JP3165997B2 - Casting method and equipment for sheet piles - Google Patents
Casting method and equipment for sheet pilesInfo
- Publication number
- JP3165997B2 JP3165997B2 JP11883996A JP11883996A JP3165997B2 JP 3165997 B2 JP3165997 B2 JP 3165997B2 JP 11883996 A JP11883996 A JP 11883996A JP 11883996 A JP11883996 A JP 11883996A JP 3165997 B2 JP3165997 B2 JP 3165997B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- sheet pile
- pipe sheet
- hole hammer
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、建設工事における
鋼管矢板の打設工法および装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for driving steel sheet pile in construction work.
【0002】[0002]
【従来の技術】砂礫、転石、捨石、コンクリート中での
締切工事、土留壁工事における鋼管矢板の打設工事、急
傾斜地盤および水中の硬質地盤、岩盤等における鋼管矢
板土留壁、締切、護岸、構台、桟橋工事等の鋼管矢板の
打設工事で、パイルハンマー、油圧(空圧)ハンマー、
バイブロハンマー等の各種ハンマーで鋼管矢板を直接そ
のままの地盤に打撃することがある。2. Description of the Related Art Cut-off work in sand and gravel, boulders, rubble, concrete, construction of steel pipe sheet piles in earth retaining wall construction, steel pipe sheet pile soil retaining walls in steep ground and underwater hard ground, rock, etc. Pile hammers, hydraulic (pneumatic) hammers,
Steel pipe sheet piles may be hit directly on the ground with various hammers such as a vibro hammer.
【0003】このようなハンマーで直接打撃した場合、
礫地盤や転石等があると、打撃により鋼管矢板の変形、
破損を生じ、打設が不可能となるおそれがある。When directly hit with such a hammer,
If there is a gravel ground or a boulder, etc.
There is a possibility that damage will be caused and casting will not be possible.
【0004】そこで現在の工法としては、全旋回式ケー
シング圧入機と、ハンマークラブバケット、重垂式チゼ
ル、ダウンザホールハンマー等の併用によって削孔を行
い、良質土砂に置換え、これをラップしながら壁状に連
続施工後、その改良した場所に鋼管矢板を打設してい
る。この場合の良質土砂に置換えのための掘削径は当然
鋼管矢板の径よりもかなり大きい径となる。[0004] Therefore, as a current construction method, drilling is performed by using a full-rotation type casing press-fitting machine and a hammer club bucket, a double vertical chisel, a down-the-hole hammer, etc., and is replaced with good-quality earth and sand. After continuous construction, steel sheet piles are cast in the improved places. In this case, the excavation diameter for replacing with good-quality earth and sand is naturally considerably larger than the diameter of the steel pipe sheet pile.
【0005】[0005]
【発明が解決しようとする課題】かかる従来の置替え工
法では、急傾斜地盤や水深の大きい湖床、河床、海底地
盤等での施工では、置替え改良工事を行うための全旋回
式ケーシング圧入機の設置架台などを初めとして非常に
大規模な仮設設備を必要とし、また、ケーシング建込み
による置換えのラップ施工精度の確保が難しい。In such a conventional replacement method, in a construction on a steeply sloping ground or a lake bed, a riverbed, or a seabed with a large depth of water, etc., a fully swiveling casing press-fitting for performing the replacement improvement work is required. It requires very large-scale temporary facilities such as a machine installation stand, and it is difficult to ensure the accuracy of wrapping work for replacement by installing a casing.
【0006】本発明の目的は前記従来例の不都合を解消
し、従来の置替え工法の場合と比べて掘削・削孔範囲が
鋼管矢板外径に近接させることができ、しかも、良質土
砂に置換える工程を経ずに掘削・削孔と同時に1工程で
鋼管矢板の打設を大掛かりの仮設設備を用いずとも精度
良く行うことができる鋼管矢板の打設工法および装置を
提供することにある。SUMMARY OF THE INVENTION An object of the present invention is to solve the above-mentioned disadvantages of the prior art, and to make the excavation and drilling area closer to the outer diameter of the steel pipe sheet pile as compared with the case of the conventional replacement method. It is an object of the present invention to provide a steel pipe sheet pile driving method and apparatus that can accurately perform the steel pipe sheet pile driving in one step at the same time as excavation and drilling without using a large-scale temporary facility.
【0007】[0007]
【課題を解決するための手段】本発明は前記目的を達成
するため、鋼管矢板の打設工法としては、使用するダウ
ンザホールハンマーはビット部が拡径可能なものとし、
杭打機に装着したダウンザホールハンマー及びロッドを
鋼管矢板内に挿入し、鋼管矢板は断面L字形のアングル
材を相互に閉じるように間隔を存して向き合わせた雌継
手と断面L字形のアングル材を相互に逆向きにして開く
ように合わせた雄継手とをそれぞれ左右側部で長手方向
に向かうように設け、これら雌継手と雄継手は先端部に
超硬ビットを取付け、ダウンザホールハンマーでの掘削
範囲から突出するこれら雌継手と雄継手相互の接続で先
行打設鋼管矢板をガイドに後行の鋼管矢板を打設し、鋼
管矢板の先端からでるダウンザホールハンマーのビット
部を拡径し、拡径後はダウンザホールハンマーで削孔打
設を開始し、削孔完了後、ビット部を縮径して鋼管矢板
内部のロッドおよびダウンザホールハンマーを引き上げ
ること、および雌継手は断面L字形のアングル材を相互
に閉じるように間隔を存して向き合わせたものであり、
雄継手は断面L字形のアングル材を相互に逆向きにして
開くように合わせたものであることを要旨とするもので
ある。According to the present invention, in order to achieve the above-mentioned object, the down-the-hole hammer used in the method of placing steel pipe sheet piles is such that the bit portion can be expanded in diameter.
A down-the-hole hammer and a rod attached to a pile driver are inserted into a steel pipe sheet pile, and the steel pipe sheet pile is opposed to a female joint and an L-shaped angle material which are spaced apart so as to close the L-shaped angle materials to each other. Male joints that are opened in opposite directions to each other are provided so as to extend in the longitudinal direction on the left and right sides, respectively, and these female joints and male joints are equipped with carbide bits at the tips and excavated with a down-the-hole hammer By connecting the female and male joints projecting from the range to each other, the succeeding steel pipe sheet pile is used as a guide to drive the succeeding steel pipe sheet pile, and the bit of the down-the-hole hammer coming out from the end of the steel pipe sheet pile is expanded to expand the diameter. After that, start drilling with a down-the-hole hammer.After drilling is completed, reduce the bit diameter and pull up the rod and down-the-hole hammer inside the steel pipe sheet pile. Hand are those that opposed at intervals so as to close the angle member of an L-shaped cross section with each other,
The gist of the male joint is that angle members having an L-shaped cross section are combined so as to be opened in opposite directions.
【0008】鋼管矢板の打設装置としては、ビット部は
掘削ビットを多数植設した三枚の水平な羽根状体が写真
機の絞りを構成するように相重ねる中心部に隙間を設け
るか否かで、縮径状態から拡径可能なものとし、さら
に、ビット部上方に該ビット部縮径時の径より径の大き
な係止部を設けたダウンザホールハンマーと、このダウ
ンザホールハンマーが挿入する鋼管矢板の先端内側に前
記ダウンザホールハンマーの係止部よりも鋼管矢板の内
径を小さくするような先端リングを設け、断面L字形の
アングル材を相互に閉じるように間隔を存して向き合わ
せた雌継手と断面L字形のアングル材を相互に逆向きに
して開くように合わせた雄継手とをそれぞれ左右側部で
長手方向に向かうように設け、これら雌継手と雄継手は
先端部に超硬ビットを取付けた鋼管矢板とからなるこ
と、および、雌継手は断面L字形のアングル材を相互に
閉じるように間隔を存して向き合わせたものであり、雄
継手は断面L字形のアングル材を相互に逆向きにして開
くように合わせたものであることを要旨とするものであ
る。In a steel sheet pile driving device, a bit portion is provided with a gap at a central portion where three horizontal blade-like members having a large number of excavating bits overlap each other so as to form an aperture of a camera. A down-the-hole hammer provided with a locking portion having a diameter larger than the diameter of the bit portion when the bit portion is reduced, and a steel sheet pile inserted by the down-the-hole hammer. A female joint which is provided with a distal end ring on the inner side of the distal end so as to make the inner diameter of the steel pipe sheet pile smaller than the locking portion of the down-the-hole hammer and faces each other at intervals so as to close the angle members having an L-shaped cross section to each other. Male joints in which angle members having an L-shaped cross section are opened in opposite directions to each other are provided so as to extend in the longitudinal direction on the left and right sides, respectively. The female joint is composed of angled members having an L-shaped cross section, and the male joint is formed by connecting the angle materials having an L-shaped cross section to each other. The gist of the invention is that it is adapted to be opened in the opposite direction.
【0009】本発明によれば、ビット部を拡径したダウ
ンザホールハンマーで鋼管矢板外径より僅かに大きい径
を削孔し、これにより鋼管矢板の先端抵抗および周辺摩
擦を小さくして削孔と同時に鋼管矢板の打設を行うこと
ができる。According to the present invention, a bit slightly larger than the outer diameter of a steel sheet pile is drilled with a down-the-hole hammer having an enlarged bit portion, thereby reducing the tip resistance and peripheral friction of the steel sheet pile to reduce drilling. A steel pipe sheet pile can be driven.
【0010】また、継手相互の接続で先行打設鋼管矢板
をガイドに精度良く後行鋼管矢板を打設でき、しかも、
継手先端部の超硬ビットで地山、岩等を切崩し、およ
び、先行打設鋼管矢板の継手内の根固めモルタル等の切
削、除去を行うことができる。[0010] Further, by connecting the joints to each other, the succeeding steel pipe sheet pile can be driven with high precision using the preceding steel pipe sheet pile as a guide.
The cemented carbide bit at the end of the joint can be used to break ground, rocks, etc., and to cut and remove root mortar and the like in the joint of the precast steel pipe sheet pile.
【0011】さらに、鋼管矢板に設けた先端リングはダ
ウンザホールハンマーの削孔位置ずれの防止を行い、先
行鋼管矢板の継手部に対するハンマービットによる破損
を防ぐとともに、ハンマーの振動打撃力を鋼管矢板に直
接伝達し、削孔と打込みとを確実に同時に行うことがで
きる。Further, the tip ring provided on the steel pipe sheet pile prevents the down-the-hole hammer drilling position from shifting, prevents the joint of the preceding steel pipe sheet pile from being damaged by the hammer bit, and applies the vibration impact force of the hammer directly to the steel pipe sheet pile. The transmission and the drilling and driving can be performed simultaneously and reliably.
【0012】[0012]
【発明の実施の形態】以下、図面にもとづいて本発明の
実施の形態を詳細に説明する。図1〜図7は本発明の鋼
管矢板の打設工法の1実施形態を示す各工程の側面図で
ある。Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 7 are side views of respective steps showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【0013】先に本発明の鋼管矢板の打設装置について
説明すると、図2、図3中1はエアー駆動の打撃機であ
るダウンザホールハンマーで、これはクローラ式の杭打
機2に装着した駆動装置(オーガーマシン)3から吊り
下げる。2 and 3, reference numeral 1 in FIG. 2 and FIG. 3 denotes a down-the-hole hammer, which is an air-driven hitting machine, which is mounted on a crawler type pile driving machine 2. It is suspended from the device (auger machine) 3.
【0014】そして図2に示すようにダウンザホールハ
ンマー1は削孔ロッド4の先端に配設され、図10〜図12
に示すようにビット部1aは掘削ビット5を多数植設し
た三枚の水平な羽根状体が写真機の絞りを構成するよう
に相重ねる中心部に隙間を設けるか否かで、縮径状態か
ら拡径可能なものとした。As shown in FIG. 2, the down-the-hole hammer 1 is disposed at the tip of the drilling rod 4, and
As shown in the figure, the bit portion 1a has a reduced diameter depending on whether or not a gap is provided at a central portion where three horizontal blade-like bodies in which a large number of drill bits 5 are planted overlap each other so as to form an aperture of a camera. The diameter can be expanded from.
【0015】図11はビット部1aの縮小状態であり、図
12は拡径状態であり、駆動装置3の回転力を削孔ロッド
4を介してダウンザホールハンマー1に伝える際に右に
回転させることで拡径状態となり、左に回転させること
で縮径状態となる。FIG. 11 shows a reduced state of the bit portion 1a.
Reference numeral 12 denotes a diameter-expanded state. When the rotational force of the driving device 3 is transmitted to the down-the-hole hammer 1 through the drilling rod 4, the diameter is increased by rotating to the right, and the diameter is reduced by rotating to the left. Become.
【0016】さらに、図8、図9に示すようにダウンザ
ホールハンマー1はビット部1aの上方で削孔ロッド4
との間に該ビット部1aの縮径時の径より径の大きな係
止部9を設けた。Further, as shown in FIGS. 8 and 9, the down-the-hole hammer 1 has a drill rod 4 above the bit portion 1a.
A locking portion 9 having a diameter larger than that of the bit portion 1a when the diameter of the bit portion 1a is reduced is provided.
【0017】6はダウンザホールハンマー1および削孔
ロッド4が挿通可能な鋼管矢板で、図13〜図15に示すよ
うに断面L字形のアングル材を相互に閉じるように間隔
を存して向き合わせた雌継手7aと断面L字形のアング
ル材を相互に逆向きにして開くように合わせた雄継手7
bとをそれぞれ左右側部で長手方向に向かうように設け
ている。Numeral 6 denotes a steel pipe sheet pile through which the down-the-hole hammer 1 and the drilling rod 4 can be inserted. As shown in FIGS. 13 to 15, angle members having an L-shaped cross section are opposed to each other with a gap therebetween. A male joint 7 in which a female joint 7a and an angle member having an L-shaped cross section are opened in opposite directions to each other.
and b are provided so as to extend in the longitudinal direction on the left and right sides, respectively.
【0018】また、これら雌継手7a、雄継手7bは先
端部に超硬ビット8を取付けた。この超硬ビット8の部
分も継手を構成するものであり、雌継手7a、雄継手7
bは形状を異とするビットである。Each of the female joint 7a and the male joint 7b has a carbide bit 8 at the tip. The part of the carbide bit 8 also constitutes a joint, and the female joint 7a and the male joint 7
b is a bit having a different shape.
【0019】これに加えて、鋼管矢板6の先端内側に前
記ダウンザホールハンマー1の係止部9の外径よりも鋼
管矢板の内径を小さくするような先端リング10を設け
た。In addition, a tip ring 10 is provided inside the tip of the steel sheet pile 6 so as to make the inner diameter of the steel sheet pile smaller than the outer diameter of the locking portion 9 of the down-the-hole hammer 1.
【0020】次に前記打設を用いて行う本発明の鋼管矢
板の打設工法について説明する。まず、図1に示すよう
に仮受架台11に鋼管矢板6をクローラクレーン12を用い
て吊込みを行い、頭部で仮受けをする。Next, a method of driving a steel pipe sheet pile according to the present invention using the above-described driving will be described. First, as shown in FIG. 1, the steel pipe sheet pile 6 is hung on the temporary receiving stand 11 using the crawler crane 12, and temporarily received by the head.
【0021】図2に示すように杭打機2を用いて、杭打
機2に装着したダウンザホールハンマー1及び削孔ロッ
ド4を前記仮受けした鋼管矢板6内に挿入する。この時
にはハンマーのビット部1aは図8に示すように縮径し
た状態である。As shown in FIG. 2, the down-the-hole hammer 1 and the drilling rod 4 mounted on the pile driver 2 are inserted into the temporarily received steel pipe sheet pile 6 using the pile driver 2. At this time, the diameter of the bit portion 1a of the hammer is reduced as shown in FIG.
【0022】図3に示すように杭打機2の補巻ワイヤー
13で鋼管矢板6を吊上げ、かつ、駆動装置(オーガーマ
シン)3、削孔ロッド4、ダウンザホールハンマー1を
同時に巻上げ、鋼管矢板6の先端から出たビット部1a
を拡径する。As shown in FIG. 3, the auxiliary winding wire of the pile driver 2
13, the steel pipe sheet pile 6 is lifted, and at the same time, the drive unit (auger machine) 3, the drilling rod 4, and the down-the-hole hammer 1 are wound up, and the bit part 1a protruding from the tip of the steel pipe sheet pile 6
Expand the diameter.
【0023】図4に示すように拡径後は鋼管矢板6をあ
ずけ、オーガー側で鋼管矢板6を吊上げる。As shown in FIG. 4, after the diameter is expanded, the steel pipe sheet pile 6 is left behind, and the steel pipe sheet pile 6 is lifted on the auger side.
【0024】図5に示すように鋼管矢板6を所定の場所
に移動し、建込みを行い、図6に示すように打設場所の
杭芯を出し、両側に導材14をセットし、鋼管の傾きに注
意しながら削孔打設を開始する。As shown in FIG. 5, the steel pipe sheet pile 6 is moved to a predetermined place, erection is performed, and the pile core at the setting place is taken out as shown in FIG. Start drilling while paying attention to the inclination of.
【0025】この場合、図13〜図15に示すように先行打
設した鋼管矢板6に対して後行打設する鋼管矢板6は雌
継手7aと雄継手7bとの係合で先行打設した鋼管矢板
6をガイドに打設できる。In this case, as shown in FIGS. 13 to 15, the steel pipe sheet pile 6 to be driven after the steel pipe sheet pile 6 which was previously driven was previously driven by engaging the female joint 7a and the male joint 7b. The steel pipe sheet pile 6 can be driven into the guide.
【0026】なお、図14中αはダウンザホールハンマー
1での掘削範囲を示すが、前記雌継手7aと雄継手7b
はこの範囲から突出する。前記雌継手7a、雄継手7b
の先端部に設けた超硬ビット8は前記ダウンザホールハ
ンマー1での掘削範囲から外れた部分の地山、岩等の切
崩し、および、先行打設した鋼管矢板の継手内の根固め
モルタル等の切削、除去を行う。In FIG. 14, α indicates the excavation range of the down-the-hole hammer 1, and the female joint 7a and the male joint 7b
Protrudes from this range. The female joint 7a and the male joint 7b
Carbide bit 8 provided at the tip of the head is used to cut off the ground, rocks, etc. at a portion outside the excavation range of the down-the-hole hammer 1 and to fix mortar, etc. in the joint of the steel pipe sheet pile previously cast. Perform cutting and removal.
【0027】図7に示すように、削孔完了後、ダウンザ
ホールハンマー1及び削孔ロッド4を逆転し、ビット部
1aを縮径して鋼管矢板6の内部から削孔ロッド4およ
びダウンザホールハンマー1を引き上げる。As shown in FIG. 7, after drilling is completed, the down-the-hole hammer 1 and the drilling rod 4 are reversed, the diameter of the bit portion 1a is reduced, and the drilling rod 4 and the down-the-hole hammer 1 are removed from the inside of the steel pipe sheet pile 6. Pull up.
【0028】図示は省略するがかかる引き上げ後、根固
めモルタルを地上より鋼管矢板内に圧送して打設し、ま
た、雌継手7aと雄継手7bの継手部内は洗浄、清掃後
ポリパイプを用いて止水剤注入袋を挿入し、この注入袋
内に有孔塩ビパイプを挿入し、塩ビパイプ口元より混合
ウレタン液を流し込み、口元まで充填することになり、
止水を行う。Although not shown in the drawings, after the lifting, the mortar is squeezed into the steel pipe sheet pile from the ground and driven into the pile. The joints of the female joint 7a and the male joint 7b are washed and cleaned, and then a polypipe is used. Insert the waterproofing agent injection bag, insert a perforated PVC pipe into this injection bag, pour the mixed urethane liquid from the PVC pipe mouth, and fill up to the mouth,
Stop water.
【0029】[0029]
【発明の効果】以上述べたように本発明の鋼管矢板の打
設工法および装置は、従来の置替え工法の場合と比べて
掘削・削孔範囲が鋼管矢板外径に近接させることがで
き、しかも、良質土砂に置換える工程を経ずに掘削・削
孔と同時に1工程で鋼管矢板の打設を大掛かりの仮設設
備を用いずとも精度良く行うことができるものである。As described above, according to the present invention, the excavation and drilling range can be made closer to the outer diameter of the steel sheet pile, compared with the conventional replacement method. Moreover, the excavation and drilling can be performed simultaneously with excavation and drilling in a single step without using a large-scale temporary facility, without using a large-scale temporary facility.
【図1】本発明の鋼管矢板の打設工法の1実施形態を示
す第1工程の縦断側面図である。FIG. 1 is a longitudinal sectional side view of a first step showing one embodiment of a steel pipe sheet pile driving method according to the present invention.
【図2】本発明の鋼管矢板の打設工法の1実施形態を示
す第2工程の縦断側面図である。FIG. 2 is a vertical sectional side view of a second step showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【図3】本発明の鋼管矢板の打設工法の1実施形態を示
す第3工程の縦断側面図である。FIG. 3 is a vertical sectional side view of a third step showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【図4】本発明の鋼管矢板の打設工法の1実施形態を示
す第4工程の縦断側面図である。FIG. 4 is a vertical sectional side view of a fourth step showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【図5】本発明の鋼管矢板の打設工法の1実施形態を示
す第5工程の縦断側面図である。FIG. 5 is a vertical sectional side view of a fifth step showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【図6】本発明の鋼管矢板の打設工法の1実施形態を示
す第6工程の縦断側面図である。FIG. 6 is a vertical sectional side view of a sixth step showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【図7】本発明の鋼管矢板の打設工法の1実施形態を示
す第7工程の縦断側面図である。FIG. 7 is a vertical sectional side view of a seventh step showing one embodiment of the steel pipe sheet pile driving method of the present invention.
【図8】図3のA部の拡大で、縮径時の縦断側面図であ
る。8 is an enlarged side view of a portion A in FIG. 3 when the diameter is reduced.
【図9】図3のA部の拡大で、拡径時の縦断側面図であ
る。9 is an enlarged view of a portion A in FIG. 3 and is a longitudinal sectional side view when the diameter is enlarged.
【図10】使用するダウンザホールハンマーの一部切欠
いた側面図である。FIG. 10 is a partially cutaway side view of a down-the-hole hammer to be used.
【図11】使用するダウンザホールハンマーの縮径時の
底面図である。FIG. 11 is a bottom view of the down-the-hole hammer used when the diameter is reduced.
【図12】使用するダウンザホールハンマーの拡径時の
底面図である。FIG. 12 is a bottom view of the down-the-hole hammer used when the diameter is expanded.
【図13】鋼管矢板の打設状態を示す平面図である。FIG. 13 is a plan view showing a driving state of a steel pipe sheet pile.
【図14】鋼管矢板の継手の詳細を示す平面図である。FIG. 14 is a plan view showing details of a joint of a steel pipe sheet pile.
【図15】鋼管矢板の打設状態を示す側面図である。FIG. 15 is a side view showing a driving state of a steel pipe sheet pile.
1…ダウンザホールハンマー 1a…ビット部 2…杭打機 3…駆動装置 4…削孔ロッド 5…掘削ビット 6…鋼管矢板 7a…雌継手 7b…雄継手 8…超硬ビット 9…係止部 10…先端リング 11…仮受架台 12…クローラク
レーン 13…補巻ワイヤー 14…導材DESCRIPTION OF SYMBOLS 1 ... Down the hole hammer 1a ... Bit part 2 ... Pile driver 3 ... Driver 4 ... Drilling rod 5 ... Drilling bit 6 ... Steel pipe sheet pile 7a ... Female joint 7b ... Male joint 8 ... Carbide bit 9 ... Locking part 10 ... Tip ring 11 ... Temporary support stand 12 ... Crawler crane 13 ... Supplementary wire 14 ... Conduction material
───────────────────────────────────────────────────── フロントページの続き (72)発明者 黒岩 憲二 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社 関西支店内 (72)発明者 河原 圭司 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社 関西支店内 (72)発明者 宇留島 千明 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社 関西支店内 (72)発明者 中室 貞幸 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社 関西支店内 (72)発明者 廣川 強士 大阪府大阪市北区中之島三丁目3番22号 関西電力株式会社内 (72)発明者 横山 弘介 兵庫県佐用郡佐用町山脇501 株式会社 横山基礎工事内 (72)発明者 林 猛 岐阜県安八郡神戸町大字横井字中新田 1528番地三菱マテリアル株式会社 岐阜 製作所内 (56)参考文献 特開 平5−311654(JP,A) 特開 平7−252829(JP,A) 特開 昭55−136328(JP,A) 特開 平9−49388(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 7/00 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Kenji Kuroiwa 1-3-15 Awaza, Nishi-ku, Osaka-shi, Osaka Kashima Construction Co., Ltd. Kansai Branch (72) Keiji Kawahara 1-3-3 Awaza, Nishi-ku, Osaka-shi, Osaka No.15 Kashima Construction Co., Ltd.Kansai Branch (72) Inventor Chiaki Uruma 1-3-15 Awaza, Nishi-ku, Osaka-shi, Osaka Prefecture Kashima Construction Co., Ltd.Kansai Branch (72) Inventor, Sadayuki Nakamuro 1-3-15 Kashima Construction Co., Ltd.Kansai Branch (72) Inventor Takeshi Hirokawa 3-2-2 Nakanoshima, Kita-ku, Osaka-shi, Osaka Kansai Electric Power Co., Inc. (72) Inventor Kosuke Yokoyama Sayo-gun, Hyogo Prefecture 501 Yamayo, Sayocho Inside Yokoyama Foundation (72) Inventor Takeshi Hayashi Kobe-cho, Anpachi-gun, Gifu Prefecture (56) References JP-A-5-311654 (JP, A) JP-A-7-252829 (JP, A) JP-A-55-136328 (JP, A) JP-A-9-49388 ( JP, A) (58) Fields surveyed (Int. Cl. 7 , DB name) E02D 7/00
Claims (4)
ト部が拡径可能なものとし、杭打機に装着したダウンザ
ホールハンマー及びロッドを鋼管矢板内に挿入し、鋼管
矢板は雌継手と雄継手とをそれぞれ左右側部で長手方向
に向かうように設け、これら雌継手と雄継手は先端部に
超硬ビットを取付け、ダウンザホールハンマーでの掘削
範囲から突出するこれら雌継手と雄継手相互の接続で先
行打設鋼管矢板をガイドに後行の鋼管矢板を打設し、鋼
管矢板の先端からでるダウンザホールハンマーのビット
部を拡径し、拡径後はダウンザホールハンマーで削孔打
設を開始し、削孔完了後、ビット部を縮径して鋼管矢板
内部のロッドおよびダウンザホールハンマーを引き上げ
ることを特徴とする鋼管矢板の打設工法。The down-the-hole hammer used has a bit portion capable of expanding in diameter, and a down-the-hole hammer and a rod attached to a pile driver are inserted into a steel pipe sheet pile. The female joint and male joint are provided with carbide bits at the tips, and they are protruded from the excavation area with a down-the-hole hammer. Driving a steel pipe sheet pile with the sheet pile as a guide, expanding the bit of the down-the-hole hammer coming out from the tip of the steel sheet pile, starting drilling with the down-the-hole hammer after the diameter expansion, and after completing the drilling, A method of placing steel pipe sheet piles, characterized in that a bit portion is reduced in diameter and a rod and a down-the-hole hammer inside the steel pipe sheet piles are pulled up.
に閉じるように間隔を存して向き合わせたものであり、
雄継手は断面L字形のアングル材を相互に逆向きにして
開くように合わせたものである請求項1記載の鋼管矢板
の打設工法。2. The female joint is formed by facing angle members having an L-shaped cross section at intervals so as to close each other.
2. The method according to claim 1, wherein the male joint is formed by opening angle members having an L-shaped cross section in a direction opposite to each other.
枚の水平な羽根状体が写真機の絞りを構成するように相
重ねる中心部に隙間を設けるか否かで、縮径状態から拡
径可能なものとし、さらに、ビット部上方に該ビット部
縮径時の径より径の大きな係止部を設けたダウンザホー
ルハンマーと、このダウンザホールハンマーが挿入する
鋼管矢板の先端内側に前記ダウンザホールハンマーの係
止部よりも鋼管矢板の内径を小さくするような先端リン
グを設け、雌継手と雄継手とをそれぞれ左右側部で長手
方向に向かうように設け、これら雌継手と雄継手は先端
部に超硬ビットを取付けた鋼管矢板とからなることを特
徴とした鋼管矢板の打設装置。3. A bit portion is determined from whether or not a diameter is reduced by determining whether or not a gap is provided at a central portion where three horizontal blade-like members having a large number of excavated bits planted therein constitute a stop of a camera. A down-the-hole hammer provided with an engagement portion having a diameter larger than the diameter of the bit portion when the bit portion is reduced, and a down-the-hole hammer provided inside a tip end of a steel pipe sheet pile into which the down-the-hole hammer is inserted; A tip ring that makes the inside diameter of the steel pipe sheet pile smaller than the locking part of the female joint is provided, and a female joint and a male joint are provided so as to extend in the longitudinal direction on the left and right sides, respectively. A steel pipe sheet pile driving device comprising a steel pipe sheet pile having a carbide bit attached thereto.
に閉じるように間隔を存して向き合わせたものであり、
雄継手は断面L字形のアングル材を相互に逆向きにして
開くように合わせたものである請求項3記載の鋼管矢板
の打設装置。4. The female joint is one in which angle members having an L-shaped cross section are opposed to each other at intervals so as to close each other.
4. The steel pipe sheet pile driving device according to claim 3, wherein the male joint is formed by opening angle members having an L-shaped cross section in opposite directions.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11883996A JP3165997B2 (en) | 1996-05-14 | 1996-05-14 | Casting method and equipment for sheet piles |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11883996A JP3165997B2 (en) | 1996-05-14 | 1996-05-14 | Casting method and equipment for sheet piles |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH09302654A JPH09302654A (en) | 1997-11-25 |
| JP3165997B2 true JP3165997B2 (en) | 2001-05-14 |
Family
ID=14746438
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11883996A Expired - Fee Related JP3165997B2 (en) | 1996-05-14 | 1996-05-14 | Casting method and equipment for sheet piles |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3165997B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4875318B2 (en) * | 2005-06-10 | 2012-02-15 | 株式会社横山基礎工事 | Protection method for the foundation of floating structures |
| JP2011021374A (en) * | 2009-07-15 | 2011-02-03 | Tokunagagumi:Kk | Sheet pile jacking method |
| JP6007036B2 (en) * | 2012-09-09 | 2016-10-12 | 株式会社横山基礎工事 | Steel pipe sheet pile placing method |
| CN107119685A (en) * | 2017-04-18 | 2017-09-01 | 中冶天工集团天津有限公司 | A kind of broken pile device and its construction method for for Static pressure pile driver abolish pile crown |
| JP6943633B2 (en) * | 2017-06-01 | 2021-10-06 | 株式会社横山基礎工事 | Ring-shaped tip hardware and middle digging pile method using it |
| CN107268561A (en) * | 2017-07-12 | 2017-10-20 | 尹俊 | Load-bearing operation platform and its installation method waterborne |
-
1996
- 1996-05-14 JP JP11883996A patent/JP3165997B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH09302654A (en) | 1997-11-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6886717B2 (en) | Construction method of steel pipe pile | |
| JP6774132B1 (en) | Construction method of steel pipe pile | |
| JP6319935B2 (en) | Tubing pile driving method | |
| JP3165997B2 (en) | Casting method and equipment for sheet piles | |
| JP4074198B2 (en) | How to remove existing piles | |
| JP2022078926A (en) | Existing pile pulling out device and sediment back-filling device, and existing pile pulling out method and sediment back-filling method | |
| JP2003082663A (en) | Pile driving device | |
| JP2003027469A (en) | Steel pipe pile, foundation pile producing method using the same and device of the method | |
| JP2005220573A (en) | Pile driving method | |
| JPH0428078B2 (en) | ||
| JPS60119816A (en) | Formation of continuous pile | |
| JPS5827366B2 (en) | Head reinforcement pile construction equipment | |
| JPH05171654A (en) | Execution construction of landslid protection pile and execution method | |
| JP6729902B1 (en) | Construction method of soil cement continuous wall | |
| JP2006009468A (en) | Driving method of medium digging type steel pipe sheet pile and steel pipe sheet pile used therefor | |
| JPH0663413B2 (en) | Drilling bit device and drilling method | |
| JP3343501B2 (en) | Excavation method | |
| JP3221895B2 (en) | Construction method of large-diameter underground wall body and excavation equipment for burying pipes | |
| JP3708795B2 (en) | Casing placement method | |
| JP3052195B2 (en) | Drilling method and equipment for large diameter pits | |
| JPH0321719A (en) | Pile driving method | |
| JP2002167759A (en) | Execution method of foundation pile | |
| JPH0224419A (en) | Pile extraction and backfilling method and pile extraction machine | |
| JP2005226268A (en) | Method for placing steel pipe sheet pile | |
| JPH0344612B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20010206 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100309 Year of fee payment: 9 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100309 Year of fee payment: 9 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130309 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130309 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160309 Year of fee payment: 15 |
|
| LAPS | Cancellation because of no payment of annual fees |