground, the expansion nail 7 provided at the lower portion of the screw auger 5 is contracted and pulled out from the opening window 4 to remove the screw auger. 5 and the enlarged excavation head 2 are released.

【0024】続いてスクリューオーガー5の中空部を利
用してその下部よりセメントミルク(図示せず)を掘削
穴13の中に充填させ、該セメントミルクを固化させる
ことによってセメントミルクを介して基礎杭1と拡大掘
削ヘッド2とを相互に一体的に連結することが出来る。
Subsequently, using a hollow portion of the screw auger 5, cement milk (not shown) is filled into the excavation hole 13 from the lower portion thereof, and the cement milk is solidified to thereby form a foundation pile via the cement milk. 1 and the enlarged excavation head 2 can be integrally connected to each other.

【0025】前記実施例に於ては、鋼管ケーシングを用
いずに本発明の施工方法を実施したが、次に鋼管ケーシ
ングを使用して本発明の施工方法を実施する実施例につ
いて詳述する。
In the above embodiment, the construction method of the present invention was carried out without using a steel pipe casing. Next, an embodiment in which the construction method of the present invention is carried out using a steel pipe casing will be described in detail.

【0026】図2(a)、(b)及び図3(a)〜
(e)に於て、9は前記基礎杭1の周りに被覆し得る鋼
管ケーシングであって、この鋼管ケーシング9の下端縁
には対応する位置に一対のカギ溝10が穿設されてい
る。また、前述の拡大掘削ヘッド2の外周面所定位置に
は、前記カギ溝10内に挿入し得る一対の突起11が夫
々所定位置に突設されている。
FIGS. 2 (a) and 2 (b) and FIGS.
In (e), reference numeral 9 denotes a steel pipe casing capable of covering around the foundation pile 1, and a pair of key grooves 10 are formed at corresponding positions on the lower end edge of the steel pipe casing 9. At a predetermined position on the outer peripheral surface of the enlarged excavation head 2, a pair of protrusions 11 that can be inserted into the key groove 10 are respectively provided at predetermined positions.

【0027】前述の鋼管ケーシング9を用いて本発明の
基礎杭の施工方法を施工する場合には、図に示すよう
に、基礎杭1の周りに被覆された鋼管ケーシング9を下
降させてこの鋼管ケーシング9の下端部を拡大掘削ヘッ
ド2の上端部の周りに被覆させながら、鋼管ケーシング
9のカギ溝10と拡大掘削ヘッド2の突起11とを相互
に位置合わせし、この状態で突起11をカギ溝10に挿
入し、さらに鋼管ケーシング9或は拡大掘削ヘッド2を
所定方向に回転させることによって、突起11をカギ溝
10の折曲最奥部に挿入して、鋼管ケーシング9と拡大
掘削ヘッド2とを相互に結合させることが出来る。
When the method for constructing a foundation pile according to the present invention is carried out by using the above-mentioned steel pipe casing 9, as shown in FIG. While covering the lower end portion of the casing 9 around the upper end portion of the enlarged excavation head 2, the key groove 10 of the steel pipe casing 9 and the projection 11 of the enlarged excavation head 2 are aligned with each other. By inserting the projection 11 into the bent innermost part of the key groove 10 by rotating the steel pipe casing 9 or the enlarged excavation head 2 in a predetermined direction, the steel pipe casing 9 and the enlarged excavation head 2 are rotated. Can be combined with each other.

【0028】続いて、図3(a)乃至(c)に示す如
く、拡大掘削ヘッド2を回転させながら地中を掘進させ
て、該拡大掘削ヘッド2と鋼管ケーシング9及び基礎杭
1とを所定の位置、即ち基礎杭1の下部及び拡大掘削ヘ
ッド2が支持層地盤12内に挿入される位置迄に埋設す
ることが出来る。このように鋼管ケーシング9を使用し
た場合には、鋼管ケーシング9を拡大掘削ヘッド2と共
に回転させながら掘進させることが出来るので、掘削穴
13の周面の土砂との関係を断ち切ることが出来、従っ
て拡大掘削ヘッド2と基礎杭1との掘進をよりスムーズ
に行うことが出来る。
Subsequently, as shown in FIGS. 3 (a) to 3 (c), the enlarged excavation head 2 is excavated in the ground while rotating, and the enlarged excavation head 2, the steel pipe casing 9 and the foundation pile 1 are fixed to each other. , That is, a position where the lower part of the foundation pile 1 and the enlarged excavation head 2 are inserted into the support layer ground 12. When the steel pipe casing 9 is used as described above, the steel pipe casing 9 can be excavated while being rotated together with the enlarged excavation head 2, so that the relationship between the steel pipe casing 9 and the soil on the peripheral surface of the excavation hole 13 can be cut off. Excavation between the enlarged excavation head 2 and the foundation pile 1 can be performed more smoothly.

【0029】前述の図3(c)の状態の時にスクリュー
オーガー5の下部よりセメントミルクを掘削穴13内に
注出する。セメントミルクの注出が完了した後で、図3
(d)、(e)に示す如く、鋼管ケーシング9或は拡大
掘削ヘッド2を所定方向に回転しながら鋼管ケーシング
9を上昇させることによって、カギ溝10より突起11
を抜き取り、かつ鋼管ケーシング9とスクリューオーガ
ー5とを基礎杭1より抜き取って、本発明に係る施工方
法を完了せしめることが出来る。
In the state shown in FIG. 3C, the cement milk is poured into the excavation hole 13 from the lower part of the screw auger 5. After the pouring of the cement milk is completed, FIG.
As shown in (d) and (e), by raising the steel pipe casing 9 while rotating the steel pipe casing 9 or the enlarged excavation head 2 in a predetermined direction, the protrusions 11 from the key grooves 10 are formed.
And the steel pipe casing 9 and the screw auger 5 are removed from the foundation pile 1 to complete the construction method according to the present invention.

【0030】前述のように、本発明の施工方法を実施し
た場合には、拡大掘削ヘッド2の外周にスクリュー刃3
を設けると共に、この拡大掘削ヘッド2をスクリューオ
ーガー5で回転させながら地中を掘削するので、スクリ
ュー刃3で掘削した掘削土の大半を掘削穴13の内周部
に圧密させることが出来る。
As described above, when the construction method of the present invention is carried out, the screw blade 3
In addition, since the excavation head 2 is excavated in the ground while rotating the enlarged excavation head 2 with the screw auger 5, most of the excavated soil excavated with the screw blade 3 can be compacted in the inner peripheral portion of the excavation hole 13.

【0031】掘削穴13に圧密されなかった掘削土の残
りの少量の残土は、スクリューオーガー5によって基礎
杭1内を通って地上に排出される。従って本発明の施工
方法を実施した場合には、極めて少量に残土が地上に排
出されるので、残土処理もそれ程手間と費用を掛けずに
実施することが出来る。
A small amount of the remaining excavated soil not compacted in the excavation hole 13 is discharged to the ground through the foundation pile 1 by the screw auger 5. Therefore, when the construction method of the present invention is carried out, the remaining soil is discharged to the ground in a very small amount, so that the processing of the remaining soil can be carried out without much trouble and cost.

【0032】また、本発明を実施した場合には、基礎杭
1よりも外径の大きな拡大掘削ヘッド2を基礎杭1の下
端に設置することが出来るので、基礎杭1の支持力をよ
り大きくすることが出来る。さらに、セメントミルクを
掘削穴13内に注入した場合には、このセメントミルク
によって、基礎杭1と拡大掘削ヘッド2とを相互に一体
的に結合させることが出来、これによって基礎杭1の支
持力を極めて強化することが出来る。
Further, when the present invention is implemented, an enlarged excavation head 2 having a larger outer diameter than the foundation pile 1 can be installed at the lower end of the foundation pile 1, so that the supporting force of the foundation pile 1 is increased. You can do it. Furthermore, when cement milk is injected into the drill hole 13, the cement pile allows the foundation pile 1 and the enlarged excavation head 2 to be integrally connected to each other, whereby the bearing capacity of the foundation pile 1 is increased. Can be greatly enhanced.

【0033】[0033]

【発明の効果】本発明に係る基礎杭の施工方法は、基礎
杭の下方にこの基礎杭の外径の1.5〜2.5倍の外径
を有する拡大掘削ヘッドを接続した状態で地中に埋設す
るので、前記基礎杭に大きな支持力を付与することが出
来る効果を有している。
According to the method for constructing a foundation pile according to the present invention, a ground excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile is connected below the foundation pile. Since it is buried inside, there is an effect that a large supporting force can be given to the foundation pile.

【0034】かつ、前記拡大掘削ヘッドの外周面にはス
クリュー刃が突設されており、かつこの拡大掘削ヘッド
はスクリューオーガーで回転させながら地中を掘進する
ので、前記スクリュー刃で地中を掘削する際に生ずる掘
削土の大半をスクリュー刃で掘削穴の周面に圧密するこ
とが出来、かつ、掘削穴の周面に圧密されなかった少量
の残土のみをスクリューオーガーによって地上に排出す
ることが出来る。従って、地上に排出される残土量を極
めて少くすることが出来る効果も有している。
A screw blade protrudes from an outer peripheral surface of the enlarged excavation head. The enlarged excavation head excavates underground while rotating with a screw auger. Most of the excavated soil generated during the drilling can be compacted to the peripheral surface of the drilled hole with a screw blade, and only a small amount of residual soil not compacted to the peripheral surface of the drilled hole can be discharged to the ground by a screw auger. I can do it. Therefore, there is also an effect that the amount of residual soil discharged to the ground can be extremely reduced.

【0035】また、本発明の実施に当って、基礎杭の周
りに鋼管ケーシングを被覆すると共に、この鋼管ケーシ
ングを前記拡大掘削ヘッドに接続し、鋼管ケーシングを
拡大掘削ヘッドと共に回転させながら地中を掘進させた
場合には、鋼管ケーシングによって掘削穴の周りの土砂
の抵抗を切断することが出来、これによって掘進をスム
ーズにすることが出来る効果を有している。
In practicing the present invention, a steel pipe casing is coated around the foundation pile, and the steel pipe casing is connected to the enlarged drilling head. In the case of excavation, the resistance of the earth and sand around the excavation hole can be cut off by the steel pipe casing, which has the effect of making excavation smooth.

【0036】さらに、拡大掘削ヘッドと基礎杭とが地中
に埋設された後で、掘削穴の中にセメントミルクを注入
して固化させた場合には、このセメントミルクを介して
前記基礎杭と拡大掘削ヘッドとを相互に一体的に結合さ
せることが出来る。これによって基礎杭の下端部の周り
を根固めし、基礎杭の支持力を著るしく向上せしめるこ
とが出来る効果を有している。
Further, when cement milk is injected into the excavation hole and solidified after the enlarged excavation head and the foundation pile are buried in the ground, the foundation pile and the foundation pile are connected via the cement milk. The enlarged drilling head can be integrally connected to each other. This has the effect of solidifying the periphery of the lower end of the foundation pile and significantly improving the support force of the foundation pile.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1(a)、(b)は夫々本発明の基礎杭の施
工方法の実施に当って用いられる装置の要部の簡略説明
図である。
FIGS. 1 (a) and 1 (b) are simplified explanatory views of the main parts of an apparatus used for carrying out a method for constructing a foundation pile according to the present invention.

【図2】図2(a)、(b)は夫々本発明の基礎杭の施
工方法の実施に当って鋼管ケーシングを用いた場合の要
部の簡略説明図である。
FIGS. 2 (a) and 2 (b) are simplified explanatory views of a main part when a steel pipe casing is used in carrying out a method for constructing a foundation pile according to the present invention, respectively.

【図3】図3(a)乃至(e)は夫々本発明の基礎杭の
施工方法の工程を示す簡略説明図である。
FIGS. 3A to 3E are simplified explanatory views showing steps of a method for constructing a foundation pile according to the present invention.

【符号の説明】[Explanation of symbols]

1 …基礎杭 2 …拡大掘削ヘッド 3 …スクリュー刃 4 …開口窓 5 …スクリューオーガー 6 …スクリュー刃 7 …拡翌爪 8 …先端スクリュー刃 9 …鋼管ケーシング 10 …カギ溝 11 …突起 12 …支持層地盤 13 …掘削穴 DESCRIPTION OF SYMBOLS 1 ... Foundation pile 2 ... Enlarged excavation head 3 ... Screw blade 4 ... Opening window 5 ... Screw auger 6 ... Screw blade 7 ... Expansion nail 8 ... Tip screw blade 9 ... Steel pipe casing 10 ... Key groove 11 ... Projection 12 ... Support layer Ground 13… Drilled hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 林 隆浩 東京都渋谷区千駄ヶ谷5−27−9 株式会 社トーヨーアサノ内 Fターム(参考) 2D041 AA02 BA12 BA13 BA35 CA05 DB03 FA14 2D050 AA07 AA16 BB02 BB05 CA05 CB05 EE03  ──────────────────────────────────────────────────の Continuing on the front page (72) Inventor Takahiro Hayashi 5-27-9 Sendagaya, Shibuya-ku, Tokyo F-term in Toyo Asano (reference) 2D041 AA02 BA12 BA13 BA35 CA05 DB03 FA14 2D050 AA07 AA16 BB02 BB05 CA05 CB05 EE03

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 基礎杭の外径の1.5〜2.5倍の外径
を有し、かつ外周面にスクリュー刃を突設した拡大掘削
ヘッド上に該基礎杭を戴置し、かつ該基礎杭の中空部に
挿入したスクリューオーガーを前記拡大掘削ヘッドに接
続した後で、該スクリューオーガーを介して前記拡大掘
削ヘッドを回転させて地中を掘削しながら前記スクリュ
ー刃で掘削土を掘削穴の周面に圧密し、かつ圧密した後
の少量の残土をスクリューオーガーによって地上に排出
し、拡大掘削ヘッドと共に基礎杭を地中に埋設すること
を特徴とした基礎杭の施工方法。
1. The foundation pile is placed on an enlarged excavation head having an outer diameter of 1.5 to 2.5 times the outer diameter of the foundation pile and having a screw blade protruding on the outer peripheral surface, and After connecting the screw auger inserted into the hollow portion of the foundation pile to the enlarged excavation head, excavating excavated soil with the screw blade while excavating underground by rotating the enlarged excavation head via the screw auger. A method of constructing a foundation pile, comprising compacting the periphery of a hole, discharging a small amount of soil after compaction to the ground by a screw auger, and burying the foundation pile together with an enlarged excavation head.
【請求項2】 前記基礎杭の周りに鋼管ケーシングを被
覆すると共に該鋼管ケーシングの下部を前記拡大掘削ヘ
ッドに接続し、該鋼管ケーシングと拡大掘削ヘッドとを
回転させて地中を掘削しながら拡大掘削ヘッドと基礎杭
を地中に埋設することを特徴とした請求項1の基礎杭の
施工方法。
2. A steel pipe casing is covered around the foundation pile and a lower portion of the steel pipe casing is connected to the enlarged drilling head, and the steel pipe casing and the enlarged drilling head are rotated to expand while drilling in the ground. 2. The method according to claim 1, wherein the excavating head and the foundation pile are buried underground.
【請求項3】 前記拡大掘削ヘッドと基礎杭とを地中に
埋設した後でセメントミルクを掘削穴の中に注入して、
該拡大掘削ヘッドと基礎杭とを一体的に結合させると共
に基礎杭の下端部の周りを根固めすることを特徴とした
請求項1或は請求項2の基礎杭の施工方法。
3. Injecting cement milk into the drilling hole after burying the enlarged drilling head and foundation pile in the ground,
3. The method for constructing a foundation pile according to claim 1, wherein the enlarged excavation head and the foundation pile are integrally connected and the periphery of the lower end of the foundation pile is solidified.
JP2000369558A 2000-12-05 2000-12-05 Execution method of foundation pile Pending JP2002167759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000369558A JP2002167759A (en) 2000-12-05 2000-12-05 Execution method of foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000369558A JP2002167759A (en) 2000-12-05 2000-12-05 Execution method of foundation pile

Publications (1)

Publication Number Publication Date
JP2002167759A true JP2002167759A (en) 2002-06-11

Family

ID=18839573

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000369558A Pending JP2002167759A (en) 2000-12-05 2000-12-05 Execution method of foundation pile

Country Status (1)

Country Link
JP (1) JP2002167759A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169827A (en) * 2004-12-16 2006-06-29 Jfe Steel Kk Screwed pile and its construction method
JP2015161143A (en) * 2014-02-28 2015-09-07 大和ハウス工業株式会社 Drilling edge attachment steel pipe for construction of cast-in-place concrete system pile, and construction method of cast-in-contact system pile
WO2020023349A1 (en) * 2018-07-24 2020-01-30 Ojjo, Inc. Threaded truss foundations and related systems, methods, and machines
EP3973107A4 (en) * 2019-05-22 2023-03-22 Stroyer, Benjamin, G. Displacement pile and pile driver adapter

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169827A (en) * 2004-12-16 2006-06-29 Jfe Steel Kk Screwed pile and its construction method
JP4604698B2 (en) * 2004-12-16 2011-01-05 Jfeスチール株式会社 Screwed pile and its construction method
JP2015161143A (en) * 2014-02-28 2015-09-07 大和ハウス工業株式会社 Drilling edge attachment steel pipe for construction of cast-in-place concrete system pile, and construction method of cast-in-contact system pile
WO2020023349A1 (en) * 2018-07-24 2020-01-30 Ojjo, Inc. Threaded truss foundations and related systems, methods, and machines
US10697490B2 (en) 2018-07-24 2020-06-30 Ojjo, Inc. Threaded truss foundations and related systems, methods, and machines
CN112840083A (en) * 2018-07-24 2021-05-25 Ojjo股份有限公司 Thread truss foundations and related systems, methods, and machines
CN112867827A (en) * 2018-07-24 2021-05-28 Ojjo股份有限公司 Thread truss foundations and related systems, methods, and machines
EP3973107A4 (en) * 2019-05-22 2023-03-22 Stroyer, Benjamin, G. Displacement pile and pile driver adapter

Similar Documents

Publication Publication Date Title
JPH0586791A (en) No muck discharge type device for driving foundation pile and no muck discharge type for driving foundation pile
JP2001336149A (en) Taper pile for civil engineering and building work foundation construction, foundation construction equipment therefor, and embedding method therefor
JP2002167759A (en) Execution method of foundation pile
JP2006342560A (en) Construction method of foundation pile
JP4523716B2 (en) Foundation pile construction method
JP3165997B2 (en) Casting method and equipment for sheet piles
JPS60119816A (en) Formation of continuous pile
JPH06316927A (en) Installation of open section pile in large diameter
JPH11280373A (en) Starting device and method for portal
JP2000297430A (en) Cast-in-place concrete pile by pulling out steel pipe form
JP2003003459A (en) Joint grout method
JP2006348564A (en) Construction method of foundation pile and foundation consolidation structure of foundation pile
JP2004278250A (en) Method for positioning concrete pile
JP2006169828A (en) Method for excavating posthole, and structure of foundation pile
JP2004011241A (en) Burying method of pile and excavating device used therefor
JP2575088B2 (en) Improvement method and equipment of foundation ground
JPS5894598A (en) Level drilling method and drill guide used therein
JP2005240395A (en) Rotary embedding method for pile
JPH0325121A (en) Sinking of pile in inner drilling pile method
JP3007755U (en) Magnifying head
JP2004156381A (en) Ground improvement method
JP2785541B2 (en) Burial method for pillars
JPS60133189A (en) Casing auger construction method
JP4080777B2 (en) Ground improvement method and apparatus
JPH05118081A (en) Soil pipe laying method and mounting socket used for method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070515

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081104

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090203

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090310

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090310

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090407